This document is a District Office Permit issued by the Maryland Department of Transportation State Highway Administration (MDOT SHA) to the Federal Highway Administration (FHWA). The permit (SHA-3-MO-1001-24-DO) authorizes tunnel repairs within the SHA right-of-way on I-495 (Capital Beltway) between Clara Barton and MacArthur Boulevard, and includes provisions for temporary traffic controls such as single lane closures and sign placement. The permit is valid from 12/6/2024 to 12/6/2025.
Key requirements include obtaining final approvals for stormwater management and erosion control from Montgomery County, applying for a Traffic Control Permit at least two days prior to road closure, and notifying the MDOT State Highway Administration Utility Inspector 48 hours before commencing work. The permittee (FHWA) must also designate a Traffic Manager, provide a 24-hour emergency contact, and submit Geographic Information System (GIS) coordinates of installed facilities within 60 calendar days of project completion.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - Mid-Atlantic Region Construction MATOC - 693C73-25-R-000073.pdf | ||
| Amendment 0001 - Mid-Atlantic Region Construction MATOC - 693C73-25-R-000073.pdf | ||
| Attachment 7 - NEPA CE MD NP CHOH 235(2) 242(1).pdf | ||
| Attachment 9 - Utility Status Report.pdf | ||
| Attachment 10 - Pavement Memo.pdf | ||
| Attachment 11 - Hydraulics Memo.pdf | ||
| Attachment 12 - MINIMUM WAGE DETERMINATION.pdf | ||
| Attachment 5 - Plans Sheets for Seed Project.pdf | ||
| Attachment 2 - VETS-4212 Form.pdf | ||
| Attachment 3 - B Pages - MD NP CHOH 235(2)_242(1)_ETC.pdf | ||
| Attachment 8 - Structure Inspection Report.pdf | ||
| Mid-Atlantic IDIQ RFP 693C73-25-R-000073.pdf | ||
| Attachment 1 - Technical Information Form.doc | DOC document | |
| Attachment 4 - J-Pages - SCRs for Seed Project.pdf | ||
| Attachment 13 - Bid Bond for Seed Project.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE MARYLAND DEPARTMENT OF TRANSPORTATION
STATE HIGHWAY ADMINISTRATION (MDOT SHA)
9300 Kenilworth Avenue Greenbelt, MD 20770
District Office Permit
Permit Number: SHA-3-MO-1001-24-DO U.C. Ref or Job ID#: Project: MD NP
CHOH 235(2
Project Number:
Route No. : I495 Route Name : Capital Beltway Limit From : Clara Barton Limit To : MacArthur Blvd Begin Mile : End Mile :
Issue Date : 12/6/2024 Expiration Date : 12/6/2025
Anticipated Start Date : Duration of Work :
So far as the MDOT State Highway Administration has the right and power to grant same, permission is hereby given to:
Permittee : Attention :
Federal Highway Administration- EFL Alvin Alvarado Burgos
22001 Loudon County Parkway Phone#: (787) 773-8443 Suite 200 Email: alvin.alvarado@dot.gov Ashburn, VA 20147
Description of Work:
Tunnel repairs within SHA right-of-way as well as temporary traffic controls to include single lane closures and placement of signs. Link to plans: PW: MD NP CHOH 235(2), 242(1)_Plans_ext.pdf.
The following Special Conditions apply to this permit.
Once obtained, provide documentation for the final approvals for both the stormwater management and sediment and erosion control though the Montgomery County Dept. of Permitting Services and the Montgomery County Soil Conservation, respectively, for the proposed project and the improvements within the SHA ROW.
You must apply for a Traffic Control Permit for the above referenced road from the SHA, District 3 Utilities, at least two days (48 hours) prior to closure and it must be approved before starting work.
Weekend and Monday requests must be in by Thursday.
Notifications:
a. Permittee must notify , the MDOT State Highway Administration , at JOHN HUTH IV Utility Inspector
By: _________________________
District Engineer MDOT State Highway Administration or , 48 hours prior to commencement of any activities related(301) 513-7492 jhuth@mdot.maryland.gov to this permit.
b. The permittee will designate the Traffic Manager for this permit and a 24 hour emergency number at the pre-construction meeting.
c. All work for this permit shall be in conformance with the above referenced documentation supplied by the utility company.
d. The Permittee is to provide Geographic Information System (GIS) coordinates of any of itsrequested facilities, infrastructure, and appurtenances installed within the permitted area(s) to MDOT SHA District Office within Sixty (60) calendar days (or agreed upon timeline) of the completion of the Permittee’s installation. The GIS coordinates should be provided on or other agreed uponAs Constructed Plans mechanism. Please see the Section 001.03.03.06 2022 UTILITY PERMIT GENERAL PROVISIONS, As Constructed Deliverables.
THIS PERMIT IS ISSUED WITH THE REQUIREMENT THAT IT WILL BE ENFORCED WITH THE
UTILITY PERMIT GENERAL PROVISIONS. A COPY OF THE UTILITY PERMIT GENERAL
PROVISIONS SHALL BE ATTACHED TO EACH AND EVERY INDIVIDUAL WORK ORDER
PERMIT ALONG WITH ANY SPECIAL PROVISIONS, ATTACHMENTS, PLANS, AND ADDENDA IN
ORDER TO CONSTITUTE A COMPLETE AUTHORIZED UTILITY PERMIT. THE COMPLETE
AUTHORIZED UTILITY PERMIT OR DISTRICT OFFICE PERMIT WHICH MUST BE FOUND ON
THE JOB SITE AT ALL TIMES.