Attachment 8 - Drawing 5 of 7.pdf
PDF 6 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrade Construction Fort Meade VAMC Federal contract opportunity
- Solicitation number
- 36C77622B0055
About this file
This solicitation is for an EHRM infrastructure upgrade construction project at the Fort Meade VAMC. The solicitation seeks a contractor to provide structured cabling, telecommunications equipment, and related services to upgrade the medical center's network infrastructure. Key requirements include installing new fiber optic and copper cabling throughout multiple buildings, upgrading telecommunications rooms with new patch panels and equipment racks, and terminating connections. The response deadline is within 60 days and award is estimated within 180 days. The estimated value is between $1-5 million. The soliciting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:1
:3
A
M
145-TN-012
MCR DETAILS EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 145
Project Director
LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
NOT TO SCALE1 VA MCR DETAILS
NOT TO SCALE2 VA DATA CENTER PATHWAY DETAILS
NOT TO SCALE3 VA DATA CENTER EQUIPMENT AND HORIZONTAL DISTRIBUTION DETAIL
NOT TO SCALE4 VA DATA CENTER MAIN DISTRIBUTION AREA DETAILS
Revisions: Date:
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:1
:3
A
M
145-TN-013
MCR DETAILS EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 145
Project Director
LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
NOT TO SCALE1 VA TYPICAL NETWORK RACK DETAIL
NOT TO SCALE2 VA TYPICAL NETWORK CABINET ACCESSORIES DETAIL
NOT TO SCALE3 VA TYPICAL SERVER CABINET DETAIL
NOT TO SCALE4 VA BONDING DETAIL
H06, ED-7
H07, ED-8
H08, ED-9
H09, ED-10
H10, ED-11
H11, ED-12
H13, HDA B
K12, ED-6
K11, ED-5
K10, ED-4
K09, ED-3
K08, ED-2
K06, ED-1
K05, HDA A
Q15, MDA B-3
Q13, MDA B-2
Q11, MDA B-1
Q09, MDA A-3
Q07, MDA A-2
Q05, MDA A-1
A B C D E F G H I J K L M N O P Q R S
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:1
:3
A
M
145-TN-014
MCR DETAILS EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 145
Project Director
LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
NOT TO SCALE1 VA MEDIA DETAIL
NOT TO SCALE2 VA SPECIFICATIONS
1/4" = 1'-0"3 MCR GRID IDENTIFICATION
TO EXISTING DUCT BANK SYSTEM.
SEE SHEETS TK-029 & TS-001 FOR
CONTINUATION.
SEE 146-TN-011
FOR CONTINUATION
SEE 113-TN-001
FOR CONTINUATION
B/VB/VB/VB/VB/VB/VB/VB/VB/VB/VB/V
A
AAAAAA
A
A
AAAAA
A
B/V
B/VB/VB/VB/VB/VB/VB/V
B/V B/V
B/V
B/V
SEE TS-001, TK-029, &
148-TN-011 FOR
CONTINUATION.
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:1
:3
A
M
145-TN-015
145 - INTERBUILDING FIBER
ROUTING
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 145
Project Director
CKJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
1/16" = 1'-0"1 BLDG 145 INTERBUILDING FIBER ROUTING
A-SIDE FIBER ROUTING A A
B-SIDE FIBER & ANALOG VOICE ROUTING B/V B/V
SHEET NOTES:
1. ROUTE A-SIDE FIBER FOR ALL BUILDINGS EXCEPT BUILDING 145, FROM
MCR INTO CRAWLSPACE. MAINTAIN MAXIMUM POSSIBLE SEPARATION
FROM B-SIDE FIBER. FIBER TO BE IN CONDUIT IN BASEMENT. SEE TK-029
FOR FIBER RISER DIAGRAM.
2. ROUTE A-SIDE FIBER FOR ALL BUILDINGS EXCEPT 145, 113, AND 146 INTO
EXISTING SITE DISTRIBUTION DUCT BANK SYSTEM. SEE TS-001 AND TK-029
FOR DETAILS.
3. ROUTE A-SIDE FIBER FOR BUILDINGS 113 AND 146 THROUGH
CRAWLSPACE UNDER HALLWAY TO BUILDING 113 BASEMENT.
4. ROUTE B-SIDE FIBER AND ANALOG VOICE CABLING FOR BUILDINGS 53,
113, 146, AND 148 INTO CRAWLSPACE. FIBER AND CABLING TO BE IN
CONDUIT IN CRAWLSPACE. MAINTAIN MAXIMUM POSSIBLE SEPARATION
FROM A-SIDE FIBER.
5. ROUTE B-SIDE FIBER AND ANALG VOICE CABLING FOR BUILDINGS 53, 113,
AND 146 THROUGH CRAWLSPACE BETWEEN BUILDINGS 145 AND 146.
6. ROUTE B-SIDE FIBER AND ANALOG VOICE CABLING FOR BUILDING 148
INTO NEW SIGNAL DUCT BANK. TS-001 AND CIVIL DRAWINGS.
GENERAL NOTES:
A. SEE 145-TN-011 FOR GENERAL NOTES.
217B
217C
C200A1
217A
216 215 214
EC2B
PC2B
213 212
PC2A
209A
HC2B
217D
ST2B
221220 222
C200A
206 205
201A
203/204 202 ST2A
C200
EC2A HC2A
223 224 225A 225 226 228A 228B
227A
228C
252255
256200
254 253
247C 247B
251 250
248A
C200B
TC2A
228D
228E 231230 231A 232
247A
PC2D
C200B1 EC2C
244 243
PC2C
240242 241
HC2C
239D
233 234 235 ST2C
239A
239C
239B 236B236A
217C1
217C2
6/ 97
6/ 97
6/ 97
6/ 97
6/ 97
6/ 97
6/ 97
6/ 97
327A
C
D
313E
ST3B
P C
B
301A
ST3A
C300A
EC3A HC3A
328A
357 355
B
C300
T C
A
330 331
353354
C300B
333A
EC3C
P C
C
344 343
341D
ST3C
341A
341C
341B
327A1 327A2 327A3
313A
313B
315A
315 3 6 317 318
320C300A1
B
A
310A
EC3B
310B
305B
305A
309D 309C
309B
309A
303/304
322C
H S
H S
H S
SS SS
S
S
CR
EL EL
CR
145-TN-021
(E) CABLE TRAY
229A-1-A1-2
229A-1-A3-4
229A-1-A5-6
229A-1-A7-8
229A-1-A9-10
229A-1-A11-12
229A-1-A13-14
229A-1-A15-16
229A-1-A17-18
229A-1-A19-20229A-1-A21-22
229A-1-A23-24
229A-1-A25-26
229A-1-A27-28
229A-1-A29-30
229A-1-A31-32
229A-1-A33-34
229A-1-A35-36
229A-1-A37-38
229A-1-A39-40
229A-1-A41-42
229A-1-A43-44
229A-1-A45-46
229A-1-A47-48
229A-1-B1-2
229A-1-B3-4
229A-1-B5-6
229A-1-B7-8
229A-1-B9-10229A-1-B11-12
229A-1-B13-14 229A-1-B15-16
229A-1-B17-18
229A-1-B19-20 229A-1-B21-22 229A-1-B23-24
229A-1-B25-26
229A-1-B27-28
229A-1-B29-30
229A-1-B31-32
229A-1-B33-34
229A-1-B35-36
229A-1-B37-38229A-1-B39-40229A-1-B41-42 229A-1-B43-44
229A-1-B45-46 229A-1-B47-48
229A-2-A1-2 229A-2-A3-4
229A-2-A5-6
229A-2-A7-8 229A-2-A9-10
229A-2-A11-12
229A-2-A13-14 229A-2-A15-16
229A-2-A17-18 229A-2-A19-20
229A-2-A21-22 229A-2-A23-24
229A-2-A29-30
229A-2-A25-26
229A-2-A27-28
229A-2-A31-32 229A-2-A33-34
229A-2-A35-36 229A-2-A37-38
229A-2-A39-40 229A-2-A41-42
229A-2-A43-44 229A-2-A45-46
229A-2-A47-48
229A-2-B1-2 229A-2-B3-4
229A-2-B5-6 229A-2-B7-8
229A-2-B9-10
229A-2-B11-12
229A-2-B13-14 229A-2-B15-16
229A-2-B17-18229A-2-B19-20
229A-2-B21-22 229A-2-B23-24
7 TYP
145-TN-021
(E) CABLE TRAY
329A-1-A1-2
329A-1-A3-4
329A-1-A5-6
329A-1-A7-8
329A-1-A9-10
329A-1-A11-12
329A-1-A13-14
329A-1-A15-16
329A-1-A17-18
329A-1-A19-20
329A-1-A21-22
329A-1-A23-24
329A-1-A25-26
329A-1-A27-28
329A-1-A29-30
329A-1-A33-34
329A-1-A35-36
329A-1-A31-32
329A-1-A37-38
329A-1-A39-40
329A-1-A41-42
329A-1-A43-44
329A-1-A45-46
329A-1-A47-48
329A-1-B1-2
329A-1-B3-4
329A-1-B5-6
329A-1-B7-8
329A-1-B9-10
329A-1-B11-12
329A-1-B13-14329A-1-B15-16 329A-1-B17-18
329A-1-B19-20 329A-1-B21-22
329A-1-B23-24 329A-1-B25-26
329A-1-B27-28 329A-1-B29-30
329A-1-B31-32
329A-1-B33-34
329A-1-B35-36
329A-1-B37-38
329A-1-B39-40
329A-1-B41-42
329A-1-B43-44
329A-1-B45-46
329A-1-B47-48
329A-1-C1-2
329A-1-C3-4
329A-1-C5-6
329A-1-C11-12
329A-1-C9-10
329A-1-C7-8 329A-1-C13-14
329A-1-C15-16
329A-1-C17-18329A-1-C19-20
329A-1-C21-22
329A-1-C23-24
329A-1-C25-26
329A-1-C27-28
329A-1-C29-30
329A-1-C31-32
329A-1-C33-34
329A-1-C35-36 329A-1-C37-38
329A-1-C39-40 329A-1-C41-42 329A-1-C43-44
329A-1-C45-46
329A-1-C47-48
329A-1-D1-2
329A-1-D3-4
329A-1-D5-6
329A-1-D7-8
329A-1-D9-10
329A-1-D11-12
329A-1-D13-14
329A-1-D15-16
329A-1-D17-18
329A-1-D19-20
329A-1-D21-22
329A-1-D23-24
329A-1-D25-26
7 TYP
BONDING BUSBAR
4" SLEEVE TO FLOORS
BELOW
4" SLEEVE TO FLOORS
ABOVE AND BELOW
B/V
B/V
B/V
B/V
A
A
A
A
A
B/V
B/V
B/V
BONDING BUSBAR
4" SLEEVE TO FLOORS
ABOVE AND BELOW
4" SLEEVE TO FLOORS
ABOVE AND BELOW
A
A
A A
A
A
B/V
B/V B/V
B/V7
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:1
:3
A
M
145-TN-021
145-TELECOM REMODEL PLAN -
SECOND & THIRD FLOORS
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 145
Project Director
LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
SHEET NOTES:
1. NEW RACK WITH PATCH PANELS, FIBER HOUSING, UPS, PDU'S, AND
SPACE FOR OIT/OEHRM EQUIPMENT.
2. NEW CONDUIT SLEEVES INTO ROOM. PROVIDE CONNECTION BETWEEN
ADJACENT SPACE AND NEW ROOM.
3. ELECTRIFIED HARDWARE PER DIVISION 8. PROVIDE CABLING AND
CONNECTION TO ACCESS CONTROL SYSTEM PANEL.
4. NEW PROXIMITY CARD READER BY ACCESS CONTROL INTEGRATOR.
PROVIDE CABLING AND CONNECTION TO ACCESS CONTROL SYSTEM
PANEL.
5. NEW STROBE. CONNECT TO LOCAL FIRE ALARM NAC.
6. PROVIDE 1"C TO NEW TELECOM CABINET IF EXISTING CANNOT BE RE-
USED.
7. PROVIDE NEW PAN-TILT-ZOOM SECURITY CAMERA, AXIS M5000 SERIES OR
EQUAL, FOR MONITORING TELECOM ROOM. PROVIDE CABLING TO
JOHNSON CONTROLS EQUIPMENT. PROVIDE ALL LABOR, CABLING,
INTEGRATION, INFRASTRUCTURE, AIM/FOCUS, ETC. FOR AN OPERABLE
SOLUTION. IF NO JOHNSON CONTROLS EQUIPMENT IS LOCATED IN THE
BUILDING OR WITHIN 250', TERMINATE CABLING ON VA PATCH PANELS
AND PROVIDE NETWORK SWITCH FOR CONNECTION TO CENTRAL JCI
EQUIPMENT. AIR-GAPPED/DEDICATED VA FIBER MAY BE USED FOR
CONNECTION. COORDINATE LOCATION/VIEW WITH VA POLICE AND COR
PRIOR TO ROUGH-IN.
8. TERMINATE NEW 25 STRAND ANALOG BACKBONE ON NEW 24 PORT PATCH
PANEL TO SUPPORT (E) ANALOG DEVICES.
GENERAL NOTES:
A. SEE 145-TN-011 FOR GENERAL NOTES.
1/16" = 1'-0"1 TELECOM REMODEL PLAN - BLDG 145 SECOND FLOOR
1/16" = 1'-0"2 TELECOM REMODEL PLAN - BLDG 145 THIRD FLOOR
1/2" = 1'-0"3 ENLARGED ROOM - 229A TELECOM REMODEL
1/2" = 1'-0"4 ENLARGED ROOM - 329 TELECOM REMODEL
A-SIDE FIBER ROUTING A A
B-SIDE FIBER ROUTING B/V B/V
80m
80m80m
TELECOM ROOM
80m
80m
80m80m
TELECOM ROOM
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:1
:3
A
M
145-TN-021.1
TELECOM DISTANCE ASSESSMENT
- SECOND & THIRD FLOORS
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 145
Project Director
LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
1" = 30'-0"1 TELECOM DISTANCE ASSESSMENT - BLDG 145 SECOND FLOOR
1" = 30'-0"2 TELECOM DISTANCE ASSESSMENT - BLDG 145 THIRD FLOOR
GENERAL NOTES:
A. DISTANCE ASSESSMENT PER VA REQUIREMENTS NOTES ALL CABLING
SHALL BE COMPLIANT.
CR
EL
146-TN-011
AAAA
A
A
A
AA
B/V
B/V
B/V
B/V
B/V
B/V B/V
108-1-A1-2
108-1-A3-4108-1-A5-6
108-1-A7-8 108-1-A9-10
108-1-A11-12
108-1-A13-14
108-1-A15-16
108-1-A17-18
108-1-A19-20
108-1-A21-22
108-1-A23-24
108-1-A25-26 8 TYP
SEE 113-TN-001
FOR CONTINUATION.
B/VB/VB/VB/VB/V
SEE 113-TN-011, 053-TN-001, & TS-001
FOR CONTINUATION
TR
22 A B/V
B/VB/V
B/V
A
A
A
A A
A
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:3
:0
A
M
146-TN-011
146-TELECOM REMODEL PLAN -
FIRST FLOOR
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
SHEET NOTES:
1. NEW RACK WITH PATCH PANELS, FIBER HOUSING, UPS, PDU'S, AND
SPACE FOR OIT/OEHRM EQUIPMENT.
2. NEW CONDUIT SLEEVES INTO ROOM. PROVIDE CONNECTION BETWEEN
ADJACENT SPACE AND NEW ROOM.
3. ELECTRIFIED HARDWARE PER DIVISION 8. PROVIDE CABLING AND
CONNECTION TO ACCESS CONTROL SYSTEM PANEL.
4. NEW PROXIMITY CARD READER BY ACCESS CONTROL INTEGRATOR.
PROVIDE CABLING AND CONNECTION TO ACCESS CONTROL SYSTEM
PANEL.
5. NEW STROBE. CONNECT TO LOCAL FIRE ALARM NAC.
6. PROPOSED A-SIDE FIBER ROUTING IN CEILING ABOVE HALLWAY FROM
BUILDING 113.
7. PROPOSED B-SIDE FIBER ROUTING IN CRAWLSPACE AND BASEMENT
FROM BUILDING 145. STAB UP TO FIRST FLOOR AS CLOSE TO NEW
TELECOM ROOM AS POSSIBLE.
8. PROVIDE 1"C TO NEW TELECOM CABINET IF EXISTING CANNOT BE RE-
USED.
9. PROVIDE NEW PAN-TILT-ZOOM SECURITY CAMERA, AXIS M5000 SERIES OR
EQUAL, FOR MONITORING TELECOM ROOM. PROVIDE CABLING TO
JOHNSON CONTROLS EQUIPMENT. PROVIDE ALL LABOR, CABLING,
INTEGRATION, INFRASTRUCTURE, AIM/FOCUS, ETC. FOR AN OPERABLE
SOLUTION. IF NO JOHNSON CONTROLS EQUIPMENT IS LOCATED IN THE
BUILDING OR WITHIN 250', TERMINATE CABLING ON VA PATCH PANELS
AND PROVIDE NETWORK SWITCH FOR CONNECTION TO CENTRAL JCI
EQUIPMENT. AIR-GAPPED/DEDICATED VA FIBER MAY BE USED FOR
CONNECTION. COORDINATE LOCATION/VIEW WITH VA POLICE AND COR
PRIOR RO ROUGH-IN.
10. TERMINATE NEW 25 STRAND ANALOG BACKBONE ON NEW 24 PORT PATCH
PANEL TO SUPPORT (E) ANALOG DEVICES.
11. B-SIDE FIBER AND ANALOG VOICE CABLING FOR BUILDINGS 113.
CRAWLSPACE BELOW HALLWAY BETWEEN BUILDINGS 113 AND 146.
1/8" = 1'-0"1 TELECOM REMODEL PLAN - BLDG 146 FIRST FLOOR
1/2" = 1'-0"2 ENLARGED ROOM - 108 TELECOM REMODEL
GENERAL NOTES:
A. SEE TK SERIES FOR DETAILS AND SCHEDULES.
B. INTENT IS TO PROVIDE (2) CABLES PER WORK AREA OUTLET, UNLESS
OTHERWISE NOTED. TO PHASE WORK SO THAT EXISTING NETWORK IS
MAINTAINED UNTIL NEW ROOMS ARE OPERABLE, GENERAL APPROACH IS
TO FIRST REPLACE CABLING IN (1) OUTLET WHERE (2) EXIST, OR PROVIDE
A SECOND IF NOT.
C. IF PHASING ALLOWS FOR ALL CABLING IN A BUILDING OR AREA TO BE
MIGRATED IN A NIGHT OR WEEKEND WITHOUT DISRUPTIONS, EXISTING
SINGLE OUTLETS MAY BE RE-USED.
A-SIDE FIBER ROUTING A A
B-SIDE FIBER & ANALOG VOICE ROUTING B/V B/V
80 METERS
80 METERS
80 METERS
80 METERS
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:3
:0
A
M
146-TN-011.1
146 - TELECOM DISTANCE
ASSESMENT
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
1" = 40'-0"1 FIRST FLOOR DISTANCE ASSESMENT
GENERAL NOTES:
A. DISTANCE ASSESSMENT PER VA REQUIREMENTS NOTES ALL CABLING
LAUNDRY
OFFICE
A A
147-TN-011A AA AA2
SEE SHEETS TK-029
& TS-001 FOR
CONTINUATION
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
BONDING BUSBAR
LAUNDRY
OFFICE
A A
A
A
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:3
:4
A
M
147-TN-011
147-TELECOM REMODEL PLAN -
FIRST FLOOR
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 147
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
1/8" = 1'-0"1 TELECOM REMODEL PLAN - BLDG 147 FIRST FLOOR
SHEET NOTES:
1. NEW WALL MOUNTED TELECOM CABINET. MOUNT WITH BOTTOM OF
CABINET +48" AFF.
2. PROPOSED FIBER ROUTING SHOWN. PROVIDE NEW CONDUIT FROM POINT
WHERE SITE DISTRIBUTION ENTERS BUILDNG.
3. PROVIDE 1"C TO NEW TELECOM CABINET IF EXISTING CANNOT BE RE-
USED.
4. ELECTRIFIED HARDWARE PER DIVISION 8. PROVIDE CABLING AND
CONNECTIONTO ACCESS CONTROL PANEL
5. NEW PROXIMITY CARD READER BY ACCESS CONTROL INTEGRATOR.
PROVIDE CABLING AND CONNECTION TO ACCESS CONTROL SYSTEM
PANEL.
6. PROVIDE NEW PAN-TILT-ZOOM SECURITY CAMERA, AXIS M5000 SERIES OR
EQUAL, FOR MONITORING TELECOM ROOM. PROVIDE CABLING TO
JOHNSON CONTROLS EQUIPMENT. PROVIDE ALL LABOR, CABLING,
INTEGRATION, INFRASTRUCTURE, AIM/FOCUS, ETC. FOR AN OPERABLE
SOLUTION. IF NO JOHNSON CONTROLS EQUIPMENT IS LOCATED IN THE
BUILDING OR WITHIN 250', TERMINATE CABLING ON VA PATCH PANELS
AND PROVIDE NETWORK SWITCH FOR CONNECTION TO CENTRAL JCI
EQUIPMENT. AIR-GAPPED/DEDICATED VA FIBER MAY BE USED FOR
CONNECTION. COORDINATE LOCATION/VIEW WITH VA POLICE AND COR
PRIOR TO ROUGH-IN.
GENERAL NOTES:
A. SEE TK SERIES FOR DETAILS AND SCHEDULES.
B. INTENT IS TO PROVIDE (2) CABLES PER WORK AREA OUTLET, UNLESS
OTHERWISE NOTED. TO PHASE WORK SO THAT EXISTING NETWORK IS
MAINTAINED UNTIL NEW ROOMS ARE OPERABLE, GENERAL APPROACH IS
TO FIRST REPLACE CABLING IN (1) OUTLET WHERE (2) EXIST, OR PROVIDE
A SECOND IF NOT.
C. CABLING PATHWAYS TO NEW TELECOM ROOMS SHALL BE CONDUIT IN
THIS BUILDING.
D. IF PHASING ALLOWS FOR ALL CABLING IN A BUILDING OR AREA TO BE
MIGRATED IN A NIGHT OR WEEKEND WITHOUT DISRUPTIONS, EXISTING
SINGLE OUTLETS MAY BE RE-USED.
A-SIDE FIBER ROUTING A A
1/2" = 1'-0"2 ENLARGED ROOM - 109 TELECOM REMODEL
80m 80m
80m
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:3
:4
A
M
147-TN-011.1
147 - TELECOM DISTANCE
ASSESSMENT
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 147
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
1" = 30'-0"1 TELECOM DISTANCE ASSESMENT - BLDG 147
GENERAL NOTES:
A. DISTANCE ASSESSMENT PER VA REQUIRMENTS NOTES ALL CABLING
148-TN-012
148-TN-013
148-TN-014
148-TN-016
148-TN-015
A A A A A A A A A
A
A A A AAAAAAA
B/V B/V B/V B/V B/V B/V B/V B/V B/V B/V B/V B/V B/V B/V B/V B/V B/V B/V B/V
B/V
CORRIDOR
D130
B/V
B/V
B/V
B/V
B/V
B/V
B/V
B/V
A
A
A B/V
SEE TS-001, TK-029 AND 145-TN-015
FOR CONTINUATION AND DETAILS.
SEE TS-001, TK-029 AND 145-TN-015
FOR CONTINUATION AND DETAILS.
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:0
:1
A
M
148-TN-011
148-TELECOM REMODEL PLAN -
FIRST FLOOR
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 148
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
1/16" = 1'-0"1 TELECOM REMODEL PLAN - BLDG 148 FIRST FLOOR
MATCHLINE
MATCHLINE
SHEET NOTES:
1. PROPOSED B-SIDE FIBER AND ANALOG VOICE CABLING ROUTE. FIBER TO
BE IN CONDUIT IN THIS BUILDING. MAINTAIN MAXIMUM POSSIBLE SPACING
FROM B-SIDE FIBER IN SHARED HALLWAYS.
2. PROPOSED A-SIDE FIBER ROUTE. FIBER TO BE IN CONDUIT IN THIS
BUILDING. MAINTAIN MAXIMUM POSSIBLE SPACING FROM A-SIDE FIBER IN
SHARED HALLWAYS.
3. EXISTING SIGNAL CONDUIT PATHWAY FROM BUILDING 145
4. FIBER TO BE IN CONDUIT IN SHARED HALLWAYS. MAINTAIN MAXIMUM
POSSIBLE SEPARATION BETWEEN A-SIDE AND B-SIDE FIBER WITHIN
HALLWAY.
5. ROUTE A-SIDE FIBER INTO BUILDING THROUGH NEW SITE WORK FROM
BUILDING 145. SEE TS-001 FOR DETAILS.
A-SIDE FIBER ROUTING A A
B-SIDE FIBER ROUTING B/V B/V
GENERAL NOTES:
A. SEE TK SERIES FOR DETAILS AND SCHEDULES.
B. INTENT IS TO PROVIDE (2) CABLES PER WORK AREA OUTLET, UNLESS
OTHERWISE NOTED. TO PHASE WORK SO THAT EXISTING NETWORK IS
MAINTAINED UNTIL NEW ROOMS ARE OPERABLE, GENERAL APPROACH IS
TO FIRST REPLACE CABLING IN (1) OUTLET WHERE (2) EXIST, OR PROVIDE
A SECOND IF NOT.
C. IF PHASING ALLOWS FOR ALL CABLING IN A BUILDING OR AREA TO BE
MIGRATED IN A NIGHT OR WEEKEND WITHOUT DISRUPTIONS, EXISTING
SINGLE OUTLETS MAY BE RE-USED.
C102
CTC1 CEC1
C106 C108
C100
CC101
CC100
CC103 CC102
C102A
B112
B111
B110B140
B108 B109
B107
B106
B104
B142
B105
B141
B143
B144
B102
B100
B145
B146
B147
BC100
BHC1
BC103
BHC2
BEC1
AM100
A103
A102
A100
A103A
A107
A101
ATC1
A133
A116B
A116
A109
A114
A111
A110A111D
A111C
A111B
A113A2
A112
A112A
A113A1
A113
A113A
A126A127 A125 A124
A128 A129
A1116A
A130
A115
A115A1
A115A
AM101
A104
A131
A123
A122
A122C A122B
A132
A122A A121 A120
A118D A118E
A118F
A118G
A118H
A118I
A118
A118A
A118B
A118C
A119
A117 A116A1
AC100
AC101
AC102
AHC2
AEC2 AHC3AHC1AEC1
AC103
A111A
A103C
A103B
AC102A
F100
F100A1 F100A2
F100A3
FM100
FM100A
FM100A1
F100A
FC100
F112
F111B
F112A
F111A
F111 FEC1
FC103
F108
FM101
FTC1 F109
F110
F110A
F101A
F101
F101B F102
F103
FC102
F104
F105
F106
F107
FC101
E127
E128
E127A
E129
E130
E130A
E131
E132 E126
EC102
E125A
E125
E133
E133B
E133C1
E133C
E132A
E134
E135
E135A
E136 E137
E137A
E138
E142
E142A
E143E144
E144A
E145 E146
E147
E149
E150
E151
EM100
E153
E154
E100
E100A
E152
E101
E103
E102
E103A
E105
E148
E104
E106
E107
E109
E108
EEC1
E110
E110A
E111 E112
E112A
E113 E114
E114A
E115
E116
E117
E117A
E118 E119
E119A
E120 E121
E121A
E122
E123A
E123
E124
EC101
EC103
EC104
EC100
E133A
EC105
G146
G147
G148
G149
G150
GM100
G100
G100A
G101
G102
G102A
G103
G104
G107
G108 G109
G110A
G109A
G110 G111
G111A
G112
G113
G113A G114
G115
G116
G116A
G117
G118
G118A
G119
GC101
G120
G120A
G121
G122
G123
G123A
G124
G124A
G125
G126
G126A
G127
G128
G129
G129A
G130
G131
G131A
G132
G133A
G133 G134
G135
G135A
G136
G137
G137A
G138
G139
G140
G140A
G141 G142
G142A
G143
G144
G145
G106
G105
GC102
GC103
GC100
GC104
G146B G146A
D113
D124
D118
D116
DC101A
D117
D114
D115
D119 D120
D121
D123
D122
D100
C104
C105A
CM100
C103
D101
D103 D146
D147
D133
D106B
D107
D104
D105
D102 D106A
D106
DC100
DEC1
D109A
D110A
D108
D110B
D112
DC101
D111
D110
D109
D145
DC103
D144
DEC2
D143A
D143
D142
D141A
D141
D140 D139
D128D126
D125 D126B
D126A
D127
D127A
D129A
D128B
D128A
D129
D130
D131/132
D138A
D138
DC102
D136A
D137
D136
DC102A
D133A
D135A
D134
D135
CC104
C102A1
CC105
A105
A106C
A106D A106F
A106G
A106H
A106
A106BA108E
A108F A106A
A108D
AC104
A108C A108B A108A A108
A106J
A108G
A102A
A102B
C105
CHC3
CHC2
CC1-148
A118HA
A119.1 A119.2
B129
B134 B136 B137
BC102
B131B132 B128B128.1B130
B133 B133.1 B135 B135.1
B127
B138
B139
B113
BC101A
BC104 B101
B118
B123B125
B115
B114
BC101
B116 B116.1
B122.1 B122 B121 B119B124B126
B117
C101
C101A
C106A C107
G147A
G146C
G146D
G146E
G147A1
E141
E139
E140
A106E A106E.1
B103
BC100A
AM101A
A112A
D
80m
80m80m
80m
80m
80m80m
80m
80m
80m80m
80m
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:0
:1
A
M
148-TN-011.1
148 - TELECOM DISTANCE
ASSESSMENT
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 148
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
1" = 30'-0"1 TELECOM DISTANCE ASSESSMENT - BLDG 148
GENERAL NOTES:
A. DISTANCE ASSESSMENT PER VA REQUIREMENTS NOTES ALL CABLING
148-TN-012
A114-A23-24
A114-A1-2
A114-A3-4
A114-A25-26
A114-A5-6 A114-A7-8
A114-A9-10
A114-A11-12
A114-A31-32 A114-A13-14
A114-A15-16 A114-A17-18
A114-A19-20
A114-A21-22
A114-A27-28 A114-A29-30
A114-A33-34
A114-A35-36 A114-A37-38
A114-A39-40
A114-A41-42
A114-A43-44
A114-A45-46
A114-A47-48 A114-B1-2
A114-B3-4
A114-B5-6A114-B7-8
A114-B9-10
A114-B11-12
A114-B13-14
A114-B15-16 A114-B17-18 A114-B19-20 A114-B21-22
A114-B23-24
A114-B25-26
A114-B27-28
A114-B29-30
A114-B31-32
A114-B33-34
A114-B35-36
A114-B37-38
A114-B39-40
A114-B41-42
A114-B43-44
A114-B45-46
A114-B47-48
A114-C1-2 A114-C3-4 A114-C5-6
A114-C7-8
A114-C9-10
A114-C11-12
A114-C13-14
A114-C15-16
A114-C17-18
A114-C19-20
A114-C21-22
A114-C23-24
A114-C25-26
A114-C27-28
A114-C29-30
A114-C31-32
A114-C33-34
A114-C35-36
A114-C37-38
A114-C39-40
A114-C41-42
A114-C43-44 A114-C45-46
A114-C47-48
A114-D1-2 A114-D3-4
A114-D5-6
A114-D7-8
A114-D9-10
A114-D11-12
A114-D13-14
A114-D15-16
A114-D17-18 A114-D19-20
A114-D21-22
A114-D23-24
TR
A114A
SOIL HOLD
ATC2
REC
STORAGE
A115
CORRIDOR
AC101
CORRIDOR
AC102
CLOSET
AHC2
ELEC RM
ATC1
TOILET
A132
TOILET
A131
STORAGE
A130
PAV LOUNGE
A129
ROOM
A112B
ROOM
A113A1
ROOM
A106H
TOILET
A108F
COPY
PRINTER
A108E TOILET
A106A
HSK CLOSET
A107
OFFICE
A108A
OFFICE
A108D OFFICE
A108B
OFFICE
A108C
OFFICE
A118G
SOIL
A116
TOILET
A116B
OFFICE
A118HA
STOR
AHC3
STOR
AEC2
STOR
F100A3
STORAGE
F100A2
WOUNDED
CARE
OFFICE
A119.2
REHAB
OFFICE
A119.1
CONFERENCE
ROOM
A122A
RECREATIONAL
STORAGE
A121
OFFICE
A118HOFFICE
A118I
GERIATRIC
EXTENDED
CARE REHAB
ADMIN AREA
A118
OFFICE
A118A
MEN'S
LOCKER
A1116A1
EMPLOYEE
BREAK
ROOM
A119
OCCUPATIONAL
THERAPY
A103A
CHAPLAIN
ADMIN
A102
CHAPLIN
OFFICE
A102B
MEN'S
TOILET
A101
WOMEN'S
TOILET
A133
EXAM ROOM
A128
BREAK
ROOM
A113
STOR
A112A
OFFICE
A118D
OFFICE
A118E
OFFICE
A118F
EOO
A122COFFICE
POLICE
A123
OFFICE
POLICE
A124
PATIENT
ADVOCATE
A127
DVA OFFICE
A125VBA OFFICE
A126
CORRIDOR
AC103
OFFICE
A122B
OCC
THERAPY
OFFICE
A103C
OCC
THERAPY
OFFICE
A103B
OCCUPATIONAL
THERAPY
A103
MECH ROOM
AM100
CORRIDOR
AC104
WOMEN'S
LOCKER
A1116A
OFFICE
A118C
OFFICE
A118B
MECHANICAL
ROOM
FM100A
STORAGE
F100A1
DIRECTOR'S
SUITE ADMIN
AREA
A106
WORSHIP
CHAPEL
A104
OFFICE
A106C
OFFICE
A106D
OFFICE
A106E.1
OFFICE
A106F
MEN'S
LOCKER
ROOM
A113A
ROOM
A113A2
OFFICE
A111B
STOR
A111C
CHAPLAIN
A102A
PATIENT
DINING
ROOM
F100
PHYSICAL
THERAPY
F112
RECREATION
A120
REC
STORAGE
A115A
WORK ROOM
AC102A
POLICE
ADMIN
A111
OFFICE
A110
VISN T-TEL
LARGE
CONFERENCE
ROOM
A109
OFFICE
A106G
OFFICE
A111D
MECH ROOM
AM101A
SHARED
OFFICE
C108
FRONT
LOBBY
A100
VEST
A117
CORRIDOR
AC100
SMALL
CONFERENCE
ROOM
A106E
OFFICE
A105
POLICE
AREA
A112
WAITING
ROOM
A108
STORAGE
F100A
MECH ROOM
AM101
VOLUNTARY
SERVICES
A122
TR
A114A
A
A
A
B/V B/V
B/V
B/V
B/V
B/V
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:0
:1
A
M
148-TN-012
148-TELECOM REMODEL PLAN -
FIRST FLOOR SECTOR A
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 148
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
SHEET NOTES:
1. NEW RACK WITH PATCH PANELS, FIBER HOUSING, UPS, PDU'S, AND
SPACE FOR OIT/OEHRM EQUIPMENT.
2. NEW CONDUIT SLEEVES INTO ROOM. PROVIDE CONNECTION BETWEEN
ADJACENT SPACE AND NEW ROOM.
3. ELECTRIFIED HARDWARE PER DIVISION 8. PROVIDE CABLING AND
CONNECTION TO ACCESS CONTROL SYSTEM PANEL.
4. NEW PROXIMITY CARD READER BY ACCESS CONTROL INTEGRATOR.
PROVIDE CABLING AND CONNECTION TO ACCESS CONTROL SYSTEM
PANEL.
5. NEW STROBE. CONNECT TO LOCAL FIRE ALARM NAC.
6. PROVIDE NEW PAN-TILT-ZOOM SECURITY CAMERA, AXIS M5000 SERIES OR
EQUAL, FOR MONITORING TELECOM ROOM. PROVIDE CABLING TO
JOHNSON CONTROLS EQUIPMENT. PROVIDE ALL LABOR, CABLING,
INTEGRATION, INFRASTRUCTURE, AIM/FOCUS, ETC. FOR AN OPERABLE
SOLUTION. IF NO JOHNSON CONTROLS EQUIPMENT IS LOCATED IN THE
BUILDING OR WITHIN 250', TERMINATE CABLING ON VA PATCH PANELS
AND PROVIDE NETWORK SWITCH FOR CONNECTION TO CENTRAL JCI
EQUIPMENT. AIR-GAPPED/DEDICATED VA FIBER MAY BE USED FOR
CONNECTION. COORDINATE LOCATION/VIEW WITH VA POLICE AND COR
PRIOR TO ROUGH-IN.
7. TERMINATE NEW 25 STRAND ANALOG BACKBONE ON NEW 24 PORT PATCH
PANEL TO SUPPORT (E) ANALOG DEVICES.
GENERAL NOTES:
A. SEE 148-TN-011 FOR GENERAL NOTES.
1/8" = 1'-0"1 TELECOM REMODEL PLAN - BLDG 148 FIRST FLOOR SECTOR A
1/2" = 1'-0"2 ENLARGED ROOM - A114A TELECOM REMODEL
A114-D25-26
A114-D27-28
A114-D29-30
A114-D31-32
A114-D33-34 A114-D35-36
A114-D37-38
A114-D39-40
A114-D41-42
A114-D43-44
A114-D45-46
A114-D47-48
A114-E1-2
A114-E3-4
A114-E5-6
A114-E7-8
A114-E9-10
A114-E11-12 A114-E13-14
A114-E17-18
A114-E15-16A114-E19-20
A114-E21-22
A114-E23-24
A114-E25-26
A114-E27-28
A114-E29-30 A114-E31-32 A114-E33-34
A114-E35-36
A114-E37-38
A114-E39-40
A114-E41-42
A114-E43-44
A114-E45-46
A114-E47-48
C106A-A1-2 C106A-A3-4
C106A-A5-6
C106A-A7-8
C106A-A9-10
C106A-A11-12
C106A-A13-14C106A-A15-16
C106A-A17-18
C106A-A19-20
C106A-A21-22C106A-A23-24C106A-A25-26
C106A-A27-28
C106A-A29-30
C106A-A31-32
C106A-A33-34
C106A-A35-36
C106A-A37-38
C106A-A39-40
C106A-A41-42
C106A-A43-44C106A-A45-46
C106A-A47-48
C106A-B1-2
C106A-B3-4
C106A-B5-6
C106A-B7-8 C106A-B9-10
C106A-B11-12
C106A-B13-14
C106A-B15-16
C106A-B17-18 C106A-B19-20
C106A-B21-22
C106A-B23-24
C106A-B25-26
C106A-B27-28
CORRIDOR
CC100
TR
CTC1
MECH ROOM
CM100
CORRIDOR
CC103
MENTAL
HEALTH
WAITING
MENTAL
HEALTH
WAITING
ROOM
C102
STOR
C102A
STOR
BEC1
STORAGE
BHC1
BATHROOM
B111
BATHROOM
B112
CORRIDOR
BC104
BATHROOM
B139
BATHROOM
B138
CORRIDOR
BC100
V-TEL EXAM
B101
NURSE
TREATMENT
ROOM
B103
TESTING LAB
B105
OFFICE
B142
M.H. COPY
PRINTER
ROOM
B108
HSK CLOSET
B140
MEDICAL
STUDENT/SWING
B113
STORAGE
CHC2
OFFICE
B102
OFFICE
B104
OFFICE
B106
OFFICE
B107
OFFICE
B109
OFFICE
B114
BREAK
ROOM
B115
OFFICE
B116
OFFICE
B116.1
WAITING
ROOM
B118
RECEPTION
AREA
B117
OFFICE
B137
BREAK
ROOM
B136
OFFICE
B135.1
OFFICE
B135OFFICE
B134
OFFICE
B133.1OFFICE
B133
OFFICE
B132
OFFICE
B131
OFFICE
B130 CONF ROOM
B129
OFFICE
B128.1
OFFICE
B128
OFFICE
B127
ACOS
MENTAL
HEALTH
OFFICE
B126
MENTAL
HEALTH
V-TEL
CONFERENCE
ROOM
B125
PSYCHIATRIST
OFFICE
B124
PCT GROUP
ROOM
B123
OFFICE
B122.1
OFFICE
B122
PATIENT
ACTIVITY
ROOM
B119
OFFICE
B121
CORRIDOR
BC102
OFFICE
B147
OFFICE
B146
OFFICE
B145
OFFICE
B144
OFFICE
B143
OFFICE
B141
CORRIDOR
BC101
STOR
C102A1 PUBLIC
WOMEN'S
RESTROOM
C101A
PUBLIC
MEN'S
RESTROOM
CC101
OFFICE
B100
SEWING
ROOM /
UNIFORM
ISSUE /
PATIENT
BAGGAGE
C100
VEST
CC102
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:0
:2
A
M
148-TN-013
148-TELECOM REMODEL PLAN -
FIRST FLOOR SECTOR B
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 148
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
GENERAL NOTES:
A. SEE 148-TN-011 FOR GENERAL NOTES.
1/8" = 1'-0"1 TELECOM REMODEL PLAN - BLDG 148 FIRST FLOOR SECTOR B
148-TN-014
C106A-B29-30
C106A-B31-32
C106A-B33-34
C106A-B35-36
C106A-B37-38
C106A-B39-40 C106A-B41-42
C106A-B43-44
C106A-B45-46
C106A-B47-48
C106A-C1-2
C106A-C3-4
C106A-C5-6 C106A-C7-8
C106A-C9-10C106A-C11-12
C106A-C13-14
C106A-C15-16
C106A-C17-18
C106A-C19-20
C106A-C21-22
C106A-C23-24 C106A-C25-26
C106A-C27-28
C106A-C29-30
C106A-C31-32
C106A-C33-34 C106A-C35-36
C106A-C37-38
C106A-C39-40
C106A-C41-42
C106A-C43-44
TR
C106A
OFFICE
C106B
ORGANIZATIONAL
IMPROVEMENT
OFFICE
C106
STORAGE
C103
CORRIDOR
CC104
CORRIDOR
CC100
CORRIDOR
CC101
STOR
D137
STOR
D134
TOILET
D135A
TOILET
D136A
VEST
D128
VEST
D129
STOR
D123
VEST
D127
TOILET
D128B
TOILET
D126B
VEST
D126
STOR
D117
STOR
D113
STOR
D110A
STOR
D111
STOR
DEC1
TOILET
C105A
OFFICE
C104
TOILET
D106A
STORAGE
D146
TOILET
D143A
BATHROOM
D141A
STOR
DEC2
BREAK
ROOM
D106
TOILET
D106B
SOILED
UTILITY
D103
CLEAN
LINEN
D101
CORRIDOR
DC101
SLEEP LAB
D136SLEEP LAB
D138
SLEEP LAB
D135
SLEEP LAB
D133
TOILET
D133A
TOILET
D138A
VEST
DC102A
CORRIDOR
D130
RUBBER
ROOM
D129A
PATIENT
ROOM
D128A
PATIENT
ROOM
D127A
PATIENT
ROOM
D124
PATIENT
ROOM
D126AMEN'S
CONG.
BATHROOM
D125
PATIENT
ROOM
D122
VEST
DC101A
PATIENT
ROOM
D116
PATIENT
ROOM
D118
PATIENT
ROOM
D114
PATIENT
ROOM
D112
PATIENT
LAUNDRY
D102
NURSING
PRACTITIONER
OFFICE
D104
VISITOR
ROOM
D105
NURSING
OFFICE
D107
CORRIDOR
D108
DAY ROOM
D110
STOR
D110B
STOR
CHC3
STORAGE
CHC2
TOILET
D121
TOILET
D120
PATIENT
LAUNDRY
D145
OFFICE
D144
SOCIAL
WORKER
OFFICE
D143
OFFICE
D142
RME COORD
D141
PATIENT
RESTROOM
D140
CORRIDOR
DC103
PATIENT
ROOM
D119
OFFICE
C107
NURSES
STATION
D109
MED ROOM
D109A
ROOM
C100.0
LOCK WARD
DINING
ROOM
C105
SOCIAL
WORKER
OFFICE
D100
CORRIDOR
CC105
GROUP
PRACTICE
MANAGER
D147
SHARED
OFFICE
C108 5
TR
C106A
A B/V
A
B/V
B/V
A
A
A
A
A
A
A A A
A
A
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:0
:2
A
M
148-TN-014
148-TELECOM REMODEL PLAN -
FIRST FLOOR SECTOR C
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 148
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
SHEET NOTES:
1. NEW RACK WITH PATCH PANELS, FIBER HOUSING, UPS, PDU'S, AND
SPACE FOR OIT/OEHRM EQUIPMENT.
2. NEW CONDUIT SLEEVES INTO ROOM. PROVIDE CONNECTION BETWEEN
ADJACENT SPACE AND NEW ROOM.
3. ELECTRIFIED HARDWARE PER DIVISION 8. PROVIDE CABLING AND
CONNECTION TO ACCESS CONTROL SYSTEM PANEL.
4. NEW PROXIMITY CARD READER BY ACCESS CONTROL INTEGRATOR.
PROVIDE CABLING AND CONNECTION TO ACCESS CONTROL SYSTEM
PANEL.
5. NEW STROBE. CONNECT TO LOCAL FIRE ALARM NAC.
6. PROVIDE NEW PAN-TILT-ZOOM SECURITY CAMERA, AXIS M5000 SERIES OR
EQUAL, FOR MONITORING TELECOM ROOM. PROVIDE CABLING TO
JOHNSON CONTROLS EQUIPMENT. PROVIDE ALL LABOR, CABLING,
INTEGRATION, INFRASTRUCTURE, AIM/FOCUS, ETC. FOR AN OPERABLE
SOLUTION. IF NO JOHNSON CONTROLS EQUIPMENT IS LOCATED IN THE
BUILDING OR WITHIN 250', TERMINATE CABLING ON VA PATCH PANELS
AND PROVIDE NETWORK SWITCH FOR CONNECTION TO CENTRAL JCI
EQUIPMENT. AIR-GAPPED/DEDICATED VA FIBER MAY BE USED FOR
CONNECTION. COORDINATE LOCATION/VIEW WITH VA POLICE AND COR
PRIOR TO ROUGH-IN.
7. TERMINATE NEW 25 STRAND ANALOG BACKBONE ON NEW 24 PORT PATCH
PANEL TO SUPPORT (E) ANALOG DEVICES.
GENERAL NOTES:
A. SEE 148-TN-011 FOR GENERAL NOTES.
1/8" = 1'-0"1 TELECOM REMODEL PLAN - BLDG 148 FIRST FLOOR SECTOR D
1/2" = 1'-0"2 ENLARGED ROOM - C106A TELECOM REMODEL
F108-1-A1-2 F108-1-A3-4
F108-1-A5-6 F108-1-A7-8
F108-1-A9-10
F108-1-A11-12
F108-1-A13-14
F108-1-A15-16
F108-1-A17-18 F108-1-A19-20
F108-1-A21-22 F108-1-A23-24
F108-1-A25-26
F108-1-A27-28
F108-1-A29-30F108-1-A31-32
F108-1-A33-34
F108-1-A35-36
F108-1-A37-38
F108-1-A39-40
F108-1-A41-42
F108-1-A43-44
F108-1-A45-46
F108-1-A47-48
F108-1-B1-2
F108-1-B3-4
F108-1-B5-6
F108-1-B7-8
F108-1-B9-10
F108-1-B11-12
F108-1-B13-14
F108-1-B15-16
F108-1-B17-18
F108-1-B19-20
F108-1-B21-22
F108-1-B23-24
F108-1-B25-26
F108-1-B27-28
F108-1-B29-30
F108-1-B31-32
F108-1-B33-34
F108-1-B35-36
F108-1-B37-38
F108-1-B39-40
F108-1-B41-42
F108-1-B43-44 F108-1-B45-46
F108-1-B47-48
F108-1-C1-2
F108-1-C3-4
F108-1-C5-6
F108-1-C7-8
F108-1-C9-10
F108-1-C11-12 F108-1-C13-14
F108-1-C15-16
F108-1-C17-18 F108-1-C19-20
F108-1-C21-22 F108-1-C23-24
F108-1-C25-26
F108-1-C27-28
F108-1-C29-30
F108-1-C31-32
F108-1-C33-34
F108-1-C35-36
F108-1-C37-38
F108-1-C39-40
F108-1-C41-42
F108-1-C43-44
F108-1-C45-46
F108-1-C47-48
TOILET
E127A
TOILET
E130A
TOILET
E125A
TOILET
E135A
TOILET
E137A
TOILET
E142A
TOILET
E144A
TOILET
E123A
TOILET
E121A
TOILET
E119A
TOILET
E117A
TOILET
E100A
STOR
E134
TUB/SHOWER
ROOM
A146
TOILET
E114A
TOILET
E112A
TOILET
E110A PATIENT
TOILET
E108
ELEC
CLOSET
EEC1
BATHROOM
E103A
STAFF
TOILET
E153
TOILET
F101B
STOR
E140
STAFF
TOILET
E154
PATIENT
LAUNDRY
E151
OFFICE
E150
OFFICE
E149
DAY ROOM
E147
PATIENT
ROOM
E137
PATIENT
ROOM
E135
PATIENT
ROOM
E145
DAY ROOM
F101
HOSPICE
ROOM
E122
HOSPICE
ROOM
E121
HOSPICE
ROOM
E120
HOSPICE
ROOM
E119
BREAK
ROOM
E118
HOSPICE
ROOM
E114
HOSPICE
ROOM
E111
PATIENT
ROOM
E105
STORAGE
E101
PATIENT
ROOM
E103
HOSPICE
FAMILY
ROOM
E110
PATIENT
ROOM
E136
CORRIDOR
EC103
PATIENT
ROOM
E138
PATIENT
ROOM
E142
PATIENT
ROOM
E143
PATIENT
ROOM
E144
VEST
E129
SOILED
UTILITY
E117
CLEAN
UTILITY
E115
VEST
E116
PATIENT
ROOM
E128
PATIENT
ROOM
E130
PATIENT
ROOM
E127
PATIENT
ROOM
E131
PATIENT
ROOM
E126
TOILET
E133B
PATIENT
ROOM
E132
SMOKE
SHELTER
E133C1
VEST
E133C
HOSPICE
ROOM
E123
CORRIDOR
EC102
STORAGE
F103
PATIENT
ROOM
E125
STOR
E124
STORAGE
E100
ELECTRICAL
ROOM
EM100
CORRIDOR
E100.0
STOR
F105
SOCIAL
WORKER
OFFICE
F104
CLC E-WARD
NURSES
STATION
E109
MED ROOM
E107
SPS STOR
E104
LINEN
E106
HSK CLOSET
E152
CLEAN
UTILITY
E148
SOILED
UTILITY
E102
DAY ROOM
E133
DAY ROOM
E139
DAY ROOM
E141
HOSPICE
ROOM
E113
HOSPICE
ROOM
E112
BREAK
ROOM
F102
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:0
:2
A
M
148-TN-015
148-TELECOM REMODEL PLAN -
FIRST FLOOR SECTOR E
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 148
Project Director
LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
1/8" = 1'-0"1 TELECOM REMODEL PLAN - BLDG 148 FIRST FLOOR SECTOR E
GENERAL NOTES:
A. SEE 148-TN-011 FOR GENERAL NOTES.
148-TN-016
F108-1-D1-2 F108-1-D3-4
F108-1-D5-6 F108-1-D7-8
F108-1-D9-10 F108-1-D11-12
F108-1-D13-14F108-1-D15-16
F108-1-D17-18 F108-1-D19-20
F108-1-D23-24
F108-1-D21-22
F108-1-D25-26
F108-1-D27-28
F108-1-D29-30
F108-1-D31-32
F108-1-D33-34
F108-1-D35-36
F108-1-D37-38
F108-1-D39-40
F108-1-D41-42
F108-1-D43-44
F108-1-D45-46
F108-1-D47-48
F108-1-E1-2
F108-1-E3-4
F108-1-E5-6
F108-1-E7-8
F108-1-E9-10
F108-1-E11-12
F108-1-E13-14
F108-1-E15-16
F108-1-E17-18
F108-1-E19-20F108-2-A5-6
F108-2-A7-8
F108-2-A9-10
F108-2-A11-12
F108-2-A13-14
F108-2-A15-16
F108-2-A17-18
F108-2-A19-20
F108-2-A21-22
F108-2-A23-24
F108-2-A25-26 F108-2-A27-28
F108-2-A29-30
F108-2-A31-32
F108-2-A33-34 F108-2-A37-38
F108-2-A35-36
F108-2-A39-40
F108-2-A41-42
F108-2-A43-44
F108-2-A45-46
F108-2-A47-48
TR
F108
STOR
F107
MECHANICAL
ROOM
FM101
STOR
FTC1
TOILET
F11A
STORAGE
FEC1
TUB/SHOWER
G147
STOR
G146E
TOILET
G135A
TOILET
G137A
BATHROOM
G133A
BATHROOM
G123A
TOILET
G120A
TOILET
G118A
TOILET
G116A
STOR
G104
TOILET
G113A
BATHROOM
G102A
BATHROOM
C100A
TOILET
F101B
TOILET
F110A
O2 STOR
F106
TOILET
G149
ROOM
G100.0
TOILET
G142A
TOILET
G140A
STOR
G146A
STOR
G146B
MED ROOM
G145
HSK CLOSET
G107
TOILET
G111ATOILET
G110A
STOR
F111B
PATIENT
LAUNDRY
G146C
EQUIP.
STORAGE
G147A
PATIENT
ROOM
G121
PATIENT
ROOM
G120
PATIENT
ROOM
G119
PATIENT
ROOM
G118
PATIENT
ROOM
G117
TOILET
G109A
? PATIENT
ROOM
G113
NUTRITION/
STORAGE
G102
OFFICE
G100
OFFICE
G101
THERAPY
TUB
F112A
VESTIBULE
G139
PATIENT
ROOM
G140
OFFICE
G103
CLEAN STRG
G108
CORRIDOR
GC101
PATIENT
ROOM
G111
PATIENT
ROOM
G110
MED RM/
STORAGE
G112
SOCIAL
WORKER
OFFICE
G109
OFFICE
G122
PATIENT
ROOM
G142
PATIENT
ROOM
G141
PATIENT
ROOM
G143
PATIENT
ROOM
G116
VEST
G115
PATIENT
ROOM
G114
FAMILY
ROOM
G136
PATIENT
ROOM
G137
PATIENT
ROOM
G138
RESTORATIVE
CARE
OFFICE
G135
PATIENT
ROOM
G133
PATIENT
ROOM
G123
DAY ROOM
F110
RECEPTION
F101A
BREAK
ROOM
F109
TOILET
G150
MECHANICAL
ROOM
GM100
SOIL
G144
RLRC
CLOSET
G134
PHYSICAL
THERAPY
F112
CORRIDOR
FC100
OCCUPATIONAL
THERAPY
F111
CLEAN
LINEN
STORAGE
G105
CLC G-WARD
NURSES
STATION
G106
DAY ROOM /
PATIENT
DINING
G146
A
A
A A
A
B/V
B/V
B/V B/V
B/V
F108-1-E21-22 F108-1-E23-24
F108-1-E25-26
F108-1-E27-28
F108-1-E29-30
F108-1-E31-32
F108-1-E33-34 F108-1-E35-36
F108-1-E37-38
F108-1-E39-40
F108-1-E41-42
F108-1-E43-44
F108-1-E45-46
F108-1-E47-48
F108-2-A1-2 F108-2-A3-4
PATIENT
ROOM
G132
322 SF
PATIENT
ROOM
G124
322 SF
BATHROOM
G124A
59 SF
BATHROOM
G131A
59 SF
PATIENT
ROOM
G131
264 SF
PATIENT
ROOM
G125
264 SF
PATIENT
ROOM
G126
264 SF
BATHROOM
G126A
59 SF
PATIENT
ROOM
G127
267 SF
PATIENT
ROOM
G129
267 SF
BATHROOM
G129A
59 SF
PATIENT
ROOM
G130
264 SF
VEST
G128
58 SF
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:0
:3
A
M
148-TN-016
148-TELECOM REMODEL PLAN -
FIRST FLOOR SECTOR G
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG 148
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
SHEET NOTES:
1. NEW RACK WITH PATCH PANELS, FIBER HOUSING, UPS, PDU'S, AND
SPACE FOR OIT/OEHRM EQUIPMENT.
2. NEW CONDUIT SLEEVES INTO ROOM. PROVIDE CONNECTION BETWEEN
ADJACENT SPACE AND NEW ROOM.
3. ELECTRIFIED HARDWARE PER DIVISION 8. PROVIDE CABLING AND
CONNECTION TO ACCESS CONTROL SYSTEM PANEL.
4. NEW PROXIMITY CARD READER BY ACCESS CONTROL INTEGRATOR.
PROVIDE CABLING AND CONNECTION TO ACCESS CONTROL SYSTEM
PANEL.
5. NEW STROBE. CONNECT TO LOCAL FIRE ALARM NAC.
6. PROVIDE NEW PAN-TILT-ZOOM SECURITY CAMERA, AXIS M5000 SERIES OR
EQUAL, FOR MONITORING TELECOM ROOM. PROVIDE CABLING TO
JOHNSON CONTROLS EQUIPMENT. PROVIDE ALL LABOR, CABLING,
INTEGRATION, INFRASTRUCTURE, AIM/FOCUS, ETC. FOR AN OPERABLE
SOLUTION. IF NO JOHNSON CONTROLS EQUIPMENT IS LOCATED IN THE
BUILDING OR WITHIN 250', TERMINATE CABLING ON VA PATCH PANELS
AND PROVIDE NETWORK SWITCH FOR CONNECTION TO CENTRAL JCI
EQUIPMENT. AIR-GAPPED/DEDICATED VA FIBER MAY BE USED FOR
CONNECTION. COORDINATE LOCATION/VIEW WITH VA POLICE AND COR
PRIOR TO ROUGH-IN.
7. TERMINATE NEW 25 STRAND ANALOG BACKBONE ON NEW 24 PORT PATCH
PANEL TO SUPPORT (E) ANALOG DEVICES.
GENERAL NOTES:
A. SEE 148-TN-011 FOR GENERAL NOTES.
1/8" = 1'-0"1 TELECOM REMODEL PLAN - BLDG 148 FIRST FLOOR SECTOR G
1/2" = 1'-0"2 ENLARGED ROOM - F108 TELECOM REMODEL
MATCHLINE
MATCHLINE
BONDING
BUSBAR
A A
A
GARAGE
101A
249 SF
GARAGE
101B
249 SF
SEE SHEETS TK-029
& TS-001 FOR
CONTINUATION
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S B
L D
G
R
.r v t
/2
/2
:3
:1
A
M
359-TN-011
359-TELECOM REMODEL PLAN EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
Project Director
LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
1/4" = 1'-0"1 TELECOM REMODEL PLAN - BLDG 359
SHEET NOTES:
1. NEW WALL MOUNTED TELECOM CABINET. MOUNT WITH BOTTOM OF
CABINET +48" AFF.
2. PROPOSED FIBER ROUTING SHOWN. PROVIDE NEW CONDUIT FROM POINT
WHERE SITE DISTRIBUTION ENTERS BUILDNG.
3. PROVIDE 1"C TO NEW TELECOM CABINET IF EXISTING CANNOT BE RE-
USED.
4. PROVIDE NEW PAN-TILT-ZOOM SECURITY CAMERA, AXIS M5000 SERIES OR
EQUAL, FOR MONITORING TELECOM ROOM. PROVIDE CABLING TO
JOHNSON CONTROLS EQUIPMENT. PROVIDE ALL LABOR, CABLING,
INTEGRATION, INFRASTRUCTURE, AIM/FOCUS, ETC. FOR AN OPERABLE
SOLUTION. IF NO JOHNSON CONTROLS EQUIPMENT IS LOCATED IN THE
BUILDING OR WITHIN 250', TERMINATE CABLING ON VA PATCH PANELS
AND PROVIDE NETWORK SWITCH FOR CONNECTION TO CENTRAL JCI
EQUIPMENT. AIR-GAPPED/DEDICATED VA FIBER MAY BE USED FOR
CONNECTION. COORDINATE LOCATION/VIEW WITH VA POLICE AND COR
PRIOR TO ROUGH-IN.
5. NEW CONDUIT SLEEVES INTO ROOM. PROVIDE CONNECTION BETWEEN
ADJACENT SPACE AND NEW ROOM.
A-SIDE FIBER ROUTING A A
GENERAL NOTES:
A. SEE TK SERIES FOR DETAILS AND SCHEDULES.
B. INTENT IS TO PROVIDE (2) CABLES PER WORK AREA OUTLET, UNLESS
OTHERWISE NOTED. TO PHASE WORK SO THAT EXISTING NETWORK IS
MAINTAINED UNTIL NEW ROOMS ARE OPERABLE, GENERAL APPROACH IS
TO FIRST REPLACE CABLING IN (1) OUTLET WHERE (2) EXIST, OR PROVIDE
A SECOND IF NOT.
C. CABLING PATHWAYS TO NEW TELECOM ROOMS SHALL BE CONDUIT IN
THIS BUILDING.
D. IF PHASING ALLOWS FOR ALL CABLING IN A BUILDING OR AREA TO BE
MIGRATED IN A NIGHT OR WEEKEND WITHOUT DISRUPTIONS, EXISTING
T171-TN-011
A A A A A A A
A
SEE SHEETS TK-029
& TS-001 FOR
CONTINUATION
OFFICE
ROOM
GARAGE
TOILET
101A
101B-1-A1-2
101B-1-A3-4
BONDING BUSBAR
A
A
TE
101B
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S
B L D
G T
R
.r v t
/2
/2
:0
:1
A
M
T171-TN-011
T171-TELECOM REMODEL PLAN -
FIRST FLOOR
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG T171
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
1/8" = 1'-0"1 TELECOM REMODEL PLAN - BLDG T171 FIRST FLOOR
1/2" = 1'-0"2 ENLARGED ROOM - 101B TELECOM REMODEL
SHEET NOTES:
1. NEW TELECOM CABINET.
2. NEW CONDUIT SLEEVES INTO ROOM. PROVIDE CONNECTION BETWEEN
ADJACENT SPACE AND NEW ROOM.
3. PROPOSED FIBER ROUTING SHOWN. PROVIDE NEW CONDUIT FROM POINT
WHERE SITE DISTRIBUTION ENTERS BUILDNG.
4. PROVIDE NEW PAN-TILT-ZOOM SECURITY CAMERA, AXIS M5000 SERIES OR
EQUAL, FOR MONITORING TELECOM ROOM. PROVIDE CABLING TO
JOHNSON CONTROLS EQUIPMENT. PROVIDE ALL LABOR, CABLING,
INTEGRATION, INFRASTRUCTURE, AIM/FOCUS, ETC. FOR AN OPERABLE
SOLUTION. IF NO JOHNSON CONTROLS EQUIPMENT IS LOCATED IN THE
BUILDING OR WITHIN 250', TERMINATE CABLING ON VA PATCH PANELS
AND PROVIDE NETWORK SWITCH FOR CONNECTION TO CENTRAL JCI
EQUIPMENT. AIR-GAPPED/DEDICATED VA FIBER MAY BE USED FOR
CONNECTION. COORDINATE LOCATION/VIEW WITH VA POLICE AND COR
PRIOR TO ROUGH-IN.
A-SIDE FIBER ROUTING A A
GENERAL NOTES:
A. SEE TK SERIES FOR DETAILS AND SCHEDULES.
B. INTENT IS TO PROVIDE (2) CABLES PER WORK AREA OUTLET, UNLESS
OTHERWISE NOTED. TO PHASE WORK SO THAT EXISTING NETWORK IS
MAINTAINED UNTIL NEW ROOMS ARE OPERABLE, GENERAL APPROACH IS
TO FIRST REPLACE CABLING IN (1) OUTLET WHERE (2) EXIST, OR PROVIDE
A SECOND IF NOT.
C. CABLING PATHWAYS TO NEW TELECOM ROOMS SHALL BE CONDUIT IN
THIS BUILDING.
D. IF PHASING ALLOWS FOR ALL CABLING IN A BUILDING OR AREA TO BE
MIGRATED IN A NIGHT OR WEEKEND WITHOUT DISRUPTIONS, EXISTING
80m80m
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S
B L D
G T
R
.r v t
/2
/2
:0
:1
A
M
T171-TN-011.1
TELECOM DISTANCE
ASSESSMENT - BLDG T171
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG T171
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
1" = 30'-0"1 TELECOM DISTANCE ASSESSMENT - BLDG T171
GENERAL NOTES:
A. DISTANCE ASSESSMENT PER VA REQUIREMENTS NOTES ALL CABLING
VA MEDICAL CENTER
FORT MEADE, SD
NORTH
PROJECT KEY PLAN
T296-TN-011
AAA
A A 6
ROOM
201ROOM
ROOM
ROOM
ROOM
102B
ROOM
ROOM
102A
ROOM
C100
LAUNDRY
101A
ROOM
201D
ROOM
202A
SEE SHEETS TK-029
& TS-001 FOR
CONTINUATION
104-1-A1-2
104-1-A3-4 104-1-A5-6
104-1-A7-8
TR
LAUNDRY
101A
A A
BONDING BUSBAR
AA
A
A
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /E
S E
R
IE
S
B L D
G T
R
.r v t
/2
/2
:5
:1
A
M
T296-TN-011
T296-TELECOM REMODEL PLANS EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
BLDG T296
Project Director
CK,LKAJAM05/25/2022
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, PE
A/E:
SHEET NOTES:
1. NEW RACK WITH PATCH PANELS, FIBER HOUSING, UPS, PDU'S, AND
SPACE FOR OIT/OEHRM EQUIPMENT.
2. NEW CONDUIT SLEEVES INTO ROOM. PROVIDE CONNECTION BETWEEN
ADJACENT SPACE AND NEW ROOM.
3. ELECTRIFIED HARDWARE PER DIVISION 8. PROVIDE CABLING AND
CONNECTION TO ACCESS CONTROL SYSTEM PANEL.
4. NEW PROXIMITY CARD READER BY ACCESS CONTROL INTEGRATOR.
PROVIDE CABLING AND CONNECTION TO ACCESS CONTROL SYSTEM
PANEL.
5. NEW STROBE. CONNECT TO LOCAL FIRE ALARM NAC.
6. PROPOSED FIBER ROUTING SHOWN. PROVIDE NEW CONDUIT FROM POINT
WHERE SITE DISTRIBUTION ENTERS BUILDNG.
7. PROVIDE 1"C TO NEW TELECOM CABINET IF EXISTING CANNOT BE RE-
USED.
8. PROVIDE NEW PAN-TILT-ZOOM SECURITY CAMERA, AXIS M5000 SERIES OR
EQUAL, FOR MONITORING TELECOM ROOM. PROVIDE CABLING TO
JOHNSON CONTROLS EQUIPMENT. PROVIDE ALL LABOR, CABLING,
INTEGRATION, INFRASTRUCTURE, AIM/FOCUS, ETC. FOR AN OPERABLE
SOLUTION. IF NO JOHNSON CONTROLS EQUIPMENT IS LOCATED IN THE
BUILDING OR WITHIN 250', TERMINATE CABLING ON VA PATCH PANELS
AND PROVIDE NETWORK SWITCH FOR CONNECTION TO CENTRAL JCI
EQUIPMENT. AIR-GAPPED/DEDICATED VA FIBER MAY BE USED FOR
CONNECTION. COORDINATE LOCATION/VIEW WITH VA POLICE AND COR
PRIOR TO ROUGH-IN.
A-SIDE FIBER ROUTING A A
1/8" = 1'-0"1 TELECOM REMODEL PLAN - BLDG T296 FIRST FLOOR
1/2" = 1'-0"2 ENLARGED ROOM - 104 TELECOM REMODEL
GENERAL NOTES:
A. SEE TK SERIES FOR DETAILS AND SCHEDULES.
B. INTENT IS TO PROVIDE (2) CABLES PER WORK AREA OUTLET, UNLESS
OTHERWISE NOTED. TO PHASE WORK SO THAT EXISTING NETWORK IS
MAINTAINED UNTIL NEW ROOMS ARE OPERABLE, GENERAL APPROACH IS
TO FIRST REPLACE CABLING IN (1) OUTLET WHERE (2) EXIST, OR PROVIDE
A SECOND IF NOT.
C. CABLING PATHWAYS TO NEW TELECOM ROOMS SHALL BE CONDUIT IN
THIS BUILDING.
D. IF PHASING ALLOWS FOR ALL CABLING IN A BUILDING OR AREA TO BE
MIGRATED IN A NIGHT OR WEEKEND WITHOUT DISRUPTIONS, EXISTING
SINGLE OUTLETS MAY BE RE-USED.
80m80m
80m
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
JEREMY A. MAXIE
5/25/22
EE-113847
B
I…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .