This is a proposal cost breakdown template for a construction project titled "J056--Correct Fire (Life) Safety Issues (Construction)" under Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The template is formatted as an Excel spreadsheet designed to capture and organize all labor and material costs by construction division using the MasterFormat classification system, which includes 26 divisions ranging from General Requirements through Transportation.
The cost breakdown structure requires offerors to separately input labor costs and material costs for each construction division, with the template automatically calculating total costs per division and generating subtotals. The template also incorporates fields for calculating overhead percentage, profit percentage, and bond percentage, which are successively applied to the division subtotals to arrive at the total base offer cost. While the template currently shows all values as zero, it is designed to provide a comprehensive financial breakdown of the base bid proposal, with all supporting calculations automated within the spreadsheet. This attachment serves as the required pricing document for the construction solicitation addressing fire and life safety corrections at a Department of Veterans Affairs facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs and Responses_0004.xlsx | XLSX spreadsheet | |
| FIRE HYDRANTS ANNUAL INSPECTIONS.pdf | ||
| ASBESTOS AND HAMZAT MATERIALS SUMMARY.pdf | ||
| 36-S501_BLDG 36 STAIR ELEVATION PLAN AND SECTIONS.pdf | ||
| 36C24626R0078 0004.docx | DOCX document | |
| S502_TYPICAL DETAILS.pdf | ||
| RFP 36C24626R0078_Revised.pdf | ||
| ATTACHMENT F - PAST PERFORMANCE QUESTIONAIRE_Revised.docx | DOCX document | |
| 36C24626R0078 0003.docx | DOCX document | |
| RFIs and Responses_0002.xlsx | XLSX spreadsheet | |
| 36C24626R0078 0002.docx | DOCX document | |
| Site Visit Sign in Sheet_08-31-2026-Correct Fire_Redacted.pdf | ||
| 36C24626R0078 0001.docx | DOCX document | |
| ATTACHMENT D WAGE DETERMINATION Last Revised Date 05-18-2026.pdf | ||
| ATTACHMENT A SPECIFICATIONS_rev.pdf | ||
| ATTACHMENT F - PAST PERFORMANCE QUESTIONAIRE.docx | DOCX document | |
| ATTACHMENT E - VA Bldgs Map - SITE VISIT MEET POINT - BLDG. 27.pdf | ||
| ATTACHMENT B DRAWINGS.pdf | ||
| 36C24626R0078_1.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL (BASE ITEMS)
BID ITEM I (BASE BID) Cost Breakdown
Project Number:
Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .