This document appears to be a Lead-Based Paint (LBP) Inventory Report related to a federal contract opportunity to repair Truemper Road at JBSA-Fort Sam Houston, Texas. The report identifies areas along Truemper Road and other surrounding roads that tested positive for lead-based paint, which will require special handling and disposal procedures during the road repair work. The related federal contract opportunity is a solicitation for the repair of Truemper Road, set aside for Woman-Owned Small Businesses (WOSB), with a project cost between $1,000,000 and $5,000,000. The solicitation requires offerors to complete specific sections of the SF 1442 form, provide a detailed cost proposal, and attend a site visit on July 9, 2024. The project will be awarded by the Department of the Air Force, Air Education and Training Command.

View the file

Other files

File Type Posted
Attachment 17-Trurmper Road Site Visit Questions and Goverment Responses.pdf PDF
Attachment 14- ADT Report.pdf PDF
Attachment 17-Trurmper Road Site Visit Questions and Goverment Responses.pdf PDF
Attachment 1- Appendix A Specifications SOW.pdf PDF
Attachment 9- Section L_Updated_23JUL24.pdf PDF
Attachment 15-Laydown area.jpg JPG image
Attachement 13- JBSA-Soil Management Plan.pdf PDF
Attachment 2-Appendix D1- Section Map Reference 23 JUL 2024.pdf PDF
Solicitation Amendment FA301624B00030002 SF 30.pdf PDF
Attachment 16- Utilities.pdf PDF
Attachment 13- RFI Questions and Goverment Response Hardee Road.pdf PDF
truemper road site visit.pdf PDF
Solicitation Amendment FA301624B00030001 SF 30.pdf PDF
REPAIR TRUEMPER ROAD SOLICITATION.pdf PDF
REPAIR TRUEMPER ROAD SOLICITATION FA301624B0003.pdf PDF
Attachment 11- Cost Estimate Breakdown.xlsx XLSX spreadsheet
Attachment 9- Section L_Updated_28May2024.pdf PDF
Attachment 12- Appendix D3 Draft 1354A.pdf PDF
Attachment 5-Climatology Report.pdf PDF
Attachment 10 - Section M.pdf PDF
Attachment 6 Heavy and Highway 5 JAN 2024.pdf PDF
Attachment 8- Appendix D2 Submittal Register.pdf PDF
Attachment 4- Appendix E- AF 103 Dig Clearance Permit.pdf PDF
Attachment 2-Appendix D1- Section Map Reference 1.pdf PDF
Attachment 1- Appendix A Specifications SOW.pdf PDF
Attachment 7- Appendix E - Utility Outage.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBSA LBP Inventory Print Report

Lead Based Paint Detected:

Roads

Square Footage: 0

Number of Floors: 0

None.tif

Drawing File Name:

Facility Status: Vacant

PhotoUnavailable.jpg

Photo File Name

Date Constructed: 0

Facility Number: Facility Name:Roadwa Unknown

Facility Owner: 502 CEG

Facility Type

Facility Address: Unknown

Facility Summary Report:

None

Facility Site: JBSA Lackland

ViewFacility Comments:

Facility Comments:

LBP Report File Name(s):

2022-10-21_LAK_CarswellRepai

Date User

6/5/2023 elv

1/4/2023 HMUser

10/21/2022 HMUser

4/23/2021 HMUser

Comment

All Truemper Ave Road Marking painted yellow are Negative for Lead Based Paint from Section 4 through six. Section four samples 1-7, include Truemper to Kelly- Dimsted Place. Section 5, Samples 8-10, Reese Street to Selfridge Blvd. Section 6.

Samples 11-12, Selfridge Blvd. to Kellack Street

Ent circle center line tested Neg for Lead paint. WT# 10429352

MPLS215339 - Repair Carswell road. The following areas are Positive for Lead Based Paint, See attached map. Areas in Red are Positive. Any disturbance of Lead Based Paint will require a Negative Exposure Assessment in accordance with 29 CFR 1926.62, Lead In Construction rules. All materials must be TCLP to determine proper disposal procedures. A Manifest shall be required for all shipments. All waste will be characterized, profiled and then manifested.JBSA Environmental are the only authority to sign manifests. A Lead Work plan shall be required for review.

LAK Repair Kenly Avenue (From Luke at Kenly ave to Kenly Ave at Ladd str.). Kenly avenue is Positive for Lead Based Paint.

Wilford Hall loop is Positive for Lead Based Paint. LAK Ent circle (From Ent cir at Huhges to Ent Meivoher Dr.) All markings entrance to Hughes to entrance MelvoherDrive are Negative for Lead Based Paint.

2 6/4/2023 0 0truemper A Lower Markings Asphalt Yellow Intact Negativ

3 6/4/2023 0 0truemper A Lower Markings Asphalt Yellow Intact Negativ

4 6/4/2023 0.05 0.03truemper A Lower Markings Asphalt Yellow Intact Negativ

5 6/4/2023 0 0.02truemper A Lower Markings Asphalt Yellow Intact Negativ

6 6/4/2023 0 0truemper A Lower Markings Asphalt Yellow Intact Negativ

7 6/4/2023 0 0truemper A Lower Markings Asphalt Yellow Intact Negativ

8 6/4/2023 0 0truemper A Lower Markings Asphalt Yellow Intact Negativ

9 6/4/2023 0 0truemper A Lower Markings Asphalt Yellow Intact Negativ

10 6/4/2023 0 0truemper A Lower Markings Asphalt Yellow Intact Negativ

11 6/4/2023 0 0truemper A Lower Markings Asphalt Yellow Intact Negativ

12 6/4/2023 0 0truemper A Lower Markings Asphalt Yellow Intact Negativ

File details come from the government source that posted it. Updated .