Attachment 7 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 6-8.pdf

PDF 31 MB Posted

Attached to
Y1DA--556-402 Expand Sterile Processing Service (SPS) - Construction - Lovell FHCC, North Chicago, IL
Solicitation number
36C77624B0018
Issued by

About this file

This document appears to be Attachment 7 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 6-8.pdf, which is associated with the federal contract opportunity for Solicitation Number 36C77624B0018 "Y1DA--556-402 Expand Sterile Processing Service (SPS) - Construction - Lovell FHCC, North Chicago, IL" issued by the Department of Veterans Affairs Technology Acquisition Center Austin.

The document contains drawings related to the construction project to expand the Sterile Processing Service (SPS) at the Lovell Federal Health Care Center in North Chicago, Illinois. The drawings appear to cover details such as floor plans, equipment layouts, and mechanical systems. No additional details about the required products, services, pricing, or other contract terms are provided in this attachment.

View the file

Other files

File Type Posted
S06 - 36C77624B0018 0004.pdf PDF
Attachment 25 - Bid Abstract OF 1419 - SPS North Chicago - Signed.pdf PDF
Attachment 26 - Bid Abstract OF 1419A - SPS North Chicago.pdf PDF
Attachment 24 - 556-402 SPS 100CD Specs Div 221300 Facility Sanitary and Vent Piping.pdf PDF
S06 - 36C77624B0018 0003.pdf PDF
S06 - 36C77624B0018 0002.pdf PDF
Attachment 22 - Technical Questions and Responses - SPS North Chicago.pdf PDF
Attachment 23 - RFI97 Atch - Bldg133CA - LDP-1-F9 QMDP-1-G3.pdf PDF
S06 - 36C77624B0018 0001.pdf PDF
Attachment 21 - Site Visit Sign-in Sheet SPS North Chicago_15JUL24.pdf PDF
Attachment 13 - 556-402 SPS 100CD SpecsV2 29NOV22-r14JUN24.pdf PDF
Attachment 12 - 556-402 SPS 100CD SpecsV1 29NOV22-r14JUN24.pdf PDF
Attachment 20 - Division Cost Breakdown - BLANK.xlsx XLSX spreadsheet
Attachment 11 - 556-402 SPS 100CD Reports 29NOV22.pdf PDF
Attachment 10 - 556-402 Expand SPS - 100CD Equip Cut Sheets - Excerpt.pdf PDF
Attachment 3 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 2-8.pdf PDF
Attachment 16 - Wage Determination - Lake County.pdf PDF
Attachment 14 - 556-402 SPS 100CD Struct Interior Design V1 29NOV22-r14JUN24.pdf PDF
Attachment 17 - Limitations on Subcontracting - Construction.docx DOCX document
S02 - 36C77624B0018.pdf PDF
Attachment 15 - 556-402 SPS 100CD Struct Interior Design V2 29NOV22-r14JUN24.pdf PDF
Attachment 4 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 3-8.pdf PDF
Attachment 19 - Contractors Statement for Exempt Organization - Illinois.docx DOCX document
Attachment 6 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 5-8.pdf PDF
Attachment 8 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 7-8.pdf PDF
Attachment 18 - Illinois Tax Language - 1.26.2023 - FINAL.docx DOCX document
Attachment 9 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 8-8.pdf PDF
Attachment 5 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 4-8.pdf PDF
Attachment 1 - 556-402 Expand SPS - GC SOW 29MAR24.docx DOCX document
Attachment 2 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 1-8.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/5

/2

:0

:1

P M

GI001

COVER

MP

133CA

C A P T. J A M E S A. L O V E L L F E D E R A L H E A L T H C A R E C E N T E R

EXPAND STERILE PROCESSING SERVICE (SPS)

NORTH CHICAGO, ILLINOIS, 60064

SITE LOCATION

VA Contract Number: 36C77622C0002

VA Point of Contact:

Daniel J. Lid, D: (224) 610-3567, Contracting Officer's Representative (COR)

Mark Revisions: Date: 07/05/2023 REVISIONS

11/29/2022

REV 6/14/2024

Volume 6 of 8

ISSUED 11/29/2022

SET REV 06/14/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/2

/2

:1

:3

P

M

GI002

INDEX OF DRAWINGS

MP

133CA

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

GENERAL

GI001 COVER

GI002 INDEX OF DRAWINGS

GI101 PHASING PLANS

GI102 FLOW DIAGRAMS

GI103 BID ALTERNATE 1 & 2

GI104 BID ALTERNATE 3 & 4

LIFE SAFETY

LS000 CODE COMPLIANCE SUMMARY PLAN

LS100 PIPE BASEMENT - LIFE SAFETY PLAN

LS101 BASEMENT FLOOR - LIFE SAFETY PLAN

LS102 FIRST FLOOR - LIFE SAFETY PLAN

LS103 EGRESS PHASING COMPLIANCE PLAN - BASEMENT

HAZARDOUS MATERIALS

HA101 BASEMENT FLOOR PLAN – ASBESTOS ABATEMENT

CIVIL

CD100 DEMOLITION PLAN PHASE 1

SP100 SITE PLAN PHASE 1

CS500 SITE DETAILS PHASE 1

CS501 SITE DETAILS PHASE 1

CG100 GRADING PLAN PHASE 1

CU100 OVERALL UTILITY PLAN PHASE 1

CU101 SANITARY SEWER PLAN & PROFILE PHASE 1

CU104 STORM SEWER PLAN AND PROFILE PHASE 1

CU500 STORM SEWER DETAILS PHASE 1

CU501 STORM SEWER DETAILS PHASE 1

STRUCTURAL

SG001 STRUCTURAL GENERAL NOTES

SD1PB.1 PIPE BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 1

SD100.1 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEVATION - PHASE 1

SD100.2 BASEMENT FLOOR - DEMO PLAN & ELEVATION - PHASE 2

SD100.3 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 3

SD100.4 BASEMENT FLOOR - PARTIAL DEMO PLAN - PHASE 4

SB1PB.1 PIPE BASEMENT FLOOR - FNDN. & MUD SLAB PLAN - PHASE 1

SB1PB.2 PIPE BASEMENT FLOOR - FOUNDATION & MUD SLAB - PHASE 2

SB301 STRUCTURAL SECTIONS

SB501 FOUNDATION DETAILS & SCHEDULES

SB502 FOUNDATION DETAILS

SF100.1 BASEMENT FLOOR FRAMING PLAN - PHASE 1

SF100.2 BASEMENT FLOOR FRAMING PLAN - PHASE 2

SF100.3 BASEMENT FLOOR - FRAMING PLAN - PHASE 3

SF101.2 FIRST FLOOR - MECHANICAL PENTHOUSE FRAMING PLAN - PHASE 2

SF102.2 SECOND FLOOR - ROOF FRAMING PLAN - PHASE 2

SF401 ELEVATIONS & DETAILS

SF402 STRUCTURAL RETROFIT ELEVATIONS IN BUILDING 133-C

SF501 FRAMING DETAILS

SF502 FRAMING DETAILS

SF503 FRAMING DETAILS

SF504 FRAMING DETAILS

SF510 LIGHT GAGE FRAMING STRUCTURAL DETAILS

SF511 WALL SECTIONS -LIGHT GAGE INFORMATION

SF600 LIVE LOAD DIAGRAM - BASEMENT FLOOR

SF601 LIVE LOAD DIAGRAM - FIRST FLOOR

ARCHITECTURAL

AG001 ARCHITECTURAL ABBREVIATIONS, LEGENDS AND NOTES

AD1PB.2 PIPE BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2

AD100.1 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 1

AD100.2 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2

AD100.3 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 3

AD100.4 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 4

AD101.2 FIRST FLOOR - DEMOLITION PLAN - PHASE 2

AD102.2 SECOND FLOOR - DEMOLITION PLAN - PHASE 2

AE1PB.2 PIPE BASEMENT FLOOR - FLOOR PLAN - PHASE 2

AE100.1 BASEMENT FLOOR - FLOOR PLAN - PHASE 1

AE100.2 BASEMENT FLOOR - FLOOR PLAN - PHASE 2

AE100.3 BASEMENT FLOOR - FLOOR PLAN - PHASE 3

AE100.4 BASEMENT FLOOR - FLOOR PLAN - PHASE 4

AE101.2 FIRST FLOOR - MECHANICAL PENTHOUSE PLAN - PHASE 2

AE102.2 SECOND FLOOR - ROOF PLAN - PHASE 2

AE110.1 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 1

AE110.2 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 2

AE110.3 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 3

AE110.4 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 4

AE201 EXTERIOR ELEVATIONS

AE301 BUILDING SECTIONS

AE302 WALL SECTIONS

AE303 WALL SECTIONS

AE304 WALL SECTIONS

AE401 ENLARGED PLANS AND ELEVATIONS

AE402 ENLARGED PLANS AND ELEVATIONS

AE501 EXTERIOR DETAILS

AE502 WALL SECTIONS & DETAILS

AE503 EXPANSION JOINT DETAILS

AE504 PLAN DETAILS

AE505 PLAN DETAILS

AE531 CEILING DETAILS

AE601 ROOM PROGRAM SCHEDULE

AE602 DOOR SCHEDULES AND DETAILS

AE801 WALL TYPES

AE901 EXTERIOR RENDERINGS AND INTERIOR 3D VIEWS

AE902 BASEMENT FLOOR - FUNCTIONAL AREA PLAN

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

INTERIORS

IN100.1 BASEMENT FLOOR - INTERIORS PLAN - PHASE 1

IN100.2 BASEMENT FLOOR - INTERIORS PLAN - PHASE 2

IN100.3 BASEMENT FLOOR - INTERIORS PLAN - PHASE 3

IN100.4 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4

IN100.41 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 1

IN100.42 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 2

IN100.43 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 3

IN100.44 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 4

IN101.2 FIRST FLOOR - INTERIORS PLAN - PHASE 2

IN501 INTERIORS DETAILS

IN601 ROOM FINISH SCHEDULE

IN602 ROOM FINISH SCHEDULE - BID ALTERNATES

IN603 SIGNAGE SCHEDULE

EQUIPMENT

QH100.2C BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA C

QH100.2D BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D

QH100.4A BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA A

QH100.4B BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA B

QH101.2D FIRST FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D

QH601 EQUIPMENT JSN SCHEDULES

FIRE PROTECTION

FA000 FIRE ALARM NOTES AND DETAILS

FA101 BASEMENT - FIRE ALARM PLAN

FA102 FIRST FLOOR - FIRE ALARM PLAN

FX000 FIRE SUPPRESSION NOTES AND DETAILS

FX101 BASEMENT - FIRE SUPPRESSION PLAN

FX102 FIRST FLOOR - FIRE SUPPRESSION PLAN

PLUMBING

P000 PLUMBING COVERSHEET

PD1PB.2 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 2

PD1PB.4 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 4

PD100.4 BASEMENT DEMOLITION - PLUMBING - PHASE 4

P1PB.0 PIPE BASEMENT - PLUMBING - ALL PHASES

P1PB.2 PIPE BASEMENT - PLUMBING - PHASE 2

P1PB.3 PIPE BASEMENT - PLUMBING - PHASE 3

P1PB.4 PIPE BASEMENT - PLUMBING - PHASE 4

P1PB.44 PIPE BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4

P100.0 BASEMENT - PLUMBING - ALL PHASES

P100.2 BASEMENT - PLUMBING - PHASE 2

P100.3 BASEMENT - PLUMBING - PHASE 3

P100.4 BASEMENT - PLUMBING - PHASE 4

P100.44 BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4

P101.0 FIRST FLOOR - PLUMBING - ALL PHASES

P101.2 FIRST FLOOR - PLUMBING - PHASE 2

P102.0 SECOND FLOOR - PLUMBING - ALL PHASES

P102.2 SECOND FLOOR - PLUMBING - PHASE 2

P200 PLUMBING ENLARGED PLAN

P300 D.I. WATER FLOW DIAGRAM

P301 PLUMBING SANITARY-VENT RISER DIAGRAM - PHASE 2

P302 PLUMBING DOMESTIC WATER RISER DIAGRAM - PHASE 2

P303 PLUMBING RISER DIAGRAM - PHASE 4

P304 DI WATER RISER DIAGRAM - PHASE 2

P400 PLUMBING DETAILS

P401 PLUMBING DETAILS

P500 PLUMBING SCHEDULES

MECHANICAL

M000 MECHANICAL COVERSHEET

MD2PB.2 PIPE BASEMENT DEMOLITION - PIPING - PHASE 2

MD100.1 BASEMENT DEMOLITION - VENTILATION - PHASE 1

MD100.2 BASEMENT DEMOLITION - VENTILATION - PHASE 2

MD100.3 BASEMENT DEMOLITION - VENTILATION - PHASE 3

MD100.4 BASEMENT DEMOLITION - VENTILATION - PHASE 4

MD101.2 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 2

MD101.4 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 4

MD102.4 SECOND FLOOR DEMOLITION – VENTILATION – PHASE 4

MD103.4 THIRD FLOOR DEMOLITION – VENTILATION – PHASE 4

MD104.4 FOURTH FLOOR DEMOLITION – VENTILATION – PHASE 4

MD200.4 BASEMENT DEMOLITION - PIPING - PHASE 4

M1PB.2 PIPE BASEMENT - VENTILATION - PHASE 2

M2PB.2 PIPE BASEMENT - PIPING - PHASE 2

M100.0 BASEMENT - VENTILATION - ALL PHASES

M100.1 BASEMENT - VENTILATION - PHASE 1

M100.2 BASEMENT - VENTILATION - PHASE 2

M100.3 BASEMENT - VENTILATION - PHASE 3

M100.4 BASEMENT - VENTILATION - PHASE 4

M100.41 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 1

M100.42 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 2

M100.43 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 3

M100.44 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 4

M101.0 FIRST FLOOR - VENTILATION - ALL PHASES

M101.2 FIRST FLOOR - VENTILATION - PHASE 2

M101.4 FIRST FLOOR - VENTILATION - PHASE 4

M102.0 SECOND FLOOR - VENTILATION - ALL PHASES

M102.2 SECOND FLOOR - VENTILATION - PHASE 2

M200.0 BASEMENT - PIPING - ALL PHASES

M200.2 BASEMENT - PIPING - PHASE 2

M200.4 BASEMENT - PIPING - PHASE 4

M200.44 BASEMENT – PIPING – PHASE 4 – BID ALTERNATE 4

M201.0 FIRST FLOOR - PIPING - ALL PHASES

M201.2 FIRST FLOOR - PIPING - PHASE 2

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

M300 MECHANICAL DETAILS

M301 MECHANICAL DETAILS

M302 MECHANICAL DETAILS

M303 MECHANICAL DETAILS

M304 AHU COMPONENT PLAN

M305 AIRFLOW MAP

M306 AIRFLOW MAP

M307 STEAM FLOW DIAGRAM

M400 MECHANICAL DIAGRAMS

M401 MECHANICAL DIAGRAMS

M402 MECHANICAL DIAGRAMS

M403 MECHANICAL DIAGRAMS

M600 MECHANICAL SCHEDULES

M601 MECHANICAL SCHEDULES

ELECTRICAL

E000 ELECTRICAL COVERSHEET

ED100.1 BASEMENT DEMOLITION - ELECTRICAL- PHASE 1

ED100.2 BASEMENT DEMOLITION - ELECTRICAL - PHASE 2

ED100.3 BASEMENT DEMOLITION - ELECTRICAL - PHASE 3

ED100.4 BASEMENT DEMOLITION - ELECTRICAL - PHASE 4

E1PB.2 SUB BASEMENT - ELECTRICAL - PHASE 2

E100.0 BASEMENT - POWER - ALL PHASES

E100.1 BASEMENT - POWER - PHASE 1

E100.2 BASEMENT - POWER - PHASE 2

E100.3 BASEMENT - POWER - PHASE 3

E100.4 BASEMENT - POWER - PHASE 4

E100.41 BASEMENT - POWER - PHASE 4 - ALTERNATE 1

E100.42 BASEMENT - POWER - PHASE 4 - ALTERNATE 2

E100.43 BASEMENT - POWER - PHASE 4 - ALTERNATE 3

E100.44 BASEMENT - POWER - PHASE 4 - ALTERNATE 4

E101.0 BASEMENT - LIGHTING - ALL PHASES

E101.1 BASEMENT - LIGHTING - PHASE 1

E101.2 BASEMENT - LIGHTING - PHASE 2

E101.3 BASEMENT - LIGHTING - PHASE 3

E101.4 BASEMENT - LIGHTING - PHASE 4

E101.41 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 1

E101.42 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 2

E101.43 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 3

E101.44 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 4

E200 FIRST FLOOR - POWER - PHASE 2

E201 FIRST FLOOR - LIGHTING - PHASE 2

E301 FIRST FLOOR OVERALL AND ENLARGED ELECTRICAL PLANS

E400 ELECTRICAL DIAGRAMS

E601 ELECTRICAL DETAILS

E602 ELECTRICAL DETAILS

E603 ELECTRICAL DETAILS

E701 ELECTRICAL PANEL SCHEDULES

TECHNOLOGY

T001 TECHNOLOGY COVERSHEET

TD100.1 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 1

TD100.2 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 2

TD100.3 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 3

TD100.4 BASEMENT DEMOLITION - TECHNOLOGY - PHASE 4

T002 OVERALL PLANS - TECHNOLOGY

T003 OVERALL PLANS - TECHNOLOGY

T100.1 BASEMENT - TECHNOLOGY - PHASE 1

T100.2 BASEMENT - TECHNOLOGY - PHASE 2

T100.3 BASEMENT - TECHNOLOGY - PHASE 3

T100.4 BASEMENT - TECHNOLOGY - PHASE 4

T100.41 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 1

T100.42 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 2

T100.43 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 3

T100.44 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 4

T200 TECHNOLOGY ROOM ENLARGEMENTS

T300 TECHNOLOGY DETAILS

T301 TECHNOLOGY DETAILS

T600 TECHNOLOGY SCHEDULES

Mark Revisions: Date:

VOL. 1

VOL. 2

VOL. 3

VOL. 4

VOL. 4

VOL. 5

VOL. 6

VOL. 6

VOL. 7

VOL. 8

H

C

C

1.

2.

3.

4.

5.

6.

UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO A TERMINAL AIR BOX

(TAB) SHALL MATCH THE INLET SIZE UNLESS THE BRANCH IS GREATER THAN 6FEET IN

LENGTH, IN WHICH CASE THE BRANCH DUCT SHALL BE SIZED AT A PRESSURE DROP OF

0.07"W.C. PER 100' OF DUCTWORK.

UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO AN AIR TERMINAL SHALL

MATCH THE INLET SIZE.

ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO

EACH OTHER.

PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.

EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING

DRAWINGS, AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL USE PRE-BALANCE

VALUES, AND NOT EXISTING CFM SHOWN ON DRAWINGS.

CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE

CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL

TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED

AS SPECIFIED FOR NEW DUCTWORK.

VENTILATION GENERAL NOTES:

1.

2.

THE SIZE OF BRANCH PIPING TO TERMINAL HEATING DEVICES AND COILS SHALL BE 3/4"

UNLESS NOTED OTHERWISE.

PIPE DRAIN LINES FROM EQUIPMENT TO NEAREST FLOOR DRAIN.

PIPING GENERAL NOTES:

1.

2.

3.

4.

AFTER CONSTRUCTION ACTIVITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) AND

BALANCING CONTRACTOR SHALL REBALANCE AIR HANDLING UNITS AND EXHAUST FANS AS

REQUIRED TO ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION

DRAWINGS.

AREAS SERVED BY THIS EQUIPMENT WHICH WERE NOT RENOVATED SHALL BE RE-

BALANCED TO THE AIRFLOW RATES MEASURED BEFORE THE RENOVATION OCCURRED

(REFER TO THE FINAL PRE- DEMOLITION REPORT).

TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST-

CONSTRUCTION TAB REPORT AS REQUIRED BY SECTION 23 05 93.

THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRED IN THE

SPECIFICATIONS.

TAB POST-CONSTRUCTION NOTES:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

MAINTAIN A MINIMUM WORKING CLEARANCE OF 3 ’-6” IN FRONT OF ALL ELECTRICAL

EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT

LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,

TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS .

MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH

OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6 ’-0” ABOVE THE

EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO

THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED

ELECTRICAL SPACE INCLUDING; DUCTWORK, PIPING, ETC.

PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND

SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING] [EACH

CONTRACTOR SHALL CUT AND PATCH ROOFS, WALLS, AND FLOORS ASSOCIATED WITH

THEIR WORK.

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

MECHANICAL PHASING NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1.

2.

3.

4.

5.

REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO

GENERAL CONTRACTOR'S/ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND PHASING

SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY

DRAWINGS DEPICT THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND

TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE

REQUIREMENTS OF THE PHASING CRITERIA.

REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.

WITH AFFECTED ADJACENT AREAS.

PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE

ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF

PROJECT.

INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP

ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT

PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.

CONTROL VALVE (TWO-WAY)

PITCH PIPE IN DIRECTION

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

THROTTLING VALVE

MIXING VALVE

CONTROL VALVE (THREE-WAY)

SOLENOID VALVE

CHECK VALVE

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE (LIQUID/GAS)

PRESSURE REDUCING VALVE (STEAM)

VACUUM BREAKER

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP

BASKET STRAINER

FLEXIBLE CONNECTION

PRESSURE/TEMPERATURE TEST PLUG

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

SUCTION DIFFUSER WITH SUPPORT FOOT

AUTOMATIC AIR VENT

MANUAL AIR VENT

DRAIN VALVE WITH HOSE CONNECTION AND CAP

T T-*

STEAM TRAP (REFER TO SCHEDULE)

T-*

F&T STEAM TRAP (REFER TO SCHEDULE)

T-*

INVERTED BUCKET STEAM TRAP (REFER TO SCHEDULE)

ALIGNMENT GUIDE

PIPE ANCHOR

EXPANSION JOINT

#.#" IS THE EXPANSION TRAVEL INCHES

CLEAN STEAM - NUMBER INDICATES PRESSURE IN PSIG.CS15

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

HIGH PRESSURE CONDENSATEHPC

HEATING WATER RETURNHWR

HEATING WATER SUPPLYHWS

LOW PRESSURE CONDENSATELPC

PUMPED CONDENSATEPC

PUMPED DISCHARGEPD

SAFETY RELIEF VENTSV

STEAM - NUMBER INDICATES PRESSURE IN PSIG.S125

DRAINDPP

METERM

PUMP

STATIC SWITCH

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

FLOW METER

FM

FLOW SWITCH

F

FS FLOW SENSOR

MECHANICAL SYMBOL LIST

SYMBOL: DESCRIPTION:

NOT ALL SYMBOLS MAY APPLY.

OCCUPANCY SENSORO

HUMIDISTAT SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

H HUMIDISTAT / SENSOR

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

DIRECTION OF AIR FLOW

FLEXIBLE DUCT

MANUAL VOLUME DAMPER

RISE IN DIRECTION OF AIR FLOWR

DUCT CAP

DROP IN DIRECTION OF AIR FLOWD

DUCT DOWN

DUCT UP

SUPPLY/OUTSIDE AIR DUCT SECTION

RETURN AIR DUCT SECTION

EXHAUST/RELIEF AIR DUCT SECTION

4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION

SD-1

6/115

AIR TERMINAL PROPERTIES SYMBOL

NECK SIZE/CFM

TERMINAL AIR BOX (REFER TO SCHEDULE)###

### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)

HUMIDIFIERH

OPPOSED BLADE DAMPER (REFER TO SCHEDULE)

PARALLEL BLADE DAMPER (REFER TO SCHEDULE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR/MONITORP

PRESSURE SENSOR (DUCT MOUNTED)P

THERMOSTAT/SENSORT

TEMPERATURE SENSORT

THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET

MECHANICAL SYMBOL LIST

SYMBOL: DESCRIPTION:

AIRFLOW MEASUREMENT SYMBOL

XX - AHU SYMBOL

Y - SEQUENTIAL NUMBER

XX-Y

NOT ALL SYMBOLS MAY APPLY.

SP

BACKFLOW PREVENTER

EJ-#

CLEAN STEAM MEDIUM PRESSURE CONDENSATECMPC

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

1 VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

SECURITY CONTRACTORS.C.

HEATING CONTRACTORH.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONSTRUCTION MANAGERC.M.

MECHANICAL ABBREVIATION KEY

ABBR: DESCRIPTION:

DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")

DIFFERENTIAL PRESSURE SWITCHDPS

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

NOT IN CONTRACTNIC

CFSD CONTROL/FIRE/SMOKE DAMPER

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FSD FIRE/SMOKE DAMPER

MA MIXED AIR

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TRANSFER DUCTTD

UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)

FD-E EXISTING FIRE DAMPER

FSD-E EXISTING FIRE SMOKE DAMPER

SD-E EXISTING SMOKE DAMPER

TERMINAL AIR BOXTAB

TYPICALTYP

UON UNLESS OTHERWISE NOTES

NORMALLY CLOSEDN.C.

NORMALLY OPENN.O.

PRESSURE SWITCHPS

MIXING VALVEMV

CO CLEANOUT

C COMMON

SCCR SHORT CIRCUIT CURRENT RATING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

Au to de sk

D oc s:

//2

1-

-4

VA

E xp an d St er ile

P ro ce ss in g

Se rv ic es

(S

PS

D es ig n/ M

EP

T2

2_

.0

0_

JL

VA

-N or th

C hi ca go

- I L-

SP

S

Ex pa ns io n_ C

.rv t

6/

/2

8:

:1

AM

M000

MECHANICAL COVERSHEET

MRM NVP

133CA

MECHANICAL SHEET INDEX

M000 MECHANICAL COVERSHEET

MD100.1 BASEMENT DEMOLITION - VENTILATION - PHASE 1

MD100.2 BASEMENT DEMOLITION - VENTILATION - PHASE 2

MD100.3 BASEMENT DEMOLITION - VENTILATION - PHASE 3

MD100.4 BASEMENT DEMOLITION - VENTILATION - PHASE 4

MD101.2 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 2

MD101.4 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 4

MD102.4 SECOND FLOOR DEMOLITION – VENTILATION – PHASE 4

MD103.4 THIRD FLOOR DEMOLITION – VENTILATION – PHASE 4

MD104.4 FOURTH FLOOR DEMOLITION – VENTILATION – PHASE 4

MD2PB.2 PIPE BASEMENT DEMOLITION - PIPING - PHASE 2

MD200.4 BASEMENT DEMOLITION - PIPING - PHASE 4

M1PB.2 PIPE BASEMENT - VENTILATION - PHASE 2

M100.0 BASEMENT - VENTILATION - ALL PHASES

M100.1 BASEMENT - VENTILATION - PHASE 1

M100.2 BASEMENT - VENTILATION - PHASE 2

M100.3 BASEMENT - VENTILATION - PHASE 3

M100.4 BASEMENT - VENTILATION - PHASE 4

M100.41 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 1

M100.42 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 2

M100.43 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 3

M100.44 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 4

M101.0 FIRST FLOOR - VENTILATION - ALL PHASES

M101.2 FIRST FLOOR - VENTILATION - PHASE 2

M101.4 FIRST FLOOR - VENTILATION - PHASE 4

M102.0 SECOND FLOOR - VENTILATION - ALL PHASES

M102.2 SECOND FLOOR - VENTILATION - PHASE 2

M2PB.2 PIPE BASEMENT - PIPING - PHASE 2

M200.0 BASEMENT - PIPING - ALL PHASES

M200.2 BASEMENT - PIPING - PHASE 2

M200.4 BASEMENT - PIPING - PHASE 4

M200.44 BASEMENT – PIPING – PHASE 4 – BID ALTERNATE 4

M201.0 FIRST FLOOR - PIPING - ALL PHASES

M201.2 FIRST FLOOR - PIPING - PHASE 2

M300 MECHANICAL DETAILS

M301 MECHANICAL DETAILS

M302 MECHANICAL DETAILS

M303 MECHANICAL DETAILS

M304 AHU COMPONENT PLAN

M305 AIRFLOW MAP

M306 AIRFLOW MAP

M307 STEAM FLOW DIAGRAM

M400 MECHANICAL DIAGRAMS

M402 MECHANICAL DIAGRAMS

M401 MECHANICAL DIAGRAMS

M403 MECHANICAL DIAGRAMS

M600 MECHANICAL SCHEDULES

M601 MECHANICAL SCHEDULES

GRAND TOTAL: 48

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

T

TT

T

T

T

K

H

G

T

7.1

Q.1

Q.6

R

S

TT

Tt

S.

6 5

R.8

T.1

G.8

K.1

K.3

K.6

4 3 2 1

J

L L.1

7.8

.18 11.12.14.16.

.25

.T

PIPE BASEMENT

PC100

Not Enclosed

PIPE BASEMENT

PD100

6216 SF

2"VENT UP

8"VENT UP

3"HPS UP

2"PC UP

8"MPS UP

8"CWR UP

8"CWS UP

1 1/4"MPC UP

1 1/4"PC UP

6"CWS UP

6"CWR UP

2 1/2"PC UP

5"HPS UP

16"CWR

16"CWS

4" P C

8" H P S

4"CWR

4"CWS

1 1/4"MPC UP

1 1/4"HPC UP1"MPC UP1 1/4"HPS UP

1 1/4"MPS UP

1 1/4"HPS UP

1 1/4"MPS UP

5"MPS UP

2 1/2"MPC UP

1"MPC UP

1"HPC UP

1"MPC UP

UH-E

UH-E

UH-E

T T

UH-E

T

3/4"MPC UP

T

T

1 1/4"MPS

1"HPC

2"MPS

1 1/4"HPS

1 1/4"MPC

1" M P S

1" M P C

1"MPS 1"MPC

1 1/4"MPS

1 1/4"HPS

3/4"MPC

8" H P S

8" C W S 8" C W R

1 1/4"MPC

1 1/4"HPC

1 1/4"MPC

1 1/4"HPC

1"MPC

1"MPC

1" M P S

1/ 4" M P C

1" H P C

4"PC

4"CWS UP

4"CWR UP

UH-E

T

1"MPS

HPC

MPC

T

4" P C

1/ 4" H P S 1/ 4" M P S

2" M P S

HPS

MPS

MPS

MPC

HPC

4"PC

HPS

MPS

MPS

P-2 P-1

2"MPC UP

8"CWS

8"CWR

6"S125

8"MPC UP

6"CWS UP

6"CWR UP

4"PC UP

5"HPS UP

6"CWS

6"CWR

6" S1

2"

PC

6"S125

4"PC

1/ 2"

PC

5" S1

10" CWR

10" CWS

10"CWS

10"CWR

6"S125

4"PC

10"CWR

10"CWS

EXISTING CWS AND CWR PIPING TO BE

RELOCATED. REFER TO NEW WORK

PLAN FOR REVISED PIPING. COORDINATE

SHUTDOWNS OF EXISTING SYSTEM WITH

OWNER TO MINIMIZE DISRUPTIONS.

CUT PIPING AS SHOWN AND

PREPARE FOR NEW

CONNECTIONS. COORDINATE

SHUTDOWNS OF EXISTING

SYSTEM WITH OWNER TO

MINIMIZE DISRUPTIONS.

10"CWS

10"CWR

CUT PIPING AS SHOWN AND PREPARE FOR

NEW CONNECTIONS. COORDINATE

SHUTDOWNS OF EXISTING SYSTEM WITH

OWNER TO MINIMIZE DISRUPTIONS.

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

Au to de sk

D oc s:

//2

1-

-4

VA

E xp an d St er ile

P ro ce ss in g

Se rv ic es

(S

PS

D es ig n/ M

EP

T2

2_

.0

0_

JL

VA

-N or th

C hi ca go

- I L-

SP

S

Ex pa ns io n_ C

.rv t

6/

/2

8:

:2

AM

MD2PB.2

PIPE BASEMENT DEMOLITION - PIPING

- PHASE 2

PGP NVP

133CA

N O R HT

1/8" = 1'-0"

PIPE BASEMENT DEMOLITION - PIPING - PHASE 21

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

T

T

T

T T

T T

T

T

T

T

T

T

P

P

K

H

G

T

7.1

Q.1

Q.6

R

S

TT

Tt

S.

J

L

7.8

.18 11.12.14.16.

.25

.T

24x10

CD-E

TAB-E

48x16

48x14

TAB-E

16x10

EG-E

CD-E

CD-E

CD-E

TAB

CD-E

TAB

CD-E

CD-E

12x6CD-E

12x6 CD

12x8

12x8

CD-E

RG-E

10x6

CD-E

CD

10x6

10x6

12x10

10x6

CD-E

CD-E

10x6

TAB8x8

TAB

x1

16x12 14x12

CD-E

CD-E

18x10

RG-E

24x7

10x6

10x6

24x7

32x10

10x6

RG-E

12x8

EG-E

CD-E

8x8

8x8

8x8 22 x1

10x6

8x8 EG-E

EG-E

CD-E

24x10

CD CD

10x8

TAB

CD-E

CD-E

TAB-E

CD-E

RG

CD-E

10x10

EG-E

14x8 8x6

10x14

10x6 10x6

TAB-E

20x1222x12

8x626x12

8x8 14x612x6

TAB-E

SG-E

EG-E

14x10

CD-E

RG-E

TAB-E

RG-E

8x6

RG-E

10x6

32x10 x1 x1

20x10

24x10

48x12 x1

38x10

26x10

CD-E

CD-E

RG-E

8x8

26x10 52x10

RG-E CD-E

TAB

CD-E CD-E22x14

EG-E

x1

34x10

32x10

CD-E

CD-E RG-E

RG-E

RG-E

x1 x1

24x12 x1

36x10

12x8

14x10

16x10

12x6

EG-EEG-E

14x8

CD-E

EG-E

12x6

CD-E

10x14

8x8 x2 x1 2 10x6

8x8

CD-E

CD-E

8x6

TAB-E

8x6

22x10 EA UP

14x10 EA UP

TO EF-33

14x10 EA UP

TO EF-25

TAB

EG-E

CD-E

CD-E

x6

12x10 x8

CD-E

TAB

x1

0 CD-E

TAB

TAB

12x14

12x14

RG-E

12x8 10x6

12x8

10x6 x1

48x20 RA UP 60x20 SA UP

20x8 EA UP

CD-E

RG-E

36x6

40x12 RA UP

12x10

RG-E

x1 026x6

RG-E

x1

RG-E

48x16 RA UP 48x16 SA UP

18x12

CD-E

16x6

10x4

10x8

10x8

CD-E

CD-E

TAB-E

TAB-E

x2 x2

RG-E

CD-E

x1 x1 x8

20x8

40x10

CD-E

x1 0 16x10 SA UP

20x12 RA DN TO

MECH ROOM

TAB-E

18x8

22x10 x1

RG-E

RG-E

52x10 EA UP x1

TAB

CD-E

EG-E

EG-E

12x4 x6

RG-E

RG-E

CD-E

RG-E

RG-E

x1

CD-E

RG-E

RG-E

RG-E

RG-E

RG-E

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

Au to de sk

D oc s:

//2

1-

-4

VA

E xp an d St er ile

P ro ce ss in g

Se rv ic es

(S

PS

D es ig n/ M

EP

T2

2_

.0

0_

JL

VA

-N or th

C hi ca go

- I L-

SP

S

Ex pa ns io n_ C

.rv t

6/

/2

8:

:3

AM

MD100.1

BASEMENT DEMOLITION -

VENTILATION - PHASE 1

MRM NVP

133CA

N O R HT

1/8" = 1'-0"

BASEMENT DEMOLITION - VENTILATION - PHASE 11

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

T

T

T

T T

T T

T

T

T

T

T

T

P

P

K

H

G

T

7.1

Q.1

Q.6

S

TT

Tt

S.

J

L

.18 11.12.14.16.

.25

.T

TAB-E

TAB-E

TAB-E

TAB-E

TAB-E

TAB-E

TAB-E

22x10 EA UP

14x10 EA UP

TO EF-33

14x10 EA UP

TO EF-25

48x20 RA UP 60x20 SA UP

20x8 EA UP

40x12 RA UP

48x16 RA UP 48x16 SA UP

TAB-E

TAB-E

16x10 SA UP

20x12 RA DN TO

MECH ROOM

TAB-E

52x10 EA UP

RG-E

RG-E

CD-E

CD-E

CD-E

CD-E

CD-E

CD-E

CD-E

CD-E

CD-E

RG-E

CD-E

CD-E

CD-E

CD-E

RG-ERG-E

EG-E

CD-EEG-E

EG-E

CD-E

CD-E

CD-E

CD-E

EG-E

SG-E

EG-E

CD-E

RG-E

RG-E

RG-E

CD-E

CD-E

RG-E

RG-E CD-E

CD-E CD-E

EG-E

CD-E

CD-E RG-E

RG-E

RG-E

EG-EEG-E CD-E

EG-E

CD-E

CD-E

CD-E

EG-E

CD-E

CD-E

CD-E

CD-E

RG-E

CD-E

RG-E

RG-E

RG-E

RG-E

CD-E

CD-E

CD-E

RG-E

CD-E

CD-E

RG-E

RG-E

CD-E

EG-E

EG-E

RG-E

RG-E

CD-E

RG-E

RG-E

CD-E

RG-E

RG-E

CD-E

CD-E

48x16

48x14

16x10

12x6

12x8

12x8 10x6

10x6

12x10

10x6

10x6

8x8 x1

16x12 14x12

18x10 24x7

10x6

10x6

24x7

32x10

10x6

12x8

8x8

8x8

8x8 22 x1

10x6

8x8

24x10 10x8

10x10

14x8 8x6

10x14

10x6 10x6

20x1222x12

26x12

8x8 14x612x6

14x10

8x6 10x6

32x10 x1 x1

20x10

24x10

48x12 x1

38x10

26x10

8x8

26x10 52x10

22x14 x1

34x10

32x10 x1 2 24 x1

24x12 x1

36x10

12x8

14x10

16x10

12x6 14x8

12x6

10x14

8x8 x2 x1 2 10x6

8x8

8x6

8x6 x6

12x10 x8 x1

12x14

12x14

12x8 10x6

12x8

10x6 x1

36x6

12x10 x1 026x6 x1

18x12

16x6

10x4

10x8

10x8 x2 x2 x1 x1 x8

20x8

40x10 x1

18x8

22x10 x1 x1

12x4 x6 x1

18x12 EA UP 24x12 EA UP

TAB-E

TAB

TAB

TAB

TAB

TAB-E

TAB-E

TAB-E

TAB-E

TAB

TAB-E

TAB

TAB

TAB

TAB

TAB-E

TAB-E

TAB

TAB-E

TAB

CD

RG-E

CD-ECD-E

CD-E

RG-E

CD-E

CD-E

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

Au to de sk

D oc s:

//2

1-

-4

VA

E xp an d St er ile

P ro ce ss in g

Se rv ic es

(S

PS

D es ig n/ M

EP

T2

2_

.0

0_

JL

VA

-N or th

C hi ca go

- I L-

SP

S

Ex pa ns io n_ C

.rv t

6/

/2

8:

:4

AM

MD100.2

BASEMENT DEMOLITION -

VENTILATION - PHASE 2

MRM NVP

133CA

N O R HT

1/8" = 1'-0"

BASEMENT DEMOLITION - VENTILATION - PHASE 21

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

UP

UP

UP

DN

T

T

T

T

T

T T

T T

T

T

T

T

T

T

T

T

T

T

T

T

P

P

PP

P

P

P

T

T

TP

K

H

G

T

7.1

Q.1

Q.6

R

S

TT

Tt

S.

6 5

R.8

T.1

G.8

K.1

K.3

K.6

4 3 2 1

J

L L.1

7.8

.18 11.12.14.16.

.25

.T

EXIST EJ

EXIST EJ

EXIST EJ

EXIST EJ

CD-E

TAB-E

48x16

48x14

TAB-E

16x10

EG-E

CD-E

CD

CD

TAB

CD

TAB

CD

CD

CD-E

12x6

12x8

12x8

CD-E

RG-E

10x6

CD

10x6

12x10

10x6

CD-E

CD-E

10x6

TAB8x8

TAB

x1

16x12 14x12

CD-E

CD-E

18x10

RG

24x7

10x6

10x6

24x7

32x10

10x6

RG-E

12x8

EG-E

CD-E

8x8

8x8

8x8 22 x1

10x6

8x8 EG-E

EG-E

CD-E

24x10 10x8

CD-E

TAB-E

CD-E

CD-E

10x10

EG-E

14x8 8x6

10x14

10x6 10x6

TAB-E

20x1222x12

26x12

8x8 14x612x6

TAB-E

SG-E

EG-E

14x10

CD-E

RG-E

TAB-E

RG-E

8x6

RG-E

10x6

32x10 x1 x1

20x10

24x10

48x12 x1

38x10

26x10

CD-E

CD-E

RG-E

8x8

26x10 52x10

RG

CD-E

TAB

CD CD-E22x14

EG-E

x1

34x10

32x10

CD-E

CD-E RG-E

RG-E

RG-E

x1 2 24 x1

24x12 x1

36x10

12x8

14x10

16x10

12x6

EG-EEG-E

14x8

CD-E

EG-E

12x6

CD-E

10x14

8x8 x2 x1 2 10x6

8x8

CD-E

CD-E

8x6

TAB-E

8x6

22x10 EA UP

14x10 EA UP

TO EF-33

14x10 EA UP

TO EF-25

TAB

EG-E

CD-E

CD-E

x6

12x10 x8

CD-E

TAB

x1

0 CD-E

TAB

TAB

12x14

12x14

RG-E

12x8 10x6

12x8

10x6 x1

48x20 RA UP 60x20 SA UP

20x8 EA UP

CD-E

RG-E

36x6

40x12 RA UP

12x10

RG-E

x1 026x6

RG-E

x1

RG-E

48x16 RA UP 48x16 SA UP

18x12

CD-E

16x6

10x4

10x8

10x8

CD-E

CD-E

TAB-E

TAB-E

x2 x2

RG-E

CD-E

x1 x1 x8

20x8

40x10

CD-E

x1 0 16x10 SA UP

20x12 RA DN TO

MECH ROOM

TAB-E

18x8

22x10 x1

RG-E

RG-E

52x10 EA UP x1

TAB

CD-E

EG-E

EG-E

12x4 x6

RG-E

RG-E

CD-E

RG-E

RG-E

x1

CD

RG-E

RG-E

RG-E

RG-E

TAB-E

CD-E

CD-E

TAB-102

34x12

TAB-103

18x12 EA UP 24x12 EA UP x1

TAB-108E

TAB-101E

TAB-101

TAB-107E

TAB-104

TAB-106

TAB-104E

TAB-102E

TAB-102

TAB-105

TAB-103

TAB-108

10x10

12x10

40x12

40x12

12x10 EA DN 12x10 SA DN

12x10 EA

UP

48x12 EA UP

TAB-108

TAB-107

TAB-106

TAB-105

TAB-103

TAB-101

x1

8x8 EA

UP

8x8

8x8

FD

EG-E

10/250

(TYP.4)

CD-E

8/125

CD-E

12/400

TAB-109

TAB-109

x1

16x12

CD-E

10/300

(TYP.6)

x1

EG-E

10/240

(TYP.2)

22x12

12x12

16x10

12x8

EG-E

12/275

CD-E

12/325

CD-E

12/325

12x12

10x10

EG-E

12/325

12x8 12x8

SG-E

16x16/725

34x12

SA UP

22x6

22x6

16x10

EG-E

22x22/625

(TYP.2)

EG-E

18x18/850

EG-E

18x18/850

SG-E

16x16/750

28x12

CD-E

10/300

CD-E

10/275

CD-E

10/275

(TYP.3)

8x8

10x12

CD-E

8/125

CD-E

10/250

(TYP.2)

CD-E

12/400

CD-E

12/375 CD-E

12/375

16x12

CD-E

10/275

EG-E

12/350

EG-E

8/125

CD-E

12/325

EG-E

12/400 x1

CD-E

8/75

TAB-103

46x1234x12

34x12 x1

CD-E

10/300

(TYP.8)

10x8 10x8

10x8

10x8

10x8 10x8

10x8

CD-E

10/300

CD-E

10/300

CD-E

10/300

20x10 x1

10x8

8x6

12x8 x1

28x12

EG-E

22x22/800

(TYP.4)

EG-E

22x22/825

(TYP.2)

30x12

12x8

EG-E

12/275 x1

22x12

40x12 SAUP

22x12 SAUP 42x14

24x12 SA

UP

x1

16x12

SA UP

x1

50x12 48x12

10x12

EG-E

10/300

EG-E

10/300

14x12 14x12

22x14 EA

UP

10x8 12x10 x1

CD-E

8/75

12x1012x8

TAB-102

TAB-104

TAB-107

CD-E

8/125

EG-E

8/200

CD-E

CD-E

RG-E

SG-E

6x6/50

FD

FD

RG-E

50x12 EA UP

40x12 EA UP 36x12 EA UP x1

14x8

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

Au to de sk

D oc s:

//2

1-

-4

VA

E xp an d St er ile

P ro ce ss in g

Se rv ic es

(S

PS

D es ig n/ M

EP

T2

2_

.0

0_

JL

VA

-N or th

C hi ca go

- I L-

SP

S

Ex pa ns io n_ C

.rv t

6/

/2

8:

:5

AM

MD100.3

BASEMENT DEMOLITION -

VENTILATION - PHASE 3

MRM NVP

133CA

N O R HT

1/8" = 1'-0"

BASEMENT DEMOLITION - VENTILATION - PHASE 31

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

T

T

T

T T

T T

T

T

T

T

T

T

T

T

T

T

T

T

P

P

PP

P

P

P

T

T

TP

K

H

G

T

7.1

Q.1

Q.6

R

S

TT

Tt

S.

6 5

R.8

T.1

G.8

K.1

K.3

K.6

4 3 1

J

L L.1

7.8

.18 11.12.14.16.

.25

.T

CD-E

TAB-E

48x16

48x14

TAB-E

16x10

EG-E

CD-E

TAB

CD

12x6

12x8

12x8

CD

RG

10x6

10x6 12x10

10x6

CD

CD

10x6

TAB8x8

TAB

x1

16x12 14x12

CD

CD

18x10 10x6

10x6

24x7

32x10

10x6

RG

12x8

EG

CD

8x8

8x8

8x8 22 x1

10x6

8x8 EG

EG

CD

24x10 10x8

CD-E

TAB-E

CD-E

CD-E

10x10

EG-E

14x8 8x6

10x14

10x6 10x6

TAB-E

20x1222x12

26x12

8x8 14x612x6

TAB-E

SG-E

EG-E

14x10

CD-E

RG-E

TAB-E

RG-E

8x6

RG-E

10x6 x1 x1

20x10

24x10

48x12 x1

38x10

26x10

CD-E

CD-E

RG-E

8x8

26x10 52x10

CD

TAB

CD

22x14

EG

x1

34x10

32x10

CD-E

CD-E RG-E

RG-E

RG-E

x1

2 24 x1

24x12 x1

36x10

12x8

14x10

16x10

12x6

EGEG

14x8

CD

EG

12x6

CD

10x14

8x8 x2 x1 2 10x6

8x8

CD-E

CD-E

8x6

TAB-E

8x6

22x10 EA UP

TO EF-35

14x10 EA UP

TO EF-33

14x10 EA UP

TO EF-25

TAB

EGCD

CD

x6 x8

CD

TAB

x1

0 CD

TAB

TAB

12x14

12x14

RG

12x8

12x8

10x6 x1

48x20 RA UP 60x20 SA UP

20x8 EA UP

CD-E

36x6

40x12 RA UP

12x10

RG

x1

026x6

RG

x1

RG

48x16 RA UP 48x16 SA UP

18x12

CD

10x4

10x8

10x8

CD-E

CD-E

TAB-E

TAB-E

x2 x2

RG-E

CD-E

x1 x1 x8

20x8

40x10

CD-E

x1 0 16x10 SA UP

20x12 RA DN TO

MECH ROOM

TAB-E

18x8

22x10 x1

RG

RG

52x10 EA UP x1

TAB

CD

EG-E

EG-E

12x4 x6

RG-E

RG-E

CD

RG

RG

x1

RG

RG

RG-E

RG-E

TAB-E

CD-E

CD-E

18x12 EA UP 24x12 EA UP x1

TAB-108E

TAB-101E

TAB-101

TAB-107E

TAB-104

TAB-106

TAB-104E

TAB-102E

TAB-102

TAB-105

TAB-103

TAB-108

10x10

12x10

40x12

40x12

12x10 EA DN 12x10 SA DN

12x10 EA

UP

48x12 EA UP

TAB-108

TAB-107

TAB-106

TAB-105

TAB-103

TAB-101

x1

8x8 EA

UP

8x8

8x8

FD

EG-E

10/250

(TYP.4)

CD-E

8/125

CD-E

12/400

TAB-109

TAB-109

x1

16x12

CD-E

10/300

(TYP.6)

x1

EG-E

10/240

(TYP.2)

22x12

12x12

16x10

12x8

EG-E

12/275

CD-E

12/325

CD-E

12/325

12x12

10x10

EG-E

12/325

12x8 12x8

SG-E

16x16/725

34x12

SA UP

22x6

22x6

16x10

EG-E

22x22/625

(TYP.2)

EG-E

18x18/850

EG-E

18x18/850

SG-E

16x16/750

28x12

CD-E

10/300

CD-E

10/275

CD-E

10/275

(TYP.3)

8x8

10x12

CD-E

8/125

CD-E

10/250

(TYP.2)

CD-E

12/400

CD-E

12/375 CD-E

12/375

16x12

CD-E

10/275

EG-E

12/350

EG-E

8/125

CD-E

12/325

EG-E

12/400 x1

CD-E

8/75

TAB-103

46x1234x12

34x12 x1

CD-E

10/300

(TYP.8)

10x8 10x8

10x8

10x8

10x8 10x8

10x8

CD-E

10/300

CD-E

10/300

CD-E

10/300

20x10 x1

10x8

8x6

12x8 x1

14x8

28x12

48x12

EG-E

22x22/800

(TYP.4)

EG-E

22x22/825

(TYP.2)

30x12

12x8

EG-E

12/275 x1

22x12

40x12 SAUP

22x12 SAUP 42x14

24x12 SA

UP

x1

16x12

SA UP

x1

50x12 48x12

10x12

EG-E

10/300

EG-E

10/300

14x12 14x12

22x14 EA

UP

10x8 12x10 x1

CD-E

8/75

12x1012x8

TAB-102

TAB-104

TAB-107

CD-E

8/125

EG-E

8/200

CD

CD

RG

CD

RGRG

SG

FD

SS-1 SS-1

32x10 32x10

RG CD

FD

50x12 EA UP

40x12 EA UP 36x12 EA UP

CD-E

8/125

SSCU-1 SSCU-1

DEMO CAP AND

PREPARE FOR NEW

CONNECTION.

DEMO CAP AND

PREPARE FOR NEW

CONNECTION.

DEMO CAP AND

PREPARE FOR NEW

CONNECTION.

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

Au to de sk

D oc s:

//2

1-

-4

VA

E xp an d St er ile

P ro ce ss in g

Se rv ic es

(S

PS

D es ig n/ M

EP

T2

2_

.0

0_

JL

VA

-N or th

C hi ca go

- I L-

SP

S

Ex pa ns io n_ C

.rv t

6/

/2

8:

:1

AM

MD100.4

BASEMENT DEMOLITION -

VENTILATION - PHASE 4

MRM NVP

133CA

N O R HT

1/8" = 1'-0"

BASEMENT DEMOLITION - VENTILATION - PHASE 41

1.

KEYNOTES:

REMOVE EXISTING PRESSURE MONITORING

SYSTEM AND ASSOCIATED CONTROLS.

1.

2.

3.

4.

SHEET NOTES:

REMOVE EXISTING TERMINAL AIR BOX, AND

ASSOCIATED SUPPLY/RETURN DUCTWORK AS

SHOWN BACK TO ACTIVE MAIN AND CAP OR

PATCH. REMOVE ASSOCIATED CONTROLS AND

THERMOSTAT. REBALANCE EXISTING AIR

HANDLER AS REQUIRED PER REVISED FLOOR

PLAN.

REMOVE EXISTING EXHAUST DUCTWORK AND

GRILLES AS SHOWN BACK TO ACTIVE MAIN

AND CAP OR PATCH. REBALANCE EXISTING

EXHAUST FAN SERVING REVISED FLOOR PLAN

AS REQUIRED.

REMOVE DUCTWORK AS SHOWN BACK TO

ACTIVE MAIN AND CAP OR PATCH.

COORDINATE SHUTDOWNS OF EXISTING

SYSTEM TO MINIMIZE DISRUPTIONS.

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

T

T

T

T

T

T T

T

T

T

K

H

G

T

7.1

Q.1

Q.6

R

S

TT

Tt

S.

6 5

R.8

T.1

G.8

K.1

K.3

K.6

4 3 2 1

J

L L.1

7.8

.18 11.12.14.16.

.25

.T

AHU-3

AHU-4

22x10 EA DN &

UP TO EF-35

14x10 EA DN &

UP TO EF-33

14x10 EA DN &

UP TO EF-25

48x20 RA DN

60x20 SA DN

20x8 EA DN

40x12 RA DN

48x16 RA DN

48x16 SA DN

16x10 RA DN

20x12 RA DN TO

MECH ROOM

52x10 EA DN

L

L

DS-E

55ø

60x30

52x20 x8

EF-E

20x8

48x14 DS-E

DS-E

EF-E

48x14

24x10 x1

48x16 48x16

48x14

28x28 EA UP

TO EF-28

RF-E

DS-E

60x20 x2

29x29 EA UP48x14

48x14 x1

42x42

36x36

18x18 EA UP

18x18

FD-E

FD-E

FD-E

FD-E

12x10

RG-E

TAB-E

CD-E CD-E

8x14

12x14

14x14

CD-E

CD-E

CD-E

CD-E

CD-E

CD-E

8x6

8x6

CD-ERG-E

TAB-E

12x14

14x14

CD-E

16x12

10x6

8x6

8x6

10x6

8x6

EG-E

14x10

14x8

CD-E CD-E

10x6 8x6

8x68x6

12x10

12x10

12x8

EG-E

CD-E14x6

RG-E24x10

TAB-E

RG-E

14x10

22x1234x1240x12

TAB-E

12x8

14x10

CD-E

TAB-E

CD-E

10x6

RG-E

8x6

8x6

12x8

CD-E

RG-E

10x6

RG-E

CD-E

12x8

12x8

10x6

CD-E

RG-E

RG-E

8x6

TAB-E

10x8

12x8

10x8

10x6

CD-E

16x12

CD-E

RG-E

CD-E

8x6

10x6

10x6

TAB-E

x1 x1

CD-ECD-ECD-E

12x6

10x6

12x10

10x6

14x10 x1

EG-E

22x10 EA DN &

UP TO EF-26

CD-ERG-E

TAB-E

EG-E

CD-E

10x6

8x6

EG-E

8x6 x1

8x6

RG-E

CD-E

CD-E

CD-E

CD-E

12x6

12x10

EG-E

TAB-E

8x6

CD-E

10x6 16x8 10x8

8x612x6

RG-E

48x14 26x1236x14

10x8 12x8

CD-E

CD-E TAB-E

12x10

RG-E

10x6 RG-E

RG-E

CD-E

RG-E

CD-E

8x6

10x6

RG-E

EG-E

TAB-E

CD-E

12x10

CD-E

EG-E EG-E

14x614x6

16x12 x1

RG-E

14…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .