Attachment 8 Plans_918PC2008.23_2019-10-30-5_pages 201-242.pdf
PDF 12 MB Posted
- Solicitation number
- 36C10F20R0069
About this file
This solicitation notice announces a tiered evaluation for the Ohio Western Reserve National Cemetery Phase 3 Development project. The acquisition will follow four tiers of evaluation: first for SDVOSB concerns, then VOSB concerns, followed by small businesses with priority given to HUBZone small businesses. Large businesses will be considered last if no award can be made under the first three tiers. The Department of Veterans Affairs Office of Construction and Facilities Management is the contracting agency. Products and services required include construction services for development of the national cemetery. The solicitation is being issued with tiered evaluation and cancellation provisions if no award can be made to ensure fulfillment of socioeconomic program goals.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEYNOTESGENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i l e
P a t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h t h i n c o f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
ELECTRICAL AND TECHNOLOGY -
PARTIAL SITE PLAN
ELECTRICAL AND TECHNOLOGY - PARTIAL SITE PLAN
SCALE: 1"=100'-0"
R
T
H
N
O
SACMDS
ES-101
BID DOCUMENTS
PUMP HOUSE ELECTRICAL PLAN
SCALE: 1/4"=1'-0"
R
PUMP HOUSE ELECTRICAL AND TECHNOLOGY
DEMOLITION PLAN
SCALE: 1/4"=1'-0"
R
GENERAL NOTES
KEYNOTES
PUMP HOUSE TECHNOLOGY PLAN
SCALE: 1/4"=1'-0"
R
IKP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
3W01
E-3W01-1
PUMP HOUSE - ELECTRICAL AND
TECHNOLOGY PLANS
SACMDS 202
D.5
DRAIN
HB
HB
F.D.
F.D.
F.D.
EYE
WASH
HB
F.D.
F.D.
F.D.
EYE
WASH
HB
BREAK ROOM
VESTIBULE
BREAK ROOM
DIR. OFFICE
MULTIPURPOSE
WOMEN
SHOWER
114A
MEN
LOCKER RM.
SHOWER
116A
CORR.
PARTS
CORR.
WASH BAY
MAINT.
STORAGE
STORAGE
MECH CORR.
MECH SHOP
UNISEX TOILET
VESTIBULE
OPEN OFFICE
ASST. DIR.
OFFICE
OFFICE
SECURITY
122A
ELEC/MECH
IT CLOSET
GENERAL NOTES
KEYNOTES
IKP
IKP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
SACMDS
ADMINISTRATION AND MAINTENANCE
BUILDING - TECHNOLOGY
DEMOLITION PLAN
ADMINISTRATION AND MAINTENANCE BUILDING - TECHNOLOGY DEMOLITION PLAN
SCALE: 1/8"=1'-0"
R
T
H
N
O
E-1001-1
HB
HB
F.D.
F.D.
F.D.
EYE
WASH
HB
F.D.
F.D.
F.D.
EYE
WASH
HB
BREAK ROOM
VESTIBULE
BREAK ROOM
DIR. OFFICE
MULTIPURPOSE
WOMEN
SHOWER
114A
MEN
LOCKER RM.
SHOWER
116A
CORR.
PARTS
CORR.
WASH BAY
MAINT.
STORAGE
STORAGE
MECH CORR.
MECH SHOP
UNISEX TOILET
VESTIBULE
OPEN OFFICE
ASST. DIR.
OFFICE
OFFICE
SECURITY
122A
ELEC/MECH
IT CLOSET
GENERAL SHEET NOTES
KEYNOTES
MD
MD
CAM
01-01/+144"
CAM
01-02/+144"
CAM
01-03/+144"
CR1
CSS
CAM
01-04/+144"
CAM
01-05/+144"
CAM
01-06/+144"
CR1
CSS
MD
CR1
CSS
CR1
CSS
MD
CR1
CSS
MD
CR1
CSS
CAM
01-07/+144"
CAM
01-08/+144"
CAM
01-09/+144"
CAM
01-10/+108"
MD
MD
MD
MD
MD
CR1
CSS
CR1
CSS
MC-1
+108"
+108"
MD
+108"
MD
+108"
MD
+108"
MD
+108"
MD
+108"
MD
+108"
MD
MD
MD
INTRUSION DETECTION
PANEL
IKP
+48"
CR1
CSS
CR1
CSS
CSS
CR1
CSS
CR1
TR-1
SPACE RESERVED FOR
ACCESS CONTROL
E-1001-2
SS-1
SS-1 CONDENSING UNIT
DS-30RA
E
E
CSS
CR1
CSS
CR1
CR1
CSS
CR1
CSS
016 015
CAM
01-13/+144"
SPACE RESERVED FOR
INTRUSION DETECTION 10
EXISTING DOOR
RELEASE
MD
01-17
CAM
01-18
CAM
MD
+96"
SIR
E-1001-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
KBSJCS
SC-LPP-1
EXISTING EQUIPMENT RACK
EXISTING WALL FIELD
SCALE: 1/4"=1'-0"
R T
H
N
O
ADMINISTRATION & MAINTENANCE
BUILDING - ELECTRICAL AND
TECHNOLOGY PLAN
ADMINISTRATION & MAINTENANCE BUILDING - ELECTRICAL AND TECHNOLOGY PLAN
SCALE: 1/8"=1'-0"
R
T
H
N
O
E-1001-2
SC-VWM-1
SC-VWM-1
SC-UPS-1
SC-PDU-1
1003 MAINTENANCE SHOP TECHNOLOGY DEMOLITION PLAN
SCALE: 1/8"=1'-0"
R
1004 MAINTENANCE SHOP TECHNOLOGY DEMOLITION PLAN
SCALE: 1/8"=1'-0"
R
GENERAL NOTES
KEYNOTES
IKP
IKP
IKP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
1003/1004
MAINTENANCE SHOPS -
TECHNOLOGY DEMOLITION PLANS
KBSJCS
E-1003-1
1003 MAINTENANCE SHOP TECHNOLOGY PLAN
SCALE: 1/8"=1'-0"
R
1004 MAINTENANCE SHOP TECHNOLOGY PLAN
SCALE: 1/8"=1'-0"
R
MD
MD
SECURITY
PANEL
SECURITY
PANEL
CR1
CSS
CR1
CSS
CR1
CSS
MD
CR1
CSS
MD
GENERAL SHEET NOTES
1. ALL INTRUSION DETECTION CABLING WILL BE
INSTALLED IN CONDUIT BACK TO THE HEADEND
EQUIPMENT. ROUTE ALL CONDUIT AND CABLING
BACK TO THE INTRUSION DETECTION SYSTEM
IN ROOM 102. AND 101 IN THEIR RESPECTIVE
BUILDING. REFER TO 1/E-104 FOR ADDITIONAL
INFORMATION AND INSTALLATION
REQUIREMENTS.
2. ALL ELECTRONIC ACCESS CONTROL CABLING
SHALL BE INSTALLED IN CONDUIT. ALL CABLING
AND CONDUIT SHALL ROUTE TO THE HEADEND
EQUIPMENT THE DESIGNATED BUILDING. REFER
TO 2/E-104 FOR ADDITIONAL INFORMATION AND
INSTALLATION REQUIREMENTS.
KEYNOTES
1. INSTALL THE NEW MULT-TECHNOLOGY SENSOR
ON THE EXISTING ROUGH-IN AND CONNECT TO
THE EXISTING CABLING. REFER TO 2/E-104 FOR
ADDITIONAL INFORMATION AND INSTALLATION
REQUIREMENTS.
2. INSTALL THE NEW INTRUSION DETECTION
PANEL WHERE THE OLD PANEL WAS LOCATED.
CONNECT THE NEW PANEL TO THE EXISTING
ELECTRICAL CIRCUIT.
3. ROUTE THE NEW CONDUIT TO THE NEW
SECURITY PANEL IN ROOM 102.
CAM
01-13/+144"
CAM
CAM
01-14/+144"
01-16/+144"
CAM
01-15/+144"
MD
+108"
CR1
CSS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
1003/1004
MAINTENANCE SHOPS -
TECHNOLOGY PLANS
KBSJCS
E-1003-2
MENS RR
WOMENS RR
106A
106B
GRAVE SITE
LOCATOR
TECHNOLOGY
EQUIPMENT
GENERAL SHEET NOTES
1. ALL INTRUSION DETECTION CABLING WILL BE
INSTALLED IN CONDUIT BACK TO THE HEADEND
EQUIPMENT. ROUTE ALL CONDUIT AND CABLING
BACK TO THE INTRUSION DETECTION SYSTEM
IN MECH #106. REFER TO 1/E-104 FOR
ADDITIONAL INFORMATION AND INSTALLATION
REQUIREMENTS.
2. ALL VIDEO SURVEILLANCE CAMERAS ROUTE IN
CONDUIT BACK TO THE HEADEND IN MECH #106.
REFER TO 4/E-104 FOR ADDITIONAL
INFORMATION AND INSTALLATION
REQUIREMENTS.
KEYNOTES
1. ROUTE CABLING FROM CLOSET THROUGH
WALL ENCLOSED IN WIREMOLD METALLIC
RACEWAY DIRECTLY UNDER AIR VENT
DIRECTLY INTO CAMERA BACK INSTALL
CAMERA SO HORIZONTAL WIREMOLD RUN IS
DIRECT INTO SIDE OF CAMERA
BACK-BOX/HOUSING.
2. ALL TECHNOLOGY EQUIPMENT AND CABLING
TO REMAIN.
3. DEMOLISH THE EXISTING MOTION DETECTOR.
REMOVE THE ROUGH-IN, BACKBOX, AND
CABLING AND PATCH AND REPAIR THE
DRYWALL.
4. CONTRACTOR SHALL DEMO ALL INTRUSION
DETECTION SYSTEM DEVICES AND CABLING.
POWER SHALL REMAIN AND CONNECTED TO
THE NEW INTRUSION PANEL. REFER TO
2/E-1401-2 FOR NEW SYSTEM COMPONENTS TO
BE INSTALLED.
CAM
01-19/+144"
CAM
01-12/+108"
INTRUSION DETECTION SYSTEM
MD
+108"
MD
+108"
MD
PIC BUILDING TECHNOLOGY PLAN
SCALE: 1/4"=1'-0"
R
PIC BUILDING TECHNOLOGY DEMOLITION PLAN
SCALE: 1/4"=1'-0"
R
KP 3
MENS RR
WOMENS RR
106A
106B
GRAVE SITE
LOCATOR
TECHNOLOGY
EQUIPMENT
INTRUSION DETECTION SYSTEM
MD
01-11
CR1
CSS
MD
+108"
MD
+108"
CAM
01-20/+108"
CR1
CSS
CSS
CAM
01-21/+144"
CAM
MD
MD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
PIC BUILDING - TECHNOLOGY PLAN
KBSJCS
E-1401-1
EXISTING COMMITTAL SHELTER #1 ELECTRICAL AND
TECHNOLOGY DEMOLITION PLAN
SCALE: 1/4"=1'-0"
R
COMMITTAL
SHELTER
STORAGE
EXISTING COMMITTAL SHELTER #1 ELECTRICAL PLAN
SCALE: 1/4"=1'-0"
R
COMMITTAL
SHELTER
STORAGE
EXISTING COMMITTAL SHELTER #1 TECHNOLOGY PLAN
SCALE: 1/4"=1'-0"
R
COMMITTAL
SHELTER
STORAGE
SP1
"TAPS" SYSTEM FUNCTIONAL DIAGRAM
NO SCALE
GENERAL NOTES
KEYNOTES
SP1
SP1
SP1
SP1
SP1 SP1
SP1 SP1
3 3
3 3
SP12
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
COMMITTAL SHELTER #1 - ELECTRICAL
AND TECHNOLOGY PLANS
SACMDS
E-4801-1
EXISTING COMMITTAL SHELTER #2 ELECTRICAL AND
TECHNOLOGY DEMOLITION PLAN
SCALE: 1/4"=1'-0"
R
COMMITTAL
SHELTER
STORAGE
EXISTING COMMITTAL SHELTER #2 ELECTRICAL PLAN
SCALE: 1/4"=1'-0"
R
COMMITTAL
SHELTER
STORAGE
EXISTING COMMITTAL SHELTER #2 TECHNOLOGY PLAN
SCALE: 1/4"=1'-0"
R
COMMITTAL
SHELTER
STORAGE
GENERAL NOTES
KEYNOTES
"TAPS" SYSTEM FUNCTIONAL DIAGRAM
NO SCALE
SP1
SP1
SP1
SP1
SP1
SP1 SP1
SP1 SP1
3 3
3 3
SP12
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
COMMITTAL SHELTER #2 - ELECTRICAL
AND TECHNOLOGY PLANS
SACMDS
E-4802-1
GENERAL NOTES
COMMITTAL SHELTER #3 ELECTRICAL PLAN
SCALE: 1/4"=1'-0"
R
STORAGE
COMMITTAL
SHELTER
COMMITTAL SHELTER #3 TECHNOLOGY PLAN
SCALE: 1/4"=1'-0"
R
STORAGE
COMMITTAL
SHELTER
"TAPS" SYSTEM FUNCTIONAL DIAGRAM
NO SCALE
SP1 SP1
SP1 SP1
3 3
3 3
SP2
SP1
SP1
SP1
SP1
SP2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
COMMITTAL SHELTER #3 - ELECTRICAL
AND TECHNOLOGY PLANS
SACMDS
E-4803-1
FIRE / SMOKE BARRIER DESIGNATIONS
VIEW NAME
VIEW KEY
PIPING SYMBOL LIST
SYMBOL: DESCRIPTION:
MECHANICAL SYMBOL LIST
SYMBOL: DESCRIPTION:
R
D
T
T
T
P
P
FM
F
VENTILATION ABBREVIATION KEY
ABBR: DESCRIPTION:
TAB POST - CONSTRUCTION NOTES:
MECHANICAL GENERAL NOTES:
MECHANICAL RENOVATION NOTES:
MECHANICAL PHASING NOTES:
VENTILATION GENERAL NOTES:
PIPING GENERAL NOTES:
TAB PRE-DEMOLITION NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
Building Number
HVAC - GENERAL NOTES
JJAWCR
H-100
HB
HB
F.D.
F.D.
F.D.
EYE
WASH
HB
F.D.
F.D.
F.D.
EYE
WASH
HB
BREAK ROOM
VESTIBULE
BREAK ROOM
DIR. OFFICE
MULTIPURPOSE
WOMEN
SHOWER
114A
MEN
LOCKER RM.
SHOWER
116A
CORR.
PARTS
CORR.
WASH BAY
MAINT.
STORAGE
STORAGE
MECH CORR.
MECH SHOP
UNISEX TOILET
VESTIBULE
OPEN OFFICE
ASST. DIR.
OFFICE
OFFICE
SECURITY
122A
ELEC/MECH
IT CLOSET
SS-1
KEYNOTES
HWS
HWR
HWS
HWR
HWSHWR
COND.
UNIT
EXIST. CUH TO REMAINEXIST. CUH TO REMAIN
CONTROL PANEL
(B-1)E
(B-2)E
(AH-1)E
(P-1)E
(P-2)E
18"x96" 0.A. DUCT
18"x66" 0.A. DUCT
28"x28" S.A. DUCT
(BOD=11'-2")
68"x17" R.A.
DUCT (BOD=9'-0")
CONDENSING UNIT
FOR SS-1
FURNISH STANDARD
WALL BRACKET AND
MOUNT TO SIDE OF
BUILDING
DUCTLESS SPLIT SYSTEM SCHEDULE
INDOOR UNIT OUTDOOR UNIT
SYMBOL SERVICE TYPE
AIRFLOW
RANGE CFM
NOM
TON
REFRIGERANT SEER WEIGHT
RATED COOLING
CAPACITY (MBH)
RATED HEATING CAPACITY AT
17°F (MBH)
ELECT MCA MOCP
SS-1, CU-1
DATA
CLOSET
HIGH
WALL
145-399 1 R410A 20.5 37 24 22
208/230-1
19 25
NOTES:
1.
RATING CONDITIONS FOR COOLING: INDOOR: 80 DEG. F DB, 67 DEG. F WB; OUTDOOR: 105 DEG. F DB, 75DEG. F WB.
2.
RATING CONDITIONS FOR HEATING: INDOOR: 70 DEG. F DB, 60 DEG. F WB; OUTDOOR: 17 DEG. DB, 15 DEG. F WB.
3. PROVIDE FACTORY-SUPPLIED SINGLE POINT ELECTRICAL CONNECTION WITH MEANS OF DISCONNECT. INDOOR UNIT POWERED FROM OUTDOOR UNIT.
4. DUCTLESS INDOOR UNIT SHALL BE MOUNTED HIGH SIDEWALL.
5. PROVIDE INTEGRAL OR FACTORY PROVIDED CONDENSATE PUMP.
6. PROVIDE HARD WIRED DIGITAL PROGRAMMABLE THERMOSTAT.
7. CONFIRM MAXIMUM REFRIGERANT LINE LENGTH PRIOR TO INSTALL CONDENSING UNIT. INSTALL PER MANUFACTURER'S RECOMMDATIONS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
ADMINISTRATION AND MAINTENANCE
BUILDING - HVAC PLAN
ADMINISTRATION AND MAINTENANCE BUILDING - HVAC PLAN
SCALE: 1/8"=1'-0"
R
T
H
N
O
JJAWCR
H-1001-1
COMMITTAL SHELTER HVAC PLAN
SCALE: 1/4"=1'-0"
R
STORAGE
COMMITTAL
SHELTER
KEYNOTES
UNIT HEATER SCHEDULE - ELECTRIC
SYMBOL DESCRIPTION SERVICE CFM
HEATING
MANUFACTURER MODEL REMARKS
MBH
KW (MIN)
KW
(MAX)
AMP VOLT PHASE
EUH-1
ELECTRIC UNIT
HEATER
STORAGE 100 350 10.2 3 3 14.5 208 1 - -
NOTES 1, 2
NOTES:
1. MOUNTING BRACKET
2. LINE VOLTAGE THERMOSTAT ; CONTRACTOR TO PROVIDE WIRING.
UNIT HEATER CONTROL - ELECTRIC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
F i t h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t
A
B
C
D
E
F
OF
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
918PC2008.23ARCHITECT/ENGINEER OF RECORD
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
BID DOCUMENTS
10/30/2019
BID DOCUMENTS
Mechanical, Electrical, Technology & Structural Engineering:
IMEG, Inc.
623 26th Avenue Rock Island, IL 61201
(309) 788-0673 Wade Ross
Irrigation Engineering & Construction Period Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525
(970) 372-6104 Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170 Eagan, MN 55121
(952) 854-3663 Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period Services:
Terracon Consultants, Inc.
12460 Plaza Drive Cleveland, OH 44130
(216) 459-8378 Thomas McDonnel
Architecture & Construction Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500 St. Louis, MO 63102
(214) 397-0305 Rob Forney
Commissioning:
National Facility Solutions 220 Ramsey Street, Hastings, MN 55033
(651) 319-0170 Scott Sinclair
COMMITTAL SHELTER #3 - HVAC
PLAN
JJAWCR
H-4803-1
B -1.01
A-1401-1
D6
MENS RR
WOMENS RR
174 178
A-1401-4
C1
A-1401-4
F1
A-1401-5
F3
C3
A-1401-7
F2
106A
106B
A-1401-1
B1
A-1401-1
B2
B3
B5
B6 A-1401-1 B5
B1
B3
MENS RR
WOMENS RR
F1
A-1401-1
154154
MECH
123123
123123
A-1401-1
B7
60"
V .I .F
V .I
.F
E Q
E Q
60"
161161
SIM
TYP
106B
106A
70 70
70 70
CT-3
CT-3
B8
A-1401-1
B8
A-1401-1
A-1401-1
F1
CT-1
SS-1
CTB-1
123123
CT-1
CTB-1
154154154
CT-1
CTB-1
M A
X
OPEN
160160
F1
A-1401-1
CT-1
CTB-1
154154
CT-1
CTB-1
MENS RR
WOMENS RR
MECH
163163
163163
INTERIOR FINISH LEGEND
CEILING:
PT-6 (GWB Ceiling) MFG: Sherwin Williams QUALITY: Flat COLOR: Pure White
NO: SW 7005
ACT-1
MFG: Armstrong FINISH: White NAME: Ultima High NRC NRC: .70 min
MILLWORK / MISC:
TOILET PARTITIONS
MFG: Accurate Partitions Corp.
STYLE: TCT Partitions COLOR: #304 Stainless Steel FINISH: Satin
QUARTZ SURFACE
QZ-1
MFG: Cambria COLOR: Temby Cream CONTACT: Hilary Lenzen
Hilary.Lenzen@ CambriaUSA.com 314-750-6759
STAINLESS STEEL
SS-1
MGF: TBD
CONTACT: TBD
WALLS:
PAINT
PT-4
MFG: Sherwin Williams COLOR: March Wind
NO: SW 2128
FINISH: ALKYD Eggshell
FLOORING:
CERAMIC TILE
CT-1 (Field Tile) MFG: Virginia Tile STYLE: Rift COLOR: Gravel SIZE: 12" x 24" INSTALL: 1/3 Drop CONTACT: Kevin Pardo
Virginia Tile kevin.pardo@VirginiaTile.com 636-734-5080
GROUT: TEC Mist 939
CT-3
MFG: Virginia Tile STYLE: Linen COLOR: UFLI303-1224 White SIZE: 12" x 24" INSTALL: Straight CONTACT: Kevin Pardo
Virginia Tile kevin.pardo@VirginiaTile.com 636-734-5080
GROUT: TEC Mist 939
CERAMIC TILE BASE
CTB-1
MFG: Virginia Tile STYLE: Linen
COLOR: UFLI203-S43C9
SIZE: 12" x 3" High Bullnose NOTE: Align grout joints with wall tile CONTACT: Kevin Pardo
Virginia Tile kevin.pardo@VirginiaTile.com 636-734-5080
WINDOW TREATMENT
WT-1
MFG: 3M
STYLE: Fascara FINISH: Dusted Crystal
NO: 7725-314
'-6
'-1
1 1/2"
2'-1"
NEW PARTITION
EXISTING
WALL TO
REMAIN
COUNTERTOP:
QUARTZ COUNTERTOP (QZ-1)
BACKSPLASH:
QUARTZ, CON'T SEALANT AT
ALL SIDES
PROVIDE INSUL. VINYL DRAIN
COVER AT TRAP AND DRAIN LDR.
AREA OF WORK
7" to 9"
60"
CT-1
CTB-1
LIFE SAFETY LEGEND
BUSINESS
UNOCCUPIED
PATH A
PATH B
INSTALL TRANSITION STRIP PER MANUFACTURER'S
RECOMMENDATIONS.
FLOOR SUBSTRATE
FINISHED
CONCRETE
SCHEDULED CERAMIC
TILE
TRANSITION STRIP
/8
0' - 0 3/4"
13605 1st Ave. N. #100 Plymouth, MN 55441
P 763.412.4000 | F 763.412.4090 | ae-mn .com Anderson Engineering of Minnesota, LLC | Proj #
KEY MAP: N.T.S.
15150
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Project Director
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
OCT 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
CD2 DOCUMENTS
CONSULTANTS
Mechanical, Electrical, Technology &
Structural
Engineering:
Revisions: Date:
IMEG, Inc.
623 26th Avenue
Rock Island, IL
61201
(309) 788-0673
Wade Ross
Irrigation Engineering
& Construction
Period
Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202
Fort Collins, CO 80525
(970) 372-6104
Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and
Construction Period
Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170
Eagan, MN 55121
(952) 854-3663
Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period
Services:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100
Sacramento, CA 95834
(916) 928-4690
Robert Holmer
Architecture &
Construction
Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500
St. Louis, MO 63102
(214) 397-0305
Rob Forney
Commissioning:
National Facility
Solutions
220 Ramsey Street, Hastings, MN 55033
(651) 319-0170
Scott Sinclair
ISSUED FOR BID
OF --
VA FORM 08 - 6231
A
F ile
P a th x p ro j\ -1 a n d e rs o n e n g o f m n \4
-o h o h io w e s te rn r e s e rv e c e m e te ry \0 re v it \2
-5
-2 v a x t it le b lo c k .d w g e d it :z a c h h s a v e d :5
/2 /2
:2 P
M p lo t:
/1
/2
:0 A
M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PUBLIC INFORMATION CENTER
BUILDING - FIRST FLOOR PLAN
918PC2008.23
A-1401-1
172MMTChecker
1/8" = 1'-0"F3 NEW P.I.C. PLAN
1/4" = 1'-0"D6 ENLARGED NEW RESTROOM PLAN
3/8" = 1'-0"B1 RESTROOM ELEVATION
3/8" = 1'-0"B2 RESTROOM ELEVATION
3/8" = 1'-0"B3 RESTROOM ELEVATION
3/8" = 1'-0"B5 RESTROOM ELEVATION
3/8" = 1'-0"B6 RESTROOM ELEVATION
1/4" = 1'-0"D1 ENLARGED DEMO RESTROOM PLAN
ROOM FINISH SCHEDULE
RM # RM NAME FLOOR FINISH
BASE
FINISH
WALL FINISH DOOR
FRAME
CEILING
FINISH COMMENTSNORTH EAST WEST SOUTH
104 MENS RR CT-3 CTB-1 CT-1 CT-1 CT-1 CT-1 SS PT-6 ALL NEW TILE FINISHES; WALL AND FLOOR
105 WOMENS RR CT-3 CTB-1 CT-1 CT-1 CT-1 CT-1 SS PT-6 ALL NEW TILE FINISHES; WALL AND FLOOR
106 MECH - - - - - - - - REPAIR EXISTING SURFACES TO MATCH ADJACENT
SUBSEQUENT TO MECHANICAL SCOPE OF WORK
1 1/2" = 1'-0"F1 SECTION @ LAV COUNTER
3/8" = 1'-0"B7 TYP TOILET ELEVATION
GENERAL NOTES:
1) COORDINATE HVAC VENTS & RETURNS
WITH MEP DRAWINGS.
2) PROVIDE ENTIRE MECHANICAL DUCT
SYSTEM CLEANING AT COMPLETION OF
NEW WORK.
3) BENCHES AND TRASH CANS AT PUBLIC
INFORMATION CENTER BUILDING TO BE
REPLACED.
4) REFER TO SPECIFICATIONS FOR TOILET
ACCESSORIES AND G-005 FOR MOUNTING
HEIGHTS.
NOTE: REFER TO D1 THIS SHEET FOR DEMOLITION PLAN
DOOR SCHEDULE
Door Number
Door
Hardware
Frame
CommentsWidth Height Thickness Material Finish Type Material
101 3' - 0" 7' - 0" 0' - 1 3/4" SS BRUSHED/
SN
HW-9 1 SS PROVIDE CARD READER AND MAGNETIC
LOCK. WITH POWER ASSIST OPENER; RE:
SPECIFICATION FOR OPERATIONS
104 3' - 0" 7' - 0" 0' - 1 3/4" SS BRUSHED/
SN
HW-15 1 SS PROVIDE STOREROOM TYPE LOCKSETS,
KEY-SECURED FROM OUTSIDE, OPERABLE
TRANSOM WINDOW ABOVE
105 3' - 0" 7' - 0" 0' - 1 3/4" SS BRUSHED/
SN
HW-15 1 SS PROVIDE STOREROOM TYPE LOCKSETS,
KEY-SECURED FROM OUTSIDE, OPERABLE
TRANSOM WINDOW ABOVE
106A 3' - 0" 7' - 0" 0' - 2" SS BRUSHED/
SN
HW-15 1 SS PROVIDE STOREROOM TYPE LOCKSETS,
CARD READER ACCESS FROM OUTSIDE
106B 3' - 0" 7' - 0" 0' - 2" SS BRUSHED/
SN
HW-15 1 SS PROVIDE STOREROOM TYPE LOCKSETS,
CARD READER ACCESS FROM OUTSIDE
NOTE: REFER TO DOOR LEGEND/INFORMATION SHEET A-0001
NOTE: REFER TO SHEET A-0001 FOR TYP. FIXTURE MOUNTING HEIGHTS.
1/8" = 1'-0"E3 LIFE SAFETY PLAN
Area Schedule (Rentable)
Name Area LoadFactor Occupancy Occupants
UNOCCUPIED 117 SF 0 UNOCCUPIED 0
UNOCCUPIED 362 SF 0 UNOCCUPIED 0
BUSINESS 544 SF 100 BUSINESS 5
PATH "B"
Travel Distance
28' - 5"
PATH "A"
Travel Distance
28' - 2"
EXISTING BUILDINGS
BUILDING CODE SUMMARY:
BUILDING DATA:
BUILDING CODE AGENCY/JURISDICTION:
BUILDING CODE:
TYPE OF WORK:
EXISTING CONSTRUCTION TYPE:
TOTAL NUMBER OF FLOORS:
NUMBER OF FLOORS ABOVE GRADE:
(THIS PROJECT)
FIRE PROTECTION SYSTEM:
CITY OF RITTMAN, OH
2015 IEBC - EXISTING
RENOVATIONS
2B
UNSPRINKLERED
PROJECT SUMMARY
PUBLIC INFORMATION CENTER BUILDING. BUSINESS USE.
# NOTE
51 REMOVE EXISTING DOOR AND FRAME; PREP. OPENING
FOR INSTALLATION OF DOOR AND DOOR FRAME.
53 REMOVE EXISTING TOILET STALL & URINAL PARTITIONS.
REPAIR EXISTING CONNECTION POINTS AT WALL AND
BULKHEAD TO REMAIN.
54 REMOVE EXISTING COUNTERTOP, CABINET, AND SINK.
55 RE: MECHANICAL PLANS FOR WORK IN THIS AREA.
56 REMOVE THE THRESHOLD & DAMAGED FLOOR BELOW.
PREPARE SUBFLOOR TO RECIEVE NEW TILE FINISHES
AND SADDLE THRESHOLDS
58 REMOVE EXISTING WALL MOUNTED TOILET.
59 REMOVE EXISTING URINAL.
60 REMOVE EXISTING LAVATORY.
61 REMOVE EXISTING MIRROR. PATCH AND REPAIR WALL
SUBSTRATE AS NECESSARY.
62 REMOVE EXIST WALL AND FLOOR FINISHES. PREP FOR
NEW FINISHES AS NEEDED THROUGHOUT.
63 NEW STAINLESS STEEL DOOR AND DOOR FRAME WITH
MECHANICAL LOUVER. PROVIDE BARRIER-FREE
ROLLOVER-TYPE ALUMINUM SADDLE THRESHOLD AT
SILL.
65 REPLACE SHEET MTL. SHROUD AT CONSOULE. FINISH TO
MATCH EXIST. STANDARD FLASHINGS. CAULK AROUND
PERIMETER
66 REMOVE EXISTING UNIT PAVERS AND SUBSTRATE AT PIC
BREEZEWAY AREA, PROVIDE NEW SUB-BASE AND
CONCRETE PAVING. RE: CIVIL FOR PAVING PROFILE.
70 PROVIDE NEW WINDOW FILM (WT-1)
72 FLOOR DRAIN TO REMAIN.
73 BATTERY OPERATED MOTION SENSOR OPERATION FOR
ALL SINKS, TOILETS, URINALS AND HAND DRYERS.
123 NEW TOILET AND URINAL PARTITIONS.
128 EXISTING GYPSUM BOARD HEADER / BULKHEAD.
129 INSTALL NEW HAND AIR DRYER. RE: ELECT. FOR
CONNECTIONS.
151 NEW SINK AND COUNTERTOP @ 2'-10" A.F.F. ADJUST
PLUMBING LINES AND UNDER COUNTER CABINET
ACCORDINGLY.
154 NEW GRAB-BARS.
155 REMOVE WALL TILE AROUND MIRRORS.
156 PROVIDE ADA MIRRORS AT EACH VANITY. (40" AFF MAX)
157 RE: MECHANICAL PLANS FOR WORK IN THIS AREA.
159 NEW TOILET PAPER DISPENSER
160 PROVIDE NEW INSUL. VINYL DRAIN COVER AT
RECONFIGURED TRAP AND DRAIN LDR.
161 PROVIDE NEW POWER ASSIST RECESSED WALL
MOUNTED OPERATOR AT 36" AFF. RE: PROJECT MANUAL
FOR FULL HARDWARE PROFILE (HW-15).
163 DEMO EXIST WINDOW SHADE AND PREP FOR NEW FINISH
174 RE: ELECTRICAL FOR LIGHTING IMPROVEMENTS IN PIC
ADMIN AREA.
178 PAINT NEW EXPOSED DUCTWORK TO MATCH ADJACENT
WALL COLOR.
196 NEW 3'X4' STAINLESS STEEL PLATE BEHIND HAND DRYER.
198 EXISTING BENCH TO BE REPLACED.
199 EXISTING WASTECAN TO BE REPLACED.
KEYED NOTES
12" = 1'-0"B8 RR TRANSITION DETAIL
5 UN ITS
h = 1
0U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
0U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
8 UN
ITS
h =
0U NITS @ 5h=
8 UN
ITS
h =
0 U NITS @ 5h=
8 UN
ITS
h =
0 U NITS @5h=
8 UN
ITS
h =
0 U
NITS @
5h= 0
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
U
NITS
5h=0
5 UN ITS
h = 1
U
NITS
@ 5h=
5 UN ITS
h = 1
U
NITS
5h= 0
5 UN ITS
h = 1
U
NITS
5h= 0
8 UN
ITS
h =
0 U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h=
8 UN
ITS
h =
0 U NITS @ 5h=
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
0U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
0U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
8 UN
ITS
h =
U
NITS @
5h=
8 UN
ITS
h =
0 U NITS @5h=
8 UN
ITS
h =
0 U NITS @ 5h=
8 UN
ITS
h =
0 U
NITS @
5h=0
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
8 UN
ITS
h =
0 U NITS @ 5h=
8 UN
ITS
h =
0U NITS @ 5h=
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h= 0
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h= 0
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
8 UN
ITS
h =
0 U NITS @ 5h=
8 UN
ITS
h =
0 U
NITS @
5h=0
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h=
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
B -1.01
MENS RR
WOMENS RR
D1
A-1401-6
A-1401-4
C1
A-1401-4
F1
A-1401-5
F3
C3
D5
A-1401-6
180153
181181 181181
A.F.F.
EXIST. GYP
8' - 0"
A.F.F.
EXIST. GYP
8' - 0"
A.F.F.
TRESPA
11' - 8"
A.F.F.
TRESPA
11' - 8"
195 187
70 70
70 70
D1
A-1401-6
A-1401-4
C1
A-1401-4
F1
A-1401-5
F3
C3
D5
A-1401-6
MENS RR
WOMENS RR
6969 6969
AREA OF WORK
13605 1st Ave. N. #100 Plymouth, MN 55441
P 763.412.4000 | F 763.412.4090 | ae-mn .com Anderson Engineering of Minnesota, LLC | Proj #
KEY MAP: N.T.S.
15150
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Project Director
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
OCT 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
CD2 DOCUMENTS
CONSULTANTS
Mechanical, Electrical, Technology &
Structural
Engineering:
Revisions: Date:
IMEG, Inc.
623 26th Avenue
Rock Island, IL
61201
(309) 788-0673
Wade Ross
Irrigation Engineering
& Construction
Period
Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202
Fort Collins, CO 80525
(970) 372-6104
Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and
Construction Period
Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170
Eagan, MN 55121
(952) 854-3663
Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period
Services:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100
Sacramento, CA 95834
(916) 928-4690
Robert Holmer
Architecture &
Construction
Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500
St. Louis, MO 63102
(214) 397-0305
Rob Forney
Commissioning:
National Facility
Solutions
220 Ramsey Street, Hastings, MN 55033
(651) 319-0170
Scott Sinclair
ISSUED FOR BID
OF --
VA FORM 08 - 6231
A
F ile
P a th x p ro j\ -1 a n d e rs o n e n g o f m n \4
-o h o h io w e s te rn r e s e rv e c e m e te ry \0 re v it \2
-5
-2 v a x t it le b lo c k .d w g e d it :z a c h h s a v e d :5
/2 /2
:2 P
M p lo t:
/1
/2
:0 A
M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PUBLIC INFORMATION CENTER
BUILDING - REFLECTED CEILING
PLAN
918PC2008.23
A-1401-2
172MMTChecker
1/4" = 1'-0"F3 REFLECTED CEILING PLAN
1/4" = 1'-0"C3 DEMOLITION REFLECTED CEILING PLAN
GENERAL NOTES:
1) COORDINATE HVAC VENTS & RETURNS
WITH MEP DRAWINGS.
2) PROVIDE ENTIRE MECHANICAL DUCT
SYSTEM CLEANING AT COMPLETION OF
NEW WORK.
# NOTE
67 REMOVE EXISTING WOOD PLANK FINISH AT HVAC SOFFIT.
68 REMOVE EXISTING WOOD PLANK FINISH AT BREEZEWAY
SOFFIT.
69 REMOVE DECORATIVE HARDWOOD FASCIA FROM
EXISTING TIE MEMBERS.
70 PROVIDE NEW WINDOW FILM (WT-1)
74 NEW SECURITY CAMERA LOCATION. RE: TECHNOLOGY
DRAWINGS FOR ADDITIONAL INFORMATION.
153 INSTALL NEW STAINLES STEEL DOORS AND FRAMES AND
TRANSOM WITH NEW HARDWARE. RE: SCHED. FOR
ADDITIONAL INFORMATION.
179 INSTALL NEW TRESPA "PURA" FLUSH-PLANK SIDING AT
HVAC BOX-SOFFIT. WOODGRAIN FINISH TO BE SELECTED
FROM MANUFACTURER'S STANDARD RANGE.
180 INSTALL NEW TRESPA "PURA" FLUSH-PLANK SIDING AT
BREEZEWAY SOFFIT. WOODGRAIN FINISH TO BE
SELECTED FROM MANUFACTURER'S STANDARD RANGE.
181 INSTALL NEW TRESPA "PURA" FLUSH-PANEL FASCIA
OVER EXISTING TIE BEAMS. WOODGRAIN FINISH TO BE
SELECTED FROM MANUFACTURER'S STANDARD RANGE
187 EXISTING SKYLIGHTS AND GLAZING TO REMAIN.
194 FINISH AT TIE BEAMS IN BREEZEWAY TO MATCH THE
TRESPA PRODUCT.
195 EXISTING SKYLIGHTS TO BE CLEANED, NEW SEALANT TO
BE APPLIED AROUND EXTERIOR.
197 REPAIR WATER DAMAGED CEILING AS REQUIRED.
KEYED NOTES
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
8 UN
ITS
h =
0 U NITS @ 5h=
8 UN
ITS
h =
0 U NITS @5h=
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h=0
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
U
NITS
@5h=
5 UN ITS
h = 1
0U
NITS
5h=
5 UN ITS
h = 1
U
NITS
@ 5h=
5 UN ITS
h = 1
0U
NITS
5h=
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h=
8 UN
ITS
h =
0 U NITS @ 5h=
8 UN
ITS
h =
0 U NITS @ 5h=
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
8 UN
ITS
h =
0 U NITS @5h=
8 UN
ITS
h =
0 U NITS @ 5h=
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h= 0
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
U
NITS
5h=0
5 UN ITS
h = 1
U
NITS
5h= 0
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=0
8 UN
ITS
h =
0U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h=
8 UN
ITS
h =
U
NITS @
5h=
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
U
NITS
5h= 0
5 UN ITS
h = 1
U
NITS
@ 5h=
5 UN ITS
h = 1
U
NITS
5h= 0
5 UN ITS
h = 1
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h=
8 UN
ITS
h =
0U NITS @ 5h=
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
B -1.01
D1
A-1401-6
A-1401-4
C1
A-1401-4
F1
D5
A-1401-6
192"
182182
184 186
186 184
185185 185185
185185185185
VIF VIF VIF VIF
AREA OF WORK
13605 1st Ave. N. #100 Plymouth, MN 55441
P 763.412.4000 | F 763.412.4090 | ae-mn .com Anderson Engineering of Minnesota, LLC | Proj #
KEY MAP: N.T.S.
15150
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Project Director
OHIO WESTERN RESERVE
NATIONAL CEMETERY
PHASE III DEVELOPMENT
OCT 30, 2019
10175 RAWIGA RD, SEVILLE, OH 44273
CD2 DOCUMENTS
CONSULTANTS
Mechanical, Electrical, Technology &
Structural
Engineering:
Revisions: Date:
IMEG, Inc.
623 26th Avenue
Rock Island, IL
61201
(309) 788-0673
Wade Ross
Irrigation Engineering
& Construction
Period
Services:
Aqua Engineering, Inc.
375 Horsetooth Rd., Bldg. 2-202
Fort Collins, CO 80525
(970) 372-6104
Robert Beccard
Cost Estimating, Scheduling, Value Engineering, and
Construction Period
Services:
CPMI, Inc.
3265 Northwood Cir., Ste. 170
Eagan, MN 55121
(952) 854-3663
Bryan Bertrand
Geotechnical Engineering, Environmental Engineering, & Construction Period
Services:
Terracon Consultants, Inc.
50 Goldenland Ct., Ste. 100
Sacramento, CA 95834
(916) 928-4690
Robert Holmer
Architecture &
Construction
Period Services:
Oculus, Inc.
1 South Memorial Dr., Suite 1500
St. Louis, MO 63102
(214) 397-0305
Rob Forney
Commissioning:
National Facility
Solutions
220 Ramsey Street, Hastings, MN 55033
(651) 319-0170
Scott Sinclair
ISSUED FOR BID
OF --
VA FORM 08 - 6231
A
F ile
P a th x p ro j\ -1 a n d e rs o n e n g o f m n \4
-o h o h io w e s te rn r e s e rv e c e m e te ry \0 re v it \2
-5
-2 v a x t it le b lo c k .d w g e d it :z a c h h s a v e d :5
/2 /2
:2 P
M p lo t:
/1
/2
:0 A
M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PUBLIC INFORMATION CENTER
BUILDING - ROOF PLAN
918PC2008.23
A-1401-3
172MMTChecker
1/4" = 1'-0"C2 ROOF PLAN
GENERAL NOTES:
1) COORDINATE HVAC VENTS & RETURNS
WITH MEP DRAWINGS.
2) PROVIDE ENTIRE MECHANICAL DUCT
SYSTEM CLEANING AT COMPLETION OF
NEW WORK.
# NOTE
182 EXISTING STANDING SEAM COPPER PAN ROOF TO
REMAIN.
183 REMOVE AND RE-FIT 16 LFT. OF INTERNAL GUTTER
LINING AND DOWNSPOUT CONNECTION.
184 CLEAN, DRY AND THOUROUGHLY INSPECT SOLDERED
JOINTS AT NEW AND EXISTING GUTTER SECTIONS
RE-SWEAT AND SOLDER ANY DEGRADED JOINTS AS
NECESSARY.
185 REPAIR AND RE-POINT MORTAR JOINTS AT EXISTING
STONE CAPS.
186 PROVIDE NEW CAP-OVER COPPER FLASHINGS
CONTINUOUS AT EXISTING GUTTER AT BREEZEWAY, EA.
SIDE.
187 EXISTING SKYLIGHTS AND GLAZING TO REMAIN.
195 EXISTING SKYLIGHTS TO BE CLEANED, NEW SEALANT TO
BE APPLIED AROUND EXTERIOR.
KEYED NOTES
h = 1
U
NITS
5h=0
5 UN ITS
h = 1
U
NITS
5h= 0
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=0
8 UN
ITS
h =
0 U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h=
8 UN
ITS
h =
U
NITS @
5h=
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
0U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
8 UN
ITS
h =
0U NITS @ 5h=
8 UN
ITS
h =
0 U NITS @ 5h=
8 UN
ITS
h =
0U NITS @ 5h=
8 UN
ITS
h =
0 U
NITS @
5h= 0
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=0
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h= 0
8 UN
ITS
h =
0 U
NITS @
5h=0
8 UN
ITS
h =
0U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
U
NITS @
5h=
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
U
NITS
@ 5h=
5 UN ITS
h = 1
0U
NITS
5h=
5 UN ITS
h = 1
U
NITS
@5h=
5 UN ITS
h = 1
U
NITS
@5h=
8 UN
ITS
h =
U
NITS @
5h=0
8 UN
ITS
h =
U
NITS @
5h= 0
8 UN
ITS
h =
0 U NITS @ 5h=
8 UN
ITS
h =
0U NITS @ 5h=
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
18 UNI
TS
4h
= 74
T
OT AL
PLA ZA
= 16
5 UN ITS
h = 1
0U
NITS
5h=
5 UN ITS
h = 1
U
NITS
5h=
5 UN ITS
h = 1
U
NITS
@ 5h=
5 UN ITS
h = 1
8 UN
ITS
h =
U
NITS @
5h=
8 UN
ITS
h =
U
NITS @
5h=
8 UN
ITS
h =
0 U NITS @ 5h=
8 UN
ITS
h =
0 U NITS @5h=
18 UNI
TS
4h
= 74
18 UNI
TS
4h
=…
This is the start of the file's text. The full file is on GovTribe.