Attachment 8. National Aircraft Services - Pricing Schedule.xlsx

XLSX spreadsheet 53 KB Posted

Attached to
National Aircraft Services - FY26
Solicitation number
15M50026QA4400001
Issued by

About this file

This is a Pricing Schedule for National Aircraft Services under solicitation 15M50026QA4400001 issued by the U.S. Marshals Service, Department of Justice, on behalf of the Asset Forfeiture Division. The pricing schedule provides estimated costs across five service categories for a base year and four option years, plus a six-month FAR 52.217-8 extension period. The five service categories are: Relocation (SOC 22012), Appraisal and Title (SOC 25105), Storage (SOC 25715), Maintenance (SOC 25703), and Disposal (SOC 25226). Base year total estimated cost is $1,072,000, with option years ranging from $1,099,300 to $1,196,200, and the FAR 52.217-8 extension period at $598,100. The contract covers relocation services for various aircraft types including rotorcraft, small, medium, large, and heavy aircraft; storage facility costs and management; maintenance including intake processing, recurring maintenance labor and consumables, and mechanical repair services; appraisals and assessment reports; and disposal services with specified pricing brackets for sales proceeds and destruction services.

The pricing schedule includes Fixed Price (FFP) and Time and Materials (T&M) line items with estimated quantities noted as the program's best projections subject to variation. Annual escalation is reflected in pricing across the option years, with travel costs increasing from $12,000 in the base year to $13,200 in Option Year 4, storage facility costs increasing from $490,000 to $545,000, and maintenance costs increasing from $460,000 to $515,000. The contractor is required to maintain capability to meet all estimated quantities throughout the entire period of performance. Sales commissions for property disposals are calculated as percentages but deducted from sales proceeds rather than invoiced separately.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

SOC2201225105257152570325226Total
Base Year$ 37,000.00$ 35,000.00$ 490,000.00$ 460,000.00$ 50,000.00$1,072,000.00TRUE
Option Year 1$ 38,300.00$ 36,000.00$ 500,000.00$ 473,750.00$ 51,250.00$1,099,300.00TRUE
Option Year 2$ 39,600.00$ 37,000.00$ 515,000.00$ 487,500.00$ 52,500.00$1,131,600.00TRUE
Option Year 3$ 40,900.00$ 38,000.00$ 530,000.00$ 501,250.00$ 53,750.00$1,163,900.00TRUE
Option Year 4$ 42,200.00$ 39,000.00$ 545,000.00$ 515,000.00$ 55,000.00$1,196,200.00TRUE
FAR 52.217-8$ 21,100.00$ 19,500.00$ 272,500.00$ 257,500.00$ 27,500.00$598,100.00TRUE
Total$219,100.00$204,500.00$2,852,500.00$2,695,000.00$290,000.00$6,261,100.00TRUE

Base Year

BASE YEAR
RELOCATION
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
0001Transport not under own power6Day$ - 0
0002Travel$ 12,000.00STOT&M$ 12,000.00
0003Relocation under own power (rotorcraft)1Day$ - 0
0004Relocation under own power (small aircraft)10Day$ - 0
0005Relocation under own power (medium aircraft)5Day$ - 0
0006Relocation under own power (large aircraft)2Day$ - 0
0007Relocation under own power (heavy aircraft)3Day$ - 0
0008Relocation Misc$ 25,000.00STOFFP (TBD)$ 25,000.00
9999Transfer from incumbent vendor1Each$ - 0
TOTAL FOR SOC 22012$ 37,000.00

APPRAISAL AND TITLE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
0009Appraisals40Each$ - 0
0010Assessment Report$ 15,000.00STOFFP (TBD)$ 15,000.00
00113rd Party Consultation$ 20,000.00STOFFP (TBD)$ 20,000.00
0012Expert Services12Hour$ - 0
TOTAL FOR SOC 25105$ 35,000.00

STORAGE

CLINDESCRIPTION# OF
DAYSEST. QTYUNITUNIT PRICETOTAL PRICE
00133rd Party Storage Space (facility costs)$ 490,000.00STOFFP (TBD)$ 490,000.00
00143rd Party Storage Space (management)3658Each$ - 0
0015Vendor Storage Space (outdoor)3658Each$ - 0
0016Vendor Storage Space (indoor)3658Each$ - 0
0017Ancillary Property Storage (indoor)365320Sq. Ft.$ - 0
TOTAL FOR SOC 25715$ 490,000.00

MAINTENANCE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
0018Intake Processing20Each$ - 0
0019Recurring Maintenance (labor)1200Hour$ - 0
0020Recurring Maintenance (consumable)$ 10,000.00STOFFP (TBD)$ 10,000.00
0021Mechanical and Repair Services$ 425,000.00STOFFP (TBD)$ 425,000.00
0022Maintenance Misc$ 25,000.00STOFFP (TBD)$ 25,000.00
TOTAL FOR SOC 25703$ 460,000.00
DISPOSAL
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
0023Sale up to $250,000$ 1,000,000.00Sales Proceeds$ - 0
0024Sale $250,001 to $1,000,000$ 2,000,000.00Sales Proceeds$ - 0
0025Sale $1,000,001 to $5,000,000$ 2,500,000.00Sales Proceeds$ - 0
0026Sale over $5,000,0011$ 10,000,000.00Sales Proceeds-N/A-
0027Destruction$ 40,000.00STOFFP (TBD)$ 40,000.00
0028Disposal Misc$ 10,000.00STOFFP (TBD)$ 10,000.00
TOTAL FOR SOC 25226$ 50,000.00
ESTIMATED TOTAL PRICE FOR BASE YEAR (CLIN 0001-0028 & 9999):$ 1,072,000.00
1 Sales commission at this level will be calculated using the indicated pricing percentage. But payment will be deducted from sales proceeds rather than invoiced at a later date.
** All estimated quanitites within this tab are the program's best projections of need, actual quantities may vary throughout the period of performance. See contract Attachment 1 for contract minimum and contract maximum.
*** Contractor shall maintain the capability to meet all estimated quantities identified within this Pricing Schedule throughout the entirety of the period of performance.

Option Year 1

OPTION YEAR 1
RELOCATION
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
1001Transport not under own power6Day$ - 0
1002Travel$ 12,300.00STOT&M$ 12,300.00
1003Relocation under own power (rotorcraft)1Day$ - 0
1004Relocation under own power (small aircraft)10Day$ - 0
1005Relocation under own power (medium aircraft)5Day$ - 0
1006Relocation under own power (large aircraft)2Day$ - 0
1007Relocation under own power (heavy aircraft)3Day$ - 0
1008Relocation Misc$ 26,000.00STOFFP (TBD)$ 26,000.00
TOTAL FOR SOC 22012$ 38,300.00

APPRAISAL AND TITLE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
1009Appraisals40Each$ - 0
1010Assessment Report$ 15,500.00STOFFP (TBD)$ 15,500.00
10113rd Party Consultation$ 20,500.00STOFFP (TBD)$ 20,500.00
1012Expert Services12Hour$ - 0
TOTAL FOR SOC 25105$ 36,000.00

STORAGE

CLINDESCRIPTION# OF
DAYSEST. QTYUNITUNIT PRICETOTAL PRICE
10133rd Party Storage Space (facility costs)$ 500,000.00STOFFP (TBD)$ 500,000.00
10143rd Party Storage Space (management)3658Each$ - 0
1015Vendor Storage Space (outdoor)3658Each$ - 0
1016Vendor Storage Space (indoor)3658Each$ - 0
1017Ancillary Property Storage (indoor)365320Sq. Ft.$ - 0
TOTAL FOR SOC 25715$ 500,000.00

MAINTENANCE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
1018Intake Processing20Each$ - 0
1019Recurring Maintenance (labor)1200Hour$ - 0
1020Recurring Maintenance (consumable)$ 10,250.00STOFFP (TBD)$ 10,250.00
1021Mechanical and Repair Services$ 437,500.00STOFFP (TBD)$ 437,500.00
1022Maintenance Misc$ 26,000.00STOFFP (TBD)$ 26,000.00
TOTAL FOR SOC 25703$ 473,750.00
DISPOSAL
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
1023Sale up to $250,000$ 1,000,000.00Sales Proceeds$ - 0
1024Sale $250,001 to $1,000,000$ 2,000,000.00Sales Proceeds$ - 0
1025Sale $1,000,001 to $5,000,000$ 2,500,000.00Sales Proceeds$ - 0
1026Sale over $5,000,0011$ 10,000,000.00Sales Proceeds-N/A-
1027Destruction$ 41,000.00STOFFP (TBD)$ 41,000.00
1028Disposal Misc$ 10,250.00STOFFP (TBD)$ 10,250.00
TOTAL FOR SOC 25226$ 51,250.00
ESTIMATED TOTAL PRICE FOR BASE YEAR (CLIN 1001-1028):$ 1,099,300.00
1 Sales commission at this level will be calculated using the indicated pricing percentage. But payment will be deducted from sales proceeds rather than invoiced at a later date.
** All estimated quanitites within this tab are the program's best projections of need, actual quantities may vary throughout the period of performance. See contract Attachment 1 for contract minimum and contract maximum.
*** Contractor shall maintain the capability to meet all estimated quantities identified within this Pricing Schedule throughout the entirety of the period of performance.

Option Year 2

OPTION YEAR 2
RELOCATION
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
2001Transport not under own power6Day$ - 0
2002Travel$ 12,600.00STOT&M$ 12,600.00
2003Relocation under own power (rotorcraft)1Day$ - 0
2004Relocation under own power (small aircraft)10Day$ - 0
2005Relocation under own power (medium aircraft)5Day$ - 0
2006Relocation under own power (large aircraft)2Day$ - 0
2007Relocation under own power (heavy aircraft)3Day$ - 0
2008Relocation Misc$ 27,000.00STOFFP (TBD)$ 27,000.00
TOTAL FOR SOC 22012$ 39,600.00

APPRAISAL AND TITLE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
2009Appraisals40Each$ - 0
2010Assessment Report$ 16,000.00STOFFP (TBD)$ 16,000.00
20113rd Party Consultation$ 21,000.00STOFFP (TBD)$ 21,000.00
2012Expert Services12Hour$ - 0
TOTAL FOR SOC 25105$ 37,000.00

STORAGE

CLINDESCRIPTION# OF
DAYSEST. QTYUNITUNIT PRICETOTAL PRICE
20133rd Party Storage Space (facility costs)$ 515,000.00STOFFP (TBD)$ 515,000.00
20143rd Party Storage Space (management)3658Each$ - 0
2015Vendor Storage Space (outdoor)3658Each$ - 0
2016Vendor Storage Space (indoor)3658Each$ - 0
2017Ancillary Property Storage (indoor)365320Sq. Ft.$ - 0
TOTAL FOR SOC 25715$ 515,000.00

MAINTENANCE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
2018Intake Processing20Each$ - 0
2019Recurring Maintenance (labor)1200Hour$ - 0
2020Recurring Maintenance (consumable)$ 10,500.00STOFFP (TBD)$ 10,500.00
2021Mechanical and Repair Services$ 450,000.00STOFFP (TBD)$ 450,000.00
2022Maintenance Misc$ 27,000.00STOFFP (TBD)$ 27,000.00
TOTAL FOR SOC 25703$ 487,500.00
DISPOSAL
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
2023Sale up to $250,000$ 1,000,000.00Sales Proceeds$ - 0
2024Sale $250,001 to $1,000,000$ 2,000,000.00Sales Proceeds$ - 0
2025Sale $1,000,001 to $5,000,000$ 2,500,000.00Sales Proceeds$ - 0
2026Sale over $5,000,0011$ 10,000,000.00Sales Proceeds-N/A-
2027Destruction$ 42,000.00STOFFP (TBD)$ 42,000.00
2028Disposal Misc$ 10,500.00STOFFP (TBD)$ 10,500.00
TOTAL FOR SOC 25226$ 52,500.00
ESTIMATED TOTAL PRICE FOR BASE YEAR (CLIN 2001-2028):$ 1,131,600.00
1 Sales commission at this level will be calculated using the indicated pricing percentage. But payment will be deducted from sales proceeds rather than invoiced at a later date.
** All estimated quanitites within this tab are the program's best projections of need, actual quantities may vary throughout the period of performance. See contract Attachment 1 for contract minimum and contract maximum.
*** Contractor shall maintain the capability to meet all estimated quantities identified within this Pricing Schedule throughout the entirety of the period of performance.

Option Year 3

OPTION YEAR 3
RELOCATION
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
3001Transport not under own power6Day$ - 0
3002Travel$ 12,900.00STOT&M$ 12,900.00
3003Relocation under own power (rotorcraft)1Day$ - 0
3004Relocation under own power (small aircraft)10Day$ - 0
3005Relocation under own power (medium aircraft)5Day$ - 0
3006Relocation under own power (large aircraft)2Day$ - 0
3007Relocation under own power (heavy aircraft)3Day$ - 0
3008Relocation Misc$ 28,000.00STOFFP (TBD)$ 28,000.00
TOTAL FOR SOC 22012$ 40,900.00

APPRAISAL AND TITLE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
3009Appraisals40Each$ - 0
3010Assessment Report$ 16,500.00STOFFP (TBD)$ 16,500.00
30113rd Party Consultation$ 21,500.00STOFFP (TBD)$ 21,500.00
3012Expert Services12Hour$ - 0
TOTAL FOR SOC 25105$ 38,000.00

STORAGE

CLINDESCRIPTION# OF
DAYSEST. QTYUNITUNIT PRICETOTAL PRICE
30133rd Party Storage Space (facility costs)$ 530,000.00STOFFP (TBD)$ 530,000.00
30143rd Party Storage Space (management)3658Each$ - 0
3015Vendor Storage Space (outdoor)3658Each$ - 0
3016Vendor Storage Space (indoor)3658Each$ - 0
3017Ancillary Property Storage (indoor)365320Sq. Ft.$ - 0
TOTAL FOR SOC 25715$ 530,000.00

MAINTENANCE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
3018Intake Processing20Each$ - 0
3019Recurring Maintenance (labor)1200Hour$ - 0
3020Recurring Maintenance (consumable)$ 10,750.00STOFFP (TBD)$ 10,750.00
3021Mechanical and Repair Services$ 462,500.00STOFFP (TBD)$ 462,500.00
3022Maintenance Misc$ 28,000.00STOFFP (TBD)$ 28,000.00
TOTAL FOR SOC 25703$ 501,250.00
DISPOSAL
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
3023Sale up to $250,000$ 1,000,000.00Sales Proceeds$ - 0
3024Sale $250,001 to $1,000,000$ 2,000,000.00Sales Proceeds$ - 0
3025Sale $1,000,001 to $5,000,000$ 2,500,000.00Sales Proceeds$ - 0
3026Sale over $5,000,0011$ 10,000,000.00Sales Proceeds-N/A-
3027Destruction$ 43,000.00STOFFP (TBD)$ 43,000.00
3028Disposal Misc$ 10,750.00STOFFP (TBD)$ 10,750.00
TOTAL FOR SOC 25226$ 53,750.00
ESTIMATED TOTAL PRICE FOR BASE YEAR (CLIN 3001-3028):$ 1,163,900.00
1 Sales commission at this level will be calculated using the indicated pricing percentage. But payment will be deducted from sales proceeds rather than invoiced at a later date.
** All estimated quanitites within this tab are the program's best projections of need, actual quantities may vary throughout the period of performance. See contract Attachment 1 for contract minimum and contract maximum.
*** Contractor shall maintain the capability to meet all estimated quantities identified within this Pricing Schedule throughout the entirety of the period of performance.

Option Year 4

OPTION YEAR 4
RELOCATION
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
4001Transport not under own power6Day$ - 0
4002Travel$ 13,200.00STOT&M$ 13,200.00
4003Relocation under own power (rotorcraft)1Day$ - 0
4004Relocation under own power (small aircraft)10Day$ - 0
4005Relocation under own power (medium aircraft)5Day$ - 0
4006Relocation under own power (large aircraft)2Day$ - 0
4007Relocation under own power (heavy aircraft)3Day$ - 0
4008Relocation Misc$ 29,000.00STOFFP (TBD)$ 29,000.00
TOTAL FOR SOC 22012$ 42,200.00

APPRAISAL AND TITLE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
4009Appraisals40Each$ - 0
4010Assessment Report$ 17,000.00STOFFP (TBD)$ 17,000.00
40113rd Party Consultation$ 22,000.00STOFFP (TBD)$ 22,000.00
4012Expert Services12Hour$ - 0
TOTAL FOR SOC 25105$ 39,000.00

STORAGE

CLINDESCRIPTION# OF
DAYSEST. QTYUNITUNIT PRICETOTAL PRICE
40133rd Party Storage Space (facility costs)$ 545,000.00STOFFP (TBD)$ 545,000.00
40143rd Party Storage Space (management)3658Each$ - 0
4015Vendor Storage Space (outdoor)3658Each$ - 0
4016Vendor Storage Space (indoor)3658Each$ - 0
4017Ancillary Property Storage (indoor)365320Sq. Ft.$ - 0
TOTAL FOR SOC 25715$ 545,000.00

MAINTENANCE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
4018Intake Processing20Each$ - 0
4019Recurring Maintenance (labor)1200Hour$ - 0
4020Recurring Maintenance (consumable)$ 11,000.00STOFFP (TBD)$ 11,000.00
4021Mechanical and Repair Services$ 475,000.00STOFFP (TBD)$ 475,000.00
4022Maintenance Misc$ 29,000.00STOFFP (TBD)$ 29,000.00
TOTAL FOR SOC 25703$ 515,000.00
DISPOSAL
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
4023Sale up to $250,000$ 1,000,000.00Sales Proceeds$ - 0
4024Sale $250,001 to $1,000,000$ 2,000,000.00Sales Proceeds$ - 0
4025Sale $1,000,001 to $5,000,000$ 2,500,000.00Sales Proceeds$ - 0
4026Sale over $5,000,0011$ 10,000,000.00Sales Proceeds-N/A-
4027Destruction$ 44,000.00STOFFP (TBD)$ 44,000.00
4028Disposal Misc$ 11,000.00STOFFP (TBD)$ 11,000.00
TOTAL FOR SOC 25226$ 55,000.00
ESTIMATED TOTAL PRICE FOR BASE YEAR (CLIN 4001-4028):$ 1,196,200.00
1 Sales commission at this level will be calculated using the indicated pricing percentage. But payment will be deducted from sales proceeds rather than invoiced at a later date.
** All estimated quanitites within this tab are the program's best projections of need, actual quantities may vary throughout the period of performance. See contract Attachment 1 for contract minimum and contract maximum.
*** Contractor shall maintain the capability to meet all estimated quantities identified within this Pricing Schedule throughout the entirety of the period of performance.

FAR 52.217-8

FAR 52.217-8
RELOCATION
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
5001Transport not under own power3Day$ - 0$ - 0
5002Travel$ 6,600.00STOT&M$ 6,600.00
5003Relocation under own power (rotorcraft)1Day$ - 0$ - 0
5004Relocation under own power (small aircraft)5Day$ - 0$ - 0
5005Relocation under own power (medium aircraft)3Day$ - 0$ - 0
5006Relocation under own power (large aircraft)1Day$ - 0$ - 0
5007Relocation under own power (heavy aircraft)2Day$ - 0$ - 0
5008Relocation Misc$ 14,500.00STOFFP (TBD)$ 14,500.00
TOTAL FOR SOC 22012$ 21,100.00

APPRAISAL AND TITLE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
5009Appraisals20Each$ - 0$ - 0
5010Assessment Report$ 8,500.00STOFFP (TBD)$ 8,500.00
50113rd Party Consultation$ 11,000.00STOFFP (TBD)$ 11,000.00
5012Expert Services6Hour$ - 0$ - 0
TOTAL FOR SOC 25105$ 19,500.00

STORAGE

CLINDESCRIPTION# OF
DAYSEST. QTYUNITUNIT PRICETOTAL PRICE
50133rd Party Storage Space (facility costs)$ 272,500.00STOFFP (TBD)$ 272,500.00
50143rd Party Storage Space (management)1824Each$ - 0$ - 0
5015Vendor Storage Space (outdoor)1824Each$ - 0$ - 0
5016Vendor Storage Space (indoor)1824Each$ - 0$ - 0
5017Ancillary Property Storage (indoor)182160Sq. Ft.$ - 0$ - 0
TOTAL FOR SOC 25715$ 272,500.00

MAINTENANCE

CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
5018Intake Processing10Each$ - 0$ - 0
5019Recurring Maintenance (labor)600Hour$ - 0$ - 0
5020Recurring Maintenance (consumable)$ 5,500.00STOFFP (TBD)$ 5,500.00
5021Mechanical and Repair Services$ 237,500.00STOFFP (TBD)$ 237,500.00
5022Maintenance Misc$ 14,500.00STOFFP (TBD)$ 14,500.00
TOTAL FOR SOC 25703$ 257,500.00
DISPOSAL
CLINDESCRIPTIONEST. QTYUNITUNIT PRICETOTAL PRICE
5023Sale up to $250,000$ 500,000.00Sales Proceeds0%$ - 0
5024Sale $250,001 to $1,000,000$ 1,000,000.00Sales Proceeds0%$ - 0
5025Sale $1,000,001 to $5,000,000$ 1,250,000.00Sales Proceeds0%$ - 0
5026Sale over $5,000,0011$ 5,000,000.00Sales Proceeds0%-N/A-
5027Destruction$ 22,000.00STOFFP (TBD)$ 22,000.00
5028Disposal Misc$ 5,500.00STOFFP (TBD)$ 5,500.00
TOTAL FOR SOC 25226$ 27,500.00
ESTIMATED TOTAL PRICE FOR BASE YEAR (CLIN 5001-5028):$ 598,100.00
1 Sales commission at this level will be calculated using the indicated pricing percentage. But payment will be deducted from sales proceeds rather than invoiced at a later date.
** All estimated quanitites within this tab are the program's best projections of need, actual quantities may vary throughout the period of performance. See contract Attachment 1 for contract minimum and contract maximum.
*** Contractor shall maintain the capability to meet all estimated quantities identified within this Pricing Schedule throughout the entirety of the period of performance.

File details come from the government source that posted it. Updated .