This is a pricing schedule template spreadsheet for an IDIQ construction management services contract with the Architect of the Capitol. The template covers labor rates for 24 different personnel categories including Project Executive, Senior Construction Manager, various engineers and inspectors, and administrative staff.

The pricing schedule spans a base period (4/1/25-3/31/26) plus seven option years extending through 3/31/33, with an additional FAR 52.217-8 six-month extension option. The template requires contractors to provide hourly rates for each labor category across all contract periods. Key personnel categories include specialized roles such as Senior Commissioning Manager, Project Controls Engineer, MEP Inspector, Elevator Engineer, and various discipline-specific inspectors (mechanical, electrical, structural). The template is designed to support construction management services across multiple AOC facilities including the Capitol Complex, House and Senate Office Buildings, Library of Congress, Supreme Court, and other federal buildings in the Washington DC area.

View the file

Other files

File Type Posted
AOCACB24R0128 A06.pdf PDF
Attachment 14 - Statement of Work 2024 Amended 1-27-25.pdf PDF
AOCACB24R0128 A05.pdf PDF
Attachment 16 Wage Determination 12-23-2024.pdf PDF
Attachment 8 - Pricing Schedule CM IDIQ Template (With Hours) -Amended 1-16-25 Edit.xlsx XLSX spreadsheet
Attachment 7 - Pricing Schedule CM IDIQ Template (Rate Only) -Amended 1-16-25.xlsx XLSX spreadsheet
AOCACB24R0128 A04.pdf PDF
AOCACB24R0128 A03.pdf PDF
AOCACB24R0128 A02.pdf PDF
AOCACB24R0128 A01.pdf PDF
AOCACB24R0128 Solicitation.pdf PDF
Attachment 4 Confined Space Policy-Tunnel Projects-Utility Distribution System-Standard Operating Procedure (June 2011).pdf PDF
Attachment 5 SOP Capitol Power Plant.pdf PDF
Attachment 14 - Section C CMS Statement of Work 2024 Draft r1.pdf PDF
Attachment 2 _Non-disclosure Agreement for Contract Employees (Sensitive but Unclassified Info).pdf PDF
Attachment 3 Certificate of Liability Insurance Sam.pdf PDF
Attachment 7 - Pricing Schedule CM IDIQ Template (Rate Only).pdf PDF
Attachment 10 Section M EVALUATION FACTORS FOR AWARD.pdf PDF
Attachment 13 Past Performance Questionnaire.pdf PDF
Attachment 6 USCP Request for Check of Criminal History-Form CP-491 (January 2021).pdf PDF
Attachment 8 - Pricing Schedule CM IDIQ Template (With Hours).pdf PDF
Attachment 8 - Pricing Schedule CM IDIQ Template (With Hours).xlsx XLSX spreadsheet
Attachment 9 Section L INSTRUCTIONS CONDITIONS.pdf PDF
Attachment 11 - Section H - Ordering Procedures.pdf PDF
Attachment 12 - CUI Order 42-4 Security of Controlled Unclassified Information.pdf PDF
Attachment 1 Blanket NDA for eBuilder Team (Template).pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2024 IGE

Construction Management Services IDIQ Pricing Schedule FY25-33
Contractor Name:
Base (4/1/25-3/31/26)Opt 1 (4/1/26-3/31/27)Opt 2 (4/1/27-3/31/28)Opt 3 (4/1/28-3/31/29)Opt 4 (4/1/29-3/31/30)Opt 5 (4/1/230-3/31/31)Opt 6 (4/1/31-3/31/32)Opt 7 (4/1/32-3/31/33)FAR52.217-8 Extension Option
Item No.DescriptionBase Rate ($/Hr)Option 1 Rate ($/Hr)Option 2 Rate ($/Hr)Option 3 Rate ($/Hr)Option 4 Rate ($/Hr)Option 5 Rate ($/Hr)Option 6 Rate ($/Hr)Option 7 Rate ($/Hr)6 months FAR52.217-8 Option Rate ($/Hr)
0001Project Executive
0002Senior Construction Manager
0003Construction Manager
0004Senior Scheduler / Analyst
0005Senior Claims Analyst
0006Senior Commissioning Manager
0007Senior Program Manager
0008Project Architect - Manager
0009Project Engineer - Manager
0010General Engineer
0011Elevator Engineer
0012Project Controls Engineer
0013Safety / OSHA Inspector
0014Cost Estimator
0015Architectural Inspector
0016Mechanical Inspector
0017Electrical Inspector
0018Structural Inspector
0019MEP Inspector
0020General Inspector
0021Elevator Inspector
0022Concrete / Masonry Inspector
0023CAD Draftsmen
0024Administrative Assistant
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0