About this file

This document appears to be a default Adobe Reader loading page with a message indicating potential PDF viewing issues. The page provides instructions for upgrading Adobe Reader and lists trademark information for Windows, Mac, and Linux operating systems. No substantive contract or solicitation information is present in this file.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

C:\Documents and Settings\jedixon.FLHD\My Documents\My Pictures\Panoramic\lbtview4.jpg Utility Status Report

EFL-FM-UTL-01(07)

Page of Review Interval:

Existing utilities [ Project Scope [ Location and Utility Information Design Information Type and/or Size Facility (** See Legend) **P=Pole, T=buried Tel. Cable, TC=Tel Conduit, PD=Pedestal, G=Gas, W=Water, S=Sewer, SS=Storm Sewer, SFM=Sewer Force Main, MH=Manhole, TV=Buried Cable TV, FO=Fiber Optic, UE=Underground Electric, Other=See Remarks 8.2.1.3144.1.471865.466429 are not ] identified on the Plans may

PrintForm:
CurrentPage:
PageCount:
Project: MD NP CHOH 235(2), 242(1), etc. Repair Carderock, McCoys Ferry and Four Locks tunnels
Date: 2025-03-24
Reviewer: Brian Fletcher, Project Support Team
PM: Yanina Kirtley
HDM: Canisha Lyons
ReviewType_Otext:
Preliminary30:
PlanInHand70:
Internal90:
External95:
Final100:
Other:
RBYESUtilities:
RBNOUtilities:
RBUnknownUtilities:
RBUTILONPlans:
RBUtilNOTPlans:
CBUtilINSCR: 1
CBUtilINSCR: 0
CBUtilINSCR: 0
CBNOUtilRelocate: 1
CBUtilDescribed: 0
scope1: 0
scope2: 0
scopeOther: 1
txtOtherScope: Tunnel repairs
ADDROWButton:
DELETEButton:
RowNum: 1
RowNum: 2
RowNum: 3
RowNum: 4
TFRoadName: Four Locks Rd.
TFRoadName: Four Locks Rd.
TFRoadName: McCoys Ferry (Tunnel)
TFRoadName: Caderock Tunnel
TFStation: Power Poles along Four Locks Rd.
TFStation: Unknown - Possibly on shared facilities on OH poles with Potomac Edison.
TFStation: 100+00 - 102+50
LeftofCL:
RightofCL:
BothLandR:
TFTypeSize: P
TFTypeSize: W
TFSizePole:
TFCompany: Potomac Edison
TFCompany: Verizon
TFCompany: Unknown
TFContactNameNum: (800) 778-9140 (per 811 ticket)
TFContactNameNum: (301) 210-0355 (per 811 ticket)
CBUtilityListing: 0
CBUtilityListing: 0
CBUtilityListing: 0
CBUtilityListing: 0
CBAddContact: 0
CBAddContact: 0
CBAddContact: 0
CBAddContact: 0
TFContact2NameNum:
CBPreConMeeting:
TFPCName:
TFPCPhone:
TFPCAddress:
TFPCEmail:
TFDesignResponce:
TFPaymentResponce:
TFResponceParty:
DLWorkCompleted:
NFEstCost:
DFAgreement:
CheckBox1: 1
CheckBox1: 1
CheckBox1: 1
CheckBox1: 1
TFRemarks: Utilities are not anticipated to be impacted based on project scope of work. EFLHD survey & mapping was conducted with quality level C and D survey. Aerial utility lines identified in survey.
TFRemarks: Utilities are not anticipated to be impacted based on project scope of work. EFLHD survey & mapping was conducted with quality level C and D survey. Aerial utility lines identified in survey.
TFRemarks: Utilities are not anticipated to be impacted based on project scope of work. EFLHD survey & mapping was conducted with quality level C and D survey. No utilities were identified.
TFRemarks: Utilities are not anticipated to be impacted based on project scope of work. EFLHD survey & mapping was conducted with quality level C and D survey. No utilities were identified.

Waterline information was a GIS file from the partner. Unknown ownership. Waterline should be verified in the field.

TFGeneralInfo: Ground Survey conducted in 04-09-2024. 811 call placed for marking utilities; however, no utilities were marked in the field. Call tickets indicate the following potential utilities exist within the project sites; (1) Verizon, (2) Potomac Edison/USIC.