Attachment 9_Required Specifications Table.pdf

PDF 101 KB Posted

Attached to
Y1EB--Major Construction Project Western New York National Cemetery - Phase 1C Pembroke, NY
Solicitation number
36C10F23R0012
Issued by

About this file

This document provides specifications and references required for major construction projects for the Department of Veterans Affairs National Cemetery Administration. The specifications include sections for general requirements, network analysis schedules, shop drawings and samples, safety requirements, reference standards, quality control, testing laboratory services, temporary environmental controls, construction waste management, sustainable construction requirements, and general commissioning requirements. Additionally, it lists the National Cemetery Administration Master Construction Specifications and Division 33 specifications.

The related federal contract opportunity is for a major construction project at the Western New York National Cemetery in Pembroke, New York. Solicitation number 36C10F23R0012 seeks construction services for Phase 1C of the cemetery project through the Department of Veterans Affairs Office of Construction and Facilities Management.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications and References Required for all Major Construction Projects AE Contracts

Number Title Source Date Location

PG 18‐15D

A/E Submission Requirements for National Cemetery

Projects TIL NCA Projects Dec‐11 https://www.cfm.va.gov/til/aeDesSubReq.asp

N/A NCA Design Guide TIL NCA Projects 22‐Jan https://www.cfm.va.gov/til/nca/dgNCA.pdf

Construction Contracts Division 1 Specifications

Section # Title Source Date Notes

01 00 01 General Requirements TIL NCA Projects 6/1/2014

Add 1.34 Project Management Information System, requiring

Kahua. Also this section must be reviewed by the planned SRE to ensure the correct vehicle and trailer configuration and equipment is provided.

01 32 16.13 Network Analysis Schedules TIL NCA Projects 5/1/2012

01 33 23 Shop Drawings, Products Data and Samples TIL VHA 9/1/2022

01 35 26 Safety Requirements TIL VHA 9/1/2022

01 42 19 Reference Standards TIL NCA Projects 6/1/2014

01 45 00 Quality Control TIL VHA 2/1/2021

01 45 29 Testing Laboratory Services TIL NCA Projects 6/1/2014

01 57 19 Temporary Environmental Controls TIL NCA Projects 6/1/2014

01 74 19 Construction Waste Management TIL NCA Projects 6/1/2014

01 81 13 Sustainable Construction Requirements TIL NCA Projects 8/1/2016 Include LEED specs from TIL VHA Projects

01 91 00 General Commissioning Requirements TIL NCA Projects 12/1/2015

Construction Contracts Division 1 ‐ Division 33 ‐ NCA Master Construction Specifications

Divison 0 ‐ 33 Master Set Construction Specifications TIL NCA Projects Various https://www.cfm.va.gov/til/ncaSpec.asp

File details come from the government source that posted it. Updated .