Attachment 7 - Price Worksheet.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- W912DY24R0047
About this file
This document is a Price Worksheet attachment for a Request for Proposal (RFP) issued by the U.S. Army Corps of Engineers (USACE), Huntsville Center (HNC) for energy management services under a Utility Energy Services Contract (UESC) for the United States Army Garrison (USAG) Miami in Miami, FL.
The RFP requires offerors to provide calculations and narratives to support their proposed Maximum Implementation Markup, Maximum Performance Markup, and Maximum Spread Above Treasury Rate. The implementation period covers installation, testing, and government acceptance of energy conservation measures, while the performance period includes post-acceptance activities. The markups must include indirect labor, overhead, sales/administrative expenses, contractor markup of subcontractor costs, and profit, but exclude estimated costs, O&M costs, and finance charges. The document also includes a labor rate table for key personnel over three years. The period of performance for the resulting UESC contract shall not exceed 25 years.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Maximum Implementation Mark-up | |
| Each offeror is required to provide calculations in excel format with narrative/basis to show how the Maximum Implementation Mark-up was estimated. | |
| The implementation period shall include all time required for installation, testing, measuring initial performance, and Government | |
| acceptance of all energy conservation measures. |
| Maximum Performance Mark-up | |
| Each offeror is required to provide calculations in excel format with narrative/basis to show how the Maximum Performance Mark-up was estimated. | |
| The performance period includes all post acceptance activities. |
| Maximum Spread Above Treasury Rate | |
| Each offeror is required to provide calculations in excel format with narrative/basis to show how the Maximum Spread Above Treasury Rate was estimated. |
| Definition - Markup | |
| Markup. The maximum of difference between the Contractor’s proposed payment and the combination of the amortized estimated cost and Operation and | |
| Maintenance (O&M) costs of the Energy Conservation Measures (ECM). (Direct costs X Markup = Proposed Price) The markup shall include: indirect labor; | |
| overhead costs; sales, general and administrative expenses; Prime Contractor markup of subcontractor-supplied equipment, material, or labor; profit to the Contractor; | |
| and other costs that are not directly attributable to the project. |
| The markup may be negotiated to a lower rate at time of award. Indirect labor shall include any salaries that cannot be |
| directly attributed to a specific task and therefore must be distributed across several tasks or projects. Indirect labor shall be included in overhead. |
| These costs shall not be recovered by the Contractor except through the percent markup. The markup shall not include estimated costs, O&M costs, and finance charges. |
| FIRMS THAT ARE WHOLLY OR PARTLY OWNED BY THE CONTRACTOR OR THE CONTRACTOR’S PARENT COMPANY SHALL |
| NOT BE CONSIDERED SUBCONTRACTORS AS THE TERM RELATES TO MARKUP. This means only one markup will be applied to the |
| sister company, parent, or other such relative and the contractor for this contract. |
Mark-up Percentage
| Maximum Implementation Mark-up | 0.00% |
| Maximum Spread Above Treasury Rate | 0.00% |
| Maximum Performance Mark-up | 0.00% |
| Maximum Spread Above Treasury Rate | 0.00% |
| Supporting Narrative/Basis: See Instructions tab for guidance required to estimate maximum markups and spreads (i.e. what are the components that make up the percentages and the calculations/basis performed that explains how they were estimated?) |
Labor Rate - Key Personnel
| 2024 | Labor Categories | |
| Unburdened Rate | ||
| Key Personnel | Project Developer | |
| Key Personnel | Project Manager | |
| Key Personnel | Site Superintendent | |
| Key Personnel | Lead Mechanical Engineer | |
| Key Personnel | Lead Electrical Engineer | |
| Key Personnel | Site Safety and Health Officer | |
| Key Personnel | Quality Control Manager | |
| 2025 | Labor Categories | |
| Unburdened Rate | ||
| Key Personnel | Project Developer | |
| Key Personnel | Project Manager | |
| Key Personnel | Site Superintendent | |
| Key Personnel | Lead Mechanical Engineer | |
| Key Personnel | Lead Electrical Engineer | |
| Key Personnel | Site Safety and Health Officer | |
| Key Personnel | Quality Control Manager | |
| 2026 | Labor Categories | |
| Unburdened Rate | ||
| Key Personnel | Project Developer | |
| Key Personnel | Project Manager | |
| Key Personnel | Site Superintendent | |
| Key Personnel | Lead Mechanical Engineer | |
| Key Personnel | Lead Electrical Engineer | |
| Key Personnel | Site Safety and Health Officer | |
| Key Personnel | Quality Control Manager |