This document is a Sustainability Implementation guide for the Orovada Wildland Fire Complex project, dated 13 March 2025. The document outlines detailed requirements for implementing sustainable building practices in accordance with the Guiding Principles for Sustainable Federal Buildings, specifically targeting new construction and modernization (NC&M) projects. Key sustainability focus areas include integrated design management, sustainable siting, stormwater management, energy efficiency, water conservation, indoor air quality, materials selection, waste management, and building resilience.
The guide provides specific instructions for compliance across 31 different sustainability criteria, with many sections requiring the Design/Construction team to coordinate with the Bureau of Land Management (BLM). Notable requirements include ensuring Energy Star and FEMP-designated products are used, designing facilities to exceed energy performance requirements by 30%, providing WaterSense plumbing fixtures, implementing indoor air quality plans during construction, identifying recyclable markets, and developing risk mitigation strategies. The document applies to design/construction projects over $3.8M in FY2025, with compliance mandatory for federal statutory requirements.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 13 March, 2025
Sustainability Implementation Orovada Wildland Fire Complex
This page left intentionally blank.
Table of Contents
1) Overview: Sustainability Implementation
2) NC&M 1.1 Integrated Design and Management
3) NC&M 1.2 Sustainable Siting
4) NC&M 1.3 Stormwater Management
5) NC&M 1.4 Infrastructure Utilization and Optimization
6) NC&M 1.5 Commissioning
7) NC&M 2.1 Energy Efficiency
8) NC&M 2.2 Energy Metering
9) NC&M 2.3 Renewable Energy
10) NC&M 2.4 Benchmarking
11) NC&M 3.1 Indoor Water Use
12) NC&M 3.2: Water Metering
13) NC& M 3.3 Outdoor Water Use
14) NC&M 3.4 Alternative Water
15) NC&M 4.1 Ventilation and Thermal Controls
16) NC&M 4.2 Daylighting and Lighting Controls
17) NC&M 4.3 Low-Emitting Materials and Products
18) NC&M 4.4 Radon Mitigation
19) NC&M 4.5 Moisture and Mold Control
20) NC&M 4.6 Indoor Air Quality during Construction
21) NC&M 4.7 Environmental Smoking Control
22) NC&M 4.8 Integrated Pest Management
23) NC&M 4.9 Occupant Health and Wellness
24) NC&M 5.1 Materials – Recycled Content
25) NC&M 5.2 Materials – Biobased Content
26) NC&M 5.3 Products
27) NC&M 5.4 Ozone Depleting Substances
28) NC&M 5.5 Hazardous Waste
29) NC&M 5.6 Solid Waste Management
30) NC&M 6.1 Risk Assessment
31) NC&M 6.2 Building Resilience and Adaptation
1) Overview: Sustainability Implementation
Federal facilities and operations are required to meet federal statutory requirements. Many of these requirements relate to high-performance sustainable buildings. The Guiding Principles for Sustainable Federal Buildings and Associated Instructions December 2020 provide a means to meet and document the building statutory requirements as well as other sustainable building recommendations. Compliance with the Guiding Principles is required for design/construction projects over $3.8M in FY2025. Below $3.8M, compliance with Guiding Principles is encouraged. In all projects, compliance with federal statutory requirements is mandatory.
For this project, the Design/Construction team shall coordinate with BLM to ensure compliance with the Guiding Principles. Guiding Principle criteria for New Construction and Modernization (NC&M) projects are listed below with clarification of the roles of the Design/Construction team and BLM in implementing each specific criteria and, in many cases, specific direction is provided for compliance.
Submit a high-level summary detailing how each criteria/principle is addressed. Refer to the Guiding Principles for Sustainable Federal Buildings and Associated Instructions December 2020 document for additional information and links to available resources.
2) NC&M 1.1 Integrated Design and Management
The project sustainability goal is to meet the Guiding Principles as addressed through this document.
Identify a team member for each criteria who is responsible to ensure compliance with the criteria.
Document compliance of each criteria throughout design and construction including a summary submittal detailing how each principle is addressed.
3) NC&M 1.2 Sustainable Siting
BLM is responsible to ensure site selection complies with Federal Management Regulation. No action required. (41 CFR § 102-76.20), (National Environmental Policy Act of 1966, as amended), (42 U.S.C.
4321), National Historic Preservation Act of 1966, as amended), (16 U.S.C. 470).
4) NC&M 1.3 Stormwater Management
Address stormwater management in accordance with “Technical Guidance on Implementing the Stormwater Runoff Requirements for Federal Projects under Section 438 of the Energy Independence and Security Act.” (42 USC § 17094).
5) NC&M 1.4 Infrastructure Utilization and Optimization
Bicycle racks and showers are included in the project. No action required. at the facility. Showers are provided as part of the building floor plan.
6) NC&M 1.5 Commissioning
Document that HVAC and lighting systems comply with Government requirements using the commissioning process identified in ASHRAE Standard 202. Tailor commissioning effort based on building size and system complexity. (42 U.S.C 8253(f)(1)(A))
7) NC&M 2.1 Energy Efficiency
Ensure Energy Star and FEMP-designated products are provided and installed. Comply with modelling and documentation required by 10 CFR Part 433 (Commercial) or Part 435 (Residential) to design facility to exceed energy performance requirements by at least 30 percent, where life cycle cost-effective. For modular housing, obtain EnergyStar Certification by achieving an Energy Star score of 75 or higher. (42 U.S.C. § 6834(a)(3)(A)), (10 CFR parts 433, subpart A and 10 CFR parts 435, subpart A), (42 U.S.C. § 8259b), (10 CFR § 436.40-436.43)
8) NC&M 2.2 Energy Metering
Provide standard electrical meter for each building. This can be accomplished by installing submetering downstream of the utility meter for each building. (42 U.S.C. § 8253(e))
9) NC&M 2.3 Renewable Energy
This element is not to be pursued. No action required. (42 U.S.C. § 15852(a))
10) NC&M 2.4 Benchmarking
BLM will perform benchmarking after construction. No action required. (42 U.S.C. § 8253(f)(8))
11) NC&M 3.1 Indoor Water Use
Provide WaterSense plumbing fixtures.
12) NC&M 3.2: Water Metering
Provide standard water meter for each building. (Federal Building Metering Guidance)
13) NC& M 3.3 Outdoor Water Use
Xxeriscaping techniques have been maximized for the site to reduce the use of potable water. Drought tolerant planting is encouraged in areas where turf grass would be typically expected. No action required.
14) NC&M 3.4 Alternative Water
This element is not to be pursued. No action required.
15) NC&M 4.1 Ventilation and Thermal Controls
Comply with the most current version of ASHRAE “Ventilation for Acceptable Indoor Air Quality” Standard 62.1 or 62.2 and ASHRAE “Thermal Environmental Conditions for Human Occupancy.” (41 CFR §§ 102-74.195 and 102-74.185).
16) NC&M 4.2 Daylighting and Lighting Controls
Meet illumination levels in accordance with 41 CFR § 102-74.180 and maximize the use of automatic dimming controls or accessible manual controls in regularly occupied spaces. Spaces along exterior walls are provided with shades. (41 CFR § 102-74.180).
17) NC&M 4.3 Low-Emitting Materials and Products
Use compliant products on at least 75% of interior products by cost or surface area, for the following materials and products: composite wood products, flooring and carpet systems, wall panels, insulation, adhesive, sealants, interior paints, and finishes, solvents, janitorial supplies, and furnishings.
18) NC&M 4.4 Radon Mitigation
Passive radon mitigation system is provided in the design No action required. (41 CFR § 102-80.20).
19) NC&M 4.5 Moisture and Mold Control
BLM to implement moisture control strategy after construction. No action required.
20) NC&M 4.6 Indoor Air Quality during Construction
Develop and implement a plan to address indoor air quality during construction based upon “2008 IAQ Guidelines for Occupied Buildings Under Construction.”
21) NC&M 4.7 Environmental Smoking Control
Provide no smoking signs at building entrances. (41 CFR § 102-74.315 and 102-74.330).
22) NC&M 4.8 Integrated Pest Management
BLM to develop and implement Integrated Pest Management after construction. No action required. (41
CFR § 102-74.35).
23) NC&M 4.9 Occupant Health and Wellness
Horseshoe pits, volleyball ay include but are not limited to water bottle-refilling stations, combination bottle-refilling stations and electric water coolers, bicycle racks, picnic tables, fitness areas, etc. Showers are provided as part of the building floor plan. Horseshoe pits, volleyball court, picnic tables, bicycle racks, showers and refrigerator door-mounted filtered ice and water fillers are provided. No action required.
24) NC&M 5.1 Materials – Recycled Content
Use compliant products to the maximum extent possible unless products are not available within a reasonable period of time, fail to meet the performance standards required, or are available at an unreasonable price. (42 U.S.C. § 6962).
25) NC&M 5.2 Materials – Biobased Content
Use compliant products to the maximum extent possible unless products are not available within a reasonable period of time, fail to meet the performance standards required, or are available at an unreasonable price. (The Farm Security and Rural Investment Act of 2002), (7 U.S.C 8102).
26) NC&M 5.3 Products
Use Sustainable Products to the maximum extent possible unless products are not available within a reasonable period of time, fail to meet the performance standards required, or are available at an unreasonable price. (FAR 52.223-23 Sustainable Products and Services).
27) NC&M 5.4 Ozone Depleting Substances
Use compliant products. (42 U.S.C. § 7671k), (42 U.S.C. § 7671l), (40 CFR part 82) (40 CFR Parts 84, 261, 262, 266, 270, and 271) (Phasedown of Hydrofluorocarbons: Management of Certain Hydrofluorocarbons and Substitutes Under the American Innovation and Manufacturing Act of 2020).
28) NC&M 5.5 Hazardous Waste
Comply with all hazardous waste construction or operation activities that are covered by RCRA subtitle C and subtitle I and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). (42 U.S.C. § 9601 et seq. and its implementing regulations at 40 CFR Parts 239-282).
29) NC&M 5.6 Solid Waste Management
Identify markets for recyclables within 50-mile radius of project site. Where markets exist, divert at least 50% of construction and demolition materials from landfills. Where markets exist, identify space within the building for the collection and storage of the following waste streams; paper, plastic, metal, corrugated cardboard, glass, and batteries.
30) NC&M 6.1 Risk Assessment
Use tools to identify hazards, threats, and risks expected at the facility. Determine risk mitigation strategies or products that minimize risk exposure.
31) NC&M 6.2 Building Resilience and Adaptation
Implement cost-effective strategies and products identified in risk assessment.
End of Document
| Cover |
| Table of Contents |
| 1) Overview: Sustainability Implementation |
| 2) NC&M 1.1 Integrated Design and Management |
| 3) NC&M 1.2 Sustainable Siting |
| 4) NC&M 1.3 Stormwater Management |
| 5) NC&M 1.4 Infrastructure Utilization and Optimization |
| 6) NC&M 1.5 Commissioning |
| 7) NC&M 2.1 Energy Efficiency |
| 8) NC&M 2.2 Energy Metering |
| 9) NC&M 2.3 Renewable Energy |
| 10) NC&M 2.4 Benchmarking |
| 11) NC&M 3.1 Indoor Water Use |
| 12) NC&M 3.2: Water Metering |
| 13) NC& M 3.3 Outdoor Water Use |
| 14) NC&M 3.4 Alternative Water |
| 15) NC&M 4.1 Ventilation and Thermal Controls |
| 16) NC&M 4.2 Daylighting and Lighting Controls |
| 17) NC&M 4.3 Low-Emitting Materials and Products |
| 18) NC&M 4.4 Radon Mitigation |
| 19) NC&M 4.5 Moisture and Mold Control |
| 20) NC&M 4.6 Indoor Air Quality during Construction |
| 21) NC&M 4.7 Environmental Smoking Control |
| 22) NC&M 4.8 Integrated Pest Management |
| 23) NC&M 4.9 Occupant Health and Wellness |
| 24) NC&M 5.1 Materials – Recycled Content |
| 25) NC&M 5.2 Materials – Biobased Content |
| 26) NC&M 5.3 Products |
| 27) NC&M 5.4 Ozone Depleting Substances |
| 28) NC&M 5.5 Hazardous Waste |
| 29) NC&M 5.6 Solid Waste Management |
| 30) NC&M 6.1 Risk Assessment |
| 31) NC&M 6.2 Building Resilience and Adaptation |