Attachment 3 - B Pages - MD NP CHOH 235(2)_242(1)_ETC.pdf
PDF 677 KB Posted
- Attached to
- Mid-Atlantic Region Construction Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- 693C73-25-R-000073
About this file
This document is a Bid Schedule for a federal construction project to repair tunnels at Carderock, Four Locks, and McCoys Ferry, part of the Mid-Atlantic Region Construction Multiple Award Task Order Contract (MATOC). The project is divided into two schedules: Schedule A (Base Task Order) and Schedule B (Government Option 1), with detailed line items covering multiple construction activities including soil erosion control, roadway excavation, concrete and asphalt work, stone masonry repair, utility location, and traffic control.
The project allows for flexible award scenarios, with a maximum performance period of 160 calendar days if both schedules are awarded simultaneously, or 145 days for Schedule A alone and 61 days for Schedule B if exercised separately. The basis for award will be the lowest Evaluation Total Price of Project, which is calculated by adding the proposal totals from Schedule A and Schedule B. The work involves extensive tunnel and infrastructure repair, including removing and resetting stone masonry, concrete repairs, pavement work, erosion control, and various site preparation and restoration activities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - Mid-Atlantic Region Construction MATOC - 693C73-25-R-000073.pdf | ||
| Amendment 0001 - Mid-Atlantic Region Construction MATOC - 693C73-25-R-000073.pdf | ||
| Mid-Atlantic IDIQ RFP 693C73-25-R-000073.pdf | ||
| Attachment 1 - Technical Information Form.doc | DOC document | |
| Attachment 4 - J-Pages - SCRs for Seed Project.pdf | ||
| Attachment 13 - Bid Bond for Seed Project.pdf | ||
| Attachment 2 - VETS-4212 Form.pdf | ||
| Attachment 8 - Structure Inspection Report.pdf | ||
| Attachment 7 - NEPA CE MD NP CHOH 235(2) 242(1).pdf | ||
| Attachment 9 - Utility Status Report.pdf | ||
| Attachment 10 - Pavement Memo.pdf | ||
| Attachment 11 - Hydraulics Memo.pdf | ||
| Attachment 12 - MINIMUM WAGE DETERMINATION.pdf | ||
| Attachment 5 - Plans Sheets for Seed Project.pdf | ||
| Attachment 6 - Permit SHA-3-MO-1001-24-DO.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL SCHEDULE INSTRUCTIONS
PROJECT: MD NP CHOH 235(2), 242(1), ETC
BIDDERS PLEASE NOTE: Before preparing the proposal, carefully read the Instructions to Offerors. While preparing the proposal comply with the following:
COMPLETING THE PROPOSAL SCHEDULE
Complete the Proposal Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Proposal Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid
Price and Amount Bid have been inserted by the Government for a pay item, do not change the
Unit Bid Price and Amount Bid for the pay item. Determine the Proposal Total for each specific individual Schedule of Work by adding the amounts of the listed items and show in the block provided for that individual Schedule of Work. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, offerors must submit prices for each pay item.
Review Subsection 109.05 of the FP (standard specifications book) regarding scope of payment for direct and indirect payment work.
Fill in the Proposal Total(s) for each individual Schedule of Work as directed on the Proposal
Summary page. Fill in the Evaluation Total Price of Project in the space provided on the
Proposal Summary page.
The amount in Block 17 of the SF 1442 should be completed as follows:
Schedule A - $ .
Schedule B - $ .
SCHEDULES OF WORK
The Proposal Schedule is comprised of the following separate schedules and options:
Schedule A (Base Task Order) - Pages B-1 through B-4
Schedule B (Government Option 1) - Pages B-5 through B-7
The Government will award the project as a Base Task Order (Schedule A) with the option to award Schedule B (Government Option 1); see FAR Clauses 52.217-4 and 52.217-5.
The purpose of the multiple schedules and options is to give the Government maximum flexibility in completing the project in a timely manner and at a cost-effective price by proper utilization of programmed funds and upon receipt of any additional funds required to award the task order. If complete funding is in place at the time of award of Schedule A (Base Task
Order), the Government may award Schedule B (Government Option 1) at that time. If additional funding is required for the award of Schedule B (Government Option 1), and is received after the award of Schedule A (Base Task Order), the Government has the right to exercise Schedule B (Government Option 1) at the unit prices bid no later than the task order completion date of Schedule A (Base Task Order).
COMPLETION OF WORK
The Government has estimated the number of calendar days necessary to complete all work from the effective date of the Notice to Proceed to task order completion for the various award scenarios. The maximum number of calendar days allowed (i.e. the task order performance period) is shown in Block 11 of the SF-1442 and described below.
If the Government awards the task order as Schedules A + B, the performance period to complete all work will be 160 calendar days.
If the Government awards the task order as Schedule A only, the performance period to complete all Schedule A work will be 145 calendar days and will start on the effective date of
Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original task order, the performance period to complete all Schedule B work will be 61 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the FP and
Special Contract Requirements (SCRs). Specific work limitations may be (but are not limited to):
National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc.); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc.); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc.). The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCRs).
Offerors are to assume that the award of the task order and approval of the Contractor’s
Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-
15) may result in the start of construction activities to be within 30 days of Notice to
Proceed. See Subsection 108.01 of the SCRs for additional details.
BASIS FOR AWARD
The task order will be awarded to the responsive, responsible offeror with the lowest Evaluation
Total Price of Project, which is defined as:
Schedule A (Base Task Order) Proposal Total +
Schedule B (Government Option 1) Proposal Total.
B-1
BID SCHEDULE
Project No : MD NP CHOH 235(2), 242(1), ETC. Schedule : A Schedule Type : Base
Project Name : Repair Carderock, Four Locks, and McCoys Ferry Tunnels
AMD# Line Item Number Pay Item Number Description Supplemental Description
Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION ALL LPSM
A0040 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL LPSM
A0060 15401-0000 CONTRACTOR
TESTING ALL LPSM
A0080 15703-2000
SOIL EROSION
CONTROL,
TEMPORARY
TURF
ESTABLISHMENT
0.400 ACRE
A0100 15705-0100
SOIL EROSION
CONTROL, SILT
FENCE
(SILT FENCE ON
PAVEMENT) 230.000 LNFT
A0120 15705-0300
SOIL EROSION
CONTROL, SLOPE
DRAINS
(CLEAR WATER
DIVERSION PIPE) 635.000 LNFT
A0140 15705-1400
SOIL EROSION
CONTROL, FIBER
ROLL
(FILTER LOG)
1,820.000 LNFT
A0160 15705-1800
SOIL EROSION
CONTROL,
TEMPORARY
DIVERSION BERM
(TEMPORARY
BARRIER
DIVERSION) 88.000 LNFT
A0180 15705-2000
SOIL EROSION
CONTROL,
FLOATING
TURBIDITY
CURTAIN
115.000 LNFT
A0200 15706-1600
SOIL EROSION
CONTROL,
STABILIZED
CONSTRUCTION
EXIT
(ENTRANCE)
3.000 EACH
A0220 15706-2200
SOIL EROSION
CONTROL, FILTER
BAG
4.000 EACH
A0240 15720-0000
STORM WATER
POLLUTION
PREVENTION
PLAN
ALL LPSM
A0260 20103-0000 CLEARING AND
GRUBBING 2,345.000 SQYD
A0280 20202-0000 SELECTIVE
CLEARING 765.000 SQYD
A0300 20301-2400 REMOVAL OF
SIGN 5.000 EACH
A0320 20303-1600
REMOVAL OF
PAVEMENT,
ASPHALT
880.000 SQYD
A0340 20304-2000 REMOVAL OF
BRIDGE
(PEDESTRIAN
WOOD BRIDGE) ALL LPSM
A0360 20305-1000 REMOVAL OF
CONCRETE
(FOUR LOCKS
CURB AND SLAB) 45.000 CUYD
A0380 20305-1000
REMOVAL OF
CONCRETE
(MCCOYS FERRY
NORTH
APPROACH SLAB)
5.000 CUYD
A0400 20401-0000 ROADWAY
EXCAVATION 150.000 CUYD
A0420 20426-1000 DITCH,
EXCAVATION 1,230.000 CUYD
A0440 20701-1000
SEPARATION-
STABILIZATION
GEOTEXTILE,
CLASS 2, TYPE E
960.000 SQYD
A0460 20820-0000 DEWATERING (PUMP-AROUND
PRACTICE) ALL LPSM
A0480 25102-0400
PLACED RIPRAP,
METHOD A,
CLASS 4
(MD RIPRAP
CLASS 2) 500.000 TON
A0500 30202-2000
ROADWAY
AGGREGATE,
METHOD 2
290.000 TON
A0520 30302-1000 DITCH
RECONDITIONING 75.000 LNFT
B-2
A0540 31302-0400
AGGREGATE-
TOPSOIL
COURSE, 4-INCH
DEPTH
215.000 SQYD
A0560 40301-0100
ASPHALT
CONCRETE
PAVEMENT, TYPE
(1/2-INCH NMSA)
200.000 TON
A0580 41202-0000 TACK COAT 420.000 GAL
A0600 55201-0800
STRUCTURAL
CONCRETE,
CLASS D (AE)
(FOUR LOCKS
SLAB AND CURB) 55.000 CUYD
A0620 55201-0800
STRUCTURAL
CONCRETE,
CLASS D (AE)
(MCCOYS FERRY
NORTH
APPROACH SLAB)
5.000 CUYD
A0640 55235-0000
EXPANSION
JOINTS
(FOUR LOCKS
BACKER ROD
AND SEALANT)
30.000 LNFT
A0660 55235-0000
EXPANSION
JOINTS
(MCCOYS FERRY
BACKER ROD
AND SEALANT)
350.000 LNFT
A0680 55401-2000
REINFORCING
STEEL, EPOXY
COATED
(FOUR LOCKS)
8,000.000 LB
A0700 55401-2000
REINFORCING
STEEL, EPOXY
COATED
(MCCOYS FERRY)
400.000 LB
A0720 60103-0260
CONCRETE,
HEADWALL FOR
60-INCH PIPE
CULVERT
(TYPE C, MD
354.01) 2.000 EACH
A0740 60201-1400 60-INCH PIPE
CULVERT
(REINFORCED
PIPE CULVERT) 34.000 LNFT
A0760 61010-0000 DRAINAGE WEEP
HOLE
(FOUR LOCKS) 78.000 EACH
A0780 61010-0000 DRAINAGE WEEP
HOLE
(MCCOYS FERRY) 78.000 EACH
A0800 62002-0000 STONE MASONRY (DRY-LAID WALL
INFILL) 45.000 SQYD
A0820 62003-0000 STONE MASONRY (TUNNEL REPAIR) ALL LPSM
A0840 62030-0000
REPOINT STONE
MASONRY
(FOUR LOCK
PORTAL HEAD
AND WINGWALLS)
30.000 LNFT
A0860 62031-0000 REPOINT STONE
MASONRY
(FOUR LOCKS
TUNNEL LINING) 1,300.000 SQFT
A0880 62031-0000 REPOINT STONE
MASONRY
(MCCOYS FERRY
TUNNEL LINING) 600.000 SQFT
B-3
A0900 62032-0000
REPOINT STONE
MASONRY
(FOUR LOCKS
MORTAR INJECT
TUNNEL LINING)
ALL LPSM
A0920 62032-0000
REPOINT STONE
MASONRY
(MCCOYS FERRY
MORTAR INJECT
TUNNEL LINING)
ALL LPSM
A0940 62035-0000
CLEAN STONE
MASONRY
SURFACES
(FOUR LOCKS
EFFLORESCENCE
REMOVAL)
520.000 SQYD
A0960 62035-0000
CLEAN STONE
MASONRY
SURFACES
(MCCOYS FERRY
EFFLORESCENCE
REMOVAL)
240.000 SQYD
A0980 62401-0300
FURNISHING AND
PLACING
TOPSOIL, 4-INCH
DEPTH
85.000 SQYD
A1000 62502-0000 TURF
ESTABLISHMENT 215.000 SQYD
A1020 62901-0600
ROLLED EROSION
CONTROL
PRODUCT, TYPE
2.B
(FOUR LOCKS
DITCH) 1,665.000 SQYD
A1040 63304-0900
SIGNS, ALUMINUM
PANELS, TYPE 3
SHEETING
85.000 SQFT
A1060 63316-1000 REMOVE AND
RESET SIGN 1.000 EACH
A1080 63501-0000
TEMPORARY
TRAFFIC
CONTROL
ALL LPSM
A1100 63701-0000 FIELD OFFICE 1.000 EACH
A1120 65001-1000
CONSTRUCT AND
MAINTAIN
DIVERSION
(TEMPORARY
ACCESS ROAD) ALL LPSM
A1140 65001-1000
CONSTRUCT AND
MAINTAIN
DIVERSION
(TEMPORARY
CROSSING) ALL LPSM
Submitted By: Schedule Total:
B-4
B-5
BID SCHEDULE
Project No : MD NP CHOH 235(2), 242(1), ETC. Schedule : B Schedule Type : Option
Project Name : Repair Carderock, Four Locks, and McCoys Ferry Tunnels
AMD# Line Item Number Pay Item Number Description Supplemental Description
Quantity Unit Unit Price Amount
B0020 15101-0000 MOBILIZATION ALL LPSM
B0040 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL LPSM
B0060 15401-0000 CONTRACTOR
TESTING ALL LPSM
B0080 15703-2000
SOIL EROSION
CONTROL,
TEMPORARY
TURF
ESTABLISHMENT
0.100 ACRE
B0100 15705-0100
SOIL EROSION
CONTROL, SILT
FENCE
(SILT FENCE ON
PAVEMENT) 190.000 LNFT
B0120 15705-1400
SOIL EROSION
CONTROL, FIBER
ROLL
(FILTER LOG)
645.000 LNFT
B0140 15706-1000
SOIL EROSION
CONTROL, INLET
PROTECTION
(STANDARD
INLET
PROTECTION)
4.000 EACH
B0160 20202-0000 SELECTIVE
CLEARING 465.000 SQYD
B0180 20301-2400 REMOVAL OF
SIGN 8.000 EACH
B0200 20302-0500 REMOVAL OF
CURB, CONCRETE 595.000 LNFT
B0220 20303-1600
REMOVAL OF
PAVEMENT,
ASPHALT
520.000 SQYD
B0240 20401-0000 ROADWAY
EXCAVATION 115.000 CUYD
B0260 20701-1000
SEPARATION-
STABILIZATION
GEOTEXTILE,
CLASS 2, TYPE E
540.000 SQYD
B0280 30202-2000
ROADWAY
AGGREGATE,
METHOD 2
270.000 TON
B0300 40301-0100
ASPHALT
CONCRETE
PAVEMENT, TYPE
(1/2-INCH NMSA)
300.000 TON
B0320 41202-0000 TACK COAT 660.000 GAL
B0340 41301-0000
ASPHALT
PAVEMENT
MILLING
(FULL DEPTH)
650.000 SQYD
B0360 41301-0400
ASPHALT
PAVEMENT
MILLING, 1 1/2-
INCH DEPTH
365.000 SQYD
B0380 55220-0000 REPAIR
CONCRETE
(HES CONCRETE) 1.000 SQYD
B0400 55223-0000
REPAIR
CONCRETE
(CLEAN AND
EPOXY COAT
REINFORCEMENT
1.000 LNFT
B0420 56101-0000
STRUCTURAL
CONCRETE
INJECTION AND
CRACK REPAIR
250.000 LNFT
B0440 60706-0000
CLEANING
DRAINAGE
STRUCTURE
(INLETS)
4.000 EACH
B0460 60901-0000 CURB, CONCRETE (MATCH EXISTING
CURB) 595.000 LNFT
B0480 61401-0000 LEAN CONCRETE
BACKFILL 5.000 CUYD
B0500 62025-1000
REMOVE AND
RESET STONE
MASONRY
(COPING
STONES) 1.000 CUYD
B0520 62030-0000 REPOINT STONE
MASONRY
(WINGWALLS) 115.000 LNFT
B0540 62401-0300
FURNISHING AND
PLACING
TOPSOIL, 4-INCH
DEPTH
135.000 SQYD
B-6
B0560 62401-0300
FURNISHING AND
PLACING
TOPSOIL, 4-INCH
DEPTH
(REPAIR
EROSION) 15.000 SQYD
B0580 62502-0000 TURF
ESTABLISHMENT 130.000 SQYD
B0600 62502-0000 TURF
ESTABLISHMENT
(REPAIR
EROSION) 15.000 SQYD
B0620 63304-0900
SIGNS, ALUMINUM
PANELS, TYPE 3
SHEETING
80.000 SQFT
B0640 63401-1900
PAVEMENT
MARKINGS, TYPE
J, SOLID
1,480.000 LNFT
B0660 63406-0400
RAISED
PAVEMENT
MARKER,
PLOWABLE, BI-
DIRECTIONAL
REFLECTIVE
15.000 EACH
B0680 63501-0000
TEMPORARY
TRAFFIC
CONTROL
ALL LPSM
B0700 64501-0000 LOCATE UTILITIES ALL LPSM
Submitted By: Schedule Total:
B-7
B - 8
PROPOSAL SUMMARY
Project MD NP CHOH 235(2), 242(1), ETC
(1) Schedule A (Base Task Order) Proposal Total (from Page B-4) = (1) $
(2) Schedule B (Government Option 1) Proposal Total (from Page B-7) = (2) $
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) $
Maximum Time Allowed for the Task Order if Schedules A and B are Awarded at the Same Time:
If the Government awards the task order as Schedules A + B, the performance period to complete all task order work will be 160 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately:
If the Government awards the task order as Schedule A only, the performance period to complete all
Schedule A work will be 145 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original task order, the performance period to complete all Schedule B work will be 61 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
File details come from the government source that posted it. Updated .