Summary of Bid Documents for Renovate Surgical Suite Phase II

This is a comprehensive set of construction bid documents for the Renovate Surgical Suite Phase II project at Salem VA Medical Center, Building 143. The project involves modifications to the existing fire suppression and plumbing systems across a four-phase renovation of the surgical suite on the first floor. The contract is issued by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, with Jon Manninen serving as the Contracting Officer's Representative (COR). The project number is 2617, and the VA drawing number is 0499-0136 with document number 658-19-103.

The fire suppression scope includes modifications to the existing system serving the project area and installation of a new wet-pipe sprinkler system for the generator building. All work must comply with NFPA 13 (2022 Edition), IBC 2021, NFPA 70 (2020 Edition), NFPA 101 (2021 Edition), NFPA 241 (2022 Edition), and VA-PG-18-10 Fire Protection Design Manual (November 2023). The system will serve areas with light hazard (0.10 GPM/SF over 1500 SF), ordinary hazard groups 1-2 (0.15-0.20 GPM/SF over 1500 SF), and extra hazard group 1 (0.30 GPM/SF over 2500 SF) classifications. Building 143 has an existing 750 GPM @ 85 PSI fire pump in the sub-basement that will serve the new system. Sprinkler piping includes black steel Schedule 40 with threaded connections for pipes 2 inches and smaller, and black steel Schedule 10 with grooved connections for larger pipes. The contractor must provide hydraulic calculations, scaled working drawings, and commissioning in accordance with NFPA 13 and 25, with calculated demand falling no less than 10 percent below the available water supply curve. The project is divided into four construction phases, each requiring maintenance of NFPA 13 compliance and coordination with existing systems outside the work area.

The plumbing scope encompasses domestic hot and cold water distribution, sanitary and vent piping, medical gas systems (oxygen, medical air, nitrogen, nitrous oxide, CO2, and waste anesthesia gas disposal), and specialized fixtures for surgical suites and patient care areas. Medical gas systems utilize zone valve boxes (ZVBs) and medical gas headwalls (MGHs) with FM-approved quick response sprinklers and standard response sprinklers in specified equipment rooms. The contractor must coordinate all piping with HVAC ductwork, electrical systems, and structural elements, maintaining proper clearances and avoiding interference with access doors. All penetrations through fire-rated barriers must be sealed with listed fire-stop systems. Dead legs in domestic water piping must be removed or limited to 1.5 times the pipe diameter. The plumbing work includes installation of circuit setters for temperature control and removal of obsolete piping. All work must comply with the International Plumbing Code, ASPE standards, and VA construction and facilities management specifications. Four-phase coordination is required to maintain system continuity and NFPA compliance throughout renovation activities.

View the file

Other files

File Type Posted
S04- Renovate Surgical Suite Ph 2- Site Visit Sign In Sheet.pdf PDF
S06-36C24626R0039 0007-Renovate Surgical Suite Phase II.pdf PDF
E-602.pdf PDF
Additional RFIs 658-19-103 Renovate Surgical II 2026-05-15-26.pdf PDF
231000-Facility Fuel Oil Systems.pdf PDF
263213 01-2018 Engine Generators - Updated.pdf PDF
S06- Renovate Surgical Suite Phase II-36C24626R0039 0006.pdf PDF
S06- Renovate Surgical Suite Phase II-36C24626R0039 0005.pdf PDF
Bldg.143-36 1st Level Zone C D Dimension Plan- 117.pdf PDF
S06- Renovate Surigcal Suite Phase II- 36C24626R0039 0004.pdf PDF
20260430.1215.08.PDT_Miller-R_to_Departme_658-19-103RenovateSurgica.zip ZIP file
Bldg.143-105 Partition Types- 117.pdf PDF
019100 General Commissiong Requirements 5.1.26.pdf PDF
Bldg.143-39 1st Level Zone D Dimension Plan-117.pdf PDF
S06-36C24626R0039 0003- Renovate Surgical Suite Phase II.pdf PDF
S06-36C24626R0039 0002-Renovate Surgical Suite Phase II.pdf PDF
S06-36C24626R0039 0001-Renovate Surgical Suite Phase II.pdf PDF
ATTACHMENT A- Architectural Drawings.pdf PDF
ATTACHMENT E - Salem VA Medical Center Map.pdf PDF
S02-36C24626R0039-Solicitation-Renovate Surgical Suite Phase II-Final.pdf PDF
ATTACHMENT B3-658-19-103 - RenovateSurgicalSuitePhaseII - Specs - Volume 3.pdf PDF
ATTACHMENT B-658-19-103-RenovateSurgicalSuitePhaseII - Specs - Volume 1.pdf PDF
ATTACHMENT A4- GeneralCivilStructural Drawings.pdf PDF
ATTACHMENT D- Base Offer Price Breakdown Form-Renovate Surgical Suite Phase II.pdf PDF
ATTACHMENT A2- ElectricalFireAlarm Drawings.pdf PDF
ATTACHMENT B2-658-19-103 - RenovateSurgicalSuitePhaseII - Specs - Volume 2.pdf PDF
ATTACHMENT C- Davis Bacon Act- Wage Determination VA20260172.pdf PDF
ATTACHEMENT A5- Mechanical Drawings.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPRINKLER PIPE

ELBOW

TEE

CHECK VALVE

CONTROL VALVE

WATERFLOW INDICATOR

RISER CHECK VALVE

BACKFLOW PREVENTER

ORDINARY HAZARD GROUP 1

ORDINARY HAZARD GROUP 2

EXTRA HAZARD GROUP 1

FIRE DEPARTMENT

CONNECTION

ZONE BOUNDARY

VA Drawing Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t o n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t th re e in c h o n e f o o t

Architecture:

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

M-R PROJECT NO:

Project Number

Fire & Life Safety:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:3

P M

FX001

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

Jon Manninen, COR

2025-12-30 PJ CA

BID DOCUMENTS

FULLY SPRINKLERED

0499-0136

658-19-103

FIRE SUPPRESSION

COVER SHEET

FIRE SUPPRESSION ABBREVIATIONS

FIRE SUPPRESSION LEGEND

(EXISTING, DEMOLITION, NEW WORK)

FIRE SUPPRESSION GENERAL NOTES

1. THE FIRE PROTECTION SCOPE OF WORK INVOLVES MODIFICATIONS TO THE EXISTING FIRE SUPPRESSION SYSTEM SERVING THE AREAS IN THE PROJECT SCOPE OF WORK BOUNDARY AS INDICATED ON THE DRAWINGS AND PROVIDING A NEW WET

PIPE SPRINKLER SYSTEM TO SERVE THE GENERATOR BUILDING.

2. ALL AREAS ARE TO BE PROTECTED WITH AUTOMATIC SPRINKLER SYSTEMS UNLESS OTHERWISE NOTED.

3. SYSTEMS SHALL BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AS WELL AS THE FOLLOWING CODES AND STANDARDS:

A. CRITERIA IN VA-PG-18-10 FIRE PROTECTION DESIGN MANUAL (NOVEMBER 2023)

B. IBC - INTERNATIONAL BUILDING CODE, 2021

C. NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2022 EDITION

D. NFPA 70 - NATIONAL ELECTRIC CODE, 2020 EDITION

E. NFPA 101 - LIFE SAFETY CODE, 2021 EDITION

F. NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, 2022 EDITION

4. PROVIDE A COMPLETE, AUTOMATIC WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 REQUIREMENTS AND VA STANDARDS IN ALL AREAS AS NOTED ON PLANS.

5. BUILDING 143 HAS AN EXISTING TO REMAIN 750 GPM @ 85 PSI RATED FIRE PUMP LOCATED IN THE SUB-BASEMENT.

6. IN GENERAL, SPRINKLERS SHALL BE ARRANGED FOR A MAXIMUM COVERAGE OF UNDER 225 SQUARE FEET PER HEAD FOR LIGHT HAZARD OCCUPANCIES AND 130 SQUARE FEET PER HEAD FOR ORDINARY HAZARD OCCUPANCIES AND 100 SF FOR EXTRA HAZARD OCCUPANCIES. COORDINATE WITH OTHER DISCIPLINES TO AVOID OBSTRUCTIONS SUCH AS LIGHTS, DIFFUSERS, ETC.

7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE PIPING AND SPRINKLER HEADS FOR PROPER COVERAGE IN EACH AREA AND ADD ADDITIONAL HEADS TO OBTAIN PROPER COVERAGE AS REQUIRED BY VARIATIONS IN FIELD LOCATIONS AND OBSTRUCTIONS AT NO ADDITIONAL COST TO OWNER. OBTAIN FINAL APPROVED ARCHITECTURAL LAYOUTS BEFORE LAYING OUT WORKING DRAWINGS.

8. PAINT AND LABEL ALL NEW SPRINKLER PIPE IN ACCORDANCE WITH SPECIFICATION 21 13 13.

9. IN UNFINISHED ROOMS WITH NO CEILING PROVIDE UPRIGHT TYPE SPRINKLER HEADS. COORDINATE HEAD LOCATIONS WITH HVAC CONTRACTOR TO MAINTAIN ADEQUATE COVERAGE ABOVE AND BELOW LARGE DUCTWORK AND OTHER OBSTRUCTIONS

AS GOVERNED BY NFPA 13.

10. CONTRACTOR SHALL SEAL ALL PIPE WALL AND FLOOR PENETRATIONS IN FIRE RATED BARRIERS WITH A LISTED FIRE STOP SYSTEM. SEE ARCHITECTURAL LIFE SAFETY PLAN FOR LOCATIONS OF SMOKE AND FIRE RATED PARTITIONS AND BARRIERS.

11. COORDINATE SPRINKLER PIPE RUNS WITH DUCTWORK, PLUMBING PIPING, AND LIGHTS. MAINTAIN 4'' CLEAR ABOVE LIGHTS. DO NO INTERFERE WITH DUCT ACCESS DOORS.

12. PIPE SIZES 2” AND SMALLER SHALL BE BLACK STEEL SCHEDULE 40 WITH THREADED END CONNECTIONS. PIPE SIZES 2.5” AND LARGER SHALL BE BLACK STEEL SCHEDULE 10 WITH GROOVED CONNECTIONS. GROOVES IN SCHEDULE 10 PIPING SHALL BE ROLLED GROOVED ONLY. HANGERS SHALL BE IN ACCORDANCE WITH NFPA 13. PROVIDE DRY SPRINKLER DROPS TO AREAS SUBJECT TO FREEZING. SPRINKLERS IN AREAS WITHOUT CEILINGS SHALL HAVE ROUGH BRASS OR FACTORY STANDARD

FINISH. ALL COMPONENTS SHALL BE UL LISTED AND FM APPROVED.

13. FLUSH, TEST, AND INSPECT WATER SUPPLY AND SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND 25. COMMISSION SYSTEM IN ACCORDANCE WITH MANUFACTURER, NFPA 13, COR, AND COMMISSIONING AGENT REQUIREMENTS. PROVIDE COPIES OF O&M MANUALS, CORRECTED SUBMITTALS, AS-BUILT SHOP DRAWINGS, AND TWO COPIES OF NFPA 25 TO OWNER, PROVIDE SYSTEM MAINTENANCE AND OPERATION INSTRUCTIONS TO OWNER'S PERSONNEL. SCHEDULE ACCEPTANCE TESTING TO BE WITNESSED BY CONTRACTING OFFICER'S REPRESENTATIVE (COR). PROVIDE CONTRACTOR'S CERTIFICATION AND TESTING PAPERWORK PER NFPA 13 AND 25.

14. HYDRAULICALLY DESIGN SYSTEM PER NFPA 13 AND IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND VA FIRE PROTECTION DESIGN MANUAL. CALCULATED DEMAND INCLUDING HOSE STREAM REQUIREMENTS SHALL FALL NO LESS THAN 10 PERCENT BELOW THE AVAILABLE WATER SUPPLY CURVE. PROVIDE A NEW FLOW TEST IN ACCORDANCE WITH NFPA 13 AND NFPA 291 PROCEDURES. SUBMIT HYDRAULIC CALCULATIONS TO CONTRACTING OFFICER'S REPRESENTATIVE (COR).

15. PREPARE SCALED WORKING DRAWINGS IN ACCORDANCE WITH NFPA 13 SHOWING LAYOUT AND DETAILS OF SPRINKLER SYSTEM. SUBMIT DRAWINGS SHOWING LAYOUT TO CONTRACTING OFFICER'S REPRESENTATIVE (COR).

16. THE DESIGN CRITERIA FOR THE SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH NFPA 13:

A. LIGHT HAZARD CLASSIFICATION: 0.10 GPM/SF DENSITY OVER 1500 SF FIRE AREA.

B. ORDINARY HAZARD GROUP-1 CLASSIFICATION: 0.15 GPM/SF DENSITY OVER 1500 SF FIRE AREA.

C. ORDINARY HAZARD GROUP-2 CLASSIFICATION: 0.20 GPM/SF DENSITY OVER 1500 SF FIRE AREA.

D. EXTRA HAZARD GROUP-1 CLASSIFICATION: 0.30 GPM/SF DENSITY OVER 2500 SF FIRE AREA.

17. PROVIDE ADDITIONAL SPRINKLER HEADS AS REQUIRED BY CEILING CONFIGURATION TO MEET REQUIREMENTS OF NFPA 13.

18. PROVIDE FM APPROVED QUICK RESPONSE SPRINKLERS IN ALL AREAS, EXCEPT THAT STANDARD RESPONSE SPRINKLERS SHALL BE PROVIDED IN FREEZERS, REFRIGERATORS, ELEVATOR HOISTWAYS, ELEVATOR MACHINE ROOMS, AND GENERATOR ROOMS. PROVIDE FM APPROVED STANDARD RESPONSE FUSIBLE LINK TYPE SPRINKLERS IN ALL ELECTRICAL ROOMS.

19. PROVIDE HEADGUARDS FOR ALL SPRINKLERS WHERE THE SPRINKLER IS INSTALLED LESS THAN 7 FEET 6 INCHES OVER ANY FINISHED FLOOR OR WORKING PLATFORM.

20. COMPLY WITH SEISMIC DESIGN REQUIREMENTS AS NECESSARY. REFER TO STRUCTURAL DRAWINGS FOR SEISMIC DESIGN CATEGORY INFORMATION.

21. WHERE STATIC PRESSURES EXCEED 100 PSI, SPRINKLERS IN A PENDENT POSITION SHALL HAVE A CUMULATIVE HORIZONTAL LENGTH OF UNSUPPORTED ARM OVERS, BRANCHLINE ENDS, OR SPRINKLER DROP SHALL NOT EXCEED 12 INCHES. IN ADDITION, EACH HANGER CLOSEST TO THE SPRINKLER SHALL BE OF A TYPE THAT PREVENTS UPWARD MOVEMENT OF PIPING.

22. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF PIPE ROUTING BETWEEN THE WORK AREA AND THE EXISTING BUILDING SUPPLY RISER. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF PIPE ROUTING BETWEEN THE EXISTING RISER AND THE FIRE PUMP DISCHARGE FOR HYDRAULIC CALCULATION PURPOSES. CONTRACTOR'S HYDRAULIC CALCULATIONS SHALL INDICATE ALL HYDRAULIC NODES BACK TO THE FIRE PUMP DISCHARGE ON SCALED DRAWINGS IN

ACCORDANCE WITH NFPA 13.

23. SPRINKLER CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT SPRINKLER SYSTEMS REMAIN IN COMPLIANCE WITH NFPA 13 AND NFPA 241 THROUGHOUT ALL PHASES OF RENOVATIONS. EXISTING SPRINKLER SYSTEMS WHICH SERVE THE SCOPE OF WORK AREAS BEING RENOVATED SHALL BE MODIFIED TO MAINTAIN NFPA 13 COMPLIANT SPRINKLER COVERAGE THROUGHOUT EACH PHASE OF RENOVATION. THE SYSTEM SHALL BE FULLY COMPLIANT AND OPERATIONAL THROUGHOUT CONSTRUCTION EXCEPT WHEN THE RENOVATION AREAS WHICH ARE ENCLOSED WITH 1-HOUR RATED FIRE BARRIERS PER NFPA 241.

FPT FIRE PUMP TRANSFER SWITCH IN EMERGENCY POSITION ZCA ZONE CONTROL ASSEMBLY

FPR FIRE PUMP RUNNING WS WET SYSTEM

FPP FIRE PUMP PHASE REVERSAL WP WEATHERPROOF

FPO FIRE PUMP POWER AVAILABLE W/O WITHOUT

FPL FIRE PUMP POWER/PHASE LOSS WMG WATER MOTOR GONG

FPF FIRE PUMP FAULT W/ WITH

FPE FIRE PUMP EMERGENCY ISOLATING SWITCH OPEN VAC VOLT, ALTERNATING CURRENT

FP FIRE PUMP UNO UNLESS NOTED OTHERWISE

FM FACTORY MUTUAL UL UNDERWRITERS' LABORATORY

FLR FLOOR TYP TYPICAL

FHV FIRE HOSE VALVE TS TAMPER SWITCH

FH FIRE HAT TOR TOP OF RISER

FFE FINISHED FLOOR ELEVATION TEMP TEMPERATURE

FEC FIRE EXTINGUISHER CABINET SYST-FEED SPRINKLER SYSTEM FEED MAIN

FE FIRE EXTINGUISHER SYST SYSTEM

FDC FIRE DEPARTMENT CONNECTION STS SHUNT TRIP SUPERVISION

FD FLOOR DRAIN STOR STORAGE

FMCP FIRE ALARM/MASS NOTIFICATION CONTROL PANEL STP STANDPIPE

FA FIRE ALARM ST STROBE

EXIST EXISTING SSI SECURITY SYSTEM INTERFACE

ETR EXISTING TO REMAIN SR SLEEPING ROOM

EST ELEVATOR SHUNT TRIP SQ SQUARE

EQUIP EQUIPMENT SP/ST SPEAKER/ STROBE

EPS ELEVATOR SHUNT TRIP POWER MONITORING SPKR SPRINKLER

EPR ELEVATOR PRIMARY FLOOR RECALL SPEC SPECIFICATION

EMER EMERGENCY SP SPEAKER

ELEV ELEVATOR SO SOUND SYSTEM OVERRIDE

EL ELEVATION SIM SIMILAR

EJ EXPANSION JOINT SGV SUPERVISED GATE VALVE

EH EXTRA HAZARD SDC SMOKE DAMPER CONTROL

EFS ELEVATOR FIRE HAT SOLID SD SMOKE DETECTOR

EFF ELEVATOR FIRE HAT FLASHING SCV SUPERVISED CONTROL VALVE

EF EXHAUST FAN SCHED SCHEDULE

EB ELECTRIC BELL SBV SUPERVISED BUTTERFLY VALVE

EAR ELEVATOR ALTERNATE FLOOR RECALL S SUPPLY

EA EACH RPZ REDUCED PRESSURE ZONE

E ELEVATOR RECALL RN RISER NIPPLE

DN DOWN/DROP NIPPLE RM ROOM

DIM DIMENSION REQ REQUIRED

DIA DIAMETER RCV RISER CONTROL VALVE

DH DOOR HOLD R RISER/RADIUS/RETURN

DD DUCT SMOKE DETECTOR PSI POUNDS PER SQUARE INCH

DC DIRECT CURRENT PS PRESSURE SWITCH

DEMO DEMOLISH, DEMOLITION PER PRIMARY ELEVATOR RECALL

DBA DECIBEL A-WEIGHTED OH ORDINARY HAZARD

DACT DIGITAL ALARM COMMUNICATOR TRANSMITTER OD OUTSIDE DIAMETER

CV CONTROL VALVE MNS MASS NOTIFICATION SYSTEM

CTR CENTER LOC LOCAL OPERATING CONSOLE

COR CONTRACTING OFFICER'S REPRESENTATIVE LH LIGHT HAZARD

CONT CONTINUE/ CONTINUOUS KH KITCHEN HOOD SUPPRESSION SYSTEM

CLG CEILING ID INSIDE DIAMETER

CIS COMMON INTELLIGIBILITY SCORE HT HEAT TRACING

CHV CHECK VALVE HL HI/LOW AIR SUPERVISORY

BOR BOTTOM OF RISER HGT HEIGHT

BFP BACK FLOW PREVENTER GF GENERATOR FAULT

BATT BATTERY GR GENERATOR RUNNING

AS AUTOMATIC SPRINKLER GPM GALLONS PER MINUTE

ALV ALARM CHECK VALVE GC GENERAL CONTRACTOR

AHU AIR HANDLING UNIT GA GAUGE

AFF ABOVE FINISHED FLOOR FT FEET

AAR AUTOMATIC AIR RELEASE FS FLOW SWITCH

1. THERE SHALL BE NO INTERRUPTION OF THE EXISTING SPRINKLER PROTECTION, WATER, ELECTRIC OR FIRE ALARM SERVICES WITHOUT PRIOR PERMISSION OF THE COR.

2. CONTRACTOR SHALL DEVELOP AN INTERIM FIRE PROTECTION PROGRAM WHERE INTERRUPTIONS INVOLVE OCCUPIED SPACES. REQUEST IN WRITING AT LEAST ONE WEEK PRIOR TO THE PLANNED INTERRUPTION.

3. CONTRACTOR SHALL RECEIVE DIRECTION FROM THE COR TO PERFORM TIE IN OF NEW WORK AND/OR REPROGRAMMING OF OPERATING, EXISTING FIRE ALARM AND SPRINKLER SYSTEMS.

OUTAGE REQUIREMENTS

Revisions: Date:

12-30-2025

A B

TEST HEADER

FIRE DEPARTMENT

CONNECTION

FIRE SPRINKLER RISER

FIRE SPRINKLER MAIN

F5

FX101

INCOMING UNDERGROUND

FIRE SERVICE MAIN. REFER

TO CIVIL DRAWINGS

FIRST FLOOR

0' - 0"

BASEMENT

-13' - 0 1/4"

TO BACKFLOW

PREVENTER TEST

HEADER

BACKFLOW

PREVENTER

TO FIRE

DEPARTMENT

CONNECTION

4" UNDERGROUND

FIRE SERVICE MAIN

ALARM CHECK

VALVE

TO SYSTEM SUPPLY

VA Drawing Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t

Civil Engineering:

LABELLA ASSOCIATES

M-R PROJECT NO:

PLAN

NORTH

ACTUAL

NORTH

Project Number

Fire & Life Safety:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:3

P M

FX101

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

Jon Manninen, COR

2025-12-30 PJ CA

BID DOCUMENTS

FULLY SPRINKLERED

0499-0136

658-19-103

FIRE SUPPRESSION

NEW WORK PLAN

GENERATOR BUILDING

GENERAL NOTES

1/4" = 1'-0"F1

GENERATOR BUILDING FIRE

SUPPRESSION PLAN

1/2" = 1'-0"F5

GENERATOR BUILDING FIRE

SUPPRESSION RISER

1. REFER TO FX001 LEGEND FOR HAZARD CLASSIFICATION

HATCHING.

2. FOR AREAS SUBJECT TO ELEVATED AMBIENT TEMPERATURES,

SPRINKLER HEAD TEMPERATURE RATINGS SHALL BE IN

ACCORDANCE WITH NFPA 13.

3. PROVIDE AUXILARY DRAINS AS NECESSARY IN ACCORDANCE

WITH NFPA 13.

4. PROVIDE ALL EQUIPMENT, MATERIAL, LABOR, SUPERVISION,

COSTS AND SERVICES REQUIRED TO INSTALL COMPLETE AND

WORKING SYSTEMS INCLUDING ALL ITEMS AND APPURTENANCES

NECESSARY, REASONABLY INCIDENTAL, OR CUSTOMARILY

INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS NOT

SPECIFIED OR SHOWN.

5. PENETRATIONS OF WALLS OR FLOORS FOR SPRINKLER PIPING

AND/OR EQUIPMENT SHALL BE PROPERLY SEALED AFTER

INSTALLATIONS. FIELD VERIFY EXISTING WALL PENETRATIONS

AND SEAL AS REQUIRED TO MAINTAIN WALL OR FLOOR RATING.

6. EACH TRADE SHALL COORDINATE THE ROUTING AND

INSTALLATION OF THEIR WORK WITH THAT OF ALL OTHER

TRADES THROUGH THE GENERAL CONTRACTOR. IN ANY

INSTANCES OF CONFLICT, SYSTEMS REQUIRING "GRADE" OR

"SLOPE" FOR DRAINAGE (SANITARY SEWER, SANITARY VENT,

EQUIPMENT/CONDENSATE DRAINS, ETC.) SHALL HAVE PRIORITY.

7. CONTRACTOR TO COORDINATE ROUTING OF SPRINKLER PIPING

WITH DUCTWORK, PIPING, AND STRUCTURE.

8. REFER TO MANUFACTURER'S LITERATURE AND INSTALLATION

RECOMMENDATIONS/INSTRUCTIONS FOR EXACT SIZES AND

LOCATIONS OF CONNECTIONS AND REQUIREMENTS OF OWNER

FURNISHED EQUIPMENT.

9. DO NOT ROUTE PIPE ABOVE ELECTRICAL EQUIPMENT AS

REQUIRED BY NFPA 13 AND NFPA 70. WHERE PIPING IS INSTALLED

ABOVE THE DEDICATED ELECTRICAL SPACE, PROVIDE DRIP PANS

BELOW AND ENSURE THERE ARE NO FITTINGS WITHIN THE

DEDICATED ELECTRICAL SPACE.

A B C D E F G H I J

PHASE 1 AREA OF WORK

EXISTING ZONE CONTROL ASSEMBLY

SERVING SPRINKLER ZONE CD

EXISTING ZCA SERVING

SPRINKLER ZONE CD

ELEVATORS

ZONE D ZONE CD

ZONE BOUNDARIES

EXISTING TO REMAIN ZONE CONTROL

ASSEMBLY SERVING SPRINKLER ZONE D

(ZONE 1-5)

POINT OF DEMOLITION BACK TO ZONE

CONTROL ASSEMBLY

EXISTING TO REMAIN SPRINKLER MAIN

SERVING ZONE D, (ZONE 1-6)

TO EXISTING ZONE

CONTROL ASSEMBLY

(ZONE D, 1-6)

PATIENT ROOM

D-143

OFFICE

D-124

DIRTY UTILITY RM

D-142

CORRIDOR

D-147

WORK RM

D-123

CORRIDOR

D-120

CORRIDOR

D-148

SEMI-RESTRICED

CORRIDOR

D-C123

TOILET

D-144

TOILET

D-145

TOILET

D-142D

TOILET

D-142E

ELECTRICAL

D-110

CLEAN LINEN

D-115

CLEAN SUPPLY

D-C133A

OR 4

D-C133

ELECTRICAL

D-C1037

EQUIPMENT

D-C131

IRM

D-C1038

OR 3

D-C130

OR 2

D-C126

OFFICE

D-C144

ANESTHESIA

WORKROOM

D-C122

OFFICE

D-C120

CLEAN CORE

D-C126D

DEMO

D-C126F

DEMO

D-C126C

DEMO

D-C126A

OR 5

D-C138

OR 6

D-C145

OR 7

D-C146

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

PATIENT RM

D-D110

PATIENT RM

D-D109

PATIENT RM

D-D108

PCU ROOM

D-D1001

PCU RM

D-D1002

ON CALL

D-D1004

STORAGE

D-D1003

ANTE

D-D1002ATOILET

D-C159

NURSING

STATION

D-C160

CORRIDOR

D-C161

CLEAN

D-D1029

SOILED HOLDING

D-D1028

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

STORAGE

D-C168

NOURISHMENT

D-D1031

TOILET

D-C1005

WAITING

D-C1006

TOILET

D-C172

OFFICE

D-C173

ELECTRICAL

D-C175

CORRIDOR

D-C177

GROUP OFFICE

D-C1015

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

WORK ROOM

D-C1010

PCU LOUNGE /

LOCKERS

D-C1012

IRM

D-C184

HSK

D-C185

ELEV

D-C186

OFFICE

D-C1019

OFFICE

D-C1018 LOGISTICS

D-C1020

OFFICE

D-C190

TOILET / SHOWER

D-C191

LOUNGE

D-C192 TOILET

D-C193

TOILET

D-C194

CORRIDOR

XC

STAIR

XB

HOUSEKEEPING

D-C103

ELECTRICAL

D-C198

OFFICE

D-C124 DIRTY UTILITIY

D-C125

GENERAL STOR

D-C125A

OFFICE

D-C115

OFFICE

D-C118 ANEST OFFICE

D-C116

ANTE

D-C119

ISOLATION ROOM

D-C117

PACU

DC-11

NURSE STATION

DC-12

BREAK RM

D-C113

TOILET

D-C114

STORAGE

D-C112

IRM

D-C121

HOUSEKEEPING

D-C105

OR 8

D-D1050

TOILET

D-C106B STORAGE

D-C106A

LOCKER

D-C107A

NURSE STATION

D-121

PATIENT ROOM

D-140

PATIENT ROOM

D-139

PATIENT ROOM

D-138

PATIENT ROOM

D-137

ISOLATION ANTE

D-136

PATIENT ROOM

D-133

PATIENT ROOM

D-132 STAFF LOUNGE

D-129

EQUIP. STORAGE

D-127

HSK

D-131

MEDS

D-134

STAFF WORK

D-130

OFFICE

D-125

CLEAN SUPPLY

D-126

NIGHT CALL

D-122

VA Drawing Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t

KEYPLAN

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

M-R PROJECT NO:

PLAN

NORTH

ACTUAL

NORTH

BUILDING 143

Project Number

Fire & Life Safety:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:4

P M

P1-FK101

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

Jon Manninen, COR

2025-12-30 PJ CA

BID DOCUMENTS

FULLY SPRINKLERED

0499-0136

658-19-103

FIRE SUPPRESSION

DEMOLITION PLAN

FIRST FLOOR PHASE 1

GENERAL NOTES

1. DEMOLISH EXISTING SPRINKLERS AND PIPING TO ACCOMODATE

NEW ARCHITECTURAL LAYOUT WITHIN THE AREA OF WORK

UNLESS NOTED OTHERWISE. COORDINATE WITH VA OUTAGE

REQUIREMENTS AND THE COR.

2. EXISTING SPRINKLER MAIN PIPING AND ZONING IS SHOWN IN

APPROXIMATE LOCATIONS. CONTRACTOR SHALL VERIFY EXACT

LOCATIONS AND SIZE OF PIPING AND EQUIPMENT PRIOR TO

CONSTRUCTION. EXISTING CONDITIONS DETERMINED FROM

LIMITED SITE INVESTIGATION AND RECORD DOCUMENTS.

3. EXISTING SMOKE ZONE BOUNDARIES SHOWN ARE BASED ON

RECORD DOCUMENTATION AND GENERAL INFORMATION

DRAWINGS. CONTRACTOR SHALL COORDINATE WITH THE COR

AND VA PERSONNEL IF ANY DISCREPANCIES ARE DISCOVERED

IN THE FIELD.

4. MAINTAIN ALL FIRE SUPPRESSION SYSTEMS CONTINUITY AND

NFPA 13 COMPLIANCE (E.G. SPACING, DISTANCE TO CEILING,

OBSTRUCTION REQUIREMENTS, ETC.) DURING RENOVATION. THE

FIRE DEPARTMENT AND THE VA COR SHALL BE NOTIFIED

IMMEDIATELY IF THE FIRE SUPPRESSION SYSTEM IS OUT OF

SERVICE AND AN APPROVED FIRE WATCH SHALL BE PROVIDED

FOR ALL OCCUPANTS LEFT UNPROTECTED BY THE SHUTDOWN

UNTIL THE FIRE SUPPRESSION SYSTEM HAS BEEN RETURNED TO

SERVICE.

5. SPRINKLER SYSTEM IS TO REMAIN IN SERVICE THROUGHOUT

PROJECT. TEMPORARILY REPLACE EXISTING PENDENT

SPRINKLERS WITH UPRIGHT SPRINKLERS AND PIPING IN AREAS

THAT HAVE CEILINGS REMOVED PER NFPA 241 AND NFPA 13.

6. SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13 AT THE

COMPLETION OF EACH PHASE. IF NEW DEFICIENCIES IN

SPRINKLER SYSTEM SPACING IN AREAS OUTSIDE OF THE

CONSTRUCTION AREA ARE CREATED DUE TO DEMOLITION AND

CONSTRUCTION ACTIVITIES (E.G. WHEN TEMPORARY BARRIERS

ARE INSTALLED, WHEN EXISTING WALLS ARE DEMOLISHED,

AND/OR WHEN NEW PERMANENT WALLS ARE INSTALLED), THE

CONTRACTOR SHALL MODIFY THE EXISTING SPRINKLERS TO

MAINTAIN NFPA 13 COMPLIANCE.

7. EXISTING SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA

SHALL STAY ACTIVE THROUGHOUT THE PROJECT. SHUTDOWNS

FOR WORK ON THE SYSTEM WITHIN THE AREA OF WORK THAT

IMPACT SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA

SHALL BE SCHEDULED WITH THE VA TWO WEEKS IN ADVANCE

AND PROVISIONS SET IN PLACE PER NFPA 241. RESTORE

SYSTEMS TO SERVICE AT THE END OF EACH WORKDAY.

8. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA

PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER

SYSTEM.

9. REFER TO GENERAL INFORMATION DRAWINGS FOR

CONSTRUCTION PHASING INFORMATION.

1/8" = 1'-0"F1

FIRST FLOOR FIRE SUPPRESSION

DEMOLITION PLAN - PHASE 1

CR

A B C D E F G H I J

CLEAN CORE

D-C126D

CONTROL ROOM

1D-124

OR-2

1D-125

OR-3 ROBOTIC

1D-126

SCRUB

C1-9B

STRETCHER

ALCOVE

C1-9A

STRETCHER

ALCOVE

C1-9C

SCRUB

C1-9BD

CORRIDOR

C1-18

CORRIDOR

C1-19

OR-1 HYBRID OR

1D-123

CLEAN CORE

1C-120

STRETCHER

ALCOVE

C1-9E

STAIR

S-8

PUMP ROOM

1D-122

IT

1D-120EQUIPMENT

1D-121

PHASE 1 AREA OF WORK

ZONE D

ZONE CD

ZONE BOUNDARIES

POINT OF CONNECTION TO EXISTING

ZONE CONTROL ASSEMBLY

EXISTING ZONE CONTROL ASSEMBLY

SERVING SPRINKLER ZONE CD

RECOVERY CCLO

D-D101

ELECTRICAL

D-D1027

SOILED HOLDING

D-D1028

CLEAN

D-D1029

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

CORRIDOR

D-C161

NURSING

STATION

D-C160

NOURISHMENT

D-D1031

MEDS

D-D1030

IRM

D-C165

PATIENT ROOM

D-D110

PATIENT ROOM

D-D109

PATIENT ROOM

D-D108

PCU ROOM

D-D1001

PCU ROOM

D-D1002

ON CALL

D-D1004

TOILET

D-C1005

STORAGE

D-D1003

ANTE

D-D1002ATOILET

D-C159

WAITING

D-C1006

TOILET

D-C172

OFFICE

D-C173

CORRIDOR

D-C177

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

GROUP OFFICE

D-C1015

WORK ROOM

D-C1010

PCU LOUNGE /

LOCKERS

D-C1012

OR-5

D-C138

STOR

D-C139

CONTROL

D-C141

EQUIP STOR

D-C143A

CLEAN SUPPLY

D-C143B

OR-7

D-C145

LOGISTICS

D-C1020

OFFICE

D-C1018

OFFICE

D-C1019

CYLINDER

STORAGE

D-C146

SOILED UTILITY

D-C142

ELECTRICAL

D-C175

CORRIDOR

XC

STAIR

XB

HOUSEKEEPING

D-C103

HSK

D-C105

OFFICE

D-C120

EQUIPMENT

STORAGE

D-C122

OFFICE

D-C123

OR-1

D-C126

CLEAN SUPPLY

D-C127

EQUIP STOR

D-C130B

SCRUB AREA

D-C126A

ELECTRICAL RM

D-C126C

HOUSEKEEPING

D-C126F

OR-4

D-C133

CLEAN SUPPLY

D-C133A

EQUIPMENT

STORAGE

D-C131

ELECTRIC

D-C1037

CLEAN SUPPLY

D-C1038

OR-2

D-C130

EXISTING ZCA SERVING

SPRINKLER ZONE CD

ELEVATORS

EXISTING TO REMAIN SPRINKLER MAIN

SERVING ZONE D, (ZONE 1-6)

TO EXISTING ZONE

CONTROL ASSEMBLY

(ZONE D, 1-6)

VA Drawing Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

M-R PROJECT NO:

PLAN

NORTH

ACTUAL

NORTH

BUILDING 143

Project Number

Fire & Life Safety:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:5

P M

P1-FX101

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

Jon Manninen, COR

2025-12-30 PJ CA

BID DOCUMENTS

FULLY SPRINKLERED

0499-0136

658-19-103

FIRE SUPPRESSION

NEW WORK PLAN

FIRST FLOOR PHASE 1

GENERAL NOTES

1/8" = 1'-0"F1

FIRST FLOOR FIRE SUPPRESSION PLAN -

PHASE 1

1. ALL AREAS ARE LIGHT HAZARD UNLESS OTHERWISE INDICATED

BY HATCHING. REFER TO LEGEND BELOW FOR HAZARD

CLASSIFICATION HATCHING.

2. FOR AREAS SUBJECT TO ELEVATED AMBIENT TEMPERATURES,

SPRINKLER HEAD TEMPERATURE RATINGS SHALL BE IN

ACCORDANCE WITH NFPA 13.

3. PROVIDE AUXILARY DRAINS AS NECESSARY IN ACCORDANCE

WITH NFPA 13.

4. PROVIDE ALL EQUIPMENT, MATERIAL, LABOR, SUPERVISION,

COSTS AND SERVICES REQUIRED TO INSTALL COMPLETE AND

WORKING SYSTEMS INCLUDING ALL ITEMS AND APPURTENANCES

NECESSARY, REASONABLY INCIDENTAL, OR CUSTOMARILY

INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS NOT

SPECIFIED OR SHOWN.

5. PENETRATIONS OF WALLS OR FLOORS FOR SPRINKLER PIPING

AND/OR EQUIPMENT SHALL BE PROPERLY SEALED AFTER

INSTALLATIONS. FIELD VERIFY EXISTING WALL PENETRATIONS

AND SEAL AS REQUIRED TO MAINTAIN WALL OR FLOOR RATING.

6. EACH TRADE SHALL COORDINATE THE ROUTING AND

INSTALLATION OF THEIR WORK WITH THAT OF ALL OTHER

TRADES THROUGH THE GENERAL CONTRACTOR. IN ANY

INSTANCES OF CONFLICT, SYSTEMS REQUIRING "GRADE" OR

"SLOPE" FOR DRAINAGE (SANITARY SEWER, SANITARY VENT,

EQUIPMENT/CONDENSATE DRAINS, ETC.) SHALL HAVE PRIORITY.

7. CONTRACTOR TO COORDINATE ROUTING OF SPRINKLER PIPING

WITH DUCTWORK, PIPING, AND STRUCTURE.

8. REFER TO MANUFACTURER'S LITERATURE AND INSTALLATION

RECOMMENDATIONS/INSTRUCTIONS FOR EXACT SIZES AND

LOCATIONS OF CONNECTIONS AND REQUIREMENTS OF OWNER

FURNISHED EQUIPMENT.

9. DO NOT ROUTE SPRINKLER PIPING OVER OR THROUGH

ELECTRICAL OR COMMUNICATION ROOMS UNLESS THE PIPING

DIRECTLY SERVES EQUIPMENT IN THE ROOM.

10. DO NOT ROUTE PIPE ABOVE ELECTRICAL EQUIPMENT AS

REQUIRED BY NFPA 13 AND NFPA 70. WHERE PIPING IS INSTALLED

ABOVE THE DEDICATED ELECTRICAL SPACE, PROVIDE DRIP PANS

BELOW AND ENSURE THERE ARE NO FITTINGS WITHIN THE

DEDICATED ELECTRICAL SPACE.

11. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA

PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER

SYSTEM.

12. THE NEW SPRINKLER ZONES BOUNDARIES SHOWN SHALL MATCH

THE NEW SMOKE COMPARTMENTS SHOWN IN THE GENERAL

INFORMATION DRAWINGS. IF EXISTING SPRINKLERS SERVING

AREAS OUTSIDE THE SCOPE OF WORK ARE FOUND TO BE

AFFECTED BY THE NEW ZONING, PROVISIONS SHALL BE MADE TO

PROVIDE A CONNECTION TO ITS APPROPRIATE ZONE. ALL WORK

SHALL BE COORDINATED WITH THE COR AND VA PERSONNEL.

13. REFER TO GENERAL INFORMATION DRAWINGS FOR

CONSTRUCTION PHASING INFORMATION.

A B C D E F G H I J

PHASE 2 AREA OF WORK

EXISTING ZONE CONTROL ASSEMBLY

SERVING SPRINKLER ZONE CD

ZONE D

ZONE CD

ZONE BOUNDARIES

EXISTING TO REMAIN ZONE CONTROL

ASSEMBLY SERVING SPRINKLER ZONE CD

CLEAN CORE

IC-1000

HYBRID OR

1D-123

CONTROL ROOM

1D-124

CORRIDOR

C1-19

OR-2

1D-125 OR-3 ROBOTIC

1D-126

EQUIPMENT

1D-121

IT

1D-120

PUMP ROOM

1D-122

DEMOLISH SPRINKLERS AND PIPING WITHIN AREA OF

WORK BACK TO EXISTING MAIN. SPRINKLER FEED MAIN IS

EXISTING TO REMAIN AS IT SERVES SPRINKLERS OUTSIDE

THE SCOPE OF WORK

CLEAN SUPPLY

D-C133A

OR-4

D-C133

ELECTRIC

D-C1037

EQUIPMENT

STORAGE

D-C131

CLEAN SUPPLY

D-C1038

OR-2

D-C130

CLEAN SUPPLY

D-C127

EQUIP STOR

D-C130B

OR-1

D-C126

OFFICE

D-C123

EQUIPMENT

STORAGE

D-C122

OFFICE

D-C120

CLEAN CORE

D-C126D

HOUSEKEEPING

D-C126F

ELECTRICAL RM

D-C126C

SCRUB AREA

D-C126A

WORK AREA

D-C126G

STAIR

S-8

IRM

D-C121

OR-5

D-C138

OR-6

D-C143

OR-7

D-C145

HSK

D-C105

STOR

D-C139

CORRIDOR

D-C21

SOILED UTILITY

D-C142

EQUIP STOR

D-C143A

CLEAN SUPPLY

D-C143B

CONTROL

D-C141

CYLINDER

STORAGE

D-C146

CORRIDOR

D-148

OR 4

D-C133

CLEAN CORE

D-C126D

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

PATIENT RM

D-D110

PATIENT RM

D-D109

PATIENT RM

D-D108

PCU ROOM

D-D1001

PCU RM

D-D1002

ON CALL

D-D1004

STORAGE

D-D1003

ANTE

D-D1002ATOILET

D-C159

NURSING

STATION

D-C160

CORRIDOR

D-C161

CLEAN

D-D1029

SOILED HOLDING

D-D1028

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

STORAGE

D-C168

NOURISHMENT

D-D1031

TOILET

D-C1005

WAITING

D-C1006

TOILET

D-C172

OFFICE

D-C173

ELECTRICAL

D-C175

CORRIDOR

D-C177

GROUP OFFICE

D-C1015

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

WORK ROOM

D-C1010

PCU LOUNGE /

LOCKERS

D-C1012

IRM

D-C184

HSK

D-C185

ELEV

D-C186

OFFICE

D-C1019

OFFICE

D-C1018 LOGISTICS

D-C1020

OFFICE

D-C190

TOILET / SHOWER

D-C191 LOUNGE

D-C192 TOILET

D-C193

TOILET

D-C194

CORRIDOR

XC

STAIR

XB

HOUSEKEEPING

D-C103

ELECTRICAL

D-C198

OFFICE

D-C124 DIRTY UTILITIY

D-C125

GENERAL STOR

D-C125A

OFFICE

D-C115

OFFICE

D-C118 ANEST OFFICE

D-C116

ANTE

D-C119

ISOLATION ROOM

D-C117

PACU

DC-11

NURSE STATION

DC-12

BREAK RM

D-C113

TOILET

D-C114

STORAGE

D-C112

OR 8

D-D1050

TOILET

D-C106B

STORAGE

D-C106A

LOCKER

D-C107A

VA Drawing Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

M-R PROJECT NO:

PLAN

NORTH

ACTUAL

NORTH

BUILDING 143

Project Number

Fire & Life Safety:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:1

P M

P2-FK101

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

Jon Manninen, COR

2025-12-30 PJ CA

BID DOCUMENTS

FULLY SPRINKLERED

0499-0136

658-19-103

FIRE SUPPRESSION

DEMOLITION PLAN

FIRST FLOOR PHASE 2

GENERAL NOTES

1/8" = 1'-0"F1

FIRST FLOOR FIRE SUPPRESSION

DEMOLITION PLAN - PHASE 2

1. DEMOLISH EXISTING SPRINKLERS AND PIPING TO ACCOMODATE

NEW ARCHITECTURAL LAYOUT WITHIN THE AREA OF WORK

UNLESS NOTED OTHERWISE. COORDINATE WITH VA OUTAGE

REQUIREMENTS AND THE COR.

2. EXISTING SPRINKLER MAIN PIPING AND ZONING IS SHOWN IN

APPROXIMATE LOCATIONS. PER RECORD DOCUMENTS, THE

ZONE CD SPRINKLER MAINS ARE CONNECTED BY BRANCHLINES.

CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND SIZE OF

PIPING AND EQUIPMENT PRIOR TO CONSTRUCTION. EXISTING

CONDITIONS DETERMINED FROM LIMITED SITE INVESTIGATION

AND RECORD DOCUMENTS.

3. EXISTING SMOKE ZONE BOUNDARIES SHOWN ARE BASED ON

RECORD DOCUMENTATION AND GENERAL INFORMATION

DRAWINGS. CONTRACTOR SHALL COORDINATE WITH THE COR

AND VA PERSONNEL IF ANY DISCREPANCIES ARE DISCOVERED

IN THE FIELD.

4. MAINTAIN ALL FIRE SUPPRESSION SYSTEMS CONTINUITY AND

NFPA 13 COMPLIANCE (E.G. SPACING, DISTANCE TO CEILING,

OBSTRUCTION REQUIREMENTS, ETC.) DURING RENOVATION. THE

FIRE DEPARTMENT AND THE VA COR SHALL BE NOTIFIED

IMMEDIATELY IF THE FIRE SUPPRESSION SYSTEM IS OUT OF

SERVICE AND AN APPROVED FIRE WATCH SHALL BE PROVIDED

FOR ALL OCCUPANTS LEFT UNPROTECTED BY THE SHUTDOWN

UNTIL THE FIRE SUPPRESSION SYSTEM HAS BEEN RETURNED TO

SERVICE.

5. SPRINKLER SYSTEM IS TO REMAIN IN SERVICE THROUGHOUT

PROJECT. TEMPORARILY REPLACE EXISTING PENDENT

SPRINKLERS WITH UPRIGHT SPRINKLERS AND PIPING IN AREAS

THAT HAVE CEILINGS REMOVED PER NFPA 241 AND NFPA 13.

6. SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13 AT THE

COMPLETION OF EACH PHASE. IF NEW DEFICIENCIES IN

SPRINKLER SYSTEM SPACING IN AREAS OUTSIDE OF THE

CONSTRUCTION AREA ARE CREATED DUE TO DEMOLITION AND

CONSTRUCTION ACTIVITIES (E.G. WHEN TEMPORARY BARRIERS

ARE INSTALLED, WHEN EXISTING WALLS ARE DEMOLISHED,

AND/OR WHEN NEW PERMANENT WALLS ARE INSTALLED), THE

CONTRACTOR SHALL MODIFY THE EXISTING SPRINKLERS TO

MAINTAIN NFPA 13 COMPLIANCE.

7. EXISTING SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA

SHALL STAY ACTIVE THROUGHOUT THE PROJECT. SHUTDOWNS

FOR WORK ON THE SYSTEM WITHIN THE AREA OF WORK THAT

IMPACT SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA

SHALL BE SCHEDULED WITH THE VA TWO WEEKS IN ADVANCE

AND PROVISIONS SET IN PLACE PER NFPA 241. RESTORE

SYSTEMS TO SERVICE AT THE END OF EACH WORKDAY.

8. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA

PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER

SYSTEM.

9. REFER TO GENERAL INFORMATION DRAWINGS FOR

CONSTRUCTION PHASING INFORMATION.

SL

CR

CR

CR

A B C D E F G H I J

PHASE 2 AREA OF WORK

OR-4 ROBOTIC

1C-128

OR-5

1C-126

ORTHO STOR

1C-125

SCRUB

C1-9F

ANESTHESIA

WORKROOM

1C-127

HAC

1C-122

LINEN ALCOVE

1C-123

IRM

1C-121

OR-7

1C-140

OR-6 CYSTO

1C-142

CORRIDOR

C1-16

EQUIPMENT

STORAGE

1C-145

CORRIDOR

C1-17

ALCOVE

C1-16C

ELECTRICAL

1C-1037

CLEAN CORE

IC-1000

CORRIDOR

D-18

NURSE STATION

D-C18

EXISTING ZONE CONTROL ASSEMBLY

SERVING SPRINKLER ZONE CD

ZONE D

ZONE CD

ZONE BOUNDARIES

EXISTING ZONE CONTROL ASSEMBLY

SERVING SPRINKLER ZONE CD

CLEAN CORE

IC-1000

IT

1D-120

EQUIPMENT

1D-121

PUMP ROOM

1D-122

CORRIDOR

C1-19

HYBRID OR

1D-123

CONTROL ROOM

1D-124 SCRUB

C1-9B

OR-2

1D-125

OR-3 ROBOTIC

1D-126

SCRUB

C1-9BD

OFFICE

D-C124

OFFICE

D-C115

OR 8

D-C106

CORRIDOR

D-C12

WAITING

D-C107

TLT

D-C106B

STORAGE

D-C106A

SOILED

1C-144

CYLINDER

STORAGE

1C-143

EXISTING ZCA SERVING

SPRINKLER ZONE CD

ELEVATORS

EXISTING TO REMAIN SPRINKLER MAIN

SERVING ZONE D, (ZONE 1-6)

TO EXISTING ZONE

CONTROL ASSEMBLY

(ZONE D, 1-6)

NEW SPRINKLER

MAIN

CONNECT TO

EXISTING PIPING

PROVIDE CAP,

PREP FOR FUTURE

CONNECTION IN

PHASE 3

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

PATIENT ROOM

D-D110

PATIENT ROOM

D-D109

PATIENT ROOM

D-D108

PCU ROOM

D-D1001

PCU ROOM

D-D1002

ON CALL

D-D1004

STORAGE

D-D1003

ANTE

D-D1002ATOILET

D-C159

NURSING

STATION

D-C160

CORRIDOR

D-C161

CLEAN

D-D1029

SOILED HOLDING

D-D1028

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

STORAGE

D-C168

NOURISHMENT

D-D1031

TOILET

D-C1005

WAITING

D-C1006

TOILET

D-C172

OFFICE

D-C173

ELECTRICAL

D-C175

CORRIDOR

D-C177

GROUP OFFICE

D-C1015

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

WORK ROOM

D-C1010

PCU LOUNGE /

LOCKERS

D-C1012

OFFICE

D-C1019

OFFICE

D-C1018 LOGISTICS

D-C1020

CORRIDOR

XC

STAIR

XB

HOUSEKEEPING

D-C103

ELECTRICAL

D-C198

VA Drawing Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

M-R PROJECT NO:

PLAN

NORTH

ACTUAL

NORTH

BUILDING 143

Project Number

Fire & Life Safety:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:1

P M

P2-FX101

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

Jon Manninen, COR

2025-12-30 PJ CA

BID DOCUMENTS

FULLY SPRINKLERED

0499-0136

658-19-103

FIRE SUPPRESSION

NEW WORK PLAN

FIRST FLOOR PHASE 2

GENERAL NOTES

1/8" = 1'-0"F1

FIRST FLOOR FIRE SUPPRESSION PLAN -

PHASE 2

1. ALL AREAS ARE LIGHT HAZARD UNLESS OTHERWISE INDICATED

BY HATCHING. REFER TO LEGEND BELOW FOR HAZARD

CLASSIFICATION HATCHING.

2. FOR AREAS SUBJECT TO ELEVATED AMBIENT TEMPERATURES,

SPRINKLER HEAD TEMPERATURE RATINGS SHALL BE IN

ACCORDANCE WITH NFPA 13.

3. PROVIDE AUXILARY DRAINS AS NECESSARY IN ACCORDANCE

WITH NFPA 13.

4. PROVIDE ALL EQUIPMENT, MATERIAL, LABOR, SUPERVISION,

COSTS AND SERVICES REQUIRED TO INSTALL COMPLETE AND

WORKING SYSTEMS INCLUDING ALL ITEMS AND APPURTENANCES

NECESSARY, REASONABLY INCIDENTAL, OR CUSTOMARILY

INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS NOT

SPECIFIED OR SHOWN.

5. PENETRATIONS OF WALLS OR FLOORS FOR SPRINKLER PIPING

AND/OR EQUIPMENT SHALL BE PROPERLY SEALED AFTER

INSTALLATIONS. FIELD VERIFY EXISTING WALL PENETRATIONS

AND SEAL AS REQUIRED TO MAINTAIN WALL OR FLOOR RATING.

6. EACH TRADE SHALL COORDINATE THE ROUTING AND

INSTALLATION OF THEIR WORK WITH THAT OF ALL OTHER

TRADES THROUGH THE GENERAL CONTRACTOR. IN ANY

INSTANCES OF CONFLICT, SYSTEMS REQUIRING "GRADE" OR

"SLOPE" FOR DRAINAGE (SANITARY SEWER, SANITARY VENT,

EQUIPMENT/CONDENSATE DRAINS, ETC.) SHALL HAVE PRIORITY.

7. CONTRACTOR TO COORDINATE ROUTING OF SPRINKLER PIPING

WITH DUCTWORK, PIPING, AND STRUCTURE.

8. REFER TO MANUFACTURER'S LITERATURE AND INSTALLATION

RECOMMENDATIONS/INSTRUCTIONS FOR EXACT SIZES AND

LOCATIONS OF CONNECTIONS AND REQUIREMENTS OF OWNER

FURNISHED EQUIPMENT.

9. DO NOT ROUTE SPRINKLER PIPING OVER OR THROUGH

ELECTRICAL OR COMMUNICATION ROOMS UNLESS THE PIPING

DIRECTLY SERVES EQUIPMENT IN THE ROOM.

10. DO NOT ROUTE PIPE ABOVE ELECTRICAL EQUIPMENT AS

REQUIRED BY NFPA 13 AND NFPA 70. WHERE PIPING IS INSTALLED

ABOVE THE DEDICATED ELECTRICAL SPACE, PROVIDE DRIP PANS

BELOW AND ENSURE THERE ARE NO FITTINGS WITHIN THE

DEDICATED ELECTRICAL SPACE.

11. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA

PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER

SYSTEM.

12. THE NEW SPRINKLER ZONES BOUNDARIES SHOWN SHALL MATCH

THE NEW SMOKE COMPARTMENTS SHOWN IN THE GENERAL

INFORMATION DRAWINGS. IF EXISTING SPRINKLERS SERVING

AREAS OUTSIDE THE SCOPE OF WORK ARE FOUND TO BE

AFFECTED BY THE NEW ZONING, PROVISIONS SHALL BE MADE TO

PROVIDE A CONNECTION TO ITS APPROPRIATE ZONE. ALL WORK

SHALL BE COORDINATED WITH THE COR AND VA PERSONNEL.

13. REFER TO GENERAL INFORMATION DRAWINGS FOR

CONSTRUCTION PHASING INFORMATION.

SL

CR

CR

CR

A B C D E F G H I J K L

PHASE 3 AREA OF WORK

PHASE 3 AREA OF WORK

EXISTING ZONE CONTROL ASSEMBLY

SERVING SPRINKLER ZONE CD

ZONE D

ZONE CD

ZONE BOUNDARIES

EXISTING ZONE CONTROL ASSEMBLY

SERVING SPRINKLER ZONE CD

ZONE CD

SPRINKLER MAIN

ZONE CD SPRINKLER

MAIN

HYBRID OR

1D-123

EQUIPMENT

1D-121

IT

1D-120

CORRIDOR

C1-24

OR-2

1D-125

CONTROL ROOM

1D-124

OR-3 ROBOTIC

1D-126

OR-4 ROBOTIC

1C-128

ANESTHESIA

WORKROOM

1C-127

ELECTRICAL

1C-1037

OR-5

1C-126

EQUIPMENT

STORAGE

1C-131

OR-6

1C-130

OR-7

1C-129

SOILED

IC-1016

GAS

IC-1017

CORRIDOR

C1-16

OR 8

D-C106

STORAGE

D-C106A

OFFICE

D-C108

WAITING

D-C107

LOCKERS

D-C107A TLT

D-C107B

OFFICE

D-C16

OFFICE

D-C109

OFFICE

D-C109A

TLT

D-C106B

CORRIDOR

D-C12

DEMO

D-15

OFFICE

D-C108A

OFFICE

D-C115

OFFICE

D-C124

NURSE STATION

D-18

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

PATIENT RM

D-D110

PATIENT RM

D-D109

PATIENT RM

D-D108

PCU ROOM

D-D1001

PCU RM

D-D1002

ON CALL

D-D1004

STORAGE

D-D1003

ANTE

D-D1002ATOILET

D-C159

NURSING

STATION

D-C160

CORRIDOR

D-C161

CLEAN

D-D1029

SOILED HOLDING

D-D1028

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

STORAGE

D-C168

NOURISHMENT

D-D1031

TOILET

D-C1005

WAITING

D-C1006

TOILET

D-C172 OFFICE

D-C173 ELECTRICAL

D-C175

CORRIDOR

D-C177

GROUP OFFICE

D-C1015

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

PCU LOUNGE /

LOCKERS

D-C1012

IRM

D-C184

HSK

D-C185

ELEV

D-C186

OFFICE

D-C1019

OFFICE

D-C1018

LOGISTICS

D-C1020

OFFICE

D-C190

CORRIDOR

XC

STAIR

XB

HOUSEKEEPING

D-C103

ELECTRICAL

D-C198

DIRTY UTILITIY

D-C125

GENERAL STOR

D-C125A

OFFICE

D-C118 ANEST OFFICE

D-C116

ANTE

D-C119

ISOLATION ROOM

D-C117

PACU

DC-11

RECOVERY

D-C13A

NURSE STATION

DC-12

BREAK RM

D-C113

TOILET

D-C114

STORAGE

D-C112

BIOHAZARD

D-C111

WAITING ROOM

D-C110

IRM

D-C121

WORK ROOM

D-C1010

VA Drawing Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

M-R PROJECT NO:

PLAN

NORTH

ACTUAL

NORTH

BUILDING 143

Project Number

Fire & Life Safety:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:3

P M

P3-FK101

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

Jon Manninen, COR

2025-12-30 PJ CA

BID DOCUMENTS

FULLY SPRINKLERED

0499-0136

658-19-103

FIRE SUPPRESSION

DEMOLITION PLAN

FIRST FLOOR PHASE 3

GENERAL NOTES

1/8" = 1'-0"F1

FIRST FLOOR FIRE SUPPRESSION

DEMOLITION PLAN - PHASE 3

1. DEMOLISH EXISTING SPRINKLERS AND PIPING TO ACCOMODATE

NEW ARCHITECTURAL LAYOUT WITHIN THE AREA OF WORK

UNLESS NOTED OTHERWISE. COORDINATE WITH VA OUTAGE

REQUIREMENTS AND THE COR.

2. EXISTING SPRINKLER MAIN PIPING AND ZONING IS SHOWN IN

APPROXIMATE LOCATIONS. PER RECORD DOCUMENTS, THE

ZONE CD SPRINKLER MAINS ARE CONNECTED BY BRANCHLINES.

CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND SIZE OF

PIPING AND EQUIPMENT PRIOR TO CONSTRUCTION. EXISTING

CONDITIONS DETERMINED FROM LIMITED SITE INVESTIGATION

AND RECORD DOCUMENTS.

3. EXISTING SMOKE ZONE BOUNDARIES SHOWN ARE BASED ON

RECORD DOCUMENTATION AND GENERAL INFORMATION

DRAWINGS. CONTRACTOR SHALL COORDINATE WITH THE COR

AND VA PERSONNEL IF ANY DISCREPANCIES ARE DISCOVERED

IN THE FIELD.

4. MAINTAIN ALL FIRE SUPPRESSION SYSTEMS CONTINUITY AND

NFPA 13 COMPLIANCE (E.G. SPACING, DISTANCE TO CEILING,

OBSTRUCTION REQUIREMENTS, ETC.) DURING RENOVATION. THE

FIRE DEPARTMENT AND THE VA COR SHALL BE NOTIFIED

IMMEDIATELY IF THE FIRE SUPPRESSION SYSTEM IS OUT OF

SERVICE AND AN APPROVED FIRE WATCH SHALL BE PROVIDED

FOR ALL OCCUPANTS LEFT UNPROTECTED BY THE SHUTDOWN

UNTIL THE FIRE SUPPRESSION SYSTEM HAS BEEN RETURNED TO

SERVICE.

5. SPRINKLER SYSTEM IS TO REMAIN IN SERVICE THROUGHOUT

PROJECT. TEMPORARILY REPLACE EXISTING PENDENT

SPRINKLERS WITH UPRIGHT SPRINKLERS AND PIPING IN AREAS

THAT HAVE CEILINGS REMOVED PER NFPA 241 AND NFPA 13.

6. SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13 AT THE

COMPLETION OF EACH PHASE. IF NEW DEFICIENCIES IN

SPRINKLER SYSTEM SPACING IN AREAS OUTSIDE OF THE

CONSTRUCTION AREA ARE CREATED DUE TO DEMOLITION AND

CONSTRUCTION ACTIVITIES (E.G. WHEN TEMPORARY BARRIERS

ARE INSTALLED, WHEN EXISTING WALLS ARE DEMOLISHED,

AND/OR WHEN NEW PERMANENT WALLS ARE INSTALLED), THE

CONTRACTOR SHALL MODIFY THE EXISTING SPRINKLERS TO

MAINTAIN NFPA 13 COMPLIANCE.

7. EXISTING SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA

SHALL STAY ACTIVE THROUGHOUT THE PROJECT. SHUTDOWNS

FOR WORK ON THE SYSTEM WITHIN THE AREA OF WORK THAT

IMPACT SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA

SHALL BE SCHEDULED WITH THE VA TWO WEEKS IN ADVANCE

AND PROVISIONS SET IN PLACE PER NFPA 241. RESTORE

SYSTEMS TO SERVICE AT THE END OF EACH WORKDAY.

8. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA

PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER

SYSTEM.

9. REFER TO GENERAL INFORMATION DRAWINGS FOR

CONSTRUCTION PHASING INFORMATION.

AO

AO

SL

CR

CR

CR

CR

AO

A B C D E F G H I J K L

PACU

D-C11

PRE-OP

1C-105.1

MEDS

1C-113

NURSE STATION

1C-105ACOMM CTR

1C-106

EQUIP ALCOVE

1C-112

TOILET

1C-109

HK

1C-108

CORRIDOR

C1-13

CORRIDOR

C1-12

CORRIDOR

C1-11

LINEN CLOSET

1C-107

ANESTHESIA

1C-124

SHARED OFFICE

1C-156

OFFICE

1C-157

CORRIDOR

C1-11

PHASE 3 AREA OF

WORK

PHASE 3 AREA OF WORK

EXISTING ZONE CONTROL ASSEMBLY

SERVING SPRINKLER ZONE CD

ZONE D

ZONE CD

ZONE BOUNDARIES

EXISTING ZONE CONTROL ASSEMBLY

SERVING SPRINKLER ZONE CD

NEW SPRINKLER

MAIN

CONNECT TO

EXISTING PIPING

PROVIDE CAP,

PREP FOR FUTURE

CONNECTION IN

PHASE 4

OR-7

1C-129

OR-6

1C-130

CORRIDOR

C1-16

GAS

IC-1017

SOILED

IC-1016

EQUIPMENT

STORAGE

1C-131

EQUIPMENT

1D-121

IT

1D-120

CORRIDOR

C1-24

HYBRID OR

1D-123

CONTROL ROOM

1D-124

OR-2

1D-125

OR-3 ROBOTIC

1D-126

OR-4 ROBOTIC

1C-128

ANESTHESIA

WORKROOM

1C-127

CLEAN CORE

1C-120

OR-5

1C-126

HAC

1C-122ORTHO STOR

C1-18

CORRIDOR

C1-11

CORRIDOR

C1-15

OFFICE

D-C124

DEMO

D-C115

ANEST OFFICE

D-C116

OFFICE

D-C118

TLT

D-C114

BREAK RM

D-C113

EQUIP STORAGE

D-C112

DIRTY UTILITY

D-C125

BIO HZRD

D-C111

WAITING

D-C110

RECOVERY

D-C13

NURSE STATION

D-C12

ISOLATION ROOM

D-C117

ANTE

D-C119

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

PATIENT ROOM

D-D110

PATIENT ROOM

D-D109

PATIENT ROOM

D-D108

PCU ROOM

D-D1001

PCU ROOM

D-D1002

ON CALL

D-D1004

STORAGE

D-D1003

ANTE

D-D1002ATOILET

D-C159

NURSING

STATION

D-C160

CORRIDOR

D-C161

CLEAN

D-D1029

SOILED HOLDING

D-D1028

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

STORAGE

D-C168

NOURISHMENT

D-D1031

TOILET

D-C1005

WAITING

D-C1006

TOILET

D-C172

OFFICE

D-C173

ELECTRICAL

D-C175

CORRIDOR

D-C177

GROUP OFFICE

D-C1015

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

WORK ROOM

D-C1010

PCU LOUNGE /

LOCKERS

D-C1012

CORRIDOR

XC

VA Drawing Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

M-R PROJECT NO:

PLAN

NORTH

ACTUAL

NORTH

BUILDING 143

Project Number

Fire & Life Safety:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:4

P M

P3-FX101

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

Jon Manninen, COR

2025-12-30 PJ CA

BID DOCUMENTS

FULLY SPRINKLERED

0499-0136

658-19-103

FIRE SUPPRESSION

NEW WORK PLAN

FIRST FLOOR PHASE 3

GENERAL NOTES

1/8" = 1'-0"F1

FIRST FLOOR FIRE SUPPRESSION PLAN -

PHASE 3 - PREP/RECOVERY

1. ALL AREAS ARE LIGHT HAZARD UNLESS OTHERWISE INDICATED

BY HATCHING. REFER TO LEGEND BELOW FOR HAZARD

CLASSIFICATION HATCHING.

2. FOR AREAS SUBJECT TO ELEVATED AMBIENT TEMPERATURES,

SPRINKLER HEAD TEMPERATURE RATINGS SHALL BE IN

ACCORDANCE WITH NFPA 13.

3. PROVIDE AUXILARY DRAINS AS NECESSARY IN ACCORDANCE

WITH NFPA 13.

4. PROVIDE ALL EQUIPMENT, MATERIAL, LABOR, SUPERVISION,

COSTS AND SERVICES REQUIRED TO INSTALL COMPLETE AND

WORKING SYSTEMS INCLUDING ALL ITEMS AND APPURTENANCES

NECESSARY, REASONABLY INCIDENTAL, OR CUSTOMARILY

INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS NOT

SPECIFIED OR SHOWN.

5. PENETRATIONS OF WALLS OR FLOORS FOR SPRINKLER PIPING

AND/OR EQUIPMENT SHALL BE PROPERLY SEALED AFTER

INSTALLATIONS. FIELD VERIFY EXISTING WALL PENETRATIONS

AND SEAL AS REQUIRED TO MAINTAIN WALL OR FLOOR RATING.

6. EACH TRADE SHALL COORDINATE THE ROUTING AND

INSTALLATION OF THEIR WORK WITH THAT OF ALL OTHER

TRADES THROUGH THE GENERAL CONTRACTOR. IN ANY

INSTANCES OF CONFLICT, SYSTEMS REQUIRING "GRADE" OR

"SLOPE" FOR DRAINAGE (SANITARY SEWER, SANITARY VENT,

EQUIPMENT/CONDENSATE DRAINS, ETC.) SHALL HAVE PRIORITY.

7. CONTRACTOR TO COORDINATE ROUTING OF SPRINKLER PIPING

WITH DUCTWORK, PIPING, AND STRUCTURE.

8. REFER TO MANUFACTURER'S LITERATURE AND INSTALLATION

RECOMMENDATIONS/INSTRUCTIONS FOR EXACT SIZES AND

LOCATIONS OF CONNECTIONS AND REQUIREMENTS OF OWNER

FURNISHED EQUIPMENT.

9. DO NOT ROUTE SPRINKLER PIPING OVER OR THROUGH

ELECTRICAL OR COMMUNICATION ROOMS UNLESS THE PIPING

DIRECTLY SERVES EQUIPMENT IN THE ROOM.

10. DO NOT ROUTE PIPE ABOVE ELECTRICAL EQUIPMENT AS

REQUIRED BY NFPA 13 AND NFPA 70. WHERE PIPING IS INSTALLED

ABOVE THE DEDICATED ELECTRICAL SPACE, PROVIDE DRIP PANS

BELOW AND ENSURE THERE ARE NO FITTINGS WITHIN THE

DEDICATED ELECTRICAL SPACE.

11. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA

PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER

SYSTEM.

12. THE NEW SPRINKLER ZONES BOUNDARIES SHOWN SHALL MATCH

THE NEW SMOKE COMPARTMENTS SHOWN IN THE GENERAL

INFORMATION DRAWINGS. IF EXISTING SPRINKLERS SERVING

AREAS OUTSIDE THE SCOPE OF WORK ARE FOUND TO BE

AFFECTED BY THE NEW ZONING, PROVISIONS SHALL BE MADE TO

PROVIDE A CONNECTION TO ITS APPROPRIATE ZONE. ALL WORK

SHALL BE COORDINATED WITH THE COR AND VA PERSONNEL.

13. REFER TO GENERAL INFORMATION DRAWINGS FOR

CONSTRUCTION PHASING INFORMATION.

AO

AO

SL

CR

CR

CR

CR

AO

A B C D E F G H I J K L

PHASE 4 AREA OF WORK

EXISTING ZONE CONTROL ASSEMBLY

SERVING SPRINKLER ZONE CD

ZONE BOUNDARIES

EXISTING ZONE CONTROL ASSEMBLY

SERVING SPRINKLER ZONE CD

PUMP ROOM

ID-1011

CLEAN CORE

1C-120

SCRUB

C1-25ASTRETCHER

ALCOVE

C1-25B

STRETCHER

ALCOVE

C1-26A

SCRUB

C1-26B

CORRIDOR

C1-26

STRETCHER

ALCOVE

C1-26C

LOUNGE

1C-114A

STORAGE

1C-121

CORRIDOR

1C-125

CORRIDOR

1C-126

OR-5

1C-131

ANESTHESIA

WORKROOM

1C-133

ELECTRICAL

1C-1037

OFFICE

1C-122

NURSE/ COMM

CENTER

1C-123

ORTHO STOR

1C-132

OR-4 ROBOTIC

1C-128

OR-3 ROBOTIC

1D-126

OR-2

1D-125

OR-1 HYBRID OR

1D-123

ZONE D

ZONE CD

ANTE

D-C119

ISOLATION ROOM

D-C117

PACU

D-C11

OFFICE

D-C118

NURSE STATION

D-C12 RECOVERY

D-C13

DEMO

D-C115

OFFICE

D-C124

DIRTY UTILITY

D-C125

GENERAL

STORAGE

D-C125A EQUIP STORAGE

D-C112

BREAK RM

D-C113TLT

D-C114

BIO HZRD

D-C111

WAITING

D-C110

ANEST OFFICE

D-C116

PATIENT ROOM

D-D116

PATIENT ROOM

D-D115

PATIENT ROOM

D-D112

PATIENT ROOM

D-D111

PATIENT RM

D-D110

PATIENT RM

D-D109

PATIENT RM

D-D108

PCU ROOM

D-D1001

PCU RM

D-D1002

ON CALL

D-D1004

STORAGE

D-D1003

ANTE

D-D1002ATOILET

D-C159

NURSING

STATION

D-C160

CORRIDOR

D-C161

CLEAN

D-D1029

SOILED HOLDING

D-D1028

ELECTRICAL

D-D1027

IRM

D-C165

RECOVERY CCLO

D-D101

MEDS

D-D1030

STORAGE

D-C168

NOURISHMENT

D-D1031

TOILET

D-C1005

WAITING

D-C1006

TOILET

D-C172

OFFICE

D-C173

ELECTRICAL

D-C175

CORRIDOR

D-C177

GROUP OFFICE

D-C1015

PCU OFFICE

D-C1007

PCU OFFICE

D-C1008

PCU EQUIPMENT

D-C1009

PCU LOUNGE /

LOCKERS

D-C1012

IRM

D-C184

HSK

D-C185

ELEV

D-C186

OFFICE

D-C1019

OFFICE

D-C1018

LOGISTICS

D-C1020

OFFICE

D-C190

CORRIDOR

XC

STAIR

XB

HOUSEKEEPING

D-C103

ELECTRICAL

D-C198

WORK ROOM

D-C1010

VA Drawing Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved by:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STANTON ENGINEERING SERVICES

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t

PF&A DESIGN, P.C.

Civil Engineering:

LABELLA ASSOCIATES

M-R PROJECT NO:

PLAN

NORTH

ACTUAL

NORTH

BUILDING 143

Project Number

Fire & Life Safety:

STANTON ENGINEERING SERVICES, LLC

/2 /2

:4

:0

P M

P4-FK101

RENOVATE SURGICAL SUITE

PHASE II

SALEM VA MEDICAL CENTER

Jon Manninen, COR

2025-12-30 PJ CA

BID DOCUMENTS

FULLY SPRINKLERED

0499-0136

658-19-103

FIRE SUPPRESSION

DEMOLITION PLAN

FIRST FLOOR PHASE 4

GENERAL NOTES

1/8" = 1'-0"F1

FIRST FLOOR FIRE SUPPRESSION

DEMOLITION PLAN - PHASE 4

1. DEMOLISH EXISTING SPRINKLERS AND PIPING TO ACCOMODATE

NEW ARCHITECTURAL LAYOUT WITHIN THE AREA OF WORK

UNLESS NOTED OTHERWISE. COORDINATE WITH VA OUTAGE

REQUIREMENTS AND THE COR.

2. EXISTING SPRINKLER MAIN PIPING AND ZONING IS SHOWN IN

APPROXIMATE LOCATIONS. PER RECORD DOCUMENTS, THE

ZONE CD SPRINKLER MAINS ARE CONNECTED BY BRANCHLINES.

CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND SIZE OF

PIPING AND EQUIPMENT PRIOR TO CONSTRUCTION. EXISTING

CONDITIONS DETERMINED FROM LIMITED SITE INVESTIGATION

AND RECORD DOCUMENTS.

3. EXISTING SMOKE ZONE BOUNDARIES SHOWN ARE BASED ON

RECORD DOCUMENTATION AND GENERAL INFORMATION

DRAWINGS. CONTRACTOR SHALL COORDINATE WITH THE COR

AND VA PERSONNEL IF ANY DISCREPANCIES ARE DISCOVERED

IN THE FIELD.

4. MAINTAIN ALL FIRE SUPPRESSION SYSTEMS CONTINUITY AND

NFPA 13 COMPLIANCE (E.G. SPACING, DISTANCE TO CEILING,

OBSTRUCTION REQUIREMENTS, ETC.) DURING RENOVATION. THE

FIRE DEPARTMENT AND THE VA COR SHALL BE NOTIFIED

IMMEDIATELY IF THE FIRE SUPPRESSION SYSTEM IS OUT OF

SERVICE AND AN APPROVED FIRE WATCH SHALL BE PROVIDED

FOR ALL OCCUPANTS LEFT UNPROTECTED BY THE SHUTDOWN

UNTIL THE FIRE SUPPRESSION SYSTEM HAS BEEN RETURNED TO

SERVICE.

5. SPRINKLER SYSTEM IS TO REMAIN IN SERVICE THROUGHOUT

PROJECT. TEMPORARILY REPLACE EXISTING PENDENT

SPRINKLERS WITH UPRIGHT SPRINKLERS AND PIPING IN AREAS

THAT HAVE CEILINGS REMOVED PER NFPA 241 AND NFPA 13.

6. SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13 AT THE

COMPLETION OF EACH PHASE. IF NEW DEFICIENCIES IN

SPRINKLER SYSTEM SPACING IN AREAS OUTSIDE OF THE

CONSTRUCTION AREA ARE CREATED DUE TO DEMOLITION AND

CONSTRUCTION ACTIVITIES (E.G. WHEN TEMPORARY BARRIERS

ARE INSTALLED, WHEN EXISTING WALLS ARE DEMOLISHED,

AND/OR WHEN NEW PERMANENT WALLS ARE INSTALLED), THE

CONTRACTOR SHALL MODIFY THE EXISTING SPRINKLERS TO

MAINTAIN NFPA 13 COMPLIANCE.

7. EXISTING SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA

SHALL STAY ACTIVE THROUGHOUT THE PROJECT. SHUTDOWNS

FOR WORK ON THE SYSTEM WITHIN THE AREA OF WORK THAT

IMPACT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .