Attachment 7 - Drawing 4 of 7.pdf

PDF 10 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrade Construction Fort Meade VAMC Federal contract opportunity
Solicitation number
36C77622B0055
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details on a federal solicitation for infrastructure upgrade construction services. The solicitation number is 36C77622B0055 and is seeking offers for EHRM Infrastructure Upgrades at the Fort Meade Veterans Affairs Medical Center. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The opportunity type is listed as a solicitation and the description provided indicates the solicitation is for infrastructure upgrade construction services at the specified VA medical center location. No other salient details such as response dates, award dates, pricing terms, or set-asides are included in this document.

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLACK HILLS VA HEALTHCARE SYSTEM

ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES - FORT MEADE, SD

PROJECT NO.: 568-21-701

CONTRACT NO.: 36C77621C0078

100% CONSTRUCTION DOCUMENTS (CD) SUBMITTAL

BLACK HILLS VA HEALTHCARE SYSTEM

BLACK HILLS NETWORK ##

113 COMANCHE ROAD | FORT MEADE, SD 57741

THE SCOPE OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING INFRASTRUCTURE IMPROVEMENTS: ELECTRICAL (ELECTRICAL PANEL UPGRADE, POWER [NORMAL, EMERGENCY]), BONDING, UPS, BUILDING MANAGEMENT SYSTEM INTERFACES, ASSESS FOR NEW AND UPGRADES TO EXISTING HVAC, RECONFIGURATION, EXPANSION AND RENOVATION OF EXISTING SPACE (DEMO, NEW CONSTRUCTION, FINISHES), COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A CABLE) IN BUILDINGS AS NECESSARY, PHYSICAL SECUITY UPGRADES, ASSESS AND UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN BUILDINGS, HAZARDOUS MATERIAL ABATEMENT. PROJECT BUILDING LOCATION INCLUDE: BUILDINGS 40, 46, 50, 53, 85, 88, 89, 90, 103, 110, 113, 137, 144, 145, 146, 147, 148, T171, AND T296.

PROJECT DESCRIPTION

1. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATION AND RELATED CONTRACT DOCUMENTS, VISIT SITE OF WORK, AND RESEARCH ALL EXISTING CONDITIONS, FACILITES, RESTRICTIONS AND OTHER MATTERS WHICH CAN AFFECT THE WORK, IN TIMELINE, QUALITY OR COST, THEREOF; FAILURE OR OMISSION OF ANY CONTRACTOR TO VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXISTING CONDITIONS, SHALL IN NO WAY RELEIVE THEM FROM ANY OBLIGATION WITH RESPECT TO THEIR CONTRACT AND NO EXTRA TIME OR COMPENSATION WILL BE ALLOWED BY REASON OF ANY THING OR MATTER CONCERNING WHICH THE CONTRACTOR COULD HAVE FULLY INFORMED THEMSELVES PRIOR TO BIDDING. GENERAL CONTRACTOR SHALL

COORDINATE ALL ASPECTS OF THE BUILDING CONSTRUCTION.

2. THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES WITH CIVIL, STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.

3. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS AND CONDITIONS OF THE PROJECT INCLUDED IN THE PROJECT MANUAL WHICH FORM A PART OF THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION NOTIFY THE COR FOR CLARIFICATION SEVEN DAYS BEFORE

BEGINNING WORK ON THE AFFECTED ACTIVITIES.

4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF THE WORK. NOTIFY THE COR OF ANY SIGNIFICANT

CHANGES IN DIMENSIONS OR CONDITIONS.

5. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS REQUIRED TO COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND SPECIFICATIONS WITHIN THE AGREED TIMELINES.

6. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA, WEEKENDS, HOLIDAYS, SHUTDOWN, ETC), CERTIFICATES, INSPECTIONS, DEPARTMENT APPROVAL, ETC. FOR WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS, CERTIFICATES, INSPECTIONS AND AGENCY APPROVALS TO THE COR PRIOR TO THE COMMENCEMENT OF THE SCOPE.

7. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL AND

SUPPLEMENTARY CONDITIONS OF THE CONTRACT.

8. U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE

DESCRIBED SYSTEM(S) .

9. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR THE PROPER PERFORMANCE OF THEIR WORK, COORDINATING WITH

OTHER TRADES, MEANS AND METHODS OF CONSTRUCTION, SAFETY AND SECURITY ON SITE.

10. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE PERFORMANCE AND INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR FINISHES AND SUBSTRATES AFFECTED.

11. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY DURING ALL CONSTRUCTION WORK.

12. PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE AT THE DISCRETION AND TO THE SATISFACTION OF THE C.O.R., WITHOUT ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE COURSE OF CONSTRUCTION.

13. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE COR AND ALL GOVERNMENT EMPLOYEES 14 DAYS IN ADVANCE OF BEGINNING EACH

CONSTRUCTION ACTIVITY.

14. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED

UNDER THIS CONTRACT BY THE CONTRACTOR.

15. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS AND/OR

AS DIRECTED BY THE C.O.R..

16. THE CONTRACTOR SHALL LEAVE THE SITE AND ALL BUILDINGS AND STRUCTURES IN PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, DUE TO A POSSIBLE WORKMANSHIP ISSUE, WITHIN ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. THIS IS NOT TO LIMIT OR EXCLUDE ANY OTHER

WARRANTY OR WARRNATY PERIOD OTHERWISE DISCRIBED.

17. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER, WATER, OR TELECOMMUNICATIONS OUTAGES AND SHUTDOWNS. ALL OUTAGES

AND SHUTDOWNS MUST BE SCHEDULED WITH THE COR ONE (1) WEEK PRIOR TO OUTAGE.

18. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO REGULATED MATERIALS ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR TO THE COMMENCEMENT OF DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS, AND ARCHITECTURAL DRAWINGS FOR ANY SYSTEM OR

PORTIONS THEREOF TO BE REMOVED, RELOCATED, REVISED OR ABANDONED.

19. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO EXPENSE TO THE OWNER.

20. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE MAINTAINED AT ALL TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE BUILDING. KEEP ALL AREAS ADJACENT TO THE WORK AREA CLEAN.

21. PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF WASTE FROM THE SITE, VERIFY WITH THE COR FOR AN ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE BE USED WITHOUT PRIOR APPROVAL FROM THE COR. ALL BUILDING INTERIOR STAGING AREAS SHALL BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL TRASH SHALL BE REMOVED FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS SHALL NOT BE STORED IN CORRIDORS OR ANY OTHER UNAUTHORIZED LOCATION AT ANY TIME.

22. FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR TO START OF WORK.

23. THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING, AND TEMPORARY SUPPORTS AND RESTRAINS IS THE SOLE

RESPONSIBILITY OF THE CONTRACTOR.

24. NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL BE IN EXCESS OF 80 DB. RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.

25. NOTIFY THE COR OF ANY DISCREPANCIES DISCOVERED IN THE FIELD THAT REQUIRE CORRECTIVE ACTION PRIOR TO TAKING ANY ACTION.

26. FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR SOILED DURING THE COURSE OF CONSTRUCTION. ALL FINISHES AND MATERIALS SHALL BE PROPERLY INTEGRATED TO INSTITUTE A

UNIFORM APPEARANCE AND SEAMESS TRANSITION.

27. ALL ITEMS TO BE REMOVED AND REPLACED SHALL BE HANDLED WITH PROPER CARE AND STORED IN SUCH A MANNER AS TO PREVENT DAMAGE; WHEN

DAMAGED, REPLACE AT NO EXPENSE TO THE OWNER.

28. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH PROVISIONS OF THE TECHNICAL SPECIFICATIONS.

29. ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS. ITEMS WRONGLY

LOCATED BY DRAWINGS SCALING SHALL BE CORRECTED.

30. SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S EXISTING SIGNAGE SYSTEMS. REFER TO SPECIFICATIONS FOR CODE REQUIRED SIGNAGE. PROVIDE ADDITIONAL SIGNAGE AS MAY BE REQUIRED BY REQUEST OF THE FIRE MARSHAL AND/OR BUILDING CODE OFFICIAL OR C.O.R..

31. EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER ROUTINE, COORDINATE SEQUENCE OF WORK AND PHASING WITH THE COR TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER. MANY OF THE WORK ITEMS REQUIRE THE WORK TO BE PERFORMED ONLY AT NIGHT, WEEKENDS, OR HOLIDAYS WITH PRIOR APPOVA OF THE C.O.R. AT NO ADDITIONAL COST TO THE GOVERNMENT.

32. PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE EXISTING REINFORCEMENT TO MAINTAIN ADEQUATE CLEARANCES FROM AND AVOID DAMAGE TO EXISTING REINFORCEMENT. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING (NDT) TO LOCATE REINFORCEMENT. WHENEVER FEASIBLE, CONTRACTOR SHALL USE GROUND PENETRATING RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS REQUIRED, CONTRACTOR SHALL PROVIDE WRITTEN REQUEST AT LEAST THREE (3) WEEKS PRIOR TO EVENT: WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE NORMAL WORK HOURS

AND SHALL BE DOCUMENTED ON THE THREE (3) WEEK LOOK-AHEAD SCHEDULE.

33. PROTECT EXISTING FIRE SUPPRESSION SYSTEMS DURING CONSTRUCTION.

34. IN THE EVENT THE CONTRACTOR DISCOVERS HAZARDOUS MATERIALS WHICH ARE NOT AVOIDABLE BY REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED IN THE CONTRACT, THE CONTRACTOR IS TO NOTIFY THE COR AND THE A/E FOR DIFFERING SITE CONDITION ACKNOWLEDGEMENT. REMEDIATION WOULD BE COMPENSATED BY ADDITIONAL MONEY AND ADDITIONAL TIME FOR CRITICAL PATH ACTIVITIES.

35. CONTRACTOR SHALL PROVIDE STAFF THAT WILL UNDERGO TRAINING AND CERTIFICATION TO ALLOW UN-ESCORTED ACCESS TO IT CLOSETS. THE CONTRACTOR SHALL CERTIFY SUFFICIENT NUMBER OF STAFF TO ACCOMMODATE PROPOSED SCHEDULE WITHOUT RELYING ON VA STAFF TO ACCOMPANY AS ESCORTS. THIS WILL REQUIRE PIV BADGING REQUIREMENT INCLUDING BACKGROUND INVESTIGATIONS. SEE "CONTRACTOR BACKGROUND INVESTIGATIONS REQUEST" FORM. COORDINATE WITH CO/CS REGARDING SUBMITTING THE FORM.

36. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING ANY REQUIRED THIRD PART INSPECTORS

GENERAL PROJECT NOTES

"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPARTMENT OF BETERANS AFFAIRS AND IS REFERRED TO THROUGOUT THE CONTACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER"

MEANS THE OWNER OR THE OWNER'S CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE.

"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BETWEEN THE GENERAL CONTRACTOR AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WIHIN THE LIMITS OF THEIR

AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.

"WORK": THE TERM "WORK" MEANS THE CONSTRUCION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S

OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.

"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT

DOCUMENTS

"DRAWINGS", "SHOP DRAWINGS", OR "PLANS": THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT

DOCUMENTS, WHENEVER LOCATED AND WHERENEVER ISSUED, SHOWNING DESIGN, LOCATIONAND

DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, ASECTIONS, DETAILS, SCHEDULES

AND DIAGRAMS.

"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE

PROJECT.

"ARCHITECT" OR "ENGINEER": MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF

SINGULAR IN NUMBER.

"TRADE CONTRACTOR" OR "CONTRACTOS": MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND OR SPECIALTY WORK IN CONNECTION

WITH THIS PROJECT.

"FURNISHED" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION INSURANCE, FIELD MEASUREMENTS,EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE

INSTALLATION.

"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS, SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLENA-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL

ACCESSORIES, SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.

"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT

LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED

TO COMPLETE THE REFERENCED TASK.

"BY OWNER", "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE

JOB SITE AND INSTALLED BY THE OWNER.

"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE CONSTUCTION FOR FUTURE INSALLATION AS SPECIFIFIED OR SHOWN.

OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE DRAWINGS AND SPECIFICATIONS CAN BE FOUND IN THE LEGENDS AND SYSMBOLS DRAWINGS FOR EACH DISCIPLINE AND IN DISION 0 AND 1 OF THE PROJECT

MANUAL.

BASIC DEFINITIONS

TEMPORARY FIRE & SMOKE PROTECTION

IF MULTIPLE CEILING TILES MUST BE REMOVED AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER WILL NEED TO BE CONSTRUCTED. IF CONTRACTOR IDENTIFIES UPCOMING WORK RESULTING IN A LONG-TERM CEILING REMOVAL, NOTIFY THE COR IMMEDIATELY WHEATHER A RATED ENCLOSURE MUST BE CONSTRUCTION OR TEMPORARY UPRIGHT SPRINKLER HEADS INSTALLED. THIS

WORK IS TO BE PART OF THE SUBMITTED SCOPE OF WORK.

IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD

THROUGH THE UNSEALED PENETRATION.

WHERE EXISTING CEILINGS ARE TEMPORARILY REMOVED FOR LONGER THAN ONE WORKING SHIFT, PROVIDE TEMPORARY UPRIGHT SPRINKLER HEADS.

WHERE EXISTING CEILINGS ARE PERMANENTLY REMOVED, COORDINATE INSTALLATION OF UPRIGHT

HEADS WITHIN ONE WORKING SHIFT TO AVOID LOSS OF SPRINKLER PROTECTION.

BLACK HILLS VA HEALTHCARE SYSTEM

BLACK HILLS NETWORK ##

113 COMANCHE ROAD | FORT MEADE, SD 57741

NORTH

PROJECT KEY PLAN

OWNER

ARCHITECT

TELECOMMUNICATIONS

ENGINEER, PROJECT LEAD

MECHANICAL ENGINEER

ELECTRICAL ENGINEER

A&E ARCHITECTS

608 NORTH 29th STREET

BILLINGS, MT 59101

406.248.2633

BLACK HILLS VA HEALTHCARE SYSTEM

FORT MEADE VAMC

GDM - PUGET SOUND DISTRICT OFFICE

1584 McNEIL ST., SUITE 200

DUPONT, WA 98327

541.380.1237

RSA

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, ALASKA 99503

907.865.0564

RSA

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, ALASKA 99503

907.865.0564

PROJECT TEAM

RSA

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, ALASKA 99503

907.865.0564

STRUCTURAL

KREMER, GHELEN, AND ASSOCIATES

400 COLUMBIA STREET, SUITE 240

VANCOUVER, WA 98660-3413

503.289.2661

GDM - ARCTIC DISTRICT OFFICE

1401 W 34TH AVE, SUITE 200

ANCHORAGE, ALASKA 99503

907.917.2957

CIVIL ENGINEER

GDM - COLUMBIA GORGE DISTRICT OFFICE

1000 W STEUBEN ST, UNIT THREE

BINGEN, WA 98605

541.436.4723

INDUSTRIAL HYGIENEFIRE PROTECTION ENGINEER

TERP CONSULTING

14241 E 4TH AVAENUE, SUITE 5-230

AURORA, CO 80011

720.779.0797

AB ANCHOR BOLT

ABV ABOVE

A/C AIR CONDITIONING

ACT ACOUSTICAL CEILING

TILE

ADDL ADDITIONAL

ADJ ADJUSTABLE

AFF ABOVE FINISH FLOOR

ALT ALTERNATE

ALUM ALUMINUM

ARCH ARCHITECT(URAL)

AWN AWNING

B/ BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM OR BENCHMARK

BRG BEARING

BTWN BETWEEN

BUR BUILT-UP ROOF

CAB CABINET

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CMU CONCRETE MASONRY

UNIT

CO CLEAN OUT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CONST CONSTRUCTION

CG CORNER GUARD

CPT CARPET

CSMT CASEMENT

CT CERAMIC TILE

D DEEP

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

DIM(S) DIMENSIONS

DISP DISPENSER

DN DOWN

DR DOOR

DS DOWNSPOUT

DTL DETAIL

DWG DRAWING

ID INSIDE DIAMETER

INFO INFORMATION

ISO ISOCYANURATE

INSUL INSULATE / INSULATED /

INSULATION

INT INTERIOR

INV INVERT

JT JOINT

J-BOX JUNCTION BOX

KIT KITCHEN

L LONG / LENGTH

LAM LAMINATE(D)

LAV LAVATORY

LF LINEAR FEET

LT LIGHT

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MECH MECHANIC(AL)

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER OR

OVERFLOW DRAIN

OPNG OPENING

OPP OPPOSITE

OSB ORIENTED STRAND BOARD

OVHD OVERHEAD

PL PLATE

PLAM PLASTIC LAMINATE

PLUMBPLUMBING

PLYWD PLYWOOD

PNL PANEL

PNT PAINT

POLY POLYESTER OR

POLYOLEFIN

PSF POUNDS PER SQUARE

FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED OR

POINT

PVMT PAVEMENT

QT QUARRY TILE

QTR QUARTER

QTY QUANTITY

R RADIUS

RA RETURN AIR

RB RUBBER BASE

RD ROOF DRAIN

RECY RECYCLE(D)

REF REFERENCE

REFRIG REFRIGERATOR

OR REFRIGERATION

REINF REINFORCE

REQD REQUIRED

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

S SOUTH

SC SOLID CORE

SCH SCHEDULE

SCHED SCHEDULED

SECT SECTION

SF SQUARE FEET

SFRM SPRAY APPLIED FIRE

RESISTIVE MATERIAL

SGL SINGLE

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SPECSSPECIFICATIONS

SOD SLAB ON DECK

SOG SLAB ON GRADE

SOH SAME OPPOSITE HAND

SS STAINLESS STEEL

ST STONE TILE

STD STANDARD

STND STANDARD

STL STEEL

STRUCT STRUCTURAL

TEMP TEMPERED

THK THICK

THRESH THRESHOLD

T.O. TOP OF

TOBM TOP OF BEAM

T.O.BM. TOP OF BEAM

T.O.P. TOP OF PLATE

T.O.S. TOP OF STEEL

T/ TOP OF

T&G TONGUE AND GROOVE

TEL TELEPHONE

THK THICK

TRANSTRANSOM

TV TELEVISION

TYP TYPICAL

E EAST

EA EACH

EC EXISTING COLUMN

EJ EXPANSION JOINT

ELEC ELECTRICAL

EL ELEVATION

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER

COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR

EXPOSED

EXT EXTERIOR

FACP FIRE ALARM CONTROL

PANEL

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

F.F. FINISH FLOOR

FIN FINISH

FIXT FIXTURE

FLR FLOOR

FND FOUNDATION

FP FIRE PROTECTION

FR FRAME

FRMG FRAMING

FT FEET/FOOT OR FIRE

TREATED

FTG FOOTING

FTNG FOOTING

FRP FIBERGLASS

REINFORCED PANEL

FRT FIRE RETARDANT

TREATED

GA GAUGE

GALV GALVANIZED

GB GYPSUM BOARD

GC GENERAL

CONTRACTOR

GL GLASS, GLAZING

GWB GYPSUM WALL BOARD

GYP GYPSUM

HC HANDICAP

HDR HEADER

HDW HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR

HT HEIGHT

HTD HEATED

HVAC HEATING/VENTILATION

& AIR CONDITIONING

UL UNDERWRITERS

LABORATORY

UNO UNLESS NOTED

OTHERWISE

VB VINYL BASE

VCT VINYL COMPOSITION

TILE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VP VENEER PLASTER

VR VAPOR RETARDER

VT VINYL TILE

VWC VINYL WALL COVERING

W WIDE OR WEST

W/ WITH

WC WATER CLOSET

WD WOOD

WDW WINDOW

WG WALL GUARD

WH WATER HEATER

W/IN WITHIN

W/O WITHOUT

WP WATERPROOF

WR WATER RESISTANT

WT WEIGHT

WWF WELDED WIRE FABRIC

# NUMBER OR POUND

@ AT

ARCHITECTURAL ABBREVIATIONS

WINDOW TAGROOM TAG

DOOR TAG KEYNOTE TAG

ASSEMBLY TAG

MATERIAL TAG

REVISION TAGREVISION CLOUD XXX

X

XX-XX

X

CEILING TAG VIEW REFERENCE

BUILDING

SECTION

WALL

SECTION

ELEVATION

GRID LINE

DETAIL

CALL OUT

INTERIOR

ELEVATION

EXTERIOR

ELEVATION

DETAIL

SECTION

#1

#2

#3

#4

POSITION OF VIEW ON SHEET

VIEW NAME

1 1/2" = 1'-0"

VIEW SCALE

VIEW NAME

A6.#

A3.#

A3.#

A3.#

A4.#

A3.#

ROOM NAME

101.1

X

X'-X"

XXX-X

XXX

W D

HT

CASEWORK TAG

CABINET DESIGN SERIES NO.

EXPLANATION OF SYMBOLS

TYPICAL SHEET VIEW NUMBERING LAYOUT

NUMBERING STARTS IN BOTTOM LEFT CORNER, MOVING

UPWARDS, SKIPPING NONE

ARCH E1 (30"x42")

PROJECT SITE

VA MEDICAL CENTER

FORT MEADE, SD

PROJECT LOCATION MAP

STURGIS, SD

U.S. Department of Veterans Affairs

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

B

IM

/2

V

A M e d ic a l C e n te r

F t M e a d e S

D /2

G e n e ra l_ r2

.r v t

-0

-2

:5

:3

00-GI-000.2

COVER AND PROJECT GENERAL

INFORMATIONGDM

1000 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GODDIN, PE

A&E DESIGN

124 NORTH 29TH STREET, #100

BILLINGS, MONTANA 59101

406.248.2633

T. MARCELLO PIERROTTET, AIA

EHRM INFRASTRUCTURE

UPGRADES

FORT MEADE, SOUTH DAKOTA

568-21-701

GEN INFO

Project Director

JPRTMP04/15/2022

100% CONSTRUCTION

DOCUMENTS

ARCHITECTA/E:

FULLY SPRINKLERED

VOLUME 2

- TELECOMMUNICATION

Revisions: Date:

1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH THE

SCOPE OF WORK.

2. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND AREAS

REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL QUANTITIES

AND LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO COMPLETE THE SCOPE OF

WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.

3. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS

SPECIFICALLY SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE

POSSESSION OF THE CONTRACTOR AND SHALL BE IMMEDIATELY REMOVED FROM THE

SITE.

4. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL AND ENVIRONMENTALLY

FRIENTLY MANNER PER VA GUIDELINES AT NO ADDITIONAL EXPENSE TO OWNER

5. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN THE

BUILDING OR ON THE SITE. ALL DEBRIS IS TO BE REMOVED, AT MINIMUM ONCE PER

SHIFT DURING THE DESIGNATED TIMES.

6. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS

MATERIALS ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO ENDANGER

HEALTH OF WORKERS AND PUBLIC.

7. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.

8. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES AND STANDARDS.

9. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH

THEIR REQUIREMENTS.

10. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE BRACING

AND SHORING.

11. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY

ADJACENT OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM

INTERFERENCE TO PUBLIC OR PRIVATE ACCESSES. MAINTAIN PROTECTED EGRESS AND

ACCESS AT ALL TIMES.

12. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION SEPARATION

WALLS AS REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST, WEATHER, AND OTHER

HAZARDS THAT MAY BE EXPOSED AS A RESULT OF THE DEMOLITION WORK.

SEE SPECIFICATION SECTION 01 35 26 FOR DETAILS AND DEMOLITION DRAWINGS FOR

LOCATIONS.

13. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE

DRILLS. DO NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED AND APPROVED BY

C.O.R..

14. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY

DIMENSION.

15. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING

STRUCTURAL ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION, UNLESS

SPECIFICALLY NOTED ON DEMOLITION PLAN. IT IS THE SOLE RESPONSIBILITY OF THE

CONTRACTOR TO IDENTIFY AND PROVIDE ANY SHORING, BRACING, OR TEMPORARY

STRUCTURE, AND TO COORDINATE WITH STRUCTURAL ENGINEER AS REQUIRED.

16. ALL PUBLIC UTILITIES ARE TO REMAIN IN OPERATION THROUGHOUT CONSTRUCTION.

CONTRACTOR TO COORDINATE ANY TEMPORARY SERVICES REQUIRED TO MAINTAIN

BUSINESS OPERATIONS WITH THE C.O.R..

17. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC.

DEMOLITION AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER. ANY

EARTHWORK REQUIRES A THIRD PARTY LOCATE.

18. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL

FIRE STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT

ALL TIMES. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT THIS

EQUIPMENT. IMMEDIATELY NOTIFY C.O.R., BUILDING SECURITY, AND BUILDING MANAGER

OF DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS

IMMEDIATELY AS DIRECTED AND TO THE SATISFACTION OF THE C.O.R.. RELOCATION OF

SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT,

NECESSITATED BY NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST

PRIORITY, AND PER THE PLANS.

19. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE POINT IN

QUESTION WITH THE C.O.R. BEFORE PROCEEDING. IMMEDIATELY STOP WORK IF

HAZARDOUS MATERIALS ARE FOUND AND CONTACT THE C.O.R..

20. SEE TELECOMMUNICATION DRAWINGS FOR REMOVAL OF ANY EQUIPMENT, CABLING

SWITCHES, AND CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE.

VERIFY WITH TELEPHONE COMPANIES, SERVICE OWNER OR TENANT

DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT NEW

CONSTRUCTION DELAYS.

21. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED, TO THE ORIGINAL RATING WHERE

CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY DAMAGE OR

PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR ORIGINAL LISTING

REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND SEPARATION AS ORIGINALLY

DESIGNED.

22. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE LEFT IN

CLEAN AND ORDERLY CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL

BE REMOVED.

23. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY AND ALL

DAMAGE CAUSED BY OR IN CONJUCTION WITH THE "WORK". REFINISH TO MATCH

EXISTING ADJACENT FINISH, OR AS NOTED HEREIN.

24. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL

SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION AND/OR

CONSTRUCTION.

25. PRIOR TO DEMOLITION, INVESTIGATE WALLS FOR CONCEALED PIPING AND/OR OTHER

UTILITIES OR SERVICES AND INFORM THE C.O.R. OF ANY CONDITION NOT DOCUMENTED

IN CONTRACT DRAWINGS. DEMO DESIGNATED WALL BASES, WALL FRAMING, BATT

INSULATION AND GYPSUM BOARD. DEMO CONDUITS AND RECEPTACLES, REFERENCE

ELECTRICAL DEMO PLAN FOR ADDITIONAL INFORMATION.

26. ALL EXISTING DIRECTIONAL SIGNAGE TO BE REMOVED UNLESS NOTED OTHERWISE.

27. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING

ADHESIVES, TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS

NOTED OTHERWISE. PREPARE REMAINING SURFACES TO RECEIVE NEW FINISHES.

DEMOLITION NOTES

HAZARDOUS MATERIALS NOTES

± 36" PATH

ASSUMED ROUTE FOR CABLE,

CONDUIT, AND/OR CABLE TRAY

1. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION. ALL INFORMATION REGARDING EXISTING CONDITIONS IS BASED UPON

OWNER-SUPPLIED DOCUMENTS AND MAY NOT PRECISELY REFLECT FIELD

CONDITIONS.

2. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND ALL WALL MOUNTED

EQUIPMENT OR ACCESSORIES; COORDINATE LOCATIONS.

3. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF STUD, UNLESS

OTHERWISE NOTED.

4. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND REPAIR ALL

INCONSISTENCIES IN FLOOR ELEVATIONS.

5. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO PROVIDE SUITABLE

SUBSTRATE FOR FINISHES.

6. REFER TO DOOR AND FRAME SCHEDULE FOR DOORS REQUIRING ADA ACCESS

CONTROL.

7. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND BOTTOM, AND

PENETRATIONS, AND INSTALL PUTTY PADS AROUND ELECTRICAL BOXES WHERE

PARTITION CONTAINS ACOUSTICAL INSULATION.

8. ALL TELECOMMUNICATION ROOMS ARE TO HAVE EXPOSED STRUCTURE UNLESS

NOTED OTHERWISE, NO CEILINGS SPECIFIED.

FLOOR PLAN NOTES

REFLECTED CEILING PLAN NOTES

1. REFER TO ELECTRICAL SHEETS FOR FIXTURE TYPES, SWITCHING, AND SPECIAL

SYSTEMS.

2. REFER TO MECHANICAL SHEETS FOR DIFFUSER AND DUCTING LAYOUTS.

3. REFERENCE EXTERIOR FINISH LEGEND FOR EXTERIOR PAINT COLORS; REFERENCE

FINISH SCHEDULE FOR INTERIOR PAINT COLORS AND FINISH.

1. REMOVAL OF HAZARDOUS MATERIALS FROM THE BUILDING MUST FOLLOW STATE AND

FEDERAL REGULATIONS, AS WELL AS LOCAL LAWS WHEN APPLICABLE. DRAWINGS

DIAGRAM THE KNOWN ACM MATERIALS AFFECTED BY THE “WORK” AND THESE

QUANTITIES FORM THE BASE BID OF THE CONTRACT. REFER TO MECHANICAL,

ELECTRICAL, AND TELECOMM DRAWINGS FOR SPECIFIC ROUTING, PENETRATIONS,

ETC. COORDINATE ALL HAZMAT CONDITIONS WITH ARCHITECTURAL PLANS.

2. ASBESTOS TESTING OF ALL MATERIALS AFFECTED WITHIN PROJECT SCOPE PRIOR TO

DEMOLITION UNLESS OTHERWISE NOTED IS REQUIRED. REFER TO SPECIFICATION

SECTION 02 82 11 FOR MATERIAL PRE-TESTED, UANTITIES, AND MECHANICAL DRAWINGS

FOR SPECIFIC PENETRATIONS AND CABLE ROUTING TO DATA PORTS IN EACH ROOM.

3. AT COMPLETION OF TESTING CONTRACTOR WILL PROVIDE A REPORT WHIC WILL

INCLDUDE MATERIAL LOCATION, DESCRIPTION, AND QUANTITY.

4. REFER TO ACM REPORT TO BE PROVIDED BY THE VA

1. PRESSURE INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE PRESSURE (VERIFY

TWICE A DAY IN WRITTING) AND SUBMIT TO C.O.R. - IF NOT, VERIFY ALL OPENINGS

(SUCH AS DOORS) ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-FILTER.

METER MUST READ CONTINOUSLY.

2. CONTRACTOR SHALL DEVELOPE A DAILY CHECK LIST FOR CONSTRUCTION

OVERSIGHT TUNED TO THE QUALITY ASSURANCE PLAN WHICH CAPTURED MOST

ERRORS. THIS MAY EVOLVE TO A LIVING DOCUMENT PENDING ISSUES

ENCOUNTERED.

3. REFER TO SPEC SECTION 01 35 26 AND DEMOLITION DRAWINGS FOR ICRA

REQUIREMENTS BASED ON DURATION / EXTENT OF WORK AND RISK FACTOR

INFECTION CONTROL NOTES

U.S. Department of Veterans Affairs

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

B

IM

/2

V

A M e d ic a l C e n te r

F t M e a d e S

D /2

G e n e ra l_ r2

.r v t

-0

-2

:5

:3

00-GI-001

DRAWING INDEX AND PROJECT

GENERAL INFORMATIONGDM

1000 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GODDIN, PE

A&E DESIGN

124 NORTH 29TH STREET, #100

BILLINGS, MONTANA 59101

406.248.2633

T. MARCELLO PIERROTTET, AIA

EHRM INFRASTRUCTURE

UPGRADES

FORT MEADE, SOUTH DAKOTA

568-21-701

GEN INFO

Project Director

JPRTMP04/15/2022

100% CONSTRUCTION

DOCUMENTS

ARCHITECTA/E:

FULLY SPRINKLERED

DRAWING INDEX

CIVIL

SHEET NO. SHEET NAME

CI0001 GENERAL NOTES

RC0001 EXISTING CONDITIONS PLAN

CU0100 SECONDARY FIBER OPTICS SITE PLAN

CU0101 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0102 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0103 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0104 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0105 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0106 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0107 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0108 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0109 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0110 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0111 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0112 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0113 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0114 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0115 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0116 SECONDARY FIBER OPTICS PLAN AND PROFILE

CU0117 SECONDARY FIBER OPTICS PLAN AND PROFILE

CG0100 CIVIL - GRADING PLAN

CJ0001 CIVIL- DETAILS

ARCHITECTURAL - DEMOLITION

ARCHITECTURAL - NEW CONSTRUCTION

VOLUME 1

SHEET NO. SHEET NAME

53-AD-201 53-DEMOLITION FLOOR PLANS

88-AD-201 88-DEMOLITION FLOOR PLANS

89-AD-201 89-DEMOLITION FLOOR PLANS

90-AD-201 90-DEMOLITION FLOOR PLANS

113-AD-200 113-BASEMENT DEMOLITION PLAN

113-AD-201 113-LEVEL 1 DEMOLITION PLAN

113-AD-202 113-LEVEL 2 DEMOLITION PLAN

145-AD-201 145-DEMOLITION FLOOR PLAN

145-AD-202 145-DEMOLITION 2ND AND 3RD LEVEL PLANS

146-AD-201 146-DEMOLITION FLOOR PLAN

148-AD-201 148-LEVEL 1 DEMOLITION PLAN

148-AD-301 148-ENLARGED DEMOLITION DRAWINGS

T296-AD-201 T296-LEVEL 1 DEMOLITION PLAN

MECHANICAL GENERAL

SHEET NO. SHEET NAME

MG-001 MECHANICAL LEGENDS & ABBREVIATIONS

MG-002 MECHANICAL SCHEDULES

MG-003 MECHANICAL SITE PLAN

MG-004 MECHANICAL DETAILS

MECHANICAL DEMOLITION

SHEET NO. SHEET NAME

053-MD-011 053 - MECHANICAL DEMOLITION - OVERALL

088-MD-011 088 - MECHANICAL DEMOLITION - OVERALL

089-MD-011 089 - MECHANICAL DEMOLITION - OVERALL

090-MD-011 090 - MECHANICAL DEMOLITION - OVERALL

113-MD-001 113 - MECHANICAL DEMOLITION - BASEMENT - OVERALL

113-MD-011 113 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL

113-MD-012 113 - ENLARGED DEMOLITION PLANS

145-MD-011 145 - MECHANICAL DEMOLITION - OVERALL

145-MD-012 145 - ENLARGED DEMOLITION PLANS

146-MD-011 146 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL

148-MD-011 148 - MECHANICAL DEMOLITION - FIRST FLOOR - OVERALL

148-MD-012 148 - ENLARGED MECHANICAL DEMOLITION PLANS

T171-MD-011 T171 - MECHANICAL DEMOLITION - OVERALL

T296-MD-011 T296 - MECHANICAL DEMOLITION - OVERALL

MECHANICAL

SHEET NO. SHEET NAME

053-MH-011 053 - MECHANICAL REMODEL - OVERALL

088-MH-011 088 - MECHANICAL REMODEL - OVERALL

089-MH-011 089 - MECHANICAL REMODEL - OVERALL

090-MH-011 090 - MECHANICAL REMODEL - OVERALL

113-MH-001 113 - MECHANICAL REMODEL - BASEMENT - OVERALL

113-MH-011 113 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL

113-MH-012 113 - ENLARGED REMODEL PLANS

145-MH-011 145 - MECHANICAL REMODEL - OVERALL

145-MH-012 145 - ENLARGED REMODEL PLANS

145-MH-013 145 - ENLARGED REMODEL PLANS

146-MH-011 146 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL

148-MH-011 148 - MECHANICAL REMODEL - ROOF - OVERALL

148-MH-012 148 - MECHANICAL REMODEL - FIRST FLOOR - OVERALL

148-MH-013 148 - ENLARGED MECHANICAL REMODEL PLANS

T171-MH-011 T171 - MECHANICAL REMODEL - OVERALL

T296-MH-011 T296 - MECHANICAL REMODEL - OVERALL

VOLUME 3

TELECOMMUNICATIONS REMODEL

SHEET NO. SHEET NAME

040-TN-011 40-TELECOM REMODEL PLAN -FIRST FLOOR

040-TN-011.1 40 -TELECOM DISTANCE ASSESSMENT

046-TN-0B1 46-TELECOM REMODEL PLANS

046-TN-011.1 46 -TELECOM DISTANCE ASSESSMENT

050-TN-011 50-TELECOM REMODEL PLAN

050-TN-011.1 50 -TELECOM DISTANCE ASSESSMENT

053-TN-0B1 53-TELECOM REMODEL PLAN -BASEMENT AND FIRST FLOOR

053-TN-0B1.1 53 -TELECOM DISTANCE ASSESSMENT

053-TN-021 53-TELECOM REMODEL PLAN -SECOND FLOOR

085-TN-011 085 -TELECOM REMODEL PLAN

088-TN-011 088 -TELECOM REMODEL PLAN

088-TN-011.1 088 -TELECOM DISTANCE ASSESSMENT

089-TN-011 BLDG 89 TELECOM REMODEL PLAN

089-TN-011.1 089 -TELECOM DISTANCE ASSESSMENT -BLDG 89

090-TN-011 090 -TELECOM REMODEL PLAN

090-TN-011.1 090 -TELECOM DISTANCE ASSESSMENT

110-TN-011 110-TELECOM REMODEL PLAN -FIRST FLOOR

113-TN-001 113 -TELECOM REMODEL -BASEMENT LAYOUT

113-TN-001.1 113 -TELECOM DISTANCE ASSESSMENT -BASEMENT

113-TN-002 113 -TELECOM REMODEL -BASEMENT NORTH

113-TN-003 113 -TELECOM REMODEL -BASEMENT EAST

113-TN-004 113 -TELECOM REMODEL -BASEMENT SOUTH

113-TN-011 113 -TELECOM REMODEL -FIRST FLOOR LAYOUT

113-TN-011.1 113 -TELECOM DISTANCE ASSESSMENT -FIRST FLOOR

113-TN-012 113 -TELECOM REMODEL -FIRST FLOOR NORTH

113-TN-013 113 -TELECOM REMODEL -FIRST FLOOR CENTRAL

113-TN-014 113 -TELECOM REMODEL -FIRST FLOOR EAST

113-TN-015 113 -TELECOM REMODEL -FIRST FLOOR SOUTH

137-TN-011 137-TELECOM REMODEL PLANS

137-TN-011.1 137 -TELECOM DISTANCE ASSESSMENT

145-TN-011 145-TELECOM REMODEL PLAN -FIRST FLOOR

145-TN-011.1 145 -TELECOM DISTANCE ASSESSMENT -FIRST FLOOR

145-TN-012 MCR DETAILS

145-TN-013 MCR DETAILS

145-TN-014 MCR DETAILS

145-TN-021 145-TELECOM REMODEL PLAN -SECOND & THIRD FLOORS

145-TN-021.1 TELECOM DISTANCE ASSESSMENT -SECOND & THIRD

146-TN-011 146-TELECOM REMODEL PLAN -BASEMENT & FIRST FLOOR

146-TN-011.1 146 -TELECOM DISTANCE ASSESMENT

147-TN-011 147-TELECOM REMODEL PLAN -FIRST FLOOR

147-TN-011.1 147 -TELECOM DISTANCE ASSESSMENT

148-TN-011 148-TELECOM REMODEL PLAN -FIRST FLOOR

148-TN-011.1 148 -TELECOM DISTANCE ASSESSMENT

148-TN-012 148-TELECOM REMODEL PLAN -FIRST FLOOR SECTOR A

148-TN-013 148-TELECOM REMODEL PLAN -FIRST FLOOR SECTOR B

148-TN-014 148-TELECOM REMODEL PLAN -FIRST FLOOR SECTOR C

148-TN-015 148-TELECOM REMODEL PLAN -FIRST FLOOR SECTOR E

148-TN-016 148-TELECOM REMODEL PLAN -FIRST FLOOR SECTOR G

359-TN-011 359-TELECOM REMODEL PLAN

T171-TN-011 T171-TELECOM REMODEL PLAN -FIRST FLOOR

T171-TN-011.1 TELECOM DISTANCE ASSESSMENT -BLDG T171

T296-TN-011 T296-TELECOM REMODEL PLANS

T296-TN-011.1 TELECOM DISTANCE ASSESSMENT -BLDG T296

TJ-001 GENERAL TELECOM NOTES

TK-001 TELECOM DETAILS

TK-002 TELECOM DETAILS

TK-003 TYPICAL RACK DETAILS AND EXISTING DATA TERMINATIONS

TK-004 PATCH PANEL SCHEDULES -BUILDING 40, 46, & 50

TK-005 PATCH PANEL SCHEDULES -BUILDING 53

TK-006 PATCH PANEL SCHEDULES -BUILDING 53

TK-007 PATCH PANEL SCHEDULES -BUILDING 85, 88, & 89

TK-008 PATCH PANEL SCHEDULES -BUILDING 90 & 110

TK-009 PATCH PANEL SCHEDULES -BUILDING 113

TK-010 PATCH PANEL SCHEDULES -BUILDING 113

TK-011 PATCH PANEL SCHEDULES -BUILDING 113

TK-012 PATCH PANEL SCHEDULES -BUILDING 113

TK-013 PATCH PANEL SCHEDULES -BUILDING 113

TK-014 PATCH PANEL SCHEDULES -BUILDING 113

TK-015 PATCH PANEL SCHEDULES -BUILDING 113

TK-016 PATCH PANEL SCHEDULES -BUILDING 113

TK-017 PATCH PANEL SCHEDULES -BUILDING 137

TK-018 PATCH PANEL SCHEDULES -BUILDING 145

TK-019 PATCH PANEL SCHEDULES -BUILDING 145

TK-020 PATCH PANEL SCHEDULES -BUILDING 145

TK-021 PATCH PANEL SCHEDULES -BUILDING 145

TK-022 PATCH PANEL SCHEDULES -BUILDING 146 & 147

TK-023 PATCH PANEL SCHEDULES -BUILDING 148

TK-024 PATCH PANEL SCHEDULES -BUILDING 148

TK-025 PATCH PANEL SCHEDULES -BUILDING 148

TK-026 PATCH PANEL SCHEDULES -BUILDING 148

TK-027 PATCH PANEL SCHEDULES -BUILDING 148

TK-028 PATCH PANEL SCHEDULES -BUILDING T171 & T296

TK-029 FIBER RISER DIAGRAM

TK-030 NEW PATCH PANEL SCHEDULE -BUILDINGS 40, 46, 50, 53 & 85

TK-031 NEW PATCH PANEL SCHEDULE -BUILDINGS 88, 89, 90, 113

TK-032 NEW PATCH PANEL SCHEDULE -BUILDING 113

TK-033 NEW PATCH PANEL SCHEDULE -BUILDINGS 113, 137 &145

TK-034 NEW PATCH PANEL SCHEDULE -BUILDINGS 145, 146 & 148

TK-035 NEW PATCH PANEL SCHEDULE -BUILDING 148

TK-036 NEW PATCH PANEL SCHEDULE -BUILDINGS 148 & 359

TK-037 TELECOM BONDING DETAILS

TK-038 TELECOM BONDING DETAILS

TK-039 NEW RACK ELEVATIONS

TK-040 NEW RACK ELEVATIONS

TK-041 NEW RACK ELEVATIONS

TK-042 NEW TELECOM SPACE EQUIPMENT SCHEDULE

TK-043 ANALOG RISER DIAGRAM

TS-001 FIBER SITE PLAN

ELECTRICAL DEMOLITION

SHEET NO. SHEET NAME

040-ED-011 40-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR

046-ED-0B1 46-ELECTRICAL DEMOLITION PLAN -BASEMENT

050-ED-011 50-ELECTRICAL DEMOLITION PLAN

053-ED-0B1 53-ELECTRICAL DEMOLITION PLANS

088-ED-011 088 -ELECTRICAL DEMOLITION PLAN

089-ED-011 BLDG 89 ELECTRICAL DEMOLITION PLAN

090-ED-011 090 -ELECTRICAL DEMOLITION PLAN

113-ED-001 113 -ELECTRICAL DEMOLITION PLAN -BASEMENT LAYOUT

113-ED-002 113 -ELECTRICAL DEMO PLAN -BASEMENT ENLARGED PLANS

113-ED-011 113 -ELECTRICAL DEMOLITION PLAN -FIRST FLOOR LAYOUT

113-ED-012 113 -ELECTRICAL DEMO PLAN -1ST FLOOR ENLARGED PLANS

137-ED-011 137-ELECTRICAL DEMOLITION PLANS

145-ED-011 145-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR

145-ED-012 ELECTRICAL DEMOLITION PLAN -FIRST FLOOR ENLARGED ROOMS

145-ED-021 145-ELECTRICAL DEMOLITION PLAN -SECOND & THIRD FLOORS

146-ED-011 146-ELECTRICAL DEMOLITION PLAN -BASEMENT & FIRST FLOOR

147-ED-011 147-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR

148-ED-011 148-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR

148-ED-012 148-ELECTRICAL DEMOLITION PLAN -ENLARGED ROOMS

T171-ED-011 T171-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR

T296-ED-011 T296-ELECTRICAL DEMOLITION PLAN -FIRST FLOOR

ELECTRICAL REMODEL

SHEET NO. SHEET NAME

EK-001 POWER SITE PLAN

EK-002 PARTIAL ONE-LINE -BUILDING 113 AND CENTRALIZED UPS

EK-003 POWER ONE-LINE -BUILDING 145

EK-004 POWER ONE-LINE -BUILDING 148

EK-005 PANEL SCHEDULES -BLDG 46 & 50

EK-006 PANEL SCHEDULES -BLDG 53, 72 & 88

EK-007 PANEL SCHEDULES -BLDG 88, 89 & 90

EK-008 PANEL SCHEDULES -BLDG 113 & 145

EK-009 PANEL SCHEDULES -BLDGS 113 & 145

EK-010 PANEL SCHEDULES -BLDG 145

EK-011 PANEL SCHEDULES -BLDG 145, 146, & 148

EK-012 PANEL SCHEDULES -BLDGS 145, 148, & 359

EK-013 PANEL SCHEDULES -BLDG T296

EK-014 POWER AND ELEVATION SCHEMATIC FOR TR RACK

040-EP-011 40-ELECTRICAL REMODEL PLAN -FIRST FLOOR

046-EP-0B1 46-ELECTRICAL REMODEL PLAN -BASEMENT

050-EP-011 50-ELECTRICAL REMODEL PLAN

053-EP-0B1 53-ELECTRICAL REMODEL PLAN -BASEMENT AND FIRST FLOOR

053-EP-021 53-ELECTRICAL REMODEL PLAN -SECOND FLOOR AND ATTIC

088-EP-011 088 -ELECTRICAL REMODEL PLAN

089-EP-011 BLDG 89 ELECTRICAL REMODEL PLAN

090-EP-011 090 -ELECTRICAL REMODEL PLAN

110-EP-011 110-ELECTRICAL REMODEL PLAN -FIRST FLOOR

113-EP-001 113 -ELECTRICAL REMODEL PLAN -BASEMENT LAYOUT

113-EP-011 113 -ELECTRICAL REMODEL PLAN -FIRST FLOOR LAYOUT

113-EP-012 113 -ELECTRICAL REMOD PLAN -FIRST FLOOR ENLARGED PLANS

137-EP-011 137-ELECTRICAL REMODEL PLANS

145-EP-011 145-ELECTRICAL REMODEL PLAN -FIRST FLOOR

145-EP-012 145-ELECTRICAL REMODEL PLAN -FIRST FLOOR ENLARGED PLANS

145-EP-013 145-ELECTRICAL REMODEL PLAN -FIRST FLOOR ENLARGED PLANS

145-EP-021 145-ELECTRICAL REMODEL PLAN -SECOND & THIRD FLOORS

145-EP-100 DATA CENTER ELECTRICAL DETAILS

146-EP-011 146-ELECTRICAL REMODEL PLAN -FIRST FLOOR

147-EP-011 147-ELECTRICAL REMODEL PLAN -FIRST FLOOR

148-EP-011 148-ELECTRICAL REMODEL PLAN -FIRST FLOOR

148-EP-012 148-ELECTRICAL REMODEL PLAN -ENLARGED ROOMS

359-EP-011 359-ELECTRICAL REMODEL PLAN

T171-EP-011 T171-ELECTRICAL REMODEL PLAN -FIRST FLOOR

T296-EP-011 T296-ELECTRICAL REMODEL PLAN -FIRST FLOOR

END OF VOLUME 1

VOLUME 2, CONTINUED

SHEET NO. SHEET NAME

40-AE-201 40-FLOOR PLANS

46-AE-201 46-FLOOR PLANS

50-AE-201 50-FLOOR PLANS

53-AE-201 53-BASEMENT AND LEVEL 1 FLOOR PLANS

53-AE-202 53-LEVEL 2 AND ATTIC FLOOR PLANS

53-AE-301 53-ENLARGED PLANS AND ELEVATIONS

88-AE-201 88-FLOOR PLANS AND ELEVATIONS

89-AE-200 89-FLOOR PLANS

89-AE-301 89-ENLARGED PLANS AND ELEVATIONS

90-AE-201 90-FLOOR PLANS AND ELEVATIONS

110-AE-201 110-FLOOR PLANS

113-AE-200 113-BASEMENT FLOOR PLAN

113-AE-201 113-LEVEL 1 FLOOR PLAN

113-AE-202 113-LEVEL 2 FLOOR PLAN

113-AE-301 113-ENLARGED PLANS AND ELEVATIONS

113-AE-302 113-ENLARGED PLANS AND ELEVATIONS

113-AE-303 113-ENLARGED PLANS AND ELEVATIONS

137-AE-200 137-FLOOR PLANS

145-AE-201 145 - LEVEL 1, LEVEL 2, AND LEVEL 3 FLOOR PLANS

145-AE-301 145-ENLARGED MCR PLANS

145-AE-302 145 - ENLARGED OIT PLANS

145-AE-303 145-ENLARGED TR PLANS AND ELEVATIONS

145-AE-304 145-ENLARGED TR PLANS AND ELEVATIONS

145-AE-305 145-ENLARGED TR PLANS AND ELEVATIONS

145-AE-601 145-MCR ELEVATIONS

145-AE-602 SECTIONS AND DETAILS

145-AE-801 145-VERTICAL CIRCULATION

145-AE-802 STAIR, RAMP AND RAILING DETAILS

146-AE-201 146-FLOOR PLANS

146-AE-301 146-ENLARGED PLANS AND ELEVATIONS

148-AE-201 148-LEVEL 1 FLOOR PLAN

148-AE-202 148 ROOF PLAN

148-AE-301 148-ENLARGED PLANS AND TR ELEVATIONS

148-AE-302 148-ENLARGED PLANS AND TR ELEVATIONS

148-AE-303 148-ENLARGED PLANS AND TR ELEVATIONS

359-AE-201 359-FLOOR PLANS

T171-AE-201 T171-FLOOR PLANS

T296-AE-201 T296-FLOOR PLANS AND ELEVATIONS

T296-AE-501 T296- BUILDING ELEVATIONS AND DETAILS

TELECOMMUNICATIONS DEMOLITION

SHEET NO. SHEET NAME

040-TD-011 40-TELECOM DEMOLITION PLAN -FIRST FLOOR

046-TD-0B1 46-TELECOM DEMOLITION PLANS

050-TD-011 50-TELECOM DEMOLITION PLAN

053-TD-0B1 53-TELECOM DEMOLITION PLAN -BASEMENT AND FIRST FLOOR

053-TD-021 53-TELECOM DEMOLITION PLAN -SECOND FLOOR AND ATTIC

085-TD-011 085 -TELECOM DEMOLITION PLAN

088-TD-011 088 -TELECOM DEMOLITION PLAN

089-TD-011 BLDG 89 TELECOM DEMOLITION PLAN

090-TD-011 090 -TELECOM DEMOLITION PLAN

113-TD-001 113 -TELECOM DEMOLITION PLAN -BASEMENT LAYOUT

113-TD-002 113 -TELECOM DEMOLITION PLAN -BASEMENT NORTH

113-TD-003 113 -TELECOM DEMOLITION PLAN -BASEMENT EAST

113-TD-004 113 -TELECOM DEMOLTION PLAN -BASEMENT SOUTH

113-TD-011 113 -TELECOM DEMOLITION PLAN -FIRST FLOOR LAYOUT

113-TD-012 113 -TELECOM DEMOLITION -FIRST FLOOR NORTH

113-TD-013 113 -TELECOM DEMOLITION -FIRST FLOOR CENTRAL

113-TD-014 113 -TELECOM DEMOLITION -FIRST FLOOR EAST

113-TD-015 113 -TELECOM DEMOLITION -FIRST FLOOR SOUTH

137-TD-011 137-TELECOM DEMOLITION PLANS

145-TD-011 145-TELECOM DEMOLITION PLAN -FIRST FLOOR

145-TD-021 145-TELECOM DEMOLITION PLAN -SECOND & THIRD FLOORS

146-TD-011 146-TELECOM DEMOLITION PLAN -BASEMENT & FIRST FLOOR

147-TD-011 147-TELECOM DEMOLITION PLAN -FIRST FLOOR

148-TD-011 148-TELECOM DEMOLITION PLAN -FIRST FLOOR

148-TD-012 148-TELECOM DEMOLITION PLAN -FIRST FLOOR SECTOR A

148-TD-013 148-TELECOM DEMOLITION PLAN -FIRST FLOOR SECTOR B

148-TD-014 148-TELECOM DEMOLITION PLAN -FIRST FLOOR SECTOR C

148-TD-015 148-TELECOM DEMOLITION PLAN -FIRST FLOOR SECTOR E

148-TD-016 148-TELECOM DEMOLITION PLAN -FIRST FLOOR SECTOR G

T171-TD-011 T171-TELECOM DEMOLITION PLAN -FIRST FLOOR

T296-TD-011 T296-TELECOM DEMOLITION PLANS

VOLUME 2

STRUCTURAL

SHEET NO. SHEET NAME

145-SF-100 BUILDING 145 PLANS

296-SF-100 BUILDING T296 PLANS

Revisions: Date:

END OF VOLUME 3

END OF VOLUME 2

GENERAL

SHEET NO. SHEET NAME

00-GI-000.1 COVER AND PROJECT GENERAL INFORMATION

00-GI-001 DRAWING INDEX AND PROJECT GENERAL INFORMATION

00-GI-002 PROJECT CODE SUMMARY

00-GI-003 PROJECT LOCATION MAPS & CAMPUS PLAN

00-GI-004 ICRA CLASSIFICATION PROCESS

00-GI-005 PROJECT ASSEMBLY TYPES

00-GI-006 DOOR SCHEDULE, TYPICAL CEILING AND DOOR DETAILS

00-GI-007 PARTITION DETAILS

00-GI-008 FIRE PROTECTION NOTES

SHEET NO. SHEET NAME

00-GI-000.2 COVER AND PROJECT GENERAL INFORMATION

00-GI-001 DRAWING INDEX AND PROJECT GENERAL INFORMATION

SHEET NO. SHEET NAME

00-GI-000.3 COVER AND PROJECT GENERAL INFORMATION

00-GI-001 DRAWING INDEX AND PROJECT GENERAL INFORMATION

GENERAL

GENERAL

VOLUME 1, CONTINUED

10 5 5 3 3

040-TD-011 2D

2D

2D

2TYP

ITEM DESCRIPTION

24 PORT WAP PATCH PANEL

24 PORT COPPER PATCH PANEL

48 PORT COPPER PATCH PANEL

NETWORK SWITCH5

JOHNSON CONTROL PATCH PANEL6

CHECK POINT TEMPERATURE SENSOR7

CHECK POINT REPEATER8

MULTIMODE FIBER HOUSING9

EXISTING TELECOM ROOM SCHEDULE

UNINTERRUPTIBLE POWER SUPPLY

NOTE

DETAIL NOTES:

1. DEMOLISH EQUIPMENT AND ALL CABLING.

2. EQUIPMENT TO REMAIN.

3. EQUIPMENT TO BE SALVAGED/REMOVED BY VA.

12 PORT WAP PATCH PANEL

VA MEDICAL CENTER

FORT MEADE, SD

NORTH

PROJECT KEY PLAN

U.S. Department of Veterans Affairs

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

JEREMY A. MAXIE

5/25/22

EE-113847

B

IM

/2

V

A M e d ic a l C e n te r

F t M e a d e S

D /E

S E

R

IE

S

B L D

G

R

.r v t

/2

/2

:2

:5

A

M

040-TD-011

40-TELECOM DEMOLITION PLAN -

FIRST FLOOR

EHRM INFRASTRUCTURE

UPGRADES

FORT MEADE, SOUTH DAKOTA

568-21-701

BLDG 40

Project Director

CK,LKAJAM05/25/2022

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

GDM

1000 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, PE

A/E:

GENERAL NOTES:

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM RECORD

DRAWINGS AND/OR A NON-DESTRUCTIVE WALK THROUGH OF THE

FACILITY. THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY

OF THE INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD

VERIFY ALL ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF

WORK.

B. THE COR SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO

A WAREHOUSE AS DIRECTED BY THE COR. THE CONTRACTOR SHALL

DISPOSE OF, OFF SITE, ALL UNWANTED MATERIALS.

C. DASHED OR DOTTED LINES INDICATE ITEMS TO BE REMOVED. SOLID LINES

INDICATE EXISTING ITEMS TO REMAIN.

D. SEE TK SERIES FOR ROOM AND CABLE SCHEDULES.

E. RACEWAY AND BOXES MAY BE REUSED AS MUCH AS POSSIBLE FOR NEW

CABLING. ABANDONED CONDUIT ABOVE ACCESSIBLE CEILINGS SHALL BE

DEMOLISHED. ABANDONDED CONDUIT CONCEALED IN WALLS SHALL

REMAIN AND BOXES BLANKED.

F. OUTLETS WITH ACTIVE ANALOG DEVICES SHALL BE LEFT CONNECTED TO

TELEPHONE SYSTEM. NOTED "PHONE", "FAX", ETC. NOTE THAT THESE ARE

BASED ON CASUAL OBSERVATION AND THE CONTRACTOR SHALL

CONFIRM AND NOTE THESE WHERE ENCOUNTERED.

G. ALL ANALOG/VOICE LINES NOT ACTIVELY USED SHALL BE DEMOLISHED TO

THE PUNCHDOWN BLOCKS. CABLE DENSITY IS SIMILAR TO TELECOM

CABLING.

1/8" = 1'-0"1 TELECOM DEMOLITION PLAN - BLDG 40 FIRST FLOOR

1/2" = 1'-0"2 ENLARGED ROOM - 102 TELECOM DEMOLITION

SHEET NOTES:

1. EXISTING TELECOM SPACE. DEMOLISH NETWORK PATCH PANELS, RACKS,

AND FIBER HOUSINGS. LEAVE OTHER SYSTEMS (DDC, ACCESS CONTROL,

ETC) UNLESS OTHERWISE NOTED.

2. TYPICAL TELECOM OUTLET WITH (D)ATA CABLING. DEMOLISH CABLING TO

TELEPHONE CABINETS AND TELECOM ROOMS. DEMOLISH UNUSED VOICE

WHERE PRESENT. SEE GENERAL NOTE 'G'.

3. COORDINATE WITH COR FOR EQUIPMENT TO BE SALVAGED AND

REINSTALLED IN NEW RACKS.

WAP

ITEM DESCRIPTION

24 PORT WAP PATCH PANEL

24 PORT COPPER PATCH PANEL

48 PORT COPPER PATCH PANEL

NETWORK SWITCH5

JOHNSON CONTROL PATCH PANEL6

CHECK POINT TEMPERATURE SENSOR7

CHECK POINT REPEATER8

MULTIMODE FIBER HOUSING9

EXISTING TELECOM ROOM SCHEDULE

UNINTERRUPTIBLE POWER SUPPLY

NOTE

DETAIL NOTES:

1. DEMOLISH EQUIPMENT AND ALL CABLING.

2. EQUIPMENT TO REMAIN.

3. EQUIPMENT TO BE SALVAGED/REMOVED BY VA.

12 PORT WAP PATCH PANEL

046-TD-0B1

2D 2D

2D

2D

2D

4D

2D2D

2D

2D

2D

2D

2D

2D

2D

2D

2D

2D

2D

2D

2TYP

VA MEDICAL CENTER

FORT MEADE, SD

NORTH

PROJECT KEY PLAN

U.S. Department of Veterans Affairs

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

JEREMY A. MAXIE

5/25/22

EE-113847

B

IM

/2

V

A M e d ic a l C e n te r

F t M e a d e S

D /E

S E

R

IE

S

B L D

G

R

.r v t

/2

/2

:2

:5

A

M

046-TD-0B1

46-TELECOM DEMOLITION PLANS EHRM INFRASTRUCTURE

UPGRADES

FORT MEADE, SOUTH DAKOTA

568-21-701

BLDG 46

Project Director

CK,LKAJAM05/25/2022

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

GDM

1000 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, PE

A/E:

1/2" = 1'-0"4 ENLARGED ROOM - B100 TELECOM DEMOLITION

1/8" = 1'-0"1 TELECOM DEMOLITION PLAN - BLDG 46 BASEMENT

1/8" = 1'-0"2 TELECOM DEMOLITION PLAN - BLDG 46 FIRST FLOOR

GENERAL NOTES:

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM RECORD

DRAWINGS AND/OR A NON-DESTRUCTIVE WALK THROUGH OF THE

FACILITY. THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY

OF THE INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD

VERIFY ALL ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF

WORK.

B. THE COR SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO

A WAREHOUSE AS DIRECTED BY THE COR. THE CONTRACTOR SHALL

DISPOSE OF, OFF SITE, ALL UNWANTED MATERIALS.

C. DASHED OR DOTTED LINES INDICATE ITEMS TO BE REMOVED. SOLID LINES

INDICATE EXISTING ITEMS TO REMAIN.

D. SEE TK SERIES FOR ROOM AND CABLE SCHEDULES.

E. RACEWAY AND BOXES MAY BE REUSED AS MUCH AS POSSIBLE FOR NEW

CABLING. ABANDONED CONDUIT ABOVE ACCESSIBLE CEILINGS SHALL BE

DEMOLISHED. ABANDONDED CONDUIT CONCEALED IN WALLS SHALL

REMAIN AND BOXES BLANKED.

F. OUTLETS WITH ACTIVE ANALOG DEVICES SHALL BE LEFT CONNECTED TO

TELEPHONE SYSTEM. NOTED "PHONE", "FAX", ETC. NOTE THAT THESE ARE

BASED ON CASUAL OBSERVATION AND THE CONTRACTOR SHALL

CONFIRM AND NOTE THESE WHERE ENCOUNTERED.

G. ALL ANALOG/VOICE LINES NOT ACTIVELY USED SHALL BE DEMOLISHED TO

THE PUNCHDOWN BLOCKS. CABLE DENSITY IS SIMILAR TO TELECOM

CABLING.

SHEET NOTES:

1. EXISTING TELECOM SPACE. DEMOLISH NETWORK PATCH PANELS, RACKS,

AND FIBER HOUSINGS. LEAVE OTHER SYSTEMS (DDC, ACCESS CONTROL,

ETC) UNLESS OTHERWISE NOTED.

2. TYPICAL TELECOM OUTLET WITH (D)ATA CABLING. DEMOLISH CABLING TO

TELEPHONE CABINETS AND TELECOM ROOMS. DEMOLISH UNUSED VOICE

WHERE PRESENT. SEE GENERAL NOTE 'G'.

3. COORDINATE WITH COR FOR EQUIPMENT TO BE SALVAGED AND

REINSTALLED IN NEW RACKS.

4. SALVAGE WAPS FOR REINSTALLATION AFTER NEW CABLING. DEMOLISH

TELECOM CABLING TO CABINET.

9 10

1 3

VA MEDICAL CENTER

FORT MEADE, SD

NORTH

PROJECT KEY PLAN

ITEM DESCRIPTION

24…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .