The document is a pavement memorandum for a federal highway project located in Washington and Montgomery Counties, Maryland. The memo details pavement rehabilitation recommendations for three specific locations: Ankeney Lane, Carderock Picnic Area Road, and McCoy's Ferry Tunnel. Key recommendations include:
- Ankeney Lane: Reconstruction of 300 feet south of the Four Locks Tunnel and 43 feet of the north approach, involving 4.0 inches of Asphalt Concrete (AC) in two lifts, a 6.0-inch aggregate base, and a separation/stabilization geotextile. 2. Carderock Picnic Area Road: Lowering the grade south of the Carderock Tunnel to facilitate drainage, with a segment requiring full reconstruction and another segment needing a 1.5-inch mill and overlay. 3. McCoy's Ferry Tunnel: Reconstruction of the southern approach to correct a current drop-off. The recommendations are based on a field review conducted on March 24, 2024, with Eastern Federal Lands Highway Division (EFLHD) and National Park Service (NPS) representatives, and reference the FP-14 "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects".
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - Mid-Atlantic Region Construction MATOC - 693C73-25-R-000073.pdf | ||
| Amendment 0001 - Mid-Atlantic Region Construction MATOC - 693C73-25-R-000073.pdf | ||
| Mid-Atlantic IDIQ RFP 693C73-25-R-000073.pdf | ||
| Attachment 1 - Technical Information Form.doc | DOC document | |
| Attachment 4 - J-Pages - SCRs for Seed Project.pdf | ||
| Attachment 13 - Bid Bond for Seed Project.pdf | ||
| Attachment 7 - NEPA CE MD NP CHOH 235(2) 242(1).pdf | ||
| Attachment 9 - Utility Status Report.pdf | ||
| Attachment 11 - Hydraulics Memo.pdf | ||
| Attachment 12 - MINIMUM WAGE DETERMINATION.pdf | ||
| Attachment 2 - VETS-4212 Form.pdf | ||
| Attachment 3 - B Pages - MD NP CHOH 235(2)_242(1)_ETC.pdf | ||
| Attachment 8 - Structure Inspection Report.pdf | ||
| Attachment 5 - Plans Sheets for Seed Project.pdf | ||
| Attachment 6 - Permit SHA-3-MO-1001-24-DO.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 5 Pages
Form FHWA-201 (Rev. 11-67)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA-121 for informal correspondence. MINUTE-MEMO
SUBJECT: Project MD NP CHOH 235(2), 241(1), ETC –Pavement Recommendations Addendum
TO MESSAGE/COMMENT FROM/DATE
Y. Kirtley Project Manager
C. Lyons Highway Design Manager
This is an addendum to the Pavement Memorandum for project MD NP CHOH 235(2), 241(1), ETC. located in Washington and Montgomery Counties, Maryland.
This addendum addresses revisions to the pavement rehabilitation recommendations based on additional scope added during the 70% plan in hand field review meeting.
The original pavement memorandum is included in Appendix A.
BACKGROUND
A plan in hand field review was held on March 24, 2024, with Eastern Federal Lands Highway Division (EFLHD) and National Park Service (NPS) representatives. From the meeting, two changes were made concerning the pavement treatment
Ankeney Lane (CHOH-0242) is to have the pavement rehabilitation extend 300 feet measured from the south portal of the Four Locks. The pavement included is experiencing high severity fatigue cracking across the entire roadway width. Additionally, approximately 43 feet of the paved approach from the north portal will undergo reconstruction.
Carderock Picnic Area Road (CHOH-0235) will be lower in grade south of the Carderock Tunnel to facilitate drainage.
Mccoy’s Ferry Tunnel (CHOH-0945) will undergo reconstruction on the southern approach to correct the current drop off.
PAVEMENT RECOMMENDATIONS
Based on the pavement conditions observed during the field view and the pavement cores, we recommend the following pavement rehabilitation strategies. The recommendations included here reference the FP-14, “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects”.
Ankeney Lane South of Four Locks Tunnel (Station 23+45.29 to 26+45.00), Aknekeny Lane North of Four Locks Tunnel (Station 21+80 to 22+22.44).
The existing pavement south of Four Locks Tunnel exhibits high severity fatigue cracking, which is indicative of base and/or subgrade failure. The existing pavement condition will require pavement reconstruction. Additionally, approximately 43 feet of the north approach will require pavement reconstruction to tie into the slab replacement in Four Locks Tunnel.
We recommend placement of 4.0 inches of Asphalt Concrete (AC) split into two lifts and a 6.0-inch aggregate base, followed by a separation/stabilization geotextile. Table 1 presents the minimum pavement requirements for the Ankeney Lane reconstruction.
K. Nguyen Pavement Engineer
Through:
A. Maloche Acting Pavements Team Leader
10/30/2024
Page 2 of 5 Pages
Use this form in lieu of transmittal slips within Dept. of Trans. When message
Table 1. Reconstruction – Ankeney Lane, Stations 21+80 to 22+22.44 and 23+45.29 to 26+45.00
Layer
Minimum Thickness
(in) Comments
AC Surface Course 1.5 Asphalt Concrete Pavement, Type 1, ½” NMSA as per Section 403 AC Tack Coat --- AC Tack Coat as per Section 412
AC Base Course 2.5 Asphalt Concrete Pavement, Type 1, ½” NMSA as per Section 403 Graded Aggregate
Base 6.0
Roadway Aggregate, Method 2 as per Section 302
Geotextile --- Geotextile, Class 2, Type E as per
Section 207
Four Locks Tunnel Remaining Northern Approach The pavement recommendations for the north approach to McCoy’s Ferry Tunnel (1.5 -inch mill and overlay) remain unchanged. Please refer to Appendix A for the minimum pavement requirements.
Carderock Area Picnic Road
While Carderock Picnic Area Road is in good condition, the road west of the existing tunnel will require reconstruction to lower the grade and facilitate drainage out of the existing tunnel. We recommend reconstruction for this segment of the road (Station 100+00 to 102+95.00).
For the remaining length of Carderock Picnic Area road (Station 102+95.00 to 105+00), we recommend a 1.5-inch mill and overlay. Table 2 and 3 presents the minimum pavement requirements for the reconstruction and mill and overlay section, respectively.
Page 3 of 5 Pages
Use this form in lieu of transmittal slips within Dept. of Trans. When message
Table 2. Reconstruction – Carderock Picnic Area Road (Station 100+00 to 102+95.00)
(in) Comments
AC Surface Course 1.5 Asphalt Concrete Pavement, Type 1, ½” NMSA as per Section 403 AC Tack Coat --- AC Tack Coat as per Section 412
AC Base Course 2.5 Asphalt Concrete Pavement, Type 1, ½” NMSA as per Section 403 Graded Aggregate
Base 6.0
Roadway Aggregate, Method 2 as per Section 302
Geotextile ---
Table 3. Mill and Overlay – Carderock Picnic Area Road (Station 102+95 to 105+00)
(in) Comments
AC Surface (Existing)
1.5 AC Milling as per Section 413
AC Surface Course 1.5 Asphalt Concrete Pavement, Type 1, ½” NMSA as per Section 403 Tack Coat --- AC Tack Coat as per Section 412
Page 4 of 5 Pages
Use this form in lieu of transmittal slips within Dept. of Trans. When message
Mccoy’s Ferry South Approach
The existing paved approach to Mccoy’s Ferry Tunnel is currently in good condition, but a 4-inch drop-off exists when transitioning from the concrete slab in the tunnel to the asphalt approach. We recommend reconstruction of the approach to alleviate the drop-off. Table 4 presents the minimum requirements.
Table 4. Reconstruction – South Approach to Mccoy’s Ferry Tunnel
(in) Comments
AC Surface Course 1.5 Asphalt Concrete Pavement, Type 1, ½” NMSA as per Section 403 AC Tack Coat --- AC Tack Coat as per Section 412
AC Base Course 2.5 Asphalt Concrete Pavement, Type 1, ½” NMSA as per Section 403 Graded Aggregate
Base 6.0
Roadway Aggregate, Method 2 as per Section 302
Geotextile ---
McCoy’s Ferry Tunnel North Approach, The pavement recommendations for the north approach to McCoy’s Ferry Tunnel (6 -inch aggregate surface) remain unchanged. Please refer to Appendix A for the minimum pavement requirements.
Page 5 of 5 Pages
Use this form in lieu of transmittal slips within Dept. of Trans. When message
APPENDICES
Appendix A: Pavement Memorandum dated March 16, 2023 Appendix B : Pavement Design Analysis
Appendix A – Pavement Memo Dated March
23, 2023
Appendix B – Pavement Design Analysis
1993 AASHTO Pavement Design
DARWin Pavement Design and Analysis System
A Proprietary AASHTOWare Computer Software Product
Flexible Structural Design Module
Reconstruction at Mccoy's Ferry, Four Locks, and Carderock
Flexible Structural Design
18-kip ESALs Over Initial Performance Period 50,000 Initial Serviceability 4.2 Terminal Serviceability 2 Reliability Level 75 % Overall Standard Deviation 0.49 Roadbed Soil Resilient Modulus 4,500 psi Stage Construction 1
Calculated Design Structural Number 2.30 in
Specified Layer Design
Material Description
Struct Coef.
(Ai)
Drain Coef.
(Mi)
(Di)(in)
Width
(ft)
Calculated
SN (in) 1 AC Surface Course 0.44 1 1.5 12 0.66 2 AC Base Course 0.44 1 2.5 12 1.10 3 Aggregate Base 0.12 1 6 12 0.72
Total - - - 10.00 - 2.48
| mdkladm.pdf |
| appcoverchoh.pdf |
| sss.pdf |
| Appendix B - Pavement Design Analysis.pdf |