This is a Standard Operating Procedure (SOP) document for the Capitol Power Plant that establishes policies and procedures for CPP badging and site access control. The document, dated October 4, 2013, outlines the requirements and processes for issuing, controlling, and returning contractor badges (AOC and CPP Site-Specific badges) for all contractors entering and working on CPP grounds and projects.

The SOP details two types of badges: AOC badges that allow contractors access to the CPP, UDS Tunnel System, and certain AOC off-site facilities, and CPP badges that permit access only to the CPP complex. Key requirements include criminal history records checks (CP-491), building access card requests (CP-254B), and E-Verify verification. The document specifies that contractors must provide 24-hour notice for visitor access, requires escorts for unbadged contractors, and mandates immediate reporting of lost or stolen badges. The document includes contact information for CPP Office Contact Persons and COTR Designees, as well as a comprehensive list of authorized contractor designees from companies including AOC EMP/PPM, PARSONS, GRIMBERG, and PES who may escort CPP contractors and visitors.

View the file

Other files

File Type Posted
AOCACB24R0128 A06.pdf PDF
Attachment 14 - Statement of Work 2024 Amended 1-27-25.pdf PDF
Attachment 7 - Pricing Schedule CM IDIQ Template (Rate Only) -Amended 1-16-25.xlsx XLSX spreadsheet
AOCACB24R0128 A05.pdf PDF
Attachment 16 Wage Determination 12-23-2024.pdf PDF
Attachment 8 - Pricing Schedule CM IDIQ Template (With Hours) -Amended 1-16-25 Edit.xlsx XLSX spreadsheet
AOCACB24R0128 A04.pdf PDF
AOCACB24R0128 A03.pdf PDF
AOCACB24R0128 A02.pdf PDF
AOCACB24R0128 A01.pdf PDF
Attachment 6 USCP Request for Check of Criminal History-Form CP-491 (January 2021).pdf PDF
Attachment 2 _Non-disclosure Agreement for Contract Employees (Sensitive but Unclassified Info).pdf PDF
Attachment 3 Certificate of Liability Insurance Sam.pdf PDF
Attachment 7 - Pricing Schedule CM IDIQ Template (Rate Only).pdf PDF
Attachment 10 Section M EVALUATION FACTORS FOR AWARD.pdf PDF
Attachment 13 Past Performance Questionnaire.pdf PDF
Attachment 7 - Pricing Schedule CM IDIQ Template (Rate Only).xlsx XLSX spreadsheet
Attachment 8 - Pricing Schedule CM IDIQ Template (With Hours).pdf PDF
Attachment 8 - Pricing Schedule CM IDIQ Template (With Hours).xlsx XLSX spreadsheet
Attachment 9 Section L INSTRUCTIONS CONDITIONS.pdf PDF
Attachment 11 - Section H - Ordering Procedures.pdf PDF
Attachment 12 - CUI Order 42-4 Security of Controlled Unclassified Information.pdf PDF
Attachment 1 Blanket NDA for eBuilder Team (Template).pdf PDF
AOCACB24R0128 Solicitation.pdf PDF
Attachment 4 Confined Space Policy-Tunnel Projects-Utility Distribution System-Standard Operating Procedure (June 2011).pdf PDF
Attachment 14 - Section C CMS Statement of Work 2024 Draft r1.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .