Addendum 2_Attachment C_Revised Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- S-63400-00018081
- Issued by
- Deschutes County, Oregon
About this file
This is a revised drawing document, Addendum 2 Attachment C, prepared by Greenworks PC Landscape Architecture for the Smith Rock State Park Visitor Improvement Project in Oregon. The document provides detailed construction drawings and specifications for three main project areas: Rim Rock Trail Improvements, Day Use Parking Lot Improvements, and Overflow Parking Lot Improvements. The drawings include material schedules, keynotes, and layout plans specifying concrete paving (vehicular and pedestrian types), asphalt paving, crushed rock paving, jointing details, curbs and ramps, fencing and gates, site furnishings (benches, bollards, trash receptacles, bike racks, information kiosks), pavement markings and signage, and salvaged materials (boulders, logs, gates, signage, and mailboxes). The Day Use Parking area maintains 92 total stalls with modifications to ADA and standard parking configurations, while the Overflow Parking area reduces from 126 to 106 stalls. The drawings reference multiple detail sheets (L7.01-L7.14) and cross-reference grading and civil plans, with notation that the restroom is not included in this scope and installed by others. All materials are contractor-furnished and installed unless specifically noted as owner-furnished contractor-installed (OFCI) or owner-furnished owner-installed (OFOI).
The document emphasizes that the contractor must verify existing site conditions and provide retainer rock edging along the Rim Trail to achieve proposed grades. Specifications include isolation joints at concrete flatwork transitions, thickened concrete paving edges, doweled expansion joints, and contraction joints at locations shown on plans. Trail widths vary, requiring reference to layout plans, and all pavement-to-gravel and gravel-to-gravel transitions must be graded smooth and flush without abrupt elevation changes. The document includes erosion control specifications with requirements for straw wattle placement on slopes, using rice straw tubes with flexible netting and wood stakes, and maintains minimum spacing and overlap requirements. The registered landscape architect is Benjamin Johnson (Oregon license 587), with design dated December 2, 2005, and the project addresses site improvements including split rail fencing, stone-faced walls with specific veneer patterns and dimensions, and detailed specifications for bollards, bike racks, and trash receptacles with manufacturer requirements and surface-mounting details.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DETAIL KEYNOTES
PAVING / SURFACING
NUMBER ITEM DETL / SHT REMARKS
1.1 CONCRETE PAVING - TYPE 1 1,3/L7.01 VEHICULAR
1.2 CONCRETE PAVING - TYPE 2 2/L7.01 PEDESTRIAN
1.3 ASPHALT PAVING 7/L7.01
1.4 CRUSHED ROCK PAVING 1,2,3/L7.03 NATIVE ROCK
JOINTING
NUMBER ITEM DETL / SHT REMARKS
2.1 DOWELED EXPANSION JOINT 4/L7.01
2.2 ISOLATION JOINT 5/L7.01
2.3 CONTRACTION JOINT 6/L7.01
CURB / RAMP / WALL
NUMBER ITEM DETL / SHT REMARKS
3.1 PRECAST CONCRETE WHEELSTOP 4/L7.02
3.2 STONE FACED WALL 1,2,3,4/L7.04
3.3 CONCRETE CURB 8/L7.01
3.4 CURB RAMP 1/L7.02
FENCING / GATES
NUMBER ITEM DETL / SHT REMARKS
4.1 SPLIT RAIL FENCE 5,6/L7.04
4.2 METAL GATE - TYPE 1 4/L7.05 OFCI
4.3 METAL GATE - TYPE 2 5L7.05 OFCI
SITE FURNISHING
NUMBER ITEM DETL / SHT REMARKS
5.1 BENCH 1/L7.05 OFCI, SURFACE MOUNTED PER MANUFACTURER DETAILS
5.2 REMOVABLE BOLLARD 2/L7.05 OFCI, SURFACE MOUNTED PER MANUFACTURER DETAILS
5.3 TRASH RECEPTACLE 8/L7.04 OFCI, SURFACE MOUNTED PER MANUFACTURER DETAILS
5.4 BIKE RACK 7/L7.04 OFCI, SURFACE MOUNTED PER MANUFACTURER DETAILS
5.5 RESTROOM - NIC, INSTALLED BY OTHERS
5.6 INFORMATION KIOSK 6/L7.05 OFCI, SURFACE MOUNTED PER MANUFACTURER DETAILS
5.7 NOT USED -
SIGNAGE / STRIPING
NUMBER ITEM DETL / SHT REMARKS
6.1 ADA ACCESSIBLE PARKING STALL 3/L7.02
6.2 ADA VAN ACCESSIBLE PARKING STALL 3/L7.02
6.3 STANDARD PARKING STALL -
6.4 RV PARKING STALL -
6.5 ADA PARKING SIGN POST 5,6/L7.02
6.6 PAVEMENT MARKING - 4" WIDE WHITE STRIPE -
6.7 PAVEMENT MARKING - DIRECTIONAL ARROW 8/L7.02
6.8 PAVEMENT MARKING - CROSSWALK -
6.9 TACTILE WARNING PANEL 2/L7.02
SALVAGED MATERIALS
NUMBER ITEM DETL / SHT REMARKS
7.1 BOULDERS - TYPE 1 4/L7.03 LOCALLY SOURCED
7.2 BOULDERS - TYPE 2 5/L7.03 LOCALLY SOURCED / SUITABLE BOULDERS FOUND ON SITE
7.3 SALVAGED LOG 6/L7.03
7.4 SALVAGED GATE SIM 4/L7.05
7.5 SALVAGED TRAFFIC SIGNAGE 3/L7.05
7.6 SALVAGED MAILBOX -
1.0
2.0
3.0
4.0
5.0
6.0
7.0
1. PROVIDE ISOLATION JOINTS WHERE CONCRETE FLATWORK MEETS
OTHER FLATWORK AND VERTICAL STRUCTURES SUCH AS WALLS, CURBS,
STEPS, AND BUILDING ELEMENTS, ETC. UNLESS INDICATED OTHERWISE.
2. MATERIAL SYMBOLS ARE DIAGRAMMATIC IN NATURE AND NOT INTENDED
TO BE TO SCALE. REFER TO LAYOUT AND DETAIL SHEETS FOR ACTUAL
SIZES.
3. OPRD PROJECT MANAGER TO APPROVE OF ALL CONCRETE FORMWORK
PRIOR TO PLACING CONCRETE.
4. ALL ITEMS SHALL BE FULLY PROVIDED BY THE CONTRACTOR
(CONTRACTOR FURNISHED AND INSTALLED) UNLESS SPECIFICALLY
NOTED OTHERWISE. THE SCHEDULE "REMARKS" COLUMN INDICATES
SPECIFIC ITEMS OR SUB-COMPONENTS AS BEING OWNER-FURNISHED
CONTRACTOR-INSTALLED (OFCI) OR OWNER-FURNISHED
OWNER-INSTALLED (OFOI).
5. ALL PAVEMENT TO GRAVEL TRANSITIONS AND GRAVEL TO GRAVEL
TRANSITIONS SHALL BE GRADED SMOOTH AND FLUSH, WITH NO ABRUPT
CHANGES IN ELEVATION. TRANSITIONS SHALL BE FEATHERED AND
COMPACTED TO PROVIDE A CONTINUOUS, STABLE SURFACE FREE OF
LIPS, RUTS, OR LOOSE MATERIAL.
GENERAL NOTES RIM ROCK TRAIL IMPROVEMENTS TABLE
NUMBER SCOPE OF WORK
WIDEN TRAIL SEGMENT TO 5' MIN.
SALVAGE AND REUSE EXISTING ROCK TO BUILD TRAIL EDGE.
TOPDRESS THE SURFACE WITH CRUSHED ROCK.
ADJUST ROCK EDGE TO CORRECT CROSS SLOPE.
TOPDRESS THE SURFACE WITH CRUSHED ROCK.
BACKFILL AND COMPACT TRAIL AREA AFTER BOULDER REMOVAL.
ADJUST ROCK EDGE TO CORRECT CROSS SLOPE.
TOPDRESS THE SURFACE WITH CRUSHED ROCK.
BACKFILL TRANSITION FROM TRAIL TO BRIDGE.
PROVIDE ROCK EDGE TO CORRECT CROSS SLOPE.
TOPDRESS THE SURFACE WITH CRUSHED ROCK
BACKFILL AND COMPACT TRAIL AREA AFTER BOULDER REMOVAL.
BACKFILL AND COMPACT AROUND BENCH FOOTING.
ADJUST OR ADD TO THE ROCK EDGE TO IMPROVE CROSS SLOPE
AS NEEDED.
TOPDRESS THE SURFACE WITH CRUSHED ROCK.
BACKFILL AND COMPACT TRAIL AREA AFTER BOULDER REMOVAL.
TOPDRESS THE SURFACE WITH CRUSHED ROCK.
BACKFILL AND COMPACT TRAIL AREA AFTER BOULDER REMOVAL.
ADJUST ROCK EDGE TO IMPROVE CROSS SLOPE AS NEEDED.
TOPDRESS THE SURFACE WITH CRUSHED ROCK.
T1
T3
T2
T4
T5
T6
T7
LEGEND
SYMBOL ITEM
CONCRETE PAVING - TYPE 1 (VEHICULAR)
CONCRETE PAVING - TYPE 2 (PEDESTRIAN)
ASPHALT PAVING
CRUSHED ROCK PAVING (NATIVE ROCK)
TRASH RECEPTACLES
FEE STATION (SYMBOL NTS)
KIOSK
DOWELED EXPANSION JOINT
ISOLATION JOINT
CONTRACTION JOINT
GATE
SALVAGED LOGS
1. REFER TO THE MATERIAL PLANS FOR THE SPECIFIED CRUSHED ROCK
PAVING TYPE USED FOR TOPDRESSING.
2. REFER TO GRADING PLAN FOR THE RUNNING AND CROSS SLOPE
INFORMATION.
3. TRAIL WIDTH VARIES. REFER TO LAYOUT PLAN.
4. CONTRACTOR TO VERIFY EXISTING SITE CONDITIONS AND PROVIDE
RETAINER ROCK EDGING ALONG THE RIM TRAIL AS NECESSARY TO
ACHIEVE PROPOSED TRAIL GRADES. RETAINER ROCK DETAIL SHALL BE
SIMILAR TO DETAIL 3/L7.14.
RIM ROCK TRAIL IMPROVEMENTS NOTES
BOULDERS
STONE FACED WALL
BIKE RACK
BENCH + COMPANION SEATING SPACE
PLANTING AREA
ADA SIGNAGE
PARKING STRIPES
SPLIT RAIL FENCE
TACTILE WARNING
PA
0 S
E Ma in St
., S uit e 1
Po rtla nd , O
R
Ph : 5
2 5
Em ail : in fo@ gr ee nw or ks pc .co m
LA
ND
SC
AP
E
AR
CH
IT
EC
TU
RE
EN
VI
RO
NM
EN
TA
L
DE
SI
GN
KEY PLAN - NTS
LX.12
LX.11
LX.13 LX.14 LX.15
LX.17
LX.16
REGISTERED
LANDSCAPE ARCHITECT
Benjamin Johnson
OREGON
12/02/05
LIMIT OF WORK
LIMIT OF W
ORK
T4
T4
T5
T1
1.4 TYP
T3
T2
LEGEND
SYMBOL ITEM
1. SEE SHEET L3.00 FOR MATERIAL SCHEDULE AND NOTES, AND FOR THE
RIM TRAIL IMPROVEMENTS TABLE.
2. LIMIT OF WORK LINE INDICATED FOR REFERENCE ONLY.
SHEET NOTES
CRUSHED ROCK PAVING (NATIVE ROCK)
NORTH 0' 15' 30' 60'
SCALE: 1" = 30'-0"
MATCHLINE SEE SHEET L3.12
0 S
E Ma in St
., S uit e 1
Po rtla nd , O
R
Ph : 5
2 5
Em ail : in fo@ gr ee nw or ks pc .co m
LA
ND
SC
AP
E
AR
CH
IT
EC
TU
RE
EN
VI
RO
NM
EN
TA
L
DE
SI
GN
KEY PLAN - NTS
LX.12
LX.11
LX.13 LX.14 LX.15
LX.17
LX.16
REGISTERED
LANDSCAPE ARCHITECT
Benjamin Johnson
OREGON
12/02/05
ROW
ROW
SS
SS
SS
SS
SS
SS
SS
SS
SS SS
SS
W
W
W
SS
SS
SS
SS
SS
SS
SS
LIMIT OF WORK
LIMIT OF W
ORK
TRAIL CONNECTION TO
EXISTING PARKING LOT
PA
4.1
1.1
3.1TYP
6.1
1.2
6.5TYP
6.5
TRAIL CONNECTION TO
EXISTING RIM ROCK TRAIL
TRAIL CONNECTION TO
EXISTING RIM ROCK TRAIL
7.2 TYP
1.4 TYP
6.2
1.4 TYP
2.3 TYP
2.2 TYP
2.1
T1
LEGEND
SYMBOL ITEM
CONCRETE PAVING - TYPE 1 (VEHICULAR)
CONCRETE PAVING - TYPE 2 (PEDESTRIAN)
CRUSHED ROCK PAVING (NATIVE ROCK)
DAY USE PARKING IMPROVEMENT SUMMARY
TOTAL STALLS STANDARD ADA RV
EXISTING 92 82 5 5
PROPOSED 92 81 6 5
1. SEE SHEET L3.00 FOR MATERIAL SCHEDULE AND NOTES, AND FOR THE
RIM TRAIL IMPROVEMENTS TABLE.
2. LIMIT OF WORK LINE INDICATED FOR REFERENCE ONLY.
3. CONTRACTOR SHALL PROVIDE DOWELED EXPANSION JOINTS ,
ISOLATION JOINTS, AND SCORE JOIINTS AT LOCATIONS SHOWN ON THE
PLANS AND AS REQUIRED BY THE DETAILS ON L7.11
4. CONTRACTOR SHALL PROVIDE THICKENED CONCRETE PAVING EDGE
AS SHOWN IN DETAIL 3/L7.11.
SHEET NOTES
ISOLATION JOINT
CONTRACTION JOINT
PLANTING AREA
ADA SIGNAGE
PARKING STRIPES
SPLIT RAIL FENCE
PA
BOULDERS
0' 15' 30' 60'
SCALE: 1" = 30'-0"
MATCHLINE SEE SHEET L3.11
MATCHLINE SEE SHEET L3.13
NORTH
L3.18
0 S
E Ma in St
., S uit e 1
Po rtla nd , O
R
Ph : 5
2 5
Em ail : in fo@ gr ee nw or ks pc .co m
LA
ND
SC
AP
E
AR
CH
IT
EC
TU
RE
EN
VI
RO
NM
EN
TA
L
DE
SI
GN
KEY PLAN - NTS
LX.12
LX.11
LX.13 LX.14 LX.15
LX.17
LX.16
REGISTERED
LANDSCAPE ARCHITECT
Benjamin Johnson
OREGON
12/02/05 x x x x x x x x x x x x x x x x x x x x x x x x xx x x xx x xxx x xx x xx x xxx xxx x x x x x x xx x x x
REX HOUSE
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
SS
SS
SS
SS
SS
SS
NE CROOKED RIVER DRIVE PARK OFFICE DRIVEWAY
RV PARKING
RV PARKING
BID ALTERNATE
LIMIT OF WORK
LIM
IT
OF W
ORK
LIMIT OF WORK
LIMIT OF WORK
LIMIT OF WORK
PA
PA
PA
PA
PA
PA
PA
PA
PA
1.4 TYP
6.6 TYP
3.1 TYP
1.4 TYP
2.1 TYP
4.2
4.3
7.4
6.5TYP
4.1 TYP
6.8
6.1 1.1
1.3
7.2TYP
5.4
5.6
3.3
1 TYP
3.4 SIM (5' wide)
PA
PA
3.4 SIM (5' WIDE)
1.2 TYP
6.9TYP
2.2 TYP
5.5
2.3 TYP
6.7 TYP
6.2 TYP
6.4
6.3 TYP
5.3
1.1
6.6SIM
LEGEND
SYMBOL ITEM
CONCRETE PAVING - TYPE 1 (VEHICULAR)
CONCRETE PAVING - TYPE 2 (PEDESTRIAN)
ASPHALT PAVING
CRUSHED ROCK PAVING (NATIVE ROCK)
PLANTING AREA
ADA SIGNAGE
PARKING STRIPES
SPLIT RAIL FENCE
TACTILE WARNING
PA
OVERFLOW PARKING SUMMARY
TOTAL STALLS STANDARD ADA RV
EXISTING 126 126 0 0
PROPOSED 106 100 4 2
1. SEE SHEET L3.00 FOR MATERIAL SCHEDULE AND NOTES, AND FOR THE
RIM TRAIL IMPROVEMENTS TABLE.
2. LIMIT OF WORK LINE INDICATED FOR REFERENCE ONLY.
3. CONTRACTOR SHALL PROVIDE DOWELED EXPANSION JOINTS ,
ISOLATION JOINTS, AND SCORE JOIINTS AT LOCATIONS SHOWN ON THE
PLANS AND AS REQUIRED BY THE DETAILS ON L7.11
4. CONTRACTOR SHALL PROVIDE THICKENED CONCRETE PAVING EDGE
AS SHOWN IN DETAIL 3/L7.11.
SHEET NOTES
BIKE RACK
REFERENCE KEYNOTES
SEE CIVIL FOR STORMWATER FACILITIES
SEE CIVIL FOR ROW IMPROVEMENTS
TRASH RECEPTACLES
FEE STATION (SYMBOL NTS)
KIOSK
DOWELED EXPANSION JOINT
ISOLATION JOINT
CONTRACTION JOINT
GATE
SALVAGED LOGS
BOULDERS
0' 15' 30' 60'
SCALE: 1" = 30'-0"
MA
TC
HL
IN
E
SE
E
SH
EE
T
L3 .15
MATCHLINE SEE SHEET L3.17
NORTH
L5.18
0 S
E Ma in St
., S uit e 1
Po rtla nd , O
R
Ph : 5
2 5
Em ail : in fo@ gr ee nw or ks pc .co m
LA
ND
SC
AP
E
AR
CH
IT
EC
TU
RE
EN
VI
RO
NM
EN
TA
L
DE
SI
GN
KEY PLAN - NTS
LX.12
LX.11
LX.13 LX.14 LX.15
LX.17
LX.16
REGISTERED
LANDSCAPE ARCHITECT
Benjamin Johnson
OREGON
12/02/05
0 S
E Ma in St
., S uit e 1
Po rtla nd , O
R
Ph : 5
2 5
Em ail : in fo@ gr ee nw or ks pc .co m
LA
ND
SC
AP
E
AR
CH
IT
EC
TU
RE
EN
VI
RO
NM
EN
TA
L
DE
SI
GN
REGISTERED
LANDSCAPE ARCHITECT
Benjamin Johnson
OREGON
12/02/05
STONE FACED WALL LAYOUT
PLAN1
0' 2' 4' 8'
SCALE: 1/8" = 1'-0"
PAVING RADIUS CP
PAVING RADIUS CP
℄ 3
L7.14 STONED FACED
WALL
R=VARIES
R=VARIES
WALL EP
WALL EP
WALL PT
L7.13
BOULDER AT
ROCK OUTCROP
NOT TO SCALE
STONE VENEER AT PAVING
SECTION4
FS
1 1/2"
MAX
STONE VENEER - TYP
MORTAR JOINT - FLUSH W/ BASALT
STONE VENEER BELOW PAVING
CONCRETE WALL
CONCRETE FOOTING
CRUSHED ROCK PAVING
5"
4"± TYP
ELEVATION "B"
" H
T
MA
X
4" MIN
TYP
4 SIDES MIN ON STONE VENEER - TYP
INTEGRATE FACE OF WALL TO TOP OF WALL
4" MI
N
L7.14
ISOMETRIC "A"
MORTAR JOINT - TYP
STONE VENEER -
SEE NOTE 3 FOR
PATTERN - TYP
NOTES:
1. STONE VENEER ON FACE SHALL MEET TOP OF
WALL SEAMLESSLY AS INDICATED. DO NOT
PROVIDE COPING TO WALL.
2. STONE VENEER THICKNESS AT TOP OF WALL
SHALL BE A MINIMUM OF 6". STONE VENEER TO
BE NO LESS THAN 4" IN ANY DIMENSION OR
GREATER THAN 18" HEIGHT.
3. STONE VENEER PATTERN SHALL BE
UNCOURSED RANDOM MOSAIC RUBBLE.
FG / FS
STONE VENEER PATTERN
ISOMETRIC / ELEVATION2
0" 4" 8" 16"
SCALE: 3/4" = 1'-0"
TW
FINISH GRADE / FINISH SURFACE
SEE STRUCTURAL
FOR FOOTING AND
REINFORCEMENTS
2'- 0"
M
AX
1'-6"
NOT TO SCALE
STONE FACED WALL
SECTION3
CONCRETE WALL AND FOOTING
STONE VENEER W/ 1/2" MORTAR JOINT- TYP
SEE STRUCTURAL FOR FOOTING
AND REINFORCEMENTS
CRUSHED ROCK PAVING
L7.14
CORRUGATED METAL TIE - TYP
4'- 0"
1'- 6"
1'- 6"
6'-0" MAX
SPLIT RAIL FENCE
SECTION5
0" 6" 12" 24"
SCALE: 1/2" = 1'-0"
FG
6" ± DIAMETER UNTREATED
CEDAR POST - TYP
MORTISE AND TENON
JOINT AT RAIL TO POST
CONNECTION - TYP
6" ± DIAMETER UNTREATED
CEDAR RAIL - TYP
AGGREGATE BASE
FOOTING - TYP
L7.14
SPLIT RAIL FENCE FOOTING
SECTION6
0" 2" 4" 8"
SCALE: 1 1/2" = 1'-0"
2'- 6"
6"
FG
EQ EQ
L7.14 SPLIT RAIL FENCE
1'-0"
6"
6" ± DIAMETER UNTREATED CEDAR
POST - TYP
3"
COMPACTED SUBGRADE
AGGREGATE BASE FOOTING
BIKE RACK LAYOUT
SECTION7
0' 2' 4' 8'
SCALE: 1/8" = 1'-0"
L7.11
CONTRACTION JOINT - TYP
L7.11
CONCRETE PAVING
TYPE 2 - PEDESTRIAN
L7.11 ISOLATION JOINT
EQ EQ
3'-0"
11'-0"
6'- 0"
4'-0"
IJ
CJ
CJ
CJ
'-6
1'- 6"
L7.14 BOULDER IN PLANTING
BIKE RACK AS SPECIFIED
NOTE:
1. SURFACE-MOUNT SPECIFIED BIKE
RACK (OFCI) PER MANUFACTURER'S
DETAILS.
L7.11
CONCRETE PAVING
TYPE 1 - VEHICULAR
NOT TO SCALE
TRASH RECEPTACLE
SECTION / ELEVATION / PLAN8
NOTES:
1. MAINTAIN 12" CLEAR MINIMUM FROM RESTROOM WALL
AND 6" CLEAR MINIMUM FROM EDGE OF PAVING.
2. ORIENT DOOR OPENING AWAY FROM RESTROOM WALL.
3. PROVIDE THICKENED CONCRETE IF MANUFACTURER'S
ANCHORS REQUIRE DEEPER PROFILES.
MANUFACTURER
PROVIDED ANCHOR
BOLT(S)
CONCRETE SIDEWALK
FG
PLAN (BOTTOM) SECTION / ELEVATION
MANUFACTURER PROVIDED
ANCHOR BOLT(S)
TRASH RECEPTACLE
AS SPECIFIED
LAYOUT CENTER POINT
SLOPE
INSTALL SILT FENCE, COMPOST BERM, OR
WATTLES ON THE DOWNHILL SIDE OF THE
PROPOSED TRAIL. SELECT EROSION CONTROL
MEASURE BASED ON AVAILABLE AREA AND
VEGETATION COVER AND DIRECTION OF
OWNER'S REP. SEE DETAIL 1/C4.04, 5/C4.04,
AND 1/C4.05.
2 TYPICAL TRAIL EROSION CONTROL PLACEMENT
PLAN VIEW
SECTION 'A'
SCALE: NTS1 STRAW WATTLE ON SLOPE
NOTES:
1. STRAW WATTLES TO BE PLACED ALONG SITE CONTOURS.
2. INSTALL THE WATTLES IN A 3"-5" DEEP TRENCH, INSURING THAT NO GAPS EXIST BETWEEN THE SOIL
AND THE BOTTOM OF THE WATTLE.
3. REMOVE DUFF LAYER SO THAT INSTALLED WATTLES HAVE DIRECT CONTACT WITH THE SOIL. RUNOFF
MUST NOT BE ALLOWED TO RUN UNDER OR AROUND ROLL.
4. STRAW WATTLE SHALL BE RICE STRAW TUBE WITH FLEXIBLE NETTING. USE OF FIBER ROLLS, WHEAT
GRASS, OR RYE STRAW NOT PERMITTED.
MINIMUM 1'
OVERLAP ON
UPHILL SIDESLO
PE
DIRECTIO
NWOOD STAKE
(TYP.)
WOOD STAKE (1" SQ. MIN.) STRAW WATTLE (8"-10" DIA.)
NOTE 3
EXISTING SLOPE
3'-6" MIN.
BETWEEN
STAKES
S W
F ift h A ve
S ui te
Po rt la nd
O R
O
3.
2.
F:
.2
.4 w w w .k pf f.
co m
91718PE
EXPIRATION DATE:
OREGON
6/30/2028
File details come from the government source that posted it. Updated .