Attachment_9_-_Price_Schedule.xlsx
XLSX spreadsheet 34 KB Posted
- Attached to
- EAST CANAL EFFICIENCY IMPROVEMENTS
- Solicitation number
- 140R4026R0025
About this file
This is a Price Schedule for the East Canal Efficiency Improvements Project under Solicitation 140R4026R0025, issued by the Department of the Interior Bureau of Reclamation for the Uncompaghre Project in Colorado. The price schedule outlines 52 Contract Line Item Numbers (CLINs) spanning multiple construction and engineering work categories, including mobilization, removal of existing features, concrete work for various structures, metal fabrications, earthwork, pipeline installation, and equipment furnishing.
The project encompasses significant infrastructure construction with quantities specified in various units including cubic yards (CY) for concrete and gravel, linear feet (LF) for clearing and pipe installation, square yards (SY) for surfacing, acres (AC) for seeding, tons (TN) for riprap, and individual units (EA) for gates and equipment. Key construction elements include concrete structures for diversion pipeline inlets and outlets, side channel spillway structures, double barrel siphon systems, and ramp flume structures. Additional work includes riprap installation (275 tons), gravel surfacing (1,400 SY), pipeline furnishing and installation (diversion pipeline of 4,202 LF and siphon pipeline of 170 LF), water removal and control activities, and installation of canal gates (12-inch and 36-inch) and safety cables. The schedule identifies that many items are bid on a lump sum basis, while unit prices are required for other items. The file includes notation for overhead rates, profit rates, general and administrative rates, and pass-through overhead and profit rates for subcontractors, though specific rate values are not provided in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ECEIP Final Price Schedule
East Canal Efficiency Improvements Project, Uncompaghre Project - Colorado
| Solicitation 140R4026R0025 |
| PRICE SCHEDULE |
| CLIN | Section | Supplies or Services | Quantity | Unit | Unit Price | Amount |
| 1 | WBR 1452.232-81 & 01 71 13 | Mobilization and Preparatory Work | For the lump sum of | |||
| 2 | 02 41 07 | Removal and Disposal of Existing Features | For the lump sum of | |||
| 3 | 03 30 00 | Concrete for Diversion Pipline Inlet Structure | 78 | CY | ||
| 4 | 03 30 00 | Concrete for Diversion Pipline Outlet Structure | 15 | CY | ||
| 5 | 03 30 00 | Concrete for Side Channel Spillway Structure | 37 | CY | ||
| 6 | 03 30 00 | Concrete for Side Channel Spillway Pipe Outlet | 3 | CY | ||
| 7 | 03 30 00 | Concrete for Double Barrel Siphon Inlet and Outlet Structures | 48 | CY | ||
| 8 | 03 30 00 | Concrete for Ramp Flume Structure | 72 | CY | ||
| 9 | 03 30 00 | Concrete for GK Check Structure | 56 | CY | ||
| 10 | 03 30 00 | Lean Concrete Grout for Riprap | 5.25 | CY | ||
| 11 | 03 81 10 | Concrete Removal for Side Channel Spillway Pipe Outlet | For the lump sum of | |||
| 12 | 05 50 00 | Pipe Guardrail | 260 | LF | ||
| 13 | 05 50 00 | Chain Guardrail - Posts | 18 | EA | ||
| 14 | 05 50 00 | Walkway Plank Grating | 4 | LF | ||
| 15 | 05 50 00 | Bar Grating | 121.25 | SF | ||
| 16 | 05 50 00 | Diversion Pipeline Trash Rack | For the lump sum of | |||
| 17 | 05 50 00 | Siphon Inlet Trash Rack | For the lump sum of | |||
| 18 | 05 50 00 | Side Channel Spillway Metal Fabrications | For the lump sum of | |||
| 19 | 05 50 00 | Vault Covers | 1 | EA | ||
| 20 | 05 50 00 | Guard Posts | 11 | EA | ||
| 21 | 31 03 33 | Removal and Control of Water |
for Diversion Pipeline Inlet
| Structure | For the lump sum of | |||||
| 22 | 31 03 33 | Removal and Control of Water for Diversion Pipeline Outlet Structure, Side Channel Spillway, and Double Barrel Siphon | For the lump sum of | |||
| 23 | 31 03 33 | Removal and Control of Water | ||||
| for Ramp Flume | For the lump sum of | |||||
| 24 | 31 03 33 | Removal and Control of Water | ||||
| for GK Check Structure | For the lump sum of | |||||
| 25 | 31 11 00 | Clearing and Grubbing for Diversion Pipeline | 4202 | LF | ||
| 26 | 31 11 00 | Clearing and Grubbing for Double Barrel Siphon Pipeline | 170 | LF | ||
| 27 | 31 11 00 | Clearing and Grubbing for Side Channel Spillway Pipeline | 162 | LF | ||
| 28 | 31 23 02 | Gravel Fill for Unsuitable Material | 155 | CY | ||
| 29 | 31 23 11 | Earthwork for Diversion Pipeline Inlet Structure | For the lump sum of | |||
| 30 | 31 23 11 | Earthwork for Diversion Pipeline Outlet Structure | For the lump sum of | |||
| 31 | 31 23 11 | Earthwork for Side Channel Spillway Structure | For the lump sum of | |||
| 32 | 31 23 11 | Earthwork for Siphon Inlet and Outlet Structures | For the lump sum of | |||
| 33 | 31 23 11 | Earthwork for Ramp Flume Structure | For the lump sum of | |||
| 34 | 31 23 11 | Earthwork for GK Check Structure | For the lump sum of | |||
| 35 | 31 23 22 | Excavation of Unsuitable Material | 155 | CY | ||
| 36 | 31 37 00 | Riprap | 275.00 | TN | ||
| 37 | 32 15 10 | Gravel Surfacing | 1400 | SY | ||
| 38 | 32 92 20 | Seeding Disturbed Areas | 5.25 | AC | ||
| 39 | 33 09 12 | Flow Measuring Equipment | For the lump sum of | |||
| 40 | 33 11 16 | Furnish and Install PVC Pipe for Diversion Pipeline Drain | 40 | LF | ||
| 41 | 33 11 18 | Furnish and Install Diversion Pipeline | 4202 | LF | ||
| 42 | 33 11 18 | Furnish and Install Double Barrel Siphon Pipeline | 170 | LF | ||
| 43 | 33 12 16 | Diversion Pipeline Air Vents | 5 | EA | ||
| 44 | 33 12 16 | Diversion Pipeline Drain Assembly | For the lump sum of | |||
| 45 | 33 12 16 | Side Channel Spillway Air Vent | 1 | EA | ||
| 46 | 33 12 16 | Double Barrel Siphon Air Vent | 2 | EA | ||
| 47 | 33 12 16 | Double Barrel Siphon Drain Assemblies | For the lump sum of | |||
| 48 | 33 44 20 | Furnish and Install Side Channel Spillway Pipe | 162 | LF | ||
| 49 | 35 22 10 | Furnish and Install 12-Inch Canal Gate | 1 | EA | ||
| 50 | 35 22 10 | Furnish and Install 36-Inch Canal Gate | 2 | EA | ||
| 51 | 35 22 10 | Furnish and Install 36-Inch X 36-Inch Slide Gates | 2 | EA | ||
| 52 | 35 69 20 | Safety Cable with Floats |
Davison, Duane C: Davison, Duane C:
GVIC - $77.87 per LF
30 LF
TOTAL FOR PRICE SCHEDULE
| OTHER RATES |
| Overhead Rate |
| Profit Rate |
| General and Administrative (G&A) Rate if applied/applicable |
| Pass-Through overhead and profit rates for subcontractors |