Attachment A - NSWC Package 2 RFP Attachment 1.pdf
PDF 15 MB Posted
- Solicitation number
- N4008524R2765
About this file
This file contains attachments from a NAVFAC "NSWC Package 2" project, including a NAVFAC Red Zone checklist, security requirements, standard finishes, emergency exit plans, and multiple asbestos/lead testing reports from 2017-2023. The documents primarily focus on Building 77H at the Philadelphia Navy Yard.
The testing reports show asbestos was found in roof flashing materials (6-10% chrysotile) and lead was detected in multiple painted surfaces including metal parapets, roof components, I-beams, trusses and structural steel (ranging from 0.014% to 2.1% by weight). The NAVFAC Red Zone checklist details critical activities required for Beneficial Occupancy Date (BOD) including contractor, client and NAVFAC responsibilities. Security requirements specify protocols for identification badges, installation access, and handling of Unclassified Naval Nuclear Propulsion Information (U-NNPI). The NSWC standard finishes document provides detailed specifications for flooring, wall coverings, paint colors and other interior finishes. Multiple asbestos air sampling reports from 2020 show levels were below established Occupational Exposure Limits.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 6 - ATTACHMENTS Work Order Number NSWC Reachback Support Package 2 1799405 Philadelphia Naval Yard Annex, Philadelphia, PA
PART 6 ATTACHMENTS
PART 6 ATTACHMENTS
Part 6 Contains information that will help the contractor develop a suitable design and construct without hindrance.
Attachment A – NAVFAC RED ZONE CHECK LIST (4 PAGES)
Attachment B – NSWC SECURITY REQUIREMENTS (5 PAGES)
Attachment C – NSWC STANDARD FINISHES (2 PAGES)
Attachment D – EMERGENCY EXIT & EGRESS PATHWAY SOW FLOOR PLANS (3 PAGES)
Attachment E – NOT USED
Attachment F – B77H 2017 ASBESTOS LAB DATA (1 PAGE)
Attachment G – B77H 2022 KNEE WALL ASBESTOS LAB DATA (1 PAGE)
Attachment H – B77H 2020 ROOFING ASBESTOS LAB DATA
Attachment I – B77H 2023 CONCRETE FLOORING ASBESTOS LAB DATA (3 PAGES)
Attachment J – B77H 2020 UPPER MEZZANINE ASBESTOS WIPE LAB DATA (2 PAGES)
Attachment K – B77H 2020 ASBESTOS ROOF (PARTIAL) REMOVAL PLAN (47 PAGES)
Attachment L – B77H 2023 ASBESTOS & LEAD LAB DATA (13 PAGES)
Attachment M – LAND USE CONTROLS PHILADELPHIA NAVAL YARD (61 PAGES)
Attachment N – PHILADELPHIA NAVAL YARD PFAS REPORT (83 PAGES)
NSWC Reachback Support Package 2 Work Order Number Philadelphia Naval Yard Annex, Philadelphia, PA 1799405
*If TAB Season 1 Report (capacity, coil performance, etc.) is not submitted concurrently with TAB Proportional
Balancing Report, due to outside temperature constraints, an additional Field Acceptance Testing event is required.
NAVFAC Red Zone (NRZ) Checklist/POAM
The NRZ Checklist/POAM is a tool to track the status of critical activities required for BOD to help ensure their timely completion to prevent delays with the facility acceptance and turnover.
The critical activities are organized by section according to the responsible party (i.e. Contractor, Client, and
NAVFAC)
Critical items missing from this list should be added as necessary to ensure the list is comprehensive.
Likewise, unnecessary items should be deleted.
Any critical items left off the NRZ Checklist that are later identified after initial NRZ meeting is conducted should be added immediately so their progress can be tracked.
A copy of the NRZ Checklist/POAM shall be maintained in the contract file.
Section 1
Contractor Responsibility Critical Activities
Point of
Contact
Sched
Comp
Date
Actual
Comp
Date
Notes
A. Required for Facility Delivery:
Final Electrical Connections
Final Water Connections
Final Gas Connections
Critical System Start-up:
Duct Air Leakage Testing (DALT)
Air Barrier Testing
Electrical Systems Testing
Generator Testing
Superchlorination of Potable Water Systems
Plumbing/Backflow Testing
Elevator Testing
Boiler Testing
Crane Testing
Fire Alarm/Sprinkler Testing
Keying Plan Meeting
Deliver Lockset Cores
NMCI Connections/IT Systems Testing
IDS & SCIF Testing
Telecommunications Connections & Test
Commissioning Functional Performance
Testing (FPT)
TAB (Air and Water Balancing)
TAB Proportional Balancing Report
TAB Field Acceptance Testing
TAB Season 1 Report*
TAB Field Acceptance Testing
DDC Trend Logs / Endurance Testing
Performance Verification Testing (PVT)
PART 6 – ATTACHMENT A
NAVFAC RED ZONE CHECKLIST
(Controls / NAVFAC Acceptance)
System Training of Navy Personnel
System:
Pre-Warranty Conference
Contractor’s Pre Final Punch List Complete
Pre Final Inspection
Punch List
Final Inspection
Facility-Related Control System
Cybersecurity Commissioning
BOD/Use and Possession
B. Required for Contract Close-out:
Delivery of O&M Manuals
Delivery of Product Warranties
LEED Documentation
Energy & Sustainability Record Card
Site Restoration
Final Landscaping
Spare Parts, Extra Stock, Special Tools, etc
As-Built Drawings
Final Demobilization and Clean-up
Temp Construction Fence Removed
Project Close-out Meeting
Complete DD1354
Close-out Storm Water Permit
Seasonal/Deferred Commissioning FPT
2nd Season TAB Report
2nd Season TAB Field Accept Testing
Commissioning 10-Month/Warranty Visit
Section 2
Client Responsibility Critical Activities
Point of
Contact
Sched
Comp
Date
Actual
Comp
Date
Notes
A. Required for Facility Delivery:
Keying Plan Meeting
Telecommunication install
Mod service contracts for Phone/Utilities/
Custodial/Grounds
NMCI Installations or other networks
GFE status/delivery schedule (GFCI, GFGI)
Client provided equipment SELF installed
Client provided equipment KTR installed
Intrusion Detection Systems Test
Secure Network Installations
Attend Training
Planned User Move-in
Ribbon-cutting ceremony
Section 3
NAVFAC Responsibility Critical Activities
Point of
Contact
Sched
Comp
Date
Actual
Comp
Date
Notes
A. Required for Facility Delivery:
Coordinate Final Utility Connections
Generator Performance Verification
Transformer Performance Verification
DALT Field Acceptance
Proportional Balancing TAB Field Accept
1st Season TAB Field Acceptance
Performance Verification Testing (PVT)
(Controls)
Elevator Certification
Crane Certification
Boiler Certification
Fire Alarm/Sprinkler Test
IDS & SCIF Test
Keying plan to contractor
Locket Cores installed
Training Coordinated/Scheduled with FMS
O&Ms to FMS
Client walk-thru Inspection
Pre-Final Inspection
Final Inspection
BOD/Use and Possession
Completed Cyber Hygiene Checklist
Completed RMF Step 4 Validation
BOD Letter to Contractor
Acceptance Letter to Client
DD 1354 Signed & turned over to RPAO
Closeout permits (e.g., NPDES)
Contractor Evaluations (CPARS) Complete
Finalize Outstanding Contract Mods
Process recycled/recovered materials report
BOD (A) entered into eContracts
Inform PM of BOD
Assist PM with AE Evaluation
Warranty documentation to FMS
As-Builts to FMS
2nd Season TAB Field Acceptance Testing
Annual Elevator Maintenance Complete
Authority to Operate delivered to client
NSWC Reachback Support Package 2 Work Order Number
PART 6 – ATTACHMENT B
NSWC SECURITY REQUIREMENTS
PART 6 – ATTACHMENT B
NAVAL SURFACE WARFARE CENTER (NSWC) SECURITY REQUIREMENTS
1. Contractor Requirements for Identification Badges and Installation
Access
1.1 Citizenship Requirements
Work under this contract is restricted to U.S. citizens. No employee or representative of the Contractor will be admitted to the work site unless he/she furnishes satisfactory proof that he/she is a citizen of the United
States. Contractor personnel with dual citizenship of any other nation are considered foreign nationals and will not be approved for badges or authorized for admittance to the site of work.
1.2 Application for Contractor Identification Badges
The Contractor's employees or representatives who will be working inside
NSWCPD facilities or secure perimeters must obtain a Contractor's ID badge.
All required paperwork should be submitted to Contracting Officer’s
Representative (COR) by the Prime Contract’s FSO for the contract.
For Contractor employees or representatives that do not have a CONFIDENTIAL or higher security clearance, the Contractor shall provide a completed
SECNAV 5512/1 (DoN Local Population ID Card/Base Access Pass Registration
Form) for each employee or representative to the COR at least ten (10) business days prior to visit for Commander, Navy Region Mid-Atlantic
(CNRMA) vetting, review and approval. Contractor employees or representatives that possess a Common Access Card (CAC), Transportation
Worker Identification Card (TWIC), or other Federal Personal Identify
Verification (PIV) card, should identify the type of card and card number in Box 14 under the OTHER APPROVED IDENTITY SOURCE DOCUMENTS section of their SECNAV 5512/1 form to have the card enrolled for use at NSWCPD.
For Contractor employees or representatives that do have a CONFIDENTIAL or higher security clearance, the Contractor’s company or office must submit a
Defense Information System for Security (DISS) request. The Security
Management Office (SMO) code for NSWCPD is 64498.
Upon notification of approval, the Contractor employees or representatives will report to NSWCPD Security (Building 29) for issuance of an ID badge and given the appropriate access. The Contractor must bring with them (1) a
State ID/Driver’s license, (2) all forms of identification listed by the
Contractor on their individual SECNAV 5512/1 form, and (3) if already in possession, their CAC, TWIC, or other Federal PIV. The Contractor must obtain the required employee ID badges from the Government at his own expense. The Government is not responsible for any cost or lost time associated with obtaining or using ID badges.
One-Day Visitor Badges: The Contractor's employees or representatives can obtain a daily Visitor's badge from the Security desk inside NSWCPD facilities, however, a Government escort will be required at all times and
NSWC Reachback Support Package 2 Work Order Number
PART 6 – ATTACHMENT B
the badge will only be valid for the facility where the badge was issued.
The use of daily visitor's ID badge is not recommended as a Government escort must be scheduled in advance and escort's availability is limited and granted on a case-by-case basis (i.e. availability is not guaranteed).
There is a limit of three (3) days for signed visitors. Contractor employees or representatives planning to use One Day Visitor Badges to access Building 633 or Building 87 for any purpose, including pre-quotation or preproposal site visits, must submit a SECNAV 5512/1 (at least ten (10) days prior to visit) or DISS request and receive approval for admittance to the facility in advance. The Government is not responsible for any cost or lost time associated with escort availability in conjunction with the use of Visitor’s badges for the Contractor’s employees or representatives.
1.3 General Access Requirements and Restrictions
The following access requirements and restrictions apply to work at any
NSWCPD facility or secured perimeter.
a. No Contractor employee or representative will be admitted to the site of the work unless he/she has satisfactorily completed the Application for
Contractor Identification Badge process as determined and communicated directly by COR and has furnished satisfactory proof that he/she is a citizen of the United States. U.S. citizens with dual citizenship of any other nation are considered foreign nationals and will not be approved for badges or authorized for admittance to the site of work. Contractor employees or representatives will not be authorized admittance to the site of work until their application is approved by the Government.
b. The Contractor is responsible to collect and account for all identification badges issued to his/her personnel within 5 calendar days of the expiration of the contract, expiration of the badge, employee leaving the Contractor’s service or when no longer required. Collected badges must be returned by the Contractor to the COR. Failure to return NSWCPD property
(i.e. identification badges) can result in denial of future access.
c. Comply with all security regulations currently in force as determined and communicated directly by the Government Security personnel and as conveyed by the COR.
d. Employees or representatives of the Contractor, while working at
NSWCPD, must display the Government issued badge over the front of their outer clothing at all times. Contractors must carry at all times on their person one of the following forms of picture ID to be presented to Security personnel upon request while working in NSWCPD facilities: State
ID/Driver’s license, passport, CAC, DBIDS, TWIC, or other Federal PIV.
e. Roll up/garage doors may only be opened by Government personnel or
Contractors that meet the following requirements:
1. Signed a Roll up Door Access Request Form.
2. Completed NSWCPD Roll up door training.
NSWC Reachback Support Package 2 Work Order Number
PART 6 – ATTACHMENT B
3. Received brief from Security on responsibilities for Roll up door operation and control. Failure to follow roll up door security rules can result in loss of access to the site.
f. Fence gates may only be opened by Government personnel or Access
Control Personnel (ACP). The ACP or Government personnel must guard the gate during the entire time the gate is un-secured. The gate must be secured immediately following its use, unless otherwise permitted by the
Command Security Director. Coordinate gate access 48 hours in advance of requiring access through the gate.
g. Commercial vehicles (with company logo on both sides of vehicle), including cranes, that are required to enter the fence line perimeter or enter the building at any NSWCPD facility must be inspected by CNRMA Police at the Motor Vehicle Inspection Team (MVIT) station prior to each instance of entering the property. No personally owned vehicles are permitted within the fence line perimeter of any NSWCPD facility. Commercial vehicle drivers must be vetted by submission of either a SECNAV 5512/1 form or DISS request. Coordinate vehicle inspection location and procedures with the
COR. The Government is not responsible for any cost or lost time associated with vehicle inspections.
h. No Contractor or personally owned cameras are allowed inside NSWCPD facilities. Additionally, pictures by contractor-owned or carried cell phones are not allowed. If photographs are required for design or construction records, submit a written request to Security to have photographs taken by a Government Official using a Government camera.
Photographs taken by the Government will be reviewed by NSWCPD Security and
NSWCPD Public Affairs Office before release to the Contractor.
i. If a security alarm is required to be temporarily disabled for a construction activity, the Contractor must submit a completed Request to
Mask Security Alarm form to the COR at least three business days in advance of the required date. The COR will coordinate with the NSWCPD Security
Office to obtain approval for the request.
j. Use of Contractor-owned laptop computers within NSWCPD facilities requires submission of an Authorization Request for Operation of Non-DoD
Portable Electronic Devices form to the COR at least three business days in advance; NSWCPD Security shall be copied on all submissions and approvals/denials of Non-DoD Portable Electronic Device forms. The
Government is not responsible for any cost or lost time associated with authorization requests for Portable Electronic Devices.
k. Commercial and personally owned vehicle (POV) parking in Government parking lots are restricted to Government employees. Unauthorized parking in Government parking lots may result in DoN Police ticketing and/or Towing as well as denial of access to NSWCPD facilities.
1.4 General
Security Classification Guidance, when invoked in individual task orders, must be in accordance with the following:
a. Level of safeguarding required: Confidential.
NSWC Reachback Support Package 2 Work Order Number
PART 6 – ATTACHMENT B
b. Access to information and equipment: classified at the Confidential
National Security Information (C-NSI) level, when providing industrial support services within facilities that actively support the Navy Nuclear
Propulsion Program (NNPP).
c. All Contractor personnel accessing classified information or classified material, associated with the performance work relative to the resultant contract, must be United States citizens, (no dual citizens or foreign nationals) and must have and maintain at a minimum a final Confidential security clearance, at time of task order award.
d. The Contractor is responsible for completing all required Government mandated training to maintain security and network access to Government sites and IT systems, as necessary to support.
e. A DoD Contract Security Classification Specification DD Form 254 will be provided to the Contractor when the contract is classified and/or the scope of work requires the generation, distribution, contact with or access to classified information, documents, material or equipment or the contract requires classification guidance and handling procedures.
1.5 Unclassified Naval Nuclear Propulsion Information (U-NNPI)
1.5.1 Purpose
Documents (specifications, drawings, etc.) that are marked as containing
NOFORN sensitive information, must be controlled pursuant to Federal law.
The information contained therein and generated as part of the inquiry must be used only for the purpose stated in the task order, and must in no case be transmitted outside the company, (unless such transmittals comply with the detailed guidance of the contract) or to any foreign national within the company. While in use, the documents must be protected from unauthorized observation, and must be kept secure so as to preclude access by anyone not having a legitimate need to view them. The documents must not be copied unless done in conformance with the detailed guidance of the contract. All the documents must be promptly returned in their entirety, unless authorized for proper disposal or retention, following completion of the task order.
1.5.2 Specific Requirements for Protecting U-NNPI
The following requirements apply to the protection of U-NNPI:
a. Only U.S. citizens who have a Need to Know (NTK) required to execute the contract will be allowed access to U-NNPI.
b. When not in direct control of an authorized individual, U-NNPI must be secured in a locked container (e.g., file cabinet, desk, safe). Access to the container must be such that only authorized persons can access it, and compromise of the container would be obvious at sight. Containers should have no labels that indicate the contents. If removed from the site, U-NNPI must remain in the personal possession of the individual. At no time should
U-NNPI be left unsecured (e.g., in a home or automobile, or unattended in a motel room or sent with baggage).
NSWC Reachback Support Package 2 Work Order Number
PART 6 – ATTACHMENT B
c. U-NNPI documents will have the word NOFORN at the top and bottom of each page. The cover sheet will have the warning statement shown below.
Documents originated in the course of work that reproduce, expand or modify marked information must be marked and controlled in the same way as the original. Media such as video tapes, disks, etc., must be marked and controlled similar to the markings on the original information.
d. U-NNPI may not be processed on networked computers with outside access unless approved by CNO (N00N). If desired, the company may submit a proposal for processing NNPI on company computer systems. Personally owned computing systems, such as personal computers, laptops, personal digital assistants, and other portable electronic devices are not authorized for processing NNPI. Exceptions require the specific approval of the cognizant
DAA and CNO (N00N).
e. U-NNPI may be faxed within the continental United States and Hawaii provided there is an authorized individual waiting to receive the document and properly control it. U-NNPI may not be faxed to facilities outside the continental United States, including military installations, unless encrypted by means approved by CNO (N00N).
f. U-NNPI may be sent within the continental United States and Hawaii via first class mail in a single opaque envelope that has no markings indicating the nature of the contents.
g. Documents containing U-NNPI must be disposed of as classified material.
h. Report any attempts to elicit U-NNPI by unauthorized persons to the appropriate security personnel.
i. Report any compromises of U-NNPI to the appropriate security personnel.
This includes intentional or unintentional public release via such methods as theft, improper disposal (e.g., material not shredded, disks lost), placement on Web site, transmission via email, or violation of the information system containing U-NNPI.
NOFORN: This document is subject to special export controls and each transmittal to foreign governments or foreign nationals may be made only with the prior approval of the Naval Sea Systems Command.
LAST UPDATED: 12-21-17
DESIGNATION MANUFACTURER STYLE COLOR SIZE/TYPE REMARKS
CPT-1 INTERFACE MANTRA 13820 MYSTICAL 4078 19.96" X 19.96" X .345" TH OFFICE/OPEN OFFICE; QUARTER TURN INSTALL
CPT-2 INTERFACE BASELINE 14135 BLUE/BASE 7405 19.96" X 19.96" X .345" TH LOBBIES; "BRICK" INSTALL
CPT-3 BENTLEY PRINCE STREET INDUSTRY
ANTRON LEGACY
882869
– STAIRS/LOBBY BORDER
CPT-4 Tandus Centiva Product No.
6298840076
Plexus Colour IV 02875 Great Lakes 18548 Modular 18"x18" BORDER/TRANSITION
FT-1 DALTILE VERANDA TITANIUM P523 13" X 13" RESTROOM
FTG-1 HYDROMENT – SHADOW H195 –
RESTROOM FLOOR/BASE TITLE GROUT; USE WITH
FT-1 AND BT-1
RF-1
JOHNSONITE Rubber Stair Treads with Integrated Riser for the visually impaired
Rubber Bamboo Pattern
TBD 1/8" TH STAIR TREAD, RISER & LANDINGS
VTC-1 ARMSTRONG MIGRATIONS
SANDY BEIGE T3512
GOLDEN SANDS
T3513
12" X 12" X 1/8" TH COFFEE MESS; CHECKERED PATTERN INSTALL
VTC-2 ARMSTRONG
STANDARD EXCELON
IMPERIAL TEXTURE
DESERT BEIGE 51809 12" X 12" X 1/8" TH COFFEE MESS (BUILDING 633)
WM-1 MATS INC ULTRA ENTRY PANEL GRAY W/ BLUE FIBER – ENTRY AREA (BUILT-IN)
WM-2 INTERFACE ENTRY LEVEL 12901 BLUE 7198 – ENTRY AREA
BT-1 DALTILE VERANDA TITANIUM P523 6" X 13" RESTROOM COVE BASE
RB-1 ROPPE PINNACLE FLAX 632 4" RUBBER, 1/8" COVE OFFICE/OPEN OFFICE COVE BASE
RB-2 JOHNSONITE TRADITIONAL SILK 129 4" RUBBER, 1/8" COVE OFFICE/OPEN OFFICE COVE BASE ALT.
ACT-1 CERTAINTEED SYMPHONY f 1322
WHITE OVERTONE
OVT-1
24" X 24" 3/4" OFFICE/OPEN OFFICE
ACT-2 CERTAINTEED SYMPHONY f 1322
WHITE OVERTONE
OVT-1
24" X 48" 3/4" OFFICE/OPEN OFFICE
ACT-3 ARMSTRONG ULTIMA 1912A WHITE
24" X 24" 3/4"
BEVELED TEGULAR EDGE
OFFICE/OPEN OFFICE (BUILDING 633)
GR-1 ARMSTRONG PRELUDE ML WHITE
15/16" EXPOSED TEE
SYSTEM
USE WITH ACT-1 & ACT-2
GR-2 ARMSTRONG SUPRAFINE XL WHITE 9/16" EXPOSED TEE SYSTEM USE WITH ACT-3
WC-1 JM LYNNE NEW CASTLE SILK SHELL 102 – LOBBY AREA WALL COVERING
WC-2 WOLF GORDON LUNDIE NAVAJO LDE 7-5071 – LOBBY AREA WALL COVERING ACCENT
WT-1 DALTILE
RITTENHOUSE
SQUARE
BISCUIT K175 3" X 6" RESTROOM WALL TILE
WT-2 DALTILE
RITTENHOUSE
SQUARE
ELEMENTAL TAN
0166 & 0766
3" X 6"
RESTROOM WALL TILE ACCENT
ALTERNATE GLOSS (0166) AND MATTE (0766)
WT-3 DALTILE
RITTENHOUSE
SQUARE
ARTESIAN BROWN
1/2" X 6" RESTROOM WALL TILE ACCENT LINER
WTG-1 HYDROMENT – CLASSIC BONE H158 RESTROOM WALL TILE GROUT
PT-1 SHERWIN WILLIAMS –
DOVER WHITE
SW6385
EGGSHELL GYPB WALLS
PT-2 SHERWIN WILLIAMS –
DOVER WHITE
SW6385
FLAT GYPB CEILINGS/BULKHEADS
PT-3 SHERWIN WILLIAMS –
OUTERBANKS
SW7534
SEMIGLOSS DOOR/FRAMES
PT-4 SHERWIN WILLIAMS –
OUTERBANKS
SW7534
EGGSHELL ACCENT WALLS
PT-5 SHERWIN WILLIAMS – NAVAL SW6244 ENAMEL OIL HAND RAILS
PL-1 PIONITE –
SUGAR MAPLE II
WM115
SUEDE
WOOD SURFACING, DOORS, VENEER PANELS,
CABINETS (BUILDING 633)M
IS
C.
NAVAL SURFACE WARFARE CENTER - PHILADELPHIA DIVISION
FINISH LIST
CE
IL
IN
G
PA
IN
TS
BA
SE
W
AL
LS
FL
O
O
RS
PL-2 PIONITE – SEQUOIA AT411 SUEDE COFFEE MESS CABINETS (BUILDING 4)
S-1 MECHOSHADE
THERMOVEIL VERT.
PRIVACY 1% OPEN
BEIGE 0907 SERIES 0900 OFFICE/OPEN OFFICE WINDOW SHADES
SSM-1 CORIAN –
TUMBLED GLASS
ALT. COTTAGE LANE
– RESTROOM COUNTERTOP
SSM-2 CORIAN – TUMBLEWEED –
COFFEE MESS, CONFERENCE ROOM, RESTROOM
COUNTERTOPS (BUILDING 633)
SSM-3 CORIAN – TUMBLEWEED – COFFEE MESS COUNTERTOP
TP-1 SCRANTON PRODUCTS HINY HIDERS SANDCASTLE MOSAIC RESTROOM PARTITIONS
PROJECT NORTH
DR
AW
N
BY
NA
VA
L S
UR
FA
CE
W
AR
FA
RE
C
EN
TE
R
PH
IL
AD
EL
PH
IA
, P
A
DE
SI
GN
ED
B
Y:
DW
G
NA
M E:
SH
EE
T
SI
ZE
2.
3.
2.
6.
CO
DE
SA
VE
D
AT
E:
SC
AL
E:
PL
O
T
DA
TE
NO
TE
S:
SHEET of
NF
A1
2_
L_
1_
FP
.d w g
77L-1
BU
IL
DI
NG
7L
FL
O
O R
DR
AF
T
LA
YO
UT
XX
XX
XX
X
1 1
AN
SI
e xp an d
B (1
1.
x
.0
In ch es
1"
7.
1600.42
KIOSK
CONF
1129.10
KIOSK
1129.13
KIOSK
1129.14
KIOSK
1129.24
CUBICLE
1129.23
CUBICLE
1129.20
CUBICLE
1129.19
CUBICLE
1129.16
CUBICLE
1129.28
CUBICLE
1129.26
CUBICLE
1129.27
CUBICLE
104.01
CUBICLE
704.02
CUBICLE
704.04
CUBICLE
704.06
CUBICLE
704.05
CUBICLE
704.03
CUBICLE
704.01
CUBICLE
LAB
1508.01
KIOSK
1508.02
KIOSK
1508.03
KIOSK
1508.04
KIOSK
905C.06
KIOSK
905C.05
KIOSK
905C.09
KIOSK
905C.08
KIOSK
905C.07
KIOSK
905C.01
KIOSK
905C.02
KIOSK
905C.03
KIOSK
905C.04
KIOSK
1600.41
CUBICLE
C9A
COMMON
611.02
CUBICLE
611.06
CUBICLE
611.04
CUBICLE
611.05
CUBICLE
611.03
CUBICLE
611.01
CUBICLE
109.03
CUBICLE
905C
OPENOFF
905A.02
KIOSK
905A.03
KIOSK
905A.01
KIOSK
905.06
CUBICLE
905.04
CUBICLE
905.05
CUBICLE
905.03
CUBICLE
905.02
CUBICLE
905.01
CUBICLE
111.02
CUBICLE
107.02
CUBICLE
1106.03
CUBICLE
314.01
KIOSK
314.02
KIOSK
1101.08A
KIOSK
1000.37
CUBICLE
1000.35
CUBICLE
1000.33
CUBICLE
1000.31
CUBICLE
1000.29
CUBICLE
1000.16
CUBICLE
1000.14
CUBICLE
1000.12
CUBICLE
1000.10
CUBICLE
1000.08
CUBICLE
1000.27
CUBICLE
1000.25
CUBICLE
1000.23
CUBICLE
1000.21
CUBICLE
1000.19
CUBICLE
1000.17
CUBICLE
1000.28
CUBICLE
1000.24
CUBICLE
1000.22
CUBICLE
1000.32
CUBICLE
1000.26
CUBICLE
1000.20
CUBICLE
1000.18
CUBICLE
1005.02
OFF_SUPPORT
1005.01
FOOD
OPENOFF
CONF
CONF
701.03
CUBICLE
701.06
CUBICLE
701.05
CUBICLE
701.04
CUBICLE
1128.02
KIOSK
1128.03
KIOSK
1128.01
KIOSK
1118.05
CUBICLE 1120.05
KIOSK
1100.14A
CUBICLE
1100.13B
CUBICLE
1100.13A
CUBICLE
1100.12A
CUBICLE
1100.10A
CUBICLE
1100.09A
CUBICLE
1600.37
KIOSK
1600.39
KIOSK
1600.40
KIOSK
1600.36
KIOSK
1600.38
KIOSK
106.02
CUBICLE
COMMON
1507.02
CUBICLE
1507.01
CUBICLE
1107.03
CUBICLE
OPENOFF
1120.04
KIOSK
1118.04
CUBICLE
1100.18
CUBICLE
1100.19
CUBICLE
500.45
CUBICLE
OPENOFF
500.15
CUBICLE
500.17
CUBICLE
500.19
CUBICLE
500.21
CUBICLE
500.46
CUBICLE
500.48
CUBICLE
500.50
CUBICLE
500.52
CUBICLE
500.03
CUBICLE
500.64
CUBICLE
500.09
CUBICLE
500.08
CUBICLE
500.07
CUBICLE
500.06
CUBICLE
500.67
CUBICLE
500.47
CUBICLE
500.49
CUBICLE
500.51
CUBICLE
500.53
CUBICLE
500.36
CUBICLE
500.11
CUBICLE
500.12
CUBICLE
500.13
CUBICLE
500.30
CUBICLE
500.32
CUBICLE
500.34
CUBICLE500.37
CUBICLE
500.40
CUBICLE
500.41
CUBICLE
500.38
CUBICLE
500.39
CUBICLE
500.42
CUBICLE
500.43
CUBICLE
OFFICE
500.63
CUBICLE
500.65
CUBICLE
500.55
CUBICLE
500.57
CUBICLE
500.59
CUBICLE
500.61
CUBICLE
500.22
CUBICLE
500.24
CUBICLE
500.26
CUBICLE
500.28
CUBICLE
500.31
CUBICLE
500.33
CUBICLE
500.35
CUBICLE
500.62
CUBICLE
500.66
CUBICLE
500.01
CUBICLE
500.02
CUBICLE
500.04
CUBICLE
500.14
CUBICLE
500.16
CUBICLE
500.18
CUBICLE
500.20
CUBICLE
500.23
CUBICLE
500.25
CUBICLE
500.27
CUBICLE
500.29
CUBICLE
500.54
CUBICLE
500.56
CUBICLE
500.58
CUBICLE
500.60
CUBICLE
OFFICE
OFFICE
1120.03
KIOSK
1118.03
CUBICLE
OFFICE
CONF
413.01
SHRDOFF
1103.01
CUBICLE
1103.02
CUBICLE
309.04
CUBICLE
309.01
CUBICLE
608.04
CUBICLE
608.01
CUBICLE
608.05
CUBICLE
OPENOFF
608.06
CUBICLE
608.02
CUBICLE608.03
CUBICLE
309.03
CUBICLE
309.02
CUBICLE
OPENOFF
C12
CORRIDOR
C9
CORRIDOR
800.15
CONF
800.13
COLLAB
800.11
COLLAB
800.09
COLLAB
800.07
COLLAB
800.08
OFF_SUPPORT 800.10
COLLAB
800.12
COLLAB
800.14
OMS
800.05
COLLAB
800.04
COLLAB
800.03
COLLAB
800.01
COLLAB
307A.01
CUBICLE
701.02
CUBICLE
701.01
CUBICLE
C6
CORRIDOR
OFFICE
S4
STAIR
100.06
KIOSK
LAB
LAB
MECH
STORAGE
LAB
OFFICE
CONF
316A
RESTRM
316C
LOCKER
316B
RESTRM
ENTRY
ELEC
LAB
COMMON
C4
CORRIDOR
C3
CORRIDOR
C5
CORRIDOR
808A
UTILITY
807K
OFFICE
807J
OFFICE
OPENOFF
807G
OFFICE
807E
OFFICE
807D
OFFICE
807C
OFFICE
807M
OFFICE
ENTRY
807KA
OFFICE
LAB
810A
OFFICE
810B
OFFICE
1100.15
OFF_SUPPORT
COMMON
OPENOFF
CONF
OPENOFF
1123.01
CUBICLE
1123.03
CUBICLE
1123.02
CUBICLE
1123.04
CUBICLE
1123.06
CUBICLE
1123.05
CUBICLE
OTHER
LAB
V5
ENTRY
OTHER
MECH
OPENOFF
OPENOFF
OPENOFF
1121.01
CUBICLE
1121.03
CUBICLE
1121.02
CUBICLE
1121.04
CUBICLE
1121.06
CUBICLE
1121.05
CUBICLE
1122.02
CUBICLE
1122.04
CUBICLE
1122.01
CUBICLE
1122.03
CUBICLE
1122.05
CUBICLE
1122.06
CUBICLE
1119.01
CUBICLE
1119.03
CUBICLE
1119.02
CUBICLE
1119.04
CUBICLE
1119.06
CUBICLE
1119.05
CUBICLE
1100.04
CUBICLE
1100.03
CUBICLE
1108.02
CUBICLE
1108.01
CUBICLE
OPENOFF
OPENOFF
1110.02
CUBICLE
1110.01
CUBICLE
OFFICE
OPENOFF
OPENOFF
UTILITY
OPENOFF
1100.14
CUBICLE
1100.13
CUBICLE
1100.12
CUBICLE
1100.11
CUBICLE
1100.10
CUBICLE
1100.09
CUBICLE
1100.16
CUBICLE
1100.17
CUBICLE
1112.04
CUBICLE
1112.02
CUBICLE
OPENOFF
1112.03
CUBICLE
1112.01
CUBICLE
1111.02
CUBICLE
1111.04
CUBICLE
1111.06
CUBICLE
OPENOFF
1111.01
CUBICLE
1111.05
CUBICLE
1111.03
CUBICLE
1109.02
CUBICLE
1109.04
CUBICLE
1109.06
CUBICLE
OPENOFF
1109.01
CUBICLE
1109.05
CUBICLE
1109.03
CUBICLE
1100.08
CUBICLE
1100.07
CUBICLE
OPENOFF
1118.02
CUBICLE
1118.01
CUBICLE
OPENOFF
1120.02
KIOSK
1120.01
KIOSK
1100.06
CUBICLE
1100.05
CUBICLE
OFFICE
OFFICE
OFFICE
MECH
OPENOFF
1107.01
CUBICLE
1107.02
CUBICLE
OPENOFF
1104.04
CUBICLE
1104.03
CUBICLE
1104.02
CUBICLE
1104.01
CUBICLE
1106.02
CUBICLE
1106.01
CUBICLE
OPENOFF
S3
STAIR
1100.02
CUBICLE1105.01
CUBICLE
1105.03
CUBICLE
OPENOFF
1105.02
CUBICLE
OPENOFF
STORAGE
1100.01
CUBICLE
OPENOFF
1101.09
CUBICLE
1101.14
CUBICLE
1101.12
CUBICLE
1101.05
CUBICLE
1101.13
CUBICLE
1101.07
CUBICLE
1101.11
KIOSK
1101.03
CUBICLE
1101.10
KIOSK
1101.01
CUBICLE
1101.08
CUBICLE
1101.06
CUBICLE
1101.04
CUBICLE
1101.02
CUBICLE
C8
CORRIDOR
C7
CORRIDOR
C1
CORRIDOR
OPENOFF
OFFICE
302A
OPENOFF
302A.01
CUBICLE
100.43
CUBICLE
100.41
CUBICLE
100.16
CUBICLE
100.08
KIOSK
100.10
KIOSK
100.12
CUBICLE
100.14
CUBICLE
100.26
CUBICLE
100.18
CUBICLE
100.20
CUBICLE
100.22
CUBICLE
100.24
CUBICLE
1101A
LAB
C2
CORRIDOR
STORAGE
STORAGE
RESTRM
V1
ENTRY
RESTRM
JANITORIAL
STORAGE
OPENOFF
MECH
LAB
V2
ENTRY
1509A
LAB
OPENOFF
OFFICE
905B
OFFICE
905A
OPENOFF
OFFICE
MECH
OFFICE
ELEC
LOCKER
LAB
LAB
LAB
MECH
600.01
CUBICLE
600.03
CUBICLE
600.04
CUBICLE
600.02
CUBICLE
OFFICE
CONF
V3
CORRIDOR
OFFICE
OFFICE
OFFICE
OPENOFF
OPENOFF
V4
ENTRY
OPENOFF
603.05
CUBICLE
603.01
CUBICLE
603.03
CUBICLE
603.06
CUBICLE
603.04
CUBICLE
603.02
CUBICLE
604.01
CUBICLE
604.03
CUBICLE
604.05
CUBICLE
604.06
CUBICLE
604.04
CUBICLE
604.02
CUBICLE
OPENOFF
600.05
CUBICLE
109.01
CUBICLE
109.02
CUBICLE
OFFICE
500.44
CUBICLE
OPENOFF
S2
STAIR
OPENOFF
315.04
CUBICLE
315.02
CUBICLE
315.03
CUBICLE
315.01
CUBICLE
COMMON
405.02
CUBICLE
405.04
CUBICLE
405.11
CUBICLE
405.10
CUBICLE
405.08
CUBICLE
405.06
CUBICLE
315.06
CUBICLE
315.08
CUBICLE
315.07
CUBICLE
315.05
CUBICLE
STORAGE
STORAGE
CONF
C5A
ENTRY
AUD
306C
DATA
FOOD
306B
FOOD
306A
CONF307A
CUBICLE
OPENOFF
OFFICE
400.01
CUBICLE
400.02
CUBICLE
414.03
CUBICLE
414.01
CUBICLE
414.04
CUBICLE
414.02
CUBICLE
OFFICE
OFFICE
405.14
CUBICLE
405.16
CUBICLE
405.12
CUBICLE
405.01
CUBICLE
405.03
CUBICLE
405.05
CUBICLE
405.07
CUBICLE
405.09
CUBICLE
405.13
CUBICLE
405.15
CUBICLE
DATA
1300.07
CUBICLE
1300.05
CUBICLE
1300.03
CUBICLE
1300.48
CUBICLE
1300.50
CUBICLE
1300.45
CUBICLE
1300.47
CUBICLE
1300.52
CUBICLE
1300.54
CUBICLE
1300.49
CUBICLE
1300.51
CUBICLE
1300.40
CUBICLE
1300.42
CUBICLE
1300.44
CUBICLE
1300.46
CUBICLE
1300.43
CUBICLE
1300.41
CUBICLE
1300.39
CUBICLE
1300.38
CUBICLE
1300.36
CUBICLE
1300.34
CUBICLE
1300.37
CUBICLE
1300.35
CUBICLE
1300.33
CUBICLE
1300.32
CUBICLE
1300.30
CUBICLE
1300.28
CUBICLE
1300.31
CUBICLE
1300.29
CUBICLE
1300.27
CUBICLE
1300.26
CUBICLE
1300.24
CUBICLE
1300.22
CUBICLE
1300.25
CUBICLE
1300.23
CUBICLE
1300.21
CUBICLE
1300.20
CUBICLE
1300.18
CUBICLE
1300.16
CUBICLE
1300.19
CUBICLE
1300.17
CUBICLE
1300.15
CUBICLE
1300.14
CUBICLE
1300.12
CUBICLE
1300.10
CUBICLE
1600.02
KIOSK
1600.05
KIOSK
1600.04
KIOSK
1600.06
KIOSK
1600.01
CUBICLE
1600.03
CUBICLE
OFFICE
1600.30
CUBICLE
1600.34
CUBICLE
1600.28
CUBICLE
1600.33
CUBICLE
1600.26
CUBICLE
1600.32
CUBICLE
1600.24
CUBICLE
1600.31
CUBICLE
1600.22
CUBICLE
1600.29
CUBICLE
1600.20
CUBICLE
1600.27
CUBICLE
1600.18
CUBICLE
1600.25
CUBICLE
1600.16
CUBICLE
1600.23
CUBICLE
1600.14
CUBICLE
1600.21
CUBICLE
1600.12
CUBICLE
1600.19
CUBICLE
1600.15
CUBICLE
1600.09
CUBICLE
1600.17
CUBICLE
1600.10
CUBICLE
1600.13
CUBICLE
1600.08
CUBICLE
1600.11
CUBICLE
1600.07
CUBICLE
ELEC
OFFICE
OFFICE
1300.13
CUBICLE
1300.11
CUBICLE
1300.09
CUBICLE
1300.08
CUBICLE
1300.06
CUBICLE
1300.04
CUBICLE
FOOD
OFFICE
100.17
CUBICLE
100.36
CUBICLE
100.19
CUBICLE
100.37
CUBICLE
100.23
CUBICLE
100.39
CUBICLE
100.21
CUBICLE
100.38
CUBICLE
100.25
CUBICLE
100.40
CUBICLE
100.27
CUBICLE
100.42
CUBICLE
100.01
CUBICLE
100.28
CUBICLE
100.13
CUBICLE
100.34
CUBICLE
100.15
CUBICLE
100.35
CUBICLE
100.11
CUBICLE
100.33
CUBICLE
100.09
CUBICLE
100.32
CUBICLE
100.07
CUBICLE
100.31
CUBICLE
100.05
CUBICLE
100.30
CUBICLE
100.03
CUBICLE
100.29
CUBICLE
1300.02
CUBICLE
1300.01
CUBICLE
300.01
CUBICLE
100.04
CUBICLE
100.02
CUBICLE
S1
STAIR
C13
CORRIDOR
CONF
MECH
MECH
MECH
LAB
ELEC
1315A
DATA
CONF
OFFICE
OFFICE
MECH
OFFICE
OFFICE
111.01
CUBICLE
MECH108
OPENOFF
107.01
CUBICLE
106.01
CUBICLE104.02
CUBICLE
OTHER
OFFICE
OFFICE
OFFICE
RESTRM
DATA
OFFICE
OFFICE
CONF
OFFICE
CONF
OPENOFF
OFFICE
STORAGE
413.02
SHRDOFF
RESTRM
DATA
MECH
CONF
CONF
807L
COMMON
807B
OFFICE
807A
OFFICE
807H
OFFICE
807F
OFFICE
C11
CORRIDOR
C10
CORRIDOR
OPENOFF
701A
OFFICE
CONF
CONF
ENTRY
601A
ELEC
601B
MECH
OPENOFF
OPENOFF
OPENOFF
800.02
COLLAB
1120.06
KIOSK
807L.01
KIOSK
807L.02
KIOSK
314.03
KIOSK
807L.03
KIOSK
100.06A
KIOSK
315.09
CUBICLE
315.10
CUBICLE
315.11
CUBICLE
315.12
CUBICLE
315.14
KIOSK
315.13
KIOSK
315.15
FOOD
C8.08
KIOSK
C8.09
KIOSK
C8.10
KIOSK
C8.11
KIOSK
C8.12
KIOSK
C8.13
KIOSK
C8.14
KIOSK
108.01
KIOSK108.02
KIOSK
108.03
KIOSK 108.04
KIOSK
1101.10A
KIOSK
810.01
KIOSK
810.03
KIOSK
810.04
KIOSK
810.02
KIOSK
PIPES &
VALVES
406.02
CUBICLE
406.01
CUBICLE
900.66
KIOSK
900.65
KIOSK
900.58
KIOSK
900.04
CUBICLE
900.08
CUBICLE
OPENOFF
900.71
KIOSK
900.74
KIOSK
900.75
KIOSK
900.76
KIOSK
900.77
KIOSK
900.78
KIOSK
900.79
KIOSK
900.80
KIOSK
900.81
KIOSK
900.82
KIOSK
900.83
KIOSK
900.84
KIOSK
900.85
KIOSK
900.86
KIOSK
900.87
KIOSK
900.88
KIOSK
900.89
KIOSK
900.90
KIOSK
900.91
KIOSK
900.92
KIOSK
900.94
KIOSK
900.93
KIOSK
900.95
KIOSK
DATA
OPENOFF
RAMP
RA
M
P
Part 1 Location
Part 2 Locations
En cl os ur e (2 robert.m.sheridan Polygon robert.m.sheridan Rectangle robert.m.sheridan Rectangle robert.m.sheridan Rectangle robert.m.sheridan Rectangle robert.m.sheridan Rectangle robert.m.sheridan Rectangle
AW
N
BY
NA
VA
L S
UR
FA
CE
W
AR
FA
RE
C
EN
TE
R
PH
IL
AD
EL
PH
IA
, P
A
DE
SI
GN
ED
B
Y:
DW
G
NA
M E:
SH
EE
T
SI
ZE
6.
9.
2.
6.
CO
DE
SA
VE
D
AT
E:
SC
AL
E:
PL
O
T
DA
TE
NO
TE
S:
SHEET of
NF
A1
2_
_1
_F P.
dw g
87-1
BU
IL
DI
NG
FL
O
O R
DR
AF
T
LA
YO
UT
XX
XX
XX
X
1 1
AN
SI
e xp an d
B (1
1.
x
.0
In ch es
1"
0.
UP UP
UP
RAMP
RAMP
RAMP
RAMP
STAIRS
RAMP
5.5" Pipe
1215.02
CUBICLE
1215.04
CUBICLE
1215.06
CUBICLE
1215.08
CUBICLE
1215.01
CUBICLE
1215.03
CUBICLE
1215.05
CUBICLE
1215.07
CUBICLE
OPENOFF
1208.07
CUBICLE
1208.08
CUBICLE
1113102A
OFFICE
1116E
UTILITY
1113C
OFFICE
1116B
STORAGE
1116A
STORAGE
1113E
ELEV
1116D
UTILITY
1116C
LAB
1113100
ENTRY
1113101
FOOD
STORAGE
1113A
SPECIAL
1113B
OPENOFF
LAB
1113102
TEMP
1208.05
CUBICLE
1208.03
CUBICLE
1208.01
CUBICLE
1208.06
CUBICLE
1208.04
CUBICLE
1208.02
CUBICLE
1100C1
CORRIDOR
LAB
LAB
1216.01
LAB
LAB
LAB
STORAGE
STORAGE
LAB
LAB
1119A
STORAGE
LAB
1118A
LAB
LAB
SUBSTATION
JANITORIAL
RESTRM
RESTRM
LAB
SPECIAL
SPECIAL
SPECIAL
LAB
RESTRM
JANITORIAL
RESTRM
LAB
LAB
LAB
LAB
LAB
SPECIAL
SPECIAL
1200C1
CORRIDOR
COMMON
1208A
LAB
1208B
LAB
LAB
LAB
LAB
LAB 1213
LAB
LAB
LAB
1300C1
CORRIDOR
1302A
OFFICE
LAB
1300C2
CORRIDOR
LAB
STORAGE
STORAGE
STORAGE
SPECIAL
OFFICE
SHOP
1301A
SPECIAL
1101.2
UTILITY
1125B
SHOP
1125A
SHOP
LAB
1101.1
UTILITY
LAB
1214.01
KIOSK
1214.02
KIOSK
1214.03
KIOSK
1113B.01
KIOSK
1113B.02
KIOSK
1113B.03
KIOSK
1113B.04
KIOSK
1113B.05
KIOSK
1113B.06
KIOSK
robert.m.sheridan Rectangle robert.m.sheridan Rectangle robert.m.sheridan Rectangle robert.m.sheridan Rectangle robert.m.sheridan Rectangle robert.m.sheridan Rectangle robert.m.sheridan Rectangle
AW
N
BY
NA
VA
L S
UR
FA
CE
W
AR
FA
RE
C
EN
TE
R
PH
IL
AD
EL
PH
IA
, P
A
DE
SI
GN
ED
B
Y:
DW
G
NA
M E:
SH
EE
T
SI
ZE
6.
.2
3.
.2
CO
DE
SA
VE
D
AT
E:
SC
AL
E:
PL
O
T
DA
TE
NO
TE
S:
SHEET of
NF
A1
6_
6_
1_
FP
.d w g
756-1
BU
IL
DI
NG
FL
O
O R
DR
AF
T
LA
YO
UT
XX
XX
XX
X
1 1
AN
SI
e xp an d
B (1
1.
x
.0
In ch es
1"
4.
BLDG. 87
UP UP
BLDG. 77H
STORAGE
LAB
LAB
LAB
1C1
CORRIDOR
LAB
FOOD
UP
CUBICLE
STORAGE
robert.m.sheridan Rectangle robert.m.sheridan Rectangle
IATL
International Asbestos
Testing Laboratories
9000 Commerce Parkway, Suite B, Mt. Laurel, NJ 08054 Telephone: 856-231-9449 Fax: 856-231-98 l 8
PRELIMINARY RESULTS
Miscellaneous Asbestos Analysis
Client: Synertech Inc.
228 Moore Street
Project:
Philadelphia, PA 19148
ClientNo.: SYNl 77
Client Contacts:
Contacts:
Phone:
Fax:
Cell/Pager:
E-Mail:
Chain of Custody:
Samples Taken in Field:
Samples Rec'd at Laboratory: L. D'Ornellas
Samples Analyzed: P. Carr Preliminary Results Fa'<ed:
Preliminary Results E-Mail:
Project No.:
Batch No.:
PNY-Bldg 77 High Mezzanine-xxxxx xxxx
203-
621757
Turnaround Time: 12 Hour
Laboratory Contacts:
Contacts: Frank E. Ehrenfeld III
Phone: (856) 231-9449
Fa'\:: (856) 231-9818
Cell/Pager:
E-Mail: frankehrenfeld(a}iatl.com
Date:
Date: 10/22/2020
Date: 10/22/2020 Date:
Date:
Summary Data
Time:
Time:
Time:
Time:
Time:
ASTM D6480 - 05(2010) Standard Test Method for Wipe Sampling of Surfaces, Indirect Preparation, and
Analysis for Asbestos Structure Number Concentration by Transmission Electron Microscopy
Client IATL Area Sampled Aliquot Results Results
(cm
Comments Sample ID# Sample ID# (ml) s/cm2 s/mm2
0293 MK0! 7083641 100 1.0 Chrysotile 9,260.0 19
0293 MK02 7083642 100 2.0 None Detected < 2,310.0 < 10
0293 MK03 7083643 100 1.0 Chrvsotile 4,630.0 10
0293 MK04 7083644 100 1.0 None Detected < 4,630.0 < 10
Several publications and resources are available for the interpretation of Asbestos in Settled Dust by ASTM methodology. The method is highly dependent on field sampling protocol.
These preliminary results are issued by IATL to expedite procedures by the clients based upon the above data. IATL assumes that all of the sampling methods and data upon which these results are based, has been accurately supplied by the client. These results may not have been reviewed by the Laboratory Director. Final Certificate of Analysis will follow these preliminary results. The signed COA is to be considered the official results. All EPA, HUD, and NJDEP conditions apply.
Page I of I TEM.MV-Dust.002 thomas.herrick Sticky Note
Asbestos Removal Work Plan
ASBESTOS ABATEMENT WORK PLAN
P r o j e c t:
Bldg. 77H Roof Repairs
Table of Contents
A. Site Specific Asbestos Removal Plan
B. Safety
C. Disposal
D. Air Monitoring
E. Final Cleaning
F. Additional Documents
A. All Phase Solutions, LLC (APS) will coordinate with subcontractor United States Roofing
Corporation (USRC) for the following removal scope of work:
Remove and dispose of approx. 290 LF non-friable asbestos containing roof flashings located at the perimeter adjacent to the wall panel system and remove and dispose of approx. 1,600 SF of non-friable asbestos containing corrugated wall panels on the exterior of the mechanical room of Bldg. 77H.
Abatement
Description: Removal and disposal of asbestos shall be limited to the schedule provided.
Work will be performed in accordance with Federal, State, and Local Regulations.
A fully lined dumpster will be located within the approved staging area to receive the materials.
Warning signs will be posted around the work area and on the dumpster.
The dedicated competent person will assess the jobsite and determine that the roofing material is intact prior to start of work and will remain non-friable during the removal process.
All demolition personnel will wear appropriate PPE for job tasks.
Air monitoring will be provided by 3rd party throughout the abatement activities.
ACM removal will take place utilizing hand tools only.
Flashings will be placed into a single 6 mil. poly bag sealed and lowered into the fully lined dumpster.
Corrugated wall panels will be wrapped in 6 mil. poly and sealed, as needed to account for size and shape, and lowered into the fully lined dumpster.
APS will coordinate with NAVFAC Environmental lead to confirm permission to remove the materials from site prior to hauling.
Appropriate manifests will be collected and submitted for all hauls of ACM.
Prior to commencement of work USRC will submit a notification for DEP, Local Board of Health, Local Fire Department and other agencies at least ten (10) days before work commences on the project. All worker and contractor licenses will be onsite prior to work.
USRC will forward a copy of the completed notification copy to APS prior to mobilization for submission to
NAVFAC.
B. SAFETY
The following work practices will also be utilized in the work area as additional required safety measures:
All Phase Solutions, LLC promotes a safe workplace, free of accidents, by the use a safety meeting among the working crew every day before the start of the workday. Before the beginning of every workday our job daily log. These meetings will focus on asbestos demolition as the schedule requires.
Personal Protection Equipment (PPE) and Use
All demolition personnel will be required to wear, as a minimum the following personal protective equipment: Hard Hat, Safety Vest, Safety Shoes/Boots, Eye Protection and Cut Resistant Gloves. . Fall
Daily Containment Inspections
USRC competent person and crew will inspect the worksite for changes in work condition prior to the removal of any ACM on a daily basis. Any deficiencies are to be resolved before proceeding with any ACM removal activities.
USRC is responsible for immediately reporting any breach in containment to APS Project Manager and
C. DISPOSAL
Waste Hauler: Advanced Disposal
Disposal Facility: Western Berks Landfill, Berks County 455 Poplar Neck Rd Birdsboro, Pa 19508
Packaging:
Material will be packed, sealed and labeled according to the regulations.
All ACM material will be transported by Advanced Disposal Western Berks landfill All waste shipments will be manifested as per regulations.
Waste is packaged as previously described. Waste materials will be lowered into the open top lined dumpster.
The dumpster will be inspected daily by USRC competent person to ensure proper containment.
USRC competent person will prepare a manifest in accordance with project protocols in preparation for the removal and pick up of the trailer by Advanced Disposal. Advanced Disposal will be hauling the ACM to its final destination (Western Berks Landfill) as written on the last section of the manifest. Disposal manifests will be signed by the landfill and returned to the owner within 30 days of disposal
GENERATOR AND/OR HAULER REQUIREMENTS
The asbestos materials will be packaged in impermeable dust tight containers (i.e. six (6) mil plastic bags) All containers will be labeled in large legible letter:
DANGER -CONTAINS ASBESTOS
FIBERS AVOID CREATING
DUST
CANCER AND LUNG DISEASE HAZARD
D. AIR MONITORING
ecoservices, LLC will perform on-site air monitoring while abatement activities are underway.
ecoservices, LLC
303 B National Rd.
Exton, PA 19341
E. Final Cleaning
USRC will remove all visible accumulations of asbestos material and debris. All deck surfaces within the Work Area will be cleaned to a condition of no visible debris. If the Project Monitor finds visible accumulations of bulk asbestos containing materials in the work area, USRC will repeat the cleaning until the work area is in compliance.
F. Additional Documents
1. Locations of ACM
2. RFP ACM Report
Building 77H, Roof Repair The Navy Yard 100% Submission Philadelphia, Pennsylvania December 4, 2018
Appendix
\\ad.wrallp.com\bsecure\81510-009\Reports\BOD\Final Submision\Building 77H Roof Repair Design BOD.docx
Appendix A – Hazardous Materials Report
Building 77H, Roof Repair The Navy Yard 100% Submission Philadelphia, Pennsylvania December 4, 2018
Appendix
\\ad.wrallp.com\bsecure\81510-009\Reports\BOD\Final Submision\Building 77H Roof Repair Design BOD.docx
This page intentionally left blank.
1331 Ashton Road P.O. Box 646 Hanover, MD 21076 410-684-3327 FAX: 410-684-3384 www.amatraining.com
Aerosol Monitoring & Analysis, Inc.
Environmental Consultants
June 28, 2018
Wayne Chang, P.E., S.E. | Associate Whitman, Requardt & Associates. LLP 801 South Caroline Street Baltimore, Maryland 21231
AMA Job #: 18339
Re: Hazardous Material Investigation for the “NSWC Building 77H Roof Repair Design” project at the Philadelphia Navy Yard in Philadelphia, Pennsylvania 19112.
Dear Mr. Chang:
On June 15th, 2018, representatives from Aerosol Monitoring & Analysis, Inc. (AMA) were on-site at Building #77H of the Philadelphia Navy Yard, located in Philadelphia, PA. AMA was onsite to perform a hazardous materials investigation for the “NSWC Building 77H Roof Repair Design” project. The purpose of the work was to identify asbestos-containing materials (ACM) and components finished with lead containing paint or surface coatings (LCP) that may be disturbed by the proposed renovations. AMA conducted bulk material sampling, and on-site evaluations to report our findings. In addition, AMA utilized an existing hazardous materials report, generated by AMA in January 2015 for the “DDG-51 Cut-Out Roof and Gutter System” project at Building 77H.
AMA representatives Mr. Douglas Ferry, Mr. Ron Stallard and Mr. Pat Dincher performed the onsite investigation for the “NSWC Building 77H Roof Repair Design” project at Building #77H at the Philadelphia Navy Yard, in Philadelphia, Pennsylvania:
Please refer to Appendix C for copies of the certifications and licenses for Mr. Ferry, Mr. Stallard and Mr. Dincher. Please note that Mr. Ferry is an employee of Briggs Associates, and was sub-contracted by AMA to perform the asbestos bulk sampling, since he is a City of Philadelphia Asbestos Investigator.
ACM INVESTIGATION
AMA's scope of work included the visual evaluation, quantification, sampling, testing, and laboratory analysis of accessible suspect ACM associated with the “NSWC Building 77H Roof Repair Design” project at Building #77H.
“NSWC Building 77H Roof Repair Design” Project
AMA, Inc. 3
Note:
1. The Roof Flashing membrane tar/ parapet wall tar from the 2014 report and the roof flashing from the 2018 investigation are one in the same and are homogeneous on east and west side lower roofs.
2. The east elevation location for gutter system improvement project was not accessible to conduct an investigation per on-site Navy Yard personnel at the time of inspection.
REGULATORY COMPLIANCE FOR ACM
The identified asbestos containing roof flashing associated with the Building 77H “NSWC Building 77H Roof Repair Design” project, at the Philadelphia Navy Yard, is regulated and categorized by the Occupational Safety and Health Administration (OSHA) 29 CFR 1926.1101 as Class II work. Disturbance and/or removal of the asbestos containing roof flashing must be performed in accordance with the requirements set forth in 29 CFR 1926.1101 for Class II work as well as any specifications generated for the project.
A regulated asbestos-containing material (RACM) is defined by the EPA’s National Emissions Standards for Hazardous Air Pollutants (NESHAP), Asbestos Regulations (40 CFR 61, Subpart M), as follows:
Regulated asbestos-containing material (RACM) means (a) Friable asbestos material, (b) Category I nonfriable ACM that has become friable, (c) Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or (d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations regulated by this subpart. The identified ACM associated with the Building 77H “Roof Replacement Project” at the Naval Support Activity in Philadelphia is categorized as Category I non-friable ACM.
By this definition the identified non-friable asbestos containing roof flashing must be abated prior to demolition or renovation, if these activities will cause these materials to become disturbed, crumbled, pulverized, or reduced to powder.
In addition to the Federal Regulations discussed above, Commonwealth of Pennsylvania (Asbestos Occupations Accreditation and Certification Act, Act of 1990, P.L. 805, No. 194) and City of Philadelphia (Asbestos Control Regulation of the Board of Health, Title 6 Health Code, of the Philadelphia Code 6-600, Asbestos Projects, adopted June 26, 1986) would be the primary regulations impacting the work, must be adhered to if the identified ACM associated with the Café HVAC Replacement Project of Building #3 at the Naval Support Activity, will be impacted.
It should be noted that additional materials maybe located throughout Building 77H that were not investigated as part of the “NSWC Building 77H Roof Repair Design” project. If additional suspect materials are observed during renovation activities, they should be by sampled an accredited asbestos inspector, who is a Philadelphia asbestos Investigator and Commonwealth of Pennsylvania certified asbestos Inspector, and submitted for laboratory analysis or treated as an
ACM.
AMA, Inc. 4
LEAD PAINT INVESTIGATION
The paint chip samples were collected in a manner conforming to the procedures developed by the Department of Housing and Urban Development (HUD) in the HUD Guidelines Appendix 13.2 Part 3 “Paint Sample Collection.” All construction related work involving paint, which contains a detectable amount of lead, is regulated by the Occupational Safety and Health Administration (OSHA), “Lead in Construction Standard,” (29 CFR1926.62). The samples were collected by scoring the surface with a razor blade and then placing the paint chips in sterilized “whirl-pak” bags. After each sample was collected, the sample was assigned a unique identifier, which was recorded on the bags and the bulk sampling survey sheet.
During the field investigation, a total of five (5) lead paint chips were collected, and submitted to AMA Analytical Services, Inc. for analysis by Atomic Absorption Spectroscopy (AAS) following the EPA method 600/R-93/200 (M)-7420. AMA Analytical Inc. analyzed the paint chip for lead content by atomic absorption spectroscopy (AAS) in accordance with EPA method SW846- 3050A-7420. AMA Analytical Inc. is accredited by the American Industrial Hygiene Association (AIHA) for lead bulk analysis. A LCP by bulk paint chip sample is any dried paint film which contains in excess of 0.009% lead by weight by laboratory analysis, using Atomic Absorption Spectroscopy (AAS) following the EPA method 600/R-93/200 (M)-7420. This level has been established by the Consumer Product Safety Commission (CPSC) in the Consumer Product Safety Improvement Act of 2008 (CPSIA) (Public Law 110-314).
The results of the laboratory analysis determined that four (4) of the five (5) paint chip samples collected on June 15th, 2018 for the Building 77H “NSWC Building 77H Roof Repair Design” project, at the Philadelphia Navy Yard in Philadelphia contained a measurable amount of lead. The following components were determined to contain a measurable amount of lead by previous documentation and the current investigation by laboratory analysis:
Red Metal Parapet/Gutter Wall (December 2014 report)
Red Metal Roof (June 2018 report) White Metal I-Beam (June 2018
Report)
White Metal Truss (June 2018 Report) White Metal Structural Steel (June 2018
Report)
REGULATORY COMPLIANCE FOR LEAD
For projects, which will disturb lead containing paint, the component must be handled in accordance with the requirements established by the EPA, OSHA, the Commonwealth of Pennsylvania, and the City of Philadelphia.
If a LCP will be disposed of during renovation/demolition activities, the waste stream must be tested, using the Toxic Characteristic Leachate Procedure (TCLP) analysis for lead, to determine the disposal requirements, following the requirements of the Resource Conservation and Recovery Act (RCRA) and any other applicable federal, Commonwealth and local laws and regulations. Contractors must be made aware of the existence of lead containing paint, surface coating, or any component containing lead in detectable amounts, so their workers can be adequately protected.
AMA, Inc. 5
It is also required that contractors be made aware of the existence of LCP, so their workers can be adequately protected. The OSHA does not recognize threshold levels of lead; therefore the regulations established in the OSHA “Lead in Construction Standard” (29 CFR 1926.62) must be adhered to during demolition and renovation of components containing lead in detectable amounts.
The Occupational Safety and Health Administration (OSHA) does not recognize threshold levels of lead; therefore the regulations established in the OSHA’s “Lead in Construction Standard” (29 CFR 1926.62), and any Commonwealth of Pennsylvania, and the City of Philadelphia laws/regulations must be adhered to during the demolition and renovation of all painted components or surface coatings.