Attachment 7_Site Safety Daily Inspection Report.docx
DOCX document 14 KB Posted
- Solicitation number
- 692M15-21-R-00015
About this file
This solicitation is seeking energy efficiency upgrades for multiple buildings at the William J. Hughes Technical Center of the Federal Aviation Administration. The scope of work includes replacing skylight, storefront, and entrance systems for three buildings, along with constructing new vestibules. The period of performance is 330 calendar days from notice to proceed. The acquisition strategy is full and open competition under North American Industry Classification code 236220 for commercial and institutional building construction, with a size standard of $39.5 million. A mandatory site visit is scheduled for February 9, 2021, with confirmation required by February 8. Proposals are due by February 25, 2021. Questions are due by February 15. The attached solicitation and applicable attachments provide full details on the requirements.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE SAFETY AND HEALTH OFFICER DAILY INSPECTION FORM
| Date: |
| Contract No.: |
| Location: |
| SSHO: |
| ITEM |
| COMMENTS/CORRECTIVE ACTION |
| Housekeeping (Garbage, cleanliness, electrical cords, ladders) |
| Drinking water/ sanitation requirements/first aid kit |
| Electrical (proper grounding, lock & tag and GFCI [good condition, inspected]) |
| Proper personal protective equipment (PPE) |
| Walking/working surfaces (tripping hazards, slippery surfaces, floor holes) |
| Electrical tools (guards in place; good condition, stored properly) |
| Cranes/ rigging equipment (for example: slings, properly stored and inspected) |
| Excavation (properly sloped or shored; permits; inspections; barricaded daily) |
| Flammables/combustibles (fire extinguishers, welding and cutting equipment) |
| Hot work (PPE, permit, combustibles, flammables protected) |
| SDS’s onsite with containers labeled |
| Scaffold system fully assembled; tags; inspections; fully planked guardrails |
| Proper barricading/ warning signs (fuel areas, trenches, storage construction sites) |
| Fire extinguishers (monthly inspection, accessible, on mechanized equipment) |
ADDITIONAL COMMENTS: