ATTACHMENT A SPECIFICATIONS_rev.pdf
PDF 4 MB Posted
- Solicitation number
- 36C24626R0078
About this file
This is a specifications attachment document for a General Services Administration (GSA) construction solicitation addressing fire and life safety code corrections at a Department of Veterans Affairs facility under Veterans Integrated Service Network 6. The solicitation number is 36C24626R0078, with the project titled "J056--Correct Fire (Life) Safety Issues (Construction)."
The document establishes that offerors must strictly adhere to all solicitation requirements, including embedded instructions, terms and conditions, representations and certifications, and technical and past performance requirements to ensure timely and equitable proposal evaluation. While the specific technical specifications are contained within the referenced attachment, this solicitation requires contractors to address fire and life safety deficiencies through construction work. Offerors should expect detailed compliance requirements and evaluation criteria tied to federal contracting standards and VA facility specifications. The opportunity appears to be issued through GSA contracting mechanisms typical for federal construction projects, requiring qualified construction contractors with demonstrated experience in life safety compliance and construction execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs and Responses_0004.xlsx | XLSX spreadsheet | |
| S502_TYPICAL DETAILS.pdf | ||
| ASBESTOS AND HAMZAT MATERIALS SUMMARY.pdf | ||
| 36-S501_BLDG 36 STAIR ELEVATION PLAN AND SECTIONS.pdf | ||
| 36C24626R0078 0004.docx | DOCX document | |
| FIRE HYDRANTS ANNUAL INSPECTIONS.pdf | ||
| RFP 36C24626R0078_Revised.pdf | ||
| 36C24626R0078 0003.docx | DOCX document | |
| ATTACHMENT F - PAST PERFORMANCE QUESTIONAIRE_Revised.docx | DOCX document | |
| RFIs and Responses_0002.xlsx | XLSX spreadsheet | |
| 36C24626R0078 0002.docx | DOCX document | |
| Site Visit Sign in Sheet_08-31-2026-Correct Fire_Redacted.pdf | ||
| 36C24626R0078 0001.docx | DOCX document | |
| ATTACHMENT D WAGE DETERMINATION Last Revised Date 05-18-2026.pdf | ||
| ATTACHMENT E - VA Bldgs Map - SITE VISIT MEET POINT - BLDG. 27.pdf | ||
| ATTACHMENT C - PROPOSAL ITEMS COST BREAKDOWN.xlsx | XLSX spreadsheet | |
| ATTACHMENT B DRAWINGS.pdf | ||
| 36C24626R0078_1.docx | DOCX document | |
| ATTACHMENT F - PAST PERFORMANCE QUESTIONAIRE.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Correct Fire (Life) Safety Issues Various Buildings
Hampton VAHCS
SPECIFICATIONS – 100% CONSTRUCTION DOCUMENTS
2/13/2026, REVISED 8/13/2026
Project Number: 590-22-110
Contract Number: 36C24622C0066
Prepared by:
INNOVATIVE SUPPORT SOLUTIONS, INC.
259 E 3rd Street
Elmhurst IL 60126 630 834 3206 benrush@issinternet.com
139 Old Creek Road • Palos Park, IL 60464 and 12200 Bunya Lane • Ruther Glen, VA 22546
Tel: 703-477-5928 • Email: dale.wheeler@systechfire.com
HALL GROUP DESIGN ENGINEERING FIRM LLC (HGD)
7872 Azalea Cove Terrace
Alexandria, VA 22315
703-688-2922 phone Email: info@hgdengineering.com
Castle Hill Associates, LLC 1197 Farnsworth Rd, Unit E
Waterville, OH 43566 567.952.0212
ISS
mailto:info@hgdengineering.com
SPECIFICATIONS – 100% CONSTRUCTION DOCUMENTS
LIST OF REVISED SPECIFICATION SECTIONS, 8/13/2026
Project Number: 590-22-110 Contract Number: 36C24622C0066
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21 01 33 23 Shop Drawings, Product Data, and Samples 09-22 01 35 26 Safety Requirements 10-22 01 42 19 Reference Standards 11-20 01 45 35 Special Inspections 06-21
DIVISION 08 - OPENINGS
08 80 00 Glazing 01-21
Project Number: 590-22-110
2/13/2026
139 Old Creek Road • Palos Park, IL 60464 and 12200 Bunya Lane • Ruther Glen, VA 22546
Tel: 703-477-5928 • Email: dale.wheeler@systechfire.com
Dale R. Wheeler
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 33 23 Shop Drawings, Product Data, and Samples 09-22 01 35 26 Safety Requirements 10-22 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21
DIVISION 05 – METALS
05 40 00 Cold-Formed Metal Framing 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
Dale R. Wheeler, PE
Digitally signed by Dale R. Wheeler, PE
DN: C=US,
E=dale.wheeler@systechfire.com, O=Systech Fire Protection, CN="Dale R. Wheeler, PE" Date: 2026.02.25 11:20:18-05'00'
07 84 00 Firestopping 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 16 13 Fiberglass Doors 08 17 10 Integrated Door Assemblies 01-21 08 41 13 Aluminum-Framed Entrances and Storefronts 01-21 08 71 00 Door Hardware 05-22 08 80 00 Glazing 01-21
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 13 16 Dry-Pipe Sprinkler Systems 01-15
DIVISION 26 – ELECTRICAL
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 33 Raceway and Boxes for Electrical Systems 11-22
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 00 Fire Detection and Alarm 10-11
Project Number: 590-22-110
8/13/2026
HALL GROUP DESIGN ENGINEERING FIRM LLC (HGD)
7872 Azalea Cove Terrace
Alexandria, VA 22315 703-688-2922 phone
Email: info@hgdengineering.com
Raquan Hall
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 01 - GENERAL REQUIREMENTS
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21 01 35 26-1.12 Infection Control 11-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21 04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21
Raquan Hall
Digitally signed by Raquan Hall Date: 2026.08.10 19:02:25 -04'00'
DIVISION 05 – METALS
05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 20 00 Finish Carpentry 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 01-21
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes 01-21 09 29 00 Gypsum Board 04-20 09 51 00 Acoustical Ceilings 12-18 09 68 00 Carpeting 01-21 09 91 00 Painting 01-21
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22 26 27 26 Wiring Devices 11-22 26 56 00 Exterior Lighting 11-22
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12 31 23 23.33 Flowable Fill 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15
Hampton VAHCS 100% Construction Documents, 2/13/2026
Hampton, VA 23667
Correct Fire (Life) Safety Issues Various Buildings, 590-22-110
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21
01 33 23 Shop Drawings, Product Data, and Samples 09-22
01 35 26 Safety Requirements 10-22
01 35 26-1.12 Infection Control 11-21
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 06-21
01 57 19 Temporary Environmental Controls 01-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 04-22
01 81 13 Sustainable Construction Requirements 10-17
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21
04 05 13 Masonry Mortaring 10-17
04 05 16 Masonry Grouting 01-21
DIVISION 05 – METALS
05 40 00 Cold-Formed Metal Framing 01-21
05 50 00 Metal Fabrications 08-18
05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 20 00 Finish Carpentry 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 01-21
00 01 10-2
07 84 00 Firestopping 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 16 13 Fiberglass Doors
08 17 10 Integrated Door Assemblies 01-21
08 41 13 Aluminum-Framed Entrances and Storefronts 01-21
08 71 00 Door Hardware 05-22
08 80 00 Glazing 01-21
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes 01-21
09 29 00 Gypsum Board 04-20
09 51 00 Acoustical Ceilings 12-18
09 68 00 Carpeting 01-21
09 91 00 Painting 01-21
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
21 13 16 Dry-Pipe Sprinkler Systems 01-15
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 27 26 Wiring Devices 11-22
26 56 00 Exterior Lighting 11-22
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12
31 23 23.33 Flowable Fill 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 12 16 Asphalt Paving 09-15
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
G001 COVER
G002 DRAWING INDEX
G003 GENERAL NOTES
G004 ICRA PERMIT
STRUCTURAL
S001 STRUCTURAL NOTES
TR1-S501 BLDG TR1A & TR1B STAIR PLAN AND SECTIONS
TR2&4-S501 BLDG TR2 & TR4 STAIR PLAN AND SECTIONS
TR3-S501 BLDG TR3 STAIR PLAN AND SECTIONS
27B-S501 BLDG 27B STAIR PLAN AND SECTIONS
28-S501 BLDG 28 STAIR PLAN AND SECTIONS
36-S501 BLDG 36 STAIR ELEVATION, PLAN AND SECTIONS
114-S501 BLDG 114 STAIR PLAN AND SECTIONS
S502 TYPICAL DETAILS
ARCHITECTURAL
A001 ARCHITECTURAL SYMBOLS
A002 ARCHITECTURAL LEGEND
TR1-A101 BLDG TR1 - 1200 STOCKLEY GARDENS - FLOOR PLAN
TR2-A101 BLDG TR2 - 18A & 18B ROLAND DR - FLOOR PLAN
TR3-A101 BLDG TR3 - 301 IRELAND ST - FLOOR PLAN
TR4-A101 BLDG TR4 - 22A & 22B ROLAND DR - FLOOR PLAN
15-A101 BLDG 15 FLOOR PLAN - 1ST FLOOR
27-A101 BLDG 27 FLOOR PLAN
27B-A101 BLDG 27B FLOOR PLAN - 2ND FLOOR
28-A101 BLDG 28 FLOOR PLAN
33-A101 BLDG 33 FLOOR PLAN - 1ST FLOOR
35-A101 BLDG 35 FLOOR PLAN
00 01 15 - 2
36-A101 BLDG 36 FLOOR PLAN
43-A101 BLDG 43 FLOOR PLAN
66-A101 BLDG 66 FLOOR PLAN
83-A101 BLDG 83 FLOOR PLAN
110-A101 BLDG 110 FLOOR PLAN
110A-A101 BLDG 110A FLOOR PLAN
114-A101 BLDG 114 FLOOR PLAN
135-A101 BLDG 135 ROOF PLAN
TR2-A201 BLDG TR2 - 18A & 18B ROLAND DR – ELEVATION DETAILS
TR3-A201 BLDG TR3 - 301 IRELAND ST - ELEVATION DETAILS
TR4-A201 BLDG TR4 - 22A & 22B ROLAND DR - ELEVATION DETAILS
27B-A201 BLDG 27B ELEVATION DETAILS
28-A201 BLDG 28 ELEVATION DETAILS
36-A201 BLDG 36 ELEVATION DETAILS
83-A201 BLDG 83 ELEVATION DETAILS
114-A201 BLDG 114 ELEVATION DETAILS
33-A301 BLDG 33 SECTION DETAILS
110-A501 BLDG 110 HANDRAIL SCHEDULE
A501 ARCHITECTURAL DETAILS
A502 ARCHITECTURAL DETAILS
ELECTRICAL
E601 ELECTRICAL SCHEDULES
FIRE SAFETY
FS001 FIRE SAFETY DESIGN NOTES
TR1-FS101 BLDG TR1 - 1200 STOCKLEY GARDENS
TR2-FS101 BLDG TR2 - 18A & 18B ROLAND DR
TR3-FS101 BLDG TR3 - 301 IRELAND ST
TR4-FS101 BLDG TR4 - 22A & 22B ROLAND DR
9-FS101 BLDG 9 - 1ST FLOOR
15-FS100 BLDG 15 - BASEMENT FLOOR
15-FS101 BLDG 15 - 1ST FLOOR
17-FS101 BLDG 17 - 1ST FLOOR
18-FS101 BLDG 18 - 1ST FLOOR
28-FS101 BLDG 28 - 1ST FLOOR
31-FS101 BLDG 31 - 1ST FLOOR
00 01 15 - 3
33-FS101 BLDG 33 - 1ST FLOOR
37-FS101 BLDG 37 - 1ST FLOOR
43-FS101 BLDG 43 - 1ST FLOOR
43-FS102 BLDG 43 - 2ND FLOOR & ATTIC
66-FS101 BLDG 66 - 1ST FLOOR
66-FS102 BLDG 66 – 2ND FLOOR
114-FS100 BLDG 114 - BASEMENT FLOOR
116-FS101 BLDG 116 - 1ST FLOOR
135-FS100 BLDG 135 - GROUND FLOOR
135-FS101 BLDG 135 - 1ST FLOOR
148S-FS101 BLDG 148 – POD S
148C-FS101 BLDG 148 - POD C
FS401 FIRE SAFETY PLANS, SECTIONS, AND DETAILS
FS402 DOORS AND FRAMES
FS501 HEAD DETAILS
FS502 HEAD DETAILS
FS503 JAMB DETAILS
FS601 DOOR SCHEDULE
FIRE PROTECTION
FP001 FIRE PROTECTION NOTES
TR1-FP101 BLDG TR1 - 1200 STOCKLEY GARDENS
TR2-FP101 BLDG TR2 - 18A & 18B ROLAND DR
TR3-FP101 BLDG TR3 - 301 IRELAND ST
TR4-FP101 BLDG TR4 - 22A & 22B ROLAND DR
17-FP101 BLDG 17 - 1ST FLOOR
28-FP101 BLDG 28 – 1ST FLOOR
28-FP102 BLDG 28 - 2ND FLOOR
33-FP101 BLDG 33 - 1ST FLOOR
33-FP102 BLDG 33 - 2ND FLOOR
35-FP101 BLDG 35 - 1ST FLOOR
43-FP101 BLDG 43 – BASEMENT & ATTIC
110-FP105 BLDG 110 - 5TH FLOOR
116-FP101 BLDG 116 - 1ST FLOOR
135-FP101 BLDG 135 – 1ST FLOOR
135-FP102 BLDG 135 - 2ND FLOOR
FP101 UNDERGROUND UTILITIES-COMPOSITE
00 01 15 - 4
FP102 UNDERGROUND UTILITIES-PARTIAL
FP103 UNDERGROUND UTILITIES-PARTIAL
FP104 UNDERGROUND UTILITIES-PARTIAL
FP105 BLDG 135 EXISTING SPRINKLER SYSTEM DRAWING
FP501 FIRE PROTECTION DETAILS
- - - END - - -
Hampton VAHCS 100% Construction Documents, 8/13/2026
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Correct Fire
(Life) Safety Issues Various Buildings as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.
C. Offices of Innovative Support Solutions, Inc., as
Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection.
Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
01 00 00 -2
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, BASE BID: Work includes general construction, alterations, walks, drainage, necessary removal of existing structures and construction and certain other items.
B. ALTERNATE NO.1: BASE BID except delete Building 28 –
Install canopy over new exterior stairwell.
C. ALTERNATE NO.2: BASE BID except delete TR-1 (Stockley) –
Replace Door: TR1-1-1
D. ALTERNATE NO.3: BASE BID except delete TR-2 18A and 18B
Roland Street – Replace the exit doors. (2 doors total both duplex units) (Doors: TR2-18A-1, TR2-18B-1).
E. ALTERNATE NO.4: BASE BID except delete TR-4 22A and 22B
Roland Street – Replace the exit doors. (2 doors total both duplex units) (Doors: TR4-22A-1, TR4-22B-1).
F. ALTERNATE NO.5: BASE BID except delete Building 9 – SOW:
Provide a fire rated door and frame for the paint storage room.
(Door: 9-1-1) (If this door replacement is removed from the scope, add a latch set to the existing door).
G. ALTERNATE NO.6: BASE BID except delete Building 31 – Replace
Door: 31-1-1.
H. ALTERNATE NO.7: BASE BID except delete Building 148 – SOW:
Provide a fire rated door at the transformer room C-176 (Door
148-C-1).
I. ALTERNATE NO.8: BASE BID except delete Building 148 – SOW:
Provide a fire rated door at the basement mechanical room. (Door
148-S-3, 148-S-4).
J. ALTERNATE NO.9: BASE BID except delete TR-1 (Stockley) – SOW:
Sprinkler the closet in the 3rd floor bedroom.
K. ALTERNATE NO.10: BASE BID except delete TR-2 18A and 18B
Roland Street – SOW: Sprinkler both units 18A and 18B.
L. ALTERNATE NO.11: BASE BID except delete TR-3 “301” – SOW:
Sprinkler the closets and restrooms.
01 00 00 -3
M. ALTERNATE NO.12: BASE BID except delete TR-4 22A and 22B
Roland Street – SOW: Sprinkler both units 22A and 22B.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at
Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the
Contracting Officer.
C. Key Control:
01 00 00 -4
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall install all permanent cores at completion of the work. See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted
24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. Parking at Hampton VAHCS is very limited. Contractor to coordinate with COR. Contractor and its employees are to park in designated areas only.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
01 00 00 -5
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the
Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the
Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workers are subject to rules of the Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.
1. Do not store materials and equipment in other than assigned areas.
2. Provide unobstructed access to Medical Center areas required to remain in operation.
G. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or
01 00 00 -6 of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
All such actions shall be coordinated with the COR or Utility
Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
H. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor.
I. Building(s) No. (s) TR1, TR2, TR3, TR4, 9, 15, 17, 18, 27, 27B, 28, 31, 33, 35, 36, 37, 43, 66, 83, 110, 110A, 114, 116, 135, 148 will be occupied by Medical Center personnel.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in
01 00 00 -7 affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical
Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by
Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
J. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans
Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
K. Utilities Services: Maintain existing utility services for
Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR.
Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the
01 00 00 -8
Medical Center Director’s prior knowledge and written approval. Refer to specification Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 14 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical
Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
01 00 00 -9
M. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply
Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
01 00 00 -10
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by
Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled
"DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR
52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by
Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this
01 00 00 -11 protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by
COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim
01 00 00 -12 those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The
Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and
01 00 00 -13 refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems
(including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"
(FAR 52.236-2).
1.11 PHYSICAL DATA – SOIL CONDITIONS
A. Data and information furnished is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
B. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
1.12 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
01 00 00 -14
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.13 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of
Construction in at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan.
Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved.
Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and
01 00 00 -15 telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h. Starting point and duration of warranty period.
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and Maintenance manuals.
k. Organizations, names and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
01 00 00 -16
5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period
1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the
Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the
Government while performing the work, including, but not limited to administrative expenses.
2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.
3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the
Contracting Officer to proceed against the Contractor.
C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section.
Communication procedures for Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/
01 00 00 -17 reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the
Contractor. This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the
Contractor of any of its responsibilities in conjunction with other portions of this provision.
D. Contractor’s Response to Construction Warranty Service
Requirements:
E. Following oral or written notification by the Contracting
Officer, the Contractor shall respond to construction warranty service requirements in accordance with the “Construction
Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the
Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.
1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.
2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.
3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.
01 00 00 -18
4. The “Construction Warranty Service Priority List” is as follows:
a) Code 1-Life Safety Systems Fire suppression systems.
Fire alarm system(s).
b) Code 1 Doors
1) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.
c) Code 3-Doors Interior/exterior personnel doors or hardware not functioning properly.
d) Code 1-Electrical Power failure (entire area or any building operational after 1600 hours).
Security lights.
Smoke detectors.
e) Code 2-Electrical Power failure (no power to a room or part of building).
Receptacle and lights not operational (in a room or part of building).
f) Code 3-Electrical Exterior lights not operational.
g) Code 1-Plumbing
2) Leaking water supply pipes
h) Code 3-Interior Floors damaged.
Paint chipping or peeling.
Casework damaged.
i) Code 1-Roof Leaks Damage to property is occurring.
j) Code 2-Water (Exterior) No water to facility.
k) Code 3
01 00 00 -19
All work not listed above.
F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the
Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.
Warranty Tags
Type of product/material
Model number
Serial number
Contract number
Warranty period from/to
Inspector’s signature
Construction Contractor
Address
Telephone number
Warranty Contact
Address
Telephone number
Warranty response time priority code
1.14 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on
Medical Center and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work.
Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
01 00 00 -20
1.15 TEMPORARY USE OF EXISTING ELEVATORS
A. Use of existing elevators for handling building materials and Contractor's personnel will be permitted subject to following provisions:
1. Contractor makes all arrangements with the COR for use of elevators. The COR will ascertain that elevators are in proper condition. Dates and times to be acceptable to COR and Contractor, and scheduled 14 days in advance.
Personnel for operating elevators will not be provided by the Department of Veterans Affairs.
2. Contractor covers and provides maximum protection of following elevator components:
a) Entrance jambs, heads soffits and threshold plates.
b) Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.
c) Finish flooring.
1.16 TEMPORARY TOILETS
A. Provide where directed, (for use of all Contractor's workers) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.
1. *Contractor may have for use of Contractor's workers, such toilet accommodations as may be assigned to
Contractor by Medical Center. Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workers. Failure to maintain
01 00 00 -21 satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.
1.17 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the
Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.
1.18 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.
B. Manuals: Maintenance and operating manuals and one compact disc
(four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views
01 00 00 -22 showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.
C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment.
All such training will be at the job site. These requirements are more specifically detailed in the various technical sections.
Instructions for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed. This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage.
The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the VA and the contractual requirements. The Department of
Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the
COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.
01 00 00 -23
1.19 HISTORIC PRESERVATION
A. Where the Contractor or any of the Contractor's employees, prior to, or during the construction work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up.
- - - E N D - - -
Construction Documents - 100%,8/13/2026
Project Schedules 01 32 16.15 - 1 P a g e | 1
Correct Fire (Life) Safety Issues Various Buildings, 590-22-110 11-01-21
SECTION 01 32 16.15
PROJECT SCHEDULES
PART 1- GENERAL
1.1 DESCRIPTION:
A. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements, and shall keep the Project Schedule up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers).
Conventional Critical Path Method (CPM) technique shall be utilized to satisfy both time and cost applications.
1.2 CONTRACTOR'S REPRESENTATIVE:
A. The Contractor shall designate an authorized representative responsible for the Project Schedule including preparation, review and…