This is a Pricing Submittal Form (Addendum 3, Attachment A, Form A-2) for ITB 14564, the Smith Rock State Park Visitor Improvement Project, issued by Oregon Parks and Recreation Department. The project encompasses three base bid components and one bid alternate located in Terrebonne, Oregon. Project 1—Rim Rock Trail Improvements—includes 27 line items covering mobilization, survey stakeout, erosion and traffic control, demolition, tree removal, asphalt and concrete paving, fencing, landscaping, and signage. Project 2—North Rim Rock Trail Extension—comprises 17 items with similar scope elements including crushed rock paving, fencing, and landscaping. Project 3—Overflow Parking Lot Improvements—contains 38 items addressing parking lot construction, stormwater infrastructure (gravity storm sewers and basins), concrete and asphalt paving, fencing, gates, pay station installation, and landscaping. Project 4, the Restroom Plaza Bid Alternate, includes 19 items for a pedestrian plaza with amenities such as benches, kiosks, bicycle racks, and trash receptacles. All quantities are estimates provided as bidding guides only; actual payment will be based on measured, installed quantities. Bidders must enter unit costs and total costs for every itemized line, and failure to provide complete pricing information may result in bid rejection as non-responsive.
The bid price represents the total contract price including contractor profit and overhead, with all non-itemized work considered incidental. The State reserves the right to increase or decrease quantities at the same unit prices or remove items to meet budgetary constraints. Contractors must notify the Project Manager if quantity bids differ from plan quantities by 10 percent or more; materials procured without prior approval that exceed this threshold are subject to non-payment. No specific pricing floor or pricing terms are established in this form, as it functions as a template for bidders to complete. No set-asides are indicated in this document. The contract is subject to the State of Oregon General Conditions for OPRD Construction Contracts (March 2026 edition), and work is restricted by Golden Eagle protection measures, including seasonal limitations on work within one mile of nest sites and mandatory biological monitoring during intensive activities.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ADDENDUM 3 ATTACHMENT A |
| FORM A-2 - PRICING FORM |
| ITB 14564 |
| Smith Rock State Park Visitor Improvement Project |
| PRICING SUBMITTAL FORM |
| PRICING SUBMITTAL INSTRUCTIONS: Bidders shall enter pricing and other required information for all Bid Items listed in this Pricing Submittal Form. If this Pricing Submittal Form is replaced by Addendum, Bidders shall use the Addendum form to provide pricing and other required information. If the Pricing Submittal Form is only modified by Addendum, then Bidders shall follow the instructions in the Addendum for making modifications to the Pricing Submittal Form. Failure to supply the required information in the Pricing Submittal Form as modified by subsequent Addenda may result in Bid rejection as non-responsive. |
Note: Bid price is total contract price including contractor's profit and overhead. All work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work.
The undersigned understands that the State reserves the right to increase or decrease the above quantities at the same unit prices as show or to remove items as necessary to meet budgetary constraints. The undersigned has carefully examined the Contract Documents and the site of the work, ang agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, temporary facilities and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set herein.
| The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities. | ||||||
| Item # | Description | Unit | Unit Cost | Total Cost | ||
| PROJECT 1 – RIM ROCK TRAIL IMPROVEMENTS: | ||||||
| BASE BID | ||||||
| A | 1 | Mobilization | 1 | LS | $ - 0 | |
| A | 2 | Survey - Project Stakeout | 1 | LS | $ - 0 | |
| A | 3 | Erosion Control | 1 | LS | $ - 0 | |
| A | 4 | Traffic Control | 1 | LS | $ - 0 | |
| A | 5 | Demolition, Clearing and Grubbing | 1 | LS | $ - 0 | |
| A | 6 | Tree Removal | 5 | EA | $ - 0 | |
| A | 7 | Asphalt Sawcut & Excavation | 3,000 | SF | $ - 0 | |
| A | 8 | General Excavation and Earthwork | 1 | LS | $ - 0 | |
| A | 9 | Rock Excavation (Allowance) | 1 | CY | $ - 0 | |
| A | 10 | Base Rock or Shoulder Backfill Rock | 270 | TN | $ - 0 | |
| A | 11 | Pavement Markings - Painted Striping | 1 | LS | $ - 0 | |
| A | 12 | Cast-in-Place Concrete Curb | 26 | LF | $ - 0 | |
| A | 13 | Concrete Paving – Type 1 Vehicular: | 2,400 | SF | $ - 0 | |
| A | 14 | Concrete Paving – Type 2 Pedestrian | 755 | SF | $ - 0 | |
| A | 15 | Tactile Warning Panel | 1 | EA | $ - 0 | |
| A | 16 | Crushed Rock Paving | 160 | TN | $ - 0 | |
| A | 17 | Precast Concrete Wheel Stops | 7 | EA | $ - 0 | |
| A | 18 | Bollard (OFCI) | 1 | EA | $ - 0 | |
| A | 19 | Split Rail Fence | 90 | LF | $ - 0 | |
| A | 20 | Stone Faced Wall | 55 | LF | $ - 0 | |
| A | 21 | Boulder Placement | 1 | LS | $ - 0 | |
| A | 22 | Bench Installation (OFCI) | 2 | EA | $ - 0 | |
| A | 23 | Landscape - Amended Topsoil | 145 | CY | $ - 0 | |
| A | 24 | Landscape - Compost | 35 | CY | $ - 0 | |
| A | 25 | Landscape - Seeding | 10,000 | SF | $ - 0 | |
| A | 26 | Landscape - General - Plantings | 1 | LS | $ - 0 | |
| A | 27 | Signs - ADA | 7 | EA | $ - 0 | |
| $ - 0 | ||||||
| PROJECT 2 – NORTH RIM ROCK TRAIL EXTENSION | ||||||
| BASE BID | ||||||
| B | 1 | Mobilization | 1 | LS | $ - 0 | |
| B | 2 | Survey - Project Stakeout | 1 | LS | $ - 0 | |
| B | 3 | Erosion Control | 1 | LS | $ - 0 | |
| B | 4 | Traffic Control | 1 | LS | $ - 0 | |
| B | 5 | Demolition, Clearing and Grubbing | 1 | LS | $ - 0 | |
| B | 6 | General Excavation and Earthwork | 1 | LS | $ - 0 | |
| B | 7 | Rock Excavation (Allowance) | 10 | CY | $ - 0 | |
| B | 8 | Base Rock or Shoulder Backfill Rock | 150 | TN | $ - 0 | |
| B | 9 | Crushed Rock Paving | 150 | TN | $ - 0 | |
| B | 10 | Split Rail Fence | 90 | LF | $ - 0 | |
| B | 11 | Boulder Placement | 1 | LS | $ - 0 | |
| B | 12 | Salvage Log Placement | 1 | LS | $ - 0 | |
| B | 13 | Bench Installation (OFCI) | 3 | EA | $ - 0 | |
| B | 14 | Landscape - Amended Topsoil | 140 | CY | $ - 0 | |
| B | 15 | Landscape - Compost | 35 | CY | $ - 0 | |
| A | 16 | Landscape - Seeding | 11,000 | SF | $ - 0 | |
| B | 17 | Landscape - General Plantings | 1 | LS | $ - 0 | |
| $ - 0 | ||||||
| PROJECT 3 – OVERFLOW PARKING LOT IMPROVEMENTS | ||||||
| BASE BID | ||||||
| C | 1 | Mobilization | 1 | LS | $ - 0 | |
| C | 2 | Survey - Project Stakeout | 1 | LS | $ - 0 | |
| C | 3 | Erosion Control | 1 | LS | $ - 0 | |
| C | 4 | Traffic Control | 1 | LS | $ - 0 | |
| C | 5 | Demolition, Clearing and Grubbing | 1 | LS | $ - 0 | |
| C | 6 | Tree Removal | 7 | EA | $ - 0 | |
| C | 7 | General Excavation and Earthwork | 1 | LS | $ - 0 | |
| C | 8 | Rock Excavation (Allowance) | 10 | CY | $ - 0 | |
| C | 9 | Base Rock or Shoulder Backfill rock | 1,300 | TN | $ - 0 | |
| C | 10 | Asphalt Paving - Leveling and Wearing Courses | 1100 | TON | $ - 0 | |
| C | 11 | Pavement Markings - Painted Striping | 1 | LS | $ - 0 | |
| C | 12 | Pavement Markings - Crosswalk | 1 | LS | $ - 0 | |
| C | 13 | Cast-in-Place Concrete Curb | 150 | LF | $ - 0 | |
| C | 14 | Concrete Paving – Type 1 Vehicular: | 1,100 | SF | $ - 0 | |
| C | 15 | Concrete Paving – Type 2 Pedestrian | 1,500 | SF | $ - 0 | |
| C | 16 | Tactile Warning Panel | 6 | EA | $ - 0 | |
| C | 17 | Crushed Rock Paving | 40 | TN | $ - 0 | |
| C | 18 | Precast Concrete Wheel Stops | 104 | EA | $ - 0 | |
| C | 19 | Gravity Storm Sewer - 6" | 74 | LF | $ - 0 | |
| C | 20 | Gravity Storm Sewer - 8" | 88 | LF | $ - 0 | |
| C | 21 | Gravity Storm Sewer - 12" | 69 | LF | $ - 0 | |
| C | 22 | Cleanout to Grade | 10 | EA | $ - 0 | |
| C | 23 | Outfall | 1 | EA | $ - 0 | |
| C | 24 | Overflow Inlet | 3 | EA | $ - 0 | |
| C | 25 | Stormwater Basin | 681 | LF | $ - 0 | |
| C | 26 | [RESERVED] Electrical Conduit | 450 | LF | $ - 0 | |
| C | 27 | Split Rail Fence | 700 | LF | $ - 0 | |
| C | 28 | Boulder Placement | 1 | LS | $ - 0 | |
| C | 29 | Gate Installation (OFCI) | 2 | EA | $ - 0 | |
| C | 30 | Salvage Gate Reinstall | 1 | EA | $ - 0 | |
| C | 31 | [RESERVED] Pay Station (OFCI) | 1 | EA | $ - 0 | |
| C | 32 | Landscape - Amended Topsoil | 140 | CY | $ - 0 | |
| C | 33 | Landscape - Compost | 35 | CY | $ - 0 | |
| C | 34 | Landscape - Seeding | 18,000 | SF | $ - 0 | |
| C | 35 | Landscape - General Plantings | 1 | LS | $ - 0 | |
| C | 36 | Signs - Reinstall | 10 | EA | $ - 0 | |
| C | 37 | Signs - ADA | 4 | EA | $ - 0 | |
| C | 38 | Mailbox Reinstall | 1 | EA | $ - 0 | |
| $ - 0 | ||||||
| TOTAL BASE BID (Sum of Project 1, 2, and 3 Totals) | $ - 0 |
| PROJECT 4 BID ALTERNATE– RESTROOM PLAZA | |||||
| D | 1 | Mobilization | 1 | LS | $ - 0 |
| D | 2 | Survey - Project Stakeout | 1 | LS | $ - 0 |
| D | 3 | Erosion Control | 1 | LS | $ - 0 |
| D | 4 | Demolition, Clearing and Grubbing | 1 | LS | $ - 0 |
| D | 5 | Tree Removal | 8 | EA | $ - 0 |
| D | 6 | General Excavation and Earthwork | 1 | LS | $ - 0 |
| D | 7 | Rock Excavation (Allowance) | 5 | CY | $ - 0 |
| D | 8 | Base Rock or Shoulder Backfill rock | 40 | TN | $ - 0 |
| D | 9 | Concrete Paving – Type 2 Pedestrian | 1,750 | SF | $ - 0 |
| D | 10 | Crushed Rock Paving | 8 | TN | $ - 0 |
| D | 11 | Boulder Placement | 1 | LS | $ - 0 |
| D | 12 | Bench Installation (OFCI) | 1 | EA | $ - 0 |
| D | 13 | Information Kiosk Installation (OFCI) | 1 | EA | $ - 0 |
| D | 14 | Bicycle Racks (OFCI) | 2 | EA | $ - 0 |
| D | 15 | Trash Receptacle (OFCI) | 1 | EA | $ - 0 |
| D | 16 | Landscape - Amended Topsoil | 20 | CY | $ - 0 |
| D | 17 | Landscape - Compost | 5 | CY | $ - 0 |
| D | 18 | Landscape - Seeding | 2,300 | SF | $ - 0 |
| D | 19 | Landscape - General Plantings | 1 | LS | $ - 0 |
| TOTAL BID ALTERNATE (Sum of Project 4 Totals) | $ - 0 |
By (Bidder Company Name and Authorized Signer Name) Date
Sheet2
| P1 | P3 | |||
| Agg base | 6" | 8" | 12" | |
| 9.7 | 65.2 | 22.57 | 110.81 | |
| 1208 | 76.18 | 51.61 | 36.71 | |
| 302 | 36.54 | 16 | 25.02 | |
| 37 | 75.76 | |||
| 1200 | 87.1 | |||
| 400 | 70.72 | |||
| 145 | 75.76 | |||
| 361 | 17 | |||
| 8 | 17 | |||
| 2 | 73.3 | |||
| 45.5 | 177.92 | 87.7 | 172.54 | |
| 3718.2 | CY | 594.52 | ||
| 5577.3 | TN |
| 33 | drive |
| 49.5 | TN |