Attachment 8- Appendix D2 Submittal Register.pdf

PDF 255 KB Posted

Attached to
REPAIR TRUEMPER ROAD JBSA-LACKLAND TX
Solicitation number
MPLS239369
Issued by

About this file

This document is a Submittal Register associated with a federal contract opportunity to Repair Truemper Road at JBSA-Fort Sam Houston, TX. The contract is a 100% set-aside for Women-Owned Small Businesses within NAICS code 237310, with an estimated value between $1,000,000 and $5,000,000. Key submittals required include a Demolition Plan, Deconstruction Plan, Asbestos Work Plans, Lead Work Plans, Construction Waste Management Plan, Warranty Management Plan, Operation and Maintenance Manuals, As-Built Drawings, and various test reports and certifications. The contract includes standard construction specification sections such as Concrete, Earthwork, Paving, Striping, and Curbs and Gutters. A site visit is scheduled for July 9, 2024, and the contracting agency is the Department of the Air Force Air Education and Training Command.

View the file

Other files

File Type Posted
Attachment 17-Trurmper Road Site Visit Questions and Goverment Responses.pdf PDF
Attachment 14- ADT Report.pdf PDF
Attachment 17-Trurmper Road Site Visit Questions and Goverment Responses.pdf PDF
Attachment 1- Appendix A Specifications SOW.pdf PDF
Attachment 9- Section L_Updated_23JUL24.pdf PDF
Attachment 15-Laydown area.jpg JPG image
Attachement 13- JBSA-Soil Management Plan.pdf PDF
Attachment 2-Appendix D1- Section Map Reference 23 JUL 2024.pdf PDF
Solicitation Amendment FA301624B00030002 SF 30.pdf PDF
Attachment 16- Utilities.pdf PDF
Attachment 13- RFI Questions and Goverment Response Hardee Road.pdf PDF
truemper road site visit.pdf PDF
Solicitation Amendment FA301624B00030001 SF 30.pdf PDF
REPAIR TRUEMPER ROAD SOLICITATION.pdf PDF
REPAIR TRUEMPER ROAD SOLICITATION FA301624B0003.pdf PDF
Attachment 11- Cost Estimate Breakdown.xlsx XLSX spreadsheet
Attachment 9- Section L_Updated_28May2024.pdf PDF
Attachment 12- Appendix D3 Draft 1354A.pdf PDF
Attachment 5-Climatology Report.pdf PDF
Attachment 10 - Section M.pdf PDF
Attachment 6 Heavy and Highway 5 JAN 2024.pdf PDF
Attachment 4- Appendix E- AF 103 Dig Clearance Permit.pdf PDF
Attachment 3- Appendix D4 LMP Report.pdf PDF
Attachment 2-Appendix D1- Section Map Reference 1.pdf PDF
Attachment 1- Appendix A Specifications SOW.pdf PDF
Attachment 7- Appendix E - Utility Outage.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 12 PAGES

Truemper

01 11 00 SD-01 Preconstruction Submittals

GSalvage Plan

1.4.3 GContractor Laydown Area

Request

1.4.3 SQualifications Of General

Contractor

SD-02 Shop Drawings

1.4.3Issued For Construction (IFC)

Package

1.4.3Geotechnical Report

SD-07 Certificates

1.4.3 GDraft Interim Dd 1354

SD-10 Operation and Maintenance

Data

1.4.3 GOperation & Maintenance Manual

SD-11 Closeout Submittals

1.4.3 SRecord Documents

1.4.3 SWarranty Management Plan

1.4.3 GInterim Dd 1354

01 32 01.00 10 SD-01 Preconstruction Submittals

1.2 SProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 12 PAGES

01 33 00 1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.4 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.9.2 SAccident Reports

1.5Activity Hazard Analysis (AHA)

1.6.1Hot Work Permit

Certificate of Compliance

1.11.1 GRadiography Operation Planning

Work Sheet

1.11.1 GPortable Gauge Operations

Planning Worksheet

01 57 20 SD-01 Preconstruction Submittals

1.6 GENVIRONMENTAL

G

PROTECTION PLAN

G

1.5.1

G

Environmental Permits

3.7.2Equipment Inventory

SD-02 Shop Drawings

GAsbestos Work Plans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

S

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 12 PAGES

01 57 20 SAsbestos Certifications

SAsbestos Transporter License

SAsbestos Medical clearances

SAsbestos Training Certificates

SAsbestos TDSHS License

SAsbestos Inspection Reports

SUnsigned copy of State

Renovation

SDemolition Notifications

GLead Work Plans

SLead Occupant Protection Plan

STexas Department of State

Health Services Lead Licenses

SLead Notifications

SLead Training Certificates

GLead Based Paint Reports

GLead Inspection reports

SD-03 Product Data

SAsbestos Air Monitoring reports

Lead Air Monitoring reports

SD-04 Samples

Lead OSHA Negative Exposure

Assessment

GLead Work Plan

EPA Lead Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 12 PAGES

01 57 20 SLead Awareness Training certificates

SOSHA Air Monitoring

SLead Training Certificates

GWaste Disposal Plan

GLead Inspection reports

GLead Based Paint Reports

SD-06 Test Reports

3.1.4.1 GAnalytical Results

SD-11 Closeout Submittals

3.11.4.8 GLead Abatement Activities

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan

SD-06 Test Reports

1.9.2Quarterly Reports

1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.6.1 SWarranty Management Plan

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 12 PAGES

01 78 00 3.7 SOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

1.6.1As-Built Record of Equipment and Materials

3.6As-Built Record of Equipment and Materials

2.2 GCertification of EPA Designated

Items

2.3 GCertification Of USDA Designated

Items

3.9.1 GInterim DD FORM 1354

3.9.2 GChecklist for DD FORM 1354

3.9.2 GHigh Performance and

Sustainable Building (HPSB)

Checklist

3.4 GFinal Approved Shop Drawings

02 41 00 SD-01 Preconstruction Submittals

GDemolition Plan

GDeconstruction Plan

1.5Existing Conditions

SD-07 Certificates

1.3 GNotification

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 12 PAGES

02 41 00 Receipts

03 30 00 SD-01 Preconstruction Submittals

Concrete Curing Plan

Quality Control Organizational

Chart

SD-02 Shop Drawings

GReinforcing Steel

SD-03 Product Data

Joint Sealants

Joint Filler

Formwork Materials

2.1.1Cementitious Materials

2.3Reinforcement

Local/Regional Materials

Pumping Concrete

Finishing Plan

Nonshrink Grout

SD-04 Samples

Surface Finish Samples

GConcrete Mix Design

SD-06 Test Reports

GConcrete Mix Design

3.11.3.3 GCompressive Strength Tests

3.11.3.1Slump Tests

2.1.2Water

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 12 PAGES

03 30 00 SD-07 Certificates

2.3.1Reinforcing Bars

Joint Sealants

Curing Compound

31 00 00 SD-01 Preconstruction Submittals

3.6 GUtilization of Excavated Materials

D-06 Test Reports

3.13Testing

Borrow Site Testing

SD-07 Certificates

3.13Testing

31 23 00.00 20 SD-06 Test Reports

GBorrow Site Testing

Fill and backfill

Density tests

Moisture Content Tests

32 01 16.71 SD-06 Test Reports

3.6.1QC Monitoring

3.5.3 GGrade-Conformance Tests

3.4 GTest Section Results

3.7.1 GMacrosurface Texture

Acceptance

32 01 19.61 SD-03 Product Data

2.1Sealants

Manufacturer's

Recommendations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 12 PAGES

32 01 19.61 SD-04 Samples

2.1Sealants

Backer Rod

2.3.2Bond Breaking Tapes

SD-06 Test Reports

2.1Sealants

SD-07 Certificates

3.1Equipment List

SD-08 Manufacturer’s Instructions

2.1Sealants

32 11 13.13 SD-03 Product Data

2.1 GPlant, Equipment, Machines, and

Tools

2.2.4 GMix Design

1.2.3Waybills and Delivery Tickets

1.6.1 GContractor's Plans

SD-04 Samples

2.2.1Lime

SD-05 Design Data

1.8.1 GJob-Mix Formula

SD-06 Test Reports

3.5Sampling and Testing

3.6.3Field Density

SD-07 Certificates

2.2.2Bituminous Material

2.2.1Lime

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 12 PAGES

32 11 13.13 2.2.4Laboratory

32 11 20 SD-03 Product Data

2.3 GPlant, Equipment, and Tools

1.1.3Waybills and Delivery Tickets

SD-06 Test Reports

2.2.1 GInitial Tests

3.13.1 GIn-Place Tests

1.7.2 GTest Section Report

32 11 23 SD-03 Product Data

2.4 GPlant, Equipment, and Tools

Waybills and Delivery Tickets

SD-06 Test Reports

2.3.1 GInitial Tests

3.13.1 GIn-Place Tests

1.6.2 GTest Section Report

32 12 13 SD-03 Product Data

1.1.3Waybills and Delivery Tickets

2.2.4Local/Regional Materials

SD-06 Test Reports

3.7Sampling and Testing

32 12 16.16 SD-02 Shop Drawings

2.1 GPlacement Plan

SD-03 Product Data

2.1.6 GDiamond Grinding Plan

2.4 GMix Design

3.1 GContractor Quality Control

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 12 PAGES

32 12 16.16 SD-04 Samples

2.2Aggregates

2.3Asphalt Cement Binder

SD-06 Test Reports

2.2 GAggregates

3.1.3.9QC Monitoring

SD-07 Certificates

2.3 GAsphalt Cement Binder

1.3.11Laboratory Accreditation and

Validation

32 16 19 SD-03 Product Data

2.1Concrete

2.6.5Biodegradable Form Release

Agent

3.2Biodegradable Form Release

Agent

SD-06 Test Reports

3.8Field Quality Control

32 17 23 SD-03 Product Data

GSurface Preparation Equipment

List

GApplication Equipment List

3.2Exterior Surface Preparation

1.4.1 GSafety Data Sheets

2.2.3.2 GReflective media for roads

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 12 PAGES

32 17 23 G

G

2.2.2

G

Thermoplastic compound 3.3.2

G

Thermoplastic compound

Raised Pavement Markers

Primers and Adhesives

SD-06 Test Reports

G2.2.3.2

G

Reflective Media for Roads

G

G

G

High Build Acrylic Coating 2.2.2

G

Thermoplastic Compound 3.3.2

G

Thermoplastic Compound

G

3.4.1

Test Reports

SD-07 Certificates

1.4.2

Qualifications 1.4.1Volatile Organic Compound 2.2.2Thermoplastic Compound

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 12 PAGES

32 17 23 3.3.2Thermoplastic Compound

SD-08 Manufacturer’s Instructions

2.2.2 GThermoplastic Compound

3.3.2 GThermoplastic Compound

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .