14564 Preliminary Bid Results.xlsx

XLSX spreadsheet 77 KB Posted

Attached to
ITB 14564 Smith Rock State Park Visitor Improvement Project
Solicitation number
S-63400-00018081
Issued by
Deschutes County, Oregon

About this file

Smith Rock State Park Visitor Improvement Project - Preliminary Bid Results

This file contains preliminary bid results for Oregon Parks and Recreation's ITB #14564 for the Smith Rock State Park Visitor Improvement Project located in Terrebonne, Oregon. The project encompasses three base bid components: Rim Rock Trail Improvements, North Rim Rock Trail Extension, and Overflow Parking Lot Improvements, with a fourth optional bid alternate for Restroom Plaza improvements. Work includes mobilization, survey stakeout, erosion and traffic control, demolition, tree removal, excavation, asphalt and concrete paving, fencing, benches, bollards, gates, gravity storm sewers, stormwater basins, and landscaping. Eight contractors submitted bids with the bid closing date of November 19, 2026. Construction is restricted to 7:00 AM to 5:00 PM, Monday through Friday, during park operations, with eagle protection requirements limiting work within one mile of Golden Eagle nest sites from January 15 to July 15, and minimizing loud or percussive work from January 15 to June 15.

Base bid totals for Projects 1, 2, and 3 combined ranged from $863,281.00 (Rickabaugh Construction, the apparent low bidder) to $1,514,548.00 (Forge Civil LLC), with bids inclusive of all labor, equipment, materials, permits, and supervision. When Project 4 (Restroom Plaza) bid alternate pricing is included, total bids ranged from $899,956.00 to $1,563,263.00. The State of Oregon retains authority to increase or decrease quantities at the same unit prices or remove items entirely, with payment based on actual measured quantities. Contractors were required to enter unit and total costs for all itemized line items on the bid form, with all non-itemized work considered incidental. The file notes these results are preliminary and have not yet been evaluated for responsiveness, with final bid results to be posted upon completion of evaluation.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRELIM. BID RESULTS

PRELIMINARY BID RESULTS
Bids below have not yet been evaluated for responsiveness. Final bid results will be posted once available
OPRD #14564
OregonBuys #S-63400-00018081
Closing:11/19/2026
Title:Smith Rock State Park Visitor Improvement Project
Bidder NameTotal Bid (Project 1, 2 and 3)
Relson Contracting LLC$1,299,556.96

Tim Bloom Construction $1,092,597.02

Deschutes Construction Corp $1,163,114.95

Forge Civil LLC $1,514,548.00

Rickabaugh Construction $863,281.00

Cascade Civil Corp $1,141,231.00

Paul Brothers Inc $1,298,681.92

Central Oregon Homes $908,809.00

Bidder NameTotal Bid with Bid Alternate (Project 1, 2, 3 & 4)
Relson Contracting LLC$1,409,655.11

Tim Bloom Construction $1,149,553.52

Deschutes Construction Corp $1,239,433.61

Forge Civil LLC $1,563,263.00

Rickabaugh Construction $899,956.00

Cascade Civil Corp $1,241,521.00

Paul Brothers Inc $1,354,156.87

Central Oregon Homes $974,717.00

&"Arial,Bold"&14* * * Preliminary Results Only * * *&12 &"Arial,Italic"&10(results are not final until evaluation is completed)

&"Arial,Italic"&8&F &"Arial,Italic"&8Page &P

Relson Contracting

Relson Contracting LLC
601 E Antler Ave Suite 134
Redmond, OR 97756
Item #DescriptionQuantityUnitUnit CostTotal Cost
Project 1 - Rim Rock Trail Improvements
BASE BID
A1Mobilization1LS$ 6,500.79$ 6,500.79
A2Survey - Project Stakeout1LS$ 8,440.79$ 8,440.79
A3Erosion Control1LS$ 13,797.45$ 13,797.45
A4Traffic Control1LS$ 9,196.79$ 9,196.79
A5Demolition, Clearing and Grubbing1LS$ 25,007.83$ 25,007.83
A6Tree Removal5LS$ 1,403.91$ 7,019.55
A7Asphalt Sawcut & Excavation3000SF$ 3.37$ 10,110.00
A8General Excavation and Earthwork1LS$ 34,673.67$ 34,673.67
A9Rock Excavation (Allowance)1CY$ 2,842.15$ 2,842.15
A10Base Rock or Shoulder Backfill Rock270TN$ 125.45$ 33,871.50
A11Pavement Markings - Painted Striping1LS$ 5,433.71$ 5,433.71
A12Cast-in-Place Concrete Curb26LF$ 188.59$ 4,903.34
A13Concrete Paving - Type 1 Vehicular2400SF$ 13.39$ 32,136.00
A14Concrete Paving - Type 2 Pedestrian755SF$ 13.95$ 10,532.25
A15Tactile Warning Panel1EA$ 4,363.35$ 4,363.35
A16Crushed Rock Paving160TN$ 140.18$ 22,428.80
A17Precast Concrete Wheel Stops7EA$ 396.86$ 2,778.02
A18Bollard (OFCI)1EA$ 3,631.10$ 3,631.10
A19Split Rail Fence90LF$ 29.90$ 2,691.00
A20Stone Faced Wall55LF$ 857.72$ 47,174.60
A21Boulder Placement1LS$ 2,118.85$ 2,118.85
A22Bench Installation (OFCI)2EA$ 5,886.75$ 11,773.50
A23Landscape - Amended Topsoil145CY$ 63.28$ 9,175.60
A24Landscape - Compost35CY$ 144.17$ 5,045.95
A25Landscape - Seeding10,000SF$ 0.43$ 4,300.00
A26Landscape - General - Plantings1LS$ 9,723.72$ 9,723.72
A27Signs - ADA7EA$ 1,176.77$ 8,237.39
PROJECT 1 TOTAL$ 337,907.70
Project 2 - North Rim Rock Trail Extension
BASE BID
B1Mobilization1LS$ 6,500.79$ 6,500.79
B2Survey - Project Stakeout1LS$ 8,440.79$ 8,440.79
B3Erosion Control1LS$ 13,820.40$ 13,820.40
B4Traffic Control1LS$ 7,488.99$ 7,488.99
B5Demolition, Clearing and Grubbing1LS$ 21,066.60$ 21,066.60
B6General Excavation and Earthwork1LS$ 19,240.97$ 19,240.97
B7Rock Excavation (Allowance)10CY$ 2,842.15$ 28,421.50
B8Base Rock or Shoulder Backfill Rock150TN$ 162.00$ 24,300.00
B9Crushed Rock Paving150TN$ 133.99$ 20,098.50
B10Split Rail Fence90LF$ 29.90$ 2,691.00
B11Boulder Placement1LS$ 2,118.85$ 2,118.85
B12Salvage Log Placement1LS$ 31,105.51$ 31,105.51
B13Bench Installation (OFCI)3EA$ 5,720.32$ 17,160.96
B14Landscape - Amended Topsoil140CY$ 64.11$ 8,975.40
B15Landscape - Compost35CY$ 144.17$ 5,045.95
B16Landscape - Seeding11,000SF$ 0.37$ 4,070.00
B17Landscape - General Plantings1LS$ 16,223.84$ 16,223.84
PROJECT 2 TOTAL$ 236,770.05
Project 3 - Overflow Parking Lot Improvements
BASE BID
C1Mobilization1LS$ 7,610.79$ 7,610.79
C2Survey - Project Stakeout1LS$ 8,440.79$ 8,440.79
C3Erosion Control1LS$ 11,605.92$ 11,605.92
C4Traffic Control1LS$ 13,198.99$ 13,198.99
C5Demolition, Clearing and Grubbing1LS$ 45,949.53$ 45,949.53
C6Tree Removal7EA$ 1,374.49$ 9,621.43
C7General Excavation and Earthwork1LS$ 35,312.93$ 35,312.93
C8Rock Excavation (Allowance)10CY$ 2,842.15$ 28,421.50
C9Base Rock or Shoulder Backfill Rock1,300TN$ 45.06$ 58,578.00
C10Asphalt Paving - Leveling and Wearing Courses1,100TN$ 127.31$ 140,041.00
C11Pavement Markings - Painted Striping1LS$ 3,724.07$ 3,724.07
C12Pavement Markings - Crosswalk1LS$ 2,518.79$ 2,518.79
C13Cast-in-Place Concrete Curb150LF$ 92.62$ 13,893.00
C14Concrete Paving - Type 1 Vehicular1,100SF$ 14.99$ 16,489.00
C15Concrete Paving - Type 2 Pedestrian1,500SF$ 12.02$ 18,030.00
C16Tactile Warning Panel6EA$ 1,129.72$ 6,778.32
C17Crushed Rock Paving40TN$ 143.66$ 5,746.40
C18Precast Concrete Wheel Stops104EA$ 134.25$ 13,962.00
C19Gravity Storm Sewer - 6"74LF$ 372.08$ 27,533.92
C20Gravity Storm Sewer - 8"88LF$ 291.96$ 25,692.48
C21Gravity Storm Sewer - 12"69LF$ 426.80$ 29,449.20
C22Cleanout to Grade10EA$ 380.69$ 3,806.90
C23Outfall1EA$ 3,812.19$ 3,812.19
C24Overflow Inlet3EA$ 942.57$ 2,827.71
C25Stormwater Basin681LF$ 155.23$ 105,711.63
C26RESERVED0N/A$ - 0
C27Split Rail Fence700LF$ 24.08$ 16,856.00
C28Boulder Placement1LS$ 2,118.85$ 2,118.85
C29Gate Installation (OFCI)2EA$ 11,728.62$ 23,457.24
C30Salvage Gate Reinstall1EA$ 4,766.15$ 4,766.15
C31RESERVED0N/A$ - 0
C32Landscape - Amended Topsoil140CY$ 64.11$ 8,975.40
C33Landscape - Compost35CY$ 144.17$ 5,045.95
C34Landscape - Seeding18,000SF$ 0.31$ 5,580.00
C35Landscape - General Plantings1LS$ 6,902.86$ 6,902.86
C36Signs - Reinstall10EA$ 720.02$ 7,200.20
C37Signs - ADA4EA$ 1,022.82$ 4,091.28
C38Mailbox Reinstall1$ 1,128.79$ 1,128.79
PROJECT 3 TOTAL$ 724,879.21

TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,299,556.96

Project 4 Bid Alternate - Restroom Plaza
D1Mobilization1LS$ 3,998.20$ 3,998.20
D2Survey - Project Stakeout1LS$ 8,038.20$ 8,038.20
D3Erosion Control1LS$ 2,793.20$ 2,793.20
D4Demolition, Clearing and Grubbing1LS$ 6,718.63$ 6,718.63
D5Tree Removal8EA$ 1,305.02$ 10,440.16
D6General Excavation and Earthwork1LS$ 7,426.68$ 7,426.68
D7Rock Excavation (Allowance)5CY$ 2,842.15$ 14,210.75
D8Base Rock or Shoulder Backfill Rock40TN$ 201.41$ 8,056.40
D9Concrete Paving - Type 2 Pedestrian1750SF$ 11.99$ 20,982.50
D10Crushed Rock Paving8TN$ 393.03$ 3,144.24
D11Boulder Placement1LS$ 2,118.85$ 2,118.85
D12Bench Installation (OCFI)1EA$ 5,784.55$ 5,784.55
D13Information Kiosk Installation (OCFI)1EA$ 6,748.56$ 6,748.56
D14Bicycle Racks (OCFI)2EA$ 685.73$ 1,371.46
D15Trash Receptacle (OCFI)1EA$ 841.45$ 841.45
D16Landscape - Amended Topsoil20CY$ 154.43$ 3,088.60
D17Landscape - Compost5CY$ 406.84$ 2,034.20
D18Landscape - Seeding2,300SF$ 0.76$ 1,748.00
D19Landscape - General Plantings1LS$ 553.52$ 553.52
BID ALTERNATE PROJECT 4 TOTAL$ 110,098.15

TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,409,655.11

Tim Bloom Construction

Tim Bloom Construction, Inc
PO Box 1708
Prineville, OR 97754
Item #DescriptionQuantityUnitUnit CostTotal Cost
Project 1 - Rim Rock Trail Improvements
BASE BID
A1Mobilization1LS$ 16,300.00$ 16,300.00
A2Survey - Project Stakeout1LS$ 7,200.00$ 7,200.00
A3Erosion Control1LS$ 16,122.00$ 16,122.00
A4Traffic Control1LS$ 750.00$ 750.00
A5Demolition, Clearing and Grubbing1LS$ 16,754.00$ 16,754.00
A6Tree Removal5LS$ 280.00$ 1,400.00
A7Asphalt Sawcut & Excavation3000SF$ 2.51$ 7,530.00
A8General Excavation and Earthwork1LS$ 31,173.00$ 31,173.00
A9Rock Excavation (Allowance)1CY$ 70.00$ 70.00
A10Base Rock or Shoulder Backfill Rock270TN$ 201.00$ 54,270.00
A11Pavement Markings - Painted Striping1LS$ 3,699.00$ 3,699.00
A12Cast-in-Place Concrete Curb26LF$ 46.50$ 1,209.00
A13Concrete Paving - Type 1 Vehicular2400SF$ 13.57$ 32,568.00
A14Concrete Paving - Type 2 Pedestrian755SF$ 10.25$ 7,738.75
A15Tactile Warning Panel1EA$ 1,100.00$ 1,100.00
A16Crushed Rock Paving160TN$ 190.20$ 30,432.00
A17Precast Concrete Wheel Stops7EA$ 175.00$ 1,225.00
A18Bollard (OFCI)1EA$ 705.00$ 705.00
A19Split Rail Fence90LF$ 36.00$ 3,240.00
A20Stone Faced Wall55LF$ 761.00$ 41,855.00
A21Boulder Placement1LS$ 16,330.00$ 16,330.00
A22Bench Installation (OFCI)2EA$ 1,440.00$ 2,880.00
A23Landscape - Amended Topsoil145CY$ 91.71$ 13,297.95
A24Landscape - Compost35CY$ 125.60$ 4,396.00
A25Landscape - Seeding10,000SF$ 0.55$ 5,500.00
A26Landscape - General - Plantings1LS$ 16,240.20$ 16,240.20
A27Signs - ADA7EA$ 878.00$ 6,146.00
PROJECT 1 TOTAL$ 340,130.90
Project 2 - North Rim Rock Trail Extension
BASE BID
B1Mobilization1LS$ 9,460.15$ 9,460.15
B2Survey - Project Stakeout1LS$ 4,800.00$ 4,800.00
B3Erosion Control1LS$ 14,820.00$ 14,820.00
B4Traffic Control1LS$ 1,400.00$ 1,400.00
B5Demolition, Clearing and Grubbing1LS$ 21,460.00$ 21,460.00
B6General Excavation and Earthwork1LS$ 21,460.00$ 21,460.00
B7Rock Excavation (Allowance)10CY$ 70.00$ 700.00
B8Base Rock or Shoulder Backfill Rock150TN$ 184.03$ 27,604.50
B9Crushed Rock Paving150TN$ 129.13$ 19,369.50
B10Split Rail Fence90LF$ 36.00$ 3,240.00
B11Boulder Placement1LS$ 31,830.00$ 31,830.00
B12Salvage Log Placement1LS$ 9,180.00$ 9,180.00
B13Bench Installation (OFCI)3EA$ 1,496.00$ 4,488.00
B14Landscape - Amended Topsoil140CY$ 96.45$ 13,503.00
B15Landscape - Compost35CY$ 98.46$ 3,446.10
B16Landscape - Seeding11,000SF$ 0.55$ 6,050.00
B17Landscape - General Plantings1LS$ 14,961.00$ 14,961.00
PROJECT 2 TOTAL$ 207,772.25
Project 3 - Overflow Parking Lot Improvements
BASE BID
C1Mobilization1LS$ 26,000.00$ 26,000.00
C2Survey - Project Stakeout1LS$ 9,000.00$ 9,000.00
C3Erosion Control1LS$ 14,824.00$ 14,824.00
C4Traffic Control1LS$ 2,692.00$ 2,692.00
C5Demolition, Clearing and Grubbing1LS$ 62,707.00$ 62,707.00
C6Tree Removal7EA$ 358.00$ 2,506.00
C7General Excavation and Earthwork1LS$ 24,384.00$ 24,384.00
C8Rock Excavation (Allowance)10CY$ 70.00$ 700.00
C9Base Rock or Shoulder Backfill Rock1,300TN$ 48.03$ 62,439.00
C10Asphalt Paving - Leveling and Wearing Courses1,100TN$ 115.70$ 127,270.00
C11Pavement Markings - Painted Striping1LS$ 3,636.00$ 3,636.00
C12Pavement Markings - Crosswalk1LS$ 3,050.00$ 3,050.00
C13Cast-in-Place Concrete Curb150LF$ 38.00$ 5,700.00
C14Concrete Paving - Type 1 Vehicular1,100SF$ 13.38$ 14,718.00
C15Concrete Paving - Type 2 Pedestrian1,500SF$ 10.22$ 15,330.00
C16Tactile Warning Panel6EA$ 1,100.00$ 6,600.00
C17Crushed Rock Paving40TN$ 92.00$ 3,680.00
C18Precast Concrete Wheel Stops104EA$ 175.00$ 18,200.00
C19Gravity Storm Sewer - 6"74LF$ 34.75$ 2,571.50
C20Gravity Storm Sewer - 8"88LF$ 46.30$ 4,074.40
C21Gravity Storm Sewer - 12"69LF$ 100.00$ 6,900.00
C22Cleanout to Grade10EA$ 275.00$ 2,750.00
C23Outfall1EA$ 806.00$ 806.00
C24Overflow Inlet3EA$ 360.00$ 1,080.00
C25Stormwater Basin681LF$ 53.12$ 36,174.72
C26RESERVED0N/A$ - 0
C27Split Rail Fence700LF$ 36.00$ 25,200.00
C28Boulder Placement1LS$ 10,600.00$ 10,600.00
C29Gate Installation (OFCI)2EA$ 6,040.00$ 12,080.00
C30Salvage Gate Reinstall1EA$ 700.00$ 700.00
C31RESERVED0N/A$ - 0
C32Landscape - Amended Topsoil140CY$ 90.08$ 12,611.20
C33Landscape - Compost35CY$ 98.43$ 3,445.05
C34Landscape - Seeding18,000SF$ 0.45$ 8,100.00
C35Landscape - General Plantings1LS$ 9,840.00$ 9,840.00
C36Signs - Reinstall10EA$ 175.00$ 1,750.00
C37Signs - ADA4EA$ 602.00$ 2,408.00
C38Mailbox Reinstall1$ 140.00$ 140.00
PROJECT 3 TOTAL$ 544,666.87

TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,092,570.02

Project 4 Bid Alternate - Restroom Plaza
D1Mobilization1LS$ 2,700.00$ 2,700.00
D2Survey - Project Stakeout1LS$ 2,400.00$ 2,400.00
D3Erosion Control1LS$ 4,246.00$ 4,246.00
D4Demolition, Clearing and Grubbing1LS$ 2,125.00$ 2,125.00
D5Tree Removal8EA$ 250.00$ 2,000.00
D6General Excavation and Earthwork1LS$ 5,250.00$ 5,250.00
D7Rock Excavation (Allowance)5CY$ 70.00$ 350.00
D8Base Rock or Shoulder Backfill Rock40TN$ 125.70$ 5,028.00
D9Concrete Paving - Type 2 Pedestrian1750SF$ 10.20$ 17,850.00
D10Crushed Rock Paving8TN$ 137.50$ 1,100.00
D11Boulder Placement1LS$ 722.50$ 722.50
D12Bench Installation (OCFI)1EA$ 940.00$ 940.00
D13Information Kiosk Installation (OCFI)1EA$ 2,290.00$ 2,290.00
D14Bicycle Racks (OCFI)2EA$ 500.00$ 1,000.00
D15Trash Receptacle (OCFI)1EA$ 285.00$ 285.00
D16Landscape - Amended Topsoil20CY$ 100.40$ 2,008.00
D17Landscape - Compost5CY$ 182.80$ 914.00
D18Landscape - Seeding2,300SF$ 0.85$ 1,955.00
D19Landscape - General Plantings1LS$ 3,793.00$ 3,793.00
BID ALTERNATE PROJECT 4 TOTAL$ 56,956.50

TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,149,526.52

Deschutes Construction Corp

Deschutes Construction Corp
494 SW Veterans Way Ste 5
Redmond, OR 97756
Item #DescriptionQuantityUnitUnit CostTotal Cost
Project 1 - Rim Rock Trail Improvements
BASE BID
A1Mobilization1LS$ 11,503.25$ 11,503.25
A2Survey - Project Stakeout1LS$ 2,725.00$ 2,725.00
A3Erosion Control1LS$ 13,763.23$ 13,763.23
A4Traffic Control1LS$ 1,860.00$ 1,860.00
A5Demolition, Clearing and Grubbing1LS$ 23,013.52$ 23,013.52
A6Tree Removal5LS$ 370.83$ 1,854.15
A7Asphalt Sawcut & Excavation3000SF$ 1.06$ 3,180.00
A8General Excavation and Earthwork1LS$ 24,347.93$ 24,347.93
A9Rock Excavation (Allowance)1CY$ 1,265.43$ 1,265.43
A10Base Rock or Shoulder Backfill Rock270TN$ 54.41$ 14,690.70
A11Pavement Markings - Painted Striping1LS$ 5,232.00$ 5,232.00
A12Cast-in-Place Concrete Curb26LF$ 40.00$ 1,040.00
A13Concrete Paving - Type 1 Vehicular2400SF$ 12.00$ 28,800.00
A14Concrete Paving - Type 2 Pedestrian755SF$ 10.00$ 7,550.00
A15Tactile Warning Panel1EA$ 2,670.50$ 2,670.50
A16Crushed Rock Paving160TN$ 151.45$ 24,232.00
A17Precast Concrete Wheel Stops7EA$ 256.15$ 1,793.05
A18Bollard (OFCI)1EA$ 1,090.00$ 1,090.00
A19Split Rail Fence90LF$ 99.91$ 8,991.90
A20Stone Faced Wall55LF$ 364.59$ 20,052.45
A21Boulder Placement1LS$ 9,105.02$ 9,105.02
A22Bench Installation (OFCI)2EA$ 3,204.43$ 6,408.86
A23Landscape - Amended Topsoil145CY$ 92.65$ 13,434.25
A24Landscape - Compost35CY$ 92.65$ 3,242.75
A25Landscape - Seeding10,000SF$ 0.55$ 5,500.00
A26Landscape - General - Plantings1LS$ 6,530.77$ 6,530.77
A27Signs - ADA7EA$ 609.74$ 4,268.18
PROJECT 1 TOTAL$ 248,144.94
Project 2 - North Rim Rock Trail Extension
BASE BID
B1Mobilization1LS$ 12,622.37$ 12,622.37
B2Survey - Project Stakeout1LS$ 2,725.00$ 2,725.00
B3Erosion Control1LS$ 16,103.41$ 16,103.41
B4Traffic Control1LS$ 1,860.00$ 1,860.00
B5Demolition, Clearing and Grubbing1LS$ 19,625.94$ 19,625.94
B6General Excavation and Earthwork1LS$ 21,183.97$ 21,183.97
B7Rock Excavation (Allowance)10CY$ 126.54$ 1,265.40
B8Base Rock or Shoulder Backfill Rock150TN$ 50.63$ 7,594.50
B9Crushed Rock Paving150TN$ 142.96$ 21,444.00
B10Split Rail Fence90LF$ 76.18$ 6,856.20
B11Boulder Placement1LS$ 42,210.21$ 42,210.21
B12Salvage Log Placement1LS$ 5,300.20$ 5,300.20
B13Bench Installation (OFCI)3EA$ 2,401.31$ 7,203.93
B14Landscape - Amended Topsoil140CY$ 92.65$ 12,971.00
B15Landscape - Compost35CY$ 92.65$ 3,242.75
B16Landscape - Seeding11,000SF$ 0.55$ 6,050.00
B17Landscape - General Plantings1LS$ 15,154.42$ 15,154.42
PROJECT 2 TOTAL$ 203,413.30
Project 3 - Overflow Parking Lot Improvements
BASE BID
C1Mobilization1LS$ 13,461.72$ 13,461.72
C2Survey - Project Stakeout1LS$ 5,450.00$ 5,450.00
C3Erosion Control1LS$ 25,245.14$ 25,245.14
C4Traffic Control1LS$ 1,860.00$ 1,860.00
C5Demolition, Clearing and Grubbing1LS$ 39,538.60$ 39,538.60
C6Tree Removal7EA$ 370.83$ 2,595.81
C7General Excavation and Earthwork1LS$ 76,366.72$ 76,366.72
C8Rock Excavation (Allowance)10CY$ 126.54$ 1,265.40
C9Base Rock or Shoulder Backfill Rock1,300TN$ 52.59$ 68,367.00
C10Asphalt Paving - Leveling and Wearing Courses1,100TN$ 126.09$ 138,699.00
C11Pavement Markings - Painted Striping1LS$ 7,922.12$ 7,922.12
C12Pavement Markings - Crosswalk1LS$ 941.76$ 941.76
C13Cast-in-Place Concrete Curb150LF$ 40.00$ 6,000.00
C14Concrete Paving - Type 1 Vehicular1,100SF$ 12.00$ 13,200.00
C15Concrete Paving - Type 2 Pedestrian1,500SF$ 10.00$ 15,000.00
C16Tactile Warning Panel6EA$ 63.58$ 381.48
C17Crushed Rock Paving40TN$ 138.30$ 5,532.00
C18Precast Concrete Wheel Stops104EA$ 256.15$ 26,639.60
C19Gravity Storm Sewer - 6"74LF$ 96.12$ 7,112.88
C20Gravity Storm Sewer - 8"88LF$ 98.52$ 8,669.76
C21Gravity Storm Sewer - 12"69LF$ 103.57$ 7,146.33
C22Cleanout to Grade10EA$ 2,748.39$ 27,483.90
C23Outfall1EA$ 1,131.15$ 1,131.15
C24Overflow Inlet3EA$ 1,943.57$ 5,830.71
C25Stormwater Basin681LF$ 115.64$ 78,750.84
C26RESERVED0N/A$ - 0
C27Split Rail Fence700LF$ 56.45$ 39,515.00
C28Boulder Placement1LS$ 26,250.01$ 26,250.01
C29Gate Installation (OFCI)2EA$ 6,408.87$ 12,817.74
C30Salvage Gate Reinstall1EA$ 6,408.87$ 6,408.87
C31RESERVED0N/A$ - 0
C32Landscape - Amended Topsoil140CY$ 92.65$ 12,971.00
C33Landscape - Compost35CY$ 92.65$ 3,242.75
C34Landscape - Seeding18,000SF$ 0.55$ 9,900.00
C35Landscape - General Plantings1LS$ 4,078.68$ 4,078.68
C36Signs - Reinstall10EA$ 699.32$ 6,993.20
C37Signs - ADA4EA$ 998.16$ 3,992.64
C38Mailbox Reinstall1$ 794.90$ 794.90
PROJECT 3 TOTAL$ 711,556.71

TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,163,114.95

Project 4 Bid Alternate - Restroom Plaza
D1Mobilization1LS$ 9,773.81$ 9,773.81
D2Survey - Project Stakeout1LS$ 1,635.00$ 1,635.00
D3Erosion Control1LS$ 3,200.00$ 3,200.00
D4Demolition, Clearing and Grubbing1LS$ 4,772.23$ 4,772.23
D5Tree Removal8EA$ 370.83$ 2,966.64
D6General Excavation and Earthwork1LS$ 3,308.86$ 3,308.86
D7Rock Excavation (Allowance)5CY$ 126.54$ 632.70
D8Base Rock or Shoulder Backfill Rock40TN$ 59.12$ 2,364.80
D9Concrete Paving - Type 2 Pedestrian1750SF$ 10.90$ 19,075.00
D10Crushed Rock Paving8TN$ 293.93$ 2,351.44
D11Boulder Placement1LS$ 2,270.57$ 2,270.57
D12Bench Installation (OCFI)1EA$ 3,632.23$ 3,632.23
D13Information Kiosk Installation (OCFI)1EA$ 6,408.87$ 6,408.87
D14Bicycle Racks (OCFI)2EA$ 1,816.12$ 3,632.24
D15Trash Receptacle (OCFI)1EA$ 1,966.25$ 1,966.25
D16Landscape - Amended Topsoil20CY$ 92.65$ 1,853.00
D17Landscape - Compost5CY$ 92.65$ 463.25
D18Landscape - Seeding2,300SF$ 0.55$ 1,265.00
D19Landscape - General Plantings1LS$ 4,746.77$ 4,746.77
BID ALTERNATE PROJECT 4 TOTAL$ 76,318.66

TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,239,433.61

Forge Civil LLC

Forge Civil LLC
11421 NE 149 ST
Brush Prairie, WA 98606
Item #DescriptionQuantityUnitUnit CostTotal Cost
Project 1 - Rim Rock Trail Improvements
BASE BID
A1Mobilization1LS$ 58,000.00$ 58,000.00
A2Survey - Project Stakeout1LS$ 12,000.00$ 12,000.00
A3Erosion Control1LS$ 13,000.00$ 13,000.00
A4Traffic Control1LS$ 3,000.00$ 3,000.00
A5Demolition, Clearing and Grubbing1LS$ 36,000.00$ 36,000.00
A6Tree Removal5LS$ 900.00$ 4,500.00
A7Asphalt Sawcut & Excavation3000SF$ 5.00$ 15,000.00
A8General Excavation and Earthwork1LS$ 29,000.00$ 29,000.00
A9Rock Excavation (Allowance)1CY$ 500.00$ 500.00
A10Base Rock or Shoulder Backfill Rock270TN$ 100.00$ 27,000.00
A11Pavement Markings - Painted Striping1LS$ 5,000.00$ 5,000.00
A12Cast-in-Place Concrete Curb26LF$ 18.00$ 468.00
A13Concrete Paving - Type 1 Vehicular2400SF$ 12.00$ 28,800.00
A14Concrete Paving - Type 2 Pedestrian755SF$ 11.00$ 8,305.00
A15Tactile Warning Panel1EA$ 500.00$ 500.00
A16Crushed Rock Paving160TN$ 100.00$ 16,000.00
A17Precast Concrete Wheel Stops7EA$ 250.00$ 1,750.00
A18Bollard (OFCI)1EA$ 500.00$ 500.00
A19Split Rail Fence90LF$ 72.00$ 6,480.00
A20Stone Faced Wall55LF$ 650.00$ 35,750.00
A21Boulder Placement1LS$ 37,000.00$ 37,000.00
A22Bench Installation (OFCI)2EA$ 500.00$ 1,000.00
A23Landscape - Amended Topsoil145CY$ 165.00$ 23,925.00
A24Landscape - Compost35CY$ 167.00$ 5,845.00
A25Landscape - Seeding10,000SF$ 0.50$ 5,000.00
A26Landscape - General - Plantings1LS$ 37,000.00$ 37,000.00
A27Signs - ADA7EA$ 800.00$ 5,600.00
PROJECT 1 TOTAL$ 416,923.00
Project 2 - North Rim Rock Trail Extension
BASE BID
B1Mobilization1LS$ 31,000.00$ 31,000.00
B2Survey - Project Stakeout1LS$ 6,000.00$ 6,000.00
B3Erosion Control1LS$ 5,000.00$ 5,000.00
B4Traffic Control1LS$ 2,500.00$ 2,500.00
B5Demolition, Clearing and Grubbing1LS$ 17,000.00$ 17,000.00
B6General Excavation and Earthwork1LS$ 15,000.00$ 15,000.00
B7Rock Excavation (Allowance)10CY$ 500.00$ 5,000.00
B8Base Rock or Shoulder Backfill Rock150TN$ 100.00$ 15,000.00
B9Crushed Rock Paving150TN$ 100.00$ 15,000.00
B10Split Rail Fence90LF$ 72.00$ 6,480.00
B11Boulder Placement1LS$ 37,000.00$ 37,000.00
B12Salvage Log Placement1LS$ 14,000.00$ 14,000.00
B13Bench Installation (OFCI)3EA$ 500.00$ 1,500.00
B14Landscape - Amended Topsoil140CY$ 165.00$ 23,100.00
B15Landscape - Compost35CY$ 167.00$ 5,845.00
B16Landscape - Seeding11,000SF$ 0.50$ 5,500.00
B17Landscape - General Plantings1LS$ 18,000.00$ 18,000.00
PROJECT 2 TOTAL$ 222,925.00
Project 3 - Overflow Parking Lot Improvements
BASE BID
C1Mobilization1LS$ 122,000.00$ 122,000.00
C2Survey - Project Stakeout1LS$ 10,000.00$ 10,000.00
C3Erosion Control1LS$ 14,000.00$ 14,000.00
C4Traffic Control1LS$ 6,000.00$ 6,000.00
C5Demolition, Clearing and Grubbing1LS$ 17,000.00$ 17,000.00
C6Tree Removal7EA$ 900.00$ 6,300.00
C7General Excavation and Earthwork1LS$ 47,000.00$ 47,000.00
C8Rock Excavation (Allowance)10CY$ 500.00$ 5,000.00
C9Base Rock or Shoulder Backfill Rock1,300TN$ 100.00$ 130,000.00
C10Asphalt Paving - Leveling and Wearing Courses1,100TN$ 180.00$ 198,000.00
C11Pavement Markings - Painted Striping1LS$ 7,000.00$ 7,000.00
C12Pavement Markings - Crosswalk1LS$ 2,000.00$ 2,000.00
C13Cast-in-Place Concrete Curb150LF$ 18.00$ 2,700.00
C14Concrete Paving - Type 1 Vehicular1,100SF$ 12.00$ 13,200.00
C15Concrete Paving - Type 2 Pedestrian1,500SF$ 11.00$ 16,500.00
C16Tactile Warning Panel6EA$ 500.00$ 3,000.00
C17Crushed Rock Paving40TN$ 100.00$ 4,000.00
C18Precast Concrete Wheel Stops104EA$ 250.00$ 26,000.00
C19Gravity Storm Sewer - 6"74LF$ 70.00$ 5,180.00
C20Gravity Storm Sewer - 8"88LF$ 110.00$ 9,680.00
C21Gravity Storm Sewer - 12"69LF$ 115.00$ 7,935.00
C22Cleanout to Grade10EA$ 250.00$ 2,500.00
C23Outfall1EA$ 4,500.00$ 4,500.00
C24Overflow Inlet3EA$ 8,000.00$ 24,000.00
C25Stormwater Basin681LF$ 60.00$ 40,860.00
C26RESERVED0N/A$ - 0
C27Split Rail Fence700LF$ 72.00$ 50,400.00
C28Boulder Placement1LS$ 30,000.00$ 30,000.00
C29Gate Installation (OFCI)2EA$ 3,000.00$ 6,000.00
C30Salvage Gate Reinstall1EA$ 2,000.00$ 2,000.00
C31RESERVED0N/A$ - 0
C32Landscape - Amended Topsoil140CY$ 165.00$ 23,100.00
C33Landscape - Compost35CY$ 167.00$ 5,845.00
C34Landscape - Seeding18,000SF$ 0.50$ 9,000.00
C35Landscape - General Plantings1LS$ 14,000.00$ 14,000.00
C36Signs - Reinstall10EA$ 500.00$ 5,000.00
C37Signs - ADA4EA$ 1,000.00$ 4,000.00
C38Mailbox Reinstall1$ 1,000.00$ 1,000.00
PROJECT 3 TOTAL$ 874,700.00

TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,514,548.00

Project 4 Bid Alternate - Restroom Plaza
D1Mobilization1LS$ 5,000.00$ 5,000.00
D2Survey - Project Stakeout1LS$ 4,000.00$ 4,000.00
D3Erosion Control1LS$ 500.00$ 500.00
D4Demolition, Clearing and Grubbing1LS$ 2,000.00$ 2,000.00
D5Tree Removal8EA$ 600.00$ 4,800.00
D6General Excavation and Earthwork1LS$ 6,500.00$ 6,500.00
D7Rock Excavation (Allowance)5CY$ 400.00$ 2,000.00
D8Base Rock or Shoulder Backfill Rock40TN$ 100.00$ 4,000.00
D9Concrete Paving - Type 2 Pedestrian1750SF$ 1.00$ 1,750.00
D10Crushed Rock Paving8TN$ 110.00$ 880.00
D11Boulder Placement1LS$ 2,000.00$ 2,000.00
D12Bench Installation (OCFI)1EA$ 500.00$ 500.00
D13Information Kiosk Installation (OCFI)1EA$ 5,000.00$ 5,000.00
D14Bicycle Racks (OCFI)2EA$ 1,000.00$ 2,000.00
D15Trash Receptacle (OCFI)1EA$ 500.00$ 500.00
D16Landscape - Amended Topsoil20CY$ 165.00$ 3,300.00
D17Landscape - Compost5CY$ 167.00$ 835.00
D18Landscape - Seeding2,300SF$ 0.50$ 1,150.00
D19Landscape - General Plantings1LS$ 2,000.00$ 2,000.00
BID ALTERNATE PROJECT 4 TOTAL$ 48,715.00

TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,563,263.00

Rickabaugh Construction

Rickabaugh Construction
3480 SW Empire Drive
Prineville Oregon
Item #DescriptionQuantityUnitUnit CostTotal Cost
Project 1 - Rim Rock Trail Improvements
BASE BID
A1Mobilization1LS$ 15,798.00$ 15,798.00
A2Survey - Project Stakeout1LS$ 10,487.00$ 10,487.00
A3Erosion Control1LS$ 8,434.00$ 8,434.00
A4Traffic Control1LS$ 1,393.00$ 1,393.00
A5Demolition, Clearing and Grubbing1LS$ 8,519.00$ 8,519.00
A6Tree Removal5LS$ 44.00$ 220.00
A7Asphalt Sawcut & Excavation3000SF$ 0.50$ 1,500.00
A8General Excavation and Earthwork1LS$ 12,948.00$ 12,948.00
A9Rock Excavation (Allowance)1CY$ 95.00$ 95.00
A10Base Rock or Shoulder Backfill Rock270TN$ 77.25$ 20,857.50
A11Pavement Markings - Painted Striping1LS$ 5,298.00$ 5,298.00
A12Cast-in-Place Concrete Curb26LF$ 34.45$ 895.70
A13Concrete Paving - Type 1 Vehicular2400SF$ 11.30$ 27,120.00
A14Concrete Paving - Type 2 Pedestrian755SF$ 8.45$ 6,379.75
A15Tactile Warning Panel1EA$ 1,420.00$ 1,420.00
A16Crushed Rock Paving160TN$ 115.00$ 18,400.00
A17Precast Concrete Wheel Stops7EA$ 122.00$ 854.00
A18Bollard (OFCI)1EA$ 214.00$ 214.00
A19Split Rail Fence90LF$ 29.00$ 2,610.00
A20Stone Faced Wall55LF$ 812.75$ 44,701.25
A21Boulder Placement1LS$ 3,016.00$ 3,016.00
A22Bench Installation (OFCI)2EA$ 105.00$ 210.00
A23Landscape - Amended Topsoil145CY$ 91.50$ 13,267.50
A24Landscape - Compost35CY$ 103.75$ 3,631.25
A25Landscape - Seeding10,000SF$ 0.35$ 3,500.00
A26Landscape - General - Plantings1LS$ 17,077.05$ 17,077.05
A27Signs - ADA7EA$ 297.00$ 2,079.00
PROJECT 1 TOTAL$ 230,925.00
Project 2 - North Rim Rock Trail Extension
BASE BID
B1Mobilization1LS$ 11,321.00$ 11,321.00
B2Survey - Project Stakeout1LS$ 10,487.00$ 10,487.00
B3Erosion Control1LS$ 5,850.00$ 5,850.00
B4Traffic Control1LS$ 892.00$ 892.00
B5Demolition, Clearing and Grubbing1LS$ 6,660.00$ 6,660.00
B6General Excavation and Earthwork1LS$ 9,591.00$ 9,591.00
B7Rock Excavation (Allowance)10CY$ 95.00$ 950.00
B8Base Rock or Shoulder Backfill Rock150TN$ 108.00$ 16,200.00
B9Crushed Rock Paving150TN$ 114.00$ 17,100.00
B10Split Rail Fence90LF$ 29.00$ 2,610.00
B11Boulder Placement1LS$ 8,493.00$ 8,493.00
B12Salvage Log Placement1LS$ 298.00$ 298.00
B13Bench Installation (OFCI)3EA$ 105.00$ 315.00
B14Landscape - Amended Topsoil140CY$ 91.50$ 12,810.00
B15Landscape - Compost35CY$ 103.75$ 3,631.25
B16Landscape - Seeding11,000SF$ 0.35$ 3,850.00
B17Landscape - General Plantings1LS$ 34,608.75$ 34,608.75
PROJECT 2 TOTAL$ 145,667.00
Project 3 - Overflow Parking Lot Improvements
BASE BID
C1Mobilization1LS$ 26,833.00$ 26,833.00
C2Survey - Project Stakeout1LS$ 14,902.00$ 14,902.00
C3Erosion Control1LS$ 4,411.00$ 4,411.00
C4Traffic Control1LS$ 1,393.00$ 1,393.00
C5Demolition, Clearing and Grubbing1LS$ 5,886.00$ 5,886.00
C6Tree Removal7EA$ 44.00$ 308.00
C7General Excavation and Earthwork1LS$ 14,910.00$ 14,910.00
C8Rock Excavation (Allowance)10CY$ 95.00$ 950.00
C9Base Rock or Shoulder Backfill Rock1,300TN$ 40.80$ 53,040.00
C10Asphalt Paving - Leveling and Wearing Courses1,100TN$ 126.95$ 139,645.00
C11Pavement Markings - Painted Striping1LS$ 8,023.00$ 8,023.00
C12Pavement Markings - Crosswalk1LS$ 953.00$ 953.00
C13Cast-in-Place Concrete Curb150LF$ 25.55$ 3,832.50
C14Concrete Paving - Type 1 Vehicular1,100SF$ 11.15$ 12,265.00
C15Concrete Paving - Type 2 Pedestrian1,500SF$ 8.95$ 13,425.00
C16Tactile Warning Panel6EA$ 1,420.00$ 8,520.00
C17Crushed Rock Paving40TN$ 91.00$ 3,640.00
C18Precast Concrete Wheel Stops104EA$ 124.00$ 12,896.00
C19Gravity Storm Sewer - 6"74LF$ 47.00$ 3,478.00
C20Gravity Storm Sewer - 8"88LF$ 65.00$ 5,720.00
C21Gravity Storm Sewer - 12"69LF$ 118.00$ 8,142.00
C22Cleanout to Grade10EA$ 481.00$ 4,810.00
C23Outfall1EA$ 296.00$ 296.00
C24Overflow Inlet3EA$ 494.00$ 1,482.00
C25Stormwater Basin681LF$ 68.00$ 46,308.00
C26RESERVED0N/A$ - 0
C27Split Rail Fence700LF$ 29.00$ 20,300.00
C28Boulder Placement1LS$ 5,116.00$ 5,116.00
C29Gate Installation (OFCI)2EA$ 1,652.00$ 3,304.00
C30Salvage Gate Reinstall1EA$ 1,652.00$ 1,652.00
C31RESERVED0N/A$ - 0
C32Landscape - Amended Topsoil140CY$ 91.50$ 12,810.00
C33Landscape - Compost35CY$ 103.75$ 3,631.25
C34Landscape - Seeding18,000SF$ 0.35$ 6,300.00
C35Landscape - General Plantings1LS$ 34,884.25$ 34,884.25
C36Signs - Reinstall10EA$ 132.00$ 1,320.00
C37Signs - ADA4EA$ 297.00$ 1,188.00
C38Mailbox Reinstall1$ 115.00$ 115.00
PROJECT 3 TOTAL$ 486,689.00

TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 863,281.00

Project 4 Bid Alternate - Restroom Plaza
D1Mobilization1LS$ 7,733.00$ 7,733.00
D2Survey - Project Stakeout1LS$ 2,759.00$ 2,759.00
D3Erosion Control1LS$ 992.00$ 992.00
D4Demolition, Clearing and Grubbing1LS$ 926.00$ 926.00
D5Tree Removal8EA$ 70.00$ 560.00
D6General Excavation and Earthwork1LS$ 2,404.00$ 2,404.00
D7Rock Excavation (Allowance)5CY$ 95.00$ 475.00
D8Base Rock or Shoulder Backfill Rock40TN$ 71.00$ 2,840.00
D9Concrete Paving - Type 2 Pedestrian1750SF$ 7.10$ 12,425.00
D10Crushed Rock Paving8TN$ 89.70$ 717.60
D11Boulder Placement1LS$ 479.00$ 479.00
D12Bench Installation (OCFI)1EA$ 106.00$ 106.00
D13Information Kiosk Installation (OCFI)1EA$ 514.00$ 514.00
D14Bicycle Racks (OCFI)2EA$ 138.00$ 276.00
D15Trash Receptacle (OCFI)1EA$ 138.00$ 138.00
D16Landscape - Amended Topsoil20CY$ 90.50$ 1,810.00
D17Landscape - Compost5CY$ 110.00$ 550.00
D18Landscape - Seeding2,300SF$ 0.35$ 805.00
D19Landscape - General Plantings1LS$ 165.40$ 165.40
BID ALTERNATE PROJECT 4 TOTAL$ 36,675.00

TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 899,956.00

Cascade Civil

Cascade Civil Corp
255 SE Black Butte Blvd
Redmond, OR 97756
Item #DescriptionQuantityUnitUnit CostTotal Cost
Project 1 - Rim Rock Trail Improvements
BASE BID
A1Mobilization1LS$ 35,000.00$ 35,000.00
A2Survey - Project Stakeout1LS$ 9,000.00$ 9,000.00
A3Erosion Control1LS$ 8,000.00$ 8,000.00
A4Traffic Control1LS$ 3,300.00$ 3,300.00
A5Demolition, Clearing and Grubbing1LS$ 25,000.00$ 25,000.00
A6Tree Removal5LS$ 1,200.00$ 6,000.00
A7Asphalt Sawcut & Excavation3000SF$ 3.00$ 9,000.00
A8General Excavation and Earthwork1LS$ 31,200.00$ 31,200.00
A9Rock Excavation (Allowance)1CY$ 300.00$ 300.00
A10Base Rock or Shoulder Backfill Rock270TN$ 85.00$ 22,950.00
A11Pavement Markings - Painted Striping1LS$ 1,200.00$ 1,200.00
A12Cast-in-Place Concrete Curb26LF$ 65.00$ 1,690.00
A13Concrete Paving - Type 1 Vehicular2400SF$ 11.00$ 26,400.00
A14Concrete Paving - Type 2 Pedestrian755SF$ 9.00$ 6,795.00
A15Tactile Warning Panel1EA$ 1,100.00$ 1,100.00
A16Crushed Rock Paving160TN$ 115.00$ 18,400.00
A17Precast Concrete Wheel Stops7EA$ 200.00$ 1,400.00
A18Bollard (OFCI)1EA$ 850.00$ 850.00
A19Split Rail Fence90LF$ 59.00$ 5,310.00
A20Stone Faced Wall55LF$ 1,400.00$ 77,000.00
A21Boulder Placement1LS$ 15,000.00$ 15,000.00
A22Bench Installation (OFCI)2EA$ 2,000.00$ 4,000.00
A23Landscape - Amended Topsoil145CY$ 100.00$ 14,500.00
A24Landscape - Compost35CY$ 120.00$ 4,200.00
A25Landscape - Seeding10,000SF$ 0.40$ 4,000.00
A26Landscape - General - Plantings1LS$ 15,000.00$ 15,000.00
A27Signs - ADA7EA$ 850.00$ 5,950.00
PROJECT 1 TOTAL$ 352,545.00
Project 2 - North Rim Rock Trail Extension
BASE BID
B1Mobilization1LS$ 25,000.00$ 25,000.00
B2Survey - Project Stakeout1LS$ 15,000.00$ 15,000.00
B3Erosion Control1LS$ 10,000.00$ 10,000.00
B4Traffic Control1LS$ 3,500.00$ 3,500.00
B5Demolition, Clearing and Grubbing1LS$ 49,000.00$ 49,000.00
B6General Excavation and Earthwork1LS$ 40,000.00$ 40,000.00
B7Rock Excavation (Allowance)10CY$ 300.00$ 3,000.00
B8Base Rock or Shoulder Backfill Rock150TN$ 85.00$ 12,750.00
B9Crushed Rock Paving150TN$ 115.00$ 17,250.00
B10Split Rail Fence90LF$ 59.00$ 5,310.00
B11Boulder Placement1LS$ 15,000.00$ 15,000.00
B12Salvage Log Placement1LS$ 10,000.00$ 10,000.00
B13Bench Installation (OFCI)3EA$ 2,000.00$ 6,000.00
B14Landscape - Amended Topsoil140CY$ 100.00$ 14,000.00
B15Landscape - Compost35CY$ 120.00$ 4,200.00
B16Landscape - Seeding11,000SF$ 0.40$ 4,400.00
B17Landscape - General Plantings1LS$ 15,000.00$ 15,000.00
PROJECT 2 TOTAL$ 249,410.00
Project 3 - Overflow Parking Lot Improvements
BASE BID
C1Mobilization1LS$ 55,000.00$ 55,000.00
C2Survey - Project Stakeout1LS$ 7,000.00$ 7,000.00
C3Erosion Control1LS$ 5,000.00$ 5,000.00
C4Traffic Control1LS$ 7,000.00$ 7,000.00
C5Demolition, Clearing and Grubbing1LS$ 15,000.00$ 15,000.00
C6Tree Removal7EA$ 1,200.00$ 8,400.00
C7General Excavation and Earthwork1LS$ 25,000.00$ 25,000.00
C8Rock Excavation (Allowance)10CY$ 300.00$ 3,000.00
C9Base Rock or Shoulder Backfill Rock1,300TN$ 38.00$ 49,400.00
C10Asphalt Paving - Leveling and Wearing Courses1,100TN$ 135.00$ 148,500.00
C11Pavement Markings - Painted Striping1LS$ 1,000.00$ 1,000.00
C12Pavement Markings - Crosswalk1LS$ 300.00$ 300.00
C13Cast-in-Place Concrete Curb150LF$ 65.00$ 9,750.00
C14Concrete Paving - Type 1 Vehicular1,100SF$ 11.00$ 12,100.00
C15Concrete Paving - Type 2 Pedestrian1,500SF$ 9.00$ 13,500.00
C16Tactile Warning Panel6EA$ 1,100.00$ 6,600.00
C17Crushed Rock Paving40TN$ 190.00$ 7,600.00
C18Precast Concrete Wheel Stops104EA$ 100.00$ 10,400.00
C19Gravity Storm Sewer - 6"74LF$ 78.00$ 5,772.00
C20Gravity Storm Sewer - 8"88LF$ 80.00$ 7,040.00
C21Gravity Storm Sewer - 12"69LF$ 110.00$ 7,590.00
C22Cleanout to Grade10EA$ 1,205.00$ 12,050.00
C23Outfall1EA$ 4,100.00$ 4,100.00
C24Overflow Inlet3EA$ 1,380.00$ 4,140.00
C25Stormwater Basin681LF$ 14.00$ 9,534.00
C26RESERVED0N/A$ - 0
C27Split Rail Fence700LF$ 59.00$ 41,300.00
C28Boulder Placement1LS$ 8,000.00$ 8,000.00
C29Gate Installation (OFCI)2EA$ 4,500.00$ 9,000.00
C30Salvage Gate Reinstall1EA$ 2,200.00$ 2,200.00
C31RESERVED0N/A$ - 0
C32Landscape - Amended Topsoil140CY$ 100.00$ 14,000.00
C33Landscape - Compost35CY$ 120.00$ 4,200.00
C34Landscape - Seeding18,000SF$ 0.40$ 7,200.00
C35Landscape - General Plantings1LS$ 8,700.00$ 8,700.00
C36Signs - Reinstall10EA$ 500.00$ 5,000.00
C37Signs - ADA4EA$ 850.00$ 3,400.00
C38Mailbox Reinstall1$ 1,500.00$ 1,500.00
PROJECT 3 TOTAL$ 539,276.00

TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,141,231.00

Project 4 Bid Alternate - Restroom Plaza
D1Mobilization1LS$ 10,000.00$ 10,000.00
D2Survey - Project Stakeout1LS$ 7,000.00$ 7,000.00
D3Erosion Control1LS$ 3,500.00$ 3,500.00
D4Demolition, Clearing and Grubbing1LS$ 5,000.00$ 5,000.00
D5Tree Removal8EA$ 1,200.00$ 9,600.00
D6General Excavation and Earthwork1LS$ 17,000.00$ 17,000.00
D7Rock Excavation (Allowance)5CY$ 300.00$ 1,500.00
D8Base Rock or Shoulder Backfill Rock40TN$ 110.00$ 4,400.00
D9Concrete Paving - Type 2 Pedestrian1750SF$ 9.00$ 15,750.00
D10Crushed Rock Paving8TN$ 190.00$ 1,520.00
D11Boulder Placement1LS$ 8,500.00$ 8,500.00
D12Bench Installation (OCFI)1EA$ 2,000.00$ 2,000.00
D13Information Kiosk Installation (OCFI)1EA$ 3,800.00$ 3,800.00
D14Bicycle Racks (OCFI)2EA$ 1,200.00$ 2,400.00
D15Trash Receptacle (OCFI)1EA$ 1,000.00$ 1,000.00
D16Landscape - Amended Topsoil20CY$ 120.00$ 2,400.00
D17Landscape - Compost5CY$ 200.00$ 1,000.00
D18Landscape - Seeding2,300SF$ 0.40$ 920.00
D19Landscape - General Plantings1LS$ 3,000.00$ 3,000.00
BID ALTERNATE PROJECT 4 TOTAL$ 100,290.00

TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,241,521.00

Paul Brothers

Paul Brothers Inc
8601 SE Revenue Rd
Item #DescriptionQuantityUnitUnit CostTotal Cost
Project 1 - Rim Rock Trail Improvements
BASE BID
A1Mobilization1LS$ 55,517.26$ 55,517.26
A2Survey - Project Stakeout1LS$ 4,403.60$ 4,403.60
A3Erosion Control1LS$ 18,456.67$ 18,456.67
A4Traffic Control1LS$ 1,489.00$ 1,489.00
A5Demolition, Clearing and Grubbing1LS$ 12,694.26$ 12,694.26
A6Tree Removal5LS$ 996.07$ 4,980.35
A7Asphalt Sawcut & Excavation3000SF$ 1.36$ 4,080.00
A8General Excavation and Earthwork1LS$ 19,198.45$ 19,198.45
A9Rock Excavation (Allowance)1CY$ 889.70$ 889.70
A10Base Rock or Shoulder Backfill Rock270TN$ 71.13$ 19,205.10
A11Pavement Markings - Painted Striping1LS$ 1,408.75$ 1,408.75
A12Cast-in-Place Concrete Curb26LF$ 51.55$ 1,340.30
A13Concrete Paving - Type 1 Vehicular2400SF$ 11.79$ 28,296.00
A14Concrete Paving - Type 2 Pedestrian755SF$ 8.77$ 6,621.35
A15Tactile Warning Panel1EA$ 1,479.73$ 1,479.73
A16Crushed Rock Paving160TN$ 70.78$ 11,324.80
A17Precast Concrete Wheel Stops7EA$ 125.90$ 881.30
A18Bollard (OFCI)1EA$ 268.18$ 268.18
A19Split Rail Fence90LF$ 52.98$ 4,768.20
A20Stone Faced Wall55LF$ 966.85$ 53,176.75
A21Boulder Placement1LS$ 9,471.28$ 9,471.28
A22Bench Installation (OFCI)2EA$ 825.36$ 1,650.72
A23Landscape - Amended Topsoil145CY$ 33.41$ 4,844.45
A24Landscape - Compost35CY$ 80.25$ 2,808.75
A25Landscape - Seeding10,000SF$ 0.21$ 2,100.00
A26Landscape - General - Plantings1LS$ 6,087.95$ 6,087.95
A27Signs - ADA7EA$ 772.72$ 5,409.04
PROJECT 1 TOTAL$ 282,851.94
Project 2 - North Rim Rock Trail Extension
BASE BID
B1Mobilization1LS$ 41,819.22$ 41,819.22
B2Survey - Project Stakeout1LS$ 4,403.60$ 4,403.60
B3Erosion Control1LS$ 13,396.19$ 13,396.19
B4Traffic Control1LS$ 1,489.00$ 1,489.00
B5Demolition, Clearing and Grubbing1LS$ 15,283.48$ 15,283.48
B6General Excavation and Earthwork1LS$ 11,879.70$ 11,879.70
B7Rock Excavation (Allowance)10CY$ 386.52$ 3,865.20
B8Base Rock or Shoulder Backfill Rock150TN$ 77.56$ 11,634.00
B9Crushed Rock Paving150TN$ 70.78$ 10,617.00
B10Split Rail Fence90LF$ 52.98$ 4,768.20
B11Boulder Placement1LS$ 40,470.61$ 40,470.61
B12Salvage Log Placement1LS$ 4,519.76$ 4,519.76
B13Bench Installation (OFCI)3EA$ 829.39$ 2,488.17
B14Landscape - Amended Topsoil140CY$ 34.75$ 4,865.00
B15Landscape - Compost35CY$ 80.25$ 2,808.75
B16Landscape - Seeding11,000SF$ 0.21$ 2,310.00
B17Landscape - General Plantings1LS$ 6,087.95$ 6,087.95
PROJECT 2 TOTAL$ 182,705.83
Project 3 - Overflow Parking Lot Improvements
BASE BID
C1Mobilization1LS$ 184,906.43$ 184,906.43
C2Survey - Project Stakeout1LS$ 23,953.60$ 23,953.60
C3Erosion Control1LS$ 12,252.22$ 12,252.22
C4Traffic Control1LS$ 3,237.00$ 3,237.00
C5Demolition, Clearing and Grubbing1LS$ 58,366.45$ 58,366.45
C6Tree Removal7EA$ 996.07$ 6,972.49
C7General Excavation and Earthwork1LS$ 93,339.10$ 93,339.10
C8Rock Excavation (Allowance)10CY$ 386.52$ 3,865.20
C9Base Rock or Shoulder Backfill Rock1,300TN$ 60.68$ 78,884.00
C10Asphalt Paving - Leveling and Wearing Courses1,100TN$ 133.03$ 146,333.00
C11Pavement Markings - Painted Striping1LS$ 10,257.00$ 10,257.00
C12Pavement Markings - Crosswalk1LS$ 4,370.00$ 4,370.00
C13Cast-in-Place Concrete Curb150LF$ 38.58$ 5,787.00
C14Concrete Paving - Type 1 Vehicular1,100SF$ 11.65$ 12,815.00
C15Concrete Paving - Type 2 Pedestrian1,500SF$ 9.34$ 14,010.00
C16Tactile Warning Panel6EA$ 1,479.73$ 8,878.38
C17Crushed Rock Paving40TN$ 70.78$ 2,831.20
C18Precast Concrete Wheel Stops104EA$ 125.90$ 13,093.60
C19Gravity Storm Sewer - 6"74LF$ 67.61$ 5,003.14
C20Gravity Storm Sewer - 8"88LF$ 96.11$ 8,457.68
C21Gravity Storm Sewer - 12"69LF$ 92.89$ 6,409.41
C22Cleanout to Grade10EA$ 471.24$ 4,712.40
C23Outfall1EA$ 354.37$ 354.37
C24Overflow Inlet3EA$ 692.33$ 2,076.99
C25Stormwater Basin681LF$ 39.05$ 26,593.05
C26RESERVED0N/A$ - 0
C27Split Rail Fence700LF$ 50.29$ 35,203.00
C28Boulder Placement1LS$ 23,744.35$ 23,744.35
C29Gate Installation (OFCI)2EA$ 4,318.81$ 8,637.62
C30Salvage Gate Reinstall1EA$ 4,318.81$ 4,318.81
C31RESERVED0N/A$ - 0
C32Landscape - Amended Topsoil140CY$ 31.85$ 4,459.00
C33Landscape - Compost35CY$ 80.25$ 2,808.75
C34Landscape - Seeding18,000SF$ 0.19$ 3,420.00
C35Landscape - General Plantings1LS$ 6,087.95$ 6,087.95
C36Signs - Reinstall10EA$ 326.10$ 3,261.00
C37Signs - ADA4EA$ 774.00$ 3,096.00
C38Mailbox Reinstall1$ 328.96$ 328.96
PROJECT 3 TOTAL$ 833,124.15

TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,298,681.92

Project 4 Bid Alternate - Restroom Plaza
D1Mobilization1LS$ 11,113.63$ 11,113.63
D2Survey - Project Stakeout1LS$ 4,600.00$ 4,600.00
D3Erosion Control1LS$ 1,657.78$ 1,657.78
D4Demolition, Clearing and Grubbing1LS$ 2,039.12$ 2,039.12
D5Tree Removal8EA$ 996.07$ 7,968.56
D6General Excavation and Earthwork1LS$ 1,235.85$ 1,235.85
D7Rock Excavation (Allowance)5CY$ 446.12$ 2,230.60
D8Base Rock or Shoulder Backfill Rock40TN$ 42.96$ 1,718.40
D9Concrete Paving - Type 2 Pedestrian1750SF$ 7.41$ 12,967.50
D10Crushed Rock Paving8TN$ 70.78$ 566.24
D11Boulder Placement1LS$ 297.67$ 297.67
D12Bench Installation (OCFI)1EA$ 1,230.97$ 1,230.97
D13Information Kiosk Installation (OCFI)1EA$ 5,121.62$ 5,121.62
D14Bicycle Racks (OCFI)2EA$ 178.63$ 357.26
D15Trash Receptacle (OCFI)1EA$ 178.63$ 178.63
D16Landscape - Amended Topsoil20CY$ 34.36$ 687.20
D17Landscape - Compost5CY$ 80.25$ 401.25
D18Landscape - Seeding2,300SF$ 0.35$ 805.00
D19Landscape - General Plantings1LS$ 297.67$ 297.67
BID ALTERNATE PROJECT 4 TOTAL$ 55,474.95

TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,354,156.87

Central OR Homes

Central Oregon Homes Inc
PO Box 1678
Redmond, OR 97756
Item #DescriptionQuantityUnitUnit CostTotal Cost
Project 1 - Rim Rock Trail Improvements
BASE BID
A1Mobilization1LS$ 13,690.00$ 13,690.00
A2Survey - Project Stakeout1LS$ 16,300.00$ 16,300.00
A3Erosion Control1LS$ 750.00$ 750.00
A4Traffic Control1LS$ 450.00$ 450.00
A5Demolition, Clearing and Grubbing1LS$ 13,580.00$ 13,580.00
A6Tree Removal5LS$ 900.00$ 4,500.00
A7Asphalt Sawcut & Excavation3000SF$ 2.00$ 6,000.00
A8General Excavation and Earthwork1LS$ 11,650.00$ 11,650.00
A9Rock Excavation (Allowance)1CY$ 175.00$ 175.00
A10Base Rock or Shoulder Backfill Rock270TN$ 45.00$ 12,150.00
A11Pavement Markings - Painted Striping1LS$ 12,310.00$ 12,310.00
A12Cast-in-Place Concrete Curb26LF$ 65.00$ 1,690.00
A13Concrete Paving - Type 1 Vehicular2400SF$ 11.00$ 26,400.00
A14Concrete Paving - Type 2 Pedestrian755SF$ 10.00$ 7,550.00
A15Tactile Warning Panel1EA$ 800.00$ 800.00
A16Crushed Rock Paving160TN$ 75.00$ 12,000.00
A17Precast Concrete Wheel Stops7EA$ 200.00$ 1,400.00
A18Bollard (OFCI)1EA$ 1,200.00$ 1,200.00
A19Split Rail Fence90LF$ 70.00$ 6,300.00
A20Stone Faced Wall55LF$ 900.00$ 49,500.00
A21Boulder Placement1LS$ 8,060.00$ 8,060.00
A22Bench Installation (OFCI)2EA$ 3,000.00$ 6,000.00
A23Landscape - Amended Topsoil145CY$ 65.00$ 9,425.00
A24Landscape - Compost35CY$ 95.00$ 3,325.00
A25Landscape - Seeding10,000SF$ 0.36$ 3,600.00
A26Landscape - General - Plantings1LS$ 9,860.00$ 9,860.00
A27Signs - ADA7EA$ 450.00$ 3,150.00
PROJECT 1 TOTAL$ 241,815.00
Project 2 - North Rim Rock Trail Extension
BASE BID
B1Mobilization1LS$ 7,580.00$ 7,580.00
B2Survey - Project Stakeout1LS$ 8,300.00$ 8,300.00
B3Erosion Control1LS$ 620.00$ 620.00
B4Traffic Control1LS$ 4,000.00$ 4,000.00
B5Demolition, Clearing and Grubbing1LS$ 5,100.00$ 5,100.00
B6General Excavation and Earthwork1LS$ 17,470.00$ 17,470.00
B7Rock Excavation (Allowance)10CY$ 175.00$ 1,750.00
B8Base Rock or Shoulder Backfill Rock150TN$ 45.00$ 6,750.00
B9Crushed Rock Paving150TN$ 75.00$ 11,250.00
B10Split Rail Fence90LF$ 70.00$ 6,300.00
B11Boulder Placement1LS$ 24,180.00$ 24,180.00
B12Salvage Log Placement1LS$ 950.00$ 950.00
B13Bench Installation (OFCI)3EA$ 3,000.00$ 9,000.00
B14Landscape - Amended Topsoil140CY$ 65.00$ 9,100.00
B15Landscape - Compost35CY$ 95.00$ 3,325.00
B16Landscape - Seeding11,000SF$ 0.36$ 3,960.00
B17Landscape - General Plantings1LS$ 14,230.00$ 14,230.00
PROJECT 2 TOTAL$ 133,865.00
Project 3 - Overflow Parking Lot Improvements
BASE BID
C1Mobilization1LS$ 30,180.00$ 30,180.00
C2Survey - Project Stakeout1LS$ 12,000.00$ 12,000.00
C3Erosion Control1LS$ 1,500.00$ 1,500.00
C4Traffic Control1LS$ 6,000.00$ 6,000.00
C5Demolition, Clearing and Grubbing1LS$ 15,970.00$ 15,970.00
C6Tree Removal7EA$ 900.00$ 6,300.00
C7General Excavation and Earthwork1LS$ 25,000.00$ 25,000.00
C8Rock Excavation (Allowance)10CY$ 175.00$ 1,750.00
C9Base Rock or Shoulder Backfill Rock1,300TN$ 45.00$ 58,500.00
C10Asphalt Paving - Leveling and Wearing Courses1,100TN$ 130.00$ 143,000.00
C11Pavement Markings - Painted Striping1LS$ 5,690.00$ 5,690.00
C12Pavement Markings - Crosswalk1LS$ 1,200.00$ 1,200.00
C13Cast-in-Place Concrete Curb150LF$ 65.00$ 9,750.00
C14Concrete Paving - Type 1 Vehicular1,100SF$ 11.00$ 12,100.00
C15Concrete Paving - Type 2 Pedestrian1,500SF$ 10.00$ 15,000.00
C16Tactile Warning Panel6EA$ 800.00$ 4,800.00
C17Crushed Rock Paving40TN$ 75.00$ 3,000.00
C18Precast Concrete Wheel Stops104EA$ 200.00$ 20,800.00
C19Gravity Storm Sewer - 6"74LF$ 158.00$ 11,692.00
C20Gravity Storm Sewer - 8"88LF$ 200.00$ 17,600.00
C21Gravity Storm Sewer - 12"69LF$ 160.00$ 11,040.00
C22Cleanout to Grade10EA$ 245.00$ 2,450.00
C23Outfall1EA$ 500.00$ 500.00
C24Overflow Inlet3EA$ 500.00$ 1,500.00
C25Stormwater Basin681LF$ 22.00$ 14,982.00
C26RESERVED0N/A$ - 0
C27Split Rail Fence700LF$ 70.00$ 49,000.00
C28Boulder Placement1LS$ 18,330.00$ 18,330.00
C29Gate Installation (OFCI)2EA$ 1,100.00$ 2,200.00
C30Salvage Gate Reinstall1EA$ 1,100.00$ 1,100.00
C31RESERVED0N/A$ - 0
C32Landscape - Amended Topsoil140CY$ 65.00$ 9,100.00
C33Landscape - Compost35CY$ 95.00$ 3,325.00
C34Landscape - Seeding18,000SF$ 0.36$ 6,480.00
C35Landscape - General Plantings1LS$ 6,680.00$ 6,680.00
C36Signs - Reinstall10EA$ 250.00$ 2,500.00
C37Signs - ADA4EA$ 450.00$ 1,800.00
C38Mailbox Reinstall1$ 310.00$ 310.00
PROJECT 3 TOTAL$ 533,129.00

TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 908,809.00

Project 4 Bid Alternate - Restroom Plaza
D1Mobilization1LS$ 3,730.00$ 3,730.00
D2Survey - Project Stakeout1LS$ 5,300.00$ 5,300.00
D3Erosion Control1LS$ 300.00$ 300.00
D4Demolition, Clearing and Grubbing1LS$ 2,800.00$ 2,800.00
D5Tree Removal8EA$ 900.00$ 7,200.00
D6General Excavation and Earthwork1LS$ 11,000.00$ 11,000.00
D7Rock Excavation (Allowance)5CY$ 175.00$ 875.00
D8Base Rock or Shoulder Backfill Rock40TN$ 45.00$ 1,800.00
D9Concrete Paving - Type 2 Pedestrian1750SF$ 10.00$ 17,500.00
D10Crushed Rock Paving8TN$ 75.00$ 600.00
D11Boulder Placement1LS$ 1,780.00$ 1,780.00
D12Bench Installation (OCFI)1EA$ 3,000.00$ 3,000.00
D13Information Kiosk Installation (OCFI)1EA$ 6,500.00$ 6,500.00
D14Bicycle Racks (OCFI)2EA$ 230.00$ 460.00
D15Trash Receptacle (OCFI)1EA$ 460.00$ 460.00
D16Landscape - Amended Topsoil20CY$ 65.00$ 1,300.00
D17Landscape - Compost5CY$ 95.00$ 475.00
D18Landscape - Seeding2,300SF$ 0.36$ 828.00
D19Landscape - General Plantings1LS$ - 0$ - 0
BID ALTERNATE PROJECT 4 TOTAL$ 65,908.00

TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 974,717.00

File details come from the government source that posted it. Updated .