Attachment 2-Appendix D1- Section Map Reference 1.pdf

PDF 2 MB Posted

Attached to
REPAIR TRUEMPER ROAD JBSA-LACKLAND TX
Solicitation number
MPLS239369
Issued by

About this file

This document appears to be Attachment 2-Appendix D1- Section Map Reference 1.pdf, which provides details about repairing Truemper Avenue from Kelly Drive to Housing at JBSA-Fort Sam Houston, TX. The related federal contract opportunity is Solicitation Number MPLS239369 for the REPAIR TRUEMPER ROAD project at JBSA-Lackland, TX. This is a 100% set-aside for Women Owned Small Businesses, with a project size between $1,000,000.00 and $5,000,000.00. The key details of the project include repairing the Truemper Avenue section from the bridge embankment to the north Truemper-Kelly Drive intersection, excluding the intersection. A site visit is scheduled for July 9, 2024 at 10:00 am local time in San Antonio, TX. Offerors must submit electronic bids and a detailed cost proposal in accordance with RS Means format.

View the file

Other files

File Type Posted
Attachment 17-Trurmper Road Site Visit Questions and Goverment Responses.pdf PDF
Attachment 14- ADT Report.pdf PDF
Attachment 17-Trurmper Road Site Visit Questions and Goverment Responses.pdf PDF
Attachment 1- Appendix A Specifications SOW.pdf PDF
Attachment 9- Section L_Updated_23JUL24.pdf PDF
Attachment 15-Laydown area.jpg JPG image
Attachement 13- JBSA-Soil Management Plan.pdf PDF
Attachment 2-Appendix D1- Section Map Reference 23 JUL 2024.pdf PDF
Solicitation Amendment FA301624B00030002 SF 30.pdf PDF
Attachment 16- Utilities.pdf PDF
Attachment 13- RFI Questions and Goverment Response Hardee Road.pdf PDF
truemper road site visit.pdf PDF
Solicitation Amendment FA301624B00030001 SF 30.pdf PDF
REPAIR TRUEMPER ROAD SOLICITATION.pdf PDF
REPAIR TRUEMPER ROAD SOLICITATION FA301624B0003.pdf PDF
Attachment 11- Cost Estimate Breakdown.xlsx XLSX spreadsheet
Attachment 9- Section L_Updated_28May2024.pdf PDF
Attachment 12- Appendix D3 Draft 1354A.pdf PDF
Attachment 5-Climatology Report.pdf PDF
Attachment 10 - Section M.pdf PDF
Attachment 6 Heavy and Highway 5 JAN 2024.pdf PDF
Attachment 8- Appendix D2 Submittal Register.pdf PDF
Attachment 4- Appendix E- AF 103 Dig Clearance Permit.pdf PDF
Attachment 3- Appendix D4 LMP Report.pdf PDF
Attachment 1- Appendix A Specifications SOW.pdf PDF
Attachment 7- Appendix E - Utility Outage.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Truemper Ave.- Kelly Dr. to Housing Appendix 0 1

Truemper Ave. Section 4:

Starts from the bridge embankment to north Truemper-Kelly Dr. intersection (exclude the intersection).

I

\ 't>

<:,'l<;;<:l

Enlarged Map o f Section 4

Approximate areas of Full Depth Replacement:

Repair Truemper Ave.- Kelly Dr. to Housing Appendix D 1

Truemper Ave. Section 5:

Starts from Truemper-Selfridge Blvd. intersection (includes the intersection) to Truemper-Kallack St.

(includes the intersection).

Enlarged Map o f Section 5 l 8223 . 8242 82 · 824±.

0 [@16 L

I I

Appendix 01 - Section Maps Reference_1_rev1
Appendix 01 - Section Maps Reference_2_
Appendix 01 - Section Maps Reference-3_rev1_ copy
Appendix 01 - Section Maps Reference-4_

File details come from the government source that posted it. Updated .