Attachment_7-SWPPP_Rincon_FFS.pdf
PDF 31 MB Posted
- Solicitation number
- 9TSC0105
- Issued by
- Imperial County, Los Angeles County, Riverside County, San Diego County, Imperial City, East Los Angeles CDP, Glendale City, Lake Los Angeles CDP, Los Angeles City, Lake Riverside CDP, Riverside City, Imperial Beach City, Rancho San Diego CDP, San Diego City, San Diego Country Estates CDP, California
About this file
This document is a Stormwater Pollution Prevention Plan (SWPPP) for the Rincon Fire Flow Study project. The project is being undertaken by the City of Rincon, Georgia. The SWPPP outlines the requirements for managing stormwater runoff and erosion control during the construction of the fire flow study. It provides details on site conditions, construction sequencing, best management practices, and inspection and maintenance protocols. The SWPPP must be implemented throughout the duration of the project.
The document includes technical specifications, drawings, and other supporting exhibits related to the stormwater management requirements for the project. It does not contain information about pricing, funding sources, set-asides, or contract terms, as this appears to be a technical specification document rather than a solicitation or contract.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Storm Water Pollution Prevention Plan For:
RINCON FIRE STATION FACILITY REPLACEMENT
APN 133-050-009-00
Prepared for:
CALIFORNIA DEPARTMENT OF FORESTRY & FIRE PROTECTION
1131 S STREET
SACRAMENTO, CA
JONATHAN PIKE– 916.445.4626
Contractor:
TBD
TBD
TBD – TBD
Project Site Location/Address:
16971 HIGHWAY 76
PAUMA VALLEY, CA, 92061
Qualified SWPPP Practitioner (QSP):
TBD
TBD
TBD – TBD
TBD #TBD
Qualified SWPPP Developer (QSD):
Siegfried Engineering, Inc.
3428 Brookside Road Stockton, CA 95219
PAUL SCHNEIDER, P.E. – 209.943.2021
QSD #00575
SWPPP Preparation Date:
07/22/2021
Estimated Project Dates:
START OF CONSTRUCTION: 10/01/2021
COMPLETION OF CONSTRUCTION: 05/31/2023
WDID No.: XXXXXXXX
Attachment 7 #9TSC0105 Rincon Fire Station Replacement-General Contractor
CAL FIRE
Storm Water Pollution Prevention Plan (SWPPP)
RINCON FIRE STATION FACILITY REPLACEMENT Contents
SWPPP.docx Page i
Contents
SWPPP Certification by Legally Responsible Person ............................................................................... i SWPPP Certification by Qualified SWPPP Developer .............................................................................. ii Section 100 SWPPP Requirements ..................................................................................................... 100-1
100.1 Introduction ............................................................................................................ 100-1
100.2 Permit Registration Documents ............................................................................. 100-1
100.3 SWPPP Availability and Implementation ................................................................ 100-2
100.4 SWPPP Amendments ............................................................................................ 100-2
100.5 Retention of Records ............................................................................................. 100-2
100.6 Required Non-Compliance Reporting .................................................................... 100-3
100.7 Annual Report ........................................................................................................ 100-4
100.8 Changes to Permit Coverage ................................................................................. 100-4
100.9 Notice of Termination ............................................................................................. 100-4
Section 200 Project Information .......................................................................................................... 200-1
200.1 Project and Site Description ................................................................................... 200-1
200.2 Storm Water Run-On from Offsite Areas ................................................................ 200-1
200.3 Sediment and Receiving Water Risk Determination ............................................... 200-1
200.4 Construction Schedule ........................................................................................... 200-2
200.5 Potential Construction Site Pollutant Sources ........................................................ 200-3
200.6 Identification of Non-Storm Water Discharges ....................................................... 200-4
Section 300 Best Management Practices ........................................................................................... 300-1
300.1 Schedule for BMP Implementation ......................................................................... 300-1
300.2 Erosion Control and Sediment Control ................................................................... 300-1
300.3 Non-Storm Water and Material Management ......................................................... 300-3
300.4 Post-Construction Storm Water Management Measures ....................................... 300-4
Section 400 BMP Inspection, Maintenance, and Rain Event Action Plans ...................................... 400-1
400.1 BMP Inspection and Maintenance.......................................................................... 400-1
400.2 Rain Event Action Plans ......................................................................................... 400-1
Section 500 Training ............................................................................................................................. 500-1 Section 600 Responsible Parties and Operators ............................................................................... 600-1
600.1 Responsible Parties ............................................................................................... 600-1
600.2 Contractor List ........................................................................................................ 600-2
Section 700 Construction Site Monitoring Program .......................................................................... 700-1
700.1 Visual Monitoring (Inspections) .............................................................................. 700-1
700.2 Water Quality Sampling and Analysis .................................................................... 700-1
700.3 Sample Collection and Handling ............................................................................ 700-2
700.3.1 Sample Collection Preparation ................................................................. 700-2
700.3.2 Sample Collection Procedures ................................................................. 700-2
700.3.3 Sample Handling Procedures ................................................................... 700-4
700.3.4 Sample Documentation Procedures ......................................................... 700-4
700.3.5 Sample Analysis ....................................................................................... 700-5
RINCON FIRE STATION FACILITY REPLACEMENT Contents
SWPPP.docx Page ii
700.4 Quality Assurance and Quality Control .................................................................. 700-7
700.5 Report Requirements and Records Retention ....................................................... 700-7
700.6 Data Evaluation ...................................................................................................... 700-8
700.7 Change of Conditions............................................................................................. 700-8
SWPPP Attachments Attachment A ...................................................................................................... Construction General Permit Attachment B .................................................................... Submitted Permit Registration Documents (PRDs) Attachment C ........................................................................................................... SWPPP Amendment Log Attachment D .......................................................................................................... Notice of Non-Compliance Attachment E ............................................................................................................ Discharge Reporting Log Attachment F ..................................................................................... NAL/NEL Exceedance Site Evaluations Attachment G ...................................................................................................... Submitted Changes to PRDs Attachment H ............................................................................................................... Construction Schedule Attachment I ......................................................................................... CASQA BMP Consideration Checklist Attachment J .......................................................................................... CASQA BMP Handbook Fact Sheets Attachment K .................................................................................. Construction Site Inspection Report Form Attachment L ........................... Program for Maintenance, Inspection, and Repair of Construction Site BMPs Attachment M ......................................................................................... Site Specific Rain Event Action Plan Attachment N ............................................................................................................................... Training Log Attachment O ................................................................................................................... Responsible Parties Attachment P ................................................................................................. Contractors and Subcontractors Attachment Q ........................................................................................ Construction Site Monitoring Program Attachment R ............................................................................................... Annual Certificate of Compliance
SWPPP.docx Page i
SWPPP Certification by Legally Responsible Person (LRP)
Legally Responsible Person (LRP)
Certification of the
Project Name: RINCON FIRE STATION FACILITY REPLACEMENT
APN: 133-050-009-00
“I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”
LRP Signature Date
Jonathan Pike, Project Director
916.445.4626
LRP Name and Title Telephone Number
SWPPP.docx Page ii
SWPPP Certification by Qualified SWPPP Developer (QSD)
Qualified SWPPP Developer (QSD) Certification of the
Project Name: RINCON FIRE STATION FACILITY REPLACEMENT
APN: 133-050-009-00
“I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”
QSD Signature Date
Paul Schneider, P.E., QSD, QSP 209.943.2021
QSD Name and Title Telephone Number
California Registered Professional Civil Engineer C 62498 (QSD #00575)
Type of Registration Registration Number
07/23/21
RINCON FIRE STATION FACILITY REPLACEMENT Section 100 SWPPP.docx Page 100-1
07/22/2021
Section 100 SWPPP Requirements
100.1 Introduction
The proposed Project is located in Pauma. The address is 16971 Highway 76, Pauma Valley, CA 92061.
Please refer to the site and vicinity maps included in Attachment B.
In general, the SWPPP has been prepared to comply with the State of California General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (State Water Resources Control Board Order No. 2009-0009-DWQ, as amended by 2010-0014-DWQ). Please refer to Attachment A for a copy of the General Permit.
More specifically, the SWPPP has been prepared to address the following objectives:
1. All pollutants and their sources, including sources of sediment associated with construction, construction site erosion and all other activities associated with construction activity are controlled;
2. Where not otherwise required to be under a Regional Water Quality Control Board (RWQCB) permit, all non-storm water discharges are identified and either eliminated, controlled, or treated;
3. Site BMPs are effective and result in the reduction or elimination of pollutants in storm water discharges and authorized non-storm water discharges from construction activity to the Best Available Technology/Best Control Technology (BAT/BCT) standard;
4. Calculations and design details as well as BMP controls for site run-on are complete and correct, and
5. Stabilization BMPs installed to reduce or eliminate pollutants after construction are completed.
100.2 Permit Registration Documents (PRDs)
The PRDs were submitted on
The submitted PRDs, copies of which are in Attachment B, include the documents listed below:
1. Notice of Intent (NOI);
2. Risk Assessment (Construction Site Sediment and Receiving Water Risk Determination);
3. Site Map;
4. Annual Fee; and
5. Signed Certification Statement.
100.3 SWPPP Availability and Implementation
SWPPP.docx Page 100-2
The Contractor will ensure that the SWPPP is available at the construction site during working hours while construction is occurring and that the SWPPP is made available upon request by a State or Municipal inspector. Additionally, in the event that the original SWPPP is retained by a crewmember in a construction vehicle and is not currently at the construction site, the Contractor will ensure that current copies of the BMPs and maps and/or drawings are left with the field crew and that the original SWPPP is made available via a request by radio/telephone. The SWPPP will be implemented concurrently with the start of ground disturbing activities.
100.4 SWPPP Amendments
This SWPPP will be amended:
• Whenever there is a change in construction or operations which may affect the discharge of pollutants to surface waters, groundwater(s), or a municipal separate storm sewer system (MS4).
• If any condition of the Permits is violated or the general objective of reducing or eliminating pollutants in storm water discharges has not been achieved. If the RWQCB determines that a Permit violation has occurred, the SWPPP shall be amended and implemented within 14-calendar days after notification by the RWQCB.
• Annually, prior to the defined rainy season.
• When deemed necessary by the Owner/Contractor.
The following items will be included in each amendment:
• Who requested the amendment.
• The location of proposed change.
• The reason for change.
• The original BMP proposed, if any.
• The new BMP proposed.
The amendments for this SWPPP, along with the QSD’s Certification, can be found in Attachment C.
100.5 Retention of Records
The Contractor will maintain a paper or electronic copy of all required records for a minimum of three years from the date generated or date submitted, whichever is last. Records include, but are not limited to, the following items:
SWPPP.docx Page 100-3
1. Site inspections;
2. Compliance certifications;
3. Discharge reports; and
4. Approved SWPPP document and amendments.
These records will be available at the construction site until construction is completed. The Contractor will furnish the Regional Water Quality Control Board (RWQCB), State Water Resources Control Board (SWRCB), or United States Environmental Protection Agency (EPA), within a reasonable time, any requested information to determine the compliance with the General Permit.
100.6 Required Non-Compliance Reporting
If a reportable discharge or other violation of the General Permit occurs, or if the Project receives a written notice of non-compliance, the Contractor will immediately notify the Owner; will properly document the discharge, violation, or notice; and will file a written report to the Owner within 7 days of the discharge, violation, or notice. Corrective measures will be implemented immediately following the discharge, violation, or notice. A sample Notice of Non-Compliance (NONC) form is provided in Attachment D. All discharges will be documented on a Discharge Reporting Log using the example form in Attachment E.
The report to the Owner will contain the following items:
• The date, time, location, nature of operation, and type of unauthorized discharge, including the cause or nature of the notice or order,
• The control measures (BMPs) deployed before the discharge event, or prior to receiving notice or order,
• The date of deployment and type of control measures (BMPs) deployed after the discharge event, or after receiving the notice or order, including additional measures installed or planned to reduce or prevent re-occurrence, and
• An implementation and maintenance schedule for any affected BMPs.
Exceedances and violations will also be reported electronically using the Storm Water Multiple Application and Report Tracking System (SMARTS) within 30 days and include the following:
1. Numeric Action Level (NAL) exceedances (for Risk Level 2);
2. Numeric Effluent Limitation (NEL) Violation Report (for Risk Level 2);
3. Self-reporting of any other discharge violations or to comply with RWQCB enforcement actions; and
4. Discharges which contain a hazardous substance in excess of reportable quantities established in Title 40 of the Code of Federal Regulations (CFR ), §§ 117.3 and 302.4, unless a separate NPDES Permit has been issued to regulate those discharges.
SWPPP.docx Page 100-4
The results of any NAL exceedance site evaluations along with other non-compliance events are included in Attachment F.
100.7 Annual Report
By September 1 of each year, the Contractor will prepare, certify, and electronically submit an Annual Report, in accordance with Section XVI of the General Permit. The Annual Report shall include the following data collection items and reporting elements:
1. Sampling and analysis results including laboratory reports, analytical methods and reporting limits, and chain of custody forms (for Risk Level 2);
2. Corrective actions and compliance activities, including those not implemented;
3. Violations of the General Permit;
4. Date, time, place, and name(s) of the inspector(s) for all sampling, inspections, and field measurement activities;
5. Visual observation and sample collection exception records; and
6. Training documentation of all personnel responsible for General Permit compliance activities.
The Annual Certification of Compliance Form is included in Attachment R.
100.8 Changes to Permit Coverage
Any changes to the submitted permit coverage (e.g. change in Project size, change in Project ownership, or change in Project Risk Level) will be documented. Subsequent revisions to the PRDs, including any applicable recertification of the NOI (in the case of a change in Project Risk Level), will be submitted electronically via SMARTS and will be included in Attachment G.
100.9 Notice of Termination
A Notice of Termination (NOT), along with a final site map and photographs, will be submitted electronically via SMARTS when the construction project is complete and within 90 days of meeting all General Permit requirements for termination and final stabilization. These requirements include the following:
1. The site will not pose any additional sediment discharge risk than it did prior to construction activity;
2. All construction related equipment, materials, and any temporary BMPs no longer needed are removed from the site; and
3. Post-construction storm water management measures are installed and a long-term maintenance plan that is designed for a minimum of five years has been developed.
Additionally, the NOT will demonstrate through photographs, Revised Universal Soil Loss Equation (RUSLE) results, or results of testing and analysis that the Project meets all of the requirements of Section II.D.1 of
SWPPP.docx Page 100-5
07/22/2021 the General Permit by one of the following methods:
A. The 70% final cover method (no computational proof required); or B. The RUSLE/RUSLE2 method (computational proof required); or C. A Custom method where the discharger demonstrates that the Project site complies with final stabilization.
RINCON FIRE STATION FACILITY REPLACEMENT Section 200 SWPPP.docx Page 200-1
07/22/2021
Section 200 Project Information
200.1 Project and Site Description
This project involves the redevelopment of a Cal Fire Fire Station. The site is currently a fire station – Rincon Station 10. Construction activities for this project will involve, clearing and grubbing the site, demolition of existing buildings and utilities, construction of new building structures, parking lot, installing new site utilities, paving, grading, and a stormwater infiltration basin.
The following are estimates of the construction site:
• Construction site area: 2.75 acres
• Percentage impervious area before construction: 47%
• Runoff coefficient before construction: 0.58
• Percentage impervious area after construction: 49.0%
• Runoff coefficient after construction: 0.60
200.2 Storm Water Run-On from Offsite Areas
Minimal storm water run-on is anticipated.
200.3 Sediment and Receiving Water Risk Determination
Based upon the Risk Determination Worksheet included in Attachment B, the Project risk levels are as follows:
• Sediment Risk: Medium
• Receiving Water Risk: Low
• Combined Risk: Level 2
The Sediment Risk was determined by using: (1) the EPA Rainfall Erosivity Calculator to obtain an R Factor value, 75.8, and (2) the GIS Map Method to obtain a K Factor Value = 0.17 and LS Factor = 4.97.
The product of these values, which represents a Watershed Erosion Estimate, is approximately 64.043 tons/acre. Based upon the Risk Determination Worksheet included in Attachment B, Projects with a
SWPPP.docx Page 200-2
07/22/2021
Watershed Erosion Estimate more than 15 tons/acre and less than 75 tons/acre are classified as having a Medium Sediment Risk. Having Low Receiving Water Risk combined with the Medium Sediment Risk puts this project as a Combined Risk of Level 2.
The Receiving Water Risk was determined from answering the following watershed characteristics questions (from the Risk Determination Worksheet included in Attachment B):
2. Does the disturbed area discharge (either directly or indirectly) to a 303(d)-listed waterbody impaired by sediment?
ANSWER: No
3. Does the disturbed area discharge to a waterbody with designated beneficial uses of spawn & cold & migratory?
ANSWER: No
According to the Risk Determination Worksheet included in Attachment B, Projects that can answer “No” to both of the two watershed characteristics questions shown above are classified as having a Low Receiving Water Risk.
As a result, the SWPPP is required to comply with Attachment D (Risk Level 2 Requirements) of the General Permit.
The requirements for preparing and implementing Rain Event Action Plans are provided in Section 400.2.
If needed, refer to Section 100.8 for the requirements for a change in Project Risk Level.
200.4 Construction Schedule
• Estimated Construction Start: 10/01/2021
• Install stabilized construction entrance on: 10/01/2021
• Prepare soil stabilization and sediment control implementation plan prior to rainy season, submit to the Owner by 10/01/2021
• SWPPP measures to be installed between 10/01/2021 and 05/31/2023
• Rough and finished grading between 10/02/2021 and 06/30/2022
• Install temporary concrete washout: 10/01/2021
• Underground wet and dry utilities to be installed between 11/01/2021 and 05/31/2022
• Implement final erosion control of substantially completed areas: 04/30/2023
• Estimated Construction End: 05/31/2023
SWPPP.docx Page 200-3
The Project construction schedule is also included in Attachment H.
200.5 Potential Construction Site Pollutant Sources
The following is a list of construction materials that will be used and activities that will be performed that will have the potential to contribute pollutants, other than sediment, to storm water runoff (control practices for each activity are identified in Sections 300.2 and 300.3:
• Vehicle fluids, including oil, grease, petroleum, and coolants
• Asphaltic emulsions associated with asphalt-concrete paving operations
• Cement materials associated with PCC concrete paving operations and drainage structures
• Base and subbase material
• Joint and curing compounds
• Concrete curing compounds
• Paints
• Solvents, thinners, acids
• Sandblasting materials
• Mortar mix
• Raw landscaping materials and wastes (topsoil, plant material, herbicides, fertilizers, mulch, pesticides)
• BIVIP materials (sandbags, liquid copolymer)
• Treated lumber (materials and waste)
• PCC rubble
• Masonry block rubble
• General lifter
SWPPP.docx Page 200-4
Construction activities that have the potential to contribute sediment to storm water discharges include:
• Clear and grub operations
• Grading operations
• Soil import and/or export operations
• Utility excavation operations
• Landscape operations
Attachment I lists all of the Best Management Practices (BMPs) that have been selected for implementation in this project. Implementation and location of BMPs are shown on the site maps in Attachment B. Narrative descriptions of BMPs to be used during the project are listed by category in each of the following SWPPP sections. Attachment J includes the fact sheets of all BMPs selected for this project.
200.6 Identification of Non-Storm Water Discharges
An inventory of construction activities and potential non-storm water discharges is provided in Section 200.5.
The CASQA BMP Consideration Checklist in Attachment I and the following list indicates the BMPs that have been selected to control non-storm water pollution on the construction site. Implementation and locations of some non-storm water control BMPs are shown on the site maps in Attachment B. A narrative description of each BMP follows.
• NS-1, Water Conservation Practices
• NS-3, Paving and Grinding Operations
• NS-6, Illicit Connection/Illegal Discharge Detection and Reporting
• NS-7, Potable Water/Irrigation
• NS-12, Concrete Curing
• NS-13, Concrete Finishing
RINCON FIRE STATION FACILITY REPLACEMENT Section 300 SWPPP.docx Page 300-1
07/22/2021
Section 300 Best Management Practices
300.1 Schedule for BMP Implementation
BMPs will be implemented, modified, and maintained to reflect the phase of construction and the weather conditions. The schedule for deployment of BMPs is provided in Section 200.4.
300.2 Erosion Control and Sediment Control
Erosion Control Erosion control, also referred to as soil stabilization, consists of source control measures that are designed to prevent soil particles from detaching and becoming transported in storm water runoff. Erosion control BMPs protect the soil surface by covering and/or binding soil particles. This project will incorporate erosion control measures required by the contract documents, and other measures selected by the Contractor. This project will implement the following practices for effective temporary and final erosion control during construction:
1) Preserve existing vegetation where required and when feasible.
2) Apply temporary erosion control to remaining active and non-active areas as required by the
California Stormwater BMPs Handbook - Construction, and the contract documents. Reapply as necessary to maintain effectiveness.
3) Implement temporary erosion control measures at regular intervals throughout the defined rainy season to achieve and maintain the contract’s disturbed soil area requirements. Implement erosion control prior to the defined rainy season.
4) Stabilize non-active areas as soon as feasible after the cessation of construction activities.
5) Control erosion in concentrated flow paths by applying erosion control blankets, erosion control seeding, and lining swales as required in the contract documents.
6) Apply seed to areas deemed substantially complete by the Owner during the defined rainy season.
7) At completion of construction, apply permanent erosion control to all remaining disturbed soil areas.
Sufficient erosion control materials will be maintained on-site to allow implementation in conformance with Permit requirements and described in this SWPPP. This includes implementation requirements for active areas and non-active areas that require deployment before the onset of rain.
Implementation and locations of temporary erosion control BMPs are shown on the site maps in Attachment B and/or described in this section. The CASQA BMP Consideration Checklist in Attachment I indicates the
SWPPP.docx Page 300-2
BMPs that will be implemented to control erosion on the construction site.
• EC-1, Scheduling
• EC-2, Preservation of Existing Vegetation
• EC-3, Hydraulic Mulch
• EC-10, Velocity Dissipation Devices
Sediment Control Sediment controls are structural measures that are intended to complement and enhance the selected erosion control measures and reduce sediment discharges from active construction areas. Sediment controls are designed to intercept and settle out soil particles that have been detached and transported by the force of water. This project will incorporate sediment control measures required by the contract documents, and other measures selected by the Owner/Developer/Contractor.
Sufficient quantities of temporary sediment control materials will be maintained on-site throughout the duration of the project, to allow implementation of temporary sediment controls in the event of predicted rain, and for rapid response to failures or emergencies, in conformance with other Permit requirements and as described in this SWPPP. This includes implementation requirements for active areas and non-active areas before the onset of rain.
Implementation and locations of temporary sediment control BMPs are shown on the site maps in Attachment B. The CASQA BMP Consideration Checklist in Attachment I indicates all of the BMPs that will be implemented to control sediment on the construction site; these are:
• SE-1, Silt Fence
• SE-5, Fiber Rolls
• SE-7, Street Sweeping and Vacuuming
• SE-l0, Storm Drain Inlet Protection
Tracking Control The following BMPs have been selected to reduce sediment tracking from the construction site onto private or public roads:
• TC-l, Stabilized Construction Entrance/ Exit (see detail on plan)
• TC-3, Entrance/Outlet Tire Wash (see detail on plan)
SWPPP.docx Page 300-3
07/22/2021
Wind Erosion Control The following BMPs have been selected to control dust from the construction site:
• WE1, Wind Erosion Control
300.3 Non-Storm Water and Material Management
Non-Storm Water Control An inventory of construction activities and potential non-storm water discharges is provided in Section 200.5.
The CASQA BMP Consideration Checklist in Attachment I and the following list indicates the BMPs that have been selected to control non-storm water pollution on the construction site. Implementation and locations of some non-storm water control BMPs are shown on the site maps in Attachment B. A narrative description of each BMP follows.
• NS-1, Water Conservation Practices
• NS-3, Paving and Grinding Operations
• NS-6, Illicit Connection/Illegal Discharge Detection and Reporting
• NS-7, Potable Water/Irrigation
• NS-12, Concrete Curing
• NS-13, Concrete Finishing
Material Management Control An inventory of construction activities, materials, and wastes is provided in Section 200.5. The CASQA BMP Consideration Checklist in Attachment I and the following list indicates the BMP’s that have been selected to handle materials and control construction site wastes. A narrative description of each BMP follows.
• WM-1, Material Delivery and Storage
• WM-2, Material Use
• WM-3, Stockpile Management
• WM-4, Spill Prevention and Control
• WM-5, Solid Waste Management
• WM-6, Hazardous Waste Management
SWPPP.docx Page 300-4
• WM-8, Concrete Waste Management
• WM-9, Sanitary/Septic Waste Management
300.4 Post-Construction Storm Water Management Measures
The following is the post-construction BMP that is to be used at this construction site after all construction is complete:
• A rock-lined swale draining to a stormwater infiltration basin is proposed to treat captured stormwater runoff.
The location of the post-construction BMP is shown on the Erosion Control Plan in Attachment B.
RINCON FIRE STATION FACILITY REPLACEMENT Section 400 SWPPP.docx Page 400-1
07/22/2021
Section 400 BMP Inspection, Maintenance, and Rain Event Action Plans
As indicated in Section 100, the Project Combined Risk is Level 1. As a result, a Rain Event Action Plan is not required. This section (Section 400, BMP Inspection, Maintenance, and Rain Event Action Plans) is only required as part of a Combined Risk Level 2 project.
400.1 BMP Inspection and Maintenance
Inspections will be conducted as follows:
• On a weekly basis prior to a forecast storm;
• After a rain event that causes runoff from the construction site;
• At 24-hour intervals during a rain event; and
• At any other time(s) or intervals of time specified in the contract documents
Completed inspection checklists will be submitted to the Owner within 24 hours of inspection. Copies of the completed checklists will be kept on-site with the SWPPP. Inspections will include the following information:
1. The date of inspection;
2. Weather information;
3. Site Information;
4. Observations;
5. Descriptions of the inspected BMPs and any deficiencies;
6. The corrective actions that were taken; and
7. The name, title, and signature of the inspector.
A tracking or follow-up procedure will follow any inspection that identifies deficiencies in BMPs; corrective actions will begin to be implemented within 72 hours. A program for Maintenance, Inspection and Repair of BMPs is shown in Attachment L.
400.2 Rain Event Action Plans
The Qualified SWPPP Practitioner (QSP) will develop a Rain Event Action Plan (REAP) 48-hours in advance of any precipitation event forecast to have a 50% or greater chance of producing precipitation in the project area. The REAP will be maintained on-site and will be implemented 24 hours in advance of any predicted precipitation event.
The REAP will be designed to protect all exposed portions of project sites and to ensure that the discharger has adequate materials, staff, and time to implement erosion and sediment control measures that are
RINCON FIRE STATION FACILITY REPLACEMENT Section 400 SWPPP.docx Page 400-2
07/22/2021 intended to reduce the amount of sediment and other pollutants that could be generated during the rain event.
At minimum, the REAP will include the following site and phase-specific information:
1. Site Address;
2. Calculated Risk Level (2 or 3);
3. Site Stormwater Manager Information including the name, company, and 24-hour emergency telephone number;
4. Erosion and Sediment Control Provider information including the name, company, and 24-hour emergency telephone number;
5. Stormwater Sampling Agent information including the name, company, and 24-hour emergency telephone number;
6. Activities associated with each construction phase;
7. Trades active on the construction site during each construction phase;
8. Trade contractor information; and
9. Suggested actions for each project phase.
A site-specific REAP template is provided in Attachment M.
RINCON FIRE STATION FACILITY REPLACEMENT Section 500 SWPPP.docx Page 500-1
07/22/2021
Section 500 Training
All elements of the SWPPP were prepared by a QSD and will be implemented by a QSP.
Section 600.1 shows the name of the QSP. This person has received the required training:
• Contact TBD (TBD #TBD) at TBD for a resume of training.
The training log showing formal and informal training of various Contractor personnel is shown in Attachment N.
RINCON FIRE STATION FACILITY REPLACEMENT Section 600 SWPPP.docx Page 600-1
07/22/2021
Section 600 Responsible Parties and Operators
600.1 Responsible Parties
The Legally Responsible Person (LRP) for this Project is:
JONATHAN PIKE
916.445.4626 California Department of Forestry & Fire Protection 1131 S Street Sacramento, CA 95818
The Qualified SWPPP Developer (QSD) assigned to this Project is:
PAUL SCHNEIDER, P.E. (QSD #00575)
209.943.2021 Siegfried Engineering, Inc.
3428 Brookside Road Stockton, CA 95219
The Qualified SWPPP Practitioner (QSP) assigned to this Project is:
TBD (TBD #TBD)
TBD
TBD
TBD
TBD
The QSP shall have primary responsibility and significant authority for the implementation, maintenance, inspection and amendments to the approved SWPPP. The QSP will be available at all times throughout the duration of the project. Duties of the QSP include but are not limited to:
• Ensuring full compliance with the SWPPP and the Permit
• Implementing all elements of the SWPPP, including but not limited to:
- Implementation of prompt and effective erosion and sediment control measures.
- Implementing all non-storm water management, and materials and waste management activities such as: monitoring discharges (dewatering, diversion devices); general site clean-up; vehicle
RINCON FIRE STATION FACILITY REPLACEMENT Section 600 SWPPP.docx Page 600-2
07/22/2021 and equipment cleaning, fueling and maintenance; spill control; ensuring that no materials other than storm water are discharged in quantities which will have an adverse effect on receiving waters or storm drain systems; etc.
• Pre-storm inspections
• Storm event inspections
• Post-storm inspections
• Routine inspections as specified in the project’s specifications or described in the SWPPP
• Preparing a REAP for each phase of the Project, if determined to be necessary as a result of a change in the Project Combined Risk Level
• Preparing annual compliance certification
• Ensuring elimination of all unauthorized discharges
• The QSP shall be assigned authority by the Owner/Developer/Contractor to mobilize crews in order to make immediate repairs to the control measures
• Coordinate with the Owner/Developer/Contractor to assure all of the necessary corrections/repairs are made immediately, and that the project complies with the SWPPP, the Permit and approved plans at all times
• Submitting Notices of Discharge and reports of Illicit Connections or Illegal Discharges
A copy of all written agreements or other mechanisms that provides authority from the LRP to sign permit-related documents will be included in Attachment O.
600.2 Contractor List
All contractors, subcontractors, and individuals who will be directed by the QSP will be notified of the requirement for storm water management measures during the project. A list of their names will be maintained on-site. This list will include telephone numbers, work addresses, the specific areas of responsibility of each subcontractor, and emergency contact numbers. If subcontractors change during the project, the list will be updated accordingly.
A sample subcontractor notification letter and log is included in the SWPPP as Attachment P.
RINCON FIRE STATION FACILITY REPLACEMENT Section 700 SWPPP.docx Page 700-1
07/22/2021
Section 700 Construction Site Monitoring Program
700.1 Visual Monitoring (Inspections)
The Contractor will visually monitor and inspect the site according to the following schedule:
Type of Monitoring Frequency
Non-Storm Water Inspection Quarterly for each drainage area.
Qualifying rain event:
Pre-rain inspection
All drainage areas, BMPs, and storm water containments within two business days prior to each predicted qualifying rain event.
Qualifying rain event:
Post-rain inspection
All discharge locations within two business days after each qualifying rain event.
Visually observe discharge of contained storm water when discharged.
During rain inspection Weekly and every 24 hours during extended storm events.
BMP Weekly and every 24 hours during extended storm events.
A qualifying rain event is any precipitation event forecast that has a 50% or greater chance of producing precipitation in the Project area. Likely precipitation events can be determined by the National Oceanic and Atmospheric Administration (NOAA) National Weather Service website.
The results of all inspections and assessments will be documented, a copy will be provided to the Owner within 24 hours of the inspection, and copies of the completed inspection checklists will be maintained on-site with the SWPPP. Site inspections conducted for monitoring purposes will be performed using the inspection checklist provided in Attachment K. A sample Visual Inspection Field Log Sheet is provided in Attachment Q.
The name and contact number of the assigned inspector is listed below:
Assigned inspector: TBD, TBD Contact phone: TBD
700.2 Water Quality Sampling and Analysis
The Contractor will conduct water quality sampling and analysis according to the following schedule:
Type of Monitoring Frequency
Non-visible pollutants:
spill/BMP failure based on pollutant source assessment
Within first two hours of discharge from site.
Collect samples of runoff affected by the spilled or released
SWPPP.docx Page 700-2
07/22/2021 material(s) and runoff unaffected by the spilled or released material(s).
Contained rain water At time of discharge.
Non-storm water At locations where discharged off the site.
Particle size When sediment basins are used.
If needed to justify site specific sediment risk using RUSLE.
700.3 Sample Collection and Handling
700.3.1 Sample Collection Preparation
Prior to the rainy season, all sampling personnel and alternates will review the Construction Site Monitoring Program. Qualifications of designated Contractor personnel describing environmental sampling training and experience are provided in Attachment N.
An adequate stock of supplies and equipment for monitoring will be available on the Project site or provided by the pre-approved laboratory prior to a sampling event. Monitoring supplies and equipment will be stored in a cool-temperature environment that will not come into contact with rain or direct sunlight. Sampling personnel will be available to collect samples in accordance will the sampling schedule.
Supplies maintained at the project site will include, but will not be limited to, surgical gloves, sample collection equipment, coolers, appropriate number and volume of sample bottles, identification labels, re-sealable storage bags, paper towels, personal rain gear, ice, Sampling Activity Log forms, and Chain of Custody (COC) forms (for Risk Level 2). The Contractor will obtain and maintain the field-testing instruments, as identified in Section 700.3.5, for analyzing samples in the field by Contractor sampling personnel.
Samples on the project site will be collected by the following or another pre-approved laboratory;
Alpha Analytical Laboratories, Inc 2722 Loker Avenue, West Suite A Carlsbad, CA 92010 760.930.2555
The chosen laboratory will obtain and maintain the field-testing instruments, as identified in Section 700.3.5, for analyzing samples in the field by their sampling personnel.
700.3.2 Sample Collection Procedures
Grab samples will be collected, preserved, and shipped in accordance with the Surface Water Ambient Monitoring Program (SWAMP) 2008 Quality Assurance Program Plan (QAPrP). Only personnel trained in proper water quality sampling will collect samples.
SWPPP.docx Page 700-3
07/22/2021
Upstream samples will be collected to represent the condition of the water body upgradient of the construction site. Downstream samples will be collected to represent the water body mixed with direct flow from the construction site. Samples will not be collected directly from ponded, sluggish, or stagnant water.
Upstream and downstream samples will be collected using one of the following methods:
• Placing a sample bottle directly into the stream flow in or near the main current upstream of sampling personnel, and allowing the sample bottle to fill completely;
OR,
• Placing a decontaminated or ‘sterile’ bailer or other ‘sterile’ collection device in or near the main current to collect the sample, and then transferring the collected water to appropriate sample bottles, allowing the sample bottles to fill completely.
Run-on samples, if applicable, will be collected to identify potential sedimentation/siltation and/or turbidity that originates off the project site and contributes to direct discharges from the construction site to the 303(d) listed water body. Run-on samples will be collected downgradient and within close proximity of the point of run-on to the project by pooling or ponding water and allowing the ponded water to spill over into sample bottles directly in the stream of water.
To maintain sample integrity and prevent cross-contamination, sampling collection personnel will:
• Wear a clean pair of surgical gloves prior to the collection and handling of each sample at each location.
• Use laboratory-provided sample containers (for laboratory analysis samples).
• Never sample near a running vehicle.
• Not park vehicles in the immediate sample collection area (even non-running vehicles).
• Not contaminate the inside of the sample bottle by not allowing it to come into contact with any material other than the water sample.
• Discard sample bottles or sample lids that have been dropped onto the ground prior to sample collection.
• Not leave the cooler lid open for an extended period of time once samples are placed inside.
• Not touch the exposed end of a sampling tube, if applicable.
• Avoid allowing rainwater to drip from rain gear or other surfaces into sample bottles.
SWPPP.docx Page 700-4
07/22/2021
• Not eat, smoke, or drink during sample collection.
• Not breathe, sneeze, or cough in the direction of an open sample bottle or container.
• Minimize the exposure of the samples to direct sunlight, as sunlight may cause biochemical transformation of the sample to take place.
• Decontaminate sampling equipment prior to sample collection using a TSP-soapy water wash, distilled water rinse, and final rinse with distilled water.
• Dispose of decontamination water/soaps appropriately; i.e., not discharge to the storm drain system or receiving water.
700.3.3 Sample Handling Procedures
Immediately following collection, sample bottles for laboratory analytical testing will be capped, labeled, documented on a Chain of Custody (COC) form provided by the analytical laboratory, sealed in a re-sealable plastic storage bag, placed in an ice-chilled cooler, at as near to 4 degrees Celsius as practicable, and delivered within 24 hours to the following California state-certified laboratory:
Laboratory Name: Alpha Analytical Laboratories, Inc
Address: 2722 Loker Avenue, West Suite A, Carlsbad, CA 92010
Telephone Number: 760.930.2555
Immediately following collection, samples for field analysis will be tested in accordance with the field instrument manufacturer’s instructions and results recorded on the Visual Inspection Field Log Sheet in Attachment Q.
700.3.4 Sample Documentation Procedures
All original data documented on sample bottle identification labels, Chain of Custody forms, Visual Inspection Field Log Sheets, and Inspection Checklists will be recorded using waterproof ink. These will be considered accountable documents. If an error is made on an accountable document, the individual will make corrections by lining through the error and entering the correct information. The erroneous information will not be obliterated. All corrections will be initialed and dated. Copies of the Visual Inspection Field Log Sheet and Chain of Custody form are provided in Attachment Q. Sampling and field analysis activities will be documented using the following:
• Sample Bottle Identification Labels: Sampling personnel will attach an identification label to each sample bottle. At a minimum, the following information will be recorded on the label, as appropriate:
— Project name
SWPPP.docx Page 700-5
— Project number
— Unique sample identification number and location [Project Number]-[Six digit sample collection date]-[Location] (Example: 0G5304-081801-Upstream)
Quality assurance/quality control (QA/QC) samples shall be identified similarly using a unique sample number or designation (Example: 0G5304-081801-DUP1)
— Collection date/time (No time applied to QA/QC samples)
— Analysis constituent
• Sampling Activity Logs: A log of sampling events will identify:
— Sampling date
— Separate times for sample collection of upstream, downstream, run-on, and QA/QC samples recorded to the nearest minute
— Unique sample identification number and location
— Analysis constituent
— Names of sampling personnel
— Weather conditions (including precipitation amount)
— Field analysis results
— Other pertinent data
• Chain of Custody (COC) forms: All samples to be analyzed by a laboratory will be accompanied by a COC form provided by the laboratory. Only the sample collectors will sign the COC form over to the lab. COC procedures will be strictly adhered to for QA/QC purposes.
• Storm Water Quality Construction Inspection Checklists: When applicable, the Contractor’s storm water inspector will document on the checklist that samples for sedimentation/siltation and/or turbidity were taken during a rain event.
700.3.5 Sample Analysis
All laboratory analyses will be conducted in accordance with the analytical procedures specified in 40 Code of Federal Regulations (CFR) Part 136, unless other analytical procedures have been specified in the General
SWPPP.docx Page 700-6
07/22/2021
Permit or by the RWQCB.
For samples collected for field analysis, collection, analysis and equipment calibration will be in accordance with the field instrument manufacturer’s specifications.
The following field instrument(s) will be used to analyze the following constituents:
Field Instrument Constituent
• The instrument(s) will be maintained in accordance with manufacturer’s instructions.
• The instrument(s) will be calibrated before each sampling and analysis event.
• Maintenance and calibration records will be maintained on-site with the SWPPP.
A list of potential non-visible pollutants commonly associated with construction activities is shown below:
Activity Potential Pollutant Source Laboratory Analysis
Water line flushing Chlorinated water Residual chlorine
Portable toilets Bacteria, disinfection Total/fecal coliform
Concrete & Masonry Acid Wash
Curing compounds
Concrete rinse water pH pH, alkalinity, Volatile organics compounds (VOCs) pH
Painting Resins
Thinners
Paint strippers
Solvents
Adhesives
Sealants
Semi-volatile organic compounds (SVOCs)
Phenols, VOCs
VOCs
Phenols, VOCs
Phenols, SVOCs
SVOCs
SWPPP.docx Page 700-7
07/22/2021
Cleaning Detergents
Bleaches
Solvents
Methylene Blue Activated Substances (MBAS), phosphates
Residual chlorine
VOCs
Landscaping Pesticides/Herbicides
Fertilizers
Lime and gypsum
Aluminum sulfate, sulfur
Check with analytical laboratory
NO3/NH3/P
Acidity/al…
This is the start of the file's text. The full file is on GovTribe.