Attachment 8 - Erosion & Sediment Control.PDF

PDF 120 KB Posted

Attached to
Rosselli Park Pickleball Court Construction
Solicitation number
ITB-25-016-1-2025/DG
Issued by
Pinellas County, Florida

About this file

This document is a technical specification section (Section 312500) for Erosion & Sediment Control, likely associated with the Rosselli Park Pickleball Court Construction project in Florida. The specification outlines detailed requirements for erosion and sedimentation control materials and installation methods, including high-density polypropylene reinforcing geogrids, turf reinforcement mats, high-strength geotextiles, and crushed stone bedding with filter fabric and stone riprap. The document provides comprehensive guidelines for product submittals, quality assurance, delivery, storage, handling, and installation procedures, with specific requirements for manufacturer and installer qualifications.

The specification does not include specific pricing details, funding sources, or contract award information. However, it emphasizes technical standards and best practices for erosion control, requiring manufacturers to have a minimum of 5 years of experience and installers to have at least 2 years of experience in similar product applications. The document focuses on ensuring proper installation techniques, protecting installed products, and maintaining environmental conditions recommended by manufacturers throughout the project's duration.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 312500 – Erosion & Sediment Control

08-12-2025

312500-1

SECTION 312500

EROSION & SEDIMENTATION CONTROL

1. GENERAL

1.01 SECTION INCLUDES

A. Erosion and sedimentation control.

1.02 RELATED SECTIONS

A. Section 31 20 00 - Earth Moving.

1.03 SUBMITTALS

A. Submit under provisions of Section 01 30 00 - Administrative Requirements.

B. Product Data: Manufacturer's data sheets on each product to be used, including:

1. Preparation instructions and recommendations.

2. Storage and handling requirements and recommendations.

3. Installation methods.

1.04 QUALITY ASSURANCE

A. Manufacturer Qualifications: Minimum 5 year experience manufacturing similar products.

B. Installer Qualifications: Minimum 2 year experience installing similar products.

1.05 PRE-INSTALLATION MEETINGS

A. Convene minimum two weeks prior to starting work of this section.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Deliver and store products in manufacturer's unopened packaging bearing the brand name and manufacturer's identification until ready for installation.

B. Handling: Handle materials to avoid damage.

1.07 PROJECT CONDITIONS

A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's recommended limits.

Section 312500 – Erosion & Sediment Control

08-12-2025

312500-2

1.08 SEQUENCING

A. Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress.

2. PRODUCTS

2.01 MATERIALS

A. Erosion and Sedimentation Control:

1. Type: High-density polypropylene reinforcing geogrids.

2. Type: Turf reinforcement mat.

3. Type: High-strength geotextiles.

4. Type: Crushed stone bedding with filter fabric and stone riprap.

3. EXECUTION

3.01 EXAMINATION

A. Do not begin installation until substrates have been properly prepared.

B. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.

3.02 PREPARATIONS

A. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.03 INSTALLATION

A. Install in accordance with manufacturer's instructions and in proper relationship with adjacent construction.

3.04 PROTECTION

A. Protect installed products until completion of project.

END OF SECTION