This is a Quality Assurance Surveillance Plan (QASP) that establishes performance standards and acceptable quality levels for contractor performance under the Norfolk Naval Shipyard coolant maintenance contract. The QASP defines surveillance methods and rating criteria (SAT/UNSAT) for key performance tasks including machine coolant cleaning, continual maintenance, and coolant performance tracking. For machine cleaning operations, the contractor must coordinate arrival with the Contracting Officer's Representative (COR) with zero failures to meet agreed-upon dates or perform successful cleaning, subject to 100% inspection. For continual maintenance operations, the contractor must supply clean-out data sheets within 10 calendar days of completion with a maximum of two allowable failures in submission timeliness, monitored through 100% COR inspection.
The QASP identifies two formal deliverables with defined submission requirements: Clean-Out Data Sheets (CDRL A001) due within 10 calendar days after each machine maintenance with two copies required in electronic format, and Coolant Laboratory Analysis reports (CDRL A002) due within 10 calendar days after each coolant sample with two copies required in electronic format, both submitted to the COR. Additional notes specify safety requirements including the mandatory use of a spotter with a whistle during forklift operations per Norfolk Naval Shipyard Occupational Safety and Health Environment (OSHE) standards. The surveillance method for coolant laboratory analysis tracking involves COR inspection of laboratory reports to verify coolant performance when Hocut 795 products are not utilized.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4 - FAR 52.212-1 Addendum.docx | DOCX document | |
| Attachment 9 - Wage Determination Service Contract 15-4341.pdf | ||
| Attachment 10 - Castrol2986195.pdf | ||
| Attachment 11 - Hysol_mb50.pdf | ||
| Attachment 2 - Contractor Technical Certification Template.docx | DOCX document | |
| Attachment 1 -Solicitation - N4215826QS012.pdf | ||
| Attachment 3 - PWS for Coolant Maintenance.docx | DOCX document | |
| Attachment 6 - Appendix B.pdf | ||
| Attachment 12 - qdna-HOCUT795H.pdf | ||
| Attachment 5 - Appendix A (Equipment List) SN.pdf | ||
| Attachment 7 -Exhibit C (DD 1423 CDRL).pdf | ||
| Attachment 13 - tds_hocut_795_EN.pdf | ||
| Attachment 14 - BPXE 97FDKT.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix B Quality Assurance Surveillance Plan (QASP)
This Quality Assurance Surveillance Plan (QASP) includes performance standards. The Government will use these standards to determine contractor performance and shall complete contractor performance to the Acceptable Quality Level (AQL). The COR will use this document to rate contractor. Rating will be either SAT or UNSAT. Any UNSAT rating will be explained in the notes block.
PWS
Paragraph
| Task |
| Performance Standard |
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
| Performance Rating |
Sat / Unsat
| 6.3. |
| The contractor shall clean all additional machines added to Appendix A. |
| The contractor shall coordinate arrival with COR and perform coolant cleaning successfully. |
| 0 (zero) failures to respond to the agreed upon arrival date or perform successful cleaning. |
| 100% Inspection – COR will review inspect. |
| 6.5 |
| The contractor shall perform continual maintenance of machine coolant. |
| The contractor shall supply the COR with clean-out data sheet within 10 days of completion of maintenance. |
| 2 (two) failure to supply data sheet within 10 days. |
| 100% Inspection – COR will review inspect. |
| 6.6. – 6.8 |
| The contractor shall track coolant performance (if Hocut 795 not utilized). |
| The contractor shall supply COR with coolant laboratory analysis within 10 days of completion of maintenance. |
| 2 (two) failures to supply laboratory analysis within 10 days. |
| 100% Inspection – COR will inspect. |
Notes:
6.2 Forklift operator must always have a spotter.
6.2.1 Per NNSY OSHE, forklift operation requires a spotter with a whistle while in transit.
APPENDIX B
Deliverables Schedule
| Deliverable |
| Frequency |
| Copies |
| Medium/Format |
| Submit To |
6.5.3.
Clean-Out Data Sheet
(CDRL A001)
| Within 10 calendar days after each machine maintenance |
| 2 |
| As specified/ Electronic |
| COR |
6.7.4.
Coolant Laboratory Analysis
(CDRL A002)
| Within 10 calendar days after each coolant sample |
| 2 |
| As specified/ Electronic |
| COR |