Attachment B Specifications~11.pdf

PDF 1017 KB Posted

Attached to
Odell Lake Sand Shed Repair
Solicitation number
S-73000-00014240
Issued by
Jackson County, Oregon

About this file

The document is a set of technical specifications for a construction project by the Oregon Department of Transportation (ODOT) for Odell Lake Sand Shed Repairs, located at Mile Point 62.42 on Oregon Highway 58 in Cresent, Oregon. The project involves repairs to an existing sand storage building, including adding interior bracing, removing existing roofing, installing new plywood roof sheathing, and reroofing a portion of the building. The project is situated within the Willamette National Forest and will require adherence to United States Forest Service (USFS) requirements.

The specifications outline detailed requirements for various construction aspects, including rough carpentry, metal fabrications, sheathing, and roofing panels. The project will use specific materials like preservative-treated lumber, galvanized steel fasteners, and metal roofing panels from Taylor Metals Products. The contractor will be responsible for providing all necessary personnel, tools, and equipment, and must comply with local and federal environmental regulations, forest service guidelines, and specific construction standards. The project emphasizes careful installation, proper material handling, and maintaining the aesthetic and functional integrity of the existing structure.

View the file

Other files

File Type Posted
Attachment C Project Information.docx DOCX document
00014240 Intent To Award.xlsx XLSX spreadsheet
Attachment A Plans~18.pdf PDF
00014240 Preliminary Results.xlsx XLSX spreadsheet
PreBidSignInRoster.pdf PDF
IFPL Factsheet.pdf PDF
Invitation.To.Bid~30.docx DOCX document
Prebid Meeting OPO Topics~1.doc DOC document
7035 CONTRACT_Executed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICTIONS FOR

Oregon Department of Transportation Odell Lake Stockpile Site

Sand Shed Repairs Project address:

Oregon Department of Transportation MP 62.42 Oregon Highway 58

Cresent, Oregon 97733

6/30/25

Owner:

ODOT FACILITES MANAGEMENT SECTION

885 Airport Rd SE Salem, Oregon 97301 Phone (503) 986-5777

Table of Contents Generated by SpecBuilder: 6/18/2025 Division Section Title Pages

SPECIFICATIONS GROUP

General Requirements Subgroup

DIVISION 01 - GENERAL REQUIREMENTS

011000 SUMMARY 4

012500 SUBSTITUTION PROCEDURES 1

013100 PROJECT MANAGEMENT AND COORDINATION 5

013300 SUBMITTAL PROCEDURES 3

015000 TEMPORARY FACILITIES AND CONTROLS 1

016000 PRODUCT REQUIREMENTS 4

017300 EXECUTION 6

017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 2

017700 CLOSEOUT PROCEDURES 2

Facility Construction Subgroup

DIVISION 02 - EXISTING CONDITIONS

024119 SELECTIVE DEMOLITION 2

DIVISION 05 - METALS

055000 METAL FABRICATIONS 2

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061000 ROUGH CARPENTRY 3

061600 SHEATHING 2

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

074000 ROOFING AND SIDING PANELS 4

END OF TABLE OF CONTENTS

Odell Lake Sand Shed Repairs SECTION 011000 -

SUMMARY

011000 - 1

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Time of commencement and completion.

4. Contractor's use of site and premises.

5. Excessive noise.

6. Coordination with occupants.

7. Coordination with work by others.

8. Work restrictions.

9. National Forest Land Requirements.

B. Related Requirements:

1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1.2 PROJECT INFORMATION

A. Project Identification: Odell Lake Sand Shed Repairs.

1. Mile Point 62.42 Oregon Highway 58, Cresent, OR 97733.

B. Owner: Oregon Department of Transportation.

1. Owner's Construction Project Manager (CPM): David Sturges.

C. Designer:Oregon Department of Transportation, 885 Airport Rd SE, Bldg. X, Salem, Oregon, 97301.

1. Professional of Record: Jon Doughton.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following:

1. Repairs to existing sand storage building include the addition of interior bracing, removal of existing roofing, installing new plywood roof sheathing, reroofing a portion of the building, and other Work as indicated in the Contract Documents.

a. Work by others is noted on the drawings.

011000 - 2

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

1.4 TIME OF COMMENCEMENT AND COMPLETION

A. Notice to proceed: A written notice to proceed will be provided by the Construction Project Manager (CPM) to the Contractor as indicated in the invitation to bid. The Contractor shall begin the work upon receipt of the notice to proceed. Notwithstanding any other provision of the contract the Owner shall not be obligated to accept or to pay for any work furnished by the Contractor prior to delivery of notice to proceed, whether or not the Owner has knowledge of the furnishing of work.

1.5 CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS

A. Contractor shall be supplied with one electronic set of full-size drawings and specifications. At least one complete set of contract documents, including one full-size set of drawings shall be kept at the site of construction in good condition, and shall be available to the CPM at all times.

1.6 PERMITS AND FEES

A. The acquisition of all required permits and payment of all fees, inspection charges and other similar costs shall be the responsibility of the contractor. Agency has submitted documents for plan review with the local Authority Having Jurisdiction, if required. Contractor shall pay for and obtain building permits. Contractor shall be responsible for obtaining and paying for all other construction and trades permits as may be required by Federal, State and Local Officials.

1.7 CONTRACTOR'S USE OF SITE AND PREMISES

A. Construction Operating hours shall comply with National Forest Service requirements.

B. Limits on Use of Site: Contractors lay down/staging area will be coordinated through CPM. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Driveways, Walkways, Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

2. Access to the adjacent National Forest Service trail head shall be maintained at all times.

1.8 EXCESSIVE NOISE

A. All equipment shall have muffling devices in good working order at all times. Equipment not so equipped will be removed from site.

B. Cooperate with Owner in locating high noise producing equipment in areas least offensive and/or provide sound enclosure or shielding to dampen sound.

C. Playing of loud music or similar noise will not be allowed at the work site.

011000 - 3

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

1.9 COORDINATION WITH OCCUPANTS

A. Partial Owner Occupancy: Owner will occupy the site during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations.

B. Owner has the option to begin filling the storage building with sanding rock materials prior to project completion. Owner will not begin filling prior to new plywood sheathing, rafter blocking, rafter sealing, and roof hatch installations. Owner may fill prior to installation of underlayment, roofing, trim, and flashing. Contractor shall coordinate with owner's filling operations and provide time in the work schedule for owner to complete filling operations. Contractor shall clean spilled and loose sanding material from roof after filling operations prior to proceeding with remaining work.

1.10 COORDINATION WITH WORK BY OTHERS

A. Project includes contract work by others outside of this contract. Contractor shall coordinate all work with work performed by others to create a complete and seamless finished project.

1. Prepare a project schedule including required time and sequencing for work by others.

2. Perform work according to project schedule so as to allow the orderly progression of work by others.

B. Notify CPM immediately if work performed by others is unacceptable or is not being completed according to the project schedule.

1. CPM will grant additional project time if contract work is delayed by work by others.

2. Make adjustments to project schedule to accommodate required schedule and correction items by others.

1.11 WORK RESTRICTIONS

A. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances on Project site is not permitted.

1.12 NATIONAL FOREST LAND REQUIREMENTS

A. Site is located within the Willamette National Forest and is subject to all requirements of the United Stated Forest Service (USFS).

1. Weed Free: All equipment shall be clean and maintained to be weed free prior to entering site.

2. Fire Protection: All USFS fire protection requirements shall be followed for the conditions and Industrial Fire Protection Level in effect.

3. No Open Fires: Open fire or flame is prohibited at all times.

4. Contractor's Responsibility: Contractor shall become aware of all USFS requirements affecting the work of this project and shall comply with all requirements.

011000 - 4

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

Odell Lake Sand Shed Repairs SECTION 012500 -

SUBSTITUTION

PROCEDURES

012500 - 1

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

SECTION 012500 - SUBSTITUTION PROCEDURES

1.1 Substitution Requests.

A. Substitution requests shall be made only by the General Contractor

B. Substitution Requests shall be submitted to the Procurement and Contract Specialist (PCS).

C. Substitution requests shall be allowed only during bidding process.

D. Substitution requests shall be submitted to the PCS a minimum of seven days prior to bid closing date.

E. PCS will request additional information or issue acceptance or rejection within two days.

F. Documentation:

1. Justification.

2. Coordination information.

3. Detailed comparison.

4. Product Data.

G. CPM Action: If necessary, CPM will request additional information within two days of receipt of a request for substitution. CPM will notify Contractor of acceptance or rejection within three of receipt of additional information.

1.2 SUBSTITUTIONS

A. Substitutions for Convenience: Not allowed.

END OF SECTION 012500

Odell Lake Sand Shed Repairs SECTION 013100 - PROJECT

MANAGEMENT AND

COORDINATION

013100 - 1

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Description

2. General coordination procedures.

3. Requests for Information (RFI's).

4. Project meetings.

5. Terms

1.2 DESCRIPTION

A. The Contractor shall coordinate with the CPM during the duration of the project.

1. The Contractor will be responsible for keeping the CPM informed of all activity throughout the project identified in this Contract.

1.3 GENERAL COORDINATION PROCEDURES

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

B. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.

2. Preparation of the schedule of values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

013100 - 2

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

6. Preinstallation conferences.

7. Project closeout activities.

1.4 QUALITY ASSURANCE

A. Throughout the progress of the work, the Contractor shall provide all necessary personnel thoroughly familiar with the Specifications and Drawings, completely trained and experienced in the necessary skills, who shall be present at the site and direct all work performed.

B. Conditions of Surfaces: Surfaces previously prepared or installed by another trade shall be inspected carefully before applying subsequent materials or finishes. If an unsatisfactory condition to that finish exists, notify the General Contractor and CPM in writing immediately.

Otherwise assume full responsibility for resulting appearance, condition and acceptance of finished surfaces.

C. Covering Up: No Contractor or Subcontractor shall cover up work or conceal work of other Contractor/Subcontractor until same has been inspected and/or approved by contractor and CPM.

1.5 REQUEST FOR INFORMATION (RFI)

A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. CPM will return without response those RFIs submitted by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project Name

2. Date.

3. Name of Contractor.

4. RFI number, numbered sequentially.

5. RFI subject.

6. Specification Section number and title and related paragraphs, as appropriate.

7. Drawing number and detail references, as appropriate.

8. Field dimensions and conditions, as appropriate.

9. Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract

Time or the Contract Sum, Contractor shall state schedule and cost impact in the RFI.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

C. RFI Forms: Electronic format containing information as noted above. Software-generated form with substantially the same content as indicated above, acceptable to the CPM.

013100 - 3

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

D. RFI's will be reviewed to determine action required, and response. Allow five days for CMP response to each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.

1. The following Contractor-generated RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of review actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

2. CPM's action may include a request for additional information, in which case CPM's time for response will date from time of receipt of additional information.

3. CPM's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal in accordance with General Provisions.

a. If Contractor believes the RFI response warrants change in the Contract Time or the

Contract Sum, notify CPM in writing within three days of receipt of the RFI response.

1.6 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site unless otherwise indicated.

B. Preconstruction Meeting: A preconstruction meeting, before starting construction, at a time convenient to Owner and CPM, but no later than five business days following NTP.

1. Attendees: Authorized representatives of Owner and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Responsibilities and personnel assignments.

b. Tentative construction schedule.

c. Coordination between Contractor and CPM.

d. Critical work sequencing and long lead items.

e. Designation of key personnel and their duties.

f. Lines of communications.

g. Procedures for processing field decisions and Change Orders.

h. Procedures for RFIs.

i. Procedures for testing and inspecting.

j. Procedures for processing Applications for Payment.

k. Distribution of the Contract Documents.

l. Submittal procedures.

m. Use of the premises.

n. Work restrictions.

o. Working hours.

013100 - 4

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

p. Owner's occupancy requirements.

q. Responsibility for temporary facilities and controls.

r. Construction waste management and recycling.

s. Parking availability.

t. Office, work, and storage areas.

u. Equipment deliveries and priorities.

v. Security.

w. Progress cleaning.

C. Progress Meetings: Conduct progress meetings as directed by CPM .

1. Attendees: In addition to representatives of Owner , each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

1.7 TERMS

A. "APPROVED" as used herein means "approved by the ODOT CPM.

B. 'FOR APPROVAL" means "for the CPM approval."

C. "SELECTED" means "selected by the CPM."

D. "PROVIDE" means "furnish and install."

E. Where words "or approved" ae used, Construction Project Manager is sole judge of quality and suitability of proposed alternate or substitution.

F. "CONSTRUCTION PROJECT MANAGER" (CPM) refers to the individual selected by ODOT to manage the project.

G. "Project Coordination" refers to the on-site individual (if) selected by ODOT to be the local liaison the contractor.

H. "INSTALL" means "furnish and install."

I. Items noted as "N.I.C." are "Not in Contract" and will be furnished and installed by Owner or others.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 013100

Odell Lake Sand Shed Repairs SECTION 013300 -

SUBMITTAL PROCEDURES

013300 - 1

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Submittal schedule requirements.

2. Administrative and procedural requirements for submittals.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that requires responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."

B. Informational Submittals: Written and graphic information and physical samples that do not require responsive action. Submittals may be rejected for not complying with requirements.

Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."

1.3 SUBMITTAL FORMATS

A. Submittal Information: Include the following information in each submittal:

1. Project name.

2. Date.

3. Name of Contractor.

4. Names of subcontractor, manufacturer, and supplier.

5. Unique submittal number, including revision identifier. Include Specification Section number with sequential alphanumeric identifier; and alphanumeric suffix for resubmittals.

6. Drawing number and detail references, as appropriate.

B. Options: Identify options requiring selection by CPM.

C. Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested by CPM on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet.

D. Submittals shall be electronic.

013300 - 2

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

1.4 SUBMITTAL PROCEDURES

A. Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.

1. Email: Prepare submittals as PDF package, and transmit to CPM by sending via email.

Include PDF transmittal form. Include information in email subject line as requested by

CPM.

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.

Time for review shall commence on receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 5 business days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.

2. Resubmittal Review: Allow 3 business days for review of each resubmittal.

D. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

E. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

F. Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Architect's action stamp.

1.5 SUBMITTAL REQUIREMENTS

A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's catalog cuts.

b. Manufacturer's product specifications.

c. Standard color charts.

013300 - 3

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

1.6 CONTRACTOR'S REVIEW

A. Action Submittals and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents.

Note corrections and field dimensions. Mark with approval stamp before submitting to CPM.

B. Contractor's Approval: Indicate Contractor's approval for each submittal with contractors approval stamp . Include name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

1. CPM will not review submittals received from Contractor that do not have Contractor's review and approval.

1.7 ODOT REVIEW

A. Action Submittals: CPM will review each submittal, indicate corrections or revisions required.

1. PDF Submittals: CPM will indicate, via markup on each submittal, the appropriate action as follows:

a. Submittals will be returned marked Approved, Approved as Noted, Revise and

Resubmit. Incomplete submittals will be marked Rejected and not reviewed.

B. Informational Submittals: CPM will review each submittal and will not return it, or will return it if it does not comply with requirements. CPM will forward each submittal to appropriate party.

C. Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from CPM.

D. Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.

E. Submittals received from sources other than Contractor will be returned without review.

F. Submittals not required by the Contract Documents will be returned by CPM without action.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 013300

Odell Lake Sand Shed Repairs SECTION 015000 -

TEMPORARY FACILITIES

AND CONTROLS

015000 - 1

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS

1.1 USE CHARGES

A. Toilet Facilities: Contractor supplied for all contract workers associated with the project.

B. Water Service: No water is available on project site. Contractor shall provide all water required for construction operations.

C. Electric Power Service: Available from existing system without charge.

1.2 MATERIALS

A. Portable chain-link fencing at contractor's option.

1.3 TEMPORARY FACILITIES

A. Field office as required by contractor.

1.4 EQUIPMENT

A. Fire extinguishers.

B. Fire fighting equipment as required by USFS.

1.5 SUPPORT FACILITIES INSTALLATION

A. Parking: Use designated areas of Owner's existing parking areas.

1.6 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Provide security fencing around staging and materials storage area at contractor's option.

END OF SECTION 015000

Odell Lake Sand Shed Repairs SECTION 016000 - PRODUCT

REQUIREMENTS

016000 - 1

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

SECTION 016000 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products;

special warranties; and comparable products.

1.2 DEFINITIONS

A. Products: Items obtained for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.

1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Salvaged items or items reused from other projects are not considered new products. Items that are manufactured or fabricated to include recycled content materials are considered new products, unless indicated otherwise.

3. Comparable Product: Product by named manufacturer that is demonstrated and approved through the comparable product submittal process described in Part 2 "Comparable Products" Article, to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Basis-of-Design Product Specification: A specification in which a single manufacturer's product is named and accompanied by the words "basis-of-design product," including make or model number or other designation. Published attributes and characteristics of basis-of-design product establish salient characteristics of products.

1. Evaluation of Comparable Products: In addition to the basis-of-design product description, product attributes and characteristics may be listed to establish the significant qualities related to type, function, in-service performance and physical properties, weight, dimension, durability, visual characteristics, and other special features and requirements for purposes of evaluating comparable products of additional manufacturers named in the specification. Manufacturer's published attributes and characteristics of basis-of-design product also establish salient characteristics of products for purposes of evaluating comparable products.

C. Subject to Compliance with Requirements: Where the phrase "Subject to compliance with requirements" introduces a product selection procedure in an individual Specification Section, provide products qualified under the specified product procedure. In the event that a named product or product by a named manufacturer does not meet the other requirements of the

016000 - 2

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680) specifications, select another named product or product from another named manufacturer that does meet the requirements of the specifications; submit a comparable product request or substitution request, if applicable.

D. Comparable Product Request Submittal: An action submittal requesting consideration of a comparable product, including the following information:

1. Identification of basis-of-design product or fabrication or installation method to be replaced, including Specification Section number and title and Drawing numbers and titles.

2. Data indicating compliance with the requirements specified in Part 2 "Comparable Products" Article.

E. Basis-of-Design Product Specification Submittal: An action submittal complying with requirements in Section 013300 "Submittal Procedures."

F. Substitution: Refer to Section 012500 "Substitution Procedures" for definition and limitations on substitutions.

1.3 QUALITY ASSURANCE

A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, select product compatible with products previously selected, even if previously selected products were also options.

1.4 QUALITY AND QUANTITY

A. Work shall be executed in conformity with the Owner accepted standard of practice of the trade so as to contribute to maximum efficiency of operation, accessibility and appearance, minimum cost of maintenance and construction of future alterations and additions. It shall be executed that the completed work will conform and adjust itself to any existing installation.

B. When materials are specified to conform to ASTM, Federal, or other reference specifications, the materials delivered to the site shall bear the manufacturer's printed labels stating that the materials meet the requirements of such referenced specification.

1.5 MANUFACTURER'S INSTRUCTIONS

A. Perform work in accord with manufacturer's instructions.

B. Do not omit preparatory or installation procedures required by the manufacturer.

C. Handle, install, connect, clean, condition and adjust products in strict accord with such instructions and in conformance with specified requirements.

D. Should job conditions or specified requirements conflict with manufacturer's instructions consult with CPM.

E. Do not proceed with work without clear instruction.

016000 - 3

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products, using means and methods that will prevent damage, deterioration, and loss, including theft and vandalism. Comply with manufacturer's written instructions.

1.7 PRODUCT WARRANTIES

A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents.

1. Manufacturer's Warranty: Written standard warranty form furnished by individual manufacturer for a particular product and issued in the name of the Owner or endorsed by manufacturer to Owner.

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. General Product Requirements: Provide products that comply with the Contract Documents, are undamaged and, unless otherwise indicated, are new at time of installation.

1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect.

2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Owner reserves the right to limit selection to products with warranties meeting requirements of the Contract Documents.

4. Where products are accompanied by the term "as selected," CPM will make selection.

5. Descriptive, performance, and reference standard requirements in the Specifications establish salient characteristics of products.

B. Visual Selection Specification: Where Specifications include the phrase "as selected by CPM from manufacturer's full range" or a similar phrase, select a product that complies with requirements. Professional of Record or CPM will select color, gloss, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

2.2 COMPARABLE PRODUCTS

A. Conditions for Consideration of Comparable Products: CPM will consider Contractor's request for comparable product when the following conditions are satisfied. If the following conditions are not satisfied, CPM may return requests without action, except to record noncompliance with the following requirements:

016000 - 4

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

1. Evidence that proposed product does not require revisions to the Contract Documents, is consistent with the Contract Documents, will produce the indicated results, and is compatible with other portions of the Work.

2. Detailed comparison of significant qualities of proposed product with those of the named basis-of-design product. Significant product qualities include attributes, such as type, function, in-service performance and physical properties, weight, dimension, durability, visual characteristics, and other specific features and requirements.

3. Evidence that proposed product provides specified warranty.

4. List of similar installations for completed projects, with project names and addresses and names and addresses of architects and owners, if requested.

5. Samples, if requested.

B. Action on Comparable Products Submittal: If necessary, CPM will request additional information or documentation for evaluation, as specified in Section 013300 "Submittal Procedures."

1. Form of Approval of Submittal: As specified in Section 013300 "Submittal Procedures."

2. Use product specified if CPM does not issue a decision on use of a comparable product request within time allocated.

C. Submittal Requirements, Single-Step Process: When acceptable to CPM, incorporate specified submittal requirements of individual Specification Section in combined submittal for comparable products. Approval by the CPM of Contractor's request for use of comparable product and of individual submittal requirements will also satisfy other submittal requirements.

END OF SECTION 016000

Odell Lake Sand Shed Repairs SECTION 017300 -

EXECUTION

017300 - 1

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

SECTION 017300 - EXECUTION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes general administrative and procedural requirements governing execution of the Work, including, but not limited to, the following:

1. Construction layout.

2. Installation of the Work.

3. Cutting and patching.

4. Coordination with Work by Others.

5. Progress cleaning.

6. Protection of installed construction.

7. Correction of the Work.

B. Related Requirements:

1. Section 011000 "Summary" for limits on use of the Project site.

1.2 DEFINITIONS

A. Cutting: Removal of in-place construction necessary to permit installation or performance of subsequent work.

B. Patching: Fitting and repair work required to restore construction to original conditions after installation of subsequent work.

1.3 QUALITY ASSURANCE

A. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.

1. Structural Elements: When cutting and patching structural elements, or when encountering the need for cutting and patching of elements whose structural function is not known, notify CPM of locations and details of cutting and await directions from CPM before proceeding.

Shore, brace, and support structural elements during cutting and patching. Do not cut and patch structural elements in a manner that could change their load-carrying capacity or increase deflection.

2. Other Construction Elements: Do not cut and patch other construction elements or components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety.

3. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner

017300 - 2

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680) that would, in CPM's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.

B. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of specified products and equipment.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Comply with requirements specified in other Sections.

B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.

1. If identical materials are unavailable or cannot be used, use materials that, when installed, will provide a match acceptable to CPM for the visual and functional performance of in-place materials. Use materials that are not considered hazardous.

C. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

1. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.

B. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

017300 - 3

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

B. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.

C. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CPM in accordance with requirements in Section 013100 "Project Management and Coordination."

3.3 INSTALLATION

A. Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb, and make horizontal work level.

2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.

B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

C. Install products at the time and under conditions that will ensure satisfactory results as judged by CPM. Maintain conditions required for product performance until Substantial Completion.

D. Conduct construction operations, so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy of type expected for Project.

E. Sequence the Work and allow adequate clearances to accommodate movement of construction items on-site and placement in permanent locations.

F. Tools and Equipment: Select tools or equipment that minimize production of excessive noise levels.

G. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions with manufacturer.

H. Joints: Make joints of uniform width. Where joint locations in exposed Work are not indicated, arrange joints for the best visual effect, as judged by CPM. Fit exposed connections together to form hairline joints.

3.4 CUTTING AND PATCHING

A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.

1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.

017300 - 4

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

B. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during installation or cutting and patching operations, by methods and with materials so as not to void existing warranties.

C. Temporary Support: Provide temporary support of Work to be cut.

D. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

E. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to minimize interruption to occupied areas.

F. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations. Do not over cut corners.

1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.

3. Proceed with patching after construction operations requiring cutting are complete.

G. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as practicable, as judged by CPM. Provide materials and comply with installation requirements specified in other Sections, where applicable.

1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate physical integrity of installation.

2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.

H. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces.

3.5 PROGRESS CLEANING

A. Clean Project site and work areas daily, including common areas. Enforce requirements strictly.

Dispose of materials lawfully.

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where Work is in progress to the level of cleanliness necessary for proper execution of the Work.

1. Remove liquid spills promptly.

017300 - 5

Copyright © 2025 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Oregon Department of Transportation" for "Odell Lake Sand Shed Repairs". A valid, current MasterSpec license is required for editing and use of this document for any other project.(26680)

2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as…

This is the start of the file's text. The full file is on GovTribe.