Attachment 5 SOP Capitol Power Plant.pdf
PDF 2 MB Posted
- Attached to
- Construction Management IDIQ
- Solicitation number
- AOCACB24R0128
- Issued by
-
Architect of the Capitol
About this file
This is a Standard Operating Procedure (SOP) document for the Capitol Power Plant that establishes policies and procedures for CPP badging and site access control. The document, dated October 4, 2013, outlines the requirements and processes for issuing, controlling, and returning contractor badges (AOC and CPP Site-Specific badges) for all contractors entering and working on CPP grounds and projects.
The SOP details two types of badges: AOC badges that allow contractors access to the CPP, UDS Tunnel System, and certain AOC off-site facilities, and CPP badges that permit access only to the CPP complex. Key requirements include criminal history records checks (CP-491), building access card requests (CP-254B), and E-Verify verification. The document specifies that contractors must provide 24-hour notice for visitor access, requires escorts for unbadged contractors, and mandates immediate reporting of lost or stolen badges. The document includes contact information for CPP Office Contact Persons and COTR Designees, as well as a comprehensive list of authorized contractor designees from companies including AOC EMP/PPM, PARSONS, GRIMBERG, and PES who may escort CPP contractors and visitors.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .