Attachment C Project Information.docx

DOCX document 14 KB Posted

Attached to
Odell Lake Sand Shed Repair
Solicitation number
S-73000-00014240
Issued by
Jackson County, Oregon

About this file

Attachment C Project Information is a document from the Oregon Department of Transportation (ODOT) detailing a roofing repair project at the Odell Lake Stockpile site located on Highway 58 at milepost 62.42. The project requires a qualified roofing contractor to perform specific repair work, including removing approximately 120+/- metal roof panels and 6 roof hatches, which will be later reinstalled. The scope of work involves removing existing 2x4" purlins, installing 4'x8' CDX plywood sheathing with a specific nailing pattern, adding a vapor barrier, reinstalling roof hatches, and placing 24 gauge standing seam roof panels secured with screws at 12-inch intervals, with proper flashing of roof hatches for drainage.

No specific pricing terms, funding sources, or additional contract details are provided in the document. The file focuses solely on the technical specifications and physical requirements for the roof repair at the Odell Lake Sand Shed, presenting a straightforward description of the repair work to be undertaken by the selected roofing contractor.

View the file

Other files

File Type Posted
Attachment B Specifications~11.pdf PDF
00014240 Intent To Award.xlsx XLSX spreadsheet
Attachment A Plans~18.pdf PDF
00014240 Preliminary Results.xlsx XLSX spreadsheet
PreBidSignInRoster.pdf PDF
IFPL Factsheet.pdf PDF
Invitation.To.Bid~30.docx DOCX document
Prebid Meeting OPO Topics~1.doc DOC document
7035 CONTRACT_Executed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Odell Lake Sand Shed Roof Repair The Oregon Department of Transportation is looking for a qualified roofing contractor to repair damage to our Sand Shed located at our Odell Lake Stockpile site on Hwy 58 at the summit MP. 62.42 The work will consist of removing approximately 120+/- metal roof panels and 6 roof hatches to be removed and then reinstalled later. Remove the 2x4” purlins.

Per plans install ¾”x4’x8’ cdx plywood sheathing staggered and nailed down with per plan nailing pattern and nail size, add vapor barrier and place back roof hatches. Place 24 gauge standing seam roof panels with screws 12” OC, flash all roof hatches for proper drainage.

File details come from the government source that posted it. Updated .