Summary of Bid Documents for Renovate Surgical Suite Phase II
This is a comprehensive set of construction bid documents for the Renovate Surgical Suite Phase II project at Salem VA Medical Center, Building 143. The project involves modifications to the existing fire suppression and plumbing systems across a four-phase renovation of the surgical suite on the first floor. The contract is issued by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, with Jon Manninen serving as the Contracting Officer's Representative (COR). The project number is 2617, and the VA drawing number is 0499-0136 with document number 658-19-103.
The fire suppression scope includes modifications to the existing system serving the project area and installation of a new wet-pipe sprinkler system for the generator building. All work must comply with NFPA 13 (2022 Edition), IBC 2021, NFPA 70 (2020 Edition), NFPA 101 (2021 Edition), NFPA 241 (2022 Edition), and VA-PG-18-10 Fire Protection Design Manual (November 2023). The system will serve areas with light hazard (0.10 GPM/SF over 1500 SF), ordinary hazard groups 1-2 (0.15-0.20 GPM/SF over 1500 SF), and extra hazard group 1 (0.30 GPM/SF over 2500 SF) classifications. Building 143 has an existing 750 GPM @ 85 PSI fire pump in the sub-basement that will serve the new system. Sprinkler piping includes black steel Schedule 40 with threaded connections for pipes 2 inches and smaller, and black steel Schedule 10 with grooved connections for larger pipes. The contractor must provide hydraulic calculations, scaled working drawings, and commissioning in accordance with NFPA 13 and 25, with calculated demand falling no less than 10 percent below the available water supply curve. The project is divided into four construction phases, each requiring maintenance of NFPA 13 compliance and coordination with existing systems outside the work area.
The plumbing scope encompasses domestic hot and cold water distribution, sanitary and vent piping, medical gas systems (oxygen, medical air, nitrogen, nitrous oxide, CO2, and waste anesthesia gas disposal), and specialized fixtures for surgical suites and patient care areas. Medical gas systems utilize zone valve boxes (ZVBs) and medical gas headwalls (MGHs) with FM-approved quick response sprinklers and standard response sprinklers in specified equipment rooms. The contractor must coordinate all piping with HVAC ductwork, electrical systems, and structural elements, maintaining proper clearances and avoiding interference with access doors. All penetrations through fire-rated barriers must be sealed with listed fire-stop systems. Dead legs in domestic water piping must be removed or limited to 1.5 times the pipe diameter. The plumbing work includes installation of circuit setters for temperature control and removal of obsolete piping. All work must comply with the International Plumbing Code, ASPE standards, and VA construction and facilities management specifications. Four-phase coordination is required to maintain system continuity and NFPA compliance throughout renovation activities.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPRINKLER PIPE
ELBOW
TEE
CHECK VALVE
CONTROL VALVE
WATERFLOW INDICATOR
RISER CHECK VALVE
BACKFLOW PREVENTER
ORDINARY HAZARD GROUP 1
ORDINARY HAZARD GROUP 2
EXTRA HAZARD GROUP 1
FIRE DEPARTMENT
CONNECTION
ZONE BOUNDARY
VA Drawing Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STANTON ENGINEERING SERVICES
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t o n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t th re e in c h o n e f o o t
Architecture:
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
M-R PROJECT NO:
Project Number
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:3
P M
FX001
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
Jon Manninen, COR
2025-12-30 PJ CA
BID DOCUMENTS
FULLY SPRINKLERED
0499-0136
658-19-103
FIRE SUPPRESSION
COVER SHEET
FIRE SUPPRESSION ABBREVIATIONS
FIRE SUPPRESSION LEGEND
(EXISTING, DEMOLITION, NEW WORK)
FIRE SUPPRESSION GENERAL NOTES
1. THE FIRE PROTECTION SCOPE OF WORK INVOLVES MODIFICATIONS TO THE EXISTING FIRE SUPPRESSION SYSTEM SERVING THE AREAS IN THE PROJECT SCOPE OF WORK BOUNDARY AS INDICATED ON THE DRAWINGS AND PROVIDING A NEW WET
PIPE SPRINKLER SYSTEM TO SERVE THE GENERATOR BUILDING.
2. ALL AREAS ARE TO BE PROTECTED WITH AUTOMATIC SPRINKLER SYSTEMS UNLESS OTHERWISE NOTED.
3. SYSTEMS SHALL BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AS WELL AS THE FOLLOWING CODES AND STANDARDS:
A. CRITERIA IN VA-PG-18-10 FIRE PROTECTION DESIGN MANUAL (NOVEMBER 2023)
B. IBC - INTERNATIONAL BUILDING CODE, 2021
C. NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2022 EDITION
D. NFPA 70 - NATIONAL ELECTRIC CODE, 2020 EDITION
E. NFPA 101 - LIFE SAFETY CODE, 2021 EDITION
F. NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, 2022 EDITION
4. PROVIDE A COMPLETE, AUTOMATIC WET-TYPE SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 REQUIREMENTS AND VA STANDARDS IN ALL AREAS AS NOTED ON PLANS.
5. BUILDING 143 HAS AN EXISTING TO REMAIN 750 GPM @ 85 PSI RATED FIRE PUMP LOCATED IN THE SUB-BASEMENT.
6. IN GENERAL, SPRINKLERS SHALL BE ARRANGED FOR A MAXIMUM COVERAGE OF UNDER 225 SQUARE FEET PER HEAD FOR LIGHT HAZARD OCCUPANCIES AND 130 SQUARE FEET PER HEAD FOR ORDINARY HAZARD OCCUPANCIES AND 100 SF FOR EXTRA HAZARD OCCUPANCIES. COORDINATE WITH OTHER DISCIPLINES TO AVOID OBSTRUCTIONS SUCH AS LIGHTS, DIFFUSERS, ETC.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE PIPING AND SPRINKLER HEADS FOR PROPER COVERAGE IN EACH AREA AND ADD ADDITIONAL HEADS TO OBTAIN PROPER COVERAGE AS REQUIRED BY VARIATIONS IN FIELD LOCATIONS AND OBSTRUCTIONS AT NO ADDITIONAL COST TO OWNER. OBTAIN FINAL APPROVED ARCHITECTURAL LAYOUTS BEFORE LAYING OUT WORKING DRAWINGS.
8. PAINT AND LABEL ALL NEW SPRINKLER PIPE IN ACCORDANCE WITH SPECIFICATION 21 13 13.
9. IN UNFINISHED ROOMS WITH NO CEILING PROVIDE UPRIGHT TYPE SPRINKLER HEADS. COORDINATE HEAD LOCATIONS WITH HVAC CONTRACTOR TO MAINTAIN ADEQUATE COVERAGE ABOVE AND BELOW LARGE DUCTWORK AND OTHER OBSTRUCTIONS
AS GOVERNED BY NFPA 13.
10. CONTRACTOR SHALL SEAL ALL PIPE WALL AND FLOOR PENETRATIONS IN FIRE RATED BARRIERS WITH A LISTED FIRE STOP SYSTEM. SEE ARCHITECTURAL LIFE SAFETY PLAN FOR LOCATIONS OF SMOKE AND FIRE RATED PARTITIONS AND BARRIERS.
11. COORDINATE SPRINKLER PIPE RUNS WITH DUCTWORK, PLUMBING PIPING, AND LIGHTS. MAINTAIN 4'' CLEAR ABOVE LIGHTS. DO NO INTERFERE WITH DUCT ACCESS DOORS.
12. PIPE SIZES 2” AND SMALLER SHALL BE BLACK STEEL SCHEDULE 40 WITH THREADED END CONNECTIONS. PIPE SIZES 2.5” AND LARGER SHALL BE BLACK STEEL SCHEDULE 10 WITH GROOVED CONNECTIONS. GROOVES IN SCHEDULE 10 PIPING SHALL BE ROLLED GROOVED ONLY. HANGERS SHALL BE IN ACCORDANCE WITH NFPA 13. PROVIDE DRY SPRINKLER DROPS TO AREAS SUBJECT TO FREEZING. SPRINKLERS IN AREAS WITHOUT CEILINGS SHALL HAVE ROUGH BRASS OR FACTORY STANDARD
FINISH. ALL COMPONENTS SHALL BE UL LISTED AND FM APPROVED.
13. FLUSH, TEST, AND INSPECT WATER SUPPLY AND SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 AND 25. COMMISSION SYSTEM IN ACCORDANCE WITH MANUFACTURER, NFPA 13, COR, AND COMMISSIONING AGENT REQUIREMENTS. PROVIDE COPIES OF O&M MANUALS, CORRECTED SUBMITTALS, AS-BUILT SHOP DRAWINGS, AND TWO COPIES OF NFPA 25 TO OWNER, PROVIDE SYSTEM MAINTENANCE AND OPERATION INSTRUCTIONS TO OWNER'S PERSONNEL. SCHEDULE ACCEPTANCE TESTING TO BE WITNESSED BY CONTRACTING OFFICER'S REPRESENTATIVE (COR). PROVIDE CONTRACTOR'S CERTIFICATION AND TESTING PAPERWORK PER NFPA 13 AND 25.
14. HYDRAULICALLY DESIGN SYSTEM PER NFPA 13 AND IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND VA FIRE PROTECTION DESIGN MANUAL. CALCULATED DEMAND INCLUDING HOSE STREAM REQUIREMENTS SHALL FALL NO LESS THAN 10 PERCENT BELOW THE AVAILABLE WATER SUPPLY CURVE. PROVIDE A NEW FLOW TEST IN ACCORDANCE WITH NFPA 13 AND NFPA 291 PROCEDURES. SUBMIT HYDRAULIC CALCULATIONS TO CONTRACTING OFFICER'S REPRESENTATIVE (COR).
15. PREPARE SCALED WORKING DRAWINGS IN ACCORDANCE WITH NFPA 13 SHOWING LAYOUT AND DETAILS OF SPRINKLER SYSTEM. SUBMIT DRAWINGS SHOWING LAYOUT TO CONTRACTING OFFICER'S REPRESENTATIVE (COR).
16. THE DESIGN CRITERIA FOR THE SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH NFPA 13:
A. LIGHT HAZARD CLASSIFICATION: 0.10 GPM/SF DENSITY OVER 1500 SF FIRE AREA.
B. ORDINARY HAZARD GROUP-1 CLASSIFICATION: 0.15 GPM/SF DENSITY OVER 1500 SF FIRE AREA.
C. ORDINARY HAZARD GROUP-2 CLASSIFICATION: 0.20 GPM/SF DENSITY OVER 1500 SF FIRE AREA.
D. EXTRA HAZARD GROUP-1 CLASSIFICATION: 0.30 GPM/SF DENSITY OVER 2500 SF FIRE AREA.
17. PROVIDE ADDITIONAL SPRINKLER HEADS AS REQUIRED BY CEILING CONFIGURATION TO MEET REQUIREMENTS OF NFPA 13.
18. PROVIDE FM APPROVED QUICK RESPONSE SPRINKLERS IN ALL AREAS, EXCEPT THAT STANDARD RESPONSE SPRINKLERS SHALL BE PROVIDED IN FREEZERS, REFRIGERATORS, ELEVATOR HOISTWAYS, ELEVATOR MACHINE ROOMS, AND GENERATOR ROOMS. PROVIDE FM APPROVED STANDARD RESPONSE FUSIBLE LINK TYPE SPRINKLERS IN ALL ELECTRICAL ROOMS.
19. PROVIDE HEADGUARDS FOR ALL SPRINKLERS WHERE THE SPRINKLER IS INSTALLED LESS THAN 7 FEET 6 INCHES OVER ANY FINISHED FLOOR OR WORKING PLATFORM.
20. COMPLY WITH SEISMIC DESIGN REQUIREMENTS AS NECESSARY. REFER TO STRUCTURAL DRAWINGS FOR SEISMIC DESIGN CATEGORY INFORMATION.
21. WHERE STATIC PRESSURES EXCEED 100 PSI, SPRINKLERS IN A PENDENT POSITION SHALL HAVE A CUMULATIVE HORIZONTAL LENGTH OF UNSUPPORTED ARM OVERS, BRANCHLINE ENDS, OR SPRINKLER DROP SHALL NOT EXCEED 12 INCHES. IN ADDITION, EACH HANGER CLOSEST TO THE SPRINKLER SHALL BE OF A TYPE THAT PREVENTS UPWARD MOVEMENT OF PIPING.
22. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF PIPE ROUTING BETWEEN THE WORK AREA AND THE EXISTING BUILDING SUPPLY RISER. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF PIPE ROUTING BETWEEN THE EXISTING RISER AND THE FIRE PUMP DISCHARGE FOR HYDRAULIC CALCULATION PURPOSES. CONTRACTOR'S HYDRAULIC CALCULATIONS SHALL INDICATE ALL HYDRAULIC NODES BACK TO THE FIRE PUMP DISCHARGE ON SCALED DRAWINGS IN
ACCORDANCE WITH NFPA 13.
23. SPRINKLER CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT SPRINKLER SYSTEMS REMAIN IN COMPLIANCE WITH NFPA 13 AND NFPA 241 THROUGHOUT ALL PHASES OF RENOVATIONS. EXISTING SPRINKLER SYSTEMS WHICH SERVE THE SCOPE OF WORK AREAS BEING RENOVATED SHALL BE MODIFIED TO MAINTAIN NFPA 13 COMPLIANT SPRINKLER COVERAGE THROUGHOUT EACH PHASE OF RENOVATION. THE SYSTEM SHALL BE FULLY COMPLIANT AND OPERATIONAL THROUGHOUT CONSTRUCTION EXCEPT WHEN THE RENOVATION AREAS WHICH ARE ENCLOSED WITH 1-HOUR RATED FIRE BARRIERS PER NFPA 241.
FPT FIRE PUMP TRANSFER SWITCH IN EMERGENCY POSITION ZCA ZONE CONTROL ASSEMBLY
FPR FIRE PUMP RUNNING WS WET SYSTEM
FPP FIRE PUMP PHASE REVERSAL WP WEATHERPROOF
FPO FIRE PUMP POWER AVAILABLE W/O WITHOUT
FPL FIRE PUMP POWER/PHASE LOSS WMG WATER MOTOR GONG
FPF FIRE PUMP FAULT W/ WITH
FPE FIRE PUMP EMERGENCY ISOLATING SWITCH OPEN VAC VOLT, ALTERNATING CURRENT
FP FIRE PUMP UNO UNLESS NOTED OTHERWISE
FM FACTORY MUTUAL UL UNDERWRITERS' LABORATORY
FLR FLOOR TYP TYPICAL
FHV FIRE HOSE VALVE TS TAMPER SWITCH
FH FIRE HAT TOR TOP OF RISER
FFE FINISHED FLOOR ELEVATION TEMP TEMPERATURE
FEC FIRE EXTINGUISHER CABINET SYST-FEED SPRINKLER SYSTEM FEED MAIN
FE FIRE EXTINGUISHER SYST SYSTEM
FDC FIRE DEPARTMENT CONNECTION STS SHUNT TRIP SUPERVISION
FD FLOOR DRAIN STOR STORAGE
FMCP FIRE ALARM/MASS NOTIFICATION CONTROL PANEL STP STANDPIPE
FA FIRE ALARM ST STROBE
EXIST EXISTING SSI SECURITY SYSTEM INTERFACE
ETR EXISTING TO REMAIN SR SLEEPING ROOM
EST ELEVATOR SHUNT TRIP SQ SQUARE
EQUIP EQUIPMENT SP/ST SPEAKER/ STROBE
EPS ELEVATOR SHUNT TRIP POWER MONITORING SPKR SPRINKLER
EPR ELEVATOR PRIMARY FLOOR RECALL SPEC SPECIFICATION
EMER EMERGENCY SP SPEAKER
ELEV ELEVATOR SO SOUND SYSTEM OVERRIDE
EL ELEVATION SIM SIMILAR
EJ EXPANSION JOINT SGV SUPERVISED GATE VALVE
EH EXTRA HAZARD SDC SMOKE DAMPER CONTROL
EFS ELEVATOR FIRE HAT SOLID SD SMOKE DETECTOR
EFF ELEVATOR FIRE HAT FLASHING SCV SUPERVISED CONTROL VALVE
EF EXHAUST FAN SCHED SCHEDULE
EB ELECTRIC BELL SBV SUPERVISED BUTTERFLY VALVE
EAR ELEVATOR ALTERNATE FLOOR RECALL S SUPPLY
EA EACH RPZ REDUCED PRESSURE ZONE
E ELEVATOR RECALL RN RISER NIPPLE
DN DOWN/DROP NIPPLE RM ROOM
DIM DIMENSION REQ REQUIRED
DIA DIAMETER RCV RISER CONTROL VALVE
DH DOOR HOLD R RISER/RADIUS/RETURN
DD DUCT SMOKE DETECTOR PSI POUNDS PER SQUARE INCH
DC DIRECT CURRENT PS PRESSURE SWITCH
DEMO DEMOLISH, DEMOLITION PER PRIMARY ELEVATOR RECALL
DBA DECIBEL A-WEIGHTED OH ORDINARY HAZARD
DACT DIGITAL ALARM COMMUNICATOR TRANSMITTER OD OUTSIDE DIAMETER
CV CONTROL VALVE MNS MASS NOTIFICATION SYSTEM
CTR CENTER LOC LOCAL OPERATING CONSOLE
COR CONTRACTING OFFICER'S REPRESENTATIVE LH LIGHT HAZARD
CONT CONTINUE/ CONTINUOUS KH KITCHEN HOOD SUPPRESSION SYSTEM
CLG CEILING ID INSIDE DIAMETER
CIS COMMON INTELLIGIBILITY SCORE HT HEAT TRACING
CHV CHECK VALVE HL HI/LOW AIR SUPERVISORY
BOR BOTTOM OF RISER HGT HEIGHT
BFP BACK FLOW PREVENTER GF GENERATOR FAULT
BATT BATTERY GR GENERATOR RUNNING
AS AUTOMATIC SPRINKLER GPM GALLONS PER MINUTE
ALV ALARM CHECK VALVE GC GENERAL CONTRACTOR
AHU AIR HANDLING UNIT GA GAUGE
AFF ABOVE FINISHED FLOOR FT FEET
AAR AUTOMATIC AIR RELEASE FS FLOW SWITCH
1. THERE SHALL BE NO INTERRUPTION OF THE EXISTING SPRINKLER PROTECTION, WATER, ELECTRIC OR FIRE ALARM SERVICES WITHOUT PRIOR PERMISSION OF THE COR.
2. CONTRACTOR SHALL DEVELOP AN INTERIM FIRE PROTECTION PROGRAM WHERE INTERRUPTIONS INVOLVE OCCUPIED SPACES. REQUEST IN WRITING AT LEAST ONE WEEK PRIOR TO THE PLANNED INTERRUPTION.
3. CONTRACTOR SHALL RECEIVE DIRECTION FROM THE COR TO PERFORM TIE IN OF NEW WORK AND/OR REPROGRAMMING OF OPERATING, EXISTING FIRE ALARM AND SPRINKLER SYSTEMS.
OUTAGE REQUIREMENTS
Revisions: Date:
12-30-2025
A B
TEST HEADER
FIRE DEPARTMENT
CONNECTION
FIRE SPRINKLER RISER
FIRE SPRINKLER MAIN
F5
FX101
INCOMING UNDERGROUND
FIRE SERVICE MAIN. REFER
TO CIVIL DRAWINGS
FIRST FLOOR
0' - 0"
BASEMENT
-13' - 0 1/4"
TO BACKFLOW
PREVENTER TEST
HEADER
BACKFLOW
PREVENTER
TO FIRE
DEPARTMENT
CONNECTION
4" UNDERGROUND
FIRE SERVICE MAIN
ALARM CHECK
VALVE
TO SYSTEM SUPPLY
VA Drawing Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STANTON ENGINEERING SERVICES
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t
Civil Engineering:
LABELLA ASSOCIATES
M-R PROJECT NO:
PLAN
NORTH
ACTUAL
NORTH
Project Number
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:3
P M
FX101
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
Jon Manninen, COR
2025-12-30 PJ CA
BID DOCUMENTS
FULLY SPRINKLERED
0499-0136
658-19-103
FIRE SUPPRESSION
NEW WORK PLAN
GENERATOR BUILDING
GENERAL NOTES
1/4" = 1'-0"F1
GENERATOR BUILDING FIRE
SUPPRESSION PLAN
1/2" = 1'-0"F5
GENERATOR BUILDING FIRE
SUPPRESSION RISER
1. REFER TO FX001 LEGEND FOR HAZARD CLASSIFICATION
HATCHING.
2. FOR AREAS SUBJECT TO ELEVATED AMBIENT TEMPERATURES,
SPRINKLER HEAD TEMPERATURE RATINGS SHALL BE IN
ACCORDANCE WITH NFPA 13.
3. PROVIDE AUXILARY DRAINS AS NECESSARY IN ACCORDANCE
WITH NFPA 13.
4. PROVIDE ALL EQUIPMENT, MATERIAL, LABOR, SUPERVISION,
COSTS AND SERVICES REQUIRED TO INSTALL COMPLETE AND
WORKING SYSTEMS INCLUDING ALL ITEMS AND APPURTENANCES
NECESSARY, REASONABLY INCIDENTAL, OR CUSTOMARILY
INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS NOT
SPECIFIED OR SHOWN.
5. PENETRATIONS OF WALLS OR FLOORS FOR SPRINKLER PIPING
AND/OR EQUIPMENT SHALL BE PROPERLY SEALED AFTER
INSTALLATIONS. FIELD VERIFY EXISTING WALL PENETRATIONS
AND SEAL AS REQUIRED TO MAINTAIN WALL OR FLOOR RATING.
6. EACH TRADE SHALL COORDINATE THE ROUTING AND
INSTALLATION OF THEIR WORK WITH THAT OF ALL OTHER
TRADES THROUGH THE GENERAL CONTRACTOR. IN ANY
INSTANCES OF CONFLICT, SYSTEMS REQUIRING "GRADE" OR
"SLOPE" FOR DRAINAGE (SANITARY SEWER, SANITARY VENT,
EQUIPMENT/CONDENSATE DRAINS, ETC.) SHALL HAVE PRIORITY.
7. CONTRACTOR TO COORDINATE ROUTING OF SPRINKLER PIPING
WITH DUCTWORK, PIPING, AND STRUCTURE.
8. REFER TO MANUFACTURER'S LITERATURE AND INSTALLATION
RECOMMENDATIONS/INSTRUCTIONS FOR EXACT SIZES AND
LOCATIONS OF CONNECTIONS AND REQUIREMENTS OF OWNER
FURNISHED EQUIPMENT.
9. DO NOT ROUTE PIPE ABOVE ELECTRICAL EQUIPMENT AS
REQUIRED BY NFPA 13 AND NFPA 70. WHERE PIPING IS INSTALLED
ABOVE THE DEDICATED ELECTRICAL SPACE, PROVIDE DRIP PANS
BELOW AND ENSURE THERE ARE NO FITTINGS WITHIN THE
DEDICATED ELECTRICAL SPACE.
A B C D E F G H I J
PHASE 1 AREA OF WORK
EXISTING ZONE CONTROL ASSEMBLY
SERVING SPRINKLER ZONE CD
EXISTING ZCA SERVING
SPRINKLER ZONE CD
ELEVATORS
ZONE D ZONE CD
ZONE BOUNDARIES
EXISTING TO REMAIN ZONE CONTROL
ASSEMBLY SERVING SPRINKLER ZONE D
(ZONE 1-5)
POINT OF DEMOLITION BACK TO ZONE
CONTROL ASSEMBLY
EXISTING TO REMAIN SPRINKLER MAIN
SERVING ZONE D, (ZONE 1-6)
TO EXISTING ZONE
CONTROL ASSEMBLY
(ZONE D, 1-6)
PATIENT ROOM
D-143
OFFICE
D-124
DIRTY UTILITY RM
D-142
CORRIDOR
D-147
WORK RM
D-123
CORRIDOR
D-120
CORRIDOR
D-148
SEMI-RESTRICED
CORRIDOR
D-C123
TOILET
D-144
TOILET
D-145
TOILET
D-142D
TOILET
D-142E
ELECTRICAL
D-110
CLEAN LINEN
D-115
CLEAN SUPPLY
D-C133A
OR 4
D-C133
ELECTRICAL
D-C1037
EQUIPMENT
D-C131
IRM
D-C1038
OR 3
D-C130
OR 2
D-C126
OFFICE
D-C144
ANESTHESIA
WORKROOM
D-C122
OFFICE
D-C120
CLEAN CORE
D-C126D
DEMO
D-C126F
DEMO
D-C126C
DEMO
D-C126A
OR 5
D-C138
OR 6
D-C145
OR 7
D-C146
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
PATIENT RM
D-D110
PATIENT RM
D-D109
PATIENT RM
D-D108
PCU ROOM
D-D1001
PCU RM
D-D1002
ON CALL
D-D1004
STORAGE
D-D1003
ANTE
D-D1002ATOILET
D-C159
NURSING
STATION
D-C160
CORRIDOR
D-C161
CLEAN
D-D1029
SOILED HOLDING
D-D1028
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
STORAGE
D-C168
NOURISHMENT
D-D1031
TOILET
D-C1005
WAITING
D-C1006
TOILET
D-C172
OFFICE
D-C173
ELECTRICAL
D-C175
CORRIDOR
D-C177
GROUP OFFICE
D-C1015
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
WORK ROOM
D-C1010
PCU LOUNGE /
LOCKERS
D-C1012
IRM
D-C184
HSK
D-C185
ELEV
D-C186
OFFICE
D-C1019
OFFICE
D-C1018 LOGISTICS
D-C1020
OFFICE
D-C190
TOILET / SHOWER
D-C191
LOUNGE
D-C192 TOILET
D-C193
TOILET
D-C194
CORRIDOR
XC
STAIR
XB
HOUSEKEEPING
D-C103
ELECTRICAL
D-C198
OFFICE
D-C124 DIRTY UTILITIY
D-C125
GENERAL STOR
D-C125A
OFFICE
D-C115
OFFICE
D-C118 ANEST OFFICE
D-C116
ANTE
D-C119
ISOLATION ROOM
D-C117
PACU
DC-11
NURSE STATION
DC-12
BREAK RM
D-C113
TOILET
D-C114
STORAGE
D-C112
IRM
D-C121
HOUSEKEEPING
D-C105
OR 8
D-D1050
TOILET
D-C106B STORAGE
D-C106A
LOCKER
D-C107A
NURSE STATION
D-121
PATIENT ROOM
D-140
PATIENT ROOM
D-139
PATIENT ROOM
D-138
PATIENT ROOM
D-137
ISOLATION ANTE
D-136
PATIENT ROOM
D-133
PATIENT ROOM
D-132 STAFF LOUNGE
D-129
EQUIP. STORAGE
D-127
HSK
D-131
MEDS
D-134
STAFF WORK
D-130
OFFICE
D-125
CLEAN SUPPLY
D-126
NIGHT CALL
D-122
VA Drawing Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STANTON ENGINEERING SERVICES
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t
KEYPLAN
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
M-R PROJECT NO:
PLAN
NORTH
ACTUAL
NORTH
BUILDING 143
Project Number
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:4
P M
P1-FK101
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
Jon Manninen, COR
2025-12-30 PJ CA
BID DOCUMENTS
FULLY SPRINKLERED
0499-0136
658-19-103
FIRE SUPPRESSION
DEMOLITION PLAN
FIRST FLOOR PHASE 1
GENERAL NOTES
1. DEMOLISH EXISTING SPRINKLERS AND PIPING TO ACCOMODATE
NEW ARCHITECTURAL LAYOUT WITHIN THE AREA OF WORK
UNLESS NOTED OTHERWISE. COORDINATE WITH VA OUTAGE
REQUIREMENTS AND THE COR.
2. EXISTING SPRINKLER MAIN PIPING AND ZONING IS SHOWN IN
APPROXIMATE LOCATIONS. CONTRACTOR SHALL VERIFY EXACT
LOCATIONS AND SIZE OF PIPING AND EQUIPMENT PRIOR TO
CONSTRUCTION. EXISTING CONDITIONS DETERMINED FROM
LIMITED SITE INVESTIGATION AND RECORD DOCUMENTS.
3. EXISTING SMOKE ZONE BOUNDARIES SHOWN ARE BASED ON
RECORD DOCUMENTATION AND GENERAL INFORMATION
DRAWINGS. CONTRACTOR SHALL COORDINATE WITH THE COR
AND VA PERSONNEL IF ANY DISCREPANCIES ARE DISCOVERED
IN THE FIELD.
4. MAINTAIN ALL FIRE SUPPRESSION SYSTEMS CONTINUITY AND
NFPA 13 COMPLIANCE (E.G. SPACING, DISTANCE TO CEILING,
OBSTRUCTION REQUIREMENTS, ETC.) DURING RENOVATION. THE
FIRE DEPARTMENT AND THE VA COR SHALL BE NOTIFIED
IMMEDIATELY IF THE FIRE SUPPRESSION SYSTEM IS OUT OF
SERVICE AND AN APPROVED FIRE WATCH SHALL BE PROVIDED
FOR ALL OCCUPANTS LEFT UNPROTECTED BY THE SHUTDOWN
UNTIL THE FIRE SUPPRESSION SYSTEM HAS BEEN RETURNED TO
SERVICE.
5. SPRINKLER SYSTEM IS TO REMAIN IN SERVICE THROUGHOUT
PROJECT. TEMPORARILY REPLACE EXISTING PENDENT
SPRINKLERS WITH UPRIGHT SPRINKLERS AND PIPING IN AREAS
THAT HAVE CEILINGS REMOVED PER NFPA 241 AND NFPA 13.
6. SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13 AT THE
COMPLETION OF EACH PHASE. IF NEW DEFICIENCIES IN
SPRINKLER SYSTEM SPACING IN AREAS OUTSIDE OF THE
CONSTRUCTION AREA ARE CREATED DUE TO DEMOLITION AND
CONSTRUCTION ACTIVITIES (E.G. WHEN TEMPORARY BARRIERS
ARE INSTALLED, WHEN EXISTING WALLS ARE DEMOLISHED,
AND/OR WHEN NEW PERMANENT WALLS ARE INSTALLED), THE
CONTRACTOR SHALL MODIFY THE EXISTING SPRINKLERS TO
MAINTAIN NFPA 13 COMPLIANCE.
7. EXISTING SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA
SHALL STAY ACTIVE THROUGHOUT THE PROJECT. SHUTDOWNS
FOR WORK ON THE SYSTEM WITHIN THE AREA OF WORK THAT
IMPACT SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA
SHALL BE SCHEDULED WITH THE VA TWO WEEKS IN ADVANCE
AND PROVISIONS SET IN PLACE PER NFPA 241. RESTORE
SYSTEMS TO SERVICE AT THE END OF EACH WORKDAY.
8. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA
PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER
SYSTEM.
9. REFER TO GENERAL INFORMATION DRAWINGS FOR
CONSTRUCTION PHASING INFORMATION.
1/8" = 1'-0"F1
FIRST FLOOR FIRE SUPPRESSION
DEMOLITION PLAN - PHASE 1
CR
A B C D E F G H I J
CLEAN CORE
D-C126D
CONTROL ROOM
1D-124
OR-2
1D-125
OR-3 ROBOTIC
1D-126
SCRUB
C1-9B
STRETCHER
ALCOVE
C1-9A
STRETCHER
ALCOVE
C1-9C
SCRUB
C1-9BD
CORRIDOR
C1-18
CORRIDOR
C1-19
OR-1 HYBRID OR
1D-123
CLEAN CORE
1C-120
STRETCHER
ALCOVE
C1-9E
STAIR
S-8
PUMP ROOM
1D-122
IT
1D-120EQUIPMENT
1D-121
PHASE 1 AREA OF WORK
ZONE D
ZONE CD
ZONE BOUNDARIES
POINT OF CONNECTION TO EXISTING
ZONE CONTROL ASSEMBLY
EXISTING ZONE CONTROL ASSEMBLY
SERVING SPRINKLER ZONE CD
RECOVERY CCLO
D-D101
ELECTRICAL
D-D1027
SOILED HOLDING
D-D1028
CLEAN
D-D1029
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
CORRIDOR
D-C161
NURSING
STATION
D-C160
NOURISHMENT
D-D1031
MEDS
D-D1030
IRM
D-C165
PATIENT ROOM
D-D110
PATIENT ROOM
D-D109
PATIENT ROOM
D-D108
PCU ROOM
D-D1001
PCU ROOM
D-D1002
ON CALL
D-D1004
TOILET
D-C1005
STORAGE
D-D1003
ANTE
D-D1002ATOILET
D-C159
WAITING
D-C1006
TOILET
D-C172
OFFICE
D-C173
CORRIDOR
D-C177
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
GROUP OFFICE
D-C1015
WORK ROOM
D-C1010
PCU LOUNGE /
LOCKERS
D-C1012
OR-5
D-C138
STOR
D-C139
CONTROL
D-C141
EQUIP STOR
D-C143A
CLEAN SUPPLY
D-C143B
OR-7
D-C145
LOGISTICS
D-C1020
OFFICE
D-C1018
OFFICE
D-C1019
CYLINDER
STORAGE
D-C146
SOILED UTILITY
D-C142
ELECTRICAL
D-C175
CORRIDOR
XC
STAIR
XB
HOUSEKEEPING
D-C103
HSK
D-C105
OFFICE
D-C120
EQUIPMENT
STORAGE
D-C122
OFFICE
D-C123
OR-1
D-C126
CLEAN SUPPLY
D-C127
EQUIP STOR
D-C130B
SCRUB AREA
D-C126A
ELECTRICAL RM
D-C126C
HOUSEKEEPING
D-C126F
OR-4
D-C133
CLEAN SUPPLY
D-C133A
EQUIPMENT
STORAGE
D-C131
ELECTRIC
D-C1037
CLEAN SUPPLY
D-C1038
OR-2
D-C130
EXISTING ZCA SERVING
SPRINKLER ZONE CD
ELEVATORS
EXISTING TO REMAIN SPRINKLER MAIN
SERVING ZONE D, (ZONE 1-6)
TO EXISTING ZONE
CONTROL ASSEMBLY
(ZONE D, 1-6)
VA Drawing Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STANTON ENGINEERING SERVICES
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
M-R PROJECT NO:
PLAN
NORTH
ACTUAL
NORTH
BUILDING 143
Project Number
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:5
P M
P1-FX101
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
Jon Manninen, COR
2025-12-30 PJ CA
BID DOCUMENTS
FULLY SPRINKLERED
0499-0136
658-19-103
FIRE SUPPRESSION
NEW WORK PLAN
FIRST FLOOR PHASE 1
GENERAL NOTES
1/8" = 1'-0"F1
FIRST FLOOR FIRE SUPPRESSION PLAN -
PHASE 1
1. ALL AREAS ARE LIGHT HAZARD UNLESS OTHERWISE INDICATED
BY HATCHING. REFER TO LEGEND BELOW FOR HAZARD
CLASSIFICATION HATCHING.
2. FOR AREAS SUBJECT TO ELEVATED AMBIENT TEMPERATURES,
SPRINKLER HEAD TEMPERATURE RATINGS SHALL BE IN
ACCORDANCE WITH NFPA 13.
3. PROVIDE AUXILARY DRAINS AS NECESSARY IN ACCORDANCE
WITH NFPA 13.
4. PROVIDE ALL EQUIPMENT, MATERIAL, LABOR, SUPERVISION,
COSTS AND SERVICES REQUIRED TO INSTALL COMPLETE AND
WORKING SYSTEMS INCLUDING ALL ITEMS AND APPURTENANCES
NECESSARY, REASONABLY INCIDENTAL, OR CUSTOMARILY
INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS NOT
SPECIFIED OR SHOWN.
5. PENETRATIONS OF WALLS OR FLOORS FOR SPRINKLER PIPING
AND/OR EQUIPMENT SHALL BE PROPERLY SEALED AFTER
INSTALLATIONS. FIELD VERIFY EXISTING WALL PENETRATIONS
AND SEAL AS REQUIRED TO MAINTAIN WALL OR FLOOR RATING.
6. EACH TRADE SHALL COORDINATE THE ROUTING AND
INSTALLATION OF THEIR WORK WITH THAT OF ALL OTHER
TRADES THROUGH THE GENERAL CONTRACTOR. IN ANY
INSTANCES OF CONFLICT, SYSTEMS REQUIRING "GRADE" OR
"SLOPE" FOR DRAINAGE (SANITARY SEWER, SANITARY VENT,
EQUIPMENT/CONDENSATE DRAINS, ETC.) SHALL HAVE PRIORITY.
7. CONTRACTOR TO COORDINATE ROUTING OF SPRINKLER PIPING
WITH DUCTWORK, PIPING, AND STRUCTURE.
8. REFER TO MANUFACTURER'S LITERATURE AND INSTALLATION
RECOMMENDATIONS/INSTRUCTIONS FOR EXACT SIZES AND
LOCATIONS OF CONNECTIONS AND REQUIREMENTS OF OWNER
FURNISHED EQUIPMENT.
9. DO NOT ROUTE SPRINKLER PIPING OVER OR THROUGH
ELECTRICAL OR COMMUNICATION ROOMS UNLESS THE PIPING
DIRECTLY SERVES EQUIPMENT IN THE ROOM.
10. DO NOT ROUTE PIPE ABOVE ELECTRICAL EQUIPMENT AS
REQUIRED BY NFPA 13 AND NFPA 70. WHERE PIPING IS INSTALLED
ABOVE THE DEDICATED ELECTRICAL SPACE, PROVIDE DRIP PANS
BELOW AND ENSURE THERE ARE NO FITTINGS WITHIN THE
DEDICATED ELECTRICAL SPACE.
11. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA
PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER
SYSTEM.
12. THE NEW SPRINKLER ZONES BOUNDARIES SHOWN SHALL MATCH
THE NEW SMOKE COMPARTMENTS SHOWN IN THE GENERAL
INFORMATION DRAWINGS. IF EXISTING SPRINKLERS SERVING
AREAS OUTSIDE THE SCOPE OF WORK ARE FOUND TO BE
AFFECTED BY THE NEW ZONING, PROVISIONS SHALL BE MADE TO
PROVIDE A CONNECTION TO ITS APPROPRIATE ZONE. ALL WORK
SHALL BE COORDINATED WITH THE COR AND VA PERSONNEL.
13. REFER TO GENERAL INFORMATION DRAWINGS FOR
CONSTRUCTION PHASING INFORMATION.
A B C D E F G H I J
PHASE 2 AREA OF WORK
EXISTING ZONE CONTROL ASSEMBLY
SERVING SPRINKLER ZONE CD
ZONE D
ZONE CD
ZONE BOUNDARIES
EXISTING TO REMAIN ZONE CONTROL
ASSEMBLY SERVING SPRINKLER ZONE CD
CLEAN CORE
IC-1000
HYBRID OR
1D-123
CONTROL ROOM
1D-124
CORRIDOR
C1-19
OR-2
1D-125 OR-3 ROBOTIC
1D-126
EQUIPMENT
1D-121
IT
1D-120
PUMP ROOM
1D-122
DEMOLISH SPRINKLERS AND PIPING WITHIN AREA OF
WORK BACK TO EXISTING MAIN. SPRINKLER FEED MAIN IS
EXISTING TO REMAIN AS IT SERVES SPRINKLERS OUTSIDE
THE SCOPE OF WORK
CLEAN SUPPLY
D-C133A
OR-4
D-C133
ELECTRIC
D-C1037
EQUIPMENT
STORAGE
D-C131
CLEAN SUPPLY
D-C1038
OR-2
D-C130
CLEAN SUPPLY
D-C127
EQUIP STOR
D-C130B
OR-1
D-C126
OFFICE
D-C123
EQUIPMENT
STORAGE
D-C122
OFFICE
D-C120
CLEAN CORE
D-C126D
HOUSEKEEPING
D-C126F
ELECTRICAL RM
D-C126C
SCRUB AREA
D-C126A
WORK AREA
D-C126G
STAIR
S-8
IRM
D-C121
OR-5
D-C138
OR-6
D-C143
OR-7
D-C145
HSK
D-C105
STOR
D-C139
CORRIDOR
D-C21
SOILED UTILITY
D-C142
EQUIP STOR
D-C143A
CLEAN SUPPLY
D-C143B
CONTROL
D-C141
CYLINDER
STORAGE
D-C146
CORRIDOR
D-148
OR 4
D-C133
CLEAN CORE
D-C126D
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
PATIENT RM
D-D110
PATIENT RM
D-D109
PATIENT RM
D-D108
PCU ROOM
D-D1001
PCU RM
D-D1002
ON CALL
D-D1004
STORAGE
D-D1003
ANTE
D-D1002ATOILET
D-C159
NURSING
STATION
D-C160
CORRIDOR
D-C161
CLEAN
D-D1029
SOILED HOLDING
D-D1028
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
STORAGE
D-C168
NOURISHMENT
D-D1031
TOILET
D-C1005
WAITING
D-C1006
TOILET
D-C172
OFFICE
D-C173
ELECTRICAL
D-C175
CORRIDOR
D-C177
GROUP OFFICE
D-C1015
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
WORK ROOM
D-C1010
PCU LOUNGE /
LOCKERS
D-C1012
IRM
D-C184
HSK
D-C185
ELEV
D-C186
OFFICE
D-C1019
OFFICE
D-C1018 LOGISTICS
D-C1020
OFFICE
D-C190
TOILET / SHOWER
D-C191 LOUNGE
D-C192 TOILET
D-C193
TOILET
D-C194
CORRIDOR
XC
STAIR
XB
HOUSEKEEPING
D-C103
ELECTRICAL
D-C198
OFFICE
D-C124 DIRTY UTILITIY
D-C125
GENERAL STOR
D-C125A
OFFICE
D-C115
OFFICE
D-C118 ANEST OFFICE
D-C116
ANTE
D-C119
ISOLATION ROOM
D-C117
PACU
DC-11
NURSE STATION
DC-12
BREAK RM
D-C113
TOILET
D-C114
STORAGE
D-C112
OR 8
D-D1050
TOILET
D-C106B
STORAGE
D-C106A
LOCKER
D-C107A
VA Drawing Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STANTON ENGINEERING SERVICES
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
M-R PROJECT NO:
PLAN
NORTH
ACTUAL
NORTH
BUILDING 143
Project Number
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:1
P M
P2-FK101
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
Jon Manninen, COR
2025-12-30 PJ CA
BID DOCUMENTS
FULLY SPRINKLERED
0499-0136
658-19-103
FIRE SUPPRESSION
DEMOLITION PLAN
FIRST FLOOR PHASE 2
GENERAL NOTES
1/8" = 1'-0"F1
FIRST FLOOR FIRE SUPPRESSION
DEMOLITION PLAN - PHASE 2
1. DEMOLISH EXISTING SPRINKLERS AND PIPING TO ACCOMODATE
NEW ARCHITECTURAL LAYOUT WITHIN THE AREA OF WORK
UNLESS NOTED OTHERWISE. COORDINATE WITH VA OUTAGE
REQUIREMENTS AND THE COR.
2. EXISTING SPRINKLER MAIN PIPING AND ZONING IS SHOWN IN
APPROXIMATE LOCATIONS. PER RECORD DOCUMENTS, THE
ZONE CD SPRINKLER MAINS ARE CONNECTED BY BRANCHLINES.
CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND SIZE OF
PIPING AND EQUIPMENT PRIOR TO CONSTRUCTION. EXISTING
CONDITIONS DETERMINED FROM LIMITED SITE INVESTIGATION
AND RECORD DOCUMENTS.
3. EXISTING SMOKE ZONE BOUNDARIES SHOWN ARE BASED ON
RECORD DOCUMENTATION AND GENERAL INFORMATION
DRAWINGS. CONTRACTOR SHALL COORDINATE WITH THE COR
AND VA PERSONNEL IF ANY DISCREPANCIES ARE DISCOVERED
IN THE FIELD.
4. MAINTAIN ALL FIRE SUPPRESSION SYSTEMS CONTINUITY AND
NFPA 13 COMPLIANCE (E.G. SPACING, DISTANCE TO CEILING,
OBSTRUCTION REQUIREMENTS, ETC.) DURING RENOVATION. THE
FIRE DEPARTMENT AND THE VA COR SHALL BE NOTIFIED
IMMEDIATELY IF THE FIRE SUPPRESSION SYSTEM IS OUT OF
SERVICE AND AN APPROVED FIRE WATCH SHALL BE PROVIDED
FOR ALL OCCUPANTS LEFT UNPROTECTED BY THE SHUTDOWN
UNTIL THE FIRE SUPPRESSION SYSTEM HAS BEEN RETURNED TO
SERVICE.
5. SPRINKLER SYSTEM IS TO REMAIN IN SERVICE THROUGHOUT
PROJECT. TEMPORARILY REPLACE EXISTING PENDENT
SPRINKLERS WITH UPRIGHT SPRINKLERS AND PIPING IN AREAS
THAT HAVE CEILINGS REMOVED PER NFPA 241 AND NFPA 13.
6. SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13 AT THE
COMPLETION OF EACH PHASE. IF NEW DEFICIENCIES IN
SPRINKLER SYSTEM SPACING IN AREAS OUTSIDE OF THE
CONSTRUCTION AREA ARE CREATED DUE TO DEMOLITION AND
CONSTRUCTION ACTIVITIES (E.G. WHEN TEMPORARY BARRIERS
ARE INSTALLED, WHEN EXISTING WALLS ARE DEMOLISHED,
AND/OR WHEN NEW PERMANENT WALLS ARE INSTALLED), THE
CONTRACTOR SHALL MODIFY THE EXISTING SPRINKLERS TO
MAINTAIN NFPA 13 COMPLIANCE.
7. EXISTING SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA
SHALL STAY ACTIVE THROUGHOUT THE PROJECT. SHUTDOWNS
FOR WORK ON THE SYSTEM WITHIN THE AREA OF WORK THAT
IMPACT SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA
SHALL BE SCHEDULED WITH THE VA TWO WEEKS IN ADVANCE
AND PROVISIONS SET IN PLACE PER NFPA 241. RESTORE
SYSTEMS TO SERVICE AT THE END OF EACH WORKDAY.
8. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA
PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER
SYSTEM.
9. REFER TO GENERAL INFORMATION DRAWINGS FOR
CONSTRUCTION PHASING INFORMATION.
SL
CR
CR
CR
A B C D E F G H I J
PHASE 2 AREA OF WORK
OR-4 ROBOTIC
1C-128
OR-5
1C-126
ORTHO STOR
1C-125
SCRUB
C1-9F
ANESTHESIA
WORKROOM
1C-127
HAC
1C-122
LINEN ALCOVE
1C-123
IRM
1C-121
OR-7
1C-140
OR-6 CYSTO
1C-142
CORRIDOR
C1-16
EQUIPMENT
STORAGE
1C-145
CORRIDOR
C1-17
ALCOVE
C1-16C
ELECTRICAL
1C-1037
CLEAN CORE
IC-1000
CORRIDOR
D-18
NURSE STATION
D-C18
EXISTING ZONE CONTROL ASSEMBLY
SERVING SPRINKLER ZONE CD
ZONE D
ZONE CD
ZONE BOUNDARIES
EXISTING ZONE CONTROL ASSEMBLY
SERVING SPRINKLER ZONE CD
CLEAN CORE
IC-1000
IT
1D-120
EQUIPMENT
1D-121
PUMP ROOM
1D-122
CORRIDOR
C1-19
HYBRID OR
1D-123
CONTROL ROOM
1D-124 SCRUB
C1-9B
OR-2
1D-125
OR-3 ROBOTIC
1D-126
SCRUB
C1-9BD
OFFICE
D-C124
OFFICE
D-C115
OR 8
D-C106
CORRIDOR
D-C12
WAITING
D-C107
TLT
D-C106B
STORAGE
D-C106A
SOILED
1C-144
CYLINDER
STORAGE
1C-143
EXISTING ZCA SERVING
SPRINKLER ZONE CD
ELEVATORS
EXISTING TO REMAIN SPRINKLER MAIN
SERVING ZONE D, (ZONE 1-6)
TO EXISTING ZONE
CONTROL ASSEMBLY
(ZONE D, 1-6)
NEW SPRINKLER
MAIN
CONNECT TO
EXISTING PIPING
PROVIDE CAP,
PREP FOR FUTURE
CONNECTION IN
PHASE 3
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
PATIENT ROOM
D-D110
PATIENT ROOM
D-D109
PATIENT ROOM
D-D108
PCU ROOM
D-D1001
PCU ROOM
D-D1002
ON CALL
D-D1004
STORAGE
D-D1003
ANTE
D-D1002ATOILET
D-C159
NURSING
STATION
D-C160
CORRIDOR
D-C161
CLEAN
D-D1029
SOILED HOLDING
D-D1028
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
STORAGE
D-C168
NOURISHMENT
D-D1031
TOILET
D-C1005
WAITING
D-C1006
TOILET
D-C172
OFFICE
D-C173
ELECTRICAL
D-C175
CORRIDOR
D-C177
GROUP OFFICE
D-C1015
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
WORK ROOM
D-C1010
PCU LOUNGE /
LOCKERS
D-C1012
OFFICE
D-C1019
OFFICE
D-C1018 LOGISTICS
D-C1020
CORRIDOR
XC
STAIR
XB
HOUSEKEEPING
D-C103
ELECTRICAL
D-C198
VA Drawing Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STANTON ENGINEERING SERVICES
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
M-R PROJECT NO:
PLAN
NORTH
ACTUAL
NORTH
BUILDING 143
Project Number
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:1
P M
P2-FX101
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
Jon Manninen, COR
2025-12-30 PJ CA
BID DOCUMENTS
FULLY SPRINKLERED
0499-0136
658-19-103
FIRE SUPPRESSION
NEW WORK PLAN
FIRST FLOOR PHASE 2
GENERAL NOTES
1/8" = 1'-0"F1
FIRST FLOOR FIRE SUPPRESSION PLAN -
PHASE 2
1. ALL AREAS ARE LIGHT HAZARD UNLESS OTHERWISE INDICATED
BY HATCHING. REFER TO LEGEND BELOW FOR HAZARD
CLASSIFICATION HATCHING.
2. FOR AREAS SUBJECT TO ELEVATED AMBIENT TEMPERATURES,
SPRINKLER HEAD TEMPERATURE RATINGS SHALL BE IN
ACCORDANCE WITH NFPA 13.
3. PROVIDE AUXILARY DRAINS AS NECESSARY IN ACCORDANCE
WITH NFPA 13.
4. PROVIDE ALL EQUIPMENT, MATERIAL, LABOR, SUPERVISION,
COSTS AND SERVICES REQUIRED TO INSTALL COMPLETE AND
WORKING SYSTEMS INCLUDING ALL ITEMS AND APPURTENANCES
NECESSARY, REASONABLY INCIDENTAL, OR CUSTOMARILY
INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS NOT
SPECIFIED OR SHOWN.
5. PENETRATIONS OF WALLS OR FLOORS FOR SPRINKLER PIPING
AND/OR EQUIPMENT SHALL BE PROPERLY SEALED AFTER
INSTALLATIONS. FIELD VERIFY EXISTING WALL PENETRATIONS
AND SEAL AS REQUIRED TO MAINTAIN WALL OR FLOOR RATING.
6. EACH TRADE SHALL COORDINATE THE ROUTING AND
INSTALLATION OF THEIR WORK WITH THAT OF ALL OTHER
TRADES THROUGH THE GENERAL CONTRACTOR. IN ANY
INSTANCES OF CONFLICT, SYSTEMS REQUIRING "GRADE" OR
"SLOPE" FOR DRAINAGE (SANITARY SEWER, SANITARY VENT,
EQUIPMENT/CONDENSATE DRAINS, ETC.) SHALL HAVE PRIORITY.
7. CONTRACTOR TO COORDINATE ROUTING OF SPRINKLER PIPING
WITH DUCTWORK, PIPING, AND STRUCTURE.
8. REFER TO MANUFACTURER'S LITERATURE AND INSTALLATION
RECOMMENDATIONS/INSTRUCTIONS FOR EXACT SIZES AND
LOCATIONS OF CONNECTIONS AND REQUIREMENTS OF OWNER
FURNISHED EQUIPMENT.
9. DO NOT ROUTE SPRINKLER PIPING OVER OR THROUGH
ELECTRICAL OR COMMUNICATION ROOMS UNLESS THE PIPING
DIRECTLY SERVES EQUIPMENT IN THE ROOM.
10. DO NOT ROUTE PIPE ABOVE ELECTRICAL EQUIPMENT AS
REQUIRED BY NFPA 13 AND NFPA 70. WHERE PIPING IS INSTALLED
ABOVE THE DEDICATED ELECTRICAL SPACE, PROVIDE DRIP PANS
BELOW AND ENSURE THERE ARE NO FITTINGS WITHIN THE
DEDICATED ELECTRICAL SPACE.
11. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA
PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER
SYSTEM.
12. THE NEW SPRINKLER ZONES BOUNDARIES SHOWN SHALL MATCH
THE NEW SMOKE COMPARTMENTS SHOWN IN THE GENERAL
INFORMATION DRAWINGS. IF EXISTING SPRINKLERS SERVING
AREAS OUTSIDE THE SCOPE OF WORK ARE FOUND TO BE
AFFECTED BY THE NEW ZONING, PROVISIONS SHALL BE MADE TO
PROVIDE A CONNECTION TO ITS APPROPRIATE ZONE. ALL WORK
SHALL BE COORDINATED WITH THE COR AND VA PERSONNEL.
13. REFER TO GENERAL INFORMATION DRAWINGS FOR
CONSTRUCTION PHASING INFORMATION.
SL
CR
CR
CR
A B C D E F G H I J K L
PHASE 3 AREA OF WORK
PHASE 3 AREA OF WORK
EXISTING ZONE CONTROL ASSEMBLY
SERVING SPRINKLER ZONE CD
ZONE D
ZONE CD
ZONE BOUNDARIES
EXISTING ZONE CONTROL ASSEMBLY
SERVING SPRINKLER ZONE CD
ZONE CD
SPRINKLER MAIN
ZONE CD SPRINKLER
MAIN
HYBRID OR
1D-123
EQUIPMENT
1D-121
IT
1D-120
CORRIDOR
C1-24
OR-2
1D-125
CONTROL ROOM
1D-124
OR-3 ROBOTIC
1D-126
OR-4 ROBOTIC
1C-128
ANESTHESIA
WORKROOM
1C-127
ELECTRICAL
1C-1037
OR-5
1C-126
EQUIPMENT
STORAGE
1C-131
OR-6
1C-130
OR-7
1C-129
SOILED
IC-1016
GAS
IC-1017
CORRIDOR
C1-16
OR 8
D-C106
STORAGE
D-C106A
OFFICE
D-C108
WAITING
D-C107
LOCKERS
D-C107A TLT
D-C107B
OFFICE
D-C16
OFFICE
D-C109
OFFICE
D-C109A
TLT
D-C106B
CORRIDOR
D-C12
DEMO
D-15
OFFICE
D-C108A
OFFICE
D-C115
OFFICE
D-C124
NURSE STATION
D-18
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
PATIENT RM
D-D110
PATIENT RM
D-D109
PATIENT RM
D-D108
PCU ROOM
D-D1001
PCU RM
D-D1002
ON CALL
D-D1004
STORAGE
D-D1003
ANTE
D-D1002ATOILET
D-C159
NURSING
STATION
D-C160
CORRIDOR
D-C161
CLEAN
D-D1029
SOILED HOLDING
D-D1028
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
STORAGE
D-C168
NOURISHMENT
D-D1031
TOILET
D-C1005
WAITING
D-C1006
TOILET
D-C172 OFFICE
D-C173 ELECTRICAL
D-C175
CORRIDOR
D-C177
GROUP OFFICE
D-C1015
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
PCU LOUNGE /
LOCKERS
D-C1012
IRM
D-C184
HSK
D-C185
ELEV
D-C186
OFFICE
D-C1019
OFFICE
D-C1018
LOGISTICS
D-C1020
OFFICE
D-C190
CORRIDOR
XC
STAIR
XB
HOUSEKEEPING
D-C103
ELECTRICAL
D-C198
DIRTY UTILITIY
D-C125
GENERAL STOR
D-C125A
OFFICE
D-C118 ANEST OFFICE
D-C116
ANTE
D-C119
ISOLATION ROOM
D-C117
PACU
DC-11
RECOVERY
D-C13A
NURSE STATION
DC-12
BREAK RM
D-C113
TOILET
D-C114
STORAGE
D-C112
BIOHAZARD
D-C111
WAITING ROOM
D-C110
IRM
D-C121
WORK ROOM
D-C1010
VA Drawing Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STANTON ENGINEERING SERVICES
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
M-R PROJECT NO:
PLAN
NORTH
ACTUAL
NORTH
BUILDING 143
Project Number
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:3
P M
P3-FK101
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
Jon Manninen, COR
2025-12-30 PJ CA
BID DOCUMENTS
FULLY SPRINKLERED
0499-0136
658-19-103
FIRE SUPPRESSION
DEMOLITION PLAN
FIRST FLOOR PHASE 3
GENERAL NOTES
1/8" = 1'-0"F1
FIRST FLOOR FIRE SUPPRESSION
DEMOLITION PLAN - PHASE 3
1. DEMOLISH EXISTING SPRINKLERS AND PIPING TO ACCOMODATE
NEW ARCHITECTURAL LAYOUT WITHIN THE AREA OF WORK
UNLESS NOTED OTHERWISE. COORDINATE WITH VA OUTAGE
REQUIREMENTS AND THE COR.
2. EXISTING SPRINKLER MAIN PIPING AND ZONING IS SHOWN IN
APPROXIMATE LOCATIONS. PER RECORD DOCUMENTS, THE
ZONE CD SPRINKLER MAINS ARE CONNECTED BY BRANCHLINES.
CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND SIZE OF
PIPING AND EQUIPMENT PRIOR TO CONSTRUCTION. EXISTING
CONDITIONS DETERMINED FROM LIMITED SITE INVESTIGATION
AND RECORD DOCUMENTS.
3. EXISTING SMOKE ZONE BOUNDARIES SHOWN ARE BASED ON
RECORD DOCUMENTATION AND GENERAL INFORMATION
DRAWINGS. CONTRACTOR SHALL COORDINATE WITH THE COR
AND VA PERSONNEL IF ANY DISCREPANCIES ARE DISCOVERED
IN THE FIELD.
4. MAINTAIN ALL FIRE SUPPRESSION SYSTEMS CONTINUITY AND
NFPA 13 COMPLIANCE (E.G. SPACING, DISTANCE TO CEILING,
OBSTRUCTION REQUIREMENTS, ETC.) DURING RENOVATION. THE
FIRE DEPARTMENT AND THE VA COR SHALL BE NOTIFIED
IMMEDIATELY IF THE FIRE SUPPRESSION SYSTEM IS OUT OF
SERVICE AND AN APPROVED FIRE WATCH SHALL BE PROVIDED
FOR ALL OCCUPANTS LEFT UNPROTECTED BY THE SHUTDOWN
UNTIL THE FIRE SUPPRESSION SYSTEM HAS BEEN RETURNED TO
SERVICE.
5. SPRINKLER SYSTEM IS TO REMAIN IN SERVICE THROUGHOUT
PROJECT. TEMPORARILY REPLACE EXISTING PENDENT
SPRINKLERS WITH UPRIGHT SPRINKLERS AND PIPING IN AREAS
THAT HAVE CEILINGS REMOVED PER NFPA 241 AND NFPA 13.
6. SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13 AT THE
COMPLETION OF EACH PHASE. IF NEW DEFICIENCIES IN
SPRINKLER SYSTEM SPACING IN AREAS OUTSIDE OF THE
CONSTRUCTION AREA ARE CREATED DUE TO DEMOLITION AND
CONSTRUCTION ACTIVITIES (E.G. WHEN TEMPORARY BARRIERS
ARE INSTALLED, WHEN EXISTING WALLS ARE DEMOLISHED,
AND/OR WHEN NEW PERMANENT WALLS ARE INSTALLED), THE
CONTRACTOR SHALL MODIFY THE EXISTING SPRINKLERS TO
MAINTAIN NFPA 13 COMPLIANCE.
7. EXISTING SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA
SHALL STAY ACTIVE THROUGHOUT THE PROJECT. SHUTDOWNS
FOR WORK ON THE SYSTEM WITHIN THE AREA OF WORK THAT
IMPACT SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA
SHALL BE SCHEDULED WITH THE VA TWO WEEKS IN ADVANCE
AND PROVISIONS SET IN PLACE PER NFPA 241. RESTORE
SYSTEMS TO SERVICE AT THE END OF EACH WORKDAY.
8. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA
PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER
SYSTEM.
9. REFER TO GENERAL INFORMATION DRAWINGS FOR
CONSTRUCTION PHASING INFORMATION.
AO
AO
SL
CR
CR
CR
CR
AO
A B C D E F G H I J K L
PACU
D-C11
PRE-OP
1C-105.1
MEDS
1C-113
NURSE STATION
1C-105ACOMM CTR
1C-106
EQUIP ALCOVE
1C-112
TOILET
1C-109
HK
1C-108
CORRIDOR
C1-13
CORRIDOR
C1-12
CORRIDOR
C1-11
LINEN CLOSET
1C-107
ANESTHESIA
1C-124
SHARED OFFICE
1C-156
OFFICE
1C-157
CORRIDOR
C1-11
PHASE 3 AREA OF
WORK
PHASE 3 AREA OF WORK
EXISTING ZONE CONTROL ASSEMBLY
SERVING SPRINKLER ZONE CD
ZONE D
ZONE CD
ZONE BOUNDARIES
EXISTING ZONE CONTROL ASSEMBLY
SERVING SPRINKLER ZONE CD
NEW SPRINKLER
MAIN
CONNECT TO
EXISTING PIPING
PROVIDE CAP,
PREP FOR FUTURE
CONNECTION IN
PHASE 4
OR-7
1C-129
OR-6
1C-130
CORRIDOR
C1-16
GAS
IC-1017
SOILED
IC-1016
EQUIPMENT
STORAGE
1C-131
EQUIPMENT
1D-121
IT
1D-120
CORRIDOR
C1-24
HYBRID OR
1D-123
CONTROL ROOM
1D-124
OR-2
1D-125
OR-3 ROBOTIC
1D-126
OR-4 ROBOTIC
1C-128
ANESTHESIA
WORKROOM
1C-127
CLEAN CORE
1C-120
OR-5
1C-126
HAC
1C-122ORTHO STOR
C1-18
CORRIDOR
C1-11
CORRIDOR
C1-15
OFFICE
D-C124
DEMO
D-C115
ANEST OFFICE
D-C116
OFFICE
D-C118
TLT
D-C114
BREAK RM
D-C113
EQUIP STORAGE
D-C112
DIRTY UTILITY
D-C125
BIO HZRD
D-C111
WAITING
D-C110
RECOVERY
D-C13
NURSE STATION
D-C12
ISOLATION ROOM
D-C117
ANTE
D-C119
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
PATIENT ROOM
D-D110
PATIENT ROOM
D-D109
PATIENT ROOM
D-D108
PCU ROOM
D-D1001
PCU ROOM
D-D1002
ON CALL
D-D1004
STORAGE
D-D1003
ANTE
D-D1002ATOILET
D-C159
NURSING
STATION
D-C160
CORRIDOR
D-C161
CLEAN
D-D1029
SOILED HOLDING
D-D1028
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
STORAGE
D-C168
NOURISHMENT
D-D1031
TOILET
D-C1005
WAITING
D-C1006
TOILET
D-C172
OFFICE
D-C173
ELECTRICAL
D-C175
CORRIDOR
D-C177
GROUP OFFICE
D-C1015
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
WORK ROOM
D-C1010
PCU LOUNGE /
LOCKERS
D-C1012
CORRIDOR
XC
VA Drawing Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STANTON ENGINEERING SERVICES
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
M-R PROJECT NO:
PLAN
NORTH
ACTUAL
NORTH
BUILDING 143
Project Number
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:4
P M
P3-FX101
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
Jon Manninen, COR
2025-12-30 PJ CA
BID DOCUMENTS
FULLY SPRINKLERED
0499-0136
658-19-103
FIRE SUPPRESSION
NEW WORK PLAN
FIRST FLOOR PHASE 3
GENERAL NOTES
1/8" = 1'-0"F1
FIRST FLOOR FIRE SUPPRESSION PLAN -
PHASE 3 - PREP/RECOVERY
1. ALL AREAS ARE LIGHT HAZARD UNLESS OTHERWISE INDICATED
BY HATCHING. REFER TO LEGEND BELOW FOR HAZARD
CLASSIFICATION HATCHING.
2. FOR AREAS SUBJECT TO ELEVATED AMBIENT TEMPERATURES,
SPRINKLER HEAD TEMPERATURE RATINGS SHALL BE IN
ACCORDANCE WITH NFPA 13.
3. PROVIDE AUXILARY DRAINS AS NECESSARY IN ACCORDANCE
WITH NFPA 13.
4. PROVIDE ALL EQUIPMENT, MATERIAL, LABOR, SUPERVISION,
COSTS AND SERVICES REQUIRED TO INSTALL COMPLETE AND
WORKING SYSTEMS INCLUDING ALL ITEMS AND APPURTENANCES
NECESSARY, REASONABLY INCIDENTAL, OR CUSTOMARILY
INCLUDED, EVEN THOUGH EACH AND EVERY ITEM IS NOT
SPECIFIED OR SHOWN.
5. PENETRATIONS OF WALLS OR FLOORS FOR SPRINKLER PIPING
AND/OR EQUIPMENT SHALL BE PROPERLY SEALED AFTER
INSTALLATIONS. FIELD VERIFY EXISTING WALL PENETRATIONS
AND SEAL AS REQUIRED TO MAINTAIN WALL OR FLOOR RATING.
6. EACH TRADE SHALL COORDINATE THE ROUTING AND
INSTALLATION OF THEIR WORK WITH THAT OF ALL OTHER
TRADES THROUGH THE GENERAL CONTRACTOR. IN ANY
INSTANCES OF CONFLICT, SYSTEMS REQUIRING "GRADE" OR
"SLOPE" FOR DRAINAGE (SANITARY SEWER, SANITARY VENT,
EQUIPMENT/CONDENSATE DRAINS, ETC.) SHALL HAVE PRIORITY.
7. CONTRACTOR TO COORDINATE ROUTING OF SPRINKLER PIPING
WITH DUCTWORK, PIPING, AND STRUCTURE.
8. REFER TO MANUFACTURER'S LITERATURE AND INSTALLATION
RECOMMENDATIONS/INSTRUCTIONS FOR EXACT SIZES AND
LOCATIONS OF CONNECTIONS AND REQUIREMENTS OF OWNER
FURNISHED EQUIPMENT.
9. DO NOT ROUTE SPRINKLER PIPING OVER OR THROUGH
ELECTRICAL OR COMMUNICATION ROOMS UNLESS THE PIPING
DIRECTLY SERVES EQUIPMENT IN THE ROOM.
10. DO NOT ROUTE PIPE ABOVE ELECTRICAL EQUIPMENT AS
REQUIRED BY NFPA 13 AND NFPA 70. WHERE PIPING IS INSTALLED
ABOVE THE DEDICATED ELECTRICAL SPACE, PROVIDE DRIP PANS
BELOW AND ENSURE THERE ARE NO FITTINGS WITHIN THE
DEDICATED ELECTRICAL SPACE.
11. CONTRACTOR SHALL COORDINATE WITH THE COR AND VA
PERSONNEL PRIOR TO ANY WORK ON THE EXISTING SPRINKLER
SYSTEM.
12. THE NEW SPRINKLER ZONES BOUNDARIES SHOWN SHALL MATCH
THE NEW SMOKE COMPARTMENTS SHOWN IN THE GENERAL
INFORMATION DRAWINGS. IF EXISTING SPRINKLERS SERVING
AREAS OUTSIDE THE SCOPE OF WORK ARE FOUND TO BE
AFFECTED BY THE NEW ZONING, PROVISIONS SHALL BE MADE TO
PROVIDE A CONNECTION TO ITS APPROPRIATE ZONE. ALL WORK
SHALL BE COORDINATED WITH THE COR AND VA PERSONNEL.
13. REFER TO GENERAL INFORMATION DRAWINGS FOR
CONSTRUCTION PHASING INFORMATION.
AO
AO
SL
CR
CR
CR
CR
AO
A B C D E F G H I J K L
PHASE 4 AREA OF WORK
EXISTING ZONE CONTROL ASSEMBLY
SERVING SPRINKLER ZONE CD
ZONE BOUNDARIES
EXISTING ZONE CONTROL ASSEMBLY
SERVING SPRINKLER ZONE CD
PUMP ROOM
ID-1011
CLEAN CORE
1C-120
SCRUB
C1-25ASTRETCHER
ALCOVE
C1-25B
STRETCHER
ALCOVE
C1-26A
SCRUB
C1-26B
CORRIDOR
C1-26
STRETCHER
ALCOVE
C1-26C
LOUNGE
1C-114A
STORAGE
1C-121
CORRIDOR
1C-125
CORRIDOR
1C-126
OR-5
1C-131
ANESTHESIA
WORKROOM
1C-133
ELECTRICAL
1C-1037
OFFICE
1C-122
NURSE/ COMM
CENTER
1C-123
ORTHO STOR
1C-132
OR-4 ROBOTIC
1C-128
OR-3 ROBOTIC
1D-126
OR-2
1D-125
OR-1 HYBRID OR
1D-123
ZONE D
ZONE CD
ANTE
D-C119
ISOLATION ROOM
D-C117
PACU
D-C11
OFFICE
D-C118
NURSE STATION
D-C12 RECOVERY
D-C13
DEMO
D-C115
OFFICE
D-C124
DIRTY UTILITY
D-C125
GENERAL
STORAGE
D-C125A EQUIP STORAGE
D-C112
BREAK RM
D-C113TLT
D-C114
BIO HZRD
D-C111
WAITING
D-C110
ANEST OFFICE
D-C116
PATIENT ROOM
D-D116
PATIENT ROOM
D-D115
PATIENT ROOM
D-D112
PATIENT ROOM
D-D111
PATIENT RM
D-D110
PATIENT RM
D-D109
PATIENT RM
D-D108
PCU ROOM
D-D1001
PCU RM
D-D1002
ON CALL
D-D1004
STORAGE
D-D1003
ANTE
D-D1002ATOILET
D-C159
NURSING
STATION
D-C160
CORRIDOR
D-C161
CLEAN
D-D1029
SOILED HOLDING
D-D1028
ELECTRICAL
D-D1027
IRM
D-C165
RECOVERY CCLO
D-D101
MEDS
D-D1030
STORAGE
D-C168
NOURISHMENT
D-D1031
TOILET
D-C1005
WAITING
D-C1006
TOILET
D-C172
OFFICE
D-C173
ELECTRICAL
D-C175
CORRIDOR
D-C177
GROUP OFFICE
D-C1015
PCU OFFICE
D-C1007
PCU OFFICE
D-C1008
PCU EQUIPMENT
D-C1009
PCU LOUNGE /
LOCKERS
D-C1012
IRM
D-C184
HSK
D-C185
ELEV
D-C186
OFFICE
D-C1019
OFFICE
D-C1018
LOGISTICS
D-C1020
OFFICE
D-C190
CORRIDOR
XC
STAIR
XB
HOUSEKEEPING
D-C103
ELECTRICAL
D-C198
WORK ROOM
D-C1010
VA Drawing Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved by:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STANTON ENGINEERING SERVICES
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t
PF&A DESIGN, P.C.
Civil Engineering:
LABELLA ASSOCIATES
M-R PROJECT NO:
PLAN
NORTH
ACTUAL
NORTH
BUILDING 143
Project Number
Fire & Life Safety:
STANTON ENGINEERING SERVICES, LLC
/2 /2
:4
:0
P M
P4-FK101
RENOVATE SURGICAL SUITE
PHASE II
SALEM VA MEDICAL CENTER
Jon Manninen, COR
2025-12-30 PJ CA
BID DOCUMENTS
FULLY SPRINKLERED
0499-0136
658-19-103
FIRE SUPPRESSION
DEMOLITION PLAN
FIRST FLOOR PHASE 4
GENERAL NOTES
1/8" = 1'-0"F1
FIRST FLOOR FIRE SUPPRESSION
DEMOLITION PLAN - PHASE 4
1. DEMOLISH EXISTING SPRINKLERS AND PIPING TO ACCOMODATE
NEW ARCHITECTURAL LAYOUT WITHIN THE AREA OF WORK
UNLESS NOTED OTHERWISE. COORDINATE WITH VA OUTAGE
REQUIREMENTS AND THE COR.
2. EXISTING SPRINKLER MAIN PIPING AND ZONING IS SHOWN IN
APPROXIMATE LOCATIONS. PER RECORD DOCUMENTS, THE
ZONE CD SPRINKLER MAINS ARE CONNECTED BY BRANCHLINES.
CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND SIZE OF
PIPING AND EQUIPMENT PRIOR TO CONSTRUCTION. EXISTING
CONDITIONS DETERMINED FROM LIMITED SITE INVESTIGATION
AND RECORD DOCUMENTS.
3. EXISTING SMOKE ZONE BOUNDARIES SHOWN ARE BASED ON
RECORD DOCUMENTATION AND GENERAL INFORMATION
DRAWINGS. CONTRACTOR SHALL COORDINATE WITH THE COR
AND VA PERSONNEL IF ANY DISCREPANCIES ARE DISCOVERED
IN THE FIELD.
4. MAINTAIN ALL FIRE SUPPRESSION SYSTEMS CONTINUITY AND
NFPA 13 COMPLIANCE (E.G. SPACING, DISTANCE TO CEILING,
OBSTRUCTION REQUIREMENTS, ETC.) DURING RENOVATION. THE
FIRE DEPARTMENT AND THE VA COR SHALL BE NOTIFIED
IMMEDIATELY IF THE FIRE SUPPRESSION SYSTEM IS OUT OF
SERVICE AND AN APPROVED FIRE WATCH SHALL BE PROVIDED
FOR ALL OCCUPANTS LEFT UNPROTECTED BY THE SHUTDOWN
UNTIL THE FIRE SUPPRESSION SYSTEM HAS BEEN RETURNED TO
SERVICE.
5. SPRINKLER SYSTEM IS TO REMAIN IN SERVICE THROUGHOUT
PROJECT. TEMPORARILY REPLACE EXISTING PENDENT
SPRINKLERS WITH UPRIGHT SPRINKLERS AND PIPING IN AREAS
THAT HAVE CEILINGS REMOVED PER NFPA 241 AND NFPA 13.
6. SPRINKLER SYSTEM SHALL COMPLY WITH NFPA 13 AT THE
COMPLETION OF EACH PHASE. IF NEW DEFICIENCIES IN
SPRINKLER SYSTEM SPACING IN AREAS OUTSIDE OF THE
CONSTRUCTION AREA ARE CREATED DUE TO DEMOLITION AND
CONSTRUCTION ACTIVITIES (E.G. WHEN TEMPORARY BARRIERS
ARE INSTALLED, WHEN EXISTING WALLS ARE DEMOLISHED,
AND/OR WHEN NEW PERMANENT WALLS ARE INSTALLED), THE
CONTRACTOR SHALL MODIFY THE EXISTING SPRINKLERS TO
MAINTAIN NFPA 13 COMPLIANCE.
7. EXISTING SPRINKLER SYSTEMS OUTSIDE OF THE WORK AREA
SHALL STAY ACTIVE THROUGHOUT THE PROJECT. SHUTDOWNS
FOR WORK ON THE SYSTEM WITHIN THE AREA OF WORK THAT
IMPACT…