Imperial County, Los Angeles County, Riverside County, San Diego County, Imperial City, East Los Angeles CDP, Glendale City, Lake Los Angeles CDP, Los Angeles City, Lake Riverside CDP, Riverside City, Imperial Beach City, Rancho San Diego CDP, San Diego City, San Diego Country Estates CDP, California

About this file

This document is a set of technical specifications prepared by Geocon West, Inc. for the California Department of General Services regarding the demolition of the Rincon Forest Fire Station located in Pauma Valley, California. The specifications outline the procedures for the removal and disposal of regulated asbestos-containing materials (RACM), deteriorated lead-containing paint (LCP), and universal wastes from the six structures at the site. The RACM materials include approximately 250 square feet of nonfriable cementitious exterior tiles, and 3,500 square feet of nonfriable floor tile systems. The specifications detail the contractor submittals, worker training requirements, worker protection measures, work procedures for the asbestos, lead, and universal waste abatement, as well as the waste disposal requirements.

The document does not include pricing information, set-asides, incumbent contractors, funding sources, or other commercial terms. It focuses solely on the technical requirements for the abatement and disposal of the hazardous materials prior to the demolition of the fire station.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

ASBESTOS, LEAD-CONTAINING PAINT,

AND UNIVERSAL WASTE DEMOLITION

CALIFORNIA DEPARTMENT OF

GENERAL SERVICES

DEMOLITION PROJECT

RINCON FOREST FIRE STATION

16971 HGHWAY 76

PAUMA VALLEY, SAN DIEGO COUNTY,

CALIFORNIA

PREPARED BY:

GEOCON WEST, INC.

3303 N. SAN FERNANDO BLVD.

SUITE 100

BURBANK, CA 91504

PROJECT NO. A8575-06-21

JULY 28, 2017

Attachment 6 #9TSC0105 Rincon Fire Station Replacment-General Contractor

CAL FIRE

Project No. A8575-06-21 July 28, 2017

Daniel P. O’Brien Senior Environmental Planner Department of General Services/RESD 707 3rd Street, Suite 4-430 West Sacramento, California 95605

Subject: ASBESTOS, LEAD-CONTAINING PAINT, AND UNIVERSAL WASTE

DEMOLITION TECHNICAL SPECIFICATIONS

CALIFORNIA DEPARTMENT OF GENERAL SERVICES

RINCON FOREST FIRE STATION

16971 HIGHWAY 76

PAUMA VALLEY, SAN DIEGO COUNTY, CALIFORNIA

Dear Mr. O’Brien:

Geocon is pleased to provide technical specifications for: 1) the removal of regulated asbestos-containing materials (RACM) and deteriorated (peeling/flaking) lead-containing paint (LCP); 2) the handling of universal wastes; and 3) the disturbance of intact LCP during demolition activities at the subject site (Site).

These specifications were prepared by Mr. David Watts. Mr. Watts is a California Occupational Safety and Health Administration (Cal/OSHA) Certified Asbestos Consultant (CAC), certification No. 98-2404 (expiration September 16, 2018), and a Certified Lead Paint Inspector/Assessor and Project Monitor with the California Department of Public Health (DPH), certification numbers I-1734 and M-1734 (expiration December 4, 2017).

Please contact us if you would Geocon to provide a quote for abatement oversight and perimeter air monitoring.

Please contact us if you have questions.

Sincerely, GEOCON WEST, INC.

David Watts, CAC No. 98-2404 Gerald Kasman, CEG Senior Scientist Contract Manager

(EMAIL) Addressee

TABLE OF CONTENTS

ASBESTOS, LEAD-CONTAINING PAINT, AND UNIVERSAL WASTE DEMOLITION

TECHNICAL SPECIFICATIONS

PAGE

1.0 INTRODUCTION

1.1 Site Description

1.2 Objective

1.3 Background

1.4 Applicable Regulations

1.4.1 Asbestos

1.4.2 Lead

1.4.3 Universal Waste

2.0 SCOPE OF SERVICES

2.1 Asbestos

2.2 Lead

2.3 Universal Waste

3.0 CONTRACTOR SUBMITTALS

3.1 Asbestos

3.2 Lead

3.3 Universal Waste

4.0 WORKER TRAINING

4.1 Asbestos

4.2 Lead

5.0 WORKER PROTECTION

5.1 Asbestos

5.2 Lead

5.3 Universal Waste

6.0 WORK PROCEDURES

6.1 Asbestos

6.1.1 Regulated Area

6.1.2 Cal/OSHA Class II ACM/RACM Removal

6.1.3 Decontamination

6.2 Lead

6.2.1 Containment

6.2.2 Decontamination

6.2.3 Deteriorated LCP Removal

6.2.4 Removal of Architectural Components Coated with Intact LCP

6.3 Universal Waste

6.3.1 Work Area

6.3.2 Decontamination

7.0 WASTE DISPOSAL

7.1 Asbestos

7.2 Lead

7.3 Universal Waste

TABLE OF CONTENTS (continued)

FIGURES

1. Vicinity Map 2-4. Site Plans

SITE PHOTOGRAPHS (1 through 24)

TABLES

1. Summary of Analytical Laboratory Test Results – Asbestos

2. Summary of Analytical Laboratory Test Results – Paint

3. Universal Waste

Geocon Project No. A8575-06-21 -1- July 28, 2017

1.0 INTRODUCTION

1.1 Site Description

The project consists of six structures at the Rincon Forest Fire Station located at 16971 Highway

76 in Pauma Valley, California. The Site is depicted on the Vicinity Map (Figure 1), Site Plans

(Figures 2 through 4), and in the Site Photographs.

1.2 Objective

The work procedures and requirements described herein are provided for: 1) the removal of regulated asbestos-containing materials (RACM – i.e., cementitious exterior tiles) and deteriorated (peeling/flaking) lead-containing paint (LCP); 2) the handling of universal wastes; and 3) the disturbance of intact LCP during demolition activities at the Site.

1.3 Background

Geocon completed an asbestos, LCP, and universal waste survey of the Site on June 27, 2017.

The findings are presented in Geocon’s Asbestos, Lead-Containing Paint, and Universal Waste Survey

Report, dated July 28, 2017.

Chrysotile asbestos at concentrations greater than 1% was identified in the following materials used in the barracks/mess hall/garage:

Approximately 250 square feet of nonfriable cementitious exterior tiles (RACM); and

Approximately 3,500 square feet of nonfriable floor tile systems (non-RACM).

Asbestos sample group identification numbers, material descriptions, locations, approximate quantities, friability assessments, and photo references are summarized in Table 1. Sample locations are presented on the Site Plans.

Samples representing suspect LCP sampled during our survey exhibited total lead concentrations ranging from less than (<) 4.4 to 150,000 milligrams per kilogram (mg/kg). Additional composite analysis of seven samples with total lead concentrations greater than 1,000 mg/kg exhibited a representative Toxicity

Characteristic Leaching Procedure (TCLP) lead concentration of 110 milligrams per liter (mg/l). Lead is assumed to be present in all paints at the Site.

Deteriorated white LCP identified on the garage interior (approximately 20 square feet) and the shed electrical panel (approximately 40 square feet) would be considered a California and Federal hazardous waste based on lead content. As such, the deteriorated paints must be removed and disposed of prior to demolition.

Geocon Project No. A8575-06-21 -2- July 28, 2017

Paint sample identification numbers, paint descriptions, locations, approximate peeling/flaking quantities, and photo reference are summarized in Table 2. Sample locations are presented on the Site Plan, Figure 2.

Fuel tanks (liquid and propane) were observed at the Site. A total of approximately 26 fluorescent and sodium lighting fixtures were observed in the barracks/mess hall/garage, exterior areas, and hose rack.

Various household chemicals (lubricants, solvents, refrigerants, cleansers, paints, etc.) were observed in the

Barracks/mess hall/garage and shed. An inventory of observed universal wastes and suspect hazardous materials is presented in Table 3.

1.4 Applicable Regulations

1.4.1 Asbestos

Contractors performing asbestos-related work activities necessary to facilitate building demolition are required to comply with the following regulations:

San Diego County Air Pollution Control District (SDCAPCD), Rule 361.145;

United States Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAP) Asbestos Regulation (Title 40 CFR Part 61, Subpart M);

Cal/OSHA asbestos standard for the construction industry contained in Title 8 of the California Code of Regulations (Title 8, CCR, § 1529);

General Industry Safety Orders (GISO) for Asbestos (Title 8, CCR, § 5208);

Registration for Asbestos-Related Work (Title 8, CCR, §§341.6 through 341.14);

Respiratory Protective Equipment Standard (Title 8, CCR, §5144);

Hazard Communication Standard (Title 8, CCR, §5194);

Injury and Illness Prevention Program (Title 8, CCR, § 3203);

Safety Instruction for Employees (Title 8, CCR, §1510);

Access to Employee Exposure and Medical Records (Title 8, CCR, §3204);

Construction Safety Orders (Title 8, CCR, Chapter 4, Subchapter 4);

United States Department of Transportation (US DOT), Title 49 of the Code of Federal Regulations (CFR), Parts 171 through 180; and

California Department of Toxic Substances Control (DTSC) hazardous waste regulations contained in Title 22, CCR, Division 4, Chapter 30.

Removal of RACM and activities performed in conjunction with demolition of non-RACM flooring will disturb asbestos with the potential to result in worker exposure to airborne asbestos fibers.

The General Contractor and sub-contractors, hereafter collectively referred to as the “Contractor,” shall take necessary precautions to prevent or minimize the release of asbestos fibers into the air or into surrounding environments. The Contractor shall inform all workers and supervisory personnel who will be at the Site of the potential hazards of asbestos and of necessary precautions and housekeeping procedures to reduce the potential for exposure in areas where asbestos is known to be present.

Geocon Project No. A8575-06-21 -3- July 28, 2017

The Contractor shall be responsible for compliance with the Cal/OSHA asbestos standard as contained in Title 8, CCR, §1529. This regulation establishes requirements, including initial personal air monitoring, whenever any information, observation, or calculation indicates potential employee exposure to asbestos. If eight-hour time-weighted average (TWA) exposures exceed the permissible exposure limit (PEL) of 0.1 fibers per cubic centimeter (f/cc) of air, the Contractor shall stop work and implement more stringent and additional requirements, such as engineering controls and increased respiratory protection in asbestos work areas. The Contractor shall also perform Cal/OSHA pre-job notification as required in Title 8, CCR, §341.9.

The requirements specified in this document pertaining to training, medical surveillance, hygiene facilities, containment, methods of compliance, etc. are based on the presumption that the Contractor, through the use of work practice controls, will be able to maintain exposures to airborne asbestos fibers below the Cal/OSHA worker 8-hour TWA PEL of 0.1 f/cc and the 30-minute excursion limit of 1 f/cc.

The Contractor shall possess negative exposure assessments (NEAs) for similar work performed within the past 12 months, or perform initial personal air monitoring.

If worker exposures are found to exceed the Cal/OSHA worker 8-hour TWA PEL or the 30-minute excursion limit, work shall cease and work methods shall be revised.

1.4.2 Lead

Contractors performing lead-related work activities necessary to facilitate demolition are required to comply with the following regulations:

Cal/OSHA lead standard for the construction industry contained in Title 8, CCR, §1532.1;

California DPH lead regulations contained in Title 17, CCR, Division 1, Chapter 8;

Because this is not a lead abatement project designed to reduce lead hazards for a public or residential building, the only DPH regulatory (Title 17) condition that applies to the demolition work is the requirement for use of containment as defined in the United States Environmental Protection Agency (USEPA) Department of Housing and Urban Development (HUD) “Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing.”

Respiratory Protective Equipment Standard (Title 8, CCR, §5144);

Hazard Communication Standard (Title 8, CCR, §5194);

Injury and Illness Prevention Program (Title 8, CCR, §3203);

Safety Instruction for Employees (Title 8, CCR, §1510);

Access to Employee Exposure and Medical Records (Title 8, CCR, §3204);

Construction Safety Orders (Title 8, CCR, Chapter 4, Subchapter 4);

US DOT, Title 49 CFR, Parts 171 through 180; and

California DTSC hazardous waste regulations contained in Title 22, CCR, Division 4, Chapter 30.

Geocon Project No. A8575-06-21 -4- July 28, 2017

Deteriorated LCP removal and other activities performed in conjunction with demolition will disturb

LCP with the potential to result in worker exposure to airborne lead. The Contractor and shall take necessary precautions to prevent or minimize the release of lead in the form of dust, fumes, or mists from

LCP into the air or into surrounding environments. The Contractor shall inform all workers and supervisory personnel who will be at the Site of the potential hazards of lead and of necessary precautions and housekeeping procedures to reduce the potential for exposure in areas where lead is known or suspected/assumed to be present.

The Contractor shall be responsible for compliance with the Cal/OSHA lead standard as contained in

Title 8, CCR, §1532.1. In addition to Cal/OSHA pre-job notification requirements, this regulation establishes other requirements, including initial personal air monitoring, whenever any information, observation, or calculation indicates potential employee exposure to lead. If 8-hour TWA exposures exceed the action level of 30 micrograms of lead per cubic meter (g/m3) of air, the Contractor must continue to conduct periodic air monitoring at specified intervals, institute medical surveillance, and initiate a comprehensive training program. If the Cal/OSHA 8-hour TWA PEL of 50 g/m3 is exceeded, more stringent and additional requirements become effective, such as engineering controls, increased respiratory protection, regulated work areas, and warning signs in lead work areas, in addition to

California DPH lead-related construction certification for all workers and supervisors disturbing lead.

The requirements specified in this document pertaining to training, medical surveillance, hygiene facilities, containment, methods of compliance, etc. are based on the presumption that the Contractor, through the use of work practice controls, will be able to maintain worker 8-hour TWA exposures to airborne lead below the Cal/OSHA action level of 30 g/m3. The Contractor shall provide respiratory protection and perform initial personal air monitoring for workers performing “trigger tasks” as defined in Title 8, CCR, §1532.1(d). If worker exposures are found to exceed the action level, additional and more stringent requirements will become effective as detailed in the Cal/OSHA lead-in-construction standard. Work shall cease and work methods shall be revised to reflect those requirements in the event that employee exposures exceed the action level. Respiratory protection shall be required until airborne lead levels are demonstrated to be below the Cal/OSHA action level.

Geocon Project No. A8575-06-21 -5- July 28, 2017

1.4.3 Universal Waste

Contractors performing universal waste and potential hazardous materials removal activities necessary to facilitate building demolition are required to comply with the following regulations:

California Universal Waste Rule (Title 22, CCR, Division 4.5, Chapter 23);

The Toxic Substances Control Act (TSCA);

Respiratory Protective Equipment Standard (Title 8, CCR, §5144);

Hazard Communication Standard (Title 8, CCR, §5194);

Injury and Illness Prevention Program (Title 8, CCR, §3203);

Safety Instruction for Employees (Title 8, CCR, §1510);

Access to Employee Exposure and Medical Records (Title 8, CCR, §3204);

Construction Safety Orders (Title 8, CCR, Chapter 4, Subchapter 4);

US DOT, Title 49 CFR, Parts 171 through 180; and

California DTSC hazardous waste regulations contained in Title 22, CCR, Division 4, Chapter 30.

2.0 SCOPE OF SERVICES

Demolition shall include verifying the isolation of utilities, removing and disposing of RACM and deteriorated LCP, demolition of structures coated with LCP, and management of universal waste as necessary to facilitate demolition. Demolition shall be performed in an orderly manner. Waste material shall be disposed of as provided in Sections 6 and 7.

2.1 Asbestos

The primary scope of asbestos-related work for the Contractor covered by the requirements of this specification includes the following:

Removing cementitious exterior tile (RACM) from the Site prior to demolition;

Demolition with ACM floor tile systems left in place;

Segregating and characterizing waste streams; and

Ensuring proper waste handling and disposal.

2.2 Lead

The primary scope of lead-related work for the Contractor covered by the requirements of this specification includes the following:

Removing deteriorated (peeling/flaking) LCP at the Site;

Demolishing structural components coated with intact LCP;

Segregating and characterizing waste streams; and

Ensuring proper waste handling and disposal.

Geocon Project No. A8575-06-21 -6- July 28, 2017

2.3 Universal Waste

The primary scope of universal waste-related work for the Contractor covered by the requirements of this specification includes the following:

Removing universal waste and potential hazardous materials from the Site;

Segregating waste streams; and

Ensuring proper waste recycling, handling, and disposal.

3.0 CONTRACTOR SUBMITTALS

3.1 Asbestos

The Contractor shall provide the following submittals in connection with asbestos-related work on this project:

The Contractor’s current Contractors' State License Board (CSLB) number;

Copies of the certificates of registration with Cal/OSHA to perform demolition and asbestos-related work;

A copy of the SDCAPCD notification for the demolition;

A copy of the written Cal/OSHA pre-job asbestos notification in accordance with Title 8, CCR, §341.9;

Documentation to demonstrate competency of Contractor's onsite competent/certified supervisory person as defined by Title 8, CCR, §1529(b) (see Section 4);

Evidence of training of workers as required by Title 8, CCR, §1529(k)(9) (see Section 4);

Evidence that at least one field team member has been trained in first aid and cardiopulmonary resuscitation (FA/CPR) and holds a current card;

Documentation of eight-hour TWA PEL and 30-minute excursion limit NEAs for similar work performed within the past twelve months (if the Contractor is going to use NEAs for asbestos-related work); and

If applicable, a copy of a letter of city or county approval authorizing the discharge of filtered wastewater at the Site (water filtered through a minimum of a 5-micron pore size final filter prior to discharge).

The Contractor shall provide these submittals to the Department of General Services (DGS) or their designated representative not less than three working days prior to the start of asbestos-related fieldwork.

During the project, the Contractor shall provide copies of personal asbestos exposure results to the

DGS or their designated representative within 72 hours of sample collection. The Contractor shall also provide copies of waste characterization/waste disposal documentation to the DGS or their designated representative within ten working days of the removal of asbestos waste from the Site.

Geocon Project No. A8575-06-21 -7- July 28, 2017

3.2 Lead

The Contractor shall provide the following submittals in connection with lead-related work on this project:

The Contractor’s current CSLB number;

A copy of the written Cal/OSHA pre-job lead notification in accordance with Title 8, CCR, §1532.1(p);

Documentation of DPH lead-related construction certification for the Contractor’s supervisor (see Section 4);

Evidence of worker training (see Section 4);

Evidence that at least one field team member has been trained in FA/CPR and holds a current card;

and

If applicable, a copy of a letter of city or county approval authorizing the discharge of filtered wastewater at the Site (water filtered through a minimum of a 5-micron pore size final filter prior to discharge).

The Contractor shall provide these submittals to the DGS or their designated representative not less than three working days prior to the start of lead-related fieldwork. During the project, the Contractor shall provide copies of personal lead exposure air monitoring results to the DGS or their designated representative within 72 hours of sample collection. The Contractor shall also provide copies of waste characterization/waste disposal documentation to the DGS or their designated representative within ten working days of the removal of lead waste from the Site.

3.3 Universal Waste

The Contractor shall provide the following submittals in connection with universal waste removal work, if required, on this project:

The Contractor’s current CSLB number; and

Evidence that at least one field team member has been trained in FA/CPR and holds a current card.

The Contractor shall provide these submittals to the DGS or their designated representative not less than three working days prior to the start of universal waste removal fieldwork. The Contractor shall also provide copies of any waste characterization/waste disposal documentation to the DGS or their designated representative within ten working days of the removal of universal waste from the Site.

Geocon Project No. A8575-06-21 -8- July 28, 2017

4.0 WORKER TRAINING

4.1 Asbestos

The Contractor shall designate a certified supervisor/competent person to perform and supervise the duties specified under Title 8, CCR, §1529(e)(2)(D). Such competent personnel shall meet the qualifications described in Title 8, CCR, §1529(b) and (e)(2)(E), and shall have successfully completed an EPA-accredited Contractor/Supervisor course.

Training of employees performing asbestos-disturbing work shall meet the requirements outlined in Title

8, CCR, §1529(k)(9)(C). Evidence of participation in a training program shall be provided for each employee performing asbestos-disturbing work. For newly assigned employees, training documentation must be submitted before they begin asbestos-disturbing work. Each worker performing asbestos removal work shall have completed a 32-hour EPA-accredited worker course. Training shall also include, but not be limited to, respirator training, instruction in general safe work practices with specific instructions in hazards unique to the job, and training in the use of fire extinguishers.

4.2 Lead

The Contractor shall provide employee information and training prior to the time of initial job assignment in accordance with Title 8, CCR, §532.1(l), including hazard communication training specifically addressing the hazards of lead, respirator training, and training in accordance with Title 8, CCR, §1510, Safety Instruction for Employees. Training shall have been conducted within the last year.

The Contractor shall also have at least one competent person/supervisor onsite at all times during lead-related work who has DPH lead-related construction certification as a supervisor in accordance with Title 8, CCR, §1532.1(l)(3). This certification is being required to ensure that the Contractor has at least one person onsite with supervisory authority who is familiar with and knowledgeable about potential lead hazards and associated regulatory requirements. However, DPH certification of workers performing lead-related work is not required, provided that the Contractor employs sufficient engineering and work practice controls to maintain employee exposures to airborne lead below the

Cal/OSHA 8-hour TWA PEL.

5.0 WORKER PROTECTION

5.1 Asbestos

The Contractor shall provide basic protection to employees disturbing asbestos at the Site until the

Contractor performs initial personal air monitoring or provides NEAs demonstrating that worker exposure to airborne asbestos levels are below the Cal/OSHA 8-hour TWA PEL (0.1f/cc) and the

30-minute excursion limit (1f/cc). In accordance with Title 8, CCR §1529(i), basic protection includes the following:

Geocon Project No. A8575-06-21 -9- July 28, 2017

Appropriate respiratory protection, consisting of a minimum of a half-mask air-purifying respirator equipped with high efficiency particulate air (HEPA) filters (Title 8, CCR, §1529(h);

Appropriate personal protective equipment, consisting of full-body coveralls (Tyvek® or equivalent), gloves, hard hats, steel-toed boots, and face shields, glasses, or goggles; and

Hygiene facilities in accordance with Title 8, CCR, §1529(j). (The Contractor shall ensure that employees do not leave the workplace with contaminated work clothes or equipment. The Contractor shall also ensure that employees wash their hands and face at the end of each work shift, and prior to eating, drinking, smoking, etc).

5.2 Lead

The Contractor shall provide basic protection to employees performing trigger tasks, as described in

Title 8, CCR, §1532.1(d), at the Site until personal air monitoring is performed by the Contractor that shows employee exposures are below the Cal/OSHA 8-hour TWA action level of 30 g/m3. Trigger tasks that have been identified during this project include manual removal of deteriorated LCP, manual removal of building structures/components coated with intact LCP, and the clean-up of deteriorated

LCP and associated debris.

In accordance with Title 8, CCR, §1532.1(g), basic protection includes the following:

Appropriate respiratory protection, consisting of a minimum of a half-mask air-purifying respirator equipped with HEPA filters (Title 8, CCR, §1532.1(f);

Appropriate personal protective equipment, consisting of full-body coveralls (Tyvek® or equivalent), gloves, hard hats, steel-toed boots, and face shields, glasses, or goggles;

Change area with separate storage facilities for work and street clothes (The Contractor shall ensure that employees do not leave the workplace with contaminated work clothes or equipment.); and

Hand washing facilities in accordance with Title 8, CCR, §1532.1(i). (The Contractor shall ensure that employees wash their hands and face at the end of each work shift, and prior to eating, drinking, smoking, etc.).

Eating, drinking, smoking, chewing gum or tobacco, taking medications, applying makeup, or touching the hands to the face or mouth shall not be permitted in the work areas. Personnel must decontaminate before conducting these activities.

5.3 Universal Waste

The Contractor shall provide basic protection to employees performing universal waste removal work, if required, on this project. During removal of fluorescent light tubes and ballasts, personal protective equipment shall be chosen and worn in conformance with 29 CFR 1926.95, 1926.96, and 1926.102.

Basic protection includes the following:

Appropriate personal protective equipment, consisting of full-body coveralls (Tyvek® or equivalent), gloves, hard hats, steel-toed boots, and face shields, glasses, or goggles.

The eye protection should be goggle type with side shields, and vented.

Geocon Project No. A8575-06-21 -10- July 28, 2017

Facilities shall be kept in the immediate area of work to irrigate eyes and wash any skin exposed to broken lighting materials, in the event of a mercury release.

If at any time clothes become contaminated with broken lighting materials, they shall be changed immediately and disposed of as hazardous waste so as to prevent contact with the skin.

PCB ballasts or suspect PCB ballasts which show evidence of leakage require that appropriate oil resistant gloves be worn prior to handling.

The Contractor shall assure that employees wash their hands and face at the end of each work shift, and prior to eating, drinking, smoking, etc.

Change area with separate storage facilities for work and street clothes (the Contractor shall ensure that employees do not leave the workplace with contaminated work clothes or equipment).

Eating, drinking, smoking, chewing gum or tobacco, taking medications, applying makeup, or touching the hands to the face or mouth shall not be permitted in the work areas. Personnel must decontaminate before conducting these activities.

6.0 WORK PROCEDURES

6.1 Asbestos

6.1.1 Regulated Area

The Contractor shall prepare the work areas as described below before for workers performing asbestos-disturbing activities:

The Contractor shall verify that electric power and utilities to the work area have been shut down, isolated, and locked/tagged out.

The Contractor shall demarcate a regulated work area to prevent unauthorized entry in accordance with Title 8, CCR, §1529(e).

The Contractor shall post the regulated work in accordance with Title 8, CCR, §1529(k)(7).

6.1.2 Cal/OSHA Class II ACM/RACM Removal

Class II ACM/RACM removal shall be conducted in accordance with Title 8, CCR, §1529(g)(7) including:

Use of critical barriers placed over all the openings to the regulated area;

Use of wet methods/amended water; and

Use specific control methods for Class II ACM removal work in accordance with Title 8, CCR, §1529(g)(1)(A) through (C) and (g)(8).

6.1.3 Decontamination

In accordance with Title 8, CCR, §1529(j)(2), the Contractor shall ensure that the following decontamination activities are completed for workers performing asbestos-disturbing activities:

Geocon Project No. A8575-06-21 -11- July 28, 2017

During Cal/OSHA Class II interior asbestos removal work (if required), workers when leaving the regulated area must remove disposable clothing before entering the shower/decontamination stage, decontaminate, and remove respirators in the shower/decontamination stage. Before re-entering the regulated area, each worker must dress in clean protective clothing.

For exterior work areas, establish an equipment area of sufficient size (adjacent to the regulated area) to accommodate equipment and personnel decontamination.

For exterior work, contaminated work clothing must be decontaminated with a HEPA vacuum before it is removed.

Equipment and material must be decontaminated before removal from the equipment area.

Entry and egress to/from the regulated area must be through the decontamination unit (interior work areas) or equipment area (exterior work areas).

6.2 Lead

6.2.1 Containment

The Contractor shall prepare the work areas as described below before performing lead-related work:

The Contractor shall verify that electric power and utilities to the work area have been shut down, isolated, and locked/tagged out.

The Contractor shall demarcate and post the work area to prevent unauthorized entry in accordance with Title 8, CCR, §1532.1(i) and (m).

For deteriorated LCP removal, the Contractor shall place a drop cloth consisting of a minimum of a single layer of 6-mil polyethylene sheeting on the ground beneath the area where deteriorated LCP removal is to occur, and extending 10 feet beyond the perimeter of working surfaces in all directions. The plastic shall be secured to the side of the building/building wall with tape or other anchoring system (no gaps between plastic and building), and weighted down with two-by-fours or similar objects. If precipitation is a possibility, the Contractor shall raise the edges of the plastic sheeting to create a basin to prevent contaminated runoff.

The Contractor shall keep all windows closed within 20 feet of working surfaces, including any windows of adjacent structures.

Geocon Project No. A8575-06-21 -12- July 28, 2017

6.2.2 Decontamination

In accordance with Title 8, CCR, §1532.1(i), the Contractor shall ensure that decontamination activities as described below are completed for workers performing trigger tasks as described in Title 8, CCR, §1532.1(d):

Establish a two-stage decontamination area, including a clean change area and hand-washing facilities at the entrance to the work areas;

Provide storage facilities in the clean change area for employees' street clothes, cleaned reusable personal protective equipment (e.g., goggles, respirators), and personal items. Provide an adequate supply of clean disposable protective work clothing, replacement filters for respirators, and disposable towels.

Provide the hand washing facilities with a suitable supply of clean potable water to permit each employee to wash hair, hands, forearms, face, and neck. Also, provide clean disposable towels and labeled waste bags and containers for depositing used disposable protective work clothing and towels.

All personnel exiting the work area shall first remove gross contamination and debris from themselves using a HEPA-filtered vacuum.

After HEPA-vacuuming themselves, personnel shall proceed to the decontamination area where they shall use the hand-washing facilities to decontaminate themselves and their reusable personal protective equipment.

Workers shall first remove disposable protective clothing and deposit in waste receptacles before using the hand-washing facilities. Before removing their respirators and entering the clean change area, employees shall wash hands, forearms, face, neck, and exposed skin.

6.2.3 Deteriorated LCP Removal

The Contractor shall take necessary precautions to prevent or minimize the release of lead dust into the air or into surrounding environments during lead-related work. The Contractor shall use any combination of the following controls, or propose own controls.

Wet deteriorated LCP surfaces with water immediately prior to removal. Remove deteriorated

LCP from the higher areas first.

Continuously wet surfaces with a fine mist or spray of water during the lead-related work.

Use local exhaust ventilation (HEPA filtered before discharge) to control dust emissions near the source when using vacuums or power equipment during LCP removal.

Maintain surfaces as free as practical of the accumulation of dust/debris.

Do not dry sweep dust/debris or use compressed air for cleaning surfaces.

Decontaminate all equipment and tools prior to their removal from the Site.

Segregate, containerize, characterize, and label waste streams as they are generated. Cover portable containers used to transport debris/waste.

Geocon Project No. A8575-06-21 -13- July 28, 2017

6.2.4 Removal of Architectural Components Coated with Intact LCP

The Contractor shall take necessary precautions to prevent or minimize the release of lead dust into the air or into surrounding environments during lead-related work. The Contractor shall use any combination of the following controls, or propose own controls.

Wet structures with water immediately prior to removal.

Continuously wet surfaces with a fine mist or spray of water during the removal process.

Use local exhaust ventilation (HEPA filtered before discharge) to control dust emissions near the source when using vacuums or power equipment during lead-related work.

Do not dry sweep dust/debris or use compressed air for lead-related work.

Segregate, containerize, characterize, and label waste streams as they are generated. Cover portable containers used to transport debris/waste.

6.3 Universal Waste

6.3.1 Work Area

The Contractor shall prepare the work areas as described below before performing universal waste removal work, if necessary:

The Contractor shall verify that electric power and utilities to the work area have been shut down, isolated, and locked/tagged out.

Segregate, containerize, characterize, and label waste streams as they are generated.

For fluorescent light tube and ballast removal, the Contractor shall place a drop cloth consisting of a minimum of a single layer of 6-mil polyethylene sheeting on the ground beneath the light fixtures.

The Contractor shall remove fluorescent light tubes lamps without breakage and place in protective storage containers to avoid breakage.

If the fluorescent light ballast is marked “No PCB’s,” it shall be considered non-PCB. Other ballasts shall be treated as PCB ballasts.

Geocon Project No. A8575-06-21 -14- July 28, 2017

6.3.2 Decontamination

Personal protective equipment shall be chosen and worn in conformance with 29 CFR 1926.95, 1926.96, and 1926.102. The eye protection should be goggle type with side shields, and vented. In the event of leakage, protective gloves should be worn at all times during the handling of any potential

PCB-containing materials.

Workers shall first remove disposable protective clothing and deposit in waste receptacles before using the hand-washing facilities. Before removing their respirators and entering the clean change area, employees shall wash hands, forearms, face, neck, and exposed skin.

All workers handling known or suspect PCB-containing materials will have access to washing facilities equipped with soap, warm water and towels. Employees shall wash hands (up to forearms), neck and face prior to breaks (including meal breaks) and prior to leaving the work site at the end of the day. Employees will not be permitted to smoke, eat or apply cosmetics nor any other type of “hand to mouth activity” during work associated with PCBs prior to washing hands, face and neck.

Contractor shall provide storage facilities in the clean change area for employees' street clothes, cleaned reusable personal protective equipment (e.g., goggles, respirators), and personal items.

Also, provide an adequate supply of clean disposable protective work clothing, replacement filters for respirators, and disposable towels.

Contractor shall provide the hand washing facilities with a suitable supply of clean potable water to permit each employee to wash hair, hands, forearms, face, and neck. Also, provide clean disposable towels and labeled waste bags and containers for depositing used disposable protective work clothing and towels.

7.0 WASTE DISPOSAL

7.1 Asbestos

Friable asbestos-containing waste (if generated) shall be managed for disposal as a California hazardous waste. Hazardous wastes shall be immediately removed from the property by a waste hauler with required licenses from state and local authorities with jurisdiction.

Asbestos waste shall be double-contained by: 1) wrapping components in two layers of 6-mil polyethylene sheeting, 2) wrapping or bagging waste in 6-mil polyethylene bags and placing in containers lined with 6-mil polyethylene sheeting, or 3) placing in 6-mil polyethylene bags

(double-bagged). Containerized asbestos-containing waste shall be transported out of the regulated area through the equipment area. Asbestos-containing waste containers shall be properly labeled in accordance with Title 8, CCR, §1529(k)(8).

Nonfriable asbestos-containing waste is nonhazardous in California.

Geocon Project No. A8575-06-21 -15- July 28, 2017

When drums, bags, or wrapped components have been removed from the work area, they shall be loaded into an enclosed or covered container for transport. If large dumpsters are used for asbestos waste disposal, they shall have doors or tops that can be closed and locked to prevent vandalism or other disturbance of asbestos debris. Bags of asbestos-containing waste shall be placed, not thrown, into these containers to avoid splitting.

Disposal must occur at an authorized facility in accordance with the regulatory requirements of

NESHAP and applicable State and local regulations. The Contractor shall obtain permits required for transport and disposal of hazardous waste and asbestos-contaminated waste, and provide copies of all waste disposal documentation to the DGS or their designated representative.

7.2 Lead

The Contractor is responsible for providing waste receptacles required for disposal. The Contractor shall locate disposal facilities that will accept LCP debris/waste materials removed from the Site. Solid wastes that are not classified as hazardous shall be disposed of in a State-approved landfill. Hazardous wastes shall be immediately removed from the property by a waste hauler with required licenses from state and local authorities with jurisdiction. The Contractor shall obtain permits required for transport and disposal of lead-containing/contaminated debris/waste, and provide copies of waste characterization/waste disposal documentation to the DGS or their designated representative.

The Contractor shall follow all Federal and State regulations for handling, characterizing, containerizing, and disposing of lead-containing/contaminated waste materials per the requirements of Title 22, CCR and the Resource Conservation and Recovery Act (RCRA).

Debris is to be treated as hazardous lead waste if results of laboratory analysis indicate a lead concentration at or above any one of the following criteria for lead content:

Total Threshold Limit Concentration (TTLC) - 1,000 mg/kg;

Soluble Threshold Limit Concentration (STLC) - 5.0 mg/l; or

Toxicity Characteristic Leaching Procedure (TCLP) - 5.0 mg/l.

For a waste to be managed as non-hazardous, the landfill may also require that the waste pass the acute fish toxicity test in of Title 22, CCR, §66261.24(a)(b).

Geocon Project No. A8575-06-21 -16- July 28, 2017

7.3 Universal Waste

The Contractor is responsible for providing waste receptacles required for universal waste recycling transportation or disposal. The Contractor shall locate recycling contractors and facilities that will recover/recycle air conditioner refrigerant and accept fluorescent light tubes removed from the Site.

The Contractor shall locate disposal facilities that will accept mercury (broken light tubes) and

PCB-containing debris/waste materials removed from the Site. Hazardous wastes shall be immediately removed from the Site by a waste hauler with all required licenses from State and local authorities with jurisdiction. The Contractor shall obtain permits required for transport and recycling/disposal of universal waste and hazardous waste, and provide copies of waste characterization/waste disposal documentation to the DGS or their designated representative.

The Contractor shall follow Federal and State regulations for handling, characterizing, containerizing, and disposing of broken fluorescent light tubes, PCB-containing light ballasts, and associated contaminated debris waste materials per the requirements of Title 22, CCR, RCRA, and TSCA.

Spent fluorescent light tube shall be considered hazardous wastes and labeled as such for temporary onsite storage, transportation, and disposal or recycling. Fluorescent light tubes shall be disposed of as a hazardous mercury waste at a permitted land disposal facility or recycled.

Known or suspect PCB-containing materials must meet the packaging requirements of 49 CFR Parts

171-180 (40 CFR 761.60). When packaging PCBs, the interstitial space in the container must be filled with sufficient absorbent materials to absorb any liquid PCBs remaining in the components. Fluorescent light ballasts containing PCBs in their potting material must be disposed of in a TSCA approved disposal facility as a bulk product waste. Any discharges or spills shall be cleaned up and reported. Known or suspect PCB-containing ballasts shall be managed, labeled, and disposed of as California Hazardous

Waste. A California hazardous waste manifest shall be prepared by the Contractor and used for each shipment of PCB ballasts and PCB-contaminated items or materials. Fluorescent light ballasts labeled as

“No PCB's” may be disposed of as non-hazardous construction waste.

Fallbrook

Bonsall

Vista

Escondido Fwy.

Valley Center

Rincon

Pauma Valley

Palomar

Pala

.dR retneC yellaV

Pala Rd.

APPROX. SCALE: feet

6,0000 12,000

SITE LOCATION

Rincon Forest Fire Station 16971 Highway 76, Pauma Valley, California

VICINITY MAP

July 2017 Figure 1A8575-06-21

NO SCALE

LEGEND:

Approximate Asbestos Sample Location Approximate Paint Sample Location Roof

Garage Living Room

Furnace Room

Office

Barracks

(R)

RINCON FIRE HOUSE

P-1

P-2

P-3

P-4

P-5

P-6

P-7

P-8

P-9

3(R) 44

22-24

18 30

31-33

6(R) 8(R)

2(R)

19-21

5(R)

4(R)40-4234-36

37-39

1(R)

7(R) 10-12 25-27

9(R)

Restroom

Patio

S to ra ge

Dining RoomPatio

Pantry

Kitchen

Rincon Forest Fire Station 16971 Highway 76, Pauma Valley, California

SITE PLAN

July 2017 Figure 2A8575-06-21

Approximate Asbestos Sample Location

Electrical Service

Approximate Paint Sample Location Roof(R)

SIGN

PROPANE TANK SHED

45(R) 46(R)47(R)

48-50

P-17

P-16

P-11

P-10

P-12

Rincon Forest Fire Station 16971 Highway 76, Pauma Valley, California

July 2017 Figure 3A8575-06-21

Approximate Asbestos Sample Location Approximate Paint Sample Location Roof

Canopy

Equipment Box

Bollards, Typ.

(R)

HOSE RACK

FUEL TANK PAD

58P-15

P-13

P-14

53(R)

54(R)

55(R) 56

Rincon Forest Fire Station 16971 Highway 76, Pauma Valley, California

July 2017 Figure 4A8575-06-21

Photo 1 – Rincon Forest Fire Station at 16971 Highway 76 in Pauma Valley, California

Photo 2 – Barracks/mess hall/garage

Photo 3 – Barracks/mess hall/garage roof

PHOTOGRAPHS 1, 2, & 3

Rincon Forest Fire Station

16971 Highway 76 in Pauma Valley, California A8575-06-21 July 2017

Photo 4 – Barracks/mess hall/garage exterior siding

Photo 5 – Barracks/mess hall/garage cementitious exterior tiles (ACM)

Photo 6 – Barracks/mess hall/garage cream/brown floor tile (ACM tile and mastic)

PHOTOGRAPHS 4, 5, & 6

Rincon Forest Fire Station

Photo 7 – Barracks/mess hall/garage base coving over plaster

Photo 8 – Barracks/mess hall/garage interior

Photo 9 – Barracks/mess hall/garage attic

PHOTOGRAPHS 7, 8, & 9

Rincon Forest Fire Station

Photo 10 – Barracks/mess hall/garage ducting

Photo 11 – Barracks/mess hall/garage ducting

Photo 12 – Barracks/mess hall/garage exterior

PHOTOGRAPHS 10, 11, & 12

Rincon Forest Fire Station

Photo 13 – Garage (deteriorated paint)

Photo 14 – Shed

Photo 15 – Shed interior

PHOTOGRAPHS 13, 14, & 15

Rincon Forest Fire Station

Photo 16 – Shed electrical panel

Photo 17 – Fuel tank pad and canopy

Photo 18 – Hose rack

PHOTOGRAPHS 16, 17, & 18

Rincon Forest Fire Station

Photo 19 – Propane tank

Photo 20 – Barracks/mess hall green interior paint

Photo 21 – Barracks/mess hall/garage typical fluorescent fixture

PHOTOGRAPHS 19, 20, & 21

Rincon Forest Fire Station

Photo 22 – Barracks/mess hall/garage typical sodium fixture

Photo 23 – Barracks/mess hall air conditioning unit

Photo 24 – Barracks/mess hall/garage exit sign

PHOTOGRAPHS 22, 23, & 24

Rincon Forest Fire Station

Geocon Project No. A8575-06-21

CALIFORNIA DEPARTMENT OF GENERAL SERVICES

RINCON FOREST FIRE STATION

16971 HIGHWAY 76 IN PAUMA VALLEY, CALIFORNIA

Sample Group No. Material Description Approximate Quantity Friable Site Photos Asbestos Content

1-3 Asphalt roofing shingles (barracks/mess hall/garage) NA NA 3 ND

4-6 Roofing core - flat sections (barracks/mess hall/garage) NA NA 3 ND

7-9 Roofing mastic (barracks/mess hall/garage) NA NA 3 ND

10-12 Siding (barracks/mess hall/garage) NA NA 4 ND

13-15 Cementitious exterior tiles (barracks/mess hall/garage) 250 square feet No 5 5%

16-18 Cream/brown floor tile (barracks/mess hall/garage)* 3,500 square feet No 6 5%

19-21 Base coving mastic (barracks/mess hall/garage) NA NA 7 ND

22-24 Base coving mastic (barracks/mess hall/garage) NA NA 7 ND

25-27 Base coving mastic (barracks/mess hall/garage) NA NA 7 ND

28-30 Gypsum board system (barracks/mess hall/garage) NA NA 8 ND

31-33 Hardwall plaster (barracks/mess hall/garage) NA NA 7 ND

34-36 Attic insulation (barracks/mess hall/garage) NA NA 9 ND

37-39 Duct insulation (barracks/mess hall/garage) NA NA 9 & 11 ND

40-42 Duct sealant (barracks/mess hall/garage) NA NA 10 ND

43 & 44 Concrete (barracks/mess hall/garage) NA NA 12 ND

45-47 Roofing core (shed) NA NA 14 ND

48-50 Vapor barrier (shed) NA NA 15 ND

51 & 52 Concrete (shed) NA NA 14 ND

53-55 Roofing core (fuel tank pad/canopy) NA NA 17 ND

56 & 57 Concrete (fuel tank pad/canopy) NA NA 17 ND

58 & 59 Concrete (hose rack) NA NA 18 ND

60 & 61 Concrete (propane tank) NA NA 19 ND

62 & 63 Concrete/mortar (fire station sign) NA NA 1 ND

Notes:

NA = Not applicable (no asbestos detected) ND = Not detected

* 9 by 9-inch vinyl floor tile (mastic asbestos content is assumed greater than 1%)

TABLE 1

SUMMARY OF ANALYTICAL LABORATORY TEST RESULTS - ASBESTOS

Polarized Light Microscopy (PLM) - EPA Test Method 600/R-93/116

TABLE 2

SUMMARY OF ANALYTICAL LABORATORY TEST RESULTS - PAINT

CALIFORNIA DEPARTMENT OF GENERAL SERVICES

RINCON FOREST FIRE STATION

16971 HIGHWAY 76 IN PAUMA VALLEY, CALIFORNIA

Sample No. Paint Description Approximate Quantity

Peeling/Flaking Site Photos

Total Lead (mg/kg)

WET Lead (mg/l)

TCLP Lead (mg/l)

P-1 Multi-layer/color exterior (barracks/mess hall/garage) Intact 2, 4, & 5 56,000 --- 110* P-2 Brown exterior trim (barracks/mess hall/garage) Intact 2, 4, & 5 58,000 --- 110* P-3 Light brown roofing paint (barracks/mess hall/garage) Intact 3 35,000 --- 110* P-4 White interior (barracks/mess hall) Intact 7 & 8 <4.4 --- --- P-5 Green interior (barracks/mess hall) Intact 20 <18 --- --- P-6 Blue interior (barracks/mess hall) Intact 10 & 11 21 --- --- P-7 Dark brown exterior (barracks/mess hall/garage) Intact 2, 4, & 5 7,500 --- 110* P-8 Yellow hazard (barracks/mess hall/garage) Intact 12 78 3.4 --- P-9 White interior (garage) 20 square feet 13 150,000 --- 110*

P-10 Beige exterior (shed) Intact 14 <6.7 --- --- P-11 Brown exterior trim (shed) Intact 14 <7.4 --- --- P-12 White exterior (shed electrical panel) 40 square feet 16 3,900 --- 110* P-13 Beige exterior (fuel tank pad/canopy) Intact 17 27 --- --- P-14 Yellow hazard (fuel tank bollards) Intact 17 25 --- --- P-15 Multi-layer/color exterior (hose rack) Intact 18 46 --- --- P-16 Multi-layer/color exterior (propane tank) Intact 19 11,000 --- 110* P-17 Varnish (fire station sign) Intact 1 <26 --- ---

Notes:

mg/kg = milligrams per kilogram (EPA Test Method 6010) WET = Waste Extraction Test mg/l = milligrams per liter (EPA Test Method 6010)

TCLP = Toxicity Characteristic Leaching Procedure

* Reported result is a 7-part composite of sample groups P1, 2, 3, 7, 9, 12, and 16

--- = not analyzed

TABLE 3

UNIVERSAL WASTE

CALIFORNIA DEPARTMENT OF GENERAL SERVICES

RINCON FOREST FIRE STATION

16971 HIGHWAY 76 IN PAUMA VALLEY, CALIFORNIA

Component Description Suspect Hazardous Constituent Locations Approximate Quantities

Fuels Diesel, gasoline, and propane Fuel tank pad and propane tank Various (Photos 17 & 19)

Fluorescent/sodium lighting fixtures Mercury (tubes) and PCBs (ballasts) Barracks/mess hall/garage, exterior, and hose storage 26 fixtures (Photos 21 & 22)

Various household chemicals Lubricants, solvents, cleansers, refrigerant, paints, etc.

Barracks/mess hall/garage and shed Various (Photos 23 & 24)