Attachment 5 General Condition Breakdown.docx
DOCX document 13 KB Posted
- Solicitation number
- 36C24926R0056
About this file
This is a General Condition Breakdown document that outlines cost categories and line items for a construction project. The document is structured into three primary cost sections: Project Management, Bonds and Insurance, and Site Conditions.
The Project Management section itemizes labor costs for key personnel including superintendent(s), safety manager, CPM scheduler, quality assurance/quality control staff, project manager(s), project executive, field office engineer, field office support staff, project expeditor, and assistant superintendent(s). The Bonds and Insurance section covers builder's risk insurance, general liability insurance, and security, payment, and performance bonds. The Site Conditions section is the most extensive, detailing temporary facility and utility costs including power consumption for offices and general site use, water and sewer consumption and distribution infrastructure, electrical and telephone system installation and consumption fees, fire protection, heating and cooling, fencing, covered walkways, SWPPP measures, traffic control, barricading and signage, temporary roads and walkways, lighting, partitions, sanitary facilities, laydown areas, security services, photo documentation, and protection measures for in-place work and adjacent structures. This breakdown appears to serve as a template for estimating general contractor overhead and site management costs for the Department of Veterans Affairs Energy Management System Upgrade project (Project 6264A-18-204) under Solicitation Number 36C24926R0056.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI RESPONES - 626A4-18-204 - Upgrade Energy Management System.pdf | ||
| Sign-in Sheet - 626A4-18-204 - Upgrade Energy Management System.pdf | ||
| 36C24926R0056 0001.docx | DOCX document | |
| Attachment B Bid Item No. 2 Panel Upgrade List.pdf | ||
| Attachment 8 Request For Information Form.docx | DOCX document | |
| Attachment 4 Calc. of Self Performed Work.xlsx | XLSX spreadsheet | |
| Attachment 2 Drawings.pdf | ||
| Attachment 1 Specification.pdf | ||
| Attachment 9 Wage Determination - TN20260187 - Modification 0 - 01-02-2026.pdf | ||
| Attachment 7 Contractor EMR Certification Form.docx | DOCX document | |
| Attachment 6 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 3 Pricing Schedule.xlsx | XLSX spreadsheet | |
| Attachment A Panel Upgrade List.pdf | ||
| 36C24926R0056_1.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Management:
Superintendent(s)
Safety Manager
CPM Scheduler
Quality Assurance/Quality Control
Project Manager (s)
Project Executive
Field Office Engineer
Field Office Support Staff
Project Expeditor
Assistant Superintendent (s)
Project Manager Subtotal
Bonds and Insurance (excluding any for Subcontractors):
Builder’s Risk Insurance
General Liability Insurance
Security, Payment & Performance Bonds
Bonds and Insurance Subtotal:
Site Conditions:
Temporary Power Consumption (Offices)
Temporary Power Consumption (General Site Use)
Temporary Water and Sewer Consumption
Temporary Water Hookup, Distribution & Meters
Temporary Electrical Hookup, Distribution & Meters
Temporary Telephone & Network System Installation
Temporary Telephone & Internet Consumption Fees
Temporary Fire Protection
Temporary Heating & Cooling
Temporary Fencing
Temporary Covered Walkways
SWPPP Measures
Temporary Entries and Truck Washes
Street Cleaning (by G.C.)
Traffic Control Measures
Temporary Barricades & Signage
Temporary Roads & Walkways (install & maintenance)
Temporary Lighting
Temporary Partitions & Covered Floor Openings
Temporary Toilets/Sanitary Measures
Temporary Laydown (prep and restoration)
Security System/Watchman
Pre-construction Photo Documentation
Progress Photos
Temporary Protection (in place work/adjacent structures)