ATTACHMENT D- Base Offer Price Breakdown Form-Renovate Surgical Suite Phase II.pdf

PDF 262 KB Posted

Attached to
Z1DA--Renovate Surgical Suite Phase II
Solicitation number
36C24626R0039
Issued by

About this file

This is a Base Proposal Item Price Breakdown Form for a federal construction solicitation. The form is Solicitation Attachment D for RFP Number 36C24626R0039, Project 658-19-103, titled "Renovate Surgical Suite Phase II." The offeror must complete pricing information organized by the 2020 MasterFormat divisions, which cover all construction trades and systems including general requirements, concrete, masonry, metals, wood, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, transportation, and electrical power generation.

The form requires offerors to break down costs by labor and material for each division, with a total cost column for each line item. After completing the divisions subtotal, offerors must calculate overhead, profit, and insurance as separate line items with designated percentages. The form includes rows for bond percentage, overhead percentage, profit percentage, and insurance and taxes percentage, followed by a subtotal and final total base proposal item price. The template is designed to ensure consistent pricing presentation and detailed cost transparency across all construction scopes for the surgical suite renovation project.

View the file

Other files

File Type Posted
S04- Renovate Surgical Suite Ph 2- Site Visit Sign In Sheet.pdf PDF
S06-36C24626R0039 0007-Renovate Surgical Suite Phase II.pdf PDF
E-602.pdf PDF
Additional RFIs 658-19-103 Renovate Surgical II 2026-05-15-26.pdf PDF
231000-Facility Fuel Oil Systems.pdf PDF
263213 01-2018 Engine Generators - Updated.pdf PDF
S06- Renovate Surgical Suite Phase II-36C24626R0039 0006.pdf PDF
S06- Renovate Surgical Suite Phase II-36C24626R0039 0005.pdf PDF
Bldg.143-36 1st Level Zone C D Dimension Plan- 117.pdf PDF
S06- Renovate Surigcal Suite Phase II- 36C24626R0039 0004.pdf PDF
20260430.1215.08.PDT_Miller-R_to_Departme_658-19-103RenovateSurgica.zip ZIP file
Bldg.143-105 Partition Types- 117.pdf PDF
019100 General Commissiong Requirements 5.1.26.pdf PDF
Bldg.143-39 1st Level Zone D Dimension Plan-117.pdf PDF
S06-36C24626R0039 0003- Renovate Surgical Suite Phase II.pdf PDF
S06-36C24626R0039 0002-Renovate Surgical Suite Phase II.pdf PDF
S06-36C24626R0039 0001-Renovate Surgical Suite Phase II.pdf PDF
ATTACHMENT A- Architectural Drawings.pdf PDF
ATTACHMENT E - Salem VA Medical Center Map.pdf PDF
S02-36C24626R0039-Solicitation-Renovate Surgical Suite Phase II-Final.pdf PDF
ATTACHMENT B3-658-19-103 - RenovateSurgicalSuitePhaseII - Specs - Volume 3.pdf PDF
ATTACHMENT B-658-19-103-RenovateSurgicalSuitePhaseII - Specs - Volume 1.pdf PDF
ATTACHMENT A4- GeneralCivilStructural Drawings.pdf PDF
ATTACHMENT A2- ElectricalFireAlarm Drawings.pdf PDF
ATTACHMENT B2-658-19-103 - RenovateSurgicalSuitePhaseII - Specs - Volume 2.pdf PDF
ATTACHMENT C- Davis Bacon Act- Wage Determination VA20260172.pdf PDF
ATTACHEMENT A5- Mechanical Drawings.pdf PDF
ATTACHMENT A3- FireSuppressionPlumbing Drawings.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE II - SOLICITATION ATTACHMENT D

BASE PROPOSAL ITEM PRICE BREAKDOWN FORM

RFP NUMBER: 36C24626R0039

PROJECT NO./TITLE: 658-19- 103, Renovate Surgical Suite Phase II

OFFEROR:

ITEM DESCRIPTION Labor Material Total Cost

Division 1 General Requirements

Division 2 Existing Conditions

Division 3 Concrete

Division 4 Masonry

Division 5 Metals

Division 6 Wood and Plastic

Division 7 Thermal & Moisture Protect

Division 8 Openings

Division 9 Finishes

Division 10 Specialties

Division 11 Equipment

Division 12 Furnishings

Division 13 Special Construction

Division 14 Conveying Equipment

Division 21 Fire Suppression

Division 22 Plumbing

Division 23 HVAC

Division 25 Integrated Automation

Division 26 Electrical

Division 27 Communications

Division 28 Electronic Safety & Security

Division 31 Earthwork

Division 32 Exterior Improvements

Division 33 Utilities

Division 34 Transportation

Division 48 Electrical Power Generation

Divisions Subtotal:

Overhead/Profit and Insurance

Bond (___%)

Overhead (___%)

Profit (___%)

Insurance and Taxes (___%)

Subtotal:

TOTAL BASE PROPOSAL ITEM PRICE

File details come from the government source that posted it. Updated .