This is a Pricing Submittal Form (Attachment A Form A-2) for Invitation to Bid (ITB) 14564 issued by Oregon Parks and Recreation Department for the Smith Rock State Park Visitor Improvement Project. The project encompasses three base bid components and one alternate bid: Project 1 – Rim Rock Trail Improvements, Project 2 – North Rim Rock Trail Extension, Project 3 – Overflow Parking Lot Improvements, and Project 4 (Alternate) – Restroom Plaza. The base bid work includes site mobilization, survey and stakeout, erosion and traffic control, demolition and clearing, excavation and earthwork, paving (asphalt and concrete), installation of amenities such as fencing, benches, bollards, gates, and pay stations, stormwater infrastructure including gravity storm sewers and basins, and landscape improvements including topsoil, compost, seeding, and plantings. Specific quantities are detailed across all projects, ranging from individual units (such as 7 tree removals and 2 gate installations) to significant volume measures (such as 1,300 tons of backfill rock, 1,100 tons of asphalt paving, and 18,000 square feet of landscape seeding for the parking lot project alone).
Bidders are required to enter unit costs and total costs for all itemized bid items on the form provided. The bid price represents the total contract price including the contractor's profit and overhead, and all work described in the contract documents but not specifically itemized is considered incidental to the work. The State reserves the right to increase or decrease quantities at the same unit prices or remove items as necessary to meet budgetary constraints, with payment to be made based on actual measured quantities rather than estimated quantities. The form includes sections for submission of pricing by the bidder's authorized representative with signature and date, and it notes that failure to supply required information may result in bid rejection as non-responsive.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT A |
| FORM A-2 - PRICING FORM |
| ITB 14564 |
| Smith Rock State Park Visitor Improvement Project |
| PRICING SUBMITTAL FORM |
| PRICING SUBMITTAL INSTRUCTIONS: Bidders shall enter pricing and other required information for all Bid Items listed in this Pricing Submittal Form. If this Pricing Submittal Form is replaced by Addendum, Bidders shall use the Addendum form to provide pricing and other required information. If the Pricing Submittal Form is only modified by Addendum, then Bidders shall follow the instructions in the Addendum for making modifications to the Pricing Submittal Form. Failure to supply the required information in the Pricing Submittal Form as modified by subsequent Addenda may result in Bid rejection as non-responsive. |
Note: Bid price is total contract price including contractor's profit and overhead. All work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work.
The undersigned understands that the State reserves the right to increase or decrease the above quantities at the same unit prices as show or to remove items as necessary to meet budgetary constraints. The undersigned has carefully examined the Contract Documents and the site of the work, ang agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, temporary facilities and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set herein.
| The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities. | ||||||
| Item # | Description | Unit | Unit Cost | Total Cost | ||
| PROJECT 1 – RIM ROCK TRAIL IMPROVEMENTS: | ||||||
| BASE BID | ||||||
| A | 1 | Mobilization | 1 | LS | $ - 0 | |
| A | 2 | Survey - Project Stakeout | 1 | LS | $ - 0 | |
| A | 3 | Erosion Control | 1 | LS | $ - 0 | |
| A | 4 | Traffic Control | 1 | LS | $ - 0 | |
| A | 5 | Demolition, Clearing and Grubbing | 1 | LS | $ - 0 | |
| A | 6 | Tree Removal | 5 | EA | $ - 0 | |
| A | 7 | Asphalt Sawcut & Excavation | 3,000 | SF | $ - 0 | |
| A | 8 | General Excavation and Earthwork | 1 | LS | $ - 0 | |
| A | 9 | Rock Excavation (Allowance) | 1 | CY | $ - 0 | |
| A | 10 | Base Rock or Shoulder Backfill Rock | 270 | TN | $ - 0 | |
| A | 11 | Pavement Markings - Painted Striping | 1 | LS | $ - 0 | |
| A | 12 | Cast-in-Place Concrete Curb | 26 | LF | $ - 0 | |
| A | 13 | Concrete Paving – Type 1 Vehicular: | 2,400 | SF | $ - 0 | |
| A | 14 | Concrete Paving – Type 2 Pedestrian | 755 | SF | $ - 0 | |
| A | 15 | Tactile Warning Panel | 1 | EA | $ - 0 | |
| A | 16 | Crushed Rock Paving | 160 | TN | $ - 0 | |
| A | 17 | Precast Concrete Wheel Stops | 7 | EA | $ - 0 | |
| A | 18 | Bollard (OFCI) | 1 | EA | $ - 0 | |
| A | 19 | Split Rail Fence | 90 | LF | $ - 0 | |
| A | 20 | Stone Faced Wall | 55 | LF | $ - 0 | |
| A | 21 | Boulder Placement | 1 | LS | $ - 0 | |
| A | 22 | Bench Installation (OFCI) | 2 | EA | $ - 0 | |
| A | 23 | Landscape - Amended Topsoil | 145 | CY | $ - 0 | |
| A | 24 | Landscape - Compost | 35 | CY | $ - 0 | |
| A | 25 | Landscape - Seeding | 10,000 | SF | $ - 0 | |
| A | 26 | Landscape - General - Plantings | 1 | LS | $ - 0 | |
| A | 27 | Signs - ADA | 7 | EA | $ - 0 | |
| $ - 0 | ||||||
| PROJECT 2 – NORTH RIM ROCK TRAIL EXTENSION | ||||||
| BASE BID | ||||||
| B | 1 | Mobilization | 1 | LS | $ - 0 | |
| B | 2 | Survey - Project Stakeout | 1 | LS | $ - 0 | |
| B | 3 | Erosion Control | 1 | LS | $ - 0 | |
| B | 4 | Traffic Control | 1 | LS | $ - 0 | |
| B | 5 | Demolition, Clearing and Grubbing | 1 | LS | $ - 0 | |
| B | 6 | General Excavation and Earthwork | 1 | LS | $ - 0 | |
| B | 7 | Rock Excavation (Allowance) | 10 | CY | $ - 0 | |
| B | 8 | Base Rock or Shoulder Backfill Rock | 150 | TN | $ - 0 | |
| B | 9 | Crushed Rock Paving | 150 | TN | $ - 0 | |
| B | 10 | Split Rail Fence | 90 | LF | $ - 0 | |
| B | 11 | Boulder Placement | 1 | LS | $ - 0 | |
| B | 12 | Salvage Log Placement | 1 | LS | $ - 0 | |
| B | 13 | Bench Installation (OFCI) | 3 | EA | $ - 0 | |
| B | 14 | Landscape - Amended Topsoil | 140 | CY | $ - 0 | |
| B | 15 | Landscape - Compost | 35 | CY | $ - 0 | |
| A | 16 | Landscape - Seeding | 11,000 | SF | $ - 0 | |
| B | 17 | Landscape - General Plantings | 1 | LS | $ - 0 | |
| $ - 0 | ||||||
| PROJECT 3 – OVERFLOW PARKING LOT IMPROVEMENTS | ||||||
| BASE BID | ||||||
| C | 1 | Mobilization | 1 | LS | $ - 0 | |
| C | 2 | Survey - Project Stakeout | 1 | LS | $ - 0 | |
| C | 3 | Erosion Control | 1 | LS | $ - 0 | |
| C | 4 | Traffic Control | 1 | LS | $ - 0 | |
| C | 5 | Demolition, Clearing and Grubbing | 1 | LS | $ - 0 | |
| C | 6 | Tree Removal | 7 | EA | $ - 0 | |
| C | 7 | General Excavation and Earthwork | 1 | LS | $ - 0 | |
| C | 8 | Rock Excavation (Allowance) | 10 | CY | $ - 0 | |
| C | 9 | Base Rock or Shoulder Backfill rock | 1,300 | TN | $ - 0 | |
| C | 10 | Asphalt Paving - Leveling and Wearing Courses | 1100 | TON | $ - 0 | |
| C | 11 | Pavement Markings - Painted Striping | 1 | LS | $ - 0 | |
| C | 12 | Pavement Markings - Crosswalk | 1 | LS | $ - 0 | |
| C | 13 | Cast-in-Place Concrete Curb | 150 | LF | $ - 0 | |
| C | 14 | Concrete Paving – Type 1 Vehicular: | 1,100 | SF | $ - 0 | |
| C | 15 | Concrete Paving – Type 2 Pedestrian | 1,500 | SF | $ - 0 | |
| C | 16 | Tactile Warning Panel | 6 | EA | $ - 0 | |
| C | 17 | Crushed Rock Paving | 40 | TN | $ - 0 | |
| C | 18 | Precast Concrete Wheel Stops | 104 | EA | $ - 0 | |
| C | 19 | Gravity Storm Sewer - 6" | 74 | LF | $ - 0 | |
| C | 20 | Gravity Storm Sewer - 8" | 88 | LF | $ - 0 | |
| C | 21 | Gravity Storm Sewer - 12" | 69 | LF | $ - 0 | |
| C | 22 | Cleanout to Grade | 10 | EA | $ - 0 | |
| C | 23 | Outfall | 1 | EA | $ - 0 | |
| C | 24 | Overflow Inlet | 3 | EA | $ - 0 | |
| C | 25 | Stormwater Basin | 681 | LF | $ - 0 | |
| C | 26 | Electrical Conduit | 450 | LF | $ - 0 | |
| C | 27 | Split Rail Fence | 700 | LF | $ - 0 | |
| C | 28 | Boulder Placement | 1 | LS | $ - 0 | |
| C | 29 | Gate Installation (OFCI) | 2 | EA | $ - 0 | |
| C | 30 | Salvage Gate Reinstall | 1 | EA | $ - 0 | |
| C | 31 | Pay Station (OFCI) | 1 | EA | $ - 0 | |
| C | 32 | Landscape - Amended Topsoil | 140 | CY | $ - 0 | |
| C | 33 | Landscape - Compost | 35 | CY | $ - 0 | |
| C | 34 | Landscape - Seeding | 18,000 | SF | $ - 0 | |
| C | 35 | Landscape - General Plantings | 1 | LS | $ - 0 | |
| C | 36 | Signs - Reinstall | 10 | EA | $ - 0 | |
| C | 37 | Signs - ADA | 4 | EA | $ - 0 | |
| C | 38 | Mailbox Reinstall | 1 | EA | $ - 0 | |
| $ - 0 | ||||||
| TOTAL BASE BID (Sum of Project 1, 2, and 3 Totals) | $ - 0 |
| PROJECT 4 BID ALTERNATE– RESTROOM PLAZA | |||||
| D | 1 | Mobilization | 1 | LS | $ - 0 |
| D | 2 | Survey - Project Stakeout | 1 | LS | $ - 0 |
| D | 3 | Erosion Control | 1 | LS | $ - 0 |
| D | 4 | Demolition, Clearing and Grubbing | 1 | LS | $ - 0 |
| D | 5 | Tree Removal | 8 | EA | $ - 0 |
| D | 6 | General Excavation and Earthwork | 1 | LS | $ - 0 |
| D | 7 | Rock Excavation (Allowance) | 5 | CY | $ - 0 |
| D | 8 | Base Rock or Shoulder Backfill rock | 40 | TN | $ - 0 |
| D | 9 | Concrete Paving – Type 2 Pedestrian | 1,750 | SF | $ - 0 |
| D | 10 | Crushed Rock Paving | 8 | TN | $ - 0 |
| D | 11 | Boulder Placement | 1 | LS | $ - 0 |
| D | 12 | Bench Installation (OFCI) | 1 | EA | $ - 0 |
| D | 13 | Information Kiosk Installation (OFCI) | 1 | EA | $ - 0 |
| D | 14 | Bicycle Racks (OFCI) | 2 | EA | $ - 0 |
| D | 15 | Trash Receptacle (OFCI) | 1 | EA | $ - 0 |
| D | 16 | Landscape - Amended Topsoil | 20 | CY | $ - 0 |
| D | 17 | Landscape - Compost | 5 | CY | $ - 0 |
| D | 18 | Landscape - Seeding | 2,300 | SF | $ - 0 |
| D | 19 | Landscape - General Plantings | 1 | LS | $ - 0 |
| TOTAL BID ALTERNATE (Sum of Project 4 Totals) | $ - 0 |
By (Bidder Company Name and Authorized Signer Name) Date
Sheet2
| P1 | P3 | |||
| Agg base | 6" | 8" | 12" | |
| 9.7 | 65.2 | 22.57 | 110.81 | |
| 1208 | 76.18 | 51.61 | 36.71 | |
| 302 | 36.54 | 16 | 25.02 | |
| 37 | 75.76 | |||
| 1200 | 87.1 | |||
| 400 | 70.72 | |||
| 145 | 75.76 | |||
| 361 | 17 | |||
| 8 | 17 | |||
| 2 | 73.3 | |||
| 45.5 | 177.92 | 87.7 | 172.54 | |
| 3718.2 | CY | 594.52 | ||
| 5577.3 | TN |
| 33 | drive |
| 49.5 | TN |