This document is a pricing schedule for federal contract FNWZ 25-0166 for South Apron Blast Shields construction work. The pricing schedule contains two line items: a base bid and one optional bid, each priced as a lump sum (LS) for construction services funded under appropriation 529 FUNDS. Both line items encompass all survey, design, layout, plant, labor, supplies, equipment, materials, supervision, and incidentals required to complete work in compliance with the Statement of Work and contract terms and conditions.
The base bid carries a performance period of 60 days from the Notice to Proceed (NTP), while Option 1 has an accelerated performance period of 14 days from NTP. Performance time includes mobilization, submittal approval, material delivery, construction work execution, closeout documentation, and submission of DD Form 1354 information upon work completion. Contractors are required to submit pricing for both the base bid and optional line item, with a total contract price line provided for summary.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA466126R0008_Amendment0001_13Oct2026.pdf | ||
| Wage Determination (Heavy).pdf | ||
| FNWZ 25-0166 South Apron Blast Shields_SoW_Redacted.pdf | ||
| Q and A Sheet.docx | DOCX document | |
| FA466126R0008 solicitation_Redacted.pdf | ||
| Attachment C - AF Form 3065.pdf | ||
| Attachment C - AF Form 3064.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B South Apron Blast Shields
PRICING SCHEDULE FNWZ 25-0166
Attachment C – Pricing Schedule - Page 1 of 1
0001 Base Bid – South Apron Blast Shields (Construction) 529 FUNDS This item includes all survey, design, layout, plant, labor, supplies, equipment, materials, supervision and incidentals required to complete all work in compliance with the Statement of Work and terms & conditions of the contract for South Apron Blast Shields
LS $
0001 Option 1 – South Apron Blast Shields (Construction) 529 FUNDS This item includes all survey, design, layout, plant, labor, supplies, equipment, materials, supervision and incidentals required to complete all work in compliance with the Statement of Work and terms & conditions of the contract for South Apron Blast Shields.
LS $
TOTAL $
CONTRACT PERFORMANCE TIME:
1. Period of Performance
a. Base Bid - The period of performance shall be 60 days from the Notice to Proceed (NTP).
b. Option 1 – The period of performance shall be 14 days from the Notice to Proceed (NTP).
2. Performance time includes mobilization, submittal approval, delivery of materials, actual construction work, close out documents, and submitted DD Form 1354 information when work is completed.