Attachment 4 Calc. of Self Performed Work.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C24926R0056
About this file
This is a cost breakdown template for calculating self-performed versus subcontracted work required in proposals for federal construction contracts. The form specifically applies to offerors classified under NAICS code 238210 (All Other Specialty Trade Contractors) and mandates that at least 25 percent of contract performance costs for personnel must be performed by the prime contractor's own employees. Offerors must provide a detailed breakdown of personnel costs and material/equipment costs organized by specification division applicable to the project, clearly identifying which work will be self-performed versus subcontracted. The template requires designation of subcontractor size status (small business or non-small business) and includes space for the prime contractor and multiple subcontractors with separate line items for each.
The calculation methodology requires offerors to compute the self-performed work percentage by subtracting total subcontractor personnel costs from total personnel costs (including both prime and subcontractor labor), then dividing the remainder by total personnel costs and multiplying by 100. Home office overhead, profit/fee, and bond costs are added as separate line items after the personnel and material/equipment subtotal. The form includes an authorized representative certification statement confirming the accuracy of the representations. This attachment supports proposals for the Department of Veterans Affairs Veterans Health Administration project 6264A-18-204 Upgrade Energy Management System (Solicitation Number 36C24926R0056).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI RESPONES - 626A4-18-204 - Upgrade Energy Management System.pdf | ||
| Sign-in Sheet - 626A4-18-204 - Upgrade Energy Management System.pdf | ||
| 36C24926R0056 0001.docx | DOCX document | |
| Attachment 5 General Condition Breakdown.docx | DOCX document | |
| Attachment 9 Wage Determination - TN20260187 - Modification 0 - 01-02-2026.pdf | ||
| Attachment 7 Contractor EMR Certification Form.docx | DOCX document | |
| Attachment 6 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 3 Pricing Schedule.xlsx | XLSX spreadsheet | |
| Attachment A Panel Upgrade List.pdf | ||
| 36C24926R0056_1.docx | DOCX document | |
| Attachment 8 Request For Information Form.docx | DOCX document | |
| Attachment 2 Drawings.pdf | ||
| Attachment 1 Specification.pdf | ||
| Attachment B Bid Item No. 2 Panel Upgrade List.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK | ||||||
| Offerors for All Other Specialty Trade Contractors (NAICS code 238210) must provide | ||||||
| at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format. | ||||||
| Specification Division | SB Vendor (Y or N) | Personnel Cost | Material/Equipment Costs | |||
| Prime | Y | $0.00 | $0.00 | Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only. | ||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| (Add additional lines as necessary for each Division applicable to this project) | $ | $ | ||||
| $ - 0 | $0.00 |
| $ | $ | ||||
| Sub Total (Personnel Costs, Material/Equipment Costs) | $ | 0.00 | Add percentage to gray areas only. | ||
| Percentage | 0 | Profit | $ | 0.00 | |
| Percentage | 0 | Home Office Overhead | $ | 0.00 | |
| Percentage | 0 | Bond | $ | 0.00 | |
| Grand Total | $ | 0.00 | |||
| Calculation of self-performed personnel costs: | |||||
| 1. Total personnel costs * both prime and all subcontractors: | $0.00 | ||||
| 2. Subtract all subcontractor personnel costs* companies that will perform work | |||||
| on this contract: | $0.00 | ||||
| 3. Remainder is ‘Total amount of work to be self-performed under the | |||||
| Contract’: | $0.00 | ||||
| 4. Self-performed work = Line 3/Line 1 x 100 = | ERROR:#DIV/0! |
| *personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to |
| the project (includes project manager, job superintendent, administrative, estimators, etc.) |
| I certify the above representations are true and correct to the best of my knowledge. |
(Signature and Typed Name of Authorized Representative) Date
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .