Smith Rock State Park Visitor Improvement Project - Preliminary Bid Results
This file contains preliminary bid results for Oregon Parks and Recreation's ITB #14564 for the Smith Rock State Park Visitor Improvement Project located in Terrebonne, Oregon. The project encompasses three base bid components: Rim Rock Trail Improvements, North Rim Rock Trail Extension, and Overflow Parking Lot Improvements, with a fourth optional bid alternate for Restroom Plaza improvements. Work includes mobilization, survey stakeout, erosion and traffic control, demolition, tree removal, excavation, asphalt and concrete paving, fencing, benches, bollards, gates, gravity storm sewers, stormwater basins, and landscaping. Eight contractors submitted bids with the bid closing date of November 19, 2026. Construction is restricted to 7:00 AM to 5:00 PM, Monday through Friday, during park operations, with eagle protection requirements limiting work within one mile of Golden Eagle nest sites from January 15 to July 15, and minimizing loud or percussive work from January 15 to June 15.
Base bid totals for Projects 1, 2, and 3 combined ranged from $863,281.00 (Rickabaugh Construction, the apparent low bidder) to $1,514,548.00 (Forge Civil LLC), with bids inclusive of all labor, equipment, materials, permits, and supervision. When Project 4 (Restroom Plaza) bid alternate pricing is included, total bids ranged from $899,956.00 to $1,563,263.00. The State of Oregon retains authority to increase or decrease quantities at the same unit prices or remove items entirely, with payment based on actual measured quantities. Contractors were required to enter unit and total costs for all itemized line items on the bid form, with all non-itemized work considered incidental. The file notes these results are preliminary and have not yet been evaluated for responsiveness, with final bid results to be posted upon completion of evaluation.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRELIM. BID RESULTS
| PRELIMINARY BID RESULTS | ||
| Bids below have not yet been evaluated for responsiveness. Final bid results will be posted once available | ||
| OPRD # | 14564 | |
| OregonBuys # | S-63400-00018081 | |
| Closing: | 11/19/2026 | |
| Title: | Smith Rock State Park Visitor Improvement Project | |
| Bidder Name | Total Bid (Project 1, 2 and 3) | |
| Relson Contracting LLC | $1,299,556.96 |
Tim Bloom Construction $1,092,597.02
Deschutes Construction Corp $1,163,114.95
Forge Civil LLC $1,514,548.00
Rickabaugh Construction $863,281.00
Cascade Civil Corp $1,141,231.00
Paul Brothers Inc $1,298,681.92
Central Oregon Homes $908,809.00
| Bidder Name | Total Bid with Bid Alternate (Project 1, 2, 3 & 4) |
| Relson Contracting LLC | $1,409,655.11 |
Tim Bloom Construction $1,149,553.52
Deschutes Construction Corp $1,239,433.61
Forge Civil LLC $1,563,263.00
Rickabaugh Construction $899,956.00
Cascade Civil Corp $1,241,521.00
Paul Brothers Inc $1,354,156.87
Central Oregon Homes $974,717.00
&"Arial,Bold"&14* * * Preliminary Results Only * * *&12 &"Arial,Italic"&10(results are not final until evaluation is completed)
&"Arial,Italic"&8&F &"Arial,Italic"&8Page &P
Relson Contracting
| Relson Contracting LLC | |||||
| 601 E Antler Ave Suite 134 | |||||
| Redmond, OR 97756 | |||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost |
| Project 1 - Rim Rock Trail Improvements | |||||
| BASE BID | |||||
| A1 | Mobilization | 1 | LS | $ 6,500.79 | $ 6,500.79 |
| A2 | Survey - Project Stakeout | 1 | LS | $ 8,440.79 | $ 8,440.79 |
| A3 | Erosion Control | 1 | LS | $ 13,797.45 | $ 13,797.45 |
| A4 | Traffic Control | 1 | LS | $ 9,196.79 | $ 9,196.79 |
| A5 | Demolition, Clearing and Grubbing | 1 | LS | $ 25,007.83 | $ 25,007.83 |
| A6 | Tree Removal | 5 | LS | $ 1,403.91 | $ 7,019.55 |
| A7 | Asphalt Sawcut & Excavation | 3000 | SF | $ 3.37 | $ 10,110.00 |
| A8 | General Excavation and Earthwork | 1 | LS | $ 34,673.67 | $ 34,673.67 |
| A9 | Rock Excavation (Allowance) | 1 | CY | $ 2,842.15 | $ 2,842.15 |
| A10 | Base Rock or Shoulder Backfill Rock | 270 | TN | $ 125.45 | $ 33,871.50 |
| A11 | Pavement Markings - Painted Striping | 1 | LS | $ 5,433.71 | $ 5,433.71 |
| A12 | Cast-in-Place Concrete Curb | 26 | LF | $ 188.59 | $ 4,903.34 |
| A13 | Concrete Paving - Type 1 Vehicular | 2400 | SF | $ 13.39 | $ 32,136.00 |
| A14 | Concrete Paving - Type 2 Pedestrian | 755 | SF | $ 13.95 | $ 10,532.25 |
| A15 | Tactile Warning Panel | 1 | EA | $ 4,363.35 | $ 4,363.35 |
| A16 | Crushed Rock Paving | 160 | TN | $ 140.18 | $ 22,428.80 |
| A17 | Precast Concrete Wheel Stops | 7 | EA | $ 396.86 | $ 2,778.02 |
| A18 | Bollard (OFCI) | 1 | EA | $ 3,631.10 | $ 3,631.10 |
| A19 | Split Rail Fence | 90 | LF | $ 29.90 | $ 2,691.00 |
| A20 | Stone Faced Wall | 55 | LF | $ 857.72 | $ 47,174.60 |
| A21 | Boulder Placement | 1 | LS | $ 2,118.85 | $ 2,118.85 |
| A22 | Bench Installation (OFCI) | 2 | EA | $ 5,886.75 | $ 11,773.50 |
| A23 | Landscape - Amended Topsoil | 145 | CY | $ 63.28 | $ 9,175.60 |
| A24 | Landscape - Compost | 35 | CY | $ 144.17 | $ 5,045.95 |
| A25 | Landscape - Seeding | 10,000 | SF | $ 0.43 | $ 4,300.00 |
| A26 | Landscape - General - Plantings | 1 | LS | $ 9,723.72 | $ 9,723.72 |
| A27 | Signs - ADA | 7 | EA | $ 1,176.77 | $ 8,237.39 |
| PROJECT 1 TOTAL | $ 337,907.70 |
| Project 2 - North Rim Rock Trail Extension | |||||
| BASE BID | |||||
| B1 | Mobilization | 1 | LS | $ 6,500.79 | $ 6,500.79 |
| B2 | Survey - Project Stakeout | 1 | LS | $ 8,440.79 | $ 8,440.79 |
| B3 | Erosion Control | 1 | LS | $ 13,820.40 | $ 13,820.40 |
| B4 | Traffic Control | 1 | LS | $ 7,488.99 | $ 7,488.99 |
| B5 | Demolition, Clearing and Grubbing | 1 | LS | $ 21,066.60 | $ 21,066.60 |
| B6 | General Excavation and Earthwork | 1 | LS | $ 19,240.97 | $ 19,240.97 |
| B7 | Rock Excavation (Allowance) | 10 | CY | $ 2,842.15 | $ 28,421.50 |
| B8 | Base Rock or Shoulder Backfill Rock | 150 | TN | $ 162.00 | $ 24,300.00 |
| B9 | Crushed Rock Paving | 150 | TN | $ 133.99 | $ 20,098.50 |
| B10 | Split Rail Fence | 90 | LF | $ 29.90 | $ 2,691.00 |
| B11 | Boulder Placement | 1 | LS | $ 2,118.85 | $ 2,118.85 |
| B12 | Salvage Log Placement | 1 | LS | $ 31,105.51 | $ 31,105.51 |
| B13 | Bench Installation (OFCI) | 3 | EA | $ 5,720.32 | $ 17,160.96 |
| B14 | Landscape - Amended Topsoil | 140 | CY | $ 64.11 | $ 8,975.40 |
| B15 | Landscape - Compost | 35 | CY | $ 144.17 | $ 5,045.95 |
| B16 | Landscape - Seeding | 11,000 | SF | $ 0.37 | $ 4,070.00 |
| B17 | Landscape - General Plantings | 1 | LS | $ 16,223.84 | $ 16,223.84 |
| PROJECT 2 TOTAL | $ 236,770.05 |
| Project 3 - Overflow Parking Lot Improvements | |||||
| BASE BID | |||||
| C1 | Mobilization | 1 | LS | $ 7,610.79 | $ 7,610.79 |
| C2 | Survey - Project Stakeout | 1 | LS | $ 8,440.79 | $ 8,440.79 |
| C3 | Erosion Control | 1 | LS | $ 11,605.92 | $ 11,605.92 |
| C4 | Traffic Control | 1 | LS | $ 13,198.99 | $ 13,198.99 |
| C5 | Demolition, Clearing and Grubbing | 1 | LS | $ 45,949.53 | $ 45,949.53 |
| C6 | Tree Removal | 7 | EA | $ 1,374.49 | $ 9,621.43 |
| C7 | General Excavation and Earthwork | 1 | LS | $ 35,312.93 | $ 35,312.93 |
| C8 | Rock Excavation (Allowance) | 10 | CY | $ 2,842.15 | $ 28,421.50 |
| C9 | Base Rock or Shoulder Backfill Rock | 1,300 | TN | $ 45.06 | $ 58,578.00 |
| C10 | Asphalt Paving - Leveling and Wearing Courses | 1,100 | TN | $ 127.31 | $ 140,041.00 |
| C11 | Pavement Markings - Painted Striping | 1 | LS | $ 3,724.07 | $ 3,724.07 |
| C12 | Pavement Markings - Crosswalk | 1 | LS | $ 2,518.79 | $ 2,518.79 |
| C13 | Cast-in-Place Concrete Curb | 150 | LF | $ 92.62 | $ 13,893.00 |
| C14 | Concrete Paving - Type 1 Vehicular | 1,100 | SF | $ 14.99 | $ 16,489.00 |
| C15 | Concrete Paving - Type 2 Pedestrian | 1,500 | SF | $ 12.02 | $ 18,030.00 |
| C16 | Tactile Warning Panel | 6 | EA | $ 1,129.72 | $ 6,778.32 |
| C17 | Crushed Rock Paving | 40 | TN | $ 143.66 | $ 5,746.40 |
| C18 | Precast Concrete Wheel Stops | 104 | EA | $ 134.25 | $ 13,962.00 |
| C19 | Gravity Storm Sewer - 6" | 74 | LF | $ 372.08 | $ 27,533.92 |
| C20 | Gravity Storm Sewer - 8" | 88 | LF | $ 291.96 | $ 25,692.48 |
| C21 | Gravity Storm Sewer - 12" | 69 | LF | $ 426.80 | $ 29,449.20 |
| C22 | Cleanout to Grade | 10 | EA | $ 380.69 | $ 3,806.90 |
| C23 | Outfall | 1 | EA | $ 3,812.19 | $ 3,812.19 |
| C24 | Overflow Inlet | 3 | EA | $ 942.57 | $ 2,827.71 |
| C25 | Stormwater Basin | 681 | LF | $ 155.23 | $ 105,711.63 |
| C26 | RESERVED | 0 | N/A | $ - 0 | |
| C27 | Split Rail Fence | 700 | LF | $ 24.08 | $ 16,856.00 |
| C28 | Boulder Placement | 1 | LS | $ 2,118.85 | $ 2,118.85 |
| C29 | Gate Installation (OFCI) | 2 | EA | $ 11,728.62 | $ 23,457.24 |
| C30 | Salvage Gate Reinstall | 1 | EA | $ 4,766.15 | $ 4,766.15 |
| C31 | RESERVED | 0 | N/A | $ - 0 | |
| C32 | Landscape - Amended Topsoil | 140 | CY | $ 64.11 | $ 8,975.40 |
| C33 | Landscape - Compost | 35 | CY | $ 144.17 | $ 5,045.95 |
| C34 | Landscape - Seeding | 18,000 | SF | $ 0.31 | $ 5,580.00 |
| C35 | Landscape - General Plantings | 1 | LS | $ 6,902.86 | $ 6,902.86 |
| C36 | Signs - Reinstall | 10 | EA | $ 720.02 | $ 7,200.20 |
| C37 | Signs - ADA | 4 | EA | $ 1,022.82 | $ 4,091.28 |
| C38 | Mailbox Reinstall | 1 | $ 1,128.79 | $ 1,128.79 | |
| PROJECT 3 TOTAL | $ 724,879.21 |
TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,299,556.96
| Project 4 Bid Alternate - Restroom Plaza | |||||
| D1 | Mobilization | 1 | LS | $ 3,998.20 | $ 3,998.20 |
| D2 | Survey - Project Stakeout | 1 | LS | $ 8,038.20 | $ 8,038.20 |
| D3 | Erosion Control | 1 | LS | $ 2,793.20 | $ 2,793.20 |
| D4 | Demolition, Clearing and Grubbing | 1 | LS | $ 6,718.63 | $ 6,718.63 |
| D5 | Tree Removal | 8 | EA | $ 1,305.02 | $ 10,440.16 |
| D6 | General Excavation and Earthwork | 1 | LS | $ 7,426.68 | $ 7,426.68 |
| D7 | Rock Excavation (Allowance) | 5 | CY | $ 2,842.15 | $ 14,210.75 |
| D8 | Base Rock or Shoulder Backfill Rock | 40 | TN | $ 201.41 | $ 8,056.40 |
| D9 | Concrete Paving - Type 2 Pedestrian | 1750 | SF | $ 11.99 | $ 20,982.50 |
| D10 | Crushed Rock Paving | 8 | TN | $ 393.03 | $ 3,144.24 |
| D11 | Boulder Placement | 1 | LS | $ 2,118.85 | $ 2,118.85 |
| D12 | Bench Installation (OCFI) | 1 | EA | $ 5,784.55 | $ 5,784.55 |
| D13 | Information Kiosk Installation (OCFI) | 1 | EA | $ 6,748.56 | $ 6,748.56 |
| D14 | Bicycle Racks (OCFI) | 2 | EA | $ 685.73 | $ 1,371.46 |
| D15 | Trash Receptacle (OCFI) | 1 | EA | $ 841.45 | $ 841.45 |
| D16 | Landscape - Amended Topsoil | 20 | CY | $ 154.43 | $ 3,088.60 |
| D17 | Landscape - Compost | 5 | CY | $ 406.84 | $ 2,034.20 |
| D18 | Landscape - Seeding | 2,300 | SF | $ 0.76 | $ 1,748.00 |
| D19 | Landscape - General Plantings | 1 | LS | $ 553.52 | $ 553.52 |
| BID ALTERNATE PROJECT 4 TOTAL | $ 110,098.15 |
TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,409,655.11
Tim Bloom Construction
| Tim Bloom Construction, Inc | |||||
| PO Box 1708 | |||||
| Prineville, OR 97754 | |||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost |
| Project 1 - Rim Rock Trail Improvements | |||||
| BASE BID | |||||
| A1 | Mobilization | 1 | LS | $ 16,300.00 | $ 16,300.00 |
| A2 | Survey - Project Stakeout | 1 | LS | $ 7,200.00 | $ 7,200.00 |
| A3 | Erosion Control | 1 | LS | $ 16,122.00 | $ 16,122.00 |
| A4 | Traffic Control | 1 | LS | $ 750.00 | $ 750.00 |
| A5 | Demolition, Clearing and Grubbing | 1 | LS | $ 16,754.00 | $ 16,754.00 |
| A6 | Tree Removal | 5 | LS | $ 280.00 | $ 1,400.00 |
| A7 | Asphalt Sawcut & Excavation | 3000 | SF | $ 2.51 | $ 7,530.00 |
| A8 | General Excavation and Earthwork | 1 | LS | $ 31,173.00 | $ 31,173.00 |
| A9 | Rock Excavation (Allowance) | 1 | CY | $ 70.00 | $ 70.00 |
| A10 | Base Rock or Shoulder Backfill Rock | 270 | TN | $ 201.00 | $ 54,270.00 |
| A11 | Pavement Markings - Painted Striping | 1 | LS | $ 3,699.00 | $ 3,699.00 |
| A12 | Cast-in-Place Concrete Curb | 26 | LF | $ 46.50 | $ 1,209.00 |
| A13 | Concrete Paving - Type 1 Vehicular | 2400 | SF | $ 13.57 | $ 32,568.00 |
| A14 | Concrete Paving - Type 2 Pedestrian | 755 | SF | $ 10.25 | $ 7,738.75 |
| A15 | Tactile Warning Panel | 1 | EA | $ 1,100.00 | $ 1,100.00 |
| A16 | Crushed Rock Paving | 160 | TN | $ 190.20 | $ 30,432.00 |
| A17 | Precast Concrete Wheel Stops | 7 | EA | $ 175.00 | $ 1,225.00 |
| A18 | Bollard (OFCI) | 1 | EA | $ 705.00 | $ 705.00 |
| A19 | Split Rail Fence | 90 | LF | $ 36.00 | $ 3,240.00 |
| A20 | Stone Faced Wall | 55 | LF | $ 761.00 | $ 41,855.00 |
| A21 | Boulder Placement | 1 | LS | $ 16,330.00 | $ 16,330.00 |
| A22 | Bench Installation (OFCI) | 2 | EA | $ 1,440.00 | $ 2,880.00 |
| A23 | Landscape - Amended Topsoil | 145 | CY | $ 91.71 | $ 13,297.95 |
| A24 | Landscape - Compost | 35 | CY | $ 125.60 | $ 4,396.00 |
| A25 | Landscape - Seeding | 10,000 | SF | $ 0.55 | $ 5,500.00 |
| A26 | Landscape - General - Plantings | 1 | LS | $ 16,240.20 | $ 16,240.20 |
| A27 | Signs - ADA | 7 | EA | $ 878.00 | $ 6,146.00 |
| PROJECT 1 TOTAL | $ 340,130.90 |
| Project 2 - North Rim Rock Trail Extension | |||||
| BASE BID | |||||
| B1 | Mobilization | 1 | LS | $ 9,460.15 | $ 9,460.15 |
| B2 | Survey - Project Stakeout | 1 | LS | $ 4,800.00 | $ 4,800.00 |
| B3 | Erosion Control | 1 | LS | $ 14,820.00 | $ 14,820.00 |
| B4 | Traffic Control | 1 | LS | $ 1,400.00 | $ 1,400.00 |
| B5 | Demolition, Clearing and Grubbing | 1 | LS | $ 21,460.00 | $ 21,460.00 |
| B6 | General Excavation and Earthwork | 1 | LS | $ 21,460.00 | $ 21,460.00 |
| B7 | Rock Excavation (Allowance) | 10 | CY | $ 70.00 | $ 700.00 |
| B8 | Base Rock or Shoulder Backfill Rock | 150 | TN | $ 184.03 | $ 27,604.50 |
| B9 | Crushed Rock Paving | 150 | TN | $ 129.13 | $ 19,369.50 |
| B10 | Split Rail Fence | 90 | LF | $ 36.00 | $ 3,240.00 |
| B11 | Boulder Placement | 1 | LS | $ 31,830.00 | $ 31,830.00 |
| B12 | Salvage Log Placement | 1 | LS | $ 9,180.00 | $ 9,180.00 |
| B13 | Bench Installation (OFCI) | 3 | EA | $ 1,496.00 | $ 4,488.00 |
| B14 | Landscape - Amended Topsoil | 140 | CY | $ 96.45 | $ 13,503.00 |
| B15 | Landscape - Compost | 35 | CY | $ 98.46 | $ 3,446.10 |
| B16 | Landscape - Seeding | 11,000 | SF | $ 0.55 | $ 6,050.00 |
| B17 | Landscape - General Plantings | 1 | LS | $ 14,961.00 | $ 14,961.00 |
| PROJECT 2 TOTAL | $ 207,772.25 |
| Project 3 - Overflow Parking Lot Improvements | |||||
| BASE BID | |||||
| C1 | Mobilization | 1 | LS | $ 26,000.00 | $ 26,000.00 |
| C2 | Survey - Project Stakeout | 1 | LS | $ 9,000.00 | $ 9,000.00 |
| C3 | Erosion Control | 1 | LS | $ 14,824.00 | $ 14,824.00 |
| C4 | Traffic Control | 1 | LS | $ 2,692.00 | $ 2,692.00 |
| C5 | Demolition, Clearing and Grubbing | 1 | LS | $ 62,707.00 | $ 62,707.00 |
| C6 | Tree Removal | 7 | EA | $ 358.00 | $ 2,506.00 |
| C7 | General Excavation and Earthwork | 1 | LS | $ 24,384.00 | $ 24,384.00 |
| C8 | Rock Excavation (Allowance) | 10 | CY | $ 70.00 | $ 700.00 |
| C9 | Base Rock or Shoulder Backfill Rock | 1,300 | TN | $ 48.03 | $ 62,439.00 |
| C10 | Asphalt Paving - Leveling and Wearing Courses | 1,100 | TN | $ 115.70 | $ 127,270.00 |
| C11 | Pavement Markings - Painted Striping | 1 | LS | $ 3,636.00 | $ 3,636.00 |
| C12 | Pavement Markings - Crosswalk | 1 | LS | $ 3,050.00 | $ 3,050.00 |
| C13 | Cast-in-Place Concrete Curb | 150 | LF | $ 38.00 | $ 5,700.00 |
| C14 | Concrete Paving - Type 1 Vehicular | 1,100 | SF | $ 13.38 | $ 14,718.00 |
| C15 | Concrete Paving - Type 2 Pedestrian | 1,500 | SF | $ 10.22 | $ 15,330.00 |
| C16 | Tactile Warning Panel | 6 | EA | $ 1,100.00 | $ 6,600.00 |
| C17 | Crushed Rock Paving | 40 | TN | $ 92.00 | $ 3,680.00 |
| C18 | Precast Concrete Wheel Stops | 104 | EA | $ 175.00 | $ 18,200.00 |
| C19 | Gravity Storm Sewer - 6" | 74 | LF | $ 34.75 | $ 2,571.50 |
| C20 | Gravity Storm Sewer - 8" | 88 | LF | $ 46.30 | $ 4,074.40 |
| C21 | Gravity Storm Sewer - 12" | 69 | LF | $ 100.00 | $ 6,900.00 |
| C22 | Cleanout to Grade | 10 | EA | $ 275.00 | $ 2,750.00 |
| C23 | Outfall | 1 | EA | $ 806.00 | $ 806.00 |
| C24 | Overflow Inlet | 3 | EA | $ 360.00 | $ 1,080.00 |
| C25 | Stormwater Basin | 681 | LF | $ 53.12 | $ 36,174.72 |
| C26 | RESERVED | 0 | N/A | $ - 0 | |
| C27 | Split Rail Fence | 700 | LF | $ 36.00 | $ 25,200.00 |
| C28 | Boulder Placement | 1 | LS | $ 10,600.00 | $ 10,600.00 |
| C29 | Gate Installation (OFCI) | 2 | EA | $ 6,040.00 | $ 12,080.00 |
| C30 | Salvage Gate Reinstall | 1 | EA | $ 700.00 | $ 700.00 |
| C31 | RESERVED | 0 | N/A | $ - 0 | |
| C32 | Landscape - Amended Topsoil | 140 | CY | $ 90.08 | $ 12,611.20 |
| C33 | Landscape - Compost | 35 | CY | $ 98.43 | $ 3,445.05 |
| C34 | Landscape - Seeding | 18,000 | SF | $ 0.45 | $ 8,100.00 |
| C35 | Landscape - General Plantings | 1 | LS | $ 9,840.00 | $ 9,840.00 |
| C36 | Signs - Reinstall | 10 | EA | $ 175.00 | $ 1,750.00 |
| C37 | Signs - ADA | 4 | EA | $ 602.00 | $ 2,408.00 |
| C38 | Mailbox Reinstall | 1 | $ 140.00 | $ 140.00 | |
| PROJECT 3 TOTAL | $ 544,666.87 |
TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,092,570.02
| Project 4 Bid Alternate - Restroom Plaza | |||||
| D1 | Mobilization | 1 | LS | $ 2,700.00 | $ 2,700.00 |
| D2 | Survey - Project Stakeout | 1 | LS | $ 2,400.00 | $ 2,400.00 |
| D3 | Erosion Control | 1 | LS | $ 4,246.00 | $ 4,246.00 |
| D4 | Demolition, Clearing and Grubbing | 1 | LS | $ 2,125.00 | $ 2,125.00 |
| D5 | Tree Removal | 8 | EA | $ 250.00 | $ 2,000.00 |
| D6 | General Excavation and Earthwork | 1 | LS | $ 5,250.00 | $ 5,250.00 |
| D7 | Rock Excavation (Allowance) | 5 | CY | $ 70.00 | $ 350.00 |
| D8 | Base Rock or Shoulder Backfill Rock | 40 | TN | $ 125.70 | $ 5,028.00 |
| D9 | Concrete Paving - Type 2 Pedestrian | 1750 | SF | $ 10.20 | $ 17,850.00 |
| D10 | Crushed Rock Paving | 8 | TN | $ 137.50 | $ 1,100.00 |
| D11 | Boulder Placement | 1 | LS | $ 722.50 | $ 722.50 |
| D12 | Bench Installation (OCFI) | 1 | EA | $ 940.00 | $ 940.00 |
| D13 | Information Kiosk Installation (OCFI) | 1 | EA | $ 2,290.00 | $ 2,290.00 |
| D14 | Bicycle Racks (OCFI) | 2 | EA | $ 500.00 | $ 1,000.00 |
| D15 | Trash Receptacle (OCFI) | 1 | EA | $ 285.00 | $ 285.00 |
| D16 | Landscape - Amended Topsoil | 20 | CY | $ 100.40 | $ 2,008.00 |
| D17 | Landscape - Compost | 5 | CY | $ 182.80 | $ 914.00 |
| D18 | Landscape - Seeding | 2,300 | SF | $ 0.85 | $ 1,955.00 |
| D19 | Landscape - General Plantings | 1 | LS | $ 3,793.00 | $ 3,793.00 |
| BID ALTERNATE PROJECT 4 TOTAL | $ 56,956.50 |
TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,149,526.52
Deschutes Construction Corp
| Deschutes Construction Corp | |||||
| 494 SW Veterans Way Ste 5 | |||||
| Redmond, OR 97756 | |||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost |
| Project 1 - Rim Rock Trail Improvements | |||||
| BASE BID | |||||
| A1 | Mobilization | 1 | LS | $ 11,503.25 | $ 11,503.25 |
| A2 | Survey - Project Stakeout | 1 | LS | $ 2,725.00 | $ 2,725.00 |
| A3 | Erosion Control | 1 | LS | $ 13,763.23 | $ 13,763.23 |
| A4 | Traffic Control | 1 | LS | $ 1,860.00 | $ 1,860.00 |
| A5 | Demolition, Clearing and Grubbing | 1 | LS | $ 23,013.52 | $ 23,013.52 |
| A6 | Tree Removal | 5 | LS | $ 370.83 | $ 1,854.15 |
| A7 | Asphalt Sawcut & Excavation | 3000 | SF | $ 1.06 | $ 3,180.00 |
| A8 | General Excavation and Earthwork | 1 | LS | $ 24,347.93 | $ 24,347.93 |
| A9 | Rock Excavation (Allowance) | 1 | CY | $ 1,265.43 | $ 1,265.43 |
| A10 | Base Rock or Shoulder Backfill Rock | 270 | TN | $ 54.41 | $ 14,690.70 |
| A11 | Pavement Markings - Painted Striping | 1 | LS | $ 5,232.00 | $ 5,232.00 |
| A12 | Cast-in-Place Concrete Curb | 26 | LF | $ 40.00 | $ 1,040.00 |
| A13 | Concrete Paving - Type 1 Vehicular | 2400 | SF | $ 12.00 | $ 28,800.00 |
| A14 | Concrete Paving - Type 2 Pedestrian | 755 | SF | $ 10.00 | $ 7,550.00 |
| A15 | Tactile Warning Panel | 1 | EA | $ 2,670.50 | $ 2,670.50 |
| A16 | Crushed Rock Paving | 160 | TN | $ 151.45 | $ 24,232.00 |
| A17 | Precast Concrete Wheel Stops | 7 | EA | $ 256.15 | $ 1,793.05 |
| A18 | Bollard (OFCI) | 1 | EA | $ 1,090.00 | $ 1,090.00 |
| A19 | Split Rail Fence | 90 | LF | $ 99.91 | $ 8,991.90 |
| A20 | Stone Faced Wall | 55 | LF | $ 364.59 | $ 20,052.45 |
| A21 | Boulder Placement | 1 | LS | $ 9,105.02 | $ 9,105.02 |
| A22 | Bench Installation (OFCI) | 2 | EA | $ 3,204.43 | $ 6,408.86 |
| A23 | Landscape - Amended Topsoil | 145 | CY | $ 92.65 | $ 13,434.25 |
| A24 | Landscape - Compost | 35 | CY | $ 92.65 | $ 3,242.75 |
| A25 | Landscape - Seeding | 10,000 | SF | $ 0.55 | $ 5,500.00 |
| A26 | Landscape - General - Plantings | 1 | LS | $ 6,530.77 | $ 6,530.77 |
| A27 | Signs - ADA | 7 | EA | $ 609.74 | $ 4,268.18 |
| PROJECT 1 TOTAL | $ 248,144.94 |
| Project 2 - North Rim Rock Trail Extension | |||||
| BASE BID | |||||
| B1 | Mobilization | 1 | LS | $ 12,622.37 | $ 12,622.37 |
| B2 | Survey - Project Stakeout | 1 | LS | $ 2,725.00 | $ 2,725.00 |
| B3 | Erosion Control | 1 | LS | $ 16,103.41 | $ 16,103.41 |
| B4 | Traffic Control | 1 | LS | $ 1,860.00 | $ 1,860.00 |
| B5 | Demolition, Clearing and Grubbing | 1 | LS | $ 19,625.94 | $ 19,625.94 |
| B6 | General Excavation and Earthwork | 1 | LS | $ 21,183.97 | $ 21,183.97 |
| B7 | Rock Excavation (Allowance) | 10 | CY | $ 126.54 | $ 1,265.40 |
| B8 | Base Rock or Shoulder Backfill Rock | 150 | TN | $ 50.63 | $ 7,594.50 |
| B9 | Crushed Rock Paving | 150 | TN | $ 142.96 | $ 21,444.00 |
| B10 | Split Rail Fence | 90 | LF | $ 76.18 | $ 6,856.20 |
| B11 | Boulder Placement | 1 | LS | $ 42,210.21 | $ 42,210.21 |
| B12 | Salvage Log Placement | 1 | LS | $ 5,300.20 | $ 5,300.20 |
| B13 | Bench Installation (OFCI) | 3 | EA | $ 2,401.31 | $ 7,203.93 |
| B14 | Landscape - Amended Topsoil | 140 | CY | $ 92.65 | $ 12,971.00 |
| B15 | Landscape - Compost | 35 | CY | $ 92.65 | $ 3,242.75 |
| B16 | Landscape - Seeding | 11,000 | SF | $ 0.55 | $ 6,050.00 |
| B17 | Landscape - General Plantings | 1 | LS | $ 15,154.42 | $ 15,154.42 |
| PROJECT 2 TOTAL | $ 203,413.30 |
| Project 3 - Overflow Parking Lot Improvements | |||||
| BASE BID | |||||
| C1 | Mobilization | 1 | LS | $ 13,461.72 | $ 13,461.72 |
| C2 | Survey - Project Stakeout | 1 | LS | $ 5,450.00 | $ 5,450.00 |
| C3 | Erosion Control | 1 | LS | $ 25,245.14 | $ 25,245.14 |
| C4 | Traffic Control | 1 | LS | $ 1,860.00 | $ 1,860.00 |
| C5 | Demolition, Clearing and Grubbing | 1 | LS | $ 39,538.60 | $ 39,538.60 |
| C6 | Tree Removal | 7 | EA | $ 370.83 | $ 2,595.81 |
| C7 | General Excavation and Earthwork | 1 | LS | $ 76,366.72 | $ 76,366.72 |
| C8 | Rock Excavation (Allowance) | 10 | CY | $ 126.54 | $ 1,265.40 |
| C9 | Base Rock or Shoulder Backfill Rock | 1,300 | TN | $ 52.59 | $ 68,367.00 |
| C10 | Asphalt Paving - Leveling and Wearing Courses | 1,100 | TN | $ 126.09 | $ 138,699.00 |
| C11 | Pavement Markings - Painted Striping | 1 | LS | $ 7,922.12 | $ 7,922.12 |
| C12 | Pavement Markings - Crosswalk | 1 | LS | $ 941.76 | $ 941.76 |
| C13 | Cast-in-Place Concrete Curb | 150 | LF | $ 40.00 | $ 6,000.00 |
| C14 | Concrete Paving - Type 1 Vehicular | 1,100 | SF | $ 12.00 | $ 13,200.00 |
| C15 | Concrete Paving - Type 2 Pedestrian | 1,500 | SF | $ 10.00 | $ 15,000.00 |
| C16 | Tactile Warning Panel | 6 | EA | $ 63.58 | $ 381.48 |
| C17 | Crushed Rock Paving | 40 | TN | $ 138.30 | $ 5,532.00 |
| C18 | Precast Concrete Wheel Stops | 104 | EA | $ 256.15 | $ 26,639.60 |
| C19 | Gravity Storm Sewer - 6" | 74 | LF | $ 96.12 | $ 7,112.88 |
| C20 | Gravity Storm Sewer - 8" | 88 | LF | $ 98.52 | $ 8,669.76 |
| C21 | Gravity Storm Sewer - 12" | 69 | LF | $ 103.57 | $ 7,146.33 |
| C22 | Cleanout to Grade | 10 | EA | $ 2,748.39 | $ 27,483.90 |
| C23 | Outfall | 1 | EA | $ 1,131.15 | $ 1,131.15 |
| C24 | Overflow Inlet | 3 | EA | $ 1,943.57 | $ 5,830.71 |
| C25 | Stormwater Basin | 681 | LF | $ 115.64 | $ 78,750.84 |
| C26 | RESERVED | 0 | N/A | $ - 0 | |
| C27 | Split Rail Fence | 700 | LF | $ 56.45 | $ 39,515.00 |
| C28 | Boulder Placement | 1 | LS | $ 26,250.01 | $ 26,250.01 |
| C29 | Gate Installation (OFCI) | 2 | EA | $ 6,408.87 | $ 12,817.74 |
| C30 | Salvage Gate Reinstall | 1 | EA | $ 6,408.87 | $ 6,408.87 |
| C31 | RESERVED | 0 | N/A | $ - 0 | |
| C32 | Landscape - Amended Topsoil | 140 | CY | $ 92.65 | $ 12,971.00 |
| C33 | Landscape - Compost | 35 | CY | $ 92.65 | $ 3,242.75 |
| C34 | Landscape - Seeding | 18,000 | SF | $ 0.55 | $ 9,900.00 |
| C35 | Landscape - General Plantings | 1 | LS | $ 4,078.68 | $ 4,078.68 |
| C36 | Signs - Reinstall | 10 | EA | $ 699.32 | $ 6,993.20 |
| C37 | Signs - ADA | 4 | EA | $ 998.16 | $ 3,992.64 |
| C38 | Mailbox Reinstall | 1 | $ 794.90 | $ 794.90 | |
| PROJECT 3 TOTAL | $ 711,556.71 |
TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,163,114.95
| Project 4 Bid Alternate - Restroom Plaza | |||||
| D1 | Mobilization | 1 | LS | $ 9,773.81 | $ 9,773.81 |
| D2 | Survey - Project Stakeout | 1 | LS | $ 1,635.00 | $ 1,635.00 |
| D3 | Erosion Control | 1 | LS | $ 3,200.00 | $ 3,200.00 |
| D4 | Demolition, Clearing and Grubbing | 1 | LS | $ 4,772.23 | $ 4,772.23 |
| D5 | Tree Removal | 8 | EA | $ 370.83 | $ 2,966.64 |
| D6 | General Excavation and Earthwork | 1 | LS | $ 3,308.86 | $ 3,308.86 |
| D7 | Rock Excavation (Allowance) | 5 | CY | $ 126.54 | $ 632.70 |
| D8 | Base Rock or Shoulder Backfill Rock | 40 | TN | $ 59.12 | $ 2,364.80 |
| D9 | Concrete Paving - Type 2 Pedestrian | 1750 | SF | $ 10.90 | $ 19,075.00 |
| D10 | Crushed Rock Paving | 8 | TN | $ 293.93 | $ 2,351.44 |
| D11 | Boulder Placement | 1 | LS | $ 2,270.57 | $ 2,270.57 |
| D12 | Bench Installation (OCFI) | 1 | EA | $ 3,632.23 | $ 3,632.23 |
| D13 | Information Kiosk Installation (OCFI) | 1 | EA | $ 6,408.87 | $ 6,408.87 |
| D14 | Bicycle Racks (OCFI) | 2 | EA | $ 1,816.12 | $ 3,632.24 |
| D15 | Trash Receptacle (OCFI) | 1 | EA | $ 1,966.25 | $ 1,966.25 |
| D16 | Landscape - Amended Topsoil | 20 | CY | $ 92.65 | $ 1,853.00 |
| D17 | Landscape - Compost | 5 | CY | $ 92.65 | $ 463.25 |
| D18 | Landscape - Seeding | 2,300 | SF | $ 0.55 | $ 1,265.00 |
| D19 | Landscape - General Plantings | 1 | LS | $ 4,746.77 | $ 4,746.77 |
| BID ALTERNATE PROJECT 4 TOTAL | $ 76,318.66 |
TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,239,433.61
Forge Civil LLC
| Forge Civil LLC | |||||
| 11421 NE 149 ST | |||||
| Brush Prairie, WA 98606 | |||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost |
| Project 1 - Rim Rock Trail Improvements | |||||
| BASE BID | |||||
| A1 | Mobilization | 1 | LS | $ 58,000.00 | $ 58,000.00 |
| A2 | Survey - Project Stakeout | 1 | LS | $ 12,000.00 | $ 12,000.00 |
| A3 | Erosion Control | 1 | LS | $ 13,000.00 | $ 13,000.00 |
| A4 | Traffic Control | 1 | LS | $ 3,000.00 | $ 3,000.00 |
| A5 | Demolition, Clearing and Grubbing | 1 | LS | $ 36,000.00 | $ 36,000.00 |
| A6 | Tree Removal | 5 | LS | $ 900.00 | $ 4,500.00 |
| A7 | Asphalt Sawcut & Excavation | 3000 | SF | $ 5.00 | $ 15,000.00 |
| A8 | General Excavation and Earthwork | 1 | LS | $ 29,000.00 | $ 29,000.00 |
| A9 | Rock Excavation (Allowance) | 1 | CY | $ 500.00 | $ 500.00 |
| A10 | Base Rock or Shoulder Backfill Rock | 270 | TN | $ 100.00 | $ 27,000.00 |
| A11 | Pavement Markings - Painted Striping | 1 | LS | $ 5,000.00 | $ 5,000.00 |
| A12 | Cast-in-Place Concrete Curb | 26 | LF | $ 18.00 | $ 468.00 |
| A13 | Concrete Paving - Type 1 Vehicular | 2400 | SF | $ 12.00 | $ 28,800.00 |
| A14 | Concrete Paving - Type 2 Pedestrian | 755 | SF | $ 11.00 | $ 8,305.00 |
| A15 | Tactile Warning Panel | 1 | EA | $ 500.00 | $ 500.00 |
| A16 | Crushed Rock Paving | 160 | TN | $ 100.00 | $ 16,000.00 |
| A17 | Precast Concrete Wheel Stops | 7 | EA | $ 250.00 | $ 1,750.00 |
| A18 | Bollard (OFCI) | 1 | EA | $ 500.00 | $ 500.00 |
| A19 | Split Rail Fence | 90 | LF | $ 72.00 | $ 6,480.00 |
| A20 | Stone Faced Wall | 55 | LF | $ 650.00 | $ 35,750.00 |
| A21 | Boulder Placement | 1 | LS | $ 37,000.00 | $ 37,000.00 |
| A22 | Bench Installation (OFCI) | 2 | EA | $ 500.00 | $ 1,000.00 |
| A23 | Landscape - Amended Topsoil | 145 | CY | $ 165.00 | $ 23,925.00 |
| A24 | Landscape - Compost | 35 | CY | $ 167.00 | $ 5,845.00 |
| A25 | Landscape - Seeding | 10,000 | SF | $ 0.50 | $ 5,000.00 |
| A26 | Landscape - General - Plantings | 1 | LS | $ 37,000.00 | $ 37,000.00 |
| A27 | Signs - ADA | 7 | EA | $ 800.00 | $ 5,600.00 |
| PROJECT 1 TOTAL | $ 416,923.00 |
| Project 2 - North Rim Rock Trail Extension | |||||
| BASE BID | |||||
| B1 | Mobilization | 1 | LS | $ 31,000.00 | $ 31,000.00 |
| B2 | Survey - Project Stakeout | 1 | LS | $ 6,000.00 | $ 6,000.00 |
| B3 | Erosion Control | 1 | LS | $ 5,000.00 | $ 5,000.00 |
| B4 | Traffic Control | 1 | LS | $ 2,500.00 | $ 2,500.00 |
| B5 | Demolition, Clearing and Grubbing | 1 | LS | $ 17,000.00 | $ 17,000.00 |
| B6 | General Excavation and Earthwork | 1 | LS | $ 15,000.00 | $ 15,000.00 |
| B7 | Rock Excavation (Allowance) | 10 | CY | $ 500.00 | $ 5,000.00 |
| B8 | Base Rock or Shoulder Backfill Rock | 150 | TN | $ 100.00 | $ 15,000.00 |
| B9 | Crushed Rock Paving | 150 | TN | $ 100.00 | $ 15,000.00 |
| B10 | Split Rail Fence | 90 | LF | $ 72.00 | $ 6,480.00 |
| B11 | Boulder Placement | 1 | LS | $ 37,000.00 | $ 37,000.00 |
| B12 | Salvage Log Placement | 1 | LS | $ 14,000.00 | $ 14,000.00 |
| B13 | Bench Installation (OFCI) | 3 | EA | $ 500.00 | $ 1,500.00 |
| B14 | Landscape - Amended Topsoil | 140 | CY | $ 165.00 | $ 23,100.00 |
| B15 | Landscape - Compost | 35 | CY | $ 167.00 | $ 5,845.00 |
| B16 | Landscape - Seeding | 11,000 | SF | $ 0.50 | $ 5,500.00 |
| B17 | Landscape - General Plantings | 1 | LS | $ 18,000.00 | $ 18,000.00 |
| PROJECT 2 TOTAL | $ 222,925.00 |
| Project 3 - Overflow Parking Lot Improvements | |||||
| BASE BID | |||||
| C1 | Mobilization | 1 | LS | $ 122,000.00 | $ 122,000.00 |
| C2 | Survey - Project Stakeout | 1 | LS | $ 10,000.00 | $ 10,000.00 |
| C3 | Erosion Control | 1 | LS | $ 14,000.00 | $ 14,000.00 |
| C4 | Traffic Control | 1 | LS | $ 6,000.00 | $ 6,000.00 |
| C5 | Demolition, Clearing and Grubbing | 1 | LS | $ 17,000.00 | $ 17,000.00 |
| C6 | Tree Removal | 7 | EA | $ 900.00 | $ 6,300.00 |
| C7 | General Excavation and Earthwork | 1 | LS | $ 47,000.00 | $ 47,000.00 |
| C8 | Rock Excavation (Allowance) | 10 | CY | $ 500.00 | $ 5,000.00 |
| C9 | Base Rock or Shoulder Backfill Rock | 1,300 | TN | $ 100.00 | $ 130,000.00 |
| C10 | Asphalt Paving - Leveling and Wearing Courses | 1,100 | TN | $ 180.00 | $ 198,000.00 |
| C11 | Pavement Markings - Painted Striping | 1 | LS | $ 7,000.00 | $ 7,000.00 |
| C12 | Pavement Markings - Crosswalk | 1 | LS | $ 2,000.00 | $ 2,000.00 |
| C13 | Cast-in-Place Concrete Curb | 150 | LF | $ 18.00 | $ 2,700.00 |
| C14 | Concrete Paving - Type 1 Vehicular | 1,100 | SF | $ 12.00 | $ 13,200.00 |
| C15 | Concrete Paving - Type 2 Pedestrian | 1,500 | SF | $ 11.00 | $ 16,500.00 |
| C16 | Tactile Warning Panel | 6 | EA | $ 500.00 | $ 3,000.00 |
| C17 | Crushed Rock Paving | 40 | TN | $ 100.00 | $ 4,000.00 |
| C18 | Precast Concrete Wheel Stops | 104 | EA | $ 250.00 | $ 26,000.00 |
| C19 | Gravity Storm Sewer - 6" | 74 | LF | $ 70.00 | $ 5,180.00 |
| C20 | Gravity Storm Sewer - 8" | 88 | LF | $ 110.00 | $ 9,680.00 |
| C21 | Gravity Storm Sewer - 12" | 69 | LF | $ 115.00 | $ 7,935.00 |
| C22 | Cleanout to Grade | 10 | EA | $ 250.00 | $ 2,500.00 |
| C23 | Outfall | 1 | EA | $ 4,500.00 | $ 4,500.00 |
| C24 | Overflow Inlet | 3 | EA | $ 8,000.00 | $ 24,000.00 |
| C25 | Stormwater Basin | 681 | LF | $ 60.00 | $ 40,860.00 |
| C26 | RESERVED | 0 | N/A | $ - 0 | |
| C27 | Split Rail Fence | 700 | LF | $ 72.00 | $ 50,400.00 |
| C28 | Boulder Placement | 1 | LS | $ 30,000.00 | $ 30,000.00 |
| C29 | Gate Installation (OFCI) | 2 | EA | $ 3,000.00 | $ 6,000.00 |
| C30 | Salvage Gate Reinstall | 1 | EA | $ 2,000.00 | $ 2,000.00 |
| C31 | RESERVED | 0 | N/A | $ - 0 | |
| C32 | Landscape - Amended Topsoil | 140 | CY | $ 165.00 | $ 23,100.00 |
| C33 | Landscape - Compost | 35 | CY | $ 167.00 | $ 5,845.00 |
| C34 | Landscape - Seeding | 18,000 | SF | $ 0.50 | $ 9,000.00 |
| C35 | Landscape - General Plantings | 1 | LS | $ 14,000.00 | $ 14,000.00 |
| C36 | Signs - Reinstall | 10 | EA | $ 500.00 | $ 5,000.00 |
| C37 | Signs - ADA | 4 | EA | $ 1,000.00 | $ 4,000.00 |
| C38 | Mailbox Reinstall | 1 | $ 1,000.00 | $ 1,000.00 | |
| PROJECT 3 TOTAL | $ 874,700.00 |
TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,514,548.00
| Project 4 Bid Alternate - Restroom Plaza | |||||
| D1 | Mobilization | 1 | LS | $ 5,000.00 | $ 5,000.00 |
| D2 | Survey - Project Stakeout | 1 | LS | $ 4,000.00 | $ 4,000.00 |
| D3 | Erosion Control | 1 | LS | $ 500.00 | $ 500.00 |
| D4 | Demolition, Clearing and Grubbing | 1 | LS | $ 2,000.00 | $ 2,000.00 |
| D5 | Tree Removal | 8 | EA | $ 600.00 | $ 4,800.00 |
| D6 | General Excavation and Earthwork | 1 | LS | $ 6,500.00 | $ 6,500.00 |
| D7 | Rock Excavation (Allowance) | 5 | CY | $ 400.00 | $ 2,000.00 |
| D8 | Base Rock or Shoulder Backfill Rock | 40 | TN | $ 100.00 | $ 4,000.00 |
| D9 | Concrete Paving - Type 2 Pedestrian | 1750 | SF | $ 1.00 | $ 1,750.00 |
| D10 | Crushed Rock Paving | 8 | TN | $ 110.00 | $ 880.00 |
| D11 | Boulder Placement | 1 | LS | $ 2,000.00 | $ 2,000.00 |
| D12 | Bench Installation (OCFI) | 1 | EA | $ 500.00 | $ 500.00 |
| D13 | Information Kiosk Installation (OCFI) | 1 | EA | $ 5,000.00 | $ 5,000.00 |
| D14 | Bicycle Racks (OCFI) | 2 | EA | $ 1,000.00 | $ 2,000.00 |
| D15 | Trash Receptacle (OCFI) | 1 | EA | $ 500.00 | $ 500.00 |
| D16 | Landscape - Amended Topsoil | 20 | CY | $ 165.00 | $ 3,300.00 |
| D17 | Landscape - Compost | 5 | CY | $ 167.00 | $ 835.00 |
| D18 | Landscape - Seeding | 2,300 | SF | $ 0.50 | $ 1,150.00 |
| D19 | Landscape - General Plantings | 1 | LS | $ 2,000.00 | $ 2,000.00 |
| BID ALTERNATE PROJECT 4 TOTAL | $ 48,715.00 |
TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,563,263.00
Rickabaugh Construction
| Rickabaugh Construction | |||||
| 3480 SW Empire Drive | |||||
| Prineville Oregon | |||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost |
| Project 1 - Rim Rock Trail Improvements | |||||
| BASE BID | |||||
| A1 | Mobilization | 1 | LS | $ 15,798.00 | $ 15,798.00 |
| A2 | Survey - Project Stakeout | 1 | LS | $ 10,487.00 | $ 10,487.00 |
| A3 | Erosion Control | 1 | LS | $ 8,434.00 | $ 8,434.00 |
| A4 | Traffic Control | 1 | LS | $ 1,393.00 | $ 1,393.00 |
| A5 | Demolition, Clearing and Grubbing | 1 | LS | $ 8,519.00 | $ 8,519.00 |
| A6 | Tree Removal | 5 | LS | $ 44.00 | $ 220.00 |
| A7 | Asphalt Sawcut & Excavation | 3000 | SF | $ 0.50 | $ 1,500.00 |
| A8 | General Excavation and Earthwork | 1 | LS | $ 12,948.00 | $ 12,948.00 |
| A9 | Rock Excavation (Allowance) | 1 | CY | $ 95.00 | $ 95.00 |
| A10 | Base Rock or Shoulder Backfill Rock | 270 | TN | $ 77.25 | $ 20,857.50 |
| A11 | Pavement Markings - Painted Striping | 1 | LS | $ 5,298.00 | $ 5,298.00 |
| A12 | Cast-in-Place Concrete Curb | 26 | LF | $ 34.45 | $ 895.70 |
| A13 | Concrete Paving - Type 1 Vehicular | 2400 | SF | $ 11.30 | $ 27,120.00 |
| A14 | Concrete Paving - Type 2 Pedestrian | 755 | SF | $ 8.45 | $ 6,379.75 |
| A15 | Tactile Warning Panel | 1 | EA | $ 1,420.00 | $ 1,420.00 |
| A16 | Crushed Rock Paving | 160 | TN | $ 115.00 | $ 18,400.00 |
| A17 | Precast Concrete Wheel Stops | 7 | EA | $ 122.00 | $ 854.00 |
| A18 | Bollard (OFCI) | 1 | EA | $ 214.00 | $ 214.00 |
| A19 | Split Rail Fence | 90 | LF | $ 29.00 | $ 2,610.00 |
| A20 | Stone Faced Wall | 55 | LF | $ 812.75 | $ 44,701.25 |
| A21 | Boulder Placement | 1 | LS | $ 3,016.00 | $ 3,016.00 |
| A22 | Bench Installation (OFCI) | 2 | EA | $ 105.00 | $ 210.00 |
| A23 | Landscape - Amended Topsoil | 145 | CY | $ 91.50 | $ 13,267.50 |
| A24 | Landscape - Compost | 35 | CY | $ 103.75 | $ 3,631.25 |
| A25 | Landscape - Seeding | 10,000 | SF | $ 0.35 | $ 3,500.00 |
| A26 | Landscape - General - Plantings | 1 | LS | $ 17,077.05 | $ 17,077.05 |
| A27 | Signs - ADA | 7 | EA | $ 297.00 | $ 2,079.00 |
| PROJECT 1 TOTAL | $ 230,925.00 |
| Project 2 - North Rim Rock Trail Extension | |||||
| BASE BID | |||||
| B1 | Mobilization | 1 | LS | $ 11,321.00 | $ 11,321.00 |
| B2 | Survey - Project Stakeout | 1 | LS | $ 10,487.00 | $ 10,487.00 |
| B3 | Erosion Control | 1 | LS | $ 5,850.00 | $ 5,850.00 |
| B4 | Traffic Control | 1 | LS | $ 892.00 | $ 892.00 |
| B5 | Demolition, Clearing and Grubbing | 1 | LS | $ 6,660.00 | $ 6,660.00 |
| B6 | General Excavation and Earthwork | 1 | LS | $ 9,591.00 | $ 9,591.00 |
| B7 | Rock Excavation (Allowance) | 10 | CY | $ 95.00 | $ 950.00 |
| B8 | Base Rock or Shoulder Backfill Rock | 150 | TN | $ 108.00 | $ 16,200.00 |
| B9 | Crushed Rock Paving | 150 | TN | $ 114.00 | $ 17,100.00 |
| B10 | Split Rail Fence | 90 | LF | $ 29.00 | $ 2,610.00 |
| B11 | Boulder Placement | 1 | LS | $ 8,493.00 | $ 8,493.00 |
| B12 | Salvage Log Placement | 1 | LS | $ 298.00 | $ 298.00 |
| B13 | Bench Installation (OFCI) | 3 | EA | $ 105.00 | $ 315.00 |
| B14 | Landscape - Amended Topsoil | 140 | CY | $ 91.50 | $ 12,810.00 |
| B15 | Landscape - Compost | 35 | CY | $ 103.75 | $ 3,631.25 |
| B16 | Landscape - Seeding | 11,000 | SF | $ 0.35 | $ 3,850.00 |
| B17 | Landscape - General Plantings | 1 | LS | $ 34,608.75 | $ 34,608.75 |
| PROJECT 2 TOTAL | $ 145,667.00 |
| Project 3 - Overflow Parking Lot Improvements | |||||
| BASE BID | |||||
| C1 | Mobilization | 1 | LS | $ 26,833.00 | $ 26,833.00 |
| C2 | Survey - Project Stakeout | 1 | LS | $ 14,902.00 | $ 14,902.00 |
| C3 | Erosion Control | 1 | LS | $ 4,411.00 | $ 4,411.00 |
| C4 | Traffic Control | 1 | LS | $ 1,393.00 | $ 1,393.00 |
| C5 | Demolition, Clearing and Grubbing | 1 | LS | $ 5,886.00 | $ 5,886.00 |
| C6 | Tree Removal | 7 | EA | $ 44.00 | $ 308.00 |
| C7 | General Excavation and Earthwork | 1 | LS | $ 14,910.00 | $ 14,910.00 |
| C8 | Rock Excavation (Allowance) | 10 | CY | $ 95.00 | $ 950.00 |
| C9 | Base Rock or Shoulder Backfill Rock | 1,300 | TN | $ 40.80 | $ 53,040.00 |
| C10 | Asphalt Paving - Leveling and Wearing Courses | 1,100 | TN | $ 126.95 | $ 139,645.00 |
| C11 | Pavement Markings - Painted Striping | 1 | LS | $ 8,023.00 | $ 8,023.00 |
| C12 | Pavement Markings - Crosswalk | 1 | LS | $ 953.00 | $ 953.00 |
| C13 | Cast-in-Place Concrete Curb | 150 | LF | $ 25.55 | $ 3,832.50 |
| C14 | Concrete Paving - Type 1 Vehicular | 1,100 | SF | $ 11.15 | $ 12,265.00 |
| C15 | Concrete Paving - Type 2 Pedestrian | 1,500 | SF | $ 8.95 | $ 13,425.00 |
| C16 | Tactile Warning Panel | 6 | EA | $ 1,420.00 | $ 8,520.00 |
| C17 | Crushed Rock Paving | 40 | TN | $ 91.00 | $ 3,640.00 |
| C18 | Precast Concrete Wheel Stops | 104 | EA | $ 124.00 | $ 12,896.00 |
| C19 | Gravity Storm Sewer - 6" | 74 | LF | $ 47.00 | $ 3,478.00 |
| C20 | Gravity Storm Sewer - 8" | 88 | LF | $ 65.00 | $ 5,720.00 |
| C21 | Gravity Storm Sewer - 12" | 69 | LF | $ 118.00 | $ 8,142.00 |
| C22 | Cleanout to Grade | 10 | EA | $ 481.00 | $ 4,810.00 |
| C23 | Outfall | 1 | EA | $ 296.00 | $ 296.00 |
| C24 | Overflow Inlet | 3 | EA | $ 494.00 | $ 1,482.00 |
| C25 | Stormwater Basin | 681 | LF | $ 68.00 | $ 46,308.00 |
| C26 | RESERVED | 0 | N/A | $ - 0 | |
| C27 | Split Rail Fence | 700 | LF | $ 29.00 | $ 20,300.00 |
| C28 | Boulder Placement | 1 | LS | $ 5,116.00 | $ 5,116.00 |
| C29 | Gate Installation (OFCI) | 2 | EA | $ 1,652.00 | $ 3,304.00 |
| C30 | Salvage Gate Reinstall | 1 | EA | $ 1,652.00 | $ 1,652.00 |
| C31 | RESERVED | 0 | N/A | $ - 0 | |
| C32 | Landscape - Amended Topsoil | 140 | CY | $ 91.50 | $ 12,810.00 |
| C33 | Landscape - Compost | 35 | CY | $ 103.75 | $ 3,631.25 |
| C34 | Landscape - Seeding | 18,000 | SF | $ 0.35 | $ 6,300.00 |
| C35 | Landscape - General Plantings | 1 | LS | $ 34,884.25 | $ 34,884.25 |
| C36 | Signs - Reinstall | 10 | EA | $ 132.00 | $ 1,320.00 |
| C37 | Signs - ADA | 4 | EA | $ 297.00 | $ 1,188.00 |
| C38 | Mailbox Reinstall | 1 | $ 115.00 | $ 115.00 | |
| PROJECT 3 TOTAL | $ 486,689.00 |
TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 863,281.00
| Project 4 Bid Alternate - Restroom Plaza | |||||
| D1 | Mobilization | 1 | LS | $ 7,733.00 | $ 7,733.00 |
| D2 | Survey - Project Stakeout | 1 | LS | $ 2,759.00 | $ 2,759.00 |
| D3 | Erosion Control | 1 | LS | $ 992.00 | $ 992.00 |
| D4 | Demolition, Clearing and Grubbing | 1 | LS | $ 926.00 | $ 926.00 |
| D5 | Tree Removal | 8 | EA | $ 70.00 | $ 560.00 |
| D6 | General Excavation and Earthwork | 1 | LS | $ 2,404.00 | $ 2,404.00 |
| D7 | Rock Excavation (Allowance) | 5 | CY | $ 95.00 | $ 475.00 |
| D8 | Base Rock or Shoulder Backfill Rock | 40 | TN | $ 71.00 | $ 2,840.00 |
| D9 | Concrete Paving - Type 2 Pedestrian | 1750 | SF | $ 7.10 | $ 12,425.00 |
| D10 | Crushed Rock Paving | 8 | TN | $ 89.70 | $ 717.60 |
| D11 | Boulder Placement | 1 | LS | $ 479.00 | $ 479.00 |
| D12 | Bench Installation (OCFI) | 1 | EA | $ 106.00 | $ 106.00 |
| D13 | Information Kiosk Installation (OCFI) | 1 | EA | $ 514.00 | $ 514.00 |
| D14 | Bicycle Racks (OCFI) | 2 | EA | $ 138.00 | $ 276.00 |
| D15 | Trash Receptacle (OCFI) | 1 | EA | $ 138.00 | $ 138.00 |
| D16 | Landscape - Amended Topsoil | 20 | CY | $ 90.50 | $ 1,810.00 |
| D17 | Landscape - Compost | 5 | CY | $ 110.00 | $ 550.00 |
| D18 | Landscape - Seeding | 2,300 | SF | $ 0.35 | $ 805.00 |
| D19 | Landscape - General Plantings | 1 | LS | $ 165.40 | $ 165.40 |
| BID ALTERNATE PROJECT 4 TOTAL | $ 36,675.00 |
TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 899,956.00
Cascade Civil
| Cascade Civil Corp | |||||
| 255 SE Black Butte Blvd | |||||
| Redmond, OR 97756 | |||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost |
| Project 1 - Rim Rock Trail Improvements | |||||
| BASE BID | |||||
| A1 | Mobilization | 1 | LS | $ 35,000.00 | $ 35,000.00 |
| A2 | Survey - Project Stakeout | 1 | LS | $ 9,000.00 | $ 9,000.00 |
| A3 | Erosion Control | 1 | LS | $ 8,000.00 | $ 8,000.00 |
| A4 | Traffic Control | 1 | LS | $ 3,300.00 | $ 3,300.00 |
| A5 | Demolition, Clearing and Grubbing | 1 | LS | $ 25,000.00 | $ 25,000.00 |
| A6 | Tree Removal | 5 | LS | $ 1,200.00 | $ 6,000.00 |
| A7 | Asphalt Sawcut & Excavation | 3000 | SF | $ 3.00 | $ 9,000.00 |
| A8 | General Excavation and Earthwork | 1 | LS | $ 31,200.00 | $ 31,200.00 |
| A9 | Rock Excavation (Allowance) | 1 | CY | $ 300.00 | $ 300.00 |
| A10 | Base Rock or Shoulder Backfill Rock | 270 | TN | $ 85.00 | $ 22,950.00 |
| A11 | Pavement Markings - Painted Striping | 1 | LS | $ 1,200.00 | $ 1,200.00 |
| A12 | Cast-in-Place Concrete Curb | 26 | LF | $ 65.00 | $ 1,690.00 |
| A13 | Concrete Paving - Type 1 Vehicular | 2400 | SF | $ 11.00 | $ 26,400.00 |
| A14 | Concrete Paving - Type 2 Pedestrian | 755 | SF | $ 9.00 | $ 6,795.00 |
| A15 | Tactile Warning Panel | 1 | EA | $ 1,100.00 | $ 1,100.00 |
| A16 | Crushed Rock Paving | 160 | TN | $ 115.00 | $ 18,400.00 |
| A17 | Precast Concrete Wheel Stops | 7 | EA | $ 200.00 | $ 1,400.00 |
| A18 | Bollard (OFCI) | 1 | EA | $ 850.00 | $ 850.00 |
| A19 | Split Rail Fence | 90 | LF | $ 59.00 | $ 5,310.00 |
| A20 | Stone Faced Wall | 55 | LF | $ 1,400.00 | $ 77,000.00 |
| A21 | Boulder Placement | 1 | LS | $ 15,000.00 | $ 15,000.00 |
| A22 | Bench Installation (OFCI) | 2 | EA | $ 2,000.00 | $ 4,000.00 |
| A23 | Landscape - Amended Topsoil | 145 | CY | $ 100.00 | $ 14,500.00 |
| A24 | Landscape - Compost | 35 | CY | $ 120.00 | $ 4,200.00 |
| A25 | Landscape - Seeding | 10,000 | SF | $ 0.40 | $ 4,000.00 |
| A26 | Landscape - General - Plantings | 1 | LS | $ 15,000.00 | $ 15,000.00 |
| A27 | Signs - ADA | 7 | EA | $ 850.00 | $ 5,950.00 |
| PROJECT 1 TOTAL | $ 352,545.00 |
| Project 2 - North Rim Rock Trail Extension | |||||
| BASE BID | |||||
| B1 | Mobilization | 1 | LS | $ 25,000.00 | $ 25,000.00 |
| B2 | Survey - Project Stakeout | 1 | LS | $ 15,000.00 | $ 15,000.00 |
| B3 | Erosion Control | 1 | LS | $ 10,000.00 | $ 10,000.00 |
| B4 | Traffic Control | 1 | LS | $ 3,500.00 | $ 3,500.00 |
| B5 | Demolition, Clearing and Grubbing | 1 | LS | $ 49,000.00 | $ 49,000.00 |
| B6 | General Excavation and Earthwork | 1 | LS | $ 40,000.00 | $ 40,000.00 |
| B7 | Rock Excavation (Allowance) | 10 | CY | $ 300.00 | $ 3,000.00 |
| B8 | Base Rock or Shoulder Backfill Rock | 150 | TN | $ 85.00 | $ 12,750.00 |
| B9 | Crushed Rock Paving | 150 | TN | $ 115.00 | $ 17,250.00 |
| B10 | Split Rail Fence | 90 | LF | $ 59.00 | $ 5,310.00 |
| B11 | Boulder Placement | 1 | LS | $ 15,000.00 | $ 15,000.00 |
| B12 | Salvage Log Placement | 1 | LS | $ 10,000.00 | $ 10,000.00 |
| B13 | Bench Installation (OFCI) | 3 | EA | $ 2,000.00 | $ 6,000.00 |
| B14 | Landscape - Amended Topsoil | 140 | CY | $ 100.00 | $ 14,000.00 |
| B15 | Landscape - Compost | 35 | CY | $ 120.00 | $ 4,200.00 |
| B16 | Landscape - Seeding | 11,000 | SF | $ 0.40 | $ 4,400.00 |
| B17 | Landscape - General Plantings | 1 | LS | $ 15,000.00 | $ 15,000.00 |
| PROJECT 2 TOTAL | $ 249,410.00 |
| Project 3 - Overflow Parking Lot Improvements | |||||
| BASE BID | |||||
| C1 | Mobilization | 1 | LS | $ 55,000.00 | $ 55,000.00 |
| C2 | Survey - Project Stakeout | 1 | LS | $ 7,000.00 | $ 7,000.00 |
| C3 | Erosion Control | 1 | LS | $ 5,000.00 | $ 5,000.00 |
| C4 | Traffic Control | 1 | LS | $ 7,000.00 | $ 7,000.00 |
| C5 | Demolition, Clearing and Grubbing | 1 | LS | $ 15,000.00 | $ 15,000.00 |
| C6 | Tree Removal | 7 | EA | $ 1,200.00 | $ 8,400.00 |
| C7 | General Excavation and Earthwork | 1 | LS | $ 25,000.00 | $ 25,000.00 |
| C8 | Rock Excavation (Allowance) | 10 | CY | $ 300.00 | $ 3,000.00 |
| C9 | Base Rock or Shoulder Backfill Rock | 1,300 | TN | $ 38.00 | $ 49,400.00 |
| C10 | Asphalt Paving - Leveling and Wearing Courses | 1,100 | TN | $ 135.00 | $ 148,500.00 |
| C11 | Pavement Markings - Painted Striping | 1 | LS | $ 1,000.00 | $ 1,000.00 |
| C12 | Pavement Markings - Crosswalk | 1 | LS | $ 300.00 | $ 300.00 |
| C13 | Cast-in-Place Concrete Curb | 150 | LF | $ 65.00 | $ 9,750.00 |
| C14 | Concrete Paving - Type 1 Vehicular | 1,100 | SF | $ 11.00 | $ 12,100.00 |
| C15 | Concrete Paving - Type 2 Pedestrian | 1,500 | SF | $ 9.00 | $ 13,500.00 |
| C16 | Tactile Warning Panel | 6 | EA | $ 1,100.00 | $ 6,600.00 |
| C17 | Crushed Rock Paving | 40 | TN | $ 190.00 | $ 7,600.00 |
| C18 | Precast Concrete Wheel Stops | 104 | EA | $ 100.00 | $ 10,400.00 |
| C19 | Gravity Storm Sewer - 6" | 74 | LF | $ 78.00 | $ 5,772.00 |
| C20 | Gravity Storm Sewer - 8" | 88 | LF | $ 80.00 | $ 7,040.00 |
| C21 | Gravity Storm Sewer - 12" | 69 | LF | $ 110.00 | $ 7,590.00 |
| C22 | Cleanout to Grade | 10 | EA | $ 1,205.00 | $ 12,050.00 |
| C23 | Outfall | 1 | EA | $ 4,100.00 | $ 4,100.00 |
| C24 | Overflow Inlet | 3 | EA | $ 1,380.00 | $ 4,140.00 |
| C25 | Stormwater Basin | 681 | LF | $ 14.00 | $ 9,534.00 |
| C26 | RESERVED | 0 | N/A | $ - 0 | |
| C27 | Split Rail Fence | 700 | LF | $ 59.00 | $ 41,300.00 |
| C28 | Boulder Placement | 1 | LS | $ 8,000.00 | $ 8,000.00 |
| C29 | Gate Installation (OFCI) | 2 | EA | $ 4,500.00 | $ 9,000.00 |
| C30 | Salvage Gate Reinstall | 1 | EA | $ 2,200.00 | $ 2,200.00 |
| C31 | RESERVED | 0 | N/A | $ - 0 | |
| C32 | Landscape - Amended Topsoil | 140 | CY | $ 100.00 | $ 14,000.00 |
| C33 | Landscape - Compost | 35 | CY | $ 120.00 | $ 4,200.00 |
| C34 | Landscape - Seeding | 18,000 | SF | $ 0.40 | $ 7,200.00 |
| C35 | Landscape - General Plantings | 1 | LS | $ 8,700.00 | $ 8,700.00 |
| C36 | Signs - Reinstall | 10 | EA | $ 500.00 | $ 5,000.00 |
| C37 | Signs - ADA | 4 | EA | $ 850.00 | $ 3,400.00 |
| C38 | Mailbox Reinstall | 1 | $ 1,500.00 | $ 1,500.00 | |
| PROJECT 3 TOTAL | $ 539,276.00 |
TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,141,231.00
| Project 4 Bid Alternate - Restroom Plaza | |||||
| D1 | Mobilization | 1 | LS | $ 10,000.00 | $ 10,000.00 |
| D2 | Survey - Project Stakeout | 1 | LS | $ 7,000.00 | $ 7,000.00 |
| D3 | Erosion Control | 1 | LS | $ 3,500.00 | $ 3,500.00 |
| D4 | Demolition, Clearing and Grubbing | 1 | LS | $ 5,000.00 | $ 5,000.00 |
| D5 | Tree Removal | 8 | EA | $ 1,200.00 | $ 9,600.00 |
| D6 | General Excavation and Earthwork | 1 | LS | $ 17,000.00 | $ 17,000.00 |
| D7 | Rock Excavation (Allowance) | 5 | CY | $ 300.00 | $ 1,500.00 |
| D8 | Base Rock or Shoulder Backfill Rock | 40 | TN | $ 110.00 | $ 4,400.00 |
| D9 | Concrete Paving - Type 2 Pedestrian | 1750 | SF | $ 9.00 | $ 15,750.00 |
| D10 | Crushed Rock Paving | 8 | TN | $ 190.00 | $ 1,520.00 |
| D11 | Boulder Placement | 1 | LS | $ 8,500.00 | $ 8,500.00 |
| D12 | Bench Installation (OCFI) | 1 | EA | $ 2,000.00 | $ 2,000.00 |
| D13 | Information Kiosk Installation (OCFI) | 1 | EA | $ 3,800.00 | $ 3,800.00 |
| D14 | Bicycle Racks (OCFI) | 2 | EA | $ 1,200.00 | $ 2,400.00 |
| D15 | Trash Receptacle (OCFI) | 1 | EA | $ 1,000.00 | $ 1,000.00 |
| D16 | Landscape - Amended Topsoil | 20 | CY | $ 120.00 | $ 2,400.00 |
| D17 | Landscape - Compost | 5 | CY | $ 200.00 | $ 1,000.00 |
| D18 | Landscape - Seeding | 2,300 | SF | $ 0.40 | $ 920.00 |
| D19 | Landscape - General Plantings | 1 | LS | $ 3,000.00 | $ 3,000.00 |
| BID ALTERNATE PROJECT 4 TOTAL | $ 100,290.00 |
TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,241,521.00
Paul Brothers
| Paul Brothers Inc |
| 8601 SE Revenue Rd |
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost |
| Project 1 - Rim Rock Trail Improvements | |||||
| BASE BID | |||||
| A1 | Mobilization | 1 | LS | $ 55,517.26 | $ 55,517.26 |
| A2 | Survey - Project Stakeout | 1 | LS | $ 4,403.60 | $ 4,403.60 |
| A3 | Erosion Control | 1 | LS | $ 18,456.67 | $ 18,456.67 |
| A4 | Traffic Control | 1 | LS | $ 1,489.00 | $ 1,489.00 |
| A5 | Demolition, Clearing and Grubbing | 1 | LS | $ 12,694.26 | $ 12,694.26 |
| A6 | Tree Removal | 5 | LS | $ 996.07 | $ 4,980.35 |
| A7 | Asphalt Sawcut & Excavation | 3000 | SF | $ 1.36 | $ 4,080.00 |
| A8 | General Excavation and Earthwork | 1 | LS | $ 19,198.45 | $ 19,198.45 |
| A9 | Rock Excavation (Allowance) | 1 | CY | $ 889.70 | $ 889.70 |
| A10 | Base Rock or Shoulder Backfill Rock | 270 | TN | $ 71.13 | $ 19,205.10 |
| A11 | Pavement Markings - Painted Striping | 1 | LS | $ 1,408.75 | $ 1,408.75 |
| A12 | Cast-in-Place Concrete Curb | 26 | LF | $ 51.55 | $ 1,340.30 |
| A13 | Concrete Paving - Type 1 Vehicular | 2400 | SF | $ 11.79 | $ 28,296.00 |
| A14 | Concrete Paving - Type 2 Pedestrian | 755 | SF | $ 8.77 | $ 6,621.35 |
| A15 | Tactile Warning Panel | 1 | EA | $ 1,479.73 | $ 1,479.73 |
| A16 | Crushed Rock Paving | 160 | TN | $ 70.78 | $ 11,324.80 |
| A17 | Precast Concrete Wheel Stops | 7 | EA | $ 125.90 | $ 881.30 |
| A18 | Bollard (OFCI) | 1 | EA | $ 268.18 | $ 268.18 |
| A19 | Split Rail Fence | 90 | LF | $ 52.98 | $ 4,768.20 |
| A20 | Stone Faced Wall | 55 | LF | $ 966.85 | $ 53,176.75 |
| A21 | Boulder Placement | 1 | LS | $ 9,471.28 | $ 9,471.28 |
| A22 | Bench Installation (OFCI) | 2 | EA | $ 825.36 | $ 1,650.72 |
| A23 | Landscape - Amended Topsoil | 145 | CY | $ 33.41 | $ 4,844.45 |
| A24 | Landscape - Compost | 35 | CY | $ 80.25 | $ 2,808.75 |
| A25 | Landscape - Seeding | 10,000 | SF | $ 0.21 | $ 2,100.00 |
| A26 | Landscape - General - Plantings | 1 | LS | $ 6,087.95 | $ 6,087.95 |
| A27 | Signs - ADA | 7 | EA | $ 772.72 | $ 5,409.04 |
| PROJECT 1 TOTAL | $ 282,851.94 |
| Project 2 - North Rim Rock Trail Extension | |||||
| BASE BID | |||||
| B1 | Mobilization | 1 | LS | $ 41,819.22 | $ 41,819.22 |
| B2 | Survey - Project Stakeout | 1 | LS | $ 4,403.60 | $ 4,403.60 |
| B3 | Erosion Control | 1 | LS | $ 13,396.19 | $ 13,396.19 |
| B4 | Traffic Control | 1 | LS | $ 1,489.00 | $ 1,489.00 |
| B5 | Demolition, Clearing and Grubbing | 1 | LS | $ 15,283.48 | $ 15,283.48 |
| B6 | General Excavation and Earthwork | 1 | LS | $ 11,879.70 | $ 11,879.70 |
| B7 | Rock Excavation (Allowance) | 10 | CY | $ 386.52 | $ 3,865.20 |
| B8 | Base Rock or Shoulder Backfill Rock | 150 | TN | $ 77.56 | $ 11,634.00 |
| B9 | Crushed Rock Paving | 150 | TN | $ 70.78 | $ 10,617.00 |
| B10 | Split Rail Fence | 90 | LF | $ 52.98 | $ 4,768.20 |
| B11 | Boulder Placement | 1 | LS | $ 40,470.61 | $ 40,470.61 |
| B12 | Salvage Log Placement | 1 | LS | $ 4,519.76 | $ 4,519.76 |
| B13 | Bench Installation (OFCI) | 3 | EA | $ 829.39 | $ 2,488.17 |
| B14 | Landscape - Amended Topsoil | 140 | CY | $ 34.75 | $ 4,865.00 |
| B15 | Landscape - Compost | 35 | CY | $ 80.25 | $ 2,808.75 |
| B16 | Landscape - Seeding | 11,000 | SF | $ 0.21 | $ 2,310.00 |
| B17 | Landscape - General Plantings | 1 | LS | $ 6,087.95 | $ 6,087.95 |
| PROJECT 2 TOTAL | $ 182,705.83 |
| Project 3 - Overflow Parking Lot Improvements | |||||
| BASE BID | |||||
| C1 | Mobilization | 1 | LS | $ 184,906.43 | $ 184,906.43 |
| C2 | Survey - Project Stakeout | 1 | LS | $ 23,953.60 | $ 23,953.60 |
| C3 | Erosion Control | 1 | LS | $ 12,252.22 | $ 12,252.22 |
| C4 | Traffic Control | 1 | LS | $ 3,237.00 | $ 3,237.00 |
| C5 | Demolition, Clearing and Grubbing | 1 | LS | $ 58,366.45 | $ 58,366.45 |
| C6 | Tree Removal | 7 | EA | $ 996.07 | $ 6,972.49 |
| C7 | General Excavation and Earthwork | 1 | LS | $ 93,339.10 | $ 93,339.10 |
| C8 | Rock Excavation (Allowance) | 10 | CY | $ 386.52 | $ 3,865.20 |
| C9 | Base Rock or Shoulder Backfill Rock | 1,300 | TN | $ 60.68 | $ 78,884.00 |
| C10 | Asphalt Paving - Leveling and Wearing Courses | 1,100 | TN | $ 133.03 | $ 146,333.00 |
| C11 | Pavement Markings - Painted Striping | 1 | LS | $ 10,257.00 | $ 10,257.00 |
| C12 | Pavement Markings - Crosswalk | 1 | LS | $ 4,370.00 | $ 4,370.00 |
| C13 | Cast-in-Place Concrete Curb | 150 | LF | $ 38.58 | $ 5,787.00 |
| C14 | Concrete Paving - Type 1 Vehicular | 1,100 | SF | $ 11.65 | $ 12,815.00 |
| C15 | Concrete Paving - Type 2 Pedestrian | 1,500 | SF | $ 9.34 | $ 14,010.00 |
| C16 | Tactile Warning Panel | 6 | EA | $ 1,479.73 | $ 8,878.38 |
| C17 | Crushed Rock Paving | 40 | TN | $ 70.78 | $ 2,831.20 |
| C18 | Precast Concrete Wheel Stops | 104 | EA | $ 125.90 | $ 13,093.60 |
| C19 | Gravity Storm Sewer - 6" | 74 | LF | $ 67.61 | $ 5,003.14 |
| C20 | Gravity Storm Sewer - 8" | 88 | LF | $ 96.11 | $ 8,457.68 |
| C21 | Gravity Storm Sewer - 12" | 69 | LF | $ 92.89 | $ 6,409.41 |
| C22 | Cleanout to Grade | 10 | EA | $ 471.24 | $ 4,712.40 |
| C23 | Outfall | 1 | EA | $ 354.37 | $ 354.37 |
| C24 | Overflow Inlet | 3 | EA | $ 692.33 | $ 2,076.99 |
| C25 | Stormwater Basin | 681 | LF | $ 39.05 | $ 26,593.05 |
| C26 | RESERVED | 0 | N/A | $ - 0 | |
| C27 | Split Rail Fence | 700 | LF | $ 50.29 | $ 35,203.00 |
| C28 | Boulder Placement | 1 | LS | $ 23,744.35 | $ 23,744.35 |
| C29 | Gate Installation (OFCI) | 2 | EA | $ 4,318.81 | $ 8,637.62 |
| C30 | Salvage Gate Reinstall | 1 | EA | $ 4,318.81 | $ 4,318.81 |
| C31 | RESERVED | 0 | N/A | $ - 0 | |
| C32 | Landscape - Amended Topsoil | 140 | CY | $ 31.85 | $ 4,459.00 |
| C33 | Landscape - Compost | 35 | CY | $ 80.25 | $ 2,808.75 |
| C34 | Landscape - Seeding | 18,000 | SF | $ 0.19 | $ 3,420.00 |
| C35 | Landscape - General Plantings | 1 | LS | $ 6,087.95 | $ 6,087.95 |
| C36 | Signs - Reinstall | 10 | EA | $ 326.10 | $ 3,261.00 |
| C37 | Signs - ADA | 4 | EA | $ 774.00 | $ 3,096.00 |
| C38 | Mailbox Reinstall | 1 | $ 328.96 | $ 328.96 | |
| PROJECT 3 TOTAL | $ 833,124.15 |
TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 1,298,681.92
| Project 4 Bid Alternate - Restroom Plaza | |||||
| D1 | Mobilization | 1 | LS | $ 11,113.63 | $ 11,113.63 |
| D2 | Survey - Project Stakeout | 1 | LS | $ 4,600.00 | $ 4,600.00 |
| D3 | Erosion Control | 1 | LS | $ 1,657.78 | $ 1,657.78 |
| D4 | Demolition, Clearing and Grubbing | 1 | LS | $ 2,039.12 | $ 2,039.12 |
| D5 | Tree Removal | 8 | EA | $ 996.07 | $ 7,968.56 |
| D6 | General Excavation and Earthwork | 1 | LS | $ 1,235.85 | $ 1,235.85 |
| D7 | Rock Excavation (Allowance) | 5 | CY | $ 446.12 | $ 2,230.60 |
| D8 | Base Rock or Shoulder Backfill Rock | 40 | TN | $ 42.96 | $ 1,718.40 |
| D9 | Concrete Paving - Type 2 Pedestrian | 1750 | SF | $ 7.41 | $ 12,967.50 |
| D10 | Crushed Rock Paving | 8 | TN | $ 70.78 | $ 566.24 |
| D11 | Boulder Placement | 1 | LS | $ 297.67 | $ 297.67 |
| D12 | Bench Installation (OCFI) | 1 | EA | $ 1,230.97 | $ 1,230.97 |
| D13 | Information Kiosk Installation (OCFI) | 1 | EA | $ 5,121.62 | $ 5,121.62 |
| D14 | Bicycle Racks (OCFI) | 2 | EA | $ 178.63 | $ 357.26 |
| D15 | Trash Receptacle (OCFI) | 1 | EA | $ 178.63 | $ 178.63 |
| D16 | Landscape - Amended Topsoil | 20 | CY | $ 34.36 | $ 687.20 |
| D17 | Landscape - Compost | 5 | CY | $ 80.25 | $ 401.25 |
| D18 | Landscape - Seeding | 2,300 | SF | $ 0.35 | $ 805.00 |
| D19 | Landscape - General Plantings | 1 | LS | $ 297.67 | $ 297.67 |
| BID ALTERNATE PROJECT 4 TOTAL | $ 55,474.95 |
TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 1,354,156.87
Central OR Homes
| Central Oregon Homes Inc | |||||
| PO Box 1678 | |||||
| Redmond, OR 97756 | |||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost |
| Project 1 - Rim Rock Trail Improvements | |||||
| BASE BID | |||||
| A1 | Mobilization | 1 | LS | $ 13,690.00 | $ 13,690.00 |
| A2 | Survey - Project Stakeout | 1 | LS | $ 16,300.00 | $ 16,300.00 |
| A3 | Erosion Control | 1 | LS | $ 750.00 | $ 750.00 |
| A4 | Traffic Control | 1 | LS | $ 450.00 | $ 450.00 |
| A5 | Demolition, Clearing and Grubbing | 1 | LS | $ 13,580.00 | $ 13,580.00 |
| A6 | Tree Removal | 5 | LS | $ 900.00 | $ 4,500.00 |
| A7 | Asphalt Sawcut & Excavation | 3000 | SF | $ 2.00 | $ 6,000.00 |
| A8 | General Excavation and Earthwork | 1 | LS | $ 11,650.00 | $ 11,650.00 |
| A9 | Rock Excavation (Allowance) | 1 | CY | $ 175.00 | $ 175.00 |
| A10 | Base Rock or Shoulder Backfill Rock | 270 | TN | $ 45.00 | $ 12,150.00 |
| A11 | Pavement Markings - Painted Striping | 1 | LS | $ 12,310.00 | $ 12,310.00 |
| A12 | Cast-in-Place Concrete Curb | 26 | LF | $ 65.00 | $ 1,690.00 |
| A13 | Concrete Paving - Type 1 Vehicular | 2400 | SF | $ 11.00 | $ 26,400.00 |
| A14 | Concrete Paving - Type 2 Pedestrian | 755 | SF | $ 10.00 | $ 7,550.00 |
| A15 | Tactile Warning Panel | 1 | EA | $ 800.00 | $ 800.00 |
| A16 | Crushed Rock Paving | 160 | TN | $ 75.00 | $ 12,000.00 |
| A17 | Precast Concrete Wheel Stops | 7 | EA | $ 200.00 | $ 1,400.00 |
| A18 | Bollard (OFCI) | 1 | EA | $ 1,200.00 | $ 1,200.00 |
| A19 | Split Rail Fence | 90 | LF | $ 70.00 | $ 6,300.00 |
| A20 | Stone Faced Wall | 55 | LF | $ 900.00 | $ 49,500.00 |
| A21 | Boulder Placement | 1 | LS | $ 8,060.00 | $ 8,060.00 |
| A22 | Bench Installation (OFCI) | 2 | EA | $ 3,000.00 | $ 6,000.00 |
| A23 | Landscape - Amended Topsoil | 145 | CY | $ 65.00 | $ 9,425.00 |
| A24 | Landscape - Compost | 35 | CY | $ 95.00 | $ 3,325.00 |
| A25 | Landscape - Seeding | 10,000 | SF | $ 0.36 | $ 3,600.00 |
| A26 | Landscape - General - Plantings | 1 | LS | $ 9,860.00 | $ 9,860.00 |
| A27 | Signs - ADA | 7 | EA | $ 450.00 | $ 3,150.00 |
| PROJECT 1 TOTAL | $ 241,815.00 |
| Project 2 - North Rim Rock Trail Extension | |||||
| BASE BID | |||||
| B1 | Mobilization | 1 | LS | $ 7,580.00 | $ 7,580.00 |
| B2 | Survey - Project Stakeout | 1 | LS | $ 8,300.00 | $ 8,300.00 |
| B3 | Erosion Control | 1 | LS | $ 620.00 | $ 620.00 |
| B4 | Traffic Control | 1 | LS | $ 4,000.00 | $ 4,000.00 |
| B5 | Demolition, Clearing and Grubbing | 1 | LS | $ 5,100.00 | $ 5,100.00 |
| B6 | General Excavation and Earthwork | 1 | LS | $ 17,470.00 | $ 17,470.00 |
| B7 | Rock Excavation (Allowance) | 10 | CY | $ 175.00 | $ 1,750.00 |
| B8 | Base Rock or Shoulder Backfill Rock | 150 | TN | $ 45.00 | $ 6,750.00 |
| B9 | Crushed Rock Paving | 150 | TN | $ 75.00 | $ 11,250.00 |
| B10 | Split Rail Fence | 90 | LF | $ 70.00 | $ 6,300.00 |
| B11 | Boulder Placement | 1 | LS | $ 24,180.00 | $ 24,180.00 |
| B12 | Salvage Log Placement | 1 | LS | $ 950.00 | $ 950.00 |
| B13 | Bench Installation (OFCI) | 3 | EA | $ 3,000.00 | $ 9,000.00 |
| B14 | Landscape - Amended Topsoil | 140 | CY | $ 65.00 | $ 9,100.00 |
| B15 | Landscape - Compost | 35 | CY | $ 95.00 | $ 3,325.00 |
| B16 | Landscape - Seeding | 11,000 | SF | $ 0.36 | $ 3,960.00 |
| B17 | Landscape - General Plantings | 1 | LS | $ 14,230.00 | $ 14,230.00 |
| PROJECT 2 TOTAL | $ 133,865.00 |
| Project 3 - Overflow Parking Lot Improvements | |||||
| BASE BID | |||||
| C1 | Mobilization | 1 | LS | $ 30,180.00 | $ 30,180.00 |
| C2 | Survey - Project Stakeout | 1 | LS | $ 12,000.00 | $ 12,000.00 |
| C3 | Erosion Control | 1 | LS | $ 1,500.00 | $ 1,500.00 |
| C4 | Traffic Control | 1 | LS | $ 6,000.00 | $ 6,000.00 |
| C5 | Demolition, Clearing and Grubbing | 1 | LS | $ 15,970.00 | $ 15,970.00 |
| C6 | Tree Removal | 7 | EA | $ 900.00 | $ 6,300.00 |
| C7 | General Excavation and Earthwork | 1 | LS | $ 25,000.00 | $ 25,000.00 |
| C8 | Rock Excavation (Allowance) | 10 | CY | $ 175.00 | $ 1,750.00 |
| C9 | Base Rock or Shoulder Backfill Rock | 1,300 | TN | $ 45.00 | $ 58,500.00 |
| C10 | Asphalt Paving - Leveling and Wearing Courses | 1,100 | TN | $ 130.00 | $ 143,000.00 |
| C11 | Pavement Markings - Painted Striping | 1 | LS | $ 5,690.00 | $ 5,690.00 |
| C12 | Pavement Markings - Crosswalk | 1 | LS | $ 1,200.00 | $ 1,200.00 |
| C13 | Cast-in-Place Concrete Curb | 150 | LF | $ 65.00 | $ 9,750.00 |
| C14 | Concrete Paving - Type 1 Vehicular | 1,100 | SF | $ 11.00 | $ 12,100.00 |
| C15 | Concrete Paving - Type 2 Pedestrian | 1,500 | SF | $ 10.00 | $ 15,000.00 |
| C16 | Tactile Warning Panel | 6 | EA | $ 800.00 | $ 4,800.00 |
| C17 | Crushed Rock Paving | 40 | TN | $ 75.00 | $ 3,000.00 |
| C18 | Precast Concrete Wheel Stops | 104 | EA | $ 200.00 | $ 20,800.00 |
| C19 | Gravity Storm Sewer - 6" | 74 | LF | $ 158.00 | $ 11,692.00 |
| C20 | Gravity Storm Sewer - 8" | 88 | LF | $ 200.00 | $ 17,600.00 |
| C21 | Gravity Storm Sewer - 12" | 69 | LF | $ 160.00 | $ 11,040.00 |
| C22 | Cleanout to Grade | 10 | EA | $ 245.00 | $ 2,450.00 |
| C23 | Outfall | 1 | EA | $ 500.00 | $ 500.00 |
| C24 | Overflow Inlet | 3 | EA | $ 500.00 | $ 1,500.00 |
| C25 | Stormwater Basin | 681 | LF | $ 22.00 | $ 14,982.00 |
| C26 | RESERVED | 0 | N/A | $ - 0 | |
| C27 | Split Rail Fence | 700 | LF | $ 70.00 | $ 49,000.00 |
| C28 | Boulder Placement | 1 | LS | $ 18,330.00 | $ 18,330.00 |
| C29 | Gate Installation (OFCI) | 2 | EA | $ 1,100.00 | $ 2,200.00 |
| C30 | Salvage Gate Reinstall | 1 | EA | $ 1,100.00 | $ 1,100.00 |
| C31 | RESERVED | 0 | N/A | $ - 0 | |
| C32 | Landscape - Amended Topsoil | 140 | CY | $ 65.00 | $ 9,100.00 |
| C33 | Landscape - Compost | 35 | CY | $ 95.00 | $ 3,325.00 |
| C34 | Landscape - Seeding | 18,000 | SF | $ 0.36 | $ 6,480.00 |
| C35 | Landscape - General Plantings | 1 | LS | $ 6,680.00 | $ 6,680.00 |
| C36 | Signs - Reinstall | 10 | EA | $ 250.00 | $ 2,500.00 |
| C37 | Signs - ADA | 4 | EA | $ 450.00 | $ 1,800.00 |
| C38 | Mailbox Reinstall | 1 | $ 310.00 | $ 310.00 | |
| PROJECT 3 TOTAL | $ 533,129.00 |
TOTAL BID (Sum of Project 1, 2 and 3 Totals) $ 908,809.00
| Project 4 Bid Alternate - Restroom Plaza | |||||
| D1 | Mobilization | 1 | LS | $ 3,730.00 | $ 3,730.00 |
| D2 | Survey - Project Stakeout | 1 | LS | $ 5,300.00 | $ 5,300.00 |
| D3 | Erosion Control | 1 | LS | $ 300.00 | $ 300.00 |
| D4 | Demolition, Clearing and Grubbing | 1 | LS | $ 2,800.00 | $ 2,800.00 |
| D5 | Tree Removal | 8 | EA | $ 900.00 | $ 7,200.00 |
| D6 | General Excavation and Earthwork | 1 | LS | $ 11,000.00 | $ 11,000.00 |
| D7 | Rock Excavation (Allowance) | 5 | CY | $ 175.00 | $ 875.00 |
| D8 | Base Rock or Shoulder Backfill Rock | 40 | TN | $ 45.00 | $ 1,800.00 |
| D9 | Concrete Paving - Type 2 Pedestrian | 1750 | SF | $ 10.00 | $ 17,500.00 |
| D10 | Crushed Rock Paving | 8 | TN | $ 75.00 | $ 600.00 |
| D11 | Boulder Placement | 1 | LS | $ 1,780.00 | $ 1,780.00 |
| D12 | Bench Installation (OCFI) | 1 | EA | $ 3,000.00 | $ 3,000.00 |
| D13 | Information Kiosk Installation (OCFI) | 1 | EA | $ 6,500.00 | $ 6,500.00 |
| D14 | Bicycle Racks (OCFI) | 2 | EA | $ 230.00 | $ 460.00 |
| D15 | Trash Receptacle (OCFI) | 1 | EA | $ 460.00 | $ 460.00 |
| D16 | Landscape - Amended Topsoil | 20 | CY | $ 65.00 | $ 1,300.00 |
| D17 | Landscape - Compost | 5 | CY | $ 95.00 | $ 475.00 |
| D18 | Landscape - Seeding | 2,300 | SF | $ 0.36 | $ 828.00 |
| D19 | Landscape - General Plantings | 1 | LS | $ - 0 | $ - 0 |
| BID ALTERNATE PROJECT 4 TOTAL | $ 65,908.00 |
TOTAL BID WITH BID ALTERNATE (Sum of Project 1, 2, 3 and 4 Totals) $ 974,717.00