Attachment 9 - MSCSP.docx

DOCX document 29 KB Posted

Attached to
Tug Time Charter for Naval Base, Guam
Solicitation number
N3220526R6049
Issued by

About this file

This is a Mission Essential Contractor Services Plan (MECSP) worksheet template required for submission in response to a Department of the Navy Military Sealift Command solicitation for tug services at Naval Base Guam. The worksheet is not a substantive document but rather a compliance template that bidders must complete in accordance with DFARS 252.237-7024.

The worksheet requires offerors to provide narrative descriptions addressing six mandatory elements of continuity of operations planning: provisions for acquiring essential personnel and resources to sustain operations for up to 30 days following a disruption; strategies for addressing challenges during extended crisis events such as pandemic waves; mitigation of time delays between personnel and resource acquisition requests and on-site availability; identification, training, and preparedness protocols for personnel capable of remote work or relocation to alternate facilities; established alert and notification procedures for mobilizing essential contractor personnel; and communication approaches for conveying employee roles and responsibilities during crises. Offerors must reference the specific sections and page numbers in their MECSP where each requirement is addressed, or provide the information directly within the worksheet as an addendum if not included in the main plan submission.

View the file

Other files

File Type Posted
Solicitation Amendment N3220526R60490004 SF 30.pdf PDF
SF 1449 - N3220526R6049 Amendment 0004.pdf PDF
Solicitation Amendment N3220526R60490003 SF 30.pdf PDF
SF1449 A0003 - N3220526R60490003.pdf PDF
Solicitation Amendment - N3220526R60490002 -SF1449.pdf PDF
Solicitation Amendment N3220526R60490002 SF 30.pdf PDF
Attachment 1 - TUGTIME 2026 (6-26) GUAM PROFORMA A0001.pdf PDF
Amendment A0001 SF1449 - N3220526R60490001.pdf PDF
Amendment A0001 SF 30 - N3220526R60490001.pdf PDF
Attachment 1 - TUGTIME 2026 (6-26) GUAM PROFORMA A0001.pdf PDF
Attachment 3 - Crew Complement.docx DOCX document
Attachment 5 - Technical Offer Worksheet 26R6049.xlsx XLSX spreadsheet
Attachment 4 - Offered Rates Sheet.docx DOCX document
Attachment 12 - Shipyard Data Template.xlsx XLSX spreadsheet
Attachment 7 - Disclosure of Lobbying Activities (SF LLL).pdf PDF
Attachment 2 - Offered Vessel Characteristic Worksheet.docx DOCX document
Solicitation - N3220526R6049.pdf PDF
Attachment 6 - Department of Labor Wage Determination.pdf PDF
Attachment 10 - Strike Contingency Plan and Vessel Casualty Plan.docx DOCX document
Attachment 1 - TUGTIME 2026 (6-26) GUAM PROFORMA.pdf PDF
Attachment 11 - Request for Clarification-Question.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 9

MISSION ESSENTIAL CONTRACTOR SERVICES PLAN (MECSP) WORKSHEET

MISSION ESSENTIAL CONTRACTOR SERVICES PLAN WORKSHEET

In accordance with DFARS 252.237-7024, NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES offerors are required to submit a Mission Essential Contractor Services Plan (MECSP). Section L-4.11 of the RFP also requires that offerors on the subject procurement complete and submit this MECSP Worksheet.

For each of the below required elements of a MECSP, set forth by DFARS 252.237-7023, offerors must respond with a narrative description of how the proposed MECSP provides the required information. References to the section and page number of the MECSP in which the requirement is addressed must also be provided. If the required information is not included in the proposed MECSP, the response provided in the below worksheet will be considered an addendum to the proposed MECSP. Please attach additional sheets, if more space is required than provided below.

1. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed (DFARS 252.237-7024(b)(1)).

2. Address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (DFARS 252.237-7024(b) (2) (i)).

3. Address the time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (DFARS 252.237-7024(b) (2) (ii)).

4. Address the components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (DFARS 252.237-7024(b) (2) (iii)).

5. Address any established alert and notification procedures for mobilizing identified “essential contractor service” personnel (DFARS 252.237-7024(b) (2) (iv)).

6. Address the approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (DFARS 252.237-7024(b) (2) (v)).

MSC TUGTIME 2026 (5-26)

File details come from the government source that posted it. Updated .