Attachment 7 - Price Worksheet.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Request for Proposal U. S. Army Garrison Miami - UESC
Solicitation number
W912DY24R0047
Issued by

About this file

This document is a Price Worksheet attachment for a Request for Proposal (RFP) issued by the U.S. Army Corps of Engineers (USACE), Huntsville Center (HNC) for energy management services under a Utility Energy Services Contract (UESC) for the United States Army Garrison (USAG) Miami in Miami, FL.

The RFP requires offerors to provide calculations and narratives to support their proposed Maximum Implementation Markup, Maximum Performance Markup, and Maximum Spread Above Treasury Rate. The implementation period covers installation, testing, and government acceptance of energy conservation measures, while the performance period includes post-acceptance activities. The markups must include indirect labor, overhead, sales/administrative expenses, contractor markup of subcontractor costs, and profit, but exclude estimated costs, O&M costs, and finance charges. The document also includes a labor rate table for key personnel over three years. The period of performance for the resulting UESC contract shall not exceed 25 years.

View the file

Other files

File Type Posted
UESC Solicitation Amend 0007_USAG Miami_4Mar2025.pdf PDF
Attachment 17 RFP Questions and Answers 2.pdf PDF
UESC Solicitation Amend 0006_USAG Miami_12Feb2025.pdf PDF
Attachment 16 Site Access Instructions.pdf PDF
Attachment 11 (SitePowerMap-wOneLine).pdf PDF
UESC Solicitation Amend 0005_USAG Miami_6Feb2025.pdf PDF
Attachment 14 (LightingPlan-Bldg3-AGB).pdf PDF
Attachment 13 (LightingPlan-Bldg2-CCA).pdf PDF
Attachment 12 (LightingPlan-Bldg1-HQ).pdf PDF
UESC Solicitation Amend_0002_USAG_Miami_9Aug2024.pdf PDF
Attachment 15 (USAG-MiamiUsageFY20-24).pdf PDF
Attachment 10 RFP Questions and Answers.pdf PDF
UESC Solicitation Amend 0003_USAG Miami_5Sep2024.pdf PDF
UESC Solicitation Amendment 0002 W912DY-24-R-0047_9Aug2024.pdf PDF
Solicitation_W912DY-24-R-0047_Amend_0001_USAG_Miami_17Jul2024.pdf PDF
Attachment 9 - BAA Certification for Contractors Signature.docx DOCX document
Attachment 2 - UESC Financial Schedules 1-5a.xlsx XLSX spreadsheet
Attachment 4a - DBA Wage Determination - Building.pdf PDF
Attachment 4c - SCA Wage Determination.pdf PDF
Solicitation_W912DY-24-R-0047_USAG_Miami_12Jul2024.pdf PDF
Attachment 8 - Small Business Participation Plan.pdf PDF
Attachment 6 - Past Performance Questionnaire.docx DOCX document
Attachment 5 - Letter of Commitment of Key Subcontractor.docx DOCX document
Attachment 4b - DBA Wage Determination - Heavy.pdf PDF
Attachment 1 - PWS for USAG Miami.docx DOCX document
Attachment 3 - UESC Data Item Descriptions.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Maximum Implementation Mark-up
Each offeror is required to provide calculations in excel format with narrative/basis to show how the Maximum Implementation Mark-up was estimated.
The implementation period shall include all time required for installation, testing, measuring initial performance, and Government
acceptance of all energy conservation measures.
Maximum Performance Mark-up
Each offeror is required to provide calculations in excel format with narrative/basis to show how the Maximum Performance Mark-up was estimated.
The performance period includes all post acceptance activities.
Maximum Spread Above Treasury Rate
Each offeror is required to provide calculations in excel format with narrative/basis to show how the Maximum Spread Above Treasury Rate was estimated.
Definition - Markup
Markup. The maximum of difference between the Contractor’s proposed payment and the combination of the amortized estimated cost and Operation and
Maintenance (O&M) costs of the Energy Conservation Measures (ECM). (Direct costs X Markup = Proposed Price) The markup shall include: indirect labor;
overhead costs; sales, general and administrative expenses; Prime Contractor markup of subcontractor-supplied equipment, material, or labor; profit to the Contractor;
and other costs that are not directly attributable to the project.
The markup may be negotiated to a lower rate at time of award. Indirect labor shall include any salaries that cannot be
directly attributed to a specific task and therefore must be distributed across several tasks or projects. Indirect labor shall be included in overhead.
These costs shall not be recovered by the Contractor except through the percent markup. The markup shall not include estimated costs, O&M costs, and finance charges.
FIRMS THAT ARE WHOLLY OR PARTLY OWNED BY THE CONTRACTOR OR THE CONTRACTOR’S PARENT COMPANY SHALL
NOT BE CONSIDERED SUBCONTRACTORS AS THE TERM RELATES TO MARKUP. This means only one markup will be applied to the
sister company, parent, or other such relative and the contractor for this contract.

Mark-up Percentage

Maximum Implementation Mark-up0.00%
Maximum Spread Above Treasury Rate0.00%
Maximum Performance Mark-up0.00%
Maximum Spread Above Treasury Rate0.00%
Supporting Narrative/Basis: See Instructions tab for guidance required to estimate maximum markups and spreads (i.e. what are the components that make up the percentages and the calculations/basis performed that explains how they were estimated?)

Labor Rate - Key Personnel

2024Labor Categories
Unburdened Rate
Key PersonnelProject Developer
Key PersonnelProject Manager
Key PersonnelSite Superintendent
Key PersonnelLead Mechanical Engineer
Key PersonnelLead Electrical Engineer
Key PersonnelSite Safety and Health Officer
Key PersonnelQuality Control Manager
2025Labor Categories
Unburdened Rate
Key PersonnelProject Developer
Key PersonnelProject Manager
Key PersonnelSite Superintendent
Key PersonnelLead Mechanical Engineer
Key PersonnelLead Electrical Engineer
Key PersonnelSite Safety and Health Officer
Key PersonnelQuality Control Manager
2026Labor Categories
Unburdened Rate
Key PersonnelProject Developer
Key PersonnelProject Manager
Key PersonnelSite Superintendent
Key PersonnelLead Mechanical Engineer
Key PersonnelLead Electrical Engineer
Key PersonnelSite Safety and Health Officer
Key PersonnelQuality Control Manager