Attachment 8 - Hold Harmless Agreement - Cathodic Protection Wells.docx

DOCX document 28 KB Posted

Attached to
Cathodic Protection, Wells
Solicitation number
FA468624R0013
Issued by

About this file

The provided document is a General Construction Contract Hold Harmless Agreement pertaining to a federal contract opportunity for Cathodic Protection Wells at Beale AFB. The key details are:

The contract opportunity, solicitation number FA468624R0013, is for a Cathodic Protection System for 7 water wells at Beale AFB, with an estimated value between $300K - $500K. The contractor agrees to conduct a site visit, prepare a project proposal and design/drawings, and engage in negotiations without liability to the government. Any design/cost estimates provided will be treated as proprietary. The government reserves the right to award or cancel the project within 60 days of proposal submission, after which the proposal prices may be renegotiated. The solicitation includes a site visit on 11 April 2024, RFIs due by 16 April 2024, and proposals due by 22 April 2024.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Construction Contract

HOLD HARMLESS AGREEMENT

This agreement pertains to the following project:

1135097 – Cathodic Protection Wells – FA468624R0013

The Contractor hereby acknowledges that the project above may not be awarded in this or in any future fiscal year. The Government reserves the right to award or cancel the project, not later than 60 days from proposal submission. After that date, proposal prices may be renegotiated.

The Contractor hereby agrees to conduct a site visit, prepare (and revise as needed) a project proposal and required design/drawings, engage in negotiations, and perform such other acts as are necessary to prepare the project for award without any liability on the part of the Government.

Any project design/cost estimates prepared by the Contractor are done so on a voluntary basis, will be treated as proprietary information, and will not be used for any purpose outside the scope of this effort.