This document is an Electrical Connection Schedule for Building Management System (BMS) Panels that specifies the power source configurations and locations for multiple BMS panels across multiple buildings within a facility.

The schedule details electrical connections for BMS panels across Buildings 1, 2, 7, 8, 16, 117, and 120. For each panel, the document identifies the normal power source and emergency power source, including specific panel sources, circuits, panel locations, and room numbers. Normal power sources are drawn from various electrical panels designated by building and location codes (e.g., G44A, G25A, G50), with corresponding circuits ranging from 2N1C to 2N20B. Emergency power sources follow similar designations with 2Q-series circuit references. Panel locations encompass diverse facility areas including mechanical rooms, fan rooms, attics, rooftops, and equipment-specific spaces such as boiler rooms, electrical rooms, and radiology departments. The document cross-references mechanical drawing numbers (01-M-401, 02-M-401, 07-M-401, 08-M-401, 16-M-101, 117-M-401, and 120-M-401) for each installation. Notable systems referenced include air handling units (AHUs), pumps, domestic hot water systems, and HVAC equipment. The schedule serves as a technical specification document for utilities shop work, providing contractors with comprehensive electrical infrastructure requirements for BMS installation and connection.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PANEL SOURCE CIRCUIT#

PANELLOCATlb

N

RM#

PANEL

SOURCE

CIRCUIT#

PANEL LOCATION

RM#

PANEL NAMES AND LOCATION NOTES FROM UTILITIES SHOP

1 B1.PO G44A 2N1C 10 G29 2Ql 36 G30 01-M-401 ALLERTON 1 B1.P1 ATTIC 2LCIY 9 TBD Ql-4-lNA TBD ATTIC 01-M-401 B1.P1 FAN ROOM 5 NODE 1, AHU 1 &2 MEC W/EXPANSION 1 B1.P2 G44A 2N1C 10 G29 2Ql 36 G30 01-M-401 B1.P2 FAN ROOM 6 MBC BEHIND G44A NODE 2 NUCMED DENTAL 1 B1.P3 G29 TBD TBD TBD SPDl 2 G30 01-M-401 B1.P3 G30 NODE 32 MBC 1 B1.P4 4TH FLR 2N1FF TBD 406A 2Ql 40 G30 01-M-141 B1.P4 AHU2 :7172 BACKNET PXC 36 W/EXPANSION 4TH FLOOR FAN ROOM 2 1 B1.P5 4TH FLR 2N1FF TBD 406A 2Ql 42 G30 01-M-141 B1.P5 AHU1: 7171 BACKNET PXC36 W/EXPANSION 4TH FLOOR FAN ROOM 1 1 B1.P6 G44A 2N1C 10 G29 2Ql 36 G30 01-M-401 B1.P6 ALLERTON 1 B1.P7 G41 2N1C TBD G29 2Ql 38 G30 01-M-401 B1.P7 ALLERTON

2 B2.PO G25A TBD TBD G22 2Q2A 13 TBD 02-M-401 ALLERTON

2 B2.P1 G2SA TBD TBD G22 2Q2A 13 TBD 02-M-401 B2.P1 ALLERTON

2 B2.P2 FAN RM2 TBD TBD TBD 2Q2A 13 TBD 02-M-401 B2.P2 FAN ROOM (G25) NODE 4 MBC HAS POINTS FOR AL5, AHU 10, 11, 30, 33, 5W, E6, AL9 2 B2.P3 10 TBD TBD TBD 2Q2D 3S 102J 02-M-401 B2.P3 - 105J - MEDIA HALLWAY NODE 3 AHU10 POINTS 2 B2.P4 G24 TBD TBD G22 2Q2A TBD TBD 02-M-401 B2.P4 - 102J ELECTRICAL ROOM IN KITCHEN NODE 33 MEC W/EXPANSIONS AHU30

2 B2.P5 ROOF TBD TBD TBD 202D 37 102J 02-M-111 B2.P5 AHU - 08 NODE 34 MEC

2 B2.P6 ROOF TBD TBD TBD 2Q2D 39 102J 02-M-111 B2.P6 AHU - 09 NODE 39 PXC 36 W/EXPANSIONS AHU9

2 B2.P7 G21 TBD TBD G22 2Q2A TBD TBD 02-M-401 B2.P5 AHU - 09 NODE 36 MEC AHU 9T

7 B7.PO G2S TBD TBD TBD TBD TBD TBD 07-M-401 ALLERTON? THERE IS NO 4TH PANEL FOR SIEMENS LISTED IN BLDG 7 7 B7.P1 GSO 2N7B TBD GSOB 2Q7B TBD GSOB 07-M-401 B7.P1 NODE 16 MBC G50 AHU 7C+AHU 7D+PUMPS 7 B7.P2 G51 2N7A TBD GSlB 2Q7A TBD G51B 07-M-401 B7.P2 NODE 17 MBC G51 AHU 7A+7B 7 B7.P3 G25 TBD TBD TBD TBD TBD TBD 07-M-401 B7.P3 NODE 18 MEC G25 BLDG 7 HW SYSTEM 8 B8.PO G2S TBD TBD TBD TBD TBD TBD 08-M-401 THERE IS NO 4TH PANEL FOR SIEMENS LISTED IN BLDG 8 8 B8.P1 G33 TBD TBD G33A TBD TBD G33A 08-M-401 B8.P1 NODE 19 MBC G33 AHU 8C+AHU 8D+PUMPS

8 B8.P2 G34 2N8A 1 G34B 2LBA 8 G34B 08-M-401 B8.P2 NODE 20 MBC G34 AHU 8A+AHU 8B

8 B8.P3 G13 TBD TBD TBD TBD TBD TBD O8-M-401 B8.P3 NODE 21 MEC PUMPS FOR DOMESTIC HOT WATER SYSTEM EXCHANGER

16 B16.PO CTRL RM TBD TBD TBD TBD TBD TBD 16-M-101 B16.P1 BOILER MAU 1&2 NODE 22 B16.P2 BOILER PUMPS NODE 24

117 B117.PO 100 TBD TBD TBD TBD TBD TBD 117-M-401 ALLERTON?

117 B117.P1 FAN RM8 TBD TBD TBD 2Q7E 27 FAN RMB 117-M-401 B117.P1 NODE 76 MBC FAN FOOM 9 W/EXPANSION BUS AHU 13+AHU 14 117 B117.P2 FAN RM9 N?G TBD FAN RM9 2Q7G 2S FAN RM9 117-M-401 B117.P2 NODE 77 MBC FAN ROOM 9 ISO FANS AL1 + AL2 120 B120.PO FAN RM 10 2N20B 29 FAN RM 10 2Q20B 17 FAN RM 10 120-M-401 B120.P1 NODE 80 FAN ROOM 10 PXC 120 B120.P1 FAN RM 10 2N20B 31 FAN RM 10 2Q20B 19 FAN RM 10 120-M-401 B120.P2 NODE 81 FAN ROOM 10 PXC

120 B120.P2 FAN RM 10 2N20B 31 FAN RM 10 2Q20B TBD FAN RM 10 120-M-401

120 B120.P3 FAN RM 10 2N20B 31 FAN RM 10 2Q20B TBD FAN RM 10 120-M-401

120 B120.P4 FAN RM 10 2N20B 31 FAN RM 10 2Q20B 19 FAN RM 10 120-M-401 B120.P4 NODE 84 MEC RADIOLOGY

ELECTRICAL CONNECTION SCHEDULE FOR BMS PANELS

BUILD

ING

BMS

PANEL

NAME

BMS

PANEL

ROOM#

NORMAL POWER SOURCE EMERGENCY POWER SOURCE MECHANICAL

REFERENCE

DRAWING#

File details come from the government source that posted it. Updated .