Attachment 13_BLDG 305_Drawings_1 OF 3.pdf

PDF 21 MB Posted

Attached to
Solicitation for Energy Efficiency upgrades to Buildings 305, 27, and 28 at the William J. Hughes Technical Center
Solicitation number
692M15-21-R-00015
Issued by

About this file

This document outlines a solicitation for energy efficiency upgrades to buildings at the William J. Hughes Technical Center. The Federal Aviation Administration is seeking proposals to perform upgrades to Building 305, which includes replacing skylights, storefront systems, and constructing new vestibules. Buildings 27 and 28 will have pyramid skylights, exterior storefront systems, curtain wall systems, and entrances replaced along with selected interior doors. The period of performance is 330 calendar days from the notice to proceed. A mandatory site visit is scheduled for February 9, 2021 and proposals are due by February 25, 2021. The principal NAICS code is 236220 for commercial and institutional building construction.

View the file

Other files

File Type Posted
Additonal QUESTIONS And Answers 3.4.21.pdf PDF
SF30 for Amendment 005.pdf PDF
Amendment 005 to SIR_692M15-21-R-00015.pdf PDF
Question 29_Combined Cubicle Layout BLDG 305_27_28.pdf PDF
Questions and Answers.pdf PDF
Amendment 004 to SIR_692M15-21-R-00015.pdf PDF
SF30 for Amendment 0004.pdf PDF
Amendment 003_ Site Visit Sign in Sheet.pdf PDF
Amendment 002 to SIR_692M15-21-R-00015.pdf PDF
SF30 for Amendment 001.pdf PDF
Amendment 00001 to SIR_692M15-21-R-00015.pdf PDF
Amendment 00001 to Attachment 14_BLDG 305_Drawings_2 OF 3.pdf PDF
Attachment 3_SF-25A Payment Bond Form.doc DOC document
Attachment 15_BLDG 305_ Drawings_3 OF 3.pdf PDF
Attachment 5_Daily Construction Inspection Report-6900-3.doc DOC document
Attachment 2_SF-25 Performance Bond Form.pdf PDF
Attachment 6_End of Day Check List.docx DOCX document
Attachment 8__Key Personnel Qualifications and Experience - IIP Comments (002)_response.docx DOCX document
Attachment 1_SF-24 Bid Bond.pdf PDF
Attachment 14_BLDG 305_Drawings_2 OF 3.pdf PDF
Attachment 9_Corporate Experience_Final.docx DOCX document
Attachment 11_Project_Combined SPECIFICATIONS.pdf PDF
Attachment 12_BLDG 27 and 28 _Drawings.pdf PDF
Attachment 10_Subcontracting Plan_FInal.docx DOCX document
Energy Efficency SIR_692M15-21-R-00015.pdf PDF
Attachment 7_Site Safety Daily Inspection Report.docx DOCX document
Attachment 4_Department Of Labor General Wage Determination.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2019-000031-G000

2019-000031-C101
2019-000031-A001
2019-000031-A101
2019-000031-A102
2019-000031-A111
2019-000031-A112
2019-000031-A113
2019-000031-A121
2019-000031-A201
2019-000031-A401
2019-000031-A402
2019-000031-A403
2019-000031-A404
2019-000031-A901
2019-000031-A902
2019-000031-S101
2019-000031-S401
2019-000031-S402
2019-000031-E101
2019-000031-E102
2019-000031-F001
2019-000031-F201

File details come from the government source that posted it. Updated .