This is a Price Schedule for the East Canal Efficiency Improvements Project under Solicitation 140R4026R0025, issued by the Department of the Interior Bureau of Reclamation for the Uncompaghre Project in Colorado. The price schedule outlines 52 Contract Line Item Numbers (CLINs) spanning multiple construction and engineering work categories, including mobilization, removal of existing features, concrete work for various structures, metal fabrications, earthwork, pipeline installation, and equipment furnishing.

The project encompasses significant infrastructure construction with quantities specified in various units including cubic yards (CY) for concrete and gravel, linear feet (LF) for clearing and pipe installation, square yards (SY) for surfacing, acres (AC) for seeding, tons (TN) for riprap, and individual units (EA) for gates and equipment. Key construction elements include concrete structures for diversion pipeline inlets and outlets, side channel spillway structures, double barrel siphon systems, and ramp flume structures. Additional work includes riprap installation (275 tons), gravel surfacing (1,400 SY), pipeline furnishing and installation (diversion pipeline of 4,202 LF and siphon pipeline of 170 LF), water removal and control activities, and installation of canal gates (12-inch and 36-inch) and safety cables. The schedule identifies that many items are bid on a lump sum basis, while unit prices are required for other items. The file includes notation for overhead rates, profit rates, general and administrative rates, and pass-through overhead and profit rates for subcontractors, though specific rate values are not provided in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ECEIP Final Price Schedule

East Canal Efficiency Improvements Project, Uncompaghre Project - Colorado

Solicitation 140R4026R0025
PRICE SCHEDULE
CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
1WBR 1452.232-81 & 01 71 13Mobilization and Preparatory WorkFor the lump sum of
202 41 07Removal and Disposal of Existing FeaturesFor the lump sum of
303 30 00Concrete for Diversion Pipline Inlet Structure78CY
403 30 00Concrete for Diversion Pipline Outlet Structure15CY
503 30 00Concrete for Side Channel Spillway Structure37CY
603 30 00Concrete for Side Channel Spillway Pipe Outlet3CY
703 30 00Concrete for Double Barrel Siphon Inlet and Outlet Structures48CY
803 30 00Concrete for Ramp Flume Structure72CY
903 30 00Concrete for GK Check Structure56CY
1003 30 00Lean Concrete Grout for Riprap5.25CY
1103 81 10Concrete Removal for Side Channel Spillway Pipe OutletFor the lump sum of
1205 50 00Pipe Guardrail260LF
1305 50 00Chain Guardrail - Posts18EA
1405 50 00Walkway Plank Grating4LF
1505 50 00Bar Grating121.25SF
1605 50 00Diversion Pipeline Trash RackFor the lump sum of
1705 50 00Siphon Inlet Trash RackFor the lump sum of
1805 50 00Side Channel Spillway Metal FabricationsFor the lump sum of
1905 50 00Vault Covers1EA
2005 50 00Guard Posts11EA
2131 03 33Removal and Control of Water

for Diversion Pipeline Inlet

StructureFor the lump sum of
2231 03 33Removal and Control of Water for Diversion Pipeline Outlet Structure, Side Channel Spillway, and Double Barrel SiphonFor the lump sum of
2331 03 33Removal and Control of Water
for Ramp FlumeFor the lump sum of
2431 03 33Removal and Control of Water
for GK Check StructureFor the lump sum of
2531 11 00Clearing and Grubbing for Diversion Pipeline4202LF
2631 11 00Clearing and Grubbing for Double Barrel Siphon Pipeline170LF
2731 11 00Clearing and Grubbing for Side Channel Spillway Pipeline162LF
2831 23 02Gravel Fill for Unsuitable Material155CY
2931 23 11Earthwork for Diversion Pipeline Inlet StructureFor the lump sum of
3031 23 11Earthwork for Diversion Pipeline Outlet StructureFor the lump sum of
3131 23 11Earthwork for Side Channel Spillway StructureFor the lump sum of
3231 23 11Earthwork for Siphon Inlet and Outlet StructuresFor the lump sum of
3331 23 11Earthwork for Ramp Flume StructureFor the lump sum of
3431 23 11Earthwork for GK Check StructureFor the lump sum of
3531 23 22Excavation of Unsuitable Material155CY
3631 37 00Riprap275.00TN
3732 15 10Gravel Surfacing1400SY
3832 92 20Seeding Disturbed Areas5.25AC
3933 09 12Flow Measuring EquipmentFor the lump sum of
4033 11 16Furnish and Install PVC Pipe for Diversion Pipeline Drain40LF
4133 11 18Furnish and Install Diversion Pipeline4202LF
4233 11 18Furnish and Install Double Barrel Siphon Pipeline170LF
4333 12 16Diversion Pipeline Air Vents5EA
4433 12 16Diversion Pipeline Drain AssemblyFor the lump sum of
4533 12 16Side Channel Spillway Air Vent1EA
4633 12 16Double Barrel Siphon Air Vent2EA
4733 12 16Double Barrel Siphon Drain AssembliesFor the lump sum of
4833 44 20Furnish and Install Side Channel Spillway Pipe162LF
4935 22 10Furnish and Install 12-Inch Canal Gate1EA
5035 22 10Furnish and Install 36-Inch Canal Gate2EA
5135 22 10Furnish and Install 36-Inch X 36-Inch Slide Gates2EA
5235 69 20Safety Cable with Floats

Davison, Duane C: Davison, Duane C:

GVIC - $77.87 per LF

30 LF

TOTAL FOR PRICE SCHEDULE

OTHER RATES
Overhead Rate
Profit Rate
General and Administrative (G&A) Rate if applied/applicable
Pass-Through overhead and profit rates for subcontractors