- Y1DA--EHRM Infrastructure Upgrade Construction Fort Meade VAMC Federal contract opportunity
- Solicitation number
- 36C77622B0055
About this file
This document provides details on a federal solicitation for construction services. The solicitation number is 36C77622B0055 from the Department of Veterans Affairs Technology Acquisition Center Austin for EHRM Infrastructure Upgrade Construction services at the Fort Meade VAMC. The opportunity type is listed as a solicitation for infrastructure upgrades to modernize and improve electronic health record management systems at the Fort Meade medical center. No other salient details are provided in this document, as the attachment itself is not included and the solicitation description is brief.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE SCOPE OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING INFRASTRUCTURE IMPROVEMENTS: ELECTRICAL (ELECTRICAL PANEL UPGRADE, POWER [NORMAL, EMERGENCY]), BONDING, UPS, BUILDING MANAGEMENT SYSTEM INTERFACES, ASSESS FOR NEW AND UPGRADES TO EXISTING HVAC, RECONFIGURATION, EXPANSION AND RENOVATION OF EXISTING SPACE (DEMO, NEW CONSTRUCTION, FINISHES), COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A CABLE) IN BUILDINGS AS NECESSARY, PHYSICAL SECUITY UPGRADES, ASSESS AND UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN BUILDINGS, HAZARDOUS MATERIAL ABATEMENT. PROJECT BUILDING LOCATION INCLUDE: BUILDINGS 40, 46, 50, 53, 85, 88, 89, 90, 103, 110, 113, 137, 144, 145, 146, 147, 148, T171, AND T296.
PROJECT DESCRIPTION
1. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATION AND RELATED CONTRACT DOCUMENTS, VISIT SITE OF WORK, AND RESEARCH ALL EXISTING CONDITIONS, FACILITES, RESTRICTIONS AND OTHER MATTERS WHICH CAN AFFECT THE WORK, IN TIMELINE, QUALITY OR COST, THEREOF; FAILURE OR OMISSION OF ANY CONTRACTOR TO VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXISTING CONDITIONS, SHALL IN NO WAY RELEIVE THEM FROM ANY OBLIGATION WITH RESPECT TO THEIR CONTRACT AND NO EXTRA TIME OR COMPENSATION WILL BE ALLOWED BY REASON OF ANY THING OR MATTER CONCERNING WHICH THE CONTRACTOR COULD HAVE FULLY INFORMED THEMSELVES PRIOR TO BIDDING. GENERAL CONTRACTOR SHALL
COORDINATE ALL ASPECTS OF THE BUILDING CONSTRUCTION.
2. THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES WITH CIVIL, STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.
3. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS AND CONDITIONS OF THE PROJECT INCLUDED IN THE PROJECT MANUAL WHICH FORM A PART OF THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION NOTIFY THE COR FOR CLARIFICATION SEVEN DAYS BEFORE
BEGINNING WORK ON THE AFFECTED ACTIVITIES.
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF THE WORK. NOTIFY THE COR OF ANY SIGNIFICANT
CHANGES IN DIMENSIONS OR CONDITIONS.
5. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS REQUIRED TO COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND SPECIFICATIONS WITHIN THE AGREED TIMELINES.
6. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA, WEEKENDS, HOLIDAYS, SHUTDOWN, ETC), CERTIFICATES, INSPECTIONS, DEPARTMENT APPROVAL, ETC. FOR WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS, CERTIFICATES, INSPECTIONS AND AGENCY APPROVALS TO THE COR PRIOR TO THE COMMENCEMENT OF THE SCOPE.
7. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL AND
SUPPLEMENTARY CONDITIONS OF THE CONTRACT.
8. U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE
DESCRIBED SYSTEM(S) .
9. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR THE PROPER PERFORMANCE OF THEIR WORK, COORDINATING WITH
OTHER TRADES, MEANS AND METHODS OF CONSTRUCTION, SAFETY AND SECURITY ON SITE.
10. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE PERFORMANCE AND INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR FINISHES AND SUBSTRATES AFFECTED.
11. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY DURING ALL CONSTRUCTION WORK.
12. PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE AT THE DISCRETION AND TO THE SATISFACTION OF THE C.O.R., WITHOUT ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE COURSE OF CONSTRUCTION.
13. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE COR AND ALL GOVERNMENT EMPLOYEES 14 DAYS IN ADVANCE OF BEGINNING EACH
CONSTRUCTION ACTIVITY.
14. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED
UNDER THIS CONTRACT BY THE CONTRACTOR.
15. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS AND/OR
AS DIRECTED BY THE C.O.R..
16. THE CONTRACTOR SHALL LEAVE THE SITE AND ALL BUILDINGS AND STRUCTURES IN PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, DUE TO A POSSIBLE WORKMANSHIP ISSUE, WITHIN ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. THIS IS NOT TO LIMIT OR EXCLUDE ANY OTHER
WARRANTY OR WARRNATY PERIOD OTHERWISE DISCRIBED.
17. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER, WATER, OR TELECOMMUNICATIONS OUTAGES AND SHUTDOWNS. ALL OUTAGES
AND SHUTDOWNS MUST BE SCHEDULED WITH THE COR ONE (1) WEEK PRIOR TO OUTAGE.
18. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO REGULATED MATERIALS ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR TO THE COMMENCEMENT OF DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS, AND ARCHITECTURAL DRAWINGS FOR ANY SYSTEM OR
PORTIONS THEREOF TO BE REMOVED, RELOCATED, REVISED OR ABANDONED.
19. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO EXPENSE TO THE OWNER.
20. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE MAINTAINED AT ALL TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE BUILDING. KEEP ALL AREAS ADJACENT TO THE WORK AREA CLEAN.
21. PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF WASTE FROM THE SITE, VERIFY WITH THE COR FOR AN ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE BE USED WITHOUT PRIOR APPROVAL FROM THE COR. ALL BUILDING INTERIOR STAGING AREAS SHALL BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL TRASH SHALL BE REMOVED FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS SHALL NOT BE STORED IN CORRIDORS OR ANY OTHER UNAUTHORIZED LOCATION AT ANY TIME.
22. FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR TO START OF WORK.
23. THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING, AND TEMPORARY SUPPORTS AND RESTRAINS IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
24. NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL BE IN EXCESS OF 80 DB. RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.
25. NOTIFY THE COR OF ANY DISCREPANCIES DISCOVERED IN THE FIELD THAT REQUIRE CORRECTIVE ACTION PRIOR TO TAKING ANY ACTION.
26. FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR SOILED DURING THE COURSE OF CONSTRUCTION. ALL FINISHES AND MATERIALS SHALL BE PROPERLY INTEGRATED TO INSTITUTE A
UNIFORM APPEARANCE AND SEAMESS TRANSITION.
27. ALL ITEMS TO BE REMOVED AND REPLACED SHALL BE HANDLED WITH PROPER CARE AND STORED IN SUCH A MANNER AS TO PREVENT DAMAGE; WHEN
DAMAGED, REPLACE AT NO EXPENSE TO THE OWNER.
28. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH PROVISIONS OF THE TECHNICAL SPECIFICATIONS.
29. ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS. ITEMS WRONGLY
LOCATED BY DRAWINGS SCALING SHALL BE CORRECTED.
30. SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S EXISTING SIGNAGE SYSTEMS. REFER TO SPECIFICATIONS FOR CODE REQUIRED SIGNAGE. PROVIDE ADDITIONAL SIGNAGE AS MAY BE REQUIRED BY REQUEST OF THE FIRE MARSHAL AND/OR BUILDING CODE OFFICIAL OR C.O.R..
31. EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER ROUTINE, COORDINATE SEQUENCE OF WORK AND PHASING WITH THE COR TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER. MANY OF THE WORK ITEMS REQUIRE THE WORK TO BE PERFORMED ONLY AT NIGHT, WEEKENDS, OR HOLIDAYS WITH PRIOR APPOVA OF THE C.O.R. AT NO ADDITIONAL COST TO THE GOVERNMENT.
32. PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE EXISTING REINFORCEMENT TO MAINTAIN ADEQUATE CLEARANCES FROM AND AVOID DAMAGE TO EXISTING REINFORCEMENT. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING (NDT) TO LOCATE REINFORCEMENT. WHENEVER FEASIBLE, CONTRACTOR SHALL USE GROUND PENETRATING RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS REQUIRED, CONTRACTOR SHALL PROVIDE WRITTEN REQUEST AT LEAST THREE (3) WEEKS PRIOR TO EVENT: WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE NORMAL WORK HOURS
AND SHALL BE DOCUMENTED ON THE THREE (3) WEEK LOOK-AHEAD SCHEDULE.
33. PROTECT EXISTING FIRE SUPPRESSION SYSTEMS DURING CONSTRUCTION.
34. IN THE EVENT THE CONTRACTOR DISCOVERS HAZARDOUS MATERIALS WHICH ARE NOT AVOIDABLE BY REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED IN THE CONTRACT, THE CONTRACTOR IS TO NOTIFY THE COR AND THE A/E FOR DIFFERING SITE CONDITION ACKNOWLEDGEMENT. REMEDIATION WOULD BE COMPENSATED BY ADDITIONAL MONEY AND ADDITIONAL TIME FOR CRITICAL PATH ACTIVITIES.
35. CONTRACTOR SHALL PROVIDE STAFF THAT WILL UNDERGO TRAINING AND CERTIFICATION TO ALLOW UN-ESCORTED ACCESS TO IT CLOSETS. THE CONTRACTOR SHALL CERTIFY SUFFICIENT NUMBER OF STAFF TO ACCOMMODATE PROPOSED SCHEDULE WITHOUT RELYING ON VA STAFF TO ACCOMPANY AS ESCORTS. THIS WILL REQUIRE PIV BADGING REQUIREMENT INCLUDING BACKGROUND INVESTIGATIONS. SEE "CONTRACTOR BACKGROUND INVESTIGATIONS REQUEST" FORM. COORDINATE WITH CO/CS REGARDING SUBMITTING THE FORM.
36. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING ANY REQUIRED THIRD PART INSPECTORS
GENERAL PROJECT NOTES
"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPARTMENT OF BETERANS AFFAIRS AND IS REFERRED TO THROUGOUT THE CONTACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER"
MEANS THE OWNER OR THE OWNER'S CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE.
"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BETWEEN THE GENERAL CONTRACTOR AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WIHIN THE LIMITS OF THEIR
AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.
"WORK": THE TERM "WORK" MEANS THE CONSTRUCION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S
OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.
"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT
DOCUMENTS
"DRAWINGS", "SHOP DRAWINGS", OR "PLANS": THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT
DOCUMENTS, WHENEVER LOCATED AND WHERENEVER ISSUED, SHOWNING DESIGN, LOCATIONAND
DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, ASECTIONS, DETAILS, SCHEDULES
AND DIAGRAMS.
"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE
PROJECT.
"ARCHITECT" OR "ENGINEER": MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF
SINGULAR IN NUMBER.
"TRADE CONTRACTOR" OR "CONTRACTOS": MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND OR SPECIALTY WORK IN CONNECTION
WITH THIS PROJECT.
"FURNISHED" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION INSURANCE, FIELD MEASUREMENTS,EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE
INSTALLATION.
"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS, SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLENA-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL
ACCESSORIES, SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.
"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT
LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED
TO COMPLETE THE REFERENCED TASK.
"BY OWNER", "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE
JOB SITE AND INSTALLED BY THE OWNER.
"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE CONSTUCTION FOR FUTURE INSALLATION AS SPECIFIFIED OR SHOWN.
OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE DRAWINGS AND SPECIFICATIONS CAN BE FOUND IN THE LEGENDS AND SYSMBOLS DRAWINGS FOR EACH DISCIPLINE AND IN DISION 0 AND 1 OF THE PROJECT
MANUAL.
BASIC DEFINITIONS
TEMPORARY FIRE & SMOKE PROTECTION
IF MULTIPLE CEILING TILES MUST BE REMOVED AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER WILL NEED TO BE CONSTRUCTED. IF CONTRACTOR IDENTIFIES UPCOMING WORK RESULTING IN A LONG-TERM CEILING REMOVAL, NOTIFY THE COR IMMEDIATELY WHEATHER A RATED ENCLOSURE MUST BE CONSTRUCTION OR TEMPORARY UPRIGHT SPRINKLER HEADS INSTALLED. THIS
WORK IS TO BE PART OF THE SUBMITTED SCOPE OF WORK.
IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD
THROUGH THE UNSEALED PENETRATION.
WHERE EXISTING CEILINGS ARE TEMPORARILY REMOVED FOR LONGER THAN ONE WORKING SHIFT, PROVIDE TEMPORARY UPRIGHT SPRINKLER HEADS.
WHERE EXISTING CEILINGS ARE PERMANENTLY REMOVED, COORDINATE INSTALLATION OF UPRIGHT
HEADS WITHIN ONE WORKING SHIFT TO AVOID LOSS OF SPRINKLER PROTECTION.
BLACK HILLS VA HEALTHCARE SYSTEM
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES - FORT MEADE, SD
PROJECT NO.: 568-21-701
CONTRACT NO.: 36C77621C0078
100% CONSTRUCTION DOCUMENTS (CD) SUBMITTAL
BLACK HILLS VA HEALTHCARE SYSTEM
BLACK HILLS NETWORK ##
113 COMANCHE ROAD | FORT MEADE, SD 57741
BLACK HILLS VA HEALTHCARE SYSTEM
BLACK HILLS NETWORK ##
113 COMANCHE ROAD | FORT MEADE, SD 57741
NORTH
PROJECT KEY PLAN
OWNER
ARCHITECT
TELECOMMUNICATIONS
ENGINEER, PROJECT LEAD
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
A&E ARCHITECTS
608 NORTH 29th STREET
BILLINGS, MT 59101
406.248.2633
BLACK HILLS VA HEALTHCARE SYSTEM
FORT MEADE VAMC
GDM - PUGET SOUND DISTRICT OFFICE
1584 McNEIL ST., SUITE 200
DUPONT, WA 98327
541.380.1237
RSA
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, ALASKA 99503
907.865.0564
RSA
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, ALASKA 99503
907.865.0564
PROJECT TEAM
RSA
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, ALASKA 99503
907.865.0564
STRUCTURAL
KREMER, GHELEN, AND ASSOCIATES
400 COLUMBIA STREET, SUITE 240
VANCOUVER, WA 98660-3413
503.289.2661
GDM - ARCTIC DISTRICT OFFICE
1401 W 34TH AVE, SUITE 200
ANCHORAGE, ALASKA 99503
907.917.2957
CIVIL ENGINEER
GDM - COLUMBIA GORGE DISTRICT OFFICE
1000 W STEUBEN ST, UNIT THREE
BINGEN, WA 98605
541.436.4723
INDUSTRIAL HYGIENEFIRE PROTECTION ENGINEER
TERP CONSULTING
14241 E 4TH AVAENUE, SUITE 5-230
AURORA, CO 80011
720.779.0797
AB ANCHOR BOLT
ABV ABOVE
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING
TILE
ADDL ADDITIONAL
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
AWN AWNING
B/ BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM OR BENCHMARK
BRG BEARING
BTWN BETWEEN
BUR BUILT-UP ROOF
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONRY
UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CG CORNER GUARD
CPT CARPET
CSMT CASEMENT
CT CERAMIC TILE
D DEEP
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIM(S) DIMENSIONS
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
ID INSIDE DIAMETER
INFO INFORMATION
ISO ISOCYANURATE
INSUL INSULATE / INSULATED /
INSULATION
INT INTERIOR
INV INVERT
JT JOINT
J-BOX JUNCTION BOX
KIT KITCHEN
L LONG / LENGTH
LAM LAMINATE(D)
LAV LAVATORY
LF LINEAR FEET
LT LIGHT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANIC(AL)
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER OR
OVERFLOW DRAIN
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OVHD OVERHEAD
PL PLATE
PLAM PLASTIC LAMINATE
PLUMBPLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLY POLYESTER OR
POLYOLEFIN
PSF POUNDS PER SQUARE
FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED OR
POINT
PVMT PAVEMENT
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RD ROOF DRAIN
RECY RECYCLE(D)
REF REFERENCE
REFRIG REFRIGERATOR
OR REFRIGERATION
REINF REINFORCE
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SC SOLID CORE
SCH SCHEDULE
SCHED SCHEDULED
SECT SECTION
SF SQUARE FEET
SFRM SPRAY APPLIED FIRE
RESISTIVE MATERIAL
SGL SINGLE
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SPECSSPECIFICATIONS
SOD SLAB ON DECK
SOG SLAB ON GRADE
SOH SAME OPPOSITE HAND
SS STAINLESS STEEL
ST STONE TILE
STD STANDARD
STND STANDARD
STL STEEL
STRUCT STRUCTURAL
TEMP TEMPERED
THK THICK
THRESH THRESHOLD
T.O. TOP OF
TOBM TOP OF BEAM
T.O.BM. TOP OF BEAM
T.O.P. TOP OF PLATE
T.O.S. TOP OF STEEL
T/ TOP OF
T&G TONGUE AND GROOVE
TEL TELEPHONE
THK THICK
TRANSTRANSOM
TV TELEVISION
TYP TYPICAL
E EAST
EA EACH
EC EXISTING COLUMN
EJ EXPANSION JOINT
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER
COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR
EXPOSED
EXT EXTERIOR
FACP FIRE ALARM CONTROL
PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
F.F. FINISH FLOOR
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FND FOUNDATION
FP FIRE PROTECTION
FR FRAME
FRMG FRAMING
FT FEET/FOOT OR FIRE
TREATED
FTG FOOTING
FTNG FOOTING
FRP FIBERGLASS
REINFORCED PANEL
FRT FIRE RETARDANT
TREATED
GA GAUGE
GALV GALVANIZED
GB GYPSUM BOARD
GC GENERAL
CONTRACTOR
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HANDICAP
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HTD HEATED
HVAC HEATING/VENTILATION
& AIR CONDITIONING
UL UNDERWRITERS
LABORATORY
UNO UNLESS NOTED
OTHERWISE
VB VINYL BASE
VCT VINYL COMPOSITION
TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VENEER PLASTER
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALL COVERING
W WIDE OR WEST
W/ WITH
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WALL GUARD
WH WATER HEATER
W/IN WITHIN
W/O WITHOUT
WP WATERPROOF
WR WATER RESISTANT
WT WEIGHT
WWF WELDED WIRE FABRIC
# NUMBER OR POUND
@ AT
ARCHITECTURAL ABBREVIATIONS
WINDOW TAGROOM TAG
DOOR TAG KEYNOTE TAG
ASSEMBLY TAG
MATERIAL TAG
REVISION TAGREVISION CLOUD XXX
X
XX-XX
X
CEILING TAG VIEW REFERENCE
BUILDING
SECTION
WALL
SECTION
ELEVATION
GRID LINE
DETAIL
CALL OUT
INTERIOR
ELEVATION
EXTERIOR
ELEVATION
DETAIL
SECTION
#1
#2
#3
#4
POSITION OF VIEW ON SHEET
VIEW NAME
1 1/2" = 1'-0"
VIEW SCALE
VIEW NAME
A6.#
A3.#
A3.#
A3.#
A4.#
A3.#
ROOM NAME
101.1
X
X'-X"
XXX-X
XXX
W D
HT
CASEWORK TAG
CABINET DESIGN SERIES NO.
EXPLANATION OF SYMBOLS
TYPICAL SHEET VIEW NUMBERING LAYOUT
NUMBERING STARTS IN BOTTOM LEFT CORNER, MOVING
UPWARDS, SKIPPING NONE
ARCH E1 (30"x42")
PROJECT SITE
VA MEDICAL CENTER
FORT MEADE, SD
PROJECT LOCATION MAP
STURGIS, SD
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /2
G e n e ra l_ r2
.r v t
-0
-2
:5
:3
00-GI-000.1
COVER AND PROJECT GENERAL
INFORMATIONGDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
GEN INFO
Project Director
JPRTMP04/15/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
VOLUME 1
- CIVIL
- ARCHITECTURAL
- MECHANICAL
Revisions: Date:
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH THE
SCOPE OF WORK.
2. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND AREAS
REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL QUANTITIES
AND LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO COMPLETE THE SCOPE OF
WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
3. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS
SPECIFICALLY SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE
POSSESSION OF THE CONTRACTOR AND SHALL BE IMMEDIATELY REMOVED FROM THE
SITE.
4. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL AND ENVIRONMENTALLY
FRIENTLY MANNER PER VA GUIDELINES AT NO ADDITIONAL EXPENSE TO OWNER
5. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN THE
BUILDING OR ON THE SITE. ALL DEBRIS IS TO BE REMOVED, AT MINIMUM ONCE PER
SHIFT DURING THE DESIGNATED TIMES.
6. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS
MATERIALS ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO ENDANGER
HEALTH OF WORKERS AND PUBLIC.
7. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.
8. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES AND STANDARDS.
9. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH
THEIR REQUIREMENTS.
10. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE BRACING
AND SHORING.
11. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY
ADJACENT OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM
INTERFERENCE TO PUBLIC OR PRIVATE ACCESSES. MAINTAIN PROTECTED EGRESS AND
ACCESS AT ALL TIMES.
12. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION SEPARATION
WALLS AS REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST, WEATHER, AND OTHER
HAZARDS THAT MAY BE EXPOSED AS A RESULT OF THE DEMOLITION WORK.
SEE SPECIFICATION SECTION 01 35 26 FOR DETAILS AND DEMOLITION DRAWINGS FOR
LOCATIONS.
13. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE
DRILLS. DO NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED AND APPROVED BY
C.O.R..
14. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY
DIMENSION.
15. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING
STRUCTURAL ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION, UNLESS
SPECIFICALLY NOTED ON DEMOLITION PLAN. IT IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR TO IDENTIFY AND PROVIDE ANY SHORING, BRACING, OR TEMPORARY
STRUCTURE, AND TO COORDINATE WITH STRUCTURAL ENGINEER AS REQUIRED.
16. ALL PUBLIC UTILITIES ARE TO REMAIN IN OPERATION THROUGHOUT CONSTRUCTION.
CONTRACTOR TO COORDINATE ANY TEMPORARY SERVICES REQUIRED TO MAINTAIN
BUSINESS OPERATIONS WITH THE C.O.R..
17. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC.
DEMOLITION AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER. ANY
EARTHWORK REQUIRES A THIRD PARTY LOCATE.
18. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL
FIRE STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT
ALL TIMES. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT THIS
EQUIPMENT. IMMEDIATELY NOTIFY C.O.R., BUILDING SECURITY, AND BUILDING MANAGER
OF DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS
IMMEDIATELY AS DIRECTED AND TO THE SATISFACTION OF THE C.O.R.. RELOCATION OF
SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT,
NECESSITATED BY NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST
PRIORITY, AND PER THE PLANS.
19. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE POINT IN
QUESTION WITH THE C.O.R. BEFORE PROCEEDING. IMMEDIATELY STOP WORK IF
HAZARDOUS MATERIALS ARE FOUND AND CONTACT THE C.O.R..
20. SEE TELECOMMUNICATION DRAWINGS FOR REMOVAL OF ANY EQUIPMENT, CABLING
SWITCHES, AND CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE.
VERIFY WITH TELEPHONE COMPANIES, SERVICE OWNER OR TENANT
DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT NEW
CONSTRUCTION DELAYS.
21. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED, TO THE ORIGINAL RATING WHERE
CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY DAMAGE OR
PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR ORIGINAL LISTING
REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND SEPARATION AS ORIGINALLY
DESIGNED.
22. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE LEFT IN
CLEAN AND ORDERLY CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL
BE REMOVED.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY AND ALL
DAMAGE CAUSED BY OR IN CONJUCTION WITH THE "WORK". REFINISH TO MATCH
EXISTING ADJACENT FINISH, OR AS NOTED HEREIN.
24. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL
SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION AND/OR
CONSTRUCTION.
25. PRIOR TO DEMOLITION, INVESTIGATE WALLS FOR CONCEALED PIPING AND/OR OTHER
UTILITIES OR SERVICES AND INFORM THE C.O.R. OF ANY CONDITION NOT DOCUMENTED
IN CONTRACT DRAWINGS. DEMO DESIGNATED WALL BASES, WALL FRAMING, BATT
INSULATION AND GYPSUM BOARD. DEMO CONDUITS AND RECEPTACLES, REFERENCE
ELECTRICAL DEMO PLAN FOR ADDITIONAL INFORMATION.
26. ALL EXISTING DIRECTIONAL SIGNAGE TO BE REMOVED UNLESS NOTED OTHERWISE.
27. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING
ADHESIVES, TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS
NOTED OTHERWISE. PREPARE REMAINING SURFACES TO RECEIVE NEW FINISHES.
DEMOLITION NOTES
HAZARDOUS MATERIALS NOTES
± 36" PATH
ASSUMED ROUTE FOR CABLE,
CONDUIT, AND/OR CABLE TRAY
1. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION. ALL INFORMATION REGARDING EXISTING CONDITIONS IS BASED UPON
OWNER-SUPPLIED DOCUMENTS AND MAY NOT PRECISELY REFLECT FIELD
CONDITIONS.
2. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND ALL WALL MOUNTED
EQUIPMENT OR ACCESSORIES; COORDINATE LOCATIONS.
3. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF STUD, UNLESS
OTHERWISE NOTED.
4. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND REPAIR ALL
INCONSISTENCIES IN FLOOR ELEVATIONS.
5. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO PROVIDE SUITABLE
SUBSTRATE FOR FINISHES.
6. REFER TO DOOR AND FRAME SCHEDULE FOR DOORS REQUIRING ADA ACCESS
CONTROL.
7. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND BOTTOM, AND
PENETRATIONS, AND INSTALL PUTTY PADS AROUND ELECTRICAL BOXES WHERE
PARTITION CONTAINS ACOUSTICAL INSULATION.
8. ALL TELECOMMUNICATION ROOMS ARE TO HAVE EXPOSED STRUCTURE UNLESS
NOTED OTHERWISE, NO CEILINGS SPECIFIED.
FLOOR PLAN NOTES
REFLECTED CEILING PLAN NOTES
1. REFER TO ELECTRICAL SHEETS FOR FIXTURE TYPES, SWITCHING, AND SPECIAL
SYSTEMS.
2. REFER TO MECHANICAL SHEETS FOR DIFFUSER AND DUCTING LAYOUTS.
3. REFERENCE EXTERIOR FINISH LEGEND FOR EXTERIOR PAINT COLORS; REFERENCE
FINISH SCHEDULE FOR INTERIOR PAINT COLORS AND FINISH.
1. REMOVAL OF HAZARDOUS MATERIALS FROM THE BUILDING MUST FOLLOW STATE AND
FEDERAL REGULATIONS, AS WELL AS LOCAL LAWS WHEN APPLICABLE. DRAWINGS
DIAGRAM THE KNOWN ACM MATERIALS AFFECTED BY THE “WORK” AND THESE
QUANTITIES FORM THE BASE BID OF THE CONTRACT. REFER TO MECHANICAL,
ELECTRICAL, AND TELECOMM DRAWINGS FOR SPECIFIC ROUTING, PENETRATIONS,
ETC. COORDINATE ALL HAZMAT CONDITIONS WITH ARCHITECTURAL PLANS.
2. ASBESTOS TESTING OF ALL MATERIALS AFFECTED WITHIN PROJECT SCOPE PRIOR TO
DEMOLITION UNLESS OTHERWISE NOTED IS REQUIRED. REFER TO SPECIFICATION
SECTION 02 82 11 FOR MATERIAL PRE-TESTED, UANTITIES, AND MECHANICAL DRAWINGS
FOR SPECIFIC PENETRATIONS AND CABLE ROUTING TO DATA PORTS IN EACH ROOM.
3. AT COMPLETION OF TESTING CONTRACTOR WILL PROVIDE A REPORT WHIC WILL
INCLDUDE MATERIAL LOCATION, DESCRIPTION, AND QUANTITY.
4. REFER TO ACM REPORT TO BE PROVIDED BY THE VA
1. PRESSURE INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE PRESSURE (VERIFY
TWICE A DAY IN WRITTING) AND SUBMIT TO C.O.R. - IF NOT, VERIFY ALL OPENINGS
(SUCH AS DOORS) ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-FILTER.
METER MUST READ CONTINOUSLY.
2. CONTRACTOR SHALL DEVELOPE A DAILY CHECK LIST FOR CONSTRUCTION
OVERSIGHT TUNED TO THE QUALITY ASSURANCE PLAN WHICH CAPTURED MOST
ERRORS. THIS MAY EVOLVE TO A LIVING DOCUMENT PENDING ISSUES
ENCOUNTERED.
3. REFER TO SPEC SECTION 01 35 26 AND DEMOLITION DRAWINGS FOR ICRA
REQUIREMENTS BASED ON DURATION / EXTENT OF WORK AND RISK FACTOR
INFECTION CONTROL NOTES
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t M e a d e S
D /2
G e n e ra l_ r2
.r v t
-0
-2
:5
:3
00-GI-001
DRAWING INDEX AND PROJECT
GENERAL INFORMATIONGDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT MEADE, SOUTH DAKOTA
568-21-701
GEN INFO
Project Director
JPRTMP04/15/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
DRAWING INDEX
CIVIL
SHEET NO. SHEET NAME
CI0001 GENERAL NOTES
RC0001 EXISTING CONDITIONS PLAN
CU0100 SECONDARY FIBER OPTICS SITE PLAN
CU0101 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0102 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0103 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0104 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0105 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0106 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0107 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0108 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0109 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0110 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0111 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0112 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0113 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0114 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0115 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0116 SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0117 SECONDARY FIBER OPTICS PLAN AND PROFILE
CG0100 CIVIL - GRADING PLAN
CJ0001 CIVIL- DETAILS
ARCHITECTURAL - DEMOLITION
ARCHITECTURAL - NEW CONSTRUCTION
VOLUME 1
SHEET NO. SHEET NAME
53-AD-201 53-DEMOLITION FLOOR PLANS
88-AD-201 88-DEMOLITION FLOOR PLANS
89-AD-201 89-DEMOLITION FLOOR PLANS
90-AD-201 90-DEMOLITION FLOOR PLANS
113-AD-200 113-BASEMENT DEMOLITION PLAN
113-AD-201 113-LEVEL 1 DEMOLITION PLAN
113-AD-202 113-LEVEL 2 DEMOLITION PLAN
145-AD-201 145-DEMOLITION FLOOR PLAN
145-AD-202 145-DEMOLITION 2ND AND 3RD LEVEL PLANS
146-AD-201 146-DEMOLITION FLOOR PLAN
148-AD-201 148-LEVEL 1 DEMOLITION PLAN
148-AD-301 148-ENLARGED DEMOLITION DRAWINGS
T296-AD-201 T296-LEVEL 1 DEMOLITION PLAN
MECHANICAL GENERAL
SHEET NO. SHEET NAME
MG-001 MECHANICAL LEGENDS & ABBREVIATIONS
MG-002 MECHANICAL SCHEDULES
MG-003 MECHANICAL SITE PLAN
MG-004 MECHANICAL DETAILS
MECHANICAL DEMOLITION
SHEET NO. SHEET NAME
053-MD-011 053 - MECHANICAL DEMOLITION - OVERALL
088-MD-011 088 - MECHANICAL DEMOLITION - OVERALL
089-MD-011 089 - MECHANICAL DEMOLITION - OVERALL
090-MD-011 090 - MECHANICAL DEMOLITION - OVERALL
113-MD-001 113 - MECHANICAL DEMOLITION - BASEMENT - OVERALL
113-MD-011 113 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL
113-MD-012 113 - ENLARGED DEMOLITION PLANS
145-MD-011 145 - MECHANICAL DEMOLITION - OVERALL
145-MD-012 145 - ENLARGED DEMOLITION PLANS
146-MD-011 146 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL
148-MD-011 148 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL
148-MD-012 148 - ENLARGED MECHANICAL DEMOLITION PLANS
T171-MD-011 T171 - MECHANICAL DEMOLITION - OVERALL
T296-MD-011 T296 - MECHANICAL DEMOLITION - OVERALL
MECHANICAL
SHEET NO. SHEET NAME
053-MH-011 053 - MECHANICAL REMODEL - OVERALL
088-MH-011 088 - MECHANICAL REMODEL - OVERALL
089-MH-011 089 - MECHANICAL REMODEL - OVERALL
090-MH-011 090 - MECHANICAL REMODEL - OVERALL
113-MH-001 113 - MECHANICAL REMODEL - BASEMENT - OVERALL
113-MH-011 113 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL
113-MH-012 113 - ENLARGED REMODEL PLANS
145-MH-011 145 - MECHANICAL REMODEL - OVERALL
145-MH-012 145 - ENLARGED REMODEL PLANS
145-MH-013 145 - ENLARGED REMODEL PLANS
146-MH-011 146 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL
148-MH-011 148 - MECHANICAL REMODEL - ROOF - OVERALL
148-MH-012 148 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL
148-MH-013 148 - ENLARGED MECHANICAL REMODEL PLANS
T171-MH-011 T171 - MECHANICAL REMODEL - OVERALL
T296-MH-011 T296 - MECHANICAL REMODEL - OVERALL
VOLUME 3
TELECOMMUNICATIONS REMODEL
SHEET NO. SHEET NAME
040-TN-011 40-TELECOM REMODEL PLAN -FIRST FLOOR
040-TN-011.1 40 -TELECOM DISTANCE ASSESSMENT
046-TN-0B1 46-TELECOM REMODEL PLANS
046-TN-011.1 46 -TELECOM DISTANCE ASSESSMENT
050-TN-011 50-TELECOM REMODEL PLAN
050-TN-011.1 50 -TELECOM DISTANCE ASSESSMENT
053-TN-0B1 53-TELECOM REMODEL PLAN -BASEMENT AND FIRST FLOOR
053-TN-0B1.1 53 -TELECOM DISTANCE ASSESSMENT
053-TN-021 53-TELECOM REMODEL PLAN -SECOND FLOOR
085-TN-011 085 -TELECOM REMODEL PLAN
088-TN-011 088 -TELECOM REMODEL PLAN
088-TN-011.1 088 -TELECOM DISTANCE ASSESSMENT
089-TN-011 BLDG 89 TELECOM REMODEL PLAN
089-TN-011.1 089 -TELECOM DISTANCE ASSESSMENT -BLDG 89
090-TN-011 090 -TELECOM REMODEL PLAN
090-TN-011.1 090 -TELECOM DISTANCE ASSESSMENT
110-TN-011 110-TELECOM REMODEL PLAN -FIRST FLOOR
113-TN-001 113 -TELECOM REMODEL -BASEMENT LAYOUT
113-TN-001.1 113 -TELECOM DISTANCE ASSESSMENT -BASEMENT
113-TN-002 113 -TELECOM REMODEL -BASEMENT NORTH
113-TN-003 113 -TELECOM REMODEL -BASEMENT EAST
113-TN-004 113 -TELECOM REMODEL -BASEMENT SOUTH
113-TN-011 113 -TELECOM REMODEL -FIRST FLOOR LAYOUT
113-TN-011.1 113 -TELECOM DISTANCE ASSESSMENT -FIRST FLOOR
113-TN-012 113 -TELECOM REMODEL -FIRST FLOOR NORTH
113-TN-013 113 -TELECOM REMODEL -FIRST FLOOR CENTRAL
113-TN-014 113 -TELECOM REMODEL -FIRST FLOOR EAST
113-TN-015 113 -TELECOM REMODEL -FIRST FLOOR SOUTH
137-TN-011 137-TELECOM REMODEL PLANS
137-TN-011.1 137 -TELECOM DISTANCE ASSESSMENT
145-TN-011 145-TELECOM REMODEL PLAN -FIRST FLOOR
145-TN-011.1 145 -TELECOM DISTANCE ASSESSMENT -FIRST FLOOR
145-TN-012 MCR DETAILS
145-TN-013 MCR DETAILS
145-TN-014 MCR DETAILS
145-TN-021 145-TELECOM REMODEL PLAN -SECOND & THIRD FLOORS
145-TN-021.1 TELECOM DISTANCE ASSESSMENT -SECOND & THIRD
146-TN-011 146-TELECOM REMODEL PLAN -BASEMENT & FIRST FLOOR
146-TN-011.1 146 -TELECOM DISTANCE ASSESMENT
147-TN-011 147-TELECOM REMODEL PLAN -FIRST FLOOR
147-TN-011.1 147 -TELECOM DISTANCE ASSESSMENT
148-TN-011 148-TELECOM REMODEL PLAN -FIRST FLOOR
148-TN-011.1 148 -TELECOM DISTANCE ASSESSMENT
148-TN-012 148-TELECOM REMODEL PLAN -FIRST FLOOR SECTOR A
148-TN-013 148-TELECOM REMODEL PLAN -FIRST FLOOR SECTOR B
148-TN-014 148-TELECOM REMODEL PLAN -FIRST FLOOR SECTOR C
148-TN-015 148-TELECOM REMODEL PLAN -FIRST FLOOR SECTOR E
148-TN-016 148-TELECOM REMODEL PLAN -FIRST FLOOR SECTOR G
359-TN-011 359-TELECOM REMODEL PLAN
T171-TN-011 T171-TELECOM REMODEL PLAN -FIRST FLOOR
T171-TN-011.1 TELECOM DISTANCE ASSESSMENT -BLDG T171
T296-TN-011 T296-TELECOM REMODEL PLANS
T296-TN-011.1 TELECOM DISTANCE ASSESSMENT -BLDG T296
TJ-001 GENERAL TELECOM NOTES
TK-001 TELECOM DETAILS
TK-002 TELECOM DETAILS
TK-003 TYPICAL RACK DETAILS AND EXISTING DATA TERMINATIONS
TK-004 PATCH PANEL SCHEDULES -BUILDING 40, 46, & 50
TK-005 PATCH PANEL SCHEDULES -BUILDING 53
TK-006 PATCH PANEL SCHEDULES -BUILDING 53
TK-007 PATCH PANEL SCHEDULES -BUILDING 85, 88, & 89
TK-008 PATCH PANEL SCHEDULES -BUILDING 90 & 110
TK-009 PATCH PANEL SCHEDULES -BUILDING 113
TK-010 PATCH PANEL SCHEDULES -BUILDING 113
TK-011 PATCH PANEL SCHEDULES -BUILDING 113
TK-012 PATCH PANEL SCHEDULES -BUILDING 113
TK-013 PATCH PANEL SCHEDULES -BUILDING 113
TK-014 PATCH PANEL SCHEDULES -BUILDING 113
TK-015 PATCH PANEL SCHEDULES -BUILDING 113
TK-016 PATCH PANEL SCHEDULES -BUILDING 113
TK-017 PATCH PANEL SCHEDULES -BUILDING 137
TK-018 PATCH PANEL SCHEDULES -BUILDING 145
TK-019 PATCH PANEL SCHEDULES -BUILDING 145
TK-020 PATCH PANEL SCHEDULES -BUILDING 145
TK-021 PATCH PANEL SCHEDULES -BUILDING 145
TK-022 PATCH PANEL SCHEDULES -BUILDING 146 & 147
TK-023 PATCH PANEL SCHEDULES -BUILDING 148
TK-024 PATCH PANEL SCHEDULES -BUILDING 148
TK-025 PATCH PANEL SCHEDULES -BUILDING 148
TK-026 PATCH PANEL SCHEDULES -BUILDING 148
TK-027 PATCH PANEL SCHEDULES -BUILDING 148
TK-028 PATCH PANEL SCHEDULES -BUILDING T171 & T296
TK-029 FIBER RISER DIAGRAM
TK-030 NEW PATCH PANEL SCHEDULE -BUILDINGS 40, 46, 50, 53 & 85
TK-031 NEW PATCH PANEL SCHEDULE -BUILDINGS 88, 89, 90, 113
TK-032 NEW PATCH PANEL SCHEDULE -BUILDING 113
TK-033 NEW PATCH PANEL SCHEDULE -BUILDINGS 113, 137 &145
TK-034 NEW PATCH PANEL SCHEDULE -BUILDINGS 145, 146 & 148
TK-035 NEW PATCH PANEL SCHEDULE -BUILDING 148
TK-036 NEW PATCH PANEL SCHEDULE -BUILDINGS 148 & 359
TK-037 TELECOM BONDING DETAILS
TK-038 TELECOM BONDING DETAILS
TK-039 NEW RACK ELEVATIONS
TK-040 NEW RACK ELEVATIONS
TK-041 NEW RACK ELEVATIONS
TK-042 NEW TELECOM SPACE EQUIPMENT SCHEDULE
TK-043 ANALOG RISER DIAGRAM
TS-001 FIBER SITE PLAN
ELECTRICAL DEMOLITION
SHEET NO. SHEET NAME
040-ED-011 40-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR
046-ED-0B1 46-ELECTRICAL DEMOLITION PLAN -BASEMENT
050-ED-011 50-ELECTRICAL DEMOLITION PLAN
053-ED-0B1 53-ELECTRICAL DEMOLITION PLANS
088-ED-011 088 -ELECTRICAL DEMOLITION PLAN
089-ED-011 BLDG 89 ELECTRICAL DEMOLITION PLAN
090-ED-011 090 -ELECTRICAL DEMOLITION PLAN
113-ED-001 113 -ELECTRICAL DEMOLITION PLAN -BASEMENT LAYOUT
113-ED-002 113 -ELECTRICAL DEMO PLAN -BASEMENT ENLARGED PLANS
113-ED-011 113 -ELECTRICAL DEMOLITION PLAN -FIRST FLOOR LAYOUT
113-ED-012 113 -ELECTRICAL DEMO PLAN -1ST FLOOR ENLARGED PLANS
137-ED-011 137-ELECTRICAL DEMOLITION PLANS
145-ED-011 145-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR
145-ED-012 ELECTRICAL DEMOLITION PLAN -FIRST FLOOR ENLARGED ROOMS
145-ED-021 145-ELECTRICAL DEMOLITION PLAN -SECOND & THIRD FLOORS
146-ED-011 146-ELECTRICAL DEMOLITION PLAN -BASEMENT & FIRST FLOOR
147-ED-011 147-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR
148-ED-011 148-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR
148-ED-012 148-ELECTRICAL DEMOLITION PLAN -ENLARGED ROOMS
T171-ED-011 T171-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR
T296-ED-011 T296-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR
ELECTRICAL REMODEL
SHEET NO. SHEET NAME
EK-001 POWER SITE PLAN
EK-002 PARTIAL ONE-LINE -BUILDING 113 AND CENTRALIZED UPS
EK-003 POWER ONE-LINE -BUILDING 145
EK-004 POWER ONE-LINE -BUILDING 148
EK-005 PANEL SCHEDULES -BLDG 46 & 50
EK-006 PANEL SCHEDULES -BLDG 53, 72 & 88
EK-007 PANEL SCHEDULES -BLDG 88, 89 & 90
EK-008 PANEL SCHEDULES -BLDG 113 & 145
EK-009 PANEL SCHEDULES -BLDGS 113 & 145
EK-010 PANEL SCHEDULES -BLDG 145
EK-011 PANEL SCHEDULES -BLDG 145, 146, & 148
EK-012 PANEL SCHEDULES -BLDGS 145, 148, & 359
EK-013 PANEL SCHEDULES -BLDG T296
EK-014 POWER AND ELEVATION SCHEMATIC FOR TR RACK
040-EP-011 40-ELECTRICAL REMODEL PLAN -FIRST FLOOR
046-EP-0B1 46-ELECTRICAL REMODEL PLAN -BASEMENT
050-EP-011 50-ELECTRICAL REMODEL PLAN
053-EP-0B1 53-ELECTRICAL REMODEL PLAN -BASEMENT AND FIRST FLOOR
053-EP-021 53-ELECTRICAL REMODEL PLAN -SECOND FLOOR AND ATTIC
088-EP-011 088 -ELECTRICAL REMODEL PLAN
089-EP-011 BLDG 89 ELECTRICAL REMODEL PLAN
090-EP-011 090 -ELECTRICAL REMODEL PLAN
110-EP-011 110-ELECTRICAL REMODEL PLAN -FIRST FLOOR
113-EP-001 113 -ELECTRICAL REMODEL PLAN -BASEMENT LAYOUT
113-EP-011 113 -ELECTRICAL REMODEL PLAN -FIRST FLOOR LAYOUT
113-EP-012 113 -ELECTRICAL REMOD PLAN -FIRST FLOOR ENLARGED PLANS
137-EP-011 137-ELECTRICAL REMODEL PLANS
145-EP-011 145-ELECTRICAL REMODEL PLAN -FIRST FLOOR
145-EP-012 145-ELECTRICAL REMODEL PLAN -FIRST FLOOR ENLARGED PLANS
145-EP-013 145-ELECTRICAL REMODEL PLAN -FIRST FLOOR ENLARGED PLANS
145-EP-021 145-ELECTRICAL REMODEL PLAN -SECOND & THIRD FLOORS
145-EP-100 DATA CENTER ELECTRICAL DETAILS
146-EP-011 146-ELECTRICAL REMODEL PLAN -FIRST FLOOR
147-EP-011 147-ELECTRICAL REMODEL PLAN -FIRST FLOOR
148-EP-011 148-ELECTRICAL REMODEL PLAN -FIRST FLOOR
148-EP-012 148-ELECTRICAL REMODEL PLAN -ENLARGED ROOMS
359-EP-011 359-ELECTRICAL REMODEL PLAN
T171-EP-011 T171-ELECTRICAL REMODEL PLAN -FIRST FLOOR
T296-EP-011 T296-ELECTRICAL REMODEL PLAN -FIRST FLOOR
END OF VOLUME 1
VOLUME 2, CONTINUED
SHEET NO. SHEET NAME
40-AE-201 40-FLOOR PLANS
46-AE-201 46-FLOOR PLANS
50-AE-201 50-FLOOR PLANS
53-AE-201 53-BASEMENT AND LEVEL 1 FLOOR PLANS
53-AE-202 53-LEVEL 2 AND ATTIC FLOOR PLANS
53-AE-301 53-ENLARGED PLANS AND ELEVATIONS
88-AE-201 88-FLOOR PLANS AND ELEVATIONS
89-AE-200 89-FLOOR PLANS
89-AE-301 89-ENLARGED PLANS AND ELEVATIONS
90-AE-201 90-FLOOR PLANS AND ELEVATIONS
110-AE-201 110-FLOOR PLANS
113-AE-200 113-BASEMENT FLOOR PLAN
113-AE-201 113-LEVEL 1 FLOOR PLAN
113-AE-202 113-LEVEL 2 FLOOR PLAN
113-AE-301 113-ENLARGED PLANS AND ELEVATIONS
113-AE-302 113-ENLARGED PLANS AND ELEVATIONS
113-AE-303 113-ENLARGED PLANS AND ELEVATIONS
137-AE-200 137-FLOOR PLANS
145-AE-201 145 - LEVEL 1, LEVEL 2, AND LEVEL 3 FLOOR PLANS
145-AE-301 145-ENLARGED MCR PLANS
145-AE-302 145 - ENLARGED OIT PLANS
145-AE-303 145-ENLARGED TR PLANS AND ELEVATIONS
145-AE-304 145-ENLARGED TR PLANS AND ELEVATIONS
145-AE-305 145-ENLARGED TR PLANS AND ELEVATIONS
145-AE-601 145-MCR ELEVATIONS
145-AE-602 SECTIONS AND DETAILS
145-AE-801 145-VERTICAL CIRCULATION
145-AE-802 STAIR, RAMP AND RAILING DETAILS
146-AE-201 146-FLOOR PLANS
146-AE-301 146-ENLARGED PLANS AND ELEVATIONS
148-AE-201 148-LEVEL 1 FLOOR PLAN
148-AE-202 148 ROOF PLAN
148-AE-301 148-ENLARGED PLANS AND TR ELEVATIONS
148-AE-302 148-ENLARGED PLANS AND TR ELEVATIONS
148-AE-303 148-ENLARGED PLANS AND TR ELEVATIONS
359-AE-201 359-FLOOR PLANS
T171-AE-201 T171-FLOOR PLANS
T296-AE-201 T296-FLOOR PLANS AND ELEVATIONS
T296-AE-501 T296- BUILDING ELEVATIONS AND DETAILS
TELECOMMUNICATIONS DEMOLITION
SHEET NO. SHEET NAME
040-TD-011 40-TELECOM DEMOLITION PLAN -FIRST FLOOR
046-TD-0B1 46-TELECOM DEMOLITION PLANS
050-TD-011 50-TELECOM DEMOLITION PLAN
053-TD-0B1 53-TELECOM DEMOLITION PLAN -BASEMENT AND FIRST FLOOR
053-TD-021 53-TELECOM DEMOLITION PLAN -SECOND FLOOR AND ATTIC
085-TD-011 085 -TELECOM DEMOLITION PLAN
088-TD-011 088 -TELECOM DEMOLITION PLAN
089-TD-011 BLDG 89 TELECOM DEMOLITION PLAN
090-TD-011 090 -TELECOM DEMOLITION PLAN
113-TD-001 113 -TELECOM DEMOLITION PLAN -BASEMENT LAYOUT
113-TD-002 113 -TELECOM DEMOLITION PLAN -BASEMENT NORTH
113-TD-003 113 -TELECOM DEMOLITION PLAN -BASEMENT EAST
113-TD-004 113 -TELECOM DEMOLTION PLAN -BASEMENT SOUTH
113-TD-011 113 -TELECOM DEMOLITION PLAN -FIRST FLOOR LAYOUT
113-TD-012 113 -TELECOM DEMOLITION -FIRST FLOOR NORTH
113-TD-013 113 -TELECOM DEMOLITION -FIRST FLOOR CENTRAL
113-TD-014 113 -TELECOM DEMOLITION -FIRST FLOOR EAST
113-TD-015 113 -TELECOM DEMOLITION -FIRST FLOOR SOUTH
137-TD-011 137-TELECOM DEMOLITION PLANS
145-TD-011 145-TELECOM DEMOLITION PLAN -FIRST FLOOR
145-TD-021 145-TELECOM DEMOLITION PLAN -SECOND & THIRD FLOORS
146-TD-011 146-TELECOM DEMOLITION PLAN -BASEMENT & FIRST FLOOR
147-TD-011 147-TELECOM DEMOLITION PLAN -FIRST FLOOR
148-TD-011 148-TELECOM DEMOLITION PLAN -FIRST FLOOR
148-TD-012 148-TELECOM DEMOLITION PLAN -FIRST FLOOR SECTOR A
148-TD-013 148-TELECOM DEMOLITION PLAN -FIRST FLOOR SECTOR B
148-TD-014 148-TELECOM DEMOLITION PLAN -FIRST FLOOR SECTOR C
148-TD-015 148-TELECOM DEMOLITION PLAN -FIRST FLOOR SECTOR E
148-TD-016 148-TELECOM DEMOLITION PLAN -FIRST FLOOR SECTOR G
T171-TD-011 T171-TELECOM DEMOLITION PLAN -FIRST FLOOR
T296-TD-011 T296-TELECOM DEMOLITION PLANS
VOLUME 2
STRUCTURAL
SHEET NO. SHEET NAME
145-SF-100 BUILDING 145 PLANS
296-SF-100 BUILDING T296 PLANS
Revisions: Date:
END OF VOLUME 3
END OF VOLUME 2
GENERAL
SHEET NO. SHEET NAME
00-GI-000.1 COVER AND PROJECT GENERAL INFORMATION
00-GI-001 DRAWING INDEX AND PROJECT GENERAL INFORMATION
00-GI-002 PROJECT CODE SUMMARY
00-GI-003 PROJECT LOCATION MAPS & CAMPUS PLAN
00-GI-004 ICRA CLASSIFICATION PROCESS
00-GI-005 PROJECT ASSEMBLY TYPES
00-GI-006 DOOR SCHEDULE, TYPICAL CEILING AND DOOR DETAILS
00-GI-007 PARTITION DETAILS
00-GI-008 FIRE PROTECTION NOTES
SHEET NO. SHEET NAME
00-GI-000.2 COVER AND PROJECT GENERAL INFORMATION
00-GI-001 DRAWING INDEX AND PROJECT GENERAL INFORMATION
SHEET NO. SHEET NAME
00-GI-000.3 COVER AND PROJECT GENERAL INFORMATION
00-GI-001 DRAWING INDEX AND PROJECT GENERAL INFORMATION
GENERAL
GENERAL
VOLUME 1, CONTINUED
3-
APPLICABLE CODES AND ORDINANCES ENERGY CODE - BUILDING ENVELOPE
2021 NFPA 101, LIFE SAFETY CODE
2022 NFPA 13, STANDARD FOR THE INSTALL ATION OF SPRINKLER SYSTEMS
2020 NFPA 25, STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS
2020 NFPA 70, NATIONAL ELECTRICAL CODE
2022 NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE
2020 NFPA 75, STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT
2021 INTERNATIONAL BUILDING CODE (IBC) WHERE NFPA 101 AND ASSOCIATED DOCUMENTS ARE SILENT
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL FIRE CODE (IFC), WHERE NFPA STANDARDS AND CODES ARE SILENT
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL FUEL GAS CODE (IFGC)
2021 UNIFORM PLUMBING CODE
2009 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES (ICC/ANSI 117.1)
PER 2018 IECC TABLE C402.2:
INSULATION ENTIRELY ABOVE DECKROOFS
METAL FRAMEDWALLS, ABOVE GRADE
BELOW- GRADE WALLWALLS, BELOW GRADE
UNHEATED SLABSSLAB- ON- GRADE FLOORS
SWINGING
OPAQUE DOORS
REQUIRED PROVIDED
ROLL- UP OR SLIDING
MONTANA- CLIMATE ZONE XX
R-30ci
R-13 + R-7.5ci
R-7.5ci
R-10 FOR 24" BELOW
U-0.37
R-4.75
R-30ci (MIN.)
R-22 + R-7.5ci
R-7.5ci
R-15 TO T.O. FOUNDATION
U-0.37
R-4.75
BUILDING ELEMENT
FIXED FENESTRATION
OPERABLE FENESTRATION
ENTRANCE DOORS
U-0.36; SHGC-0.40
U-0.43; SHGC-0.40
U-0.77; SHGC-0.40
U-0.33 MIN;
GLAZING SHGC 0.27 MIN
N/A
U-0.33 MIN;
GLAZING SHGC 0.27 MIN
2018 INTERNATIONAL ENERGY CODE SUMMARIES AND REFERENCE SECTIONS BELOW ARE PROVIDED FOR CONVENIANCE ONLY .
IT IS THE CONTRACTORS RESPONSIBILITY TO UNDERSTAND AND MEET THE REQUIREMENTS OF THE 2018 INTERNATIONAL
ENERGY CODE
C402.4 AIR LEAKAGE (MANDATORY)
THE THERMAL ENVELOPE OF BUILDINGS SHALL COMPLY WITH SECTIONS C402.4.1 THROUGH C402.4.8
C402.4.1 AIR BARRIERS
A CONTINUOUS AIR BARRIER SHALL BE PROVIDED THROUGHOUT THE BUILDING THERMAL ENVELOPE.
C402.4.1.1 AIR BARRIER CONSTRUCTION
1. THE AIR BARRIER SHALL BE CONTINUOUS FOR ALL ASSEMBLIES THAT ARE THE THERMAL ENVELOP OF THE
BUILDING AND ACROSS THE JOINTS AND ASSEMBLIES.
2.AIR BARRIER JOINTS AND SEAMS SHALL BE SEALED, INCLUDING SEALING TRANSITIONS IN PLACES AND
CHANGES IN MATERIALS.
3. RECESSED LIGHTING FIXTURES AND OTHER SIMILAR INSTALLED OBJECTS WHICH PENETRATE THE AIR
BARRIER SHALL COMPLY WITH SECTION C402.4.8
EXCEPTION: BUILDINGS THAT COMPLY WITH SECTION C402.4.1.2.3 ARE NOT REQUIRED TO COMPLY WITH
ITEMS 1 AND 3
C402.4.1.2.3 BUILDING TEST
THE COMPLETED BUILDING SHALL BE TESTED AND THE AIR LEAKAGE RATE OF THE BUILDING ENVELOPE SHALL NOT EXCEED 0.40 cfm/ft² AT A PRESSURE DIFFERENTIAL OF 0.3 INCHES WATER GAUGE (2.0l/s*m² AT 75 Pa) IN ACCORDANCE WITH ASTM E779 OR AN EQUIVALENT METHOD APPROVED BY THE CODE OFFICIAL.
C402.4.2 AIR BARRIER PENETRATIONS
A CONTINUOUS AIR BARRIER SHALL BE PROVIDED THROUGHOUT THE BUILDING THERMAL ENVELOPE.
ACCESSIBILITY
SECTION 1103 SCOPING REQUIREMENTS - 1103.1 WHERE REQUIRED.
SITES, BUILDINGS, STRUCTURES, FACILITIES, ELEMENTS AND SPACES, TEMPORARY OR PERMANENT, SHALL BE ACCESSIBLE
TO PERSONS WITH PHYSICAL DISABILITIES.
EXCEPTIONS:
1103.2.3 EMPLOYEE WORK AREAS. SPACES AND ELEMENTS WITHIN EMPLOYEE WORK AREAS SHALL ONLY BE REQUIRED TO COMPLY WITH SECTION 907.5.2.3.2, 1007, AND 1104.3.1 AND SHALL BE DESIGNED AND CONSTRUCTION SO THAT INDIVIDUALS
WITH DISABILITIES CAN APPROACH, ENTER, AND EXIT THE WORK AREAS.
1103.2.8 LIMITED ACCESS SPACES. NONOCCUPIABLE SPACES ACCESSED ONLY BY LADDERS, CATWALKS, CRAWLSPACES, FREIGHT ELEVATORS OR VERY NARROW PASSAGEWAYS ARE NOT REQUIRED TO BE ACCESSIBLE.
1103.2.9 EQUIPMENT SPACES. SPACES FREQUENTED ONLY BY PERSONNEL FOR MAINTENANCE, REPAIR OR MONITORING OF
EQUIPMENT ARE NOT REQUIRED TO BE ACCESSIBLE.
2203.2.15 WALK IN COOLERS AND FREEZERS. WALK IN COOLERS AND FREEZERS INTENDED FOR EMPLOYEE USE ONLY ARE
NOT REQUIRED TO BE ACCESSIBLE.
SECTION 1104 ACCESSIBLE ROUTES - 1104.5 LOCATION.
ACCESSIBLE ROUTES SHALL COINCIDE WITH OR BE LOCATED IN THE SAME AREA AS A GENERAL CIRCULATION PATH. WHERE THE CIRCULATION PATH IS INTERIOR, THE ACCESSIBLE ROUTE SHALL ALSO BE INTERIOR. WHERE ONLY ONE ACCESSIBLE ROUTE IS PROVIDED, THE ACCESSIBLE ROUTE SHALL NOT PASS THROUGH KITCHENS, STORAGE ROOMS, RESTROOMS, CLOSETS, OR SIMILAR SPACES.
1105.1 PUBLIC ENTRANCES.
IN ADDITION TO ACCESSIBLE ENTRANCES REQUIRED BY SECTION 1105.1.1 THROUGH 1105.1.6, AT LEAST 60 PERCENT OF ALL
PUBLIC ENTRANCES SHALL BE ACCESSIBLE.
EXCEPTIONS: LOADING AND SERVICE ENTRANCES THAT ARE NOT THE ONLY ENTRANCE TO A TENANT SPACE.
1105.1.6 TENANT SPACES.
AT LEAST ONE ACCESSIBLE ENTRANCE SHALL BE PROVIDED TO EACH TENANT.
SECTION 1106 PARKING AND PASSENGER LOADING FACILITIES - 1106.1 REQUIRED.
WHERE PARKING IS PROVIDED, ACCESSIBLE PARKING SPACES SHALL BE PROVIDED IN COMPLIANCE WITH TABLE 1106.1, EXCEPT AS REQUIRED BY SECTION 1106.2 THROUGH 1106.4.
1106.6 LOCATION.
ACCESSIBLE PARKING SPACES SHALL BE LOCATED ON THE SHORTEST ACCESSIBLE ROUTE OF TRAVEL FROM ADJACENT
PARKING TO AN ACCESSIBLE BUILDING ENTRANCE.
SECTION 1108 SPECIAL OCCUPANCIES - 1108.2 ASSEMBLY AREA SEATING.
A BUILDING, ROOM OR SPACE USED FOR ASSEMBLY PURPOSED WITH FIXED SEATING SHALL COMPLY WITH SECTION 1108.2.1 THROUGH 1108.2.5. PER 1108.2.2.1 GENERAL SEATING. WHEELCHAIR SPACES SHALL BE PROVIDED IN ACCORDANCE WITH
TABLE 1108.2.2.1.
SECTION 1110 SIGNAGE - 1110.1 SIGNS.
REQUIRED ACCESSIBLE ELEMENTS SHALL BE IDENTIFIED BY THE INTERNATIONAL SYMBOL OF ACCESSIBILITY AT THE FOLLOWING LOCATIONS: ACCESSIBLE PARKING SPACES, PASSENGER LOADING ZONES, ROOMS, ENTRANCES, CHECK-OUT AISLES, FAMILY OR ASSISTED-USE TOILET AND BATHING ROOMS, AREAS OF REFUGE, AND EXTERIOR AREAS. IN ADDITIONAL
1110.2 DIRECTIONAL SIGNAGE. DIRECTIONAL SIGNAGE INDICATING THE ROUTE TO THE NEAREST LIKE ACCESSIBLE ELEMENT SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS STATED IN 1110.2 AND INCLUDE THE INTERNATIONAL SYMBOL OF
ACCESSIBILITY.
1110.4 VARIABLE MESSAGE SIGNS - TRANSPORTATION FACILITIES.
WHERE PROVIDED IN TRANSPORTATION FACILITIES, VARIABLE MESSAGE SIGNS CONVEYING TRANSPORTATION-RELATED
INFORMATION SHALL COMPLY WITH SECTION 1110.4
1. REPETITIVE AND/OR INTERMITTENT HIGH-LEVEL NOISE PERMITTED ONLY DURING
DAYTIME. AT 50’-0” FROM THE PROJECT BOUNDARY DO NOT EXCEED 70 DB(A) FOR
MORE THAN 12 MINUTES IN ANY HOUR.
2. MAXIMUM AMBIENT NOISE…