Attachment 6_End of Day Check List.docx

DOCX document 13 KB Posted

Attached to
Solicitation for Energy Efficiency upgrades to Buildings 305, 27, and 28 at the William J. Hughes Technical Center
Solicitation number
692M15-21-R-00015
Issued by

About this file

This document summarizes a federal solicitation for energy efficiency upgrades at multiple buildings. The Federal Aviation Administration is seeking proposals to replace skylight, storefront, entrance, and curtain wall systems and construct new vestibules at three buildings at its Technical Center in Atlantic City, New Jersey. Offerors must attend a mandatory site visit on February 9, 2021 and submit responses by February 25, 2021. Questions are due by February 15. The period of performance is 330 calendar days from notice to proceed. The work is being conducted through full and open competition under North American Industry Classification System code 236220 for commercial and institutional building construction.

View the file

Other files

File Type Posted
Additonal QUESTIONS And Answers 3.4.21.pdf PDF
SF30 for Amendment 005.pdf PDF
Amendment 005 to SIR_692M15-21-R-00015.pdf PDF
Question 29_Combined Cubicle Layout BLDG 305_27_28.pdf PDF
Questions and Answers.pdf PDF
Amendment 004 to SIR_692M15-21-R-00015.pdf PDF
SF30 for Amendment 0004.pdf PDF
Amendment 003_ Site Visit Sign in Sheet.pdf PDF
Amendment 002 to SIR_692M15-21-R-00015.pdf PDF
SF30 for Amendment 001.pdf PDF
Amendment 00001 to SIR_692M15-21-R-00015.pdf PDF
Amendment 00001 to Attachment 14_BLDG 305_Drawings_2 OF 3.pdf PDF
Attachment 3_SF-25A Payment Bond Form.doc DOC document
Attachment 15_BLDG 305_ Drawings_3 OF 3.pdf PDF
Attachment 5_Daily Construction Inspection Report-6900-3.doc DOC document
Attachment 2_SF-25 Performance Bond Form.pdf PDF
Attachment 8__Key Personnel Qualifications and Experience - IIP Comments (002)_response.docx DOCX document
Attachment 13_BLDG 305_Drawings_1 OF 3.pdf PDF
Attachment 1_SF-24 Bid Bond.pdf PDF
Attachment 14_BLDG 305_Drawings_2 OF 3.pdf PDF
Attachment 9_Corporate Experience_Final.docx DOCX document
Attachment 11_Project_Combined SPECIFICATIONS.pdf PDF
Attachment 12_BLDG 27 and 28 _Drawings.pdf PDF
Attachment 10_Subcontracting Plan_FInal.docx DOCX document
Energy Efficency SIR_692M15-21-R-00015.pdf PDF
Attachment 7_Site Safety Daily Inspection Report.docx DOCX document
Attachment 4_Department Of Labor General Wage Determination.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 305 AND 27 & 28 ENERGY IMPROVEMENT PROJECT

CONTRACT

WORKSITE END OF SHIFT DAILY CHECKLIST

DATE: ________________TIME: __________ AM PM (circle one)
GENERAL HOUSEKEEPING:Check to indicate completed and OK

Debris and trash have been removed from the work

areas of the building__________
Tools have been properly stored__________
Materials are properly staged and secured__________

WEATHERTIGHTNESS:

Membrane and seams have been checked__________
Flashings are secured and sealed__________
Temporary water cut-offs have been checked__________

SAFETY:

Flammables have been removed from the roof of the building, and have been properly stored in an approved on-ground

location at least 75 feet from the building__________
Chemicals are labeled and stored in appropriate containers__________
“Hot” equipment has cooled down or is stored away from the roof__________
Fire extinguishers are on hand and ready (near egresses)__________
Required fall protection measures are in place__________
Evacuation plan in place (exit routes identified)__________

Contractor Field Supt. /Delegate SIGNATURE -

FAA Const. Rep. SIGNATURE -