This document is a solicitation for energy efficiency upgrades to buildings 305, 27, and 28 at the William J. Hughes Technical Center. The scope of work includes replacing skylight, storefront, curtain wall, and entrance systems. The period of performance is 330 calendar days from notice to proceed. A mandatory site visit will be held on February 9, 2021, with RSVPs due by February 8. Responses are due by February 25, 2021. The NAICS code is 236220 for commercial and institutional building construction. The solicitation is attached and includes applicable attachments as outlined in section J.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Buildings 27, 28 & 305 2019000031
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 33 00 SUBMITTAL PROCEDURES
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23 OPERATION AND MAINTENANCE DATA
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION AND DECONSTRUCTION
DI VI SI ON 05 - METALS
05 40 00 COLD-FORMED METAL FRAMING
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 42 13 METAL WALL PANELS
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 16 ALUMINUM DOORS AND FRAMES
08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND FRAMES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
09 96 00 HIGH-PERFORMANCE COATINGS
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES - OPTION 1 AND OPTION 2
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 00.00 40 FIRE-SUPPRESSION SPRINKLER SYSTEMS
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
PROJECT TABLE OF CONTENTS Page 1
23 83 00.00 20 ELECTRIC SPACE HEATING EQUIPMENT
DI VI SI ON 26 - ELECTRI CAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to or commencing work on site.
Certificates of insurance
Surety bonds
List of proposed Subcontractors
List of proposed products
Construction progress schedule
Network Analysis Schedule (NAS)
Submittal register
Schedule of prices or Earned Value Report
Health and safety plan
Work plan
Quality Control(QC) plan
Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, SECTION 01 33 00 Page 1 instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, SECTION 01 33 00 Page 2 installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.
SD-10 Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
This data is intended to be incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
1.1.2 Approving Authority
Office or designated person authorized to approve submittal.
1.1.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Submittal Register
SECTION 01 33 00 Page 3
1.3 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.3.1 Government Approved (G)
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer. Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are considered to be "shop drawings."
1.4 PREPARATION
1.4.1 Transmittal Form
1.4.2 Source Drawings for Shop Drawings
The entire set of Source Drawing files (DWG) will not be provided to the Contractor. Only those requested by the Contractor to prepare shop drawings may be provided. Request the specific Drawing Number only for the preparation of Shop Drawings. These drawings may only be provided after award.
1.4.2.1 Terms and Conditions
Data contained on these electronic files must not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor must make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor must, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
These electronic Source Drawing files are not construction documents.
Differences may exist between the Source Drawing files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic Source Drawing files, nor does it make representation to the compatibility of these files with the Contractor hardware or software. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished Source Drawing files, the signed and sealed construction documents govern. The Contractor is responsible for determining if any conflict exists. Use of these Source Drawing files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project. If the Contractor uses, duplicates or modifies these electronic Source Drawing files for use in producing construction data related to this contract, remove all previous indicia of ownership (seals, logos, signatures, initials and dates).
SECTION 01 33 00 Page 4
1.4.3 Electronic File Format
Provide submittals in electronic format, with the exception of material samples required for SD-04 Samples items. In addition to the electronic submittal, provide three hard copies of the submittals. Compile the submittal file as a single, complete document, to include the Transmittal Form described within. Name the electronic submittal file specifically according to its contents, coordinate the file naming convention with the Contracting Officer. Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in PDF, unless otherwise specified or directed by the Contracting Officer. Generate PDF files from original documents with bookmarks so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Index and bookmark files exceeding 30 pages to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.
Email electronic submittal documents fewer than 10MB to an email address as directed by the Contracting Officer. Provide electronic documents over 10MB on an optical disc, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:
https://safe.amrdec.army.mil/safe/ .
Provide hard copies of submittals when requested by the Contracting Officer. Up to 6 additional hard copies of any submittal may be requested at the discretion of the Contracting Officer, at no additional cost to the Government.
1.5 QUANTITY OF SUBMITTALS
1.5.1 Number of Copies of SD-02 Shop Drawings
Submit six copies of submittals of shop drawings requiring review and approval only by QC organization and seven copies of shop drawings requiring review and approval by Contracting Officer.
1.5.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's Instructions
Submit in compliance with quantity requirements specified for shop drawings.
1.5.3 Number of Samples SD-04 Samples
a. Submit two samples, or two sets of samples showing range of variation, of each required item. One approved sample or set of samples will be retained by approving authority and one will be returned to Contractor.
b. Submit one sample panel or provide one sample installation where directed. Include components listed in technical section or as directed.
c. Submit one sample installation, where directed.
d. Submit one sample of non-solid materials.
SECTION 01 33 00 Page 5
1.5.4 Number of Copies SD-05 Design Data and SD-07 Certificates
Submit in compliance with quantity requirements specified for shop drawings.
1.5.5 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field Reports
Submit in compliance with quantity and quality requirements specified for shop drawings other than field test results that will be submitted with QC reports.
1.5.6 Number of Copies of SD-10 Operation and Maintenance Data
Submit five copies of O&M Data to the Contracting Officer for review and approval.
1.5.7 Number of Copies of SD-01 Preconstruction Submittals and SD-11 Closeout Submittals
Unless otherwise specified, submit three sets of administrative submittals.
1.6 VARIATIONS
Variations from contract requirements require both Designer of Record (DOR) and Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.
1.6.1 Considering Variations
Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).
Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.6.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item.
Clearly mark the proposed variation in all documentation.
1.6.3 Warranting that Variations are Compatible
When delivering a variation for approval, Contractor, including its Designer(s) of Record, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.6.4
SECTION 01 33 00 Page 6
Review Schedule is Modified
In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.
1.7 SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and
(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. The Government will provide the initial submittal register in electronic format with the following fields completed, to the extent that will be required by the Government during subsequent usage.
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.7.1 Use of Submittal Register
Submit submittal register. Submit with QC plan and project schedule.
Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:
Column (a) Activity Number: Activity number from the project schedule.
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.7.2 Contractor Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor with each submittal throughout contract.
SECTION 01 33 00 Page 7
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l) List date of submittal transmission.
Column (q) List date approval received.
1.7.3 Approving Authority Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l) List date of submittal receipt.
Column (m) through (p) List Date related to review actions.
Column (q) List date returned to Contractor.
1.7.4 Copies Delivered to the Government
Deliver one copy of submittal register updated by Contractor to Government with each invoice request.
1.8 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
SECTION 01 33 00 Page 8
1.9 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
a. Note date on which submittal was received.
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date submittals. Two (2) copies of the submittal will be retained by the Contracting Officer and 2 copies of the submittal will be returned to the Contractor.
1.9.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
1.10 DISAPPROVED OR REJECTED SUBMITTALS
Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the Contract clause CHANGES, is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work.
Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
SECTION 01 33 00 Page 9
1.11 APPROVED/ACCEPTED SUBMITTALS
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.12 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.
Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals. Contractor to replace such materials or equipment to meet contract requirements.
Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 33 00 Page 10
SECTION 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS
04/20
PART 1 GENERAL
1.1 REFERENCES
APPLICABLE PUBLICATIONS: The publications listed below are integral to this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
United States Code of Federal Regulations (CFR)
29 CFR 1910.94 Subpart G - Occupational Health and Environmental Control, Ventilation
29 CFR 1910.146 Subpart J - General Environmental Controls
- Permit-required Confined Spaces
29 CFR 1910.1200 Subpart Z - Toxic and Hazardous Substances Hazard Communication
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 262 Standards Applicable to Generators of Hazardous Waste
40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
49 CFR 178 Specifications for Packaging
New Jersey Administrative Code (NJAC) and Statute Titles (NJST).
List includes but is not limited to:
NJAC 7:7A Freshwater Wetlands Protection Act Rules
NJAC 7:26G Hazardous Waste
NJAC 7:27 Bureau of Air Pollution Control Regulations
NJAC 7:30 Pesticide Control Code
U.S. FEDERAL AVIATION ADMINISTRATION (FAA)
Federal Aviation Administration (FAA) Orders and Advisory Circulars. List includes but is not limited to:
1050.1F Policies and Procedures for Considering Environmental Impacts
Agreements. List includes but is not limited to:
SECTION 01 57 19 Page 1
Federal Facilities Agreement (FAAFederal Facilities Agreement (FAA
Atlantic County Municipal Utilities Authority
Atlantic County Utilities Authority
Other Reference Documents
WJHTC Geospatial Data Standards
WJHTC Asbestos Abatement Scope of Work
WJHTC Technical Center Stormwater Pollution Prevention Plan (SWPPP)
WJHTC Stormwater Management at Construction Sites Scope of Work
WJHTC Technical Center Spill Prevention, Control and Countermeasures Plan (SPCC)
WJHTC Environmental Compliance: Spill Prevention, Reporting Requirements, and Liability Statement of Work
New Jersey Department of Environmental Protection (NJDEP) Stormwater Best Management Practices
1989 Federal Manual for Identifying and Delineating Jurisdictional Wetlands
1.2 DEFINITIONS
1.2.1 Asbestos
"Asbestos" includes chrysoltile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos, and any of these minerals that have been chemically treated and/or altered.
1.2.2 Categorical Exclusion
Categorical Exclusions are those types of Federal actions that meet the criteria in 40 CFR 1508.4 required by NEPA and are further defined by FAA Order 1050.1F . They represent actions that the FAA has found; based on past experience with similar actions, do not normally require an EA or an EIS. In accordance with F AA Order 1050.1F , Categorical Exclusions may be documented.
1.2.3 Chemical Wastes
Combustible and noncombustible wastes such as ashes and waste materials resulting from construction or maintenance and repair work, leaves, tree, brush, and shrub trimmings.
1.2.4 Debris
Combustible and noncombustible wastes such as ashes and waste materials resulting from construction or maintenance and repair work, leaves, tree, brush, and shrub trimmings.
SECTION 01 57 19 Page 2
1.2.5 Discharge
Any intentional or unintentional action or omission resulting in the releasing, spilling, leaking, pumping, pouring, emitting, emptying or dumping of a pollutant into the waters of the State of New Jersey, onto land or into wells from which the pollutant might flow or drain into such waters or into the air, and shall include the release of any pollutant into treatment works.
1.2.6 Drip Line
The outer most horizontal perimeter of foliage or limbs of the tree(s) and shrub(s).
1.2.7 Fugitive Dust
Particulate matter or any visible air contaminant (smoke, dust, or fume) other than uncombined water that is not collected by a capture system and emitted from a stack, but is released to the atmosphere at the point of generation.
1.2.8 Hazardous Substance
Such elements and compounds, including petroleum, petroleum products, pesticides, solvents and other substances as set forth NJAC 7:E .
1.2.9 Hazardous Waste
Hazardous substances as defined in 40 CFR 261 or as defined by applicable state and local regulations.
1.2.10 Oily Waste
Petroleum products and bituminous materials.
1.2.11 Pollutant
Any dredged spoil, solid waste, sewage, garbage, refuse, oil, grease, sewage sludge, munitions, chemical wastes, biological materials, thermal waste, wrecked or discarded equipment, rock, sand, construction waste or runoff or other residue discharged to the land, ground waters or surface waters.
1.2.12 Polychlorinated Biphenyls (PCB)
A mixture of compounds composed of the biphenyl molecule which has been chlorinated to varying degrees.
1.2.13 Rubbish
Combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.
1.2.14 Sanitary Wastes
1.2.14.1 Sewage
Wastes characterized as domestic sanitary sewage.
SECTION 01 57 19 Page 3
1.2.14.2 Garbage
Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
1.2.15 Sediment
Soil and other debris that has eroded and has been transported by runoff water or wind.
1.2.16 Solid Waste
Rubbish, debris, garbage, and other discarded solid materials, except hazardous waste as defined in paragraph entitled "Hazardous Waste," resulting from industrial, commercial, and agricultural operations and from community activities.
1.2.17 Spill Event
A spill is any release of oil or hazardous substances to the water or ground that is not controlled or permitted. This includes any spilling, leaking, pumping, emitting, discharging, injecting, escaping, leaching, disposing, or dumping of liquid or solid material that is not authorized in writing by the Contracting Officer.
1.2.18 Reportable Release
A reportable release means any spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into the environment of a known or unknown material or hazardous substance that poses an immediate threat to human health or the environment to the air, soil, or water. Reportable releases are: a sheen of oil on the water; a violation of the Installation's or project's water permit (NPDES permit); a sewage spill that threatens human health or the environment; a Comprehensive Environmental Response, Compensation, and Liability Act reportable quantity for hazardous/toxic substances (40 CFR 302) ; an air or hazardous substance release that is a threat to human health or the environment, or released outside the facility boundaries; any discharge from an underground storage tank regulated under WAC 173-360; or oil spilled to the ground or to permeable secondary containment of 42 gallons and greater.
1.2.19 Underground Storage Tank (UST)
Any one or more combination of tanks, as set forth in NJAC 7:14B-1.6 , including appurtenant pipes, lines, fixtures and other related equipment, used to contain an accumulation of hazardous substances, including petroleum products, the volume of which, including the volume of the appurtenant pipes, lines, fixtures and other related equipment, is 10 percent or more below the ground.
1.2.20 Universal Waste
Any of the following dangerous waste that are subject to the universal waste requirements of WAC-173-303-573: Batteries as described in WAC-173-303-573(2)); Lamps as described in WAC-173-303-573(5);
Mercury-containing equipment as described in WAC-173-303-573(3).
SECTION 01 57 19 Page 4
1.2.21 Volatile Organic Substance
Any organic substances, mixture of organic and inorganic substances including, but not limited to, petroleum crude's, petroleum fractions, petrochemicals, solvents, diluents, and thinners which have vapor pressures or sums of partial pressures of substances of 0.02 pounds per square inch (one millimeter of mercury) absolute or greater measured at standard conditions of atmospheric pressure and a temperature of 60 degrees Fahrenheit; in the case of surface coating formulations, includes coalescing or other agent, regardless of vapor pressure, which evaporates from the coating during the drying phase; but does not include methane, CFC-11, CFC-12, CFC-22, CFC-23, CFC-113, CFC-114 and CFC-115.
1.2.22 Wetlands
Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support and under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs and similar areas. Wetland Inventory Maps, promulgated by the FAA in cooperation with the U.S. Fish and Wildlife Service, shall be used to identify wetlands to be protected on the FAA Technical Center.
Maps are available from Site Engineering, ANG-E343.
1.3 ASBESTOS
Remove, handle, and dispose of asbestos in accordance with FAA Safety Order 3900.55B and the WJH Technical Center Asbestos Abatement Scope of Work.
1.4 POLYCHLORINATED BIPHENYLS (PCB) CONTROL
Remove, handle, and dispose of PCB's in accordance with COMS Contract Attachment II, Section 13, Environmental Compliance and Hazardous Waste Removal.
1.5 WATER QUALITY
Manage Storm water in accordance with WJHTC CT Order 1050.3A and the WJHTC Storm water Management at Construction Sites Scope of Work.
Contractor shall be responsible for regular inspection of equipment and compliance with all applicable Environmental Compliance: Spill Prevention, Reporting Requirements and Liability Scope of Work.
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Health And Safety Plan; G
The Contractor shall submit four copies of a SSHP, each accompanied by an
SECTION 01 57 19 Page 5 electronic disk copy to the Contracting Officer within fourteen (14) days after the Notice to Proceed.
Disposal Permit For Hazardous Waste; G
Submit two (2) copies and an electronic copy of the applicable EPA and state permits or licenses for transportation, treatment, storage, and disposal of hazardous waste by permitted facilities.
SD-03 Product Data
Manufacturer's Msds Product Data Sheet; G
Submit (3) copies and an electronic copy of all MSDS for each material to be used in accordance with 29 CFR 1910.1200 , Subpart Z
SD-06 Test Reports
Abrasive Blasting Waste Materials Laboratory Analysis; G
Submit three copies and an electronic disk copy of an approved laboratory analysis of materials collected as a result from sandblasting or abrasive blasting operations before disposing of waste materials.
The laboratory shall be certified by the State of New Jersey for each parameter performed in accordance with NJAC 7:18-1.1 et. seq.
Monthly Recycling Report; G
Submit 2 copies and an electronic disk copy of the Monthly Recycling Report.
Laboratory Analysis; G
Submit three copies and an electronic disk copy of an approved laboratory analysis of materials collected before disposing of waste materials. The laboratory shall be certified by the State of New Jersey for each parameter performed in accordance with NJAC 7:18-1.1 et. seq.
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
3.1 PROTECTION OF NATURAL RESOURCES
Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work. Confine construction activities to within the limits of the work indicated or specified.
3.1.1 Land Resources
Except in areas to be cleared, do not remove, cut, deface, injure, or
SECTION 01 57 19 Page 6 destroy trees or shrubs without permission from the Contracting Officer and FAA Natural Resource Program Manager. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages unless authorized by the FAA Natural Resource Program Manager. Where such use of attached ropes, cables, or guys is authorized, the Contractor shall be responsible for any resultant damage.
3.1.1.1 Protection
Protect existing trees which are to remain and which may be injured, bruised, defaced, or otherwise damaged by construction operations. Remove displaced rocks from uncleared areas. By approved excavation, remove trees with 30 percent or more of their root systems destroyed. The use of heavy equipment within the drip line of trees which are to remain shall be avoided to prevent root system damage. Trees scheduled for removal will be marked by the Contracting Officer, FAA Natural Resource Program Manager, or the approved FAA representatives. Boards will not be nailed to trees that will be saved during construction. Tree limb removal, where necessary, will be done flush to trunk or main branch and finished with a smooth cut.
3.1.1.2 Replacement
Remove trees and other landscape features scarred or damaged by equipment operations, and replace with equivalent, native, undamaged trees and landscape features. Obtain Contracting Officer and FAA Natural Resources Program Manager approval before replacement.
3.1.1.3 Temporary Construction
Remove traces of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other signs of construction. Grade temporary roads, parking areas, and similar temporarily used areas to conform to surrounding contours. Temporary construction facilities shall not be located in or encroach upon wetlands, streams or wildlife management areas unless prior approval has been received from the Contracting Officer.
3.1.1.4 Replanting
Contractor shall be responsible to replant trees and/or shrubs until 100% survival is attained for one complete year after construction is completed.
3.1.2 Water Resources
3.1.2.1 Stream Crossings
Review and approval is required by the CO, the Wetland and Superfund Program Managers before any equipment will be permitted to ford live streams. A stream crossing may require Stream Encroachment Permit. Any work within a wetland or within 150 of it may require a wetlands permit.
In areas where frequent crossings are required, install temporary culverts or bridges. Remove temporary culverts or bridges upon completion of work, and repair the area to its original condition or as indicated or as specified. As stated in 1.9.7, it is the responsibility of the Contractor to prepare a permit application, pay any permit fees, obtain said permit and maintain compliance with the permit. All permit paperwork will be reviewed and approved by the FAA's Wetlands Program Manager before
SECTION 01 57 19 Page 7 submission.
3.1.2.2 Spill Prevention
Prevent oil based or other hazardous substances from entering soil, drainage areas, groundwater or surface water. Any tank utilized for storage of oils or other hazardous substances shall be double walled and designed to contain the type of liquids required for the project as well as providing secondary containment. All fuel oil tanks and other storage containers of hazardous substances must have secondary containment that can contain 110% by volume of the tank or containers contents in the event of a spill or leak. The secondary containment can include but not limited to dikes, berms, or impervious walls, curbing, culverts, weirs, booms or sorbent materials. All spills and discharges of oils or other hazardous substances shall be immediately reported by calling the Trouble Desk at
(609) 485-4122 and contacting the Contracting Officer or authorized representative in accordance with NJAC 7:1E-2.14 , Standard Operating Procedures.
3.1.2.3 Wetlands Protection
Except in conformance with an issued Federal or State permit, do not disturb, alter, fill, affect, drain, encroach upon or destroy any wetlands. Do not disturb, alter, fill, affect, encroach upon, or destroy upland buffers within 150 feet (and where specified by FAA as much as 300 feet) of a wetlands or alter surface or ground water flows into or from wetlands. Do not allow the discharge of petroleum products, pesticides, hazardous substances, chemicals, solid wastes or silt into wetlands. Do not stage construction materials, supplies, or equipment in wetlands or floodplains. When cement work is being done within 300 feet of a wetland, a concrete wash out will be used. All activities must comply with NJAC 7:7A , Freshwater Wetlands Protection Act Rules.
3.1.2.4 Dewatering Operations
There are currently 25 separate parcels of land called Areas of Concern (AOC's) located throughout the Center on which the disposal of hazardous wastes did occur or is suspected of having occurred. Because of these AOC's the entire Technical Center was placed on the National Priorities List on October 1, 1990. Consequently, if dewatering operations are contemplated the Superfund Program Manager must be consulted in writing to determine if contaminated ground water plumes associated with these AOC's will be adversely affected.
3.1.3 Fish and Wildlife Resources
Do not disturb fish and wildlife. Do not alter water flows or otherwise significantly disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as indicated or specified. Protect and do not alter, modify or affect endangered or threatened species habitat. Protect other noted critical fish and wildlife habitats. Comply with all Federal and State law and guidance regarding threatened and endangered species. If wildlife is encountered during construction activities the contractor must inform the FAA's Natural Resource Manager immediately.
3.1.3.1 Wildlife Hazard Abatement
Comply with the requirements and recommendations set forth in FAR Part 139
SECTION 01 57 19 Page 8 or as approved by the Contracting Officer.
3.2 CONTROL AND DISPOSAL OF SOLID AND SANITARY WASTE
Pick up solid wastes, and place in containers which are regularly emptied.
Do not prepare, cook, or dispose of food on the project site. Prevent contamination of the site of other areas when handling and disposing of wastes. On completion, leave the areas clean. Control and dispose of waste.
3.2.1 Disposal of Rubbish and Debris
Dispose of rubbish and debris in accordance with the requirements specified.
Remove and dispose rubbish and debris from Government property at a properly licensed facility.
3.2.2 Garbage Disposal
Place garbage in approved containers.
Remove and dispose rubbish and debris from Government property at a properly licensed facility.
3.2.3 Sewage, Odor, and Pest Control
Dispose of sewage through connection to a sanitary sewage system. Where such system is not available, use chemical toilets or comparably effective units, and periodically empty wastes into a municipal, sanitary sewage system, or construct and maintain an approved type of adequate sanitary convenience for the use of persons employed on the work in accordance with the General Paragraphs titled, "SANITATION." Include provisions for pest control in accordance with NJAC 7:30 and elimination of odors. Sewage discharges onto the land or into surface or ground water from leaks, spills or broken pipes must immediately be reported to the Security Operations Center. All sewage connections, with specific disposal plans must be pre-approved by the Infrastructure Operations and Maintenance Section, ANG-E331 through the Contracting Officer.
3.2.4 Sewage Connections
No sewer connection or lines of any type shall be constructed without a valid and current NJDEP Stage II Treatment Works Approval (TWA), Infrastructure Operations and Maintenance Section, ANG-E331, and Master Planning and Siting Board approval. No sewer connection, lines or treatment works shall operate without a valid, NJDEP approved Stage III TWA permit. Only municipal sewage shall be discharged into the sewage collection system. Any increase in municipal sewage must be reported to
ANG-E331.
3.2.5 Recycling
The Contractor shall comply with Center Order 1050.2C William J. Hughes Technical Center Wide Recycling Program 09-09-2010.
On a monthly basis the Contractor shall provide a written report of the
SECTION 01 57 19 Page 9 following solid waste and recycle categories:
Trash, bulk waste, cardboard, paper, comingled beverage containers, scrap metal construction debris, recycled petroleum, lead batteries, florescent tubes, concrete/asphalt, tree/stump waste, antifreeze.
3.3 CONTROL AND DISPOSAL OF HAZARDOUS WASTE
ANY manifest, disposal paperwork or bill of lading utilized to remove waste from this facility must be reviewed and signed by the FAA or COMS contractor Hazardous Waste Manager.
3.3.1 Hazardous Storage Containers
Choose approved containers utilizing the Hazardous Materials Table (HMT) in 49 CFR 172.101 . Refer to 49 CFR 173 to ensure manufacturing is in compliance with 49 CFR 178 . Store hazardous waste in approved containers properly labeled to identify the type of waste and the date the container was filled. Remove the containers from the project site, and handle, transport and dispose of hazardous waste within 90 days in accordance with 40 CFR 263 , 40 CFR 264 and NJAC 7:26G -7.1 through 12.1 et. seq. and paragraph 3.8 of this section. For oil and hazardous material spills, notify the Trouble Desk at (609) 485-4122, the Infrastructure Operations and Maintenance Section, ANG-E331 and the Contracting Officer immediately.
3.3.2 Petroleum Products
Conduct the fueling and lubricating of equipment and motor vehicles to protect against spills and evaporation by following standard operating procedures that minimize spill likelihood. Dispose of lubricants to be discarded and all excess oil as hazardous waste in accordance with NJAC 7:26G -7.1 to 9.1 et. seq.
3.3.3 Lead-Acid Battery Electrolyte
Dispose of electrolyte solution from lead-acid batteries. Do not dump electrolyte onto the ground or into storm drains or sanitary sewers.
Comply with 29 CFR 1910.178(g) , when installing or charging storage batteries. Use one of the following alternatives for disposal of waste electrolyte:
a. An industrial waste treatment plant, if available and approved by the Contracting Officer for neutralizing and disposing of battery acid electrolyte.
b. Transport the electrolyte to a state-approved hazardous waste disposal site. The method of transportation and equipment shall comply with applicable Federal and state regulations.
3.3.4 Discharges
Prevent discharges of hazardous materials or pollutants from entering the environment. If an accidental leak occurs, take immediate steps to contain free flowing liquid, e.g. construct temporary containment dikes or berms using an impermeable material or if need be, soil. All spills and discharges of hazardous materials shall be immediately reported to the Trouble Desk at (609) 485-4122, the Infrastructure Operations and Maintenance Section, ANG-E331and to the Contracting Officer in accordance with NJAC 1:E -2.14, Standard Operating Procedures.
SECTION 01 57 19 Page 10
3.4 DUST CONTROL
Keep dust down at all times, including during nonworking periods.
Sprinkle or treat, using water only, the soil at the site, haul roads, and other areas disturbed by operations. Dry power brooming will not be permitted. Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air blowing will be permitted only for cleaning nonparticulate debris such as steel reinforcing bars. Only wet cutting will be permitted for cutting concrete blocks, concrete, and bituminous concrete. Do not unnecessarily shake bags of cement, concrete mortar, or plaster.
3.5 ABRASIVE BLASTING
3.5.1 Abrasive Blasting Operations
Provide tarpaulin drop cloths and windscreens to enclose abrasive blasting operations to confine and collect dust, abrasive, agent, paint chips, and other debris in accordance with the requirements specified. Perform work involving removal of hazardous material in accordance with 29 CFR 1910.94 -SUBPART G. Dispose of nonhazardous abrasive blasting debris in accordance with the paragraph titled, "Disposal of Rubbish and Debris."
3.5.2 Disposal Requirements
Collect dust, sand, paint, and other debris resulting from abrasive blasting operations and store in 55-gallon drums with watertight lids.
Take a representative sample of this material, and test for TCLP Metals.
The sampling and testing shall be performed in accordance with 40 CFR 261 .
Handle debris resulting from the abrasive blasting operations as a hazardous material, and dispose of in accordance with NJAC 7:26G -7.1 et.
seq., 40 CFR 262ef Id , 40 CFR 263 , and 40 CFR 264 .
3.6 NOISE
Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times.
3.7 HAZARDOUS WASTE GENERATION
Handle generated hazardous waste (e.g. paints, oils, solvents, fuels, dielectric oil, etc.) in accordance with NJAC 7:26G -7.1 to 9.1 et. seq.
and with 40 CFR 262 . All hazardous waste shall be properly classified, packaged, marked and labeled prior to removal to a disposal facility.
3.7.1 Hazardous Waste Transportation
Transport hazardous waste in accordance with NJAC 7:26G -7.1 to 9.1 et.
seq. A hazardous waste manifest will be prepared for each shipment of hazardous waste. The transporter shall possess a valid Environmental Protection Agency (EPA) identification number and also be registered as a hazardous waste hauler with the State of New Jersey Department of Environmental Protection and any other applicable State. The Contracting Officer shall be notified at least five days prior to removal of any hazardous waste from the Technical Center.
A copy of the manifest shall be forwarded to the…