This document appears to be a set of drawings related to the expansion of the Sterile Processing Service (SPS) at the Lovell Federal Health Care Center in North Chicago, Illinois. The drawings are part of Solicitation Number 36C77624B0018, issued by the Department of Veterans Affairs Technology Acquisition Center Austin, which is seeking a contractor to perform minor construction work for the SPS expansion project. The drawings provide detailed specifications and plans for the construction activities, including layout, mechanical, electrical, and architectural details. This document is likely a technical attachment to the overall solicitation package, which would also include the Statement of Work, bid forms, and other required information for offerors to respond to the contract opportunity.

View the file

Other files

File Type Posted
S06 - 36C77624B0018 0004.pdf PDF
Attachment 25 - Bid Abstract OF 1419 - SPS North Chicago - Signed.pdf PDF
Attachment 26 - Bid Abstract OF 1419A - SPS North Chicago.pdf PDF
Attachment 24 - 556-402 SPS 100CD Specs Div 221300 Facility Sanitary and Vent Piping.pdf PDF
S06 - 36C77624B0018 0003.pdf PDF
S06 - 36C77624B0018 0002.pdf PDF
Attachment 22 - Technical Questions and Responses - SPS North Chicago.pdf PDF
Attachment 23 - RFI97 Atch - Bldg133CA - LDP-1-F9 QMDP-1-G3.pdf PDF
S06 - 36C77624B0018 0001.pdf PDF
Attachment 21 - Site Visit Sign-in Sheet SPS North Chicago_15JUL24.pdf PDF
Attachment 13 - 556-402 SPS 100CD SpecsV2 29NOV22-r14JUN24.pdf PDF
Attachment 12 - 556-402 SPS 100CD SpecsV1 29NOV22-r14JUN24.pdf PDF
Attachment 20 - Division Cost Breakdown - BLANK.xlsx XLSX spreadsheet
Attachment 11 - 556-402 SPS 100CD Reports 29NOV22.pdf PDF
Attachment 10 - 556-402 Expand SPS - 100CD Equip Cut Sheets - Excerpt.pdf PDF
Attachment 3 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 2-8.pdf PDF
Attachment 16 - Wage Determination - Lake County.pdf PDF
Attachment 14 - 556-402 SPS 100CD Struct Interior Design V1 29NOV22-r14JUN24.pdf PDF
Attachment 7 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 6-8.pdf PDF
Attachment 17 - Limitations on Subcontracting - Construction.docx DOCX document
S02 - 36C77624B0018.pdf PDF
Attachment 15 - 556-402 SPS 100CD Struct Interior Design V2 29NOV22-r14JUN24.pdf PDF
Attachment 19 - Contractors Statement for Exempt Organization - Illinois.docx DOCX document
Attachment 6 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 5-8.pdf PDF
Attachment 8 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 7-8.pdf PDF
Attachment 18 - Illinois Tax Language - 1.26.2023 - FINAL.docx DOCX document
Attachment 9 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 8-8.pdf PDF
Attachment 5 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 4-8.pdf PDF
Attachment 1 - 556-402 Expand SPS - GC SOW 29MAR24.docx DOCX document
Attachment 2 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 1-8.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/5

/2

:0

:1

P M

GI001

COVER

MP

133CA

C A P T. J A M E S A. L O V E L L F E D E R A L H E A L T H C A R E C E N T E R

EXPAND STERILE PROCESSING SERVICE (SPS)

NORTH CHICAGO, ILLINOIS, 60064

SITE LOCATION

VA Contract Number: 36C77622C0002

VA Point of Contact:

Daniel J. Lid, D: (224) 610-3567, Contracting Officer's Representative (COR)

Mark Revisions: Date: 07/05/2023 REVISIONS

11/29/2022

REV 6/14/2024

Volume 3 of 8

ISSUED 11/29/2022

SET REV 06/14/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/2

/2

:1

:3

P

M

GI002

INDEX OF DRAWINGS

MP

133CA

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

GENERAL

GI001 COVER

GI002 INDEX OF DRAWINGS

GI101 PHASING PLANS

GI102 FLOW DIAGRAMS

GI103 BID ALTERNATE 1 & 2

GI104 BID ALTERNATE 3 & 4

LIFE SAFETY

LS000 CODE COMPLIANCE SUMMARY PLAN

LS100 PIPE BASEMENT - LIFE SAFETY PLAN

LS101 BASEMENT FLOOR - LIFE SAFETY PLAN

LS102 FIRST FLOOR - LIFE SAFETY PLAN

LS103 EGRESS PHASING COMPLIANCE PLAN - BASEMENT

HAZARDOUS MATERIALS

HA101 BASEMENT FLOOR PLAN – ASBESTOS ABATEMENT

CIVIL

CD100 DEMOLITION PLAN PHASE 1

SP100 SITE PLAN PHASE 1

CS500 SITE DETAILS PHASE 1

CS501 SITE DETAILS PHASE 1

CG100 GRADING PLAN PHASE 1

CU100 OVERALL UTILITY PLAN PHASE 1

CU101 SANITARY SEWER PLAN & PROFILE PHASE 1

CU104 STORM SEWER PLAN AND PROFILE PHASE 1

CU500 STORM SEWER DETAILS PHASE 1

CU501 STORM SEWER DETAILS PHASE 1

STRUCTURAL

SG001 STRUCTURAL GENERAL NOTES

SD1PB.1 PIPE BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 1

SD100.1 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEVATION - PHASE 1

SD100.2 BASEMENT FLOOR - DEMO PLAN & ELEVATION - PHASE 2

SD100.3 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 3

SD100.4 BASEMENT FLOOR - PARTIAL DEMO PLAN - PHASE 4

SB1PB.1 PIPE BASEMENT FLOOR - FNDN. & MUD SLAB PLAN - PHASE 1

SB1PB.2 PIPE BASEMENT FLOOR - FOUNDATION & MUD SLAB - PHASE 2

SB301 STRUCTURAL SECTIONS

SB501 FOUNDATION DETAILS & SCHEDULES

SB502 FOUNDATION DETAILS

SF100.1 BASEMENT FLOOR FRAMING PLAN - PHASE 1

SF100.2 BASEMENT FLOOR FRAMING PLAN - PHASE 2

SF100.3 BASEMENT FLOOR - FRAMING PLAN - PHASE 3

SF101.2 FIRST FLOOR - MECHANICAL PENTHOUSE FRAMING PLAN - PHASE 2

SF102.2 SECOND FLOOR - ROOF FRAMING PLAN - PHASE 2

SF401 ELEVATIONS & DETAILS

SF402 STRUCTURAL RETROFIT ELEVATIONS IN BUILDING 133-C

SF501 FRAMING DETAILS

SF502 FRAMING DETAILS

SF503 FRAMING DETAILS

SF504 FRAMING DETAILS

SF510 LIGHT GAGE FRAMING STRUCTURAL DETAILS

SF511 WALL SECTIONS -LIGHT GAGE INFORMATION

SF600 LIVE LOAD DIAGRAM - BASEMENT FLOOR

SF601 LIVE LOAD DIAGRAM - FIRST FLOOR

ARCHITECTURAL

AG001 ARCHITECTURAL ABBREVIATIONS, LEGENDS AND NOTES

AD1PB.2 PIPE BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2

AD100.1 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 1

AD100.2 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2

AD100.3 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 3

AD100.4 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 4

AD101.2 FIRST FLOOR - DEMOLITION PLAN - PHASE 2

AD102.2 SECOND FLOOR - DEMOLITION PLAN - PHASE 2

AE1PB.2 PIPE BASEMENT FLOOR - FLOOR PLAN - PHASE 2

AE100.1 BASEMENT FLOOR - FLOOR PLAN - PHASE 1

AE100.2 BASEMENT FLOOR - FLOOR PLAN - PHASE 2

AE100.3 BASEMENT FLOOR - FLOOR PLAN - PHASE 3

AE100.4 BASEMENT FLOOR - FLOOR PLAN - PHASE 4

AE101.2 FIRST FLOOR - MECHANICAL PENTHOUSE PLAN - PHASE 2

AE102.2 SECOND FLOOR - ROOF PLAN - PHASE 2

AE110.1 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 1

AE110.2 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 2

AE110.3 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 3

AE110.4 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 4

AE201 EXTERIOR ELEVATIONS

AE301 BUILDING SECTIONS

AE302 WALL SECTIONS

AE303 WALL SECTIONS

AE304 WALL SECTIONS

AE401 ENLARGED PLANS AND ELEVATIONS

AE402 ENLARGED PLANS AND ELEVATIONS

AE501 EXTERIOR DETAILS

AE502 WALL SECTIONS & DETAILS

AE503 EXPANSION JOINT DETAILS

AE504 PLAN DETAILS

AE505 PLAN DETAILS

AE531 CEILING DETAILS

AE601 ROOM PROGRAM SCHEDULE

AE602 DOOR SCHEDULES AND DETAILS

AE801 WALL TYPES

AE901 EXTERIOR RENDERINGS AND INTERIOR 3D VIEWS

AE902 BASEMENT FLOOR - FUNCTIONAL AREA PLAN

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

INTERIORS

IN100.1 BASEMENT FLOOR - INTERIORS PLAN - PHASE 1

IN100.2 BASEMENT FLOOR - INTERIORS PLAN - PHASE 2

IN100.3 BASEMENT FLOOR - INTERIORS PLAN - PHASE 3

IN100.4 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4

IN100.41 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 1

IN100.42 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 2

IN100.43 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 3

IN100.44 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 4

IN101.2 FIRST FLOOR - INTERIORS PLAN - PHASE 2

IN501 INTERIORS DETAILS

IN601 ROOM FINISH SCHEDULE

IN602 ROOM FINISH SCHEDULE - BID ALTERNATES

IN603 SIGNAGE SCHEDULE

EQUIPMENT

QH100.2C BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA C

QH100.2D BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D

QH100.4A BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA A

QH100.4B BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA B

QH101.2D FIRST FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D

QH601 EQUIPMENT JSN SCHEDULES

FIRE PROTECTION

FA000 FIRE ALARM NOTES AND DETAILS

FA101 BASEMENT - FIRE ALARM PLAN

FA102 FIRST FLOOR - FIRE ALARM PLAN

FX000 FIRE SUPPRESSION NOTES AND DETAILS

FX101 BASEMENT - FIRE SUPPRESSION PLAN

FX102 FIRST FLOOR - FIRE SUPPRESSION PLAN

PLUMBING

P000 PLUMBING COVERSHEET

PD1PB.2 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 2

PD1PB.4 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 4

PD100.4 BASEMENT DEMOLITION - PLUMBING - PHASE 4

P1PB.0 PIPE BASEMENT - PLUMBING - ALL PHASES

P1PB.2 PIPE BASEMENT - PLUMBING - PHASE 2

P1PB.3 PIPE BASEMENT - PLUMBING - PHASE 3

P1PB.4 PIPE BASEMENT - PLUMBING - PHASE 4

P1PB.44 PIPE BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4

P100.0 BASEMENT - PLUMBING - ALL PHASES

P100.2 BASEMENT - PLUMBING - PHASE 2

P100.3 BASEMENT - PLUMBING - PHASE 3

P100.4 BASEMENT - PLUMBING - PHASE 4

P100.44 BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4

P101.0 FIRST FLOOR - PLUMBING - ALL PHASES

P101.2 FIRST FLOOR - PLUMBING - PHASE 2

P102.0 SECOND FLOOR - PLUMBING - ALL PHASES

P102.2 SECOND FLOOR - PLUMBING - PHASE 2

P200 PLUMBING ENLARGED PLAN

P300 D.I. WATER FLOW DIAGRAM

P301 PLUMBING SANITARY-VENT RISER DIAGRAM - PHASE 2

P302 PLUMBING DOMESTIC WATER RISER DIAGRAM - PHASE 2

P303 PLUMBING RISER DIAGRAM - PHASE 4

P304 DI WATER RISER DIAGRAM - PHASE 2

P400 PLUMBING DETAILS

P401 PLUMBING DETAILS

P500 PLUMBING SCHEDULES

MECHANICAL

M000 MECHANICAL COVERSHEET

MD2PB.2 PIPE BASEMENT DEMOLITION - PIPING - PHASE 2

MD100.1 BASEMENT DEMOLITION - VENTILATION - PHASE 1

MD100.2 BASEMENT DEMOLITION - VENTILATION - PHASE 2

MD100.3 BASEMENT DEMOLITION - VENTILATION - PHASE 3

MD100.4 BASEMENT DEMOLITION - VENTILATION - PHASE 4

MD101.2 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 2

MD101.4 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 4

MD102.4 SECOND FLOOR DEMOLITION – VENTILATION – PHASE 4

MD103.4 THIRD FLOOR DEMOLITION – VENTILATION – PHASE 4

MD104.4 FOURTH FLOOR DEMOLITION – VENTILATION – PHASE 4

MD200.4 BASEMENT DEMOLITION - PIPING - PHASE 4

M1PB.2 PIPE BASEMENT - VENTILATION - PHASE 2

M2PB.2 PIPE BASEMENT - PIPING - PHASE 2

M100.0 BASEMENT - VENTILATION - ALL PHASES

M100.1 BASEMENT - VENTILATION - PHASE 1

M100.2 BASEMENT - VENTILATION - PHASE 2

M100.3 BASEMENT - VENTILATION - PHASE 3

M100.4 BASEMENT - VENTILATION - PHASE 4

M100.41 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 1

M100.42 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 2

M100.43 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 3

M100.44 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 4

M101.0 FIRST FLOOR - VENTILATION - ALL PHASES

M101.2 FIRST FLOOR - VENTILATION - PHASE 2

M101.4 FIRST FLOOR - VENTILATION - PHASE 4

M102.0 SECOND FLOOR - VENTILATION - ALL PHASES

M102.2 SECOND FLOOR - VENTILATION - PHASE 2

M200.0 BASEMENT - PIPING - ALL PHASES

M200.2 BASEMENT - PIPING - PHASE 2

M200.4 BASEMENT - PIPING - PHASE 4

M200.44 BASEMENT – PIPING – PHASE 4 – BID ALTERNATE 4

M201.0 FIRST FLOOR - PIPING - ALL PHASES

M201.2 FIRST FLOOR - PIPING - PHASE 2

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

M300 MECHANICAL DETAILS

M301 MECHANICAL DETAILS

M302 MECHANICAL DETAILS

M303 MECHANICAL DETAILS

M304 AHU COMPONENT PLAN

M305 AIRFLOW MAP

M306 AIRFLOW MAP

M307 STEAM FLOW DIAGRAM

M400 MECHANICAL DIAGRAMS

M401 MECHANICAL DIAGRAMS

M402 MECHANICAL DIAGRAMS

M403 MECHANICAL DIAGRAMS

M600 MECHANICAL SCHEDULES

M601 MECHANICAL SCHEDULES

ELECTRICAL

E000 ELECTRICAL COVERSHEET

ED100.1 BASEMENT DEMOLITION - ELECTRICAL- PHASE 1

ED100.2 BASEMENT DEMOLITION - ELECTRICAL - PHASE 2

ED100.3 BASEMENT DEMOLITION - ELECTRICAL - PHASE 3

ED100.4 BASEMENT DEMOLITION - ELECTRICAL - PHASE 4

E1PB.2 SUB BASEMENT - ELECTRICAL - PHASE 2

E100.0 BASEMENT - POWER - ALL PHASES

E100.1 BASEMENT - POWER - PHASE 1

E100.2 BASEMENT - POWER - PHASE 2

E100.3 BASEMENT - POWER - PHASE 3

E100.4 BASEMENT - POWER - PHASE 4

E100.41 BASEMENT - POWER - PHASE 4 - ALTERNATE 1

E100.42 BASEMENT - POWER - PHASE 4 - ALTERNATE 2

E100.43 BASEMENT - POWER - PHASE 4 - ALTERNATE 3

E100.44 BASEMENT - POWER - PHASE 4 - ALTERNATE 4

E101.0 BASEMENT - LIGHTING - ALL PHASES

E101.1 BASEMENT - LIGHTING - PHASE 1

E101.2 BASEMENT - LIGHTING - PHASE 2

E101.3 BASEMENT - LIGHTING - PHASE 3

E101.4 BASEMENT - LIGHTING - PHASE 4

E101.41 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 1

E101.42 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 2

E101.43 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 3

E101.44 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 4

E200 FIRST FLOOR - POWER - PHASE 2

E201 FIRST FLOOR - LIGHTING - PHASE 2

E301 FIRST FLOOR OVERALL AND ENLARGED ELECTRICAL PLANS

E400 ELECTRICAL DIAGRAMS

E601 ELECTRICAL DETAILS

E602 ELECTRICAL DETAILS

E603 ELECTRICAL DETAILS

E701 ELECTRICAL PANEL SCHEDULES

TECHNOLOGY

T001 TECHNOLOGY COVERSHEET

TD100.1 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 1

TD100.2 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 2

TD100.3 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 3

TD100.4 BASEMENT DEMOLITION - TECHNOLOGY - PHASE 4

T002 OVERALL PLANS - TECHNOLOGY

T003 OVERALL PLANS - TECHNOLOGY

T100.1 BASEMENT - TECHNOLOGY - PHASE 1

T100.2 BASEMENT - TECHNOLOGY - PHASE 2

T100.3 BASEMENT - TECHNOLOGY - PHASE 3

T100.4 BASEMENT - TECHNOLOGY - PHASE 4

T100.41 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 1

T100.42 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 2

T100.43 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 3

T100.44 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 4

T200 TECHNOLOGY ROOM ENLARGEMENTS

T300 TECHNOLOGY DETAILS

T301 TECHNOLOGY DETAILS

T600 TECHNOLOGY SCHEDULES

Mark Revisions: Date:

VOL. 1

VOL. 2

VOL. 3

VOL. 4

VOL. 4

VOL. 5

VOL. 6

VOL. 6

VOL. 7

VOL. 8

A

ACOUST. ACOUSTICAL

ACT ACOUSTIC TILE

ADP ART DISPLAY PANEL

ADT ART DISPLAY TRACK

ADJ ADJACENT, ADJUSTABLE

AFC ABOVE FINISH CEILING

AFF ABOVE FINISH FLOOR

AFP ACCORDION FOLDING PARTITION

AFS ACCESS FLOOR SYSTEM

AHU AIR HANDLING UNIT

ALUM ALUMINUM

AFS ACCESS FLOOR SYSTEM

APPROX APPROXIMATE

ARCH ARCHITECTURE, ARCHITECT

ABBREVIATIONS - SEE ADDITIONAL FINISH MATERIAL ABBREVIATIONS IN THE ROOM FINISH SCHEDULE MATERIAL LEGEND

B

B BENCH

BM BEAM

BD BOARD, BLAST DOOR

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BP BULLET PROOF

C

CAB CABINET

CID COMPREHENSIVE INTERIOR DESIGN

CMU CONCRETE MASONRY UNIT

CJ CONTROL JOINT,

CONSTRUCTION JOINT

C CENTER LINE

CLG CEILING

COL COLUMN

CONC CONCRETE

CONSTR CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACT, CONTRACTOR

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CPT CARPET

CR CHAIR RAIL

CT CARPET TILE

CUP CENTRAL UTILITY PLANT

D

DBL DOUBLE

DC DISPLAY CASE

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DML DEMOLITION

DN DOWN

DR DOOR

DS DOWNSPOUT

DWG DRAWING

E

EA EACH

EEWS EMERGENCY EYEWASH & SHOWER

EF EXHAUST FAN

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

EQUIP EQUIPMENT

EQ. EQUAL

ETC AND SO FORTH (ETCETERA)

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

F

FD FLOOR DRAIN

FDN FOUNDATION

FEB FIRE EXTINGUISHER

& WALL BRACKET

FEC FIRE EXTINGUISHER CABINET

FFL FINISH FLOOR LEVEL

FHC FIRE HOSE CABINET

(WITH EXTINGUISHER & BRACKET)

FHR FIRE HOSE REEL

(WITH EXTINGUISHER & BRACKET)

FIN FINISHED, FINISH

FFEL FINISHED FLOOR ELEVATION

FLR FLOOR

FV FIELD VERIFY

G

GA GAUGE

GALV GALVANIZED

GEJ GUTTER EXPANSION JOINT

GL GRADE LINE, GLASS

GRTG GRATING

GYP GYPSUM

GYP BD GYPSUM BOARD

H

HD HAND

HDWR HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HIGH POINT

HT. HEIGHT

HVAC HEATING, VENTILATION & AIR

CONDITIONING

I

I.D. INSIDE DIAMETER

INSUL INSULATION

INT INTERIOR

J

JC JANITOR'S CLOSET

JT JOINT

L

LAM LAMINATE

LAV LAVATORY

LBL LABEL

LVR LOUVER

LVR LP LOUVER LOW POINT

LP LOW POINT

M

MACH MACHINE

MAINT MAINTENANCE

MANUF MANUFACTURE

MAS MASONRY

MAX MAXIMUM

MECH MECHANICAL

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

M.R. MIRRORED

MTD MOUNTED

MTL METAL

N

NIC NOT IN CONTRACT

NGVD NATIONAL GEODETIC

VERTICAL DATUM

NO NUMBER

NTS NOT TO SCALE

O

O.C. ON CENTER

O.D. OUTSIDE DIAMETER

OFF OFFICE

OPP OPPOSITE

OPP. HD. OPPOSITE HAND

OPNG OPENING

OTS OPEN TO STRUCTURE

P P PAINT (e.g. P-1)

PTD PAINTED

PRTN PARTITION

PLAM PLASTIC LAMINATE

P. PLATE

PNL PANEL

PR PAIR

PLYWD PLYWOOD

R

R OR RAD RADIUS

RA RETURN AIR

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE: REFERENCE

RECP RECEPTACLE

REG REGULAR

REINF REINFORCED

REQ'D REQUIRED

RGH ROUGH

T

TECH TECHNICAL

THK THICK

THRU THROUGH

TLT TOILET

T & B TOP & BOTTOM

T.O.P. TOP OF PARAPET

T.O.S. TOP OF STEEL

TYP TYPICAL

U

U.N.O. UNLESS NOTED OTHERWISE

UL UNDERWRITERS LABORATORY

V

VENT VENTILATE, VENTILATOR

VERT VERTICAL

VOL VOLUME

W

W WIDTH

W/ WITH

WD WOOD

WT WEIGHT

FOR MEDICAL

FACILITIES ONLY

CS CENTRAL STERILE

CT COMPUTED TOMOGRAPHY

ER EMERGENCY ROOM

ICU INTENSIVE CARE UNIT

LDRP LABOR-DELIVERY-RECOVERY-POST

PARTUM

LTC LONG TERM CARE

MRI MAGNETIC RESONANCE IMAGING

MICU MEDICAL INTENSIVE CARE UNIT

OR OPERATING ROOM

OT OCCUPATIONAL THERAPY

PACU POST ANESTHETIC CARE UNIT

PT PHYSICAL THERAPY

RT RESPIRATORY THERAPY

SICU SURGICAL INTENSIVE CARE UNIT

S

SAPF SPECIAL ACCESS PROGRAM FACILITY

SCHED. SCHEDULE

SECT SECTION

SHT SHEET

SID STRUCTURAL INTERIOR DESIGN

SIM SIMILAR

SPEC SPECIFICATION

SPS SYNTHETIC PANEL SYSTEM

SS STAINLESS STEEL

SSMA STEEL STUD MANUFACTURERS

ASSOCIATION WWW.SSMA.COM

STC SOUND TRANSMISSION

COEFFICIENT

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUPP. SUPPORT

SUSP SUSPENDED

ARCHITECTURAL SYMBOLS

A101

DETAIL NUMBER

0 COLUMN NUMBER / GRID LINE

SHEET NUMBER

ARCHITECTURAL SECTION

WINDOW TYPE

1 Ref

R e f

1 Ref

R e f

ARCHITECTURAL ELEVATION-

INTERIOR

X

X-XXX

DETAIL NUMBER

SHEET NUMBER

CENTER LINE

DIMENSION LINE

DOOR NUMBER SYMBOL

x'- x"

EXISTING TO REMAIN

NEW CONSTRUCTION

EXISTING TO BE REMOVED

EXISTING TO REMAIN

1i

KEYNOTE - RENOVATION

WALL / PARTITION TYPE

KEYNOTE - DEMOLITION PLANX

X

X

NOTE: NOT ALL SYMBOLS USED

ROOM NAME

ROOM NAME

ROOM CODE

XX

X-XXX

SHEET DETAIL IS DRAWN ON

DETAIL NUMBER

XX

X-XXX

ARCHITECTURAL ELEVATION -

EXTERIOR

XX SF / XX SF

XXXX

PROGRAM SF

ACT-X

X'-X" AFF

CEILING CODE

CEILING HEIGHT, ABOVE FINISH

FLOOR

NOT IN CONTRACT

ROOM NUMBER

DESIGN SF

MATERIAL SYMBOLS

CAST-IN-PLACE CONCRETE

EARTH

EXISTING CONSTRUCTION

TO REMAIN U.N.O.

BRICK

GYPSUM

RIGID INSULATION

STEEL

GUIDE FOR CLEARANCES AT DOORS

PULL SIDE PUSH SIDE

NOTE: X=12" MINIMUM IF DOOR HAS BOTH

A CLOSER AND LATCH

HINGE SIDE APPROACHES - SWINGING DOORS

PULL SIDE PUSH SIDE

PULL SIDE PUSH SIDE

NOTE: X=36" MINIMUM IF Y=60"; X=42"

MINIMUM IF Y=54".

NOTE: Y=48" MINIMUM IF DOOR HAS BOTH

A LATCH AND CLOSER.

NOTE: Y=54" MINIMUM IF DOOR HAS

CLOSER.

FRONT APPROACHES - SWINGING DOORS

LATCH SIDE APPROACHES - SWINGING DOORS

NOTE:

1. ALL DOORS IN ALCOVES SHALL COMPLY WITH CLEARANCES FOR FRONT APPROACHES.

2. ENTRY DOORS TO HOSPITAL PATIENT ROOMS FOR IN-PATIENTS SHALL BE EXEMPTED

FROM REQUIREMENT FOR SPACE AT LATCH SIDE OF DOOR (SEE DIMENSION "X") IF DOOR

IS AT LEAST 44" WIDE.

NOTE: Y=48" MINIMUM IF DOOR HAS CLOSER.

Y

X X

Y

M

IN

4'

-0

X

M

IN

5'

-0

MIN.

1'-6"

Y

X

M

IN

3'

-6

MIN.

4'-6"

M

IN

4'

-0

MIN.

2'-0"

MIN.

2'-0"

M

IN

3'

-6

1. CONTRACTOR SHALL COMPLY WITH THE MOST

CURRENT VERSION OF OSHA'S PUBLICATION

3142-12R "LEAD IN CONSTRUCTION" (29 CFR 1926.62)

FOR CONSTRUCTION ACTIVITIES THAT DISTURB

LEAD-BASED PAINTED SURFACES, PAINT

CONTAINING DETECTABLE LEVELS OF LEAD OR

OTHER MATERIALS CONTAINING LEAD.

2. CONTACT THE COR TO OBTAIN MOST CURRENT

COPIES OF ASBESTOS AND LEAD BASED PAINT (LBP)

REPORTS.

3. HAZARDOUS MATERIALS DISCLOSED IN THE ACM

AND LBP REPORTS MAY NOT BE A FULL ACCOUNTING

OF SUCH MATERIALS IN THE AREA OF THE FACILITY

IN QUESTION. REFER TO THE VA'S ABATEMENT

SPECIFICATIONS FOR HANDLING OF MATERIALS THAT

WERE NOT DIRECTLY OBSERVED, BUT SHOULD BE

EXPECTED BY THE ABATEMENT CONTRACTOR.

4. CONTRACTOR TO VERIFY THE ABSENCE OF

ASBESTOS CONTAINING MATERIALS (ACM) PRIOR TO

ANY DEMOLITION.

5. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT

COULD BE HAZARDOUS, THE CONTRACTOR SHALL

STOP WORK AND NOTIFY THE GOVT. IMMEDIATELY

FOR DIRECTION.

6. ALL CONTRACTORS' PERSONNEL IN AREAS NEAR

DISTURBANCE OR ABATEMENT OF HAZARDOUS

MATERIALS MUST BE NOTIFIED OF ACTIVITIES.

7. ASBESTOS AND LEAD-BASED PAINT ABATEMENT, IF

REQUIRED, SHALL BE CONDUCTED IN ACCORDANCE

WITH VA SPECIFICATIONS AND ALL APPLICABE

REGULATIONS.

8. ABATEMENT CONTRACTORS SHALL SCHEDULE

WORK IN GENERAL ACCORDANCE WITH THE

PROJECT'S PHASING STRATEGY.

HAZARDOUS MATERIALS:

FIRE PROOFING GENERAL NOTES:

1. MAINTAIN FIRE RATED CONSTRUCTION AT WALL

PENETRATIONS - CONSTRUCTION IS TO CONFORM TO

MANUFACTURER'S FIRE RATED / TEST ASSEMBLIES.

2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE

WALLS / PARTITIONS AND FLOORS. CONFORM WITH THE

TESTED / SUBMITTED FIRE RATED ASSEMBLY. USE RED

FIRE CAULK AND LABEL WALL WITH U.L. DESIGN NUMBER.

FIRE RATED WALLS SHOWN ON PLAN. FOR ADDITIONAL

RATED WALL LABEL REQUIREMENTS SEE SPEC 09 91 00

3.14.B

3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON

EXISTING STRUCTURAL MEMBERS, INCLUDING THAT

WHICH IS UNCOVERED NEEDING REPAIR AND THAT

WHICH IS DISTURBED DURING CONSTRUCTION.

4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING AT

EXISTING RATED WALLS WHICH IS UNCOVERED NEEDING

REPAIR AND THAT WHICH IS DISTURBED DURING

CONSTRUCTION. RE-LABEL EXISTING WALL IF

NECESSARY.

1. ALL BARRIERS & ENCLOSURES ARE TO HAVE UL DESIGN 1-HR

FIRE RATING.

2 SEE SPECIFICATION SECTION 01 56 00 "TEMPORARY BARRIERS

& ENCLOSURES" FOR REQUIREMENTS RELATED TO

ENCLOSURE OF CONSTRUCTION IN PROGRESS.

3. ALL ENCLOSURES AND PENETRATIONS THROUGH EXISTING

STRUCTURE ARE TO BE MAINTAINED BY THE CONTRACTOR

DURING DEMOLITION AND NEW CONSTRUCTION TO PREVENT

THE INFILTRATION OF WATER INTO THE BUILDING DURING THE

COURSE OF THE PROJECT.

4. EXTERIOR WALL ENCLOSURES SHALL BE ERECTED PRIOR TO

THE START OF DEMOLITION. ENCLOSURES SHALL BE REMOVED

AS NEEDED TO ALLOW FOR DEMOLITION AND REPLACED

BEFORE THE END OF EACH WORK DAY.

5. EXISTING CONSTRUCTION TO REMAIN SHALL BE PROTECTED

FROM DEMOLITION AND NEW CONSTRUCTION ACTIVITY.

PROTECTION METHODS SHALL BE APPROVED BY THE COR AT

LEAST ONE WEEK PRIOR TO INITIAL INSTALLATION.

6. ALL ENCLOSURES MUST BE INSPECTED AND APPROVED BY

THE COR BEFORE THE END OF EACH WORK DAY.

UNSATISFACTORY ENCLOSURE WORK SHALL BE CORRECTED

BY THE CONTRACTOR AND APPROVED BY THE COR BEFORE

CESSATION OF THE DAY'S WORK ACTIVITY.

TEMPORARY BARRIERS & ENCLOSURES:

1. THE CONTRACTOR SHALL INSPECT THE SITE, STUDY EXISTING CONDITIONS,

REVIEW DRAWINGS AND SPECIFICATIONS. CONTRACTOR SHALL ADJUST FOR

ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT.

2. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR THE WORK AND BE

RESPONSIBLE FOR SAME. COORDINATE THE WORK AND SHOP DRAWINGS WITH

ALL OTHER TRADES AFFECTED AND MAKE ANY NECESSARY OFFSETS TO

CONCEAL PIPING AND DUCTWORK AND TO CLEAR EQUIPMENT, STRUCTURAL

MEMBERS AND OTHER OBSTRUCTIONS.

3. ALL UTILITIES AND SERVICES SHALL BE KEPT IN CONTINUOUS OPERATION

UNLESS WRITTEN PERMISSION IS OTHERWISE GRANTED BY THE GOVERNMENT.

CONTRACTOR MUST CONTACT VA'S COR PRIOR TO ANY SHUTDOWNS. ADHERE

TO ALL VA REQUIRED PERMITS AND TIMELINES FOR SHUTDOWNS. SEE

SPECIFICATION 01 00 00 FOR VA REQUIREMENTS FOR SHUTDOWN.

4. TEMPORARY ALTERATIONS AND CONNECTIONS REQUIRED BY THIS CONTRACT

SHALL BE MADE SO THAT ALL BUILDING SERVICES ARE MAINTAINED WITH

MINIMUM INTERRUPTION. SCHEDULE ALL ELECTRICAL / MECHANICAL OUTAGES

WITH THE GOVERNMENT AND ADHERE TO ALL VA REQUIRED PERMITS.

5. PROTECT ALL EXISTING WORK, MATERIALS AND EQUIPMENT DESIGNATED TO

REMAIN OR BE REINSTALLED. CAP OR PLUG TEMPORARY OPENINGS. DELIVER

ALL WORK TO THE GOVERNMENT IN ORIGINAL CONDITION.

6. WHEN DEMOLITION IS COMPLETE, NOTIFY ARCHITECT AND THE GOVERNMENT

FOR A SCHEDULED MEETING TO REVIEW EXISTING CONDITIONS AND ANY

CONCERNS REGARDING NEW WORK.

7. CUTTING AND PATCHING OF EXISTING WALLS, FLOORS OR CEILINGS REQUIRED

BY NEW WORK SHALL BE INCLUDED AS WORK PROVIDED UNDER THIS

CONTRACT.

8. CUTTING SHALL BE DONE WITH CARE SO AS NOT TO DAMAGE EXISTING

STRUCTURE, EQUIPMENT, CONNECTIONS, CONTROLS, ETC.

9. DAMAGE CAUSED BY SUCH CUTTING SHALL BE REPLACED OR REPAIRED TO

ORIGINAL CONDITION BY CONTRACTOR AT NO COST TO THE THE GOVERNMENT,

UNLESS UNFORESEEN EXISTING CONDITIONS ARE DISCOVERED AND THE

GOVERNMENT / ARCHITECT ARE NOTIFIED.

10. ALL OCCUPIED WORK AREAS, BUILDING CORRIDORS AND EXTERIOR AREAS

SHALL BE KEPT CLEAR OF DEBRIS.

11. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY AND

FREE FROM DEFECTS.

12. MANUFACTURER AND MODEL NUMBERS SPECIFIED ESTABLISH THE TYPE AND

QUALITY REQUIRED, UNLESS OTHERWISE NOTED.

13. ALL WORK SHALL COMPLY WITH APPLICABLE REGULATIONS, CODES AND

ORDINANCES.

14. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS

NECESSARY TO DEMONSTRATE A COMPLETE AND SATISFACTORY

INSTALLATION.

15. ALL EXPOSED PENETRATIONS MADE THROUGH EXISTING ROOFS, FLOORS, AND

WALLS SHALL BE PATCHED WITH LIKE MATERIALS TO MATCH THE

SURROUNDING AREAS FOR A TIGHT SEAL.

16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING AND REPLACING

ANY DAMAGE TO EXISTING MATERIALS RESULTING FROM WORK UNDER THIS

CONTRACT AND SHALL RESTORE SUCH TO ITS ORIGINAL CONDITION OR BETTER

WITH NEW MATERIALS TO MATCH.

17. INSTALL THE SPECIFIED FIRE STOPPING (SLEEVES, WRAP, CONDUIT, ETC.) AT

RATED CONSTRUCTION (NEW OR EXISTING) OR SMOKE PARTITIONS:

A. REPLACE FIRE STOP AT ALL PENETRATIONS WHERE NEW

DEVICES/LINES USE EXISTING PENETRATIONS OF RATED BARRIERS.

B. REPLACE FIRE STOP AT ALL EXISTING PENETRATIONS OF RATED

BARRIERS WHERE EXISTING LINES HAVE BEEN MODIFIED OR

RELOCATED.

C. FIRE STOP ALL NEWLY CREATED PENETRATIONS WHERE NEW

DEVICES/LINES PENETRATE EXISTING FLOORS, CEILINGS AND

D. FIRE STOP ALL NEW PENETRATIONS WHERE NEW

DEVICES/LINES PENETRATE THROUGH NEWLY CONSTRUCTED

RATED BARRIERS OR SMOKE PARTITIONS.

E. USE ONLY APPROVED FIRE CAULKING AND FIRE STOPS (SEE SPEC

SECTION 078400).

18. ALL METAL STUD AND GYPSUM WALLBOARD PARTITIONS ARE DIMENSIONED TO

THE OUTSIDE FINISH FACE OF WALL AND TO THE COLUMN GRID UNLESS

OTHERWISE NOTED.

19. ALL GYPSUM BOARD SHALL BE TYPE 'X' FIRE CODE GYPSUM BOARD AND SHALL

BE MOLD AND MOISTURE RESISTANT, UNLESS NOTED OTHERWISE.

20. PROVIDE FIRE TREATED WOOD BLOCKING IN ALL WALLS TO RECEIVE WALL

HUNG ACCESSORIES, SUCH AS EQUIPMENT, SIGNAGE, GRAB BARS, MILLWORK,

COAT HOOKS, AND DOOR STOPS, ETC.

21. ALL ITEMS AND DEVICES, SUCH AS COVER PLATES, SWITCH PLATES,

CONVENIENCE OUTLETS, DOOR STOPS, AND OTHER FINISH HARDWARE, ETC.

SHALL BE REMOVED AND REINSTALLED AS PART OF THE REFINISHING OF

EXISTING WALLS INDICATED TO REMAIN.

22. THE CONTRACTOR SHALL WORK WITH THE CONDITIONS AS THEY EXIST AT THE

SITE. ALL ABOVE CEILING CONDITIONS SHALL BE REVIEWED, AND

MODIFICATIONS IDENTIFIED, COORDINATED, AND INCORPORATED INTO THE

SHOP DRAWING PROCESS. COORDINATE ALL ABOVE EILING WORK TO ENSURE

A COMPLETE AND OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO THE

GOVERNMENT. COORDINATION SHALL INCLUDE, BUT NOT BE LIMITED TO THE

FOLLOWING:

A. THE GOVERNMENT'S EQUIPMENT REQUIREMENTS.

B. THE CEILING SUPPORT SYSTEM.

C. THE MECHANICAL DUCTWORK SYSTEM.

D. THE LIGHTING FIXTURES.

E. ELECTRICAL WIRING AND CONDUIT SYSTEMS.

F. THE PLUMBING AND PIPING SYSTEMS.

G. FIRE PROTECTION SYSTEMS

H. THE COMMUNICATIONS AND SPECIAL SYSTEMS.

23. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF

DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR

SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW ENTIRE SET

OF DOCUMENTS.

24. ALL NEW STUD WALLS AND GYPSUM BOARD SHALL EXTEND TO STRUCTURE

UNLESS NOTED OTHERWISE.

25. WHEN ALTERING THE BUILDING, IF STRUCTURAL INTEGRITY APPEARS TO BE IN

QUESTION CONTRACTOR SHALL NOTIFY THE GOVERNMENT AND ARCHITECT

IMMEDIATELY.

26. ALL NEW CONSTRUCTION IS INDICATED BOLD OR FULL TONE.

27. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING INTERSECT, THE HIGHEST

RATED PARTITION TAKES PRECEDENT. MAINTAIN RATING BEHIND RECESSED

AREAS IN WALLS.

28. ALL CORRIDOR WALLS WITHIN BUILDING ARE REQUIRED TO BE SMOKE TIGHT,

WHETHER THEY ARE FIRE RATED OR NOT. REPAIR AND EXTEND AT LEAST THE

CORRIDOR SIDE OF NON-RATED CORRIDOR WALLS TO STRUCTURE, UNLESS

NOTED OTHERWISE.

29. COORDINATE CONSTRUCTION REQUIREMENTS WITH CIVIL, STRUCTURAL,

MECHANICAL, FIRE PROTECTION, PLUMBING, ELECTRICAL AND TECHNOLOGY

DRAWINGS.

30. AFTER DEMOLITION AND NEW CONSTRUCTION, REPAIR ALL FINISHED

SURFACES AND FINISH AS ADJACENT SURFACES (PAINT, ETC.). BE SURE THE

PAINT OR OTHER FINISH IS INCLUDED, NOT JUST SUBSTRATE ON EXISTING

ITEMS TO REMAIN AFFECTED BY WORK TO LIKE NEW CONDITION.

31. ALL FINISHED SURFACES ON NEW WALLS (IE INFILLING OR EXTENDING EXISTING

ITEMS) SHALL BE INSTALLED SO NEW FINISHED SURFACES ALIGN WITH

EXISTING.

32. FURNITURE SHOWN IS N.I.C. UNLESS NOTED OTHERWISE. UNLESS NOTED

OTHERWISE EQUIPMENT SHALL BE PROVIDED BY THE GOVERNMENT AND

INSTALLED BY THE CONTRACTOR AS SCHEDULED. DISCONNECTION,

RELOCATION, AND RECONNECTION OF EXISTING EQUIPMENT IS THE

RESPONSIBILITY OF THE CONTRACTOR. REFER TO Q-SERIES DRAWINGS FOR

FURNITURE AND EQUIPMENT LOCATIONS, Q-601 EQUIPMENT SCHEDULE FOR

RESPONSIBILITIES.

33. CONTRACTOR SHALL VERIFY LOCATION OF ANY EXISTING CONDUITS IN EXISTING

ROOF AND WALLS PRIOR TO START OF DRILLING OR CUTTING ANY HOLES, IF

NECESSARY, IN THE CONCRETE. POWER INTERRUPTION SHALL BE AVOIDED.

GENERAL ARCHITECTURAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/1

/2

:0

:1

P

M

AG001

ARCHITECTURAL ABBREVIATIONS,

LEGENDS AND NOTES

MP

133CA

Mark Revisions: Date:

UP

c14c16 c12 c11 c10 c8 c7 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c18 c25 c24 c26 eTT ca18 ca19 ca12ca11ca10 ca16

PIPE BASEMENT

PC100

Not Enclosed

AD14

V .I.

F

3' -4

/2

V .I.

F

4' -1

7/

8" cQ.1

7.8

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/1

/2

:0

:2

P

M

AD1PB.2

PIPE BASEMENT FLOOR - DEMOLITION

PLAN - PHASE 2 133CA

1/8" = 1'-0" F1

PIPE-BASEMENT - DEMOLITION - PHASE 2

DEMOLITION KEYNOTES

KEY KEYNOTE

AD01 REMOVE PORTION OF EXISTING CEILING AS REQUIRED FOR NEW TEMP RATED CORRIDOR.

PATCH & REPAIR CEILING(S) TO REMAIN TO MATCH ADJACENT SURFACE.

AD01a REMOVE EXISTING CEILING AND CEILING FRAMING/SUPPORTS.

AD02 REMOVE & SALVAGE EXISTING WINDOW(S) & WINDOW SILL. STORE WINDOW AND WINDOW SILL IN SAFE LOCATION. WINDOW & WINDOW SILL TO BE REINSTALLED BACK INTO EXISTING PLACE

AT A LATER PHASE. DEMO / SAW CUT PORTION OF EXISTING MASONRY WALL AS REQUIRED

FOR NEW TEMPORARY DOOR. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

AD03 VERIFY EXISTING UTILITIES.

AD09 REMOVE EXISTING DOOR & FRAME.

AD10 DEMO EXISTING SITE FOR NEW ADDITION. REFER TO CIVIL, PLUMB, ELECT, & STRUCT

DRAWINGS FOR ADITIONAL INFORMATION, TYP.

AD11 REMOVE PORTION OF EXISTING CEILING AS REQUIRED FOR NEW TEMPORARY BARRIER WALL.

PATCH & REPAIR CEILING(S) TO REMAIN TO MATCH ADJACENT SURFACE, TYP.

AD12 REMOVE PORTION OF EXISTING CEILING FINISH AS REQUIRED FOR NEW TELECOM ROOM.

SALVAGE CEILING TILES AND FRAMING MEMBERS AS REQUIRED TO USE FOR PATCHING &

REPAIRING AT OTHER CEILING LOCATIONS.

AD13 REMOVE PORTION OF EXISTING FLOOR FINISH AS REQUIRED FOR NEW TELECOM ROOM.

AD14 REMOVE PORTION OF EXISTING CONC WALL AS REQUIRED FOR NEW DOOR & FRAME. REFER

TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

AD15 REMOVE PORTION OF EXISTING WALL. PATCH & REPAIR EXISTING WALL(S) TO REMAIN TO

MATCH ADJACENT SURFACES.

AD15a REMOVE EXISTING WALL AND/OR WALL FURRING IN IT'S ENTIRETY.

AD15b REMOVE PORTION OF EXISTING WALL AS REQUIRED TO INSTALL NEW ABOVE FLOOR BEAM(S) AND BEAM REINFORCEMENT. PATCH, REPAIR, & INFILL EXISTING WALL TO MAINTAIN EXISTING

WALL RATING AND MATCH ADJACENT SURFACE.

AD16 REMOVE PORTION OF EXISTING BRICK VENEER. REFER TO STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

AD17 REMOVE EXISTING WINDOWS.

AD18 REMOVE EXISTING WINDOW, AND REMOVE PORTION OF EXISTING MASONRY WALL. REFER TO

STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

AD19 DEMO TEMPORARY DOOR & BARRIER WALLS.

AD20 DEMO PORTION OF BARRIER WALL. PATCH & REPAIR WALL(S) TO REMAIN TO MATCH

ADJACENT SURFACES.

AD21 DEMO TEMPORARY BARRIER WALL.

AD22 REMOVE PORTION OF EXISTING CEILING FINISH AS REQUIRED FOR NEW WALL. PATCH &

REPAIR CEILING AS REQUIRED TO MATCH ADJACENT SURFACES.

AD23 REMOVE EXISTING FLOOR FINISH & FLOOR ADHESIVE IN IT'S ENTIRETY. PATCH & REPAIR

FLOOR SLAB AS REQUIRED FOR NEW FLOOR FINISHE(S), TYP.

AD24 REMOVE EXISTING EQUIPMENT WALL IN IT'S ENTIRETY. PATCH & REPAIR WALL(S) TO REMAIN

TO MATCH ADJACENT SURFACES

AD24a REMOVE EXISTING SPS EQUIPMENT, AND VERIFY WITH OWNER/VA IF EQUIPMENT IS TO BE

SALVAGED OR RELOCATED, TYPICAL. REFER TO M.E.P. DRAWINGS FOR ADDITIONAL

INFORMATION.

AD24b SAWCUT AND REMOVE PORTIONS OF CONC SLAB AS REQUIRED TO REMOVE EXISTING

PLUMBING LINES, REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. REFER TO

STRUCTURAL DRAWINGS FOR ADDITIONAL CONC SLAB INFORMATION.

AD26 REMOVE EXISTING PRECAST CONC PARAPET CAP. EXISTING CONC ROOF CURB TO REMAIN.

AD27 REMOVE EXISTING LOUVER(S), REFER TO MECH DRAWINGS FOR ADDITIONAL INFORMATION.

AD28 REMOVE EXISTING QUARRY TILE FLOORING AND SETTING BED IN IT'S ENTIRETY. PATCH, REPAIR, AND INFILL FLOOR AS REQUIRED TO MATCH ADJACENT FLOOR LEVEL AND FOR NEW

FLOOR FINISH.

AD28a REMOVE EXISTING QUARRY TILE WALL BASE IN IT'S ENTIRETY. PATCH, REPAIR, AND/OR

REPLACE PORTIONS OF EXISTING WALL(S) AS REQUIRED TO MATCH ADJACENT WALL

SURFACE AND FOR NEW WALL FINISH.

AD29 REMOVE EXISTING CART WASH IN IT'S ENTIRETY, AND VERIFY WITH OWNER/VA IF CART WASH

IS TO BE SALVAGED. PATCH, REPAIR AND INFILL RECESSED FLOOR TO MATCH ADJACENT

FLOOR LEVEL, REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

AD30 REMOVE EXISTING PLUMBING FIXTURES, REFER TO PLUMBING DRAWINGS FOR ADDTIONAL

INFORMATION. EXISTING WALL(S) TO REMAIN, PATCH, REPAIR, AND/OR REPLACE PORTION OF

WALL(S) AS REQUIRED TO MATCH ADJACENT WALL SURFACE AND FOR NEW WALL FINISH.

AD31 DEMO FINISHES. PATCH & REPAIR WALL(S), FLOOR(S), AND CEILING(S) AS REQUIRED FOR NEW

FINISHES.

0' 4' 8' 16' 32'

SCALE: 1/8" = 1'-0"

Mark Revisions: Date:

A VA Revisions 07/05/2023 ISSUED 11/29/2022

UP

DN

c14c16 c12 c11 c10 c8 c7 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c18 c25 c24 c26 eTT ca18

AE303

F1

9'-

3/ 8" ca19 c1.

c2.

c3.

cA ca12ca11ca10 ca16

NEW ADDITION LOCATION

8'-0"

9' -1

1/

2"

AD02AD03

cQ.1

AD15

AD09

AD09

AD15a

AD15aAD09

AD23

AD01a

AD15a

AD01

AD01

AD15a

AD15a

11'-1 3/8" 3'-0"

1'-6 1/4"

AD15a

AD15b

AD15b

AD15b

AD09

7.8

105 SF

PT TECH

BD1610 - 133CA

1401 SF

CASE CART

BD168 - 133CA

47 SF

JAN

BD168B - 133CA

1201 SF

SPS CLEAN

BD168A - 133CA

1009 SF

SPS

DECONTAMINATION

BD171 - 133CA

SPS DECON

BD171A - 133CA

113 SF

ELEV

B - EL - DL01

36 SF

44 SF

ENG CLOSET

BD169 - 133CA

M LCKR

BC105B - 133

44 SF

F LCKR

BC105A - 133

48 SF

CORRIDOR

BC105 - 133

74 SF

TLT

BC106 - 133

44 SF SHWR

BC106A - 133

21 SF

HAC

BC109 - 133

60 SF

M LCKR

BC107 - 133

94 SF

CORRIDOR

CB147 - 133

203 SF

ELEC

BC104 - 133

53 SF

CSS MANAGER -

STORAGE

BC103 - 133

55 SF

CSS MANAGER -

INVENTORY

BC103A - 133

65 SF

SPS STAFF &

CENTRAL

SUPPLY LIGHT

STORAGE

BC102A - 133

2302 SF

CART LIFT

B-EL-CL02

63 SF

CART LIFT

CB149 - 133

106 SF

JAN CLO

BC102E -133

74 SF

F LOCKER

BD172 - 133CA

74 SF

60 SF

M TLT

BD167 - 133CA

CORRIDOR

CB148 - 133CA

794 SF

14 SF

ELEC

BD170 - 133CA

55 SF

STAFF TLT

BD172A - 133CA

PASS

BC102D-133

23 SF CART WASH

BC102B -133

36 SF

STERILE

PROCESSING

BC102C -133

125 SF

SPS CHIEF

BC110 - 133

127 SF

SPS PROG

SUPPORT

BC111 - 133

88 SF

SPS ASST CHIEF

BC112 - 133

101 SF

TELECOM

BC113 - 133

191 SF

175 SF

RECYCLE

BD166A - 133CA

772 SF

HYDROTHERAPY

BD162H - 133CA

STAIR #3

SW-B-03

180 SF

94 SF

BREAK ROOM

BC173 - 133CA

1. DASHED BOLD LINES INDICATE EXTENTS OF DEMOLITION INCLUDING

THE FOLLOWING:

* INTERIOR PARTITIONS (REMOVED TO STRUCTURE)

* CEILINGS, INCLUDING CEILING SUSPENSION SYSTEM, MISC.

STEEL SUPPORTS FOR SUSPENDED EQUIPMENT, SUSPENDED

EQUIPMENT, LIGHT FIXTURES, DIFFUSERS AND GRILLES ETC.

* FLOOR FINISHES (TO CONCRETE) INCLUDING CARPET, RVT,

SHEET VINYL, CERAMIC TILE, QUARRY TILE, BRICK PAVERS, ETC.

* DOORS AND FRAMES UNLESS NOTED OTHERWISE IN DOOR

SCHEDULE

* WINDOW GLAZING AND FRAMES UNLESS NOTED OTHERWISE

* BRICK AND BACK-UP WALL SYSTEM

* CABINETWORK, SHELVING, BASES

* TOILET PARTITIONS AND ACCESSORIES

* TACK BOARDS, MARKER BOARDS, PEGBOARDS, DISPLAY BOARDS

* EQUIPMENT ITEMS

* PLUMBING FIXTURES

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS.

3. ALL LIGHT OR HALFTONE LINES INDICATE EXISTING TO REMAIN.

SEE SPECIFICATIONS SECTIONS FOR CUTTING AND PATCHING AND

DEMOLITION 02 41 00.

4. SEE ROOM FINISH SCHEDULE, MECHANICAL PLANS, AND

ELECTRICAL PLANS FOR EXTENT OF NEW CEILING CONSTRUCTION

OR CEILING PATCHING IN EXISTING AREAS.

5. SEE ROOM FINISH SCHEDULE FOR EXTENT OF NEW FLOORING

MATERIAL IN EXISTING AREAS.

6. SEE ROOM FINISH SCHEDULE FOR EXTENT OF NEW WALL

COVERING MATERIAL IN EXISTING AREAS. WHERE NEW FINISHES

ARE REQUIRED REMOVE EXISTING WALL FINISHES, (TEXTURED

PLASTIC COATING, VINYL WALL COVERING, PANELING, BASE, ETC.).

7. CONTRACTOR TO VERIFY ALL WALL CONSTRUCTION & FINISHES

NOTED FOR REMOVAL. TAKE INTO ACCOUNT ANY DISCREPANCY

AND MAKE PROPER ADJUSTMENT TO ACCOMPLISH REQUIRED

CONSTRUCTION & FINISHES. IF STRUCTURAL INTEGRITY IS

VIOLATED, CONTACT COR & ARCHITECT. COORDINATE PHASING

WITH OWNER.

8. COORDINATE REMOVAL OF FURNITURE AND EXISTING EQUIPMENT

WITH OWNER.

9. REFER TO EQUIPMENT SCHEDULE 11700S FOR NEW LOCATIONS OF

EXISTING EQUIPMENT, ETC.

10. SAW CUT EDGES OF EXISTING FLOOR SLAB FOR REMOVAL AND

INSTALLATION OF UTILITIES. REFER TO MECHANICAL AND

ELECTRICAL DRAWINGS.

11. REMOVE FURRING OR GWB ONLY WHERE REQUIRED TO COMPLETE

CONSTRUCTION. PATCH AND MATCH WALLS AS REQUIRED TO

COMPLETE AND MATCH EXISTING CONDITIONS, UNLESS AN

ALTERNATIVE MATERIAL AND FINISH IS INDICATED.

12. REMOVE CEILINGS ONLY AS REQUIRED FOR NEW CONSTRUCTION.

REINSTALL, REPLACE OR PATCH AS REQUIRED.

DEMOLITION PLAN GENERAL NOTES:

EXIST TOPPING

SLAB (TYP)

EXIST STRUCTURAL

SLAB

REMOVE EXISTING

PARTITION / BASE

REMOVE EXISTING TOPPING

SLAB (TYP) - SEE DETAIL

NOTES FOR EXTENTS

EXIST TOPPING

SLAB (TYP)

EXIST STRUCTURAL

SLAB

NEW CONSTRUCTION

LEVELING LAYER

DETAIL NOTES:

1. WORK REQUIRES REMOVAL OF EXISTING

WALLS FULL-HEIGHT, INCLUDING STRUCTURAL

CLAY TILE/PLASTER AND GLAZED STRUCTURAL

TILE PARTITIONS AND BASE, TO DEPTH OF 1”

MINIMUM OR TO TOP OF STRUCTURAL

CONCRETE SLAB. FIELD VERIFY DEPTH OF

BASE BELOW EXISTING FINISH FLOOR, DEPTH

OF EXISTING TOPPING SLAB AND TOP OF

STRUCTURAL SLAB.

2. REMOVE TOPPING SLAB BACK TO MINIMUM OF

1-FOOT FROM EACH PARTITION.

3. AFTER PARTITION AND PORTIONS OF TOPPING

SLAB ARE REMOVED, VERIFY FLOOR LEVEL

AND FLATNESS ACROSS ROOMS SEPARATED

BY THE DEMOLISHED PARTITIONS FOR

COMPLIANCE WITH TOLERANCES ESTABLISHED

FOR LEVEL AND FLATNESS FOR FINISH

FLOORING.

A. SEE SPECIFICATION SECTIONS 09 05 16 -

SUBSURFACE PREPARATION FOR

FLOOR FINISHES AND RELATED

DIVISION 09 SECTIONS FOR SCHEDULED

FINISH FLOORING IN AREA FOR

ALLOWABLE TOLERANCES AND

LEVEL/FLATNESS REQUIREMENTS..

4. REMOVE ADDITIONAL TOPPING SLAB AS

REQUIRED TO ALLOW FOR ESTABLISHMENT OF

NEW LEVELING LAYER TO MEET SPECIFIED

LEVEL AND FLATNESS TOLERANCES.

5. REPLACE, PATCH, LEVEL AND REPAIR FLOOR

ON BOTH SIDES OF DEMOLISHED PARTITION TO

THE EXTENTS NECESSARY TO MEET SPECIFIED

REQUIREMENTS FOR LEVEL AND FLATNESS.

6. PREPARE LEVELING LAYER AND REMAINING

TOPPING SLABS FOR NEW FLOOR SUBSTRATE

AND FINISHES.

VERIFY EXISTING CONDITIONS DURING PRE-

CONSTRUCTION WALK THRU AND REVIEW WITH THE

COR: ADDITIONAL COSTS WILL NOT BE ALLOWED.

MIN.

SEE DTL NOTES

DEMOLITION

RENOVATION

MIN.

SEE DTL NOTES

1'-0" 1'-0"

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/1

/2

:0

:3

P

M

AD100.1

BASEMENT FLOOR - DEMOLITION

PLAN - PHASE 1 133CA

1/8" = 1'-0" F1

BASEMENT - DEMOLITION - PHASE 1

DEMOLITION KEYNOTES

KEY KEYNOTE

AD01 REMOVE PORTION OF EXISTING CEILING AS REQUIRED FOR NEW TEMP RATED CORRIDOR.

PATCH & REPAIR CEILING(S) TO REMAIN TO MATCH ADJACENT SURFACE.

AD01a REMOVE EXISTING CEILING AND CEILING FRAMING/SUPPORTS.

AD02 REMOVE & SALVAGE EXISTING WINDOW(S) & WINDOW SILL. STORE WINDOW AND WINDOW SILL IN SAFE LOCATION. WINDOW & WINDOW SILL TO BE REINSTALLED BACK INTO EXISTING PLACE

AT A LATER PHASE. DEMO / SAW CUT PORTION OF EXISTING MASONRY WALL AS REQUIRED

FOR NEW TEMPORARY DOOR. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

AD03 VERIFY EXISTING UTILITIES.

AD09 REMOVE EXISTING DOOR & FRAME.

AD10 DEMO EXISTING SITE FOR NEW ADDITION. REFER TO CIVIL, PLUMB, ELECT, & STRUCT

DRAWINGS FOR ADITIONAL INFORMATION, TYP.

AD11 REMOVE PORTION OF EXISTING CEILING AS REQUIRED FOR NEW TEMPORARY BARRIER WALL.

PATCH & REPAIR CEILING(S) TO REMAIN TO MATCH ADJACENT SURFACE, TYP.

AD12 REMOVE PORTION OF EXISTING CEILING FINISH AS REQUIRED FOR NEW TELECOM ROOM.

SALVAGE CEILING TILES AND FRAMING MEMBERS AS REQUIRED TO USE FOR PATCHING &

REPAIRING AT OTHER CEILING LOCATIONS.

AD13 REMOVE PORTION OF EXISTING FLOOR FINISH AS REQUIRED FOR NEW TELECOM ROOM.

AD14 REMOVE PORTION OF EXISTING CONC WALL AS REQUIRED FOR NEW DOOR & FRAME. REFER

TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

AD15 REMOVE PORTION OF EXISTING WALL. PATCH & REPAIR EXISTING WALL(S) TO REMAIN TO

MATCH ADJACENT SURFACES.

AD15a REMOVE EXISTING WALL AND/OR WALL FURRING IN IT'S ENTIRETY.

AD15b REMOVE PORTION OF EXISTING WALL AS REQUIRED TO INSTALL NEW ABOVE FLOOR BEAM(S) AND BEAM REINFORCEMENT. PATCH, REPAIR, & INFILL EXISTING WALL TO MAINTAIN EXISTING

WALL RATING AND MATCH ADJACENT SURFACE.

AD16 REMOVE PORTION OF EXISTING BRICK VENEER. REFER TO STRUCTURAL DRAWINGS FOR

ADDITIONAL INFORMATION.

AD17 REMOVE EXISTING WINDOWS.

AD18 REMOVE EXISTING WINDOW, AND REMOVE PORTION OF EXISTING MASONRY WALL. REFER TO

STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

AD19 DEMO TEMPORARY DOOR & BARRIER WALLS.

AD20 DEMO PORTION OF BARRIER WALL. PATCH & REPAIR WALL(S) TO REMAIN TO MATCH

ADJACENT SURFACES.

AD21 DEMO TEMPORARY BARRIER WALL.

AD22 REMOVE PORTION OF EXISTING CEILING FINISH AS REQUIRED FOR NEW WALL. PATCH &

REPAIR CEILING AS REQUIRED TO MATCH ADJACENT SURFACES.

AD23 REMOVE EXISTING FLOOR FINISH & FLOOR ADHESIVE IN IT'S ENTIRETY. PATCH & REPAIR

FLOOR SLAB AS REQUIRED FOR NEW FLOOR FINISHE(S), TYP.

AD24 REMOVE EXISTING EQUIPMENT WALL IN IT'S ENTIRETY. PATCH & REPAIR WALL(S) TO REMAIN

TO MATCH ADJACENT SURFACES

AD24a REMOVE EXISTING SPS EQUIPMENT, AND VERIFY WITH OWNER/VA IF EQUIPMENT IS TO BE

SALVAGED OR RELOCATED, TYPICAL. REFER TO M.E.P. DRAWINGS FOR ADDITIONAL

INFORMATION.

AD24b SAWCUT AND REMOVE PORTIONS OF CONC SLAB AS REQUIRED TO REMOVE EXISTING

PLUMBING LINES, REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. REFER TO

STRUCTURAL DRAWINGS FOR ADDITIONAL CONC SLAB INFORMATION.

AD26 REMOVE EXISTING PRECAST CONC PARAPET CAP. EXISTING CONC ROOF CURB TO REMAIN.

AD27 REMOVE EXISTING LOUVER(S), REFER TO MECH DRAWINGS FOR ADDITIONAL INFORMATION.

AD28 REMOVE EXISTING QUARRY TILE FLOORING AND SETTING BED IN IT'S ENTIRETY. PATCH, REPAIR, AND INFILL FLOOR AS REQUIRED TO MATCH ADJACENT FLOOR LEVEL AND FOR NEW

FLOOR FINISH.

AD28a REMOVE EXISTING QUARRY TILE WALL BASE IN IT'S ENTIRETY. PATCH, REPAIR, AND/OR

REPLACE PORTIONS OF EXISTING WALL(S) AS REQUIRED TO MATCH ADJACENT WALL

SURFACE AND FOR NEW WALL FINISH.

AD29 REMOVE EXISTING CART WASH IN IT'S ENTIRETY, AND VERIFY WITH OWNER/VA IF CART WASH

IS TO BE SALVAGED. PATCH, REPAIR AND INFILL RECESSED FLOOR TO MATCH ADJACENT

FLOOR LEVEL, REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

AD30 REMOVE EXISTING PLUMBING FIXTURES, REFER TO PLUMBING DRAWINGS FOR ADDTIONAL

INFORMATION. EXISTING WALL(S) TO REMAIN, PATCH, REPAIR, AND/OR REPLACE PORTION OF

WALL(S) AS REQUIRED TO MATCH ADJACENT WALL SURFACE AND FOR NEW WALL FINISH.

AD31 DEMO FINISHES. PATCH & REPAIR WALL(S), FLOOR(S), AND CEILING(S) AS REQUIRED FOR NEW

FINISHES.

0' 4' 8' 16' 32'

SCALE: 1/8" = 1'-0"

1" = 1'-0" B7

EXISTING PARTITION/FLOOR REMOVAL

Mark Revisions: Date:

UP

DN

c14c16 c12 c11 c10 c8 c7 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c18 c25 c24 c26 eTT ca18 ca19 c1.

c2.

c3.

cA ca12ca11ca10 ca16

AD09

AD15

AD11

AD17

AD16

AD17

AD16

AD17

AD11

AD10

cQ.1

AD12

AD13

7.8

AE302

C1

105 SF

PT TECH

BD1610 - 133CA

1401 SF

CASE CART

BD168 - 133CA

47 SF

JAN

BD168B - 133CA

1201 SF

SPS CLEAN

BD168A - 133CA

1009 SF

SPS

DECONTAMINATION

BD171 - 133CA

SPS DECON

BD171A - 133CA

113 SF

ELEV

B - EL - DL01

36 SF

44 SF

ENG CLOSET

BD169 - 133CA

M LCKR

BC105B - 133

44 SF

F LCKR

BC105A - 133

48 SF

CORRIDOR

BC105 - 133

74 SF

TLT

BC106 - 133

44 SF SHWR

BC106A - 133

21 SF

HAC

BC109 - 133

60 SF

M LCKR

BC107 - 133

94 SF

CORRIDOR

CB147 - 133

203 SF

ELEC

BC104 - 133

53 SF

SPS STAFF &

CENTRAL

SUPPLY LIGHT

STORAGE

BC102A - 133

2302 SF

CART LIFT

B-EL-CL02

63 SF

CART LIFT

CB149 - 133

106 SF

JAN CLO

BC102E -133

74 SF

F LOCKER

BD172 - 133CA

74 SF

60 SF

M TLT

BD167 - 133CA

CORRIDOR

CB148 - 133CA

794 SF

14 SF

ELEC

BD170 - 133CA

55 SF

STAFF TLT

BD172A - 133CA

PASS

BC102D-133

23 SF CART WASH

BC102B -133

36 SF

STERILE

PROCESSING

BC102C -133

125 SF

SPS CHIEF

BC110 - 133

127 SF

SPS PROG

SUPPORT

BC111 - 133

88 SF

SPS ASST CHIEF

BC112 - 133

101 SF

TELECOM

BC113 - 133

191 SF

175 SF

RECYCLE

BD166A - 133CA

772 SF

HYDROTHERAPY

BD162H - 133CA

STAIR #3

SW-B-03

180 SF

94 SF

BREAK ROOM

BC173 - 133CA

1. DASHED BOLD LINES INDICATE EXTENTS OF DEMOLITION INCLUDING

THE FOLLOWING:

* INTERIOR PARTITIONS (REMOVED TO STRUCTURE)

* CEILINGS, INCLUDING CEILING SUSPENSION SYSTEM, MISC.

STEEL SUPPORTS FOR SUSPENDED EQUIPMENT, SUSPENDED

EQUIPMENT, LIGHT FIXTURES, DIFFUSERS AND GRILLES ETC.

* FLOOR FINISHES (TO CONCRETE) INCLUDING CARPET, RVT,

SHEET VINYL, CERAMIC TILE, QUARRY TILE, BRICK PAVERS, ETC.

* DOORS AND FRAMES UNLESS NOTED OTHERWISE IN DOOR

SCHEDULE

* WINDOW GLAZING AND FRAMES UNLESS NOTED OTHERWISE

* BRICK AND BACK-UP WALL SYSTEM

* CABINETWORK, SHELVING, BASES

* TOILET PARTITIONS AND ACCESSORIES

* TACK BOARDS, MARKER BOARDS, PEGBOARDS, DISPLAY BOARDS

* EQUIPMENT ITEMS

* PLUMBING FIXTURES

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS.

3. ALL LIGHT OR HALFTONE LINES INDICATE EXISTING TO REMAIN.

SEE SPECIFICATIONS SECTIONS FOR CUTTING AND PATCHING AND

DEMOLITION 02 41 00.

4. SEE ROOM FINISH SCHEDULE, MECHANICAL PLANS, AND

ELECTRICAL PLANS FOR EXTENT OF NEW CEILING CONSTRUCTION

OR CEILING PATCHING IN EXISTING AREAS.

5. SEE ROOM FINISH SCHEDULE FOR EXTENT OF NEW FLOORING

MATERIAL IN EXISTING AREAS.

6. SEE ROOM FINISH SCHEDULE FOR EXTENT OF NEW WALL

COVERING MATERIAL IN EXISTING AREAS. WHERE NEW FINISHES

ARE REQUIRED REMOVE EXISTING WALL FINISHES, (TEXTURED

PLASTIC COATING, VINYL WALL COVERING, PANELING, BASE, ETC.).

7. CONTRACTOR TO VERIFY ALL WALL CONSTRUCTION & FINISHES

NOTED FOR REMOVAL. TAKE INTO ACCOUNT ANY DISCREPANCY

AND MAKE PROPER ADJUSTMENT TO ACCOMPLISH REQUIRED

CONSTRUCTION & FINISHES. IF STRUCTURAL INTEGRITY IS

VIOLATED, CONTACT COR & ARCHITECT. COORDINATE PHASING

WITH OWNER.

8. COORDINATE REMOVAL OF FURNITURE AND EXISTING EQUIPMENT

WITH OWNER.

9. REFER TO EQUIPMENT SCHEDULE 11700S FOR NEW LOCATIONS OF

EXISTING EQUIPMENT, ETC.

10. SAW CUT EDGES OF EXISTING FLOOR SLAB FOR REMOVAL AND

INSTALLATION OF UTILITIES. REFER TO MECHANICAL AND

ELECTRICAL DRAWINGS.

11. REMOVE FURRING OR GWB ONLY WHERE REQUIRED TO COMPLETE

CONSTRUCTION. PATCH AND MATCH WALLS AS REQUIRED TO

COMPLETE AND MATCH EXISTING CONDITIONS, UNLESS AN

ALTERNATIVE MATERIAL AND FINISH IS INDICATED.

12. REMOVE CEILINGS ONLY AS REQUIRED FOR NEW CONSTRUCTION.

REINSTALL, REPLACE OR PATCH AS REQUIRED.

DEMOLITION PLAN GENERAL NOTES:

TEMP.

CORRIDOR 1

BC001

377 SF

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/1

/2

:0

:3

P

M

AD100.2

BASEMENT FLOOR - DEMOLITION

PLAN - PHASE 2

? MP

133CA

1/8" = 1'-0" F1

BASEMENT - DEMOLITION - PHASE 2

DEMOLITION KEYNOTES

KEY KEYNOTE

AD01 REMOVE PORTION OF EXISTING CEILING AS REQUIRED FOR NEW TEMP RATED CORRIDOR.

PATCH & REPAIR CEILING(S) TO REMAIN TO MATCH ADJACENT SURFACE.

AD01a REMOVE EXISTING CEILING AND CEILING FRAMING/SUPPORTS.

AD02 REMOVE & SALVAGE EXISTING WINDOW(S) & WINDOW SILL. STORE WINDOW AND WINDOW SILL IN SAFE LOCATION. WINDOW & WINDOW SILL TO BE REINSTALLED BACK INTO EXISTING PLACE

AT A LATER PHASE. DEMO / SAW CUT PORTION OF EXISTING MASONRY WALL AS REQUIRED

FOR NEW TEMPORARY DOOR. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL

INFORMATION.

AD03 VERIFY EXISTING UTILITIES.

AD09 REMOVE EXISTING DOOR & FRAME.

AD10 DEMO EXISTING SITE FOR NEW ADDITION. REFER TO CIVIL, PLUMB, ELECT, & STRUCT

DRAWINGS FOR ADITIONAL INFORMATION, TYP.

AD11 REMOVE PORTION OF EXISTING CEILING AS REQUIRED FOR NEW TEMPORARY BARRIER WALL.

PATCH & REPAIR CEILING(S) TO REMAIN TO MATCH ADJACENT SURFACE, TYP.

AD12 REMOVE PORTION OF EXISTING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .