Attachment 8 Plans_918PC2008.23_2019-10-30-5_pages 201-242.pdf

PDF 12 MB Posted

Attached to
Y1PC--Ohio Western Reserve National Cemetery, Phase 3 TIERED EVALUATION
Solicitation number
36C10F20R0069
Issued by

About this file

This solicitation notice announces a tiered evaluation for the Ohio Western Reserve National Cemetery Phase 3 Development project. The acquisition will follow four tiers of evaluation: first for SDVOSB concerns, then VOSB concerns, followed by small businesses with priority given to HUBZone small businesses. Large businesses will be considered last if no award can be made under the first three tiers. The Department of Veterans Affairs Office of Construction and Facilities Management is the contracting agency. Products and services required include construction services for development of the national cemetery. The solicitation is being issued with tiered evaluation and cancellation provisions if no award can be made to ensure fulfillment of socioeconomic program goals.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEYNOTESGENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i l e

P a t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h t h i n c o f o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e r s o t o n e i n o t o n e a d e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

ELECTRICAL AND TECHNOLOGY -

PARTIAL SITE PLAN

ELECTRICAL AND TECHNOLOGY - PARTIAL SITE PLAN

SCALE: 1"=100'-0"

R

T

H

N

O

SACMDS

ES-101

BID DOCUMENTS

PUMP HOUSE ELECTRICAL PLAN

SCALE: 1/4"=1'-0"

R

PUMP HOUSE ELECTRICAL AND TECHNOLOGY

DEMOLITION PLAN

SCALE: 1/4"=1'-0"

R

GENERAL NOTES

KEYNOTES

PUMP HOUSE TECHNOLOGY PLAN

SCALE: 1/4"=1'-0"

R

IKP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

3W01

E-3W01-1

PUMP HOUSE - ELECTRICAL AND

TECHNOLOGY PLANS

SACMDS 202

D.5

DRAIN

HB

HB

F.D.

F.D.

F.D.

EYE

WASH

HB

F.D.

F.D.

F.D.

EYE

WASH

HB

BREAK ROOM

VESTIBULE

BREAK ROOM

DIR. OFFICE

MULTIPURPOSE

WOMEN

SHOWER

114A

MEN

LOCKER RM.

SHOWER

116A

CORR.

PARTS

CORR.

WASH BAY

MAINT.

STORAGE

STORAGE

MECH CORR.

MECH SHOP

UNISEX TOILET

VESTIBULE

OPEN OFFICE

ASST. DIR.

OFFICE

OFFICE

SECURITY

122A

ELEC/MECH

IT CLOSET

GENERAL NOTES

KEYNOTES

IKP

IKP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

SACMDS

ADMINISTRATION AND MAINTENANCE

BUILDING - TECHNOLOGY

DEMOLITION PLAN

ADMINISTRATION AND MAINTENANCE BUILDING - TECHNOLOGY DEMOLITION PLAN

SCALE: 1/8"=1'-0"

R

T

H

N

O

E-1001-1

HB

HB

F.D.

F.D.

F.D.

EYE

WASH

HB

F.D.

F.D.

F.D.

EYE

WASH

HB

BREAK ROOM

VESTIBULE

BREAK ROOM

DIR. OFFICE

MULTIPURPOSE

WOMEN

SHOWER

114A

MEN

LOCKER RM.

SHOWER

116A

CORR.

PARTS

CORR.

WASH BAY

MAINT.

STORAGE

STORAGE

MECH CORR.

MECH SHOP

UNISEX TOILET

VESTIBULE

OPEN OFFICE

ASST. DIR.

OFFICE

OFFICE

SECURITY

122A

ELEC/MECH

IT CLOSET

GENERAL SHEET NOTES

KEYNOTES

MD

MD

CAM

01-01/+144"

CAM

01-02/+144"

CAM

01-03/+144"

CR1

CSS

CAM

01-04/+144"

CAM

01-05/+144"

CAM

01-06/+144"

CR1

CSS

MD

CR1

CSS

CR1

CSS

MD

CR1

CSS

MD

CR1

CSS

CAM

01-07/+144"

CAM

01-08/+144"

CAM

01-09/+144"

CAM

01-10/+108"

MD

MD

MD

MD

MD

CR1

CSS

CR1

CSS

MC-1

+108"

+108"

MD

+108"

MD

+108"

MD

+108"

MD

+108"

MD

+108"

MD

+108"

MD

MD

MD

INTRUSION DETECTION

PANEL

IKP

+48"

CR1

CSS

CR1

CSS

CSS

CR1

CSS

CR1

TR-1

SPACE RESERVED FOR

ACCESS CONTROL

E-1001-2

SS-1

SS-1 CONDENSING UNIT

DS-30RA

E

E

CSS

CR1

CSS

CR1

CR1

CSS

CR1

CSS

016 015

CAM

01-13/+144"

SPACE RESERVED FOR

INTRUSION DETECTION 10

EXISTING DOOR

RELEASE

MD

01-17

CAM

01-18

CAM

MD

+96"

SIR

E-1001-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

KBSJCS

SC-LPP-1

EXISTING EQUIPMENT RACK

EXISTING WALL FIELD

SCALE: 1/4"=1'-0"

R T

H

N

O

ADMINISTRATION & MAINTENANCE

BUILDING - ELECTRICAL AND

TECHNOLOGY PLAN

ADMINISTRATION & MAINTENANCE BUILDING - ELECTRICAL AND TECHNOLOGY PLAN

SCALE: 1/8"=1'-0"

R

T

H

N

O

E-1001-2

SC-VWM-1

SC-VWM-1

SC-UPS-1

SC-PDU-1

1003 MAINTENANCE SHOP TECHNOLOGY DEMOLITION PLAN

SCALE: 1/8"=1'-0"

R

1004 MAINTENANCE SHOP TECHNOLOGY DEMOLITION PLAN

SCALE: 1/8"=1'-0"

R

GENERAL NOTES

KEYNOTES

IKP

IKP

IKP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

1003/1004

MAINTENANCE SHOPS -

TECHNOLOGY DEMOLITION PLANS

KBSJCS

E-1003-1

1003 MAINTENANCE SHOP TECHNOLOGY PLAN

SCALE: 1/8"=1'-0"

R

1004 MAINTENANCE SHOP TECHNOLOGY PLAN

SCALE: 1/8"=1'-0"

R

MD

MD

SECURITY

PANEL

SECURITY

PANEL

CR1

CSS

CR1

CSS

CR1

CSS

MD

CR1

CSS

MD

GENERAL SHEET NOTES

1. ALL INTRUSION DETECTION CABLING WILL BE

INSTALLED IN CONDUIT BACK TO THE HEADEND

EQUIPMENT. ROUTE ALL CONDUIT AND CABLING

BACK TO THE INTRUSION DETECTION SYSTEM

IN ROOM 102. AND 101 IN THEIR RESPECTIVE

BUILDING. REFER TO 1/E-104 FOR ADDITIONAL

INFORMATION AND INSTALLATION

REQUIREMENTS.

2. ALL ELECTRONIC ACCESS CONTROL CABLING

SHALL BE INSTALLED IN CONDUIT. ALL CABLING

AND CONDUIT SHALL ROUTE TO THE HEADEND

EQUIPMENT THE DESIGNATED BUILDING. REFER

TO 2/E-104 FOR ADDITIONAL INFORMATION AND

INSTALLATION REQUIREMENTS.

KEYNOTES

1. INSTALL THE NEW MULT-TECHNOLOGY SENSOR

ON THE EXISTING ROUGH-IN AND CONNECT TO

THE EXISTING CABLING. REFER TO 2/E-104 FOR

ADDITIONAL INFORMATION AND INSTALLATION

REQUIREMENTS.

2. INSTALL THE NEW INTRUSION DETECTION

PANEL WHERE THE OLD PANEL WAS LOCATED.

CONNECT THE NEW PANEL TO THE EXISTING

ELECTRICAL CIRCUIT.

3. ROUTE THE NEW CONDUIT TO THE NEW

SECURITY PANEL IN ROOM 102.

CAM

01-13/+144"

CAM

CAM

01-14/+144"

01-16/+144"

CAM

01-15/+144"

MD

+108"

CR1

CSS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

1003/1004

MAINTENANCE SHOPS -

TECHNOLOGY PLANS

KBSJCS

E-1003-2

MENS RR

WOMENS RR

106A

106B

GRAVE SITE

LOCATOR

TECHNOLOGY

EQUIPMENT

GENERAL SHEET NOTES

1. ALL INTRUSION DETECTION CABLING WILL BE

INSTALLED IN CONDUIT BACK TO THE HEADEND

EQUIPMENT. ROUTE ALL CONDUIT AND CABLING

BACK TO THE INTRUSION DETECTION SYSTEM

IN MECH #106. REFER TO 1/E-104 FOR

ADDITIONAL INFORMATION AND INSTALLATION

REQUIREMENTS.

2. ALL VIDEO SURVEILLANCE CAMERAS ROUTE IN

CONDUIT BACK TO THE HEADEND IN MECH #106.

REFER TO 4/E-104 FOR ADDITIONAL

INFORMATION AND INSTALLATION

REQUIREMENTS.

KEYNOTES

1. ROUTE CABLING FROM CLOSET THROUGH

WALL ENCLOSED IN WIREMOLD METALLIC

RACEWAY DIRECTLY UNDER AIR VENT

DIRECTLY INTO CAMERA BACK INSTALL

CAMERA SO HORIZONTAL WIREMOLD RUN IS

DIRECT INTO SIDE OF CAMERA

BACK-BOX/HOUSING.

2. ALL TECHNOLOGY EQUIPMENT AND CABLING

TO REMAIN.

3. DEMOLISH THE EXISTING MOTION DETECTOR.

REMOVE THE ROUGH-IN, BACKBOX, AND

CABLING AND PATCH AND REPAIR THE

DRYWALL.

4. CONTRACTOR SHALL DEMO ALL INTRUSION

DETECTION SYSTEM DEVICES AND CABLING.

POWER SHALL REMAIN AND CONNECTED TO

THE NEW INTRUSION PANEL. REFER TO

2/E-1401-2 FOR NEW SYSTEM COMPONENTS TO

BE INSTALLED.

CAM

01-19/+144"

CAM

01-12/+108"

INTRUSION DETECTION SYSTEM

MD

+108"

MD

+108"

MD

PIC BUILDING TECHNOLOGY PLAN

SCALE: 1/4"=1'-0"

R

PIC BUILDING TECHNOLOGY DEMOLITION PLAN

SCALE: 1/4"=1'-0"

R

KP 3

MENS RR

WOMENS RR

106A

106B

GRAVE SITE

LOCATOR

TECHNOLOGY

EQUIPMENT

INTRUSION DETECTION SYSTEM

MD

01-11

CR1

CSS

MD

+108"

MD

+108"

CAM

01-20/+108"

CR1

CSS

CSS

CAM

01-21/+144"

CAM

MD

MD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

PIC BUILDING - TECHNOLOGY PLAN

KBSJCS

E-1401-1

EXISTING COMMITTAL SHELTER #1 ELECTRICAL AND

TECHNOLOGY DEMOLITION PLAN

SCALE: 1/4"=1'-0"

R

COMMITTAL

SHELTER

STORAGE

EXISTING COMMITTAL SHELTER #1 ELECTRICAL PLAN

SCALE: 1/4"=1'-0"

R

COMMITTAL

SHELTER

STORAGE

EXISTING COMMITTAL SHELTER #1 TECHNOLOGY PLAN

SCALE: 1/4"=1'-0"

R

COMMITTAL

SHELTER

STORAGE

SP1

"TAPS" SYSTEM FUNCTIONAL DIAGRAM

NO SCALE

GENERAL NOTES

KEYNOTES

SP1

SP1

SP1

SP1

SP1 SP1

SP1 SP1

3 3

3 3

SP12

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

COMMITTAL SHELTER #1 - ELECTRICAL

AND TECHNOLOGY PLANS

SACMDS

E-4801-1

EXISTING COMMITTAL SHELTER #2 ELECTRICAL AND

TECHNOLOGY DEMOLITION PLAN

SCALE: 1/4"=1'-0"

R

COMMITTAL

SHELTER

STORAGE

EXISTING COMMITTAL SHELTER #2 ELECTRICAL PLAN

SCALE: 1/4"=1'-0"

R

COMMITTAL

SHELTER

STORAGE

EXISTING COMMITTAL SHELTER #2 TECHNOLOGY PLAN

SCALE: 1/4"=1'-0"

R

COMMITTAL

SHELTER

STORAGE

GENERAL NOTES

KEYNOTES

"TAPS" SYSTEM FUNCTIONAL DIAGRAM

NO SCALE

SP1

SP1

SP1

SP1

SP1

SP1 SP1

SP1 SP1

3 3

3 3

SP12

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

COMMITTAL SHELTER #2 - ELECTRICAL

AND TECHNOLOGY PLANS

SACMDS

E-4802-1

GENERAL NOTES

COMMITTAL SHELTER #3 ELECTRICAL PLAN

SCALE: 1/4"=1'-0"

R

STORAGE

COMMITTAL

SHELTER

COMMITTAL SHELTER #3 TECHNOLOGY PLAN

SCALE: 1/4"=1'-0"

R

STORAGE

COMMITTAL

SHELTER

"TAPS" SYSTEM FUNCTIONAL DIAGRAM

NO SCALE

SP1 SP1

SP1 SP1

3 3

3 3

SP2

SP1

SP1

SP1

SP1

SP2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

COMMITTAL SHELTER #3 - ELECTRICAL

AND TECHNOLOGY PLANS

SACMDS

E-4803-1

FIRE / SMOKE BARRIER DESIGNATIONS

VIEW NAME

VIEW KEY

PIPING SYMBOL LIST

SYMBOL: DESCRIPTION:

MECHANICAL SYMBOL LIST

SYMBOL: DESCRIPTION:

R

D

T

T

T

P

P

FM

F

VENTILATION ABBREVIATION KEY

ABBR: DESCRIPTION:

TAB POST - CONSTRUCTION NOTES:

MECHANICAL GENERAL NOTES:

MECHANICAL RENOVATION NOTES:

MECHANICAL PHASING NOTES:

VENTILATION GENERAL NOTES:

PIPING GENERAL NOTES:

TAB PRE-DEMOLITION NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

Building Number

HVAC - GENERAL NOTES

JJAWCR

H-100

HB

HB

F.D.

F.D.

F.D.

EYE

WASH

HB

F.D.

F.D.

F.D.

EYE

WASH

HB

BREAK ROOM

VESTIBULE

BREAK ROOM

DIR. OFFICE

MULTIPURPOSE

WOMEN

SHOWER

114A

MEN

LOCKER RM.

SHOWER

116A

CORR.

PARTS

CORR.

WASH BAY

MAINT.

STORAGE

STORAGE

MECH CORR.

MECH SHOP

UNISEX TOILET

VESTIBULE

OPEN OFFICE

ASST. DIR.

OFFICE

OFFICE

SECURITY

122A

ELEC/MECH

IT CLOSET

SS-1

KEYNOTES

HWS

HWR

HWS

HWR

HWSHWR

COND.

UNIT

EXIST. CUH TO REMAINEXIST. CUH TO REMAIN

CONTROL PANEL

(B-1)E

(B-2)E

(AH-1)E

(P-1)E

(P-2)E

18"x96" 0.A. DUCT

18"x66" 0.A. DUCT

28"x28" S.A. DUCT

(BOD=11'-2")

68"x17" R.A.

DUCT (BOD=9'-0")

CONDENSING UNIT

FOR SS-1

FURNISH STANDARD

WALL BRACKET AND

MOUNT TO SIDE OF

BUILDING

DUCTLESS SPLIT SYSTEM SCHEDULE

INDOOR UNIT OUTDOOR UNIT

SYMBOL SERVICE TYPE

AIRFLOW

RANGE CFM

NOM

TON

REFRIGERANT SEER WEIGHT

RATED COOLING

CAPACITY (MBH)

RATED HEATING CAPACITY AT

17°F (MBH)

ELECT MCA MOCP

SS-1, CU-1

DATA

CLOSET

HIGH

WALL

145-399 1 R410A 20.5 37 24 22

208/230-1

19 25

NOTES:

1.

RATING CONDITIONS FOR COOLING: INDOOR: 80 DEG. F DB, 67 DEG. F WB; OUTDOOR: 105 DEG. F DB, 75DEG. F WB.

2.

RATING CONDITIONS FOR HEATING: INDOOR: 70 DEG. F DB, 60 DEG. F WB; OUTDOOR: 17 DEG. DB, 15 DEG. F WB.

3. PROVIDE FACTORY-SUPPLIED SINGLE POINT ELECTRICAL CONNECTION WITH MEANS OF DISCONNECT. INDOOR UNIT POWERED FROM OUTDOOR UNIT.

4. DUCTLESS INDOOR UNIT SHALL BE MOUNTED HIGH SIDEWALL.

5. PROVIDE INTEGRAL OR FACTORY PROVIDED CONDENSATE PUMP.

6. PROVIDE HARD WIRED DIGITAL PROGRAMMABLE THERMOSTAT.

7. CONFIRM MAXIMUM REFRIGERANT LINE LENGTH PRIOR TO INSTALL CONDENSING UNIT. INSTALL PER MANUFACTURER'S RECOMMDATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

ADMINISTRATION AND MAINTENANCE

BUILDING - HVAC PLAN

ADMINISTRATION AND MAINTENANCE BUILDING - HVAC PLAN

SCALE: 1/8"=1'-0"

R

T

H

N

O

JJAWCR

H-1001-1

COMMITTAL SHELTER HVAC PLAN

SCALE: 1/4"=1'-0"

R

STORAGE

COMMITTAL

SHELTER

KEYNOTES

UNIT HEATER SCHEDULE - ELECTRIC

SYMBOL DESCRIPTION SERVICE CFM

HEATING

MANUFACTURER MODEL REMARKS

MBH

KW (MIN)

KW

(MAX)

AMP VOLT PHASE

EUH-1

ELECTRIC UNIT

HEATER

STORAGE 100 350 10.2 3 3 14.5 208 1 - -

NOTES 1, 2

NOTES:

1. MOUNTING BRACKET

2. LINE VOLTAGE THERMOSTAT ; CONTRACTOR TO PROVIDE WIRING.

UNIT HEATER CONTROL - ELECTRIC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

F i t h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

o n e e i g h o t o n e q u a r t e r i n o t t h r e e e i g h o t o n e h a l f i n o t t h r e e q u a r t e o t o n e i n o t o n e a e h a l f i n o t t h r e e i n c h o t

A

B

C

D

E

F

OF

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

918PC2008.23ARCHITECT/ENGINEER OF RECORD

1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # OCTOBER 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

BID DOCUMENTS

10/30/2019

BID DOCUMENTS

Mechanical, Electrical, Technology & Structural Engineering:

IMEG, Inc.

623 26th Avenue Rock Island, IL 61201

(309) 788-0673 Wade Ross

Irrigation Engineering & Construction Period Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202 Fort Collins, CO 80525

(970) 372-6104 Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and Construction Period Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170 Eagan, MN 55121

(952) 854-3663 Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period Services:

Terracon Consultants, Inc.

12460 Plaza Drive Cleveland, OH 44130

(216) 459-8378 Thomas McDonnel

Architecture & Construction Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500 St. Louis, MO 63102

(214) 397-0305 Rob Forney

Commissioning:

National Facility Solutions 220 Ramsey Street, Hastings, MN 55033

(651) 319-0170 Scott Sinclair

COMMITTAL SHELTER #3 - HVAC

PLAN

JJAWCR

H-4803-1

B -1.01

A-1401-1

D6

MENS RR

WOMENS RR

174 178

A-1401-4

C1

A-1401-4

F1

A-1401-5

F3

C3

A-1401-7

F2

106A

106B

A-1401-1

B1

A-1401-1

B2

B3

B5

B6 A-1401-1 B5

B1

B3

MENS RR

WOMENS RR

F1

A-1401-1

154154

MECH

123123

123123

A-1401-1

B7

60"

V .I .F

V .I

.F

E Q

E Q

60"

161161

SIM

TYP

106B

106A

70 70

70 70

CT-3

CT-3

B8

A-1401-1

B8

A-1401-1

A-1401-1

F1

CT-1

SS-1

CTB-1

123123

CT-1

CTB-1

154154154

CT-1

CTB-1

M A

X

OPEN

160160

F1

A-1401-1

CT-1

CTB-1

154154

CT-1

CTB-1

MENS RR

WOMENS RR

MECH

163163

163163

INTERIOR FINISH LEGEND

CEILING:

PT-6 (GWB Ceiling) MFG: Sherwin Williams QUALITY: Flat COLOR: Pure White

NO: SW 7005

ACT-1

MFG: Armstrong FINISH: White NAME: Ultima High NRC NRC: .70 min

MILLWORK / MISC:

TOILET PARTITIONS

MFG: Accurate Partitions Corp.

STYLE: TCT Partitions COLOR: #304 Stainless Steel FINISH: Satin

QUARTZ SURFACE

QZ-1

MFG: Cambria COLOR: Temby Cream CONTACT: Hilary Lenzen

Hilary.Lenzen@ CambriaUSA.com 314-750-6759

STAINLESS STEEL

SS-1

MGF: TBD

CONTACT: TBD

WALLS:

PAINT

PT-4

MFG: Sherwin Williams COLOR: March Wind

NO: SW 2128

FINISH: ALKYD Eggshell

FLOORING:

CERAMIC TILE

CT-1 (Field Tile) MFG: Virginia Tile STYLE: Rift COLOR: Gravel SIZE: 12" x 24" INSTALL: 1/3 Drop CONTACT: Kevin Pardo

Virginia Tile kevin.pardo@VirginiaTile.com 636-734-5080

GROUT: TEC Mist 939

CT-3

MFG: Virginia Tile STYLE: Linen COLOR: UFLI303-1224 White SIZE: 12" x 24" INSTALL: Straight CONTACT: Kevin Pardo

Virginia Tile kevin.pardo@VirginiaTile.com 636-734-5080

GROUT: TEC Mist 939

CERAMIC TILE BASE

CTB-1

MFG: Virginia Tile STYLE: Linen

COLOR: UFLI203-S43C9

SIZE: 12" x 3" High Bullnose NOTE: Align grout joints with wall tile CONTACT: Kevin Pardo

Virginia Tile kevin.pardo@VirginiaTile.com 636-734-5080

WINDOW TREATMENT

WT-1

MFG: 3M

STYLE: Fascara FINISH: Dusted Crystal

NO: 7725-314

'-6

'-1

1 1/2"

2'-1"

NEW PARTITION

EXISTING

WALL TO

REMAIN

COUNTERTOP:

QUARTZ COUNTERTOP (QZ-1)

BACKSPLASH:

QUARTZ, CON'T SEALANT AT

ALL SIDES

PROVIDE INSUL. VINYL DRAIN

COVER AT TRAP AND DRAIN LDR.

AREA OF WORK

7" to 9"

60"

CT-1

CTB-1

LIFE SAFETY LEGEND

BUSINESS

UNOCCUPIED

PATH A

PATH B

INSTALL TRANSITION STRIP PER MANUFACTURER'S

RECOMMENDATIONS.

FLOOR SUBSTRATE

FINISHED

CONCRETE

SCHEDULED CERAMIC

TILE

TRANSITION STRIP

/8

0' - 0 3/4"

13605 1st Ave. N. #100 Plymouth, MN 55441

P 763.412.4000 | F 763.412.4090 | ae-mn .com Anderson Engineering of Minnesota, LLC | Proj #

KEY MAP: N.T.S.

15150

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Project Director

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

OCT 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

CD2 DOCUMENTS

CONSULTANTS

Mechanical, Electrical, Technology &

Structural

Engineering:

Revisions: Date:

IMEG, Inc.

623 26th Avenue

Rock Island, IL

61201

(309) 788-0673

Wade Ross

Irrigation Engineering

& Construction

Period

Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202

Fort Collins, CO 80525

(970) 372-6104

Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and

Construction Period

Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170

Eagan, MN 55121

(952) 854-3663

Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period

Services:

Terracon Consultants, Inc.

50 Goldenland Ct., Ste. 100

Sacramento, CA 95834

(916) 928-4690

Robert Holmer

Architecture &

Construction

Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500

St. Louis, MO 63102

(214) 397-0305

Rob Forney

Commissioning:

National Facility

Solutions

220 Ramsey Street, Hastings, MN 55033

(651) 319-0170

Scott Sinclair

ISSUED FOR BID

OF --

VA FORM 08 - 6231

A

F ile

P a th x p ro j\ -1 a n d e rs o n e n g o f m n \4

-o h o h io w e s te rn r e s e rv e c e m e te ry \0 re v it \2

-5

-2 v a x t it le b lo c k .d w g e d it :z a c h h s a v e d :5

/2 /2

:2 P

M p lo t:

/1

/2

:0 A

M

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PUBLIC INFORMATION CENTER

BUILDING - FIRST FLOOR PLAN

918PC2008.23

A-1401-1

172MMTChecker

1/8" = 1'-0"F3 NEW P.I.C. PLAN

1/4" = 1'-0"D6 ENLARGED NEW RESTROOM PLAN

3/8" = 1'-0"B1 RESTROOM ELEVATION

3/8" = 1'-0"B2 RESTROOM ELEVATION

3/8" = 1'-0"B3 RESTROOM ELEVATION

3/8" = 1'-0"B5 RESTROOM ELEVATION

3/8" = 1'-0"B6 RESTROOM ELEVATION

1/4" = 1'-0"D1 ENLARGED DEMO RESTROOM PLAN

ROOM FINISH SCHEDULE

RM # RM NAME FLOOR FINISH

BASE

FINISH

WALL FINISH DOOR

FRAME

CEILING

FINISH COMMENTSNORTH EAST WEST SOUTH

104 MENS RR CT-3 CTB-1 CT-1 CT-1 CT-1 CT-1 SS PT-6 ALL NEW TILE FINISHES; WALL AND FLOOR

105 WOMENS RR CT-3 CTB-1 CT-1 CT-1 CT-1 CT-1 SS PT-6 ALL NEW TILE FINISHES; WALL AND FLOOR

106 MECH - - - - - - - - REPAIR EXISTING SURFACES TO MATCH ADJACENT

SUBSEQUENT TO MECHANICAL SCOPE OF WORK

1 1/2" = 1'-0"F1 SECTION @ LAV COUNTER

3/8" = 1'-0"B7 TYP TOILET ELEVATION

GENERAL NOTES:

1) COORDINATE HVAC VENTS & RETURNS

WITH MEP DRAWINGS.

2) PROVIDE ENTIRE MECHANICAL DUCT

SYSTEM CLEANING AT COMPLETION OF

NEW WORK.

3) BENCHES AND TRASH CANS AT PUBLIC

INFORMATION CENTER BUILDING TO BE

REPLACED.

4) REFER TO SPECIFICATIONS FOR TOILET

ACCESSORIES AND G-005 FOR MOUNTING

HEIGHTS.

NOTE: REFER TO D1 THIS SHEET FOR DEMOLITION PLAN

DOOR SCHEDULE

Door Number

Door

Hardware

Frame

CommentsWidth Height Thickness Material Finish Type Material

101 3' - 0" 7' - 0" 0' - 1 3/4" SS BRUSHED/

SN

HW-9 1 SS PROVIDE CARD READER AND MAGNETIC

LOCK. WITH POWER ASSIST OPENER; RE:

SPECIFICATION FOR OPERATIONS

104 3' - 0" 7' - 0" 0' - 1 3/4" SS BRUSHED/

SN

HW-15 1 SS PROVIDE STOREROOM TYPE LOCKSETS,

KEY-SECURED FROM OUTSIDE, OPERABLE

TRANSOM WINDOW ABOVE

105 3' - 0" 7' - 0" 0' - 1 3/4" SS BRUSHED/

SN

HW-15 1 SS PROVIDE STOREROOM TYPE LOCKSETS,

KEY-SECURED FROM OUTSIDE, OPERABLE

TRANSOM WINDOW ABOVE

106A 3' - 0" 7' - 0" 0' - 2" SS BRUSHED/

SN

HW-15 1 SS PROVIDE STOREROOM TYPE LOCKSETS,

CARD READER ACCESS FROM OUTSIDE

106B 3' - 0" 7' - 0" 0' - 2" SS BRUSHED/

SN

HW-15 1 SS PROVIDE STOREROOM TYPE LOCKSETS,

CARD READER ACCESS FROM OUTSIDE

NOTE: REFER TO DOOR LEGEND/INFORMATION SHEET A-0001

NOTE: REFER TO SHEET A-0001 FOR TYP. FIXTURE MOUNTING HEIGHTS.

1/8" = 1'-0"E3 LIFE SAFETY PLAN

Area Schedule (Rentable)

Name Area LoadFactor Occupancy Occupants

UNOCCUPIED 117 SF 0 UNOCCUPIED 0

UNOCCUPIED 362 SF 0 UNOCCUPIED 0

BUSINESS 544 SF 100 BUSINESS 5

PATH "B"

Travel Distance

28' - 5"

PATH "A"

Travel Distance

28' - 2"

EXISTING BUILDINGS

BUILDING CODE SUMMARY:

BUILDING DATA:

BUILDING CODE AGENCY/JURISDICTION:

BUILDING CODE:

TYPE OF WORK:

EXISTING CONSTRUCTION TYPE:

TOTAL NUMBER OF FLOORS:

NUMBER OF FLOORS ABOVE GRADE:

(THIS PROJECT)

FIRE PROTECTION SYSTEM:

CITY OF RITTMAN, OH

2015 IEBC - EXISTING

RENOVATIONS

2B

UNSPRINKLERED

PROJECT SUMMARY

PUBLIC INFORMATION CENTER BUILDING. BUSINESS USE.

# NOTE

51 REMOVE EXISTING DOOR AND FRAME; PREP. OPENING

FOR INSTALLATION OF DOOR AND DOOR FRAME.

53 REMOVE EXISTING TOILET STALL & URINAL PARTITIONS.

REPAIR EXISTING CONNECTION POINTS AT WALL AND

BULKHEAD TO REMAIN.

54 REMOVE EXISTING COUNTERTOP, CABINET, AND SINK.

55 RE: MECHANICAL PLANS FOR WORK IN THIS AREA.

56 REMOVE THE THRESHOLD & DAMAGED FLOOR BELOW.

PREPARE SUBFLOOR TO RECIEVE NEW TILE FINISHES

AND SADDLE THRESHOLDS

58 REMOVE EXISTING WALL MOUNTED TOILET.

59 REMOVE EXISTING URINAL.

60 REMOVE EXISTING LAVATORY.

61 REMOVE EXISTING MIRROR. PATCH AND REPAIR WALL

SUBSTRATE AS NECESSARY.

62 REMOVE EXIST WALL AND FLOOR FINISHES. PREP FOR

NEW FINISHES AS NEEDED THROUGHOUT.

63 NEW STAINLESS STEEL DOOR AND DOOR FRAME WITH

MECHANICAL LOUVER. PROVIDE BARRIER-FREE

ROLLOVER-TYPE ALUMINUM SADDLE THRESHOLD AT

SILL.

65 REPLACE SHEET MTL. SHROUD AT CONSOULE. FINISH TO

MATCH EXIST. STANDARD FLASHINGS. CAULK AROUND

PERIMETER

66 REMOVE EXISTING UNIT PAVERS AND SUBSTRATE AT PIC

BREEZEWAY AREA, PROVIDE NEW SUB-BASE AND

CONCRETE PAVING. RE: CIVIL FOR PAVING PROFILE.

70 PROVIDE NEW WINDOW FILM (WT-1)

72 FLOOR DRAIN TO REMAIN.

73 BATTERY OPERATED MOTION SENSOR OPERATION FOR

ALL SINKS, TOILETS, URINALS AND HAND DRYERS.

123 NEW TOILET AND URINAL PARTITIONS.

128 EXISTING GYPSUM BOARD HEADER / BULKHEAD.

129 INSTALL NEW HAND AIR DRYER. RE: ELECT. FOR

CONNECTIONS.

151 NEW SINK AND COUNTERTOP @ 2'-10" A.F.F. ADJUST

PLUMBING LINES AND UNDER COUNTER CABINET

ACCORDINGLY.

154 NEW GRAB-BARS.

155 REMOVE WALL TILE AROUND MIRRORS.

156 PROVIDE ADA MIRRORS AT EACH VANITY. (40" AFF MAX)

157 RE: MECHANICAL PLANS FOR WORK IN THIS AREA.

159 NEW TOILET PAPER DISPENSER

160 PROVIDE NEW INSUL. VINYL DRAIN COVER AT

RECONFIGURED TRAP AND DRAIN LDR.

161 PROVIDE NEW POWER ASSIST RECESSED WALL

MOUNTED OPERATOR AT 36" AFF. RE: PROJECT MANUAL

FOR FULL HARDWARE PROFILE (HW-15).

163 DEMO EXIST WINDOW SHADE AND PREP FOR NEW FINISH

174 RE: ELECTRICAL FOR LIGHTING IMPROVEMENTS IN PIC

ADMIN AREA.

178 PAINT NEW EXPOSED DUCTWORK TO MATCH ADJACENT

WALL COLOR.

196 NEW 3'X4' STAINLESS STEEL PLATE BEHIND HAND DRYER.

198 EXISTING BENCH TO BE REPLACED.

199 EXISTING WASTECAN TO BE REPLACED.

KEYED NOTES

12" = 1'-0"B8 RR TRANSITION DETAIL

5 UN ITS

h = 1

0U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

0U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

8 UN

ITS

h =

0U NITS @ 5h=

8 UN

ITS

h =

0 U NITS @ 5h=

8 UN

ITS

h =

0 U NITS @5h=

8 UN

ITS

h =

0 U

NITS @

5h= 0

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

U

NITS

5h=0

5 UN ITS

h = 1

U

NITS

@ 5h=

5 UN ITS

h = 1

U

NITS

5h= 0

5 UN ITS

h = 1

U

NITS

5h= 0

8 UN

ITS

h =

0 U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h=

8 UN

ITS

h =

0 U NITS @ 5h=

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

0U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

0U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

8 UN

ITS

h =

U

NITS @

5h=

8 UN

ITS

h =

0 U NITS @5h=

8 UN

ITS

h =

0 U NITS @ 5h=

8 UN

ITS

h =

0 U

NITS @

5h=0

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

8 UN

ITS

h =

0 U NITS @ 5h=

8 UN

ITS

h =

0U NITS @ 5h=

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h= 0

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h= 0

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

8 UN

ITS

h =

0 U NITS @ 5h=

8 UN

ITS

h =

0 U

NITS @

5h=0

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h=

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

B -1.01

MENS RR

WOMENS RR

D1

A-1401-6

A-1401-4

C1

A-1401-4

F1

A-1401-5

F3

C3

D5

A-1401-6

180153

181181 181181

A.F.F.

EXIST. GYP

8' - 0"

A.F.F.

EXIST. GYP

8' - 0"

A.F.F.

TRESPA

11' - 8"

A.F.F.

TRESPA

11' - 8"

195 187

70 70

70 70

D1

A-1401-6

A-1401-4

C1

A-1401-4

F1

A-1401-5

F3

C3

D5

A-1401-6

MENS RR

WOMENS RR

6969 6969

AREA OF WORK

13605 1st Ave. N. #100 Plymouth, MN 55441

P 763.412.4000 | F 763.412.4090 | ae-mn .com Anderson Engineering of Minnesota, LLC | Proj #

KEY MAP: N.T.S.

15150

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Project Director

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

OCT 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

CD2 DOCUMENTS

CONSULTANTS

Mechanical, Electrical, Technology &

Structural

Engineering:

Revisions: Date:

IMEG, Inc.

623 26th Avenue

Rock Island, IL

61201

(309) 788-0673

Wade Ross

Irrigation Engineering

& Construction

Period

Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202

Fort Collins, CO 80525

(970) 372-6104

Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and

Construction Period

Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170

Eagan, MN 55121

(952) 854-3663

Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period

Services:

Terracon Consultants, Inc.

50 Goldenland Ct., Ste. 100

Sacramento, CA 95834

(916) 928-4690

Robert Holmer

Architecture &

Construction

Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500

St. Louis, MO 63102

(214) 397-0305

Rob Forney

Commissioning:

National Facility

Solutions

220 Ramsey Street, Hastings, MN 55033

(651) 319-0170

Scott Sinclair

ISSUED FOR BID

OF --

VA FORM 08 - 6231

A

F ile

P a th x p ro j\ -1 a n d e rs o n e n g o f m n \4

-o h o h io w e s te rn r e s e rv e c e m e te ry \0 re v it \2

-5

-2 v a x t it le b lo c k .d w g e d it :z a c h h s a v e d :5

/2 /2

:2 P

M p lo t:

/1

/2

:0 A

M

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PUBLIC INFORMATION CENTER

BUILDING - REFLECTED CEILING

PLAN

918PC2008.23

A-1401-2

172MMTChecker

1/4" = 1'-0"F3 REFLECTED CEILING PLAN

1/4" = 1'-0"C3 DEMOLITION REFLECTED CEILING PLAN

GENERAL NOTES:

1) COORDINATE HVAC VENTS & RETURNS

WITH MEP DRAWINGS.

2) PROVIDE ENTIRE MECHANICAL DUCT

SYSTEM CLEANING AT COMPLETION OF

NEW WORK.

# NOTE

67 REMOVE EXISTING WOOD PLANK FINISH AT HVAC SOFFIT.

68 REMOVE EXISTING WOOD PLANK FINISH AT BREEZEWAY

SOFFIT.

69 REMOVE DECORATIVE HARDWOOD FASCIA FROM

EXISTING TIE MEMBERS.

70 PROVIDE NEW WINDOW FILM (WT-1)

74 NEW SECURITY CAMERA LOCATION. RE: TECHNOLOGY

DRAWINGS FOR ADDITIONAL INFORMATION.

153 INSTALL NEW STAINLES STEEL DOORS AND FRAMES AND

TRANSOM WITH NEW HARDWARE. RE: SCHED. FOR

ADDITIONAL INFORMATION.

179 INSTALL NEW TRESPA "PURA" FLUSH-PLANK SIDING AT

HVAC BOX-SOFFIT. WOODGRAIN FINISH TO BE SELECTED

FROM MANUFACTURER'S STANDARD RANGE.

180 INSTALL NEW TRESPA "PURA" FLUSH-PLANK SIDING AT

BREEZEWAY SOFFIT. WOODGRAIN FINISH TO BE

SELECTED FROM MANUFACTURER'S STANDARD RANGE.

181 INSTALL NEW TRESPA "PURA" FLUSH-PANEL FASCIA

OVER EXISTING TIE BEAMS. WOODGRAIN FINISH TO BE

SELECTED FROM MANUFACTURER'S STANDARD RANGE

187 EXISTING SKYLIGHTS AND GLAZING TO REMAIN.

194 FINISH AT TIE BEAMS IN BREEZEWAY TO MATCH THE

TRESPA PRODUCT.

195 EXISTING SKYLIGHTS TO BE CLEANED, NEW SEALANT TO

BE APPLIED AROUND EXTERIOR.

197 REPAIR WATER DAMAGED CEILING AS REQUIRED.

KEYED NOTES

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

8 UN

ITS

h =

0 U NITS @ 5h=

8 UN

ITS

h =

0 U NITS @5h=

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h=0

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

U

NITS

@5h=

5 UN ITS

h = 1

0U

NITS

5h=

5 UN ITS

h = 1

U

NITS

@ 5h=

5 UN ITS

h = 1

0U

NITS

5h=

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h=

8 UN

ITS

h =

0 U NITS @ 5h=

8 UN

ITS

h =

0 U NITS @ 5h=

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

8 UN

ITS

h =

0 U NITS @5h=

8 UN

ITS

h =

0 U NITS @ 5h=

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h= 0

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

U

NITS

5h=0

5 UN ITS

h = 1

U

NITS

5h= 0

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=0

8 UN

ITS

h =

0U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h=

8 UN

ITS

h =

U

NITS @

5h=

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

U

NITS

5h= 0

5 UN ITS

h = 1

U

NITS

@ 5h=

5 UN ITS

h = 1

U

NITS

5h= 0

5 UN ITS

h = 1

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h=

8 UN

ITS

h =

0U NITS @ 5h=

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

B -1.01

D1

A-1401-6

A-1401-4

C1

A-1401-4

F1

D5

A-1401-6

192"

182182

184 186

186 184

185185 185185

185185185185

VIF VIF VIF VIF

AREA OF WORK

13605 1st Ave. N. #100 Plymouth, MN 55441

P 763.412.4000 | F 763.412.4090 | ae-mn .com Anderson Engineering of Minnesota, LLC | Proj #

KEY MAP: N.T.S.

15150

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Project Director

OHIO WESTERN RESERVE

NATIONAL CEMETERY

PHASE III DEVELOPMENT

OCT 30, 2019

10175 RAWIGA RD, SEVILLE, OH 44273

CD2 DOCUMENTS

CONSULTANTS

Mechanical, Electrical, Technology &

Structural

Engineering:

Revisions: Date:

IMEG, Inc.

623 26th Avenue

Rock Island, IL

61201

(309) 788-0673

Wade Ross

Irrigation Engineering

& Construction

Period

Services:

Aqua Engineering, Inc.

375 Horsetooth Rd., Bldg. 2-202

Fort Collins, CO 80525

(970) 372-6104

Robert Beccard

Cost Estimating, Scheduling, Value Engineering, and

Construction Period

Services:

CPMI, Inc.

3265 Northwood Cir., Ste. 170

Eagan, MN 55121

(952) 854-3663

Bryan Bertrand

Geotechnical Engineering, Environmental Engineering, & Construction Period

Services:

Terracon Consultants, Inc.

50 Goldenland Ct., Ste. 100

Sacramento, CA 95834

(916) 928-4690

Robert Holmer

Architecture &

Construction

Period Services:

Oculus, Inc.

1 South Memorial Dr., Suite 1500

St. Louis, MO 63102

(214) 397-0305

Rob Forney

Commissioning:

National Facility

Solutions

220 Ramsey Street, Hastings, MN 55033

(651) 319-0170

Scott Sinclair

ISSUED FOR BID

OF --

VA FORM 08 - 6231

A

F ile

P a th x p ro j\ -1 a n d e rs o n e n g o f m n \4

-o h o h io w e s te rn r e s e rv e c e m e te ry \0 re v it \2

-5

-2 v a x t it le b lo c k .d w g e d it :z a c h h s a v e d :5

/2 /2

:2 P

M p lo t:

/1

/2

:0 A

M

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PUBLIC INFORMATION CENTER

BUILDING - ROOF PLAN

918PC2008.23

A-1401-3

172MMTChecker

1/4" = 1'-0"C2 ROOF PLAN

GENERAL NOTES:

1) COORDINATE HVAC VENTS & RETURNS

WITH MEP DRAWINGS.

2) PROVIDE ENTIRE MECHANICAL DUCT

SYSTEM CLEANING AT COMPLETION OF

NEW WORK.

# NOTE

182 EXISTING STANDING SEAM COPPER PAN ROOF TO

REMAIN.

183 REMOVE AND RE-FIT 16 LFT. OF INTERNAL GUTTER

LINING AND DOWNSPOUT CONNECTION.

184 CLEAN, DRY AND THOUROUGHLY INSPECT SOLDERED

JOINTS AT NEW AND EXISTING GUTTER SECTIONS

RE-SWEAT AND SOLDER ANY DEGRADED JOINTS AS

NECESSARY.

185 REPAIR AND RE-POINT MORTAR JOINTS AT EXISTING

STONE CAPS.

186 PROVIDE NEW CAP-OVER COPPER FLASHINGS

CONTINUOUS AT EXISTING GUTTER AT BREEZEWAY, EA.

SIDE.

187 EXISTING SKYLIGHTS AND GLAZING TO REMAIN.

195 EXISTING SKYLIGHTS TO BE CLEANED, NEW SEALANT TO

BE APPLIED AROUND EXTERIOR.

KEYED NOTES

h = 1

U

NITS

5h=0

5 UN ITS

h = 1

U

NITS

5h= 0

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=0

8 UN

ITS

h =

0 U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h=

8 UN

ITS

h =

U

NITS @

5h=

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

0U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

8 UN

ITS

h =

0U NITS @ 5h=

8 UN

ITS

h =

0 U NITS @ 5h=

8 UN

ITS

h =

0U NITS @ 5h=

8 UN

ITS

h =

0 U

NITS @

5h= 0

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=0

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h= 0

8 UN

ITS

h =

0 U

NITS @

5h=0

8 UN

ITS

h =

0U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

U

NITS @

5h=

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

U

NITS

@ 5h=

5 UN ITS

h = 1

0U

NITS

5h=

5 UN ITS

h = 1

U

NITS

@5h=

5 UN ITS

h = 1

U

NITS

@5h=

8 UN

ITS

h =

U

NITS @

5h=0

8 UN

ITS

h =

U

NITS @

5h= 0

8 UN

ITS

h =

0 U NITS @ 5h=

8 UN

ITS

h =

0U NITS @ 5h=

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

18 UNI

TS

4h

= 74

T

OT AL

PLA ZA

= 16

5 UN ITS

h = 1

0U

NITS

5h=

5 UN ITS

h = 1

U

NITS

5h=

5 UN ITS

h = 1

U

NITS

@ 5h=

5 UN ITS

h = 1

8 UN

ITS

h =

U

NITS @

5h=

8 UN

ITS

h =

U

NITS @

5h=

8 UN

ITS

h =

0 U NITS @ 5h=

8 UN

ITS

h =

0 U NITS @5h=

18 UNI

TS

4h

= 74

18 UNI

TS

4h

=…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .