Attachment 2 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 1-8.pdf
PDF 16 MB Posted
- Attached to
- Y1DA--556-402 Expand Sterile Processing Service (SPS) - Construction - Lovell FHCC, North Chicago, IL
- Solicitation number
- 36C77624B0018
About this file
This document appears to be attachment 2, which contains drawings related to the expansion of the Sterile Processing Service (SPS) at the Lovell Federal Health Care Center in North Chicago, Illinois. The drawings are part of the solicitation for the construction project under Solicitation Number 36C77624B0018, issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The project involves the expansion of the SPS facility, with drawings covering various aspects of the construction work. The drawings are dated from November 29, 2022, to June 24, 2024.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
556-402
11/29/2022
EXPAND STERILE PROCESSING
SERVICE (SPS)
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer Stevens & Schaap P.C.
1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.
3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010
IMEG Corp.
263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320
Calibre Engineering, Inc.
9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434
Force Protect Security Cons.
10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/5
/2
:0
:1
P M
GI001
COVER
MP
133CA
C A P T. J A M E S A. L O V E L L F E D E R A L H E A L T H C A R E C E N T E R
EXPAND STERILE PROCESSING SERVICE (SPS)
NORTH CHICAGO, ILLINOIS, 60064
SITE LOCATION
VA Contract Number: 36C77622C0002
VA Point of Contact:
Daniel J. Lid, D: (224) 610-3567, Contracting Officer's Representative (COR)
Mark Revisions: Date: 07/05/2023 REVISIONS
11/29/2022
REV 6/14/2024
Volume 1 of 8
ISSUED 11/29/2022
SET REV 06/14/2024
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
556-402
11/29/2022
EXPAND STERILE PROCESSING
SERVICE (SPS)
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer Stevens & Schaap P.C.
1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.
3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010
IMEG Corp.
263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320
Calibre Engineering, Inc.
9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434
Force Protect Security Cons.
10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/2
/2
:1
:3
P
M
GI002
INDEX OF DRAWINGS
MP
133CA
INDEX OF DRAWINGS
SHEET
NO. SHEET NAME
GENERAL
GI001 COVER
GI002 INDEX OF DRAWINGS
GI101 PHASING PLANS
GI102 FLOW DIAGRAMS
GI103 BID ALTERNATE 1 & 2
GI104 BID ALTERNATE 3 & 4
LIFE SAFETY
LS000 CODE COMPLIANCE SUMMARY PLAN
LS100 PIPE BASEMENT - LIFE SAFETY PLAN
LS101 BASEMENT FLOOR - LIFE SAFETY PLAN
LS102 FIRST FLOOR - LIFE SAFETY PLAN
LS103 EGRESS PHASING COMPLIANCE PLAN - BASEMENT
HAZARDOUS MATERIALS
HA101 BASEMENT FLOOR PLAN – ASBESTOS ABATEMENT
CIVIL
CD100 DEMOLITION PLAN PHASE 1
SP100 SITE PLAN PHASE 1
CS500 SITE DETAILS PHASE 1
CS501 SITE DETAILS PHASE 1
CG100 GRADING PLAN PHASE 1
CU100 OVERALL UTILITY PLAN PHASE 1
CU101 SANITARY SEWER PLAN & PROFILE PHASE 1
CU104 STORM SEWER PLAN AND PROFILE PHASE 1
CU500 STORM SEWER DETAILS PHASE 1
CU501 STORM SEWER DETAILS PHASE 1
STRUCTURAL
SG001 STRUCTURAL GENERAL NOTES
SD1PB.1 PIPE BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 1
SD100.1 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEVATION - PHASE 1
SD100.2 BASEMENT FLOOR - DEMO PLAN & ELEVATION - PHASE 2
SD100.3 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 3
SD100.4 BASEMENT FLOOR - PARTIAL DEMO PLAN - PHASE 4
SB1PB.1 PIPE BASEMENT FLOOR - FNDN. & MUD SLAB PLAN - PHASE 1
SB1PB.2 PIPE BASEMENT FLOOR - FOUNDATION & MUD SLAB - PHASE 2
SB301 STRUCTURAL SECTIONS
SB501 FOUNDATION DETAILS & SCHEDULES
SB502 FOUNDATION DETAILS
SF100.1 BASEMENT FLOOR FRAMING PLAN - PHASE 1
SF100.2 BASEMENT FLOOR FRAMING PLAN - PHASE 2
SF100.3 BASEMENT FLOOR - FRAMING PLAN - PHASE 3
SF101.2 FIRST FLOOR - MECHANICAL PENTHOUSE FRAMING PLAN - PHASE 2
SF102.2 SECOND FLOOR - ROOF FRAMING PLAN - PHASE 2
SF401 ELEVATIONS & DETAILS
SF402 STRUCTURAL RETROFIT ELEVATIONS IN BUILDING 133-C
SF501 FRAMING DETAILS
SF502 FRAMING DETAILS
SF503 FRAMING DETAILS
SF504 FRAMING DETAILS
SF510 LIGHT GAGE FRAMING STRUCTURAL DETAILS
SF511 WALL SECTIONS -LIGHT GAGE INFORMATION
SF600 LIVE LOAD DIAGRAM - BASEMENT FLOOR
SF601 LIVE LOAD DIAGRAM - FIRST FLOOR
ARCHITECTURAL
AG001 ARCHITECTURAL ABBREVIATIONS, LEGENDS AND NOTES
AD1PB.2 PIPE BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2
AD100.1 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 1
AD100.2 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2
AD100.3 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 3
AD100.4 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 4
AD101.2 FIRST FLOOR - DEMOLITION PLAN - PHASE 2
AD102.2 SECOND FLOOR - DEMOLITION PLAN - PHASE 2
AE1PB.2 PIPE BASEMENT FLOOR - FLOOR PLAN - PHASE 2
AE100.1 BASEMENT FLOOR - FLOOR PLAN - PHASE 1
AE100.2 BASEMENT FLOOR - FLOOR PLAN - PHASE 2
AE100.3 BASEMENT FLOOR - FLOOR PLAN - PHASE 3
AE100.4 BASEMENT FLOOR - FLOOR PLAN - PHASE 4
AE101.2 FIRST FLOOR - MECHANICAL PENTHOUSE PLAN - PHASE 2
AE102.2 SECOND FLOOR - ROOF PLAN - PHASE 2
AE110.1 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 1
AE110.2 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 2
AE110.3 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 3
AE110.4 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 4
AE201 EXTERIOR ELEVATIONS
AE301 BUILDING SECTIONS
AE302 WALL SECTIONS
AE303 WALL SECTIONS
AE304 WALL SECTIONS
AE401 ENLARGED PLANS AND ELEVATIONS
AE402 ENLARGED PLANS AND ELEVATIONS
AE501 EXTERIOR DETAILS
AE502 WALL SECTIONS & DETAILS
AE503 EXPANSION JOINT DETAILS
AE504 PLAN DETAILS
AE505 PLAN DETAILS
AE531 CEILING DETAILS
AE601 ROOM PROGRAM SCHEDULE
AE602 DOOR SCHEDULES AND DETAILS
AE801 WALL TYPES
AE901 EXTERIOR RENDERINGS AND INTERIOR 3D VIEWS
AE902 BASEMENT FLOOR - FUNCTIONAL AREA PLAN
INDEX OF DRAWINGS
SHEET
NO. SHEET NAME
INTERIORS
IN100.1 BASEMENT FLOOR - INTERIORS PLAN - PHASE 1
IN100.2 BASEMENT FLOOR - INTERIORS PLAN - PHASE 2
IN100.3 BASEMENT FLOOR - INTERIORS PLAN - PHASE 3
IN100.4 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4
IN100.41 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 1
IN100.42 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 2
IN100.43 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 3
IN100.44 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 4
IN101.2 FIRST FLOOR - INTERIORS PLAN - PHASE 2
IN501 INTERIORS DETAILS
IN601 ROOM FINISH SCHEDULE
IN602 ROOM FINISH SCHEDULE - BID ALTERNATES
IN603 SIGNAGE SCHEDULE
EQUIPMENT
QH100.2C BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA C
QH100.2D BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D
QH100.4A BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA A
QH100.4B BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA B
QH101.2D FIRST FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D
QH601 EQUIPMENT JSN SCHEDULES
FIRE PROTECTION
FA000 FIRE ALARM NOTES AND DETAILS
FA101 BASEMENT - FIRE ALARM PLAN
FA102 FIRST FLOOR - FIRE ALARM PLAN
FX000 FIRE SUPPRESSION NOTES AND DETAILS
FX101 BASEMENT - FIRE SUPPRESSION PLAN
FX102 FIRST FLOOR - FIRE SUPPRESSION PLAN
PLUMBING
P000 PLUMBING COVERSHEET
PD1PB.2 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 2
PD1PB.4 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 4
PD100.4 BASEMENT DEMOLITION - PLUMBING - PHASE 4
P1PB.0 PIPE BASEMENT - PLUMBING - ALL PHASES
P1PB.2 PIPE BASEMENT - PLUMBING - PHASE 2
P1PB.3 PIPE BASEMENT - PLUMBING - PHASE 3
P1PB.4 PIPE BASEMENT - PLUMBING - PHASE 4
P1PB.44 PIPE BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4
P100.0 BASEMENT - PLUMBING - ALL PHASES
P100.2 BASEMENT - PLUMBING - PHASE 2
P100.3 BASEMENT - PLUMBING - PHASE 3
P100.4 BASEMENT - PLUMBING - PHASE 4
P100.44 BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4
P101.0 FIRST FLOOR - PLUMBING - ALL PHASES
P101.2 FIRST FLOOR - PLUMBING - PHASE 2
P102.0 SECOND FLOOR - PLUMBING - ALL PHASES
P102.2 SECOND FLOOR - PLUMBING - PHASE 2
P200 PLUMBING ENLARGED PLAN
P300 D.I. WATER FLOW DIAGRAM
P301 PLUMBING SANITARY-VENT RISER DIAGRAM - PHASE 2
P302 PLUMBING DOMESTIC WATER RISER DIAGRAM - PHASE 2
P303 PLUMBING RISER DIAGRAM - PHASE 4
P304 DI WATER RISER DIAGRAM - PHASE 2
P400 PLUMBING DETAILS
P401 PLUMBING DETAILS
P500 PLUMBING SCHEDULES
MECHANICAL
M000 MECHANICAL COVERSHEET
MD2PB.2 PIPE BASEMENT DEMOLITION - PIPING - PHASE 2
MD100.1 BASEMENT DEMOLITION - VENTILATION - PHASE 1
MD100.2 BASEMENT DEMOLITION - VENTILATION - PHASE 2
MD100.3 BASEMENT DEMOLITION - VENTILATION - PHASE 3
MD100.4 BASEMENT DEMOLITION - VENTILATION - PHASE 4
MD101.2 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 2
MD101.4 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 4
MD102.4 SECOND FLOOR DEMOLITION – VENTILATION – PHASE 4
MD103.4 THIRD FLOOR DEMOLITION – VENTILATION – PHASE 4
MD104.4 FOURTH FLOOR DEMOLITION – VENTILATION – PHASE 4
MD200.4 BASEMENT DEMOLITION - PIPING - PHASE 4
M1PB.2 PIPE BASEMENT - VENTILATION - PHASE 2
M2PB.2 PIPE BASEMENT - PIPING - PHASE 2
M100.0 BASEMENT - VENTILATION - ALL PHASES
M100.1 BASEMENT - VENTILATION - PHASE 1
M100.2 BASEMENT - VENTILATION - PHASE 2
M100.3 BASEMENT - VENTILATION - PHASE 3
M100.4 BASEMENT - VENTILATION - PHASE 4
M100.41 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 1
M100.42 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 2
M100.43 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 3
M100.44 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 4
M101.0 FIRST FLOOR - VENTILATION - ALL PHASES
M101.2 FIRST FLOOR - VENTILATION - PHASE 2
M101.4 FIRST FLOOR - VENTILATION - PHASE 4
M102.0 SECOND FLOOR - VENTILATION - ALL PHASES
M102.2 SECOND FLOOR - VENTILATION - PHASE 2
M200.0 BASEMENT - PIPING - ALL PHASES
M200.2 BASEMENT - PIPING - PHASE 2
M200.4 BASEMENT - PIPING - PHASE 4
M200.44 BASEMENT – PIPING – PHASE 4 – BID ALTERNATE 4
M201.0 FIRST FLOOR - PIPING - ALL PHASES
M201.2 FIRST FLOOR - PIPING - PHASE 2
INDEX OF DRAWINGS
SHEET
NO. SHEET NAME
M300 MECHANICAL DETAILS
M301 MECHANICAL DETAILS
M302 MECHANICAL DETAILS
M303 MECHANICAL DETAILS
M304 AHU COMPONENT PLAN
M305 AIRFLOW MAP
M306 AIRFLOW MAP
M307 STEAM FLOW DIAGRAM
M400 MECHANICAL DIAGRAMS
M401 MECHANICAL DIAGRAMS
M402 MECHANICAL DIAGRAMS
M403 MECHANICAL DIAGRAMS
M600 MECHANICAL SCHEDULES
M601 MECHANICAL SCHEDULES
ELECTRICAL
E000 ELECTRICAL COVERSHEET
ED100.1 BASEMENT DEMOLITION - ELECTRICAL- PHASE 1
ED100.2 BASEMENT DEMOLITION - ELECTRICAL - PHASE 2
ED100.3 BASEMENT DEMOLITION - ELECTRICAL - PHASE 3
ED100.4 BASEMENT DEMOLITION - ELECTRICAL - PHASE 4
E1PB.2 SUB BASEMENT - ELECTRICAL - PHASE 2
E100.0 BASEMENT - POWER - ALL PHASES
E100.1 BASEMENT - POWER - PHASE 1
E100.2 BASEMENT - POWER - PHASE 2
E100.3 BASEMENT - POWER - PHASE 3
E100.4 BASEMENT - POWER - PHASE 4
E100.41 BASEMENT - POWER - PHASE 4 - ALTERNATE 1
E100.42 BASEMENT - POWER - PHASE 4 - ALTERNATE 2
E100.43 BASEMENT - POWER - PHASE 4 - ALTERNATE 3
E100.44 BASEMENT - POWER - PHASE 4 - ALTERNATE 4
E101.0 BASEMENT - LIGHTING - ALL PHASES
E101.1 BASEMENT - LIGHTING - PHASE 1
E101.2 BASEMENT - LIGHTING - PHASE 2
E101.3 BASEMENT - LIGHTING - PHASE 3
E101.4 BASEMENT - LIGHTING - PHASE 4
E101.41 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 1
E101.42 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 2
E101.43 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 3
E101.44 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 4
E200 FIRST FLOOR - POWER - PHASE 2
E201 FIRST FLOOR - LIGHTING - PHASE 2
E301 FIRST FLOOR OVERALL AND ENLARGED ELECTRICAL PLANS
E400 ELECTRICAL DIAGRAMS
E601 ELECTRICAL DETAILS
E602 ELECTRICAL DETAILS
E603 ELECTRICAL DETAILS
E701 ELECTRICAL PANEL SCHEDULES
TECHNOLOGY
T001 TECHNOLOGY COVERSHEET
TD100.1 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 1
TD100.2 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 2
TD100.3 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 3
TD100.4 BASEMENT DEMOLITION - TECHNOLOGY - PHASE 4
T002 OVERALL PLANS - TECHNOLOGY
T003 OVERALL PLANS - TECHNOLOGY
T100.1 BASEMENT - TECHNOLOGY - PHASE 1
T100.2 BASEMENT - TECHNOLOGY - PHASE 2
T100.3 BASEMENT - TECHNOLOGY - PHASE 3
T100.4 BASEMENT - TECHNOLOGY - PHASE 4
T100.41 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 1
T100.42 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 2
T100.43 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 3
T100.44 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 4
T200 TECHNOLOGY ROOM ENLARGEMENTS
T300 TECHNOLOGY DETAILS
T301 TECHNOLOGY DETAILS
T600 TECHNOLOGY SCHEDULES
Mark Revisions: Date:
VOL. 1
VOL. 2
VOL. 3
VOL. 4
VOL. 4
VOL. 5
VOL. 6
VOL. 6
VOL. 7
VOL. 8
UP
DN
UP
UP
DN
UP
UP
DN
UP
UP
DN
PHASING NOTES & LEGEND
GENERAL PHASING NOTES:
THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR
PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE
INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE
OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL
UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH
THE PROJECT CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE
CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE
VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO):
TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND
EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES,
HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND
EMERGENCY PREPAREDNESS.
REFER TO ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.
HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL
PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL CLARIFYING
INFORMATION. COPIES OF THE MOST CURRENT ASBESTOS REPORT AND LEAD-BASE PAINT
REPORT ARE TO BE OBTAINED FROM THE COR.
THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY
ADJACENT TO WORKING SPS AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR
TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC. IN SUCH A WAY AS TO
MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE
PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO
DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN
SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR
SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL ACTIVITIES THAT COULD HAVE THE
POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.
PHASE 1 PHASE 2 PHASE 3
PHASE 1 - PARTIAL DEMOLITION & RENOVATION OF EXISTING SITE UTILITIES
A. CONTRACTOR TO LOCATE AND VERIFY ALL UTILITY LINES, PIPES, CONNECTIONS ON THE
PROJECT SITE AND/OR RUNNING THROUGH THE PROJECT AREA .
B. CONTRACTOR SHALL PROVIDE A FENCE AROUND CONSTRUCTION AREA FOR PEDESTRIAN
CONTROL AND CONSTRUCTION DEBRIS.
C. CONTRACTOR TO DEMO, REPLACE, AND RELOCATE EXISTING UTILITY LINES AS
INDICATED IN DRAWINGS AND SPECIFICATIONS WITHOUT DISRUPTING THE EXISTING SPS
OPERATIONS, UNLESS APPROVED BY COR AND VA FHCC.
D. CONTRACTOR TO CONSTRUCT TEMPORARY CORRIDOR(S) AND DOORS AS SHOWN ON
PLAN.
E. CONTRACTOR SHALL NOTIFY VA OF THE PLANNED COMPLETION DATE OF PHASE 1 SO VA
CAN PLAN THE TRANSITION OF OPERATIONS BACK INTO PHASE 1 AREA ACCORDINGLY.
PHASE 2 - CONSTRUCT NEW SPS ADDITION & TEMPORARY INTERIOR CONSTRUCTION BARRIER
WALLS.
A. NEW SPS ADDITION IS CONSTRUCTED IN ACCORDANCE WITH CONSTRUCTION
DOCUMENTS, THE EXISTING SPS OPERATIONS WILL REMAIN IN USE.
B. CONTRACTOR WILL PLAN AND COORDINATE THE CONSTRUCTION OF THE MECHANICAL
PENTHOUSE AND THE CONNECTION TO THE EXISTING FIRST FLOOR MECHANICAL ROOM
WITH THE COR AND VA FHCC, SO AS NOT TO DISRUPT THE SPS AND FHCC OPERATIONS.
C. CONTRACTOR WILL PLAN AND COORDINATE THE CONSTRUCTION OF THE TEMPORARY
INTERIOR CONSTRUCTION BARRIER WALLS WITH THE COR AND VA FHCC SO AS NOT TO
DISRUPT THE EXISTING SPS OPERATIONS.
D. CONTRACTOR WILL NEED TO NOTIFY VA OF THE PLANNED COMPLETION DATE OF
PHASE 2, SO VA CAN PLAN THE TRANSITION OF OPERATIONS BACK INTO PHASE 2 AREA
ACCORDINGLY.
PHASE 3 - TRANSITION SPS OPERATIONS FROM THE EXISTING SPS TO THE NEW SPS ADDITION, AND CONSTRUCT TEMPORARY CORRIDORS FROM THE NEW SPS ADDITION THROUGH
THE EXISTING SPS SPACES.
A. CONTRACTOR WILL PLAN AND COORDINATE THE CONSTRUCTION OF THE TEMPORARY
CLEAN CORRIDOR WALLS WITH THE COR AND VA FHCC SO AS NOT TO DISRUPT THE
EXISTING SPS OPERATIONS.
B. CONTRACTOR WILL PLAN AND COORDINATE THE CONSTRUCTION OF THE TEMPORARY
SOILED / DIRTY CORRIDOR WALLS WITH THE COR AND VA FHCC SO AS NOT TO DISRUPT
THE EXISTING SPS OPERATIONS.
C. CONTRACTOR WILL NEED TO NOTIFY VA OF THE PLANNED COMPLETION DATE OF
PHASE 3, SO VA CAN PLAN THE TRANSITION OF OPERATIONS BACK INTO PHASE 3 AREA
ACCORDINGLY.
PHASE 4 - CONSTRUCT STAFF, ADMINISTRATION, AND LOCKER ROOM SPACES.
A. REMOVE, SALVAGE, AND RETURN EXISTING SPS EQUIPMENT AND FIXTURES TO VA FHCC,
UNLESS NOTED OTHERWISE.
B. PATCH, INFILL, & REPAIR EXISTING CONCRETE FLOOR SLABS AND WALLS AS REQUIRED
FOR NEW FLOOR AND WALL FINISHES.
PHASE 4.1 - REMOVE TEMPORARY CORRIDORS AND FINISH CONSTRUCTION IN ALL SPACES.
A. PATCH, INFILL, & REPAIR EXISTING CONCRETE FLOOR SLABS AND WALLS AS REQUIRED
FOR NEW FLOOR AND WALL FINISHES.
PHASE 4 PHASE 4.1
c14c16 c12 c11 c10 c8 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c18 c25 c24 c26 eTT ca18 ca19 ca12ca11 ca16 cQ.1
7.8 c14c16 c12 c11 c10 c8 c7 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c18 c25 c24 c26 eTT
R.8
T.1
T.9
G.8
H.8
6 5
K.2 ca18
K.3
K.6
K.8 ca19
L.1
L.9
L.4
3.7 2 14 3 c1.
5.1ca12ca11 ca16
4.8 cQ.1
7.8 c14c16 c12 c11 c10 c8 c7 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c25 c24 c26 eTT
R.8
T.1
T.9
G.8
H.8
6 5
K.2 ca18
K.3
K.6
K.8 ca19
L.1
L.9
L.4
3.7 2 14 3
5.1ca12ca11 ca16
4.8 cQ.1
7.8c14c16 c12 c11 c10 c8 c7 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c18 c25 c24 c26 eTT ca18
K.3
K.6
K.8 ca19
L.1
L.9
L.4
3.7 2 14 3 c1.
5.1ca12ca11 ca16
4.8
4D 4E
4B
4A
4C cQ.1
7.8
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
556-402
11/29/2022
EXPAND STERILE PROCESSING
SERVICE (SPS)
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer Stevens & Schaap P.C.
1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.
3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010
IMEG Corp.
263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320
Calibre Engineering, Inc.
9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434
Force Protect Security Cons.
10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407
KEY PLAN
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/1
/2
:5
:2
P
M
GI101
PHASING PLANS
AJC
133CA
1/16" = 1'-0"
BASEMENT - PHASING PLAN PHASE 1
1/16" = 1'-0"
BASEMENT - PHASING PLAN PHASE 2 & 3
1/16" = 1'-0"
FIRST FLOOR - PHASING PLAN PHASE 2
1/16" = 1'-0"
BASEMENT - PHASING PLAN PHASE 4
0' 8' 16' 32' 64'
SCALE: 1/16" = 1'-0"
Mark Revisions: Date:
A VA Revisions 07/05/2023
07/05/2023 REVISIONS
DNUP
UP
DN
Pass-through Window
Floor Access Hatch
Clean ELV
STORAGE SPS
BD183A
DECONTAMINATION
WORK AREA
BD181
STORAGE,
WATER
TREATMENT &
DETERGENT
BD181E
DECONTAMINATION
BD182
SCOPE
PROCESSING
BD182A
CLEAN
WORKROOM,
INSTRUMENT
SET
BD183
CART RETURN
BD181C
UNLOADING/
COOLING
BD181D
STERIL. AREA,
STEAM
BD184
HAC
BD181F
STORAGE,
STERILE
DURABLES
BD185
STERIL. AREA,
LOW TEMP
BD184A
CART WASHER
BD181B
CART WASHER
BD181A
SCOPE
STAGING
BD182B
TELECOM
BC108
UNLOADING/COOLING
BD184B
SS EQUIP.
BD184C
VESTIBULE
BD186
VESTIBULE
BD183B
WORKST. 05
BC106J
WORKST. 02
BC106F
PPE
BC106K
DISPATCH AREA
BC107B
WORKSTATION,
CASE CART
DISPATCH
BC107A
HAC
BC107G
STORAGE,
CLEAN
BC107E
PPE
BC107H
CLEAN
CORRIDOR
BC107F
VENDOR
DROP-OFF /
PICK-UP
BD172
WORKST. 09
BD174A
LOCKER, MALE
BD176
STAFF LOUNGE
BD178
TOILET
BD177A
TRAINING
ROOM
BD174
WORKST. 03
BC106G
CORRIDOR
BC105
HALL
BD175A
HALL
BD176B
CORRIDOR
BD177
OPEN SPACE
BC102
CART LOBBY
BD171A
SOILED ELEV
B-EL-DL01
CORRIDOR
BD171
HALL
BC107C
CASE CART
STORAGE
BC107D
TLT/SHW M
BD176D
TLT/SHW M
BD176C
PPE ALCOVE
BD179
ANTEROOM,
SOILED
TRANSITION /
DROP-OFF
BD180
CORRIDOR
BD171C
CORRIDOR
BD171B
DECONTAMINATION
CASE CART
AREA
BD180A
HALL
BD176A
HALL
BD185A
CASE CART
ASSEMBLY
BD185B
CASE CART
ASSEMBLY
BC107
WORKST. 08
BD172A
WORKST. 06
BD174B
COPIER /
WORKST. 07
BC106C
HALL
BC106L
OFFICE, AO /
WORKST. 01
BC106D
OFFICE, SPS
DEPUTY CHIEF
BC106A
OFFICE, SPS
CHIEF
BC106
HALL
BC106B
WORKST. 04
BC106H
OPEN SPACE
BD168
LOCKER,
FEMALE
BD175
HALL
BD175BTLT/SHW F
BD175D
TLT/SHW F
BD175C
CART LIFT
CB149 - 133
Department Legend
1 - DECONTAMINATION AREA
2 - SCOPE PROCESSING AREA
3 - PREPARATION AND
ASSEMBLY AREA
4 - STERILIZATION AREA
5 - RECEIVING, STORAGE AND
DISPATCH AREA
6 - STAFF AND
ADMINISTRATIVE AREA
7 - SUPPORT
Pass-through Window
Floor Access Hatch
Clean ELV
STORAGE SPS
BD183A
DECONTAMINATION
WORK AREA
BD181
STORAGE,
WATER
TREATMENT &
DETERGENT
BD181E
DECONTAMINATION
BD182
SCOPE
PROCESSING
BD182A
CLEAN
WORKROOM,
INSTRUMENT
SET
BD183
CART RETURN
BD181C
UNLOADING/
COOLING
BD181D
STERIL. AREA,
STEAM
BD184
HAC
BD181F
STORAGE,
STERILE
DURABLES
BD185
STERIL. AREA,
LOW TEMP
BD184A
CART WASHER
BD181B
CART WASHER
BD181A
SCOPE
STAGING
BD182B
TELECOM
BC108
UNLOADING/COOLING
BD184B
SS EQUIP.
BD184C
VESTIBULE
BD186
VESTIBULE
BD183B
WORKST. 05
BC106J
WORKST. 02
BC106F
PPE
BC106K
DISPATCH AREA
BC107B
WORKSTATION,
CASE CART
DISPATCH
BC107A
HAC
BC107G
STORAGE,
CLEAN
BC107E
PPE
BC107H
CLEAN
CORRIDOR
BC107F
VENDOR
DROP-OFF /
PICK-UP
BD172
WORKST. 09
BD174A
LOCKER, MALE
BD176
STAFF LOUNGE
BD178
TOILET
BD177A
TRAINING
ROOM
BD174
WORKST. 03
BC106G
CORRIDOR
BC105
HALL
BD175A
HALL
BD176B
CORRIDOR
BD177
OPEN SPACE
BC102
CART LOBBY
BD171A
SOILED ELEV
B-EL-DL01
HALL
BC107C
CASE CART
STORAGE
BC107D
COPIER /
WORKST. 07
BC106C
WORKST. 04
BC106H
OFFICE, SPS
DEPUTY CHIEF
BC106A
OFFICE, SPS
CHIEF
BC106
HALL
BC106B
WORKST. 08
BD172A
LOCKER,
FEMALE
BD175
OFFICE, AO /
WORKST. 01
BC106D
HALL
BC106L
WORKST. 06
BD174B TLT/SHW F
BD175D
TLT/SHW F
BD175C
HALL
BD175B
HALL
BD176A
TLT/SHW M
BD176C
TLT/SHW M
BD176D
PPE ALCOVE
BD179
ANTEROOM,
SOILED
TRANSITION /
DROP-OFF
BD180
DECONTAMINATION
CASE CART
AREA
BD180A
CORRIDOR
BD171B
CORRIDOR
BD171CCORRIDOR
BD171
CASE CART
ASSEMBLY
BD185B
HALL
BD185A
CASE CART
ASSEMBLY
BC107
OPEN SPACE
BD168
CART LIFT
CB149 - 133
FLOW DIAGRAM LEGEND
SOILED CASE CART & RME
CLEAN CASE CART & RME
STERILE CASE CART & RME
CASE CART & RME
DECONTAMINATION, SCOPE PROCESSING STAFF
ADMINISTRATIVE AND SPS STAFF
CLEAN, STERILE, ASSEMBLY, DISPATCH STAFF
SPS STAFF
FLOW DIRECTION
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
556-402
11/29/2022
EXPAND STERILE PROCESSING
SERVICE (SPS)
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer Stevens & Schaap P.C.
1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.
3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010
IMEG Corp.
263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320
Calibre Engineering, Inc.
9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434
Force Protect Security Cons.
10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407
KEY PLAN
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/1
/2
:5
:5
P
M
GI102
FLOW DIAGRAMS
AJC
133CA
0' 8' 16' 32'
SCALE: 3/32" = 1'-0"
3/32" = 1'-0"
BASEMENT - CART & RME FLOW DIAGRAM
3/32" = 1'-0"
BASEMENT - STAFF - FLOW DIAGRAM
Mark Revisions: Date:
A VA Revisions 07/05/2023
07/05/2023 REVISIONS
BID ALTERNATES GENERAL NOTES & LEGEND
GENERAL BID ALTERNATE NOTES:
THE BID ALTERNATE NARRATIVE AND BID ALTERNATE FLOOR PLANS PROVIDE A
GENERAL OVERVIEW FOR PROJECT BIDS AS DESIGNED. NEITHER THE NARRATIVE NOR
THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF BID
ALTERNATES OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY
RELATE TO BID ALTERNATES. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL
SCOPE OF BID ALTERNATES AS DESCRIBED HEREIN AND WORK WITH THE PROJECT
CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION
PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS
DETAILS OF EACH BID ALTERNATE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO):
TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY
WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN BID ALTERNATES, INFECTION
CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION
CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.
REFER TO ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.
HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE
GENERAL BID ALTERNATE PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL
CLARIFYING INFORMATION. COPIES OF THE MOST CURRENT ASBESTOS REPORT AND
LEAD-BASE PAINT REPORT ARE TO BE OBTAINED FROM THE COR.
THIS BID ALTERNATE PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES
DIRECTLY ADJACENT TO WORKING SPS AREAS. SPECIAL CARE SHALL BE TAKEN BY THE
CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC. IN
SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE
HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP
ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST
THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME
ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL
ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT
DEPARTMENTS.
BID ALTERNATE 1 BID ALTERNATE 2 BID ALTERNATE 3
BID ALTERNATE 1 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 1A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, CEILINGS FINISHES, AND SPS EQUIPMENT IN THEIR ENTIREY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.
1A. OFFICE, SPS CHIEF BC106; OFFICE, SPS DEPUTY CHIEF BC106A; HALL BC106B; COPIER / WORKST. 07 BC106C;
OFFICE, AO / WORKST. 01 BC106D; WORKST. 02 BC106F; WORKST. 03 BC106G; WORKST. 04 BC106H; WORKST. 05 BC106J;
PPE BC106K.
BID ALTERNATE 2 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 2A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, & CEILING FINISHES. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW
WALL, FLOOR, & CEILING FINISHES FROM BASE BID.
2A. CASE CART STORAGE BC107D; STORAGE CLEAN BC107E.
BID ALTERNATE 3 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES., SEE NOTE 3A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, & CEILING FINISHES AND SPS EQUIPMENT IN THEIR ENTIRETY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.
3A. CORRIDOR BD171B; CORRIDOR BD171C.
BID ALTERNATE 4 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 4A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, CEILING FINISHES, AND SPS EQUIPMENT IN THEIR ENTERITY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.
4A. TRAINING ROOM BD174; WORKST. 09 BD174A; WORKST. 10 BD174B; LOCKER, FEMALE BD175; HALL BD175A; HALL BD BD175B;
TLT/SHW F BD175C; TLT/SHW F BD175D; LOCKER, MALE BD176; HALL BD176A; HALL BD 176B; TLT/SHW M BD176C;
TLT/SHW M BD176D; CORRIDOR BD177; TOILET BD177A.; STAFF LOUNGE BD178.
NOTES
A. CONSTRUCTION COSTS INCLUDES ALL LABOR AND MATERIALS THAT WOULD BE USED TO CONSTRUCT NEW ROOMS & SPACES.
B. MATERIALS INCLUDE ALL ROOM FINISHES FOR FLOORS, WALLS, & CEILINGS; AND ALL MEP ITEMS, FIXTURES, AND EQUIPMENT.
BID ALTERNATE 4
SHELL SPACE
BC106A
768 SF
c14.c16. c12. c11. c10. c8. c7.
caG.
caH.
caK.
ca15.ca14.ca13.
eSs.
cTt.
cT.
cS.
cR.
cQ.
c18.
c25.
ca24.
c26.
CTT.
T.9.
G.8.
H.8.
ca18.
K.6.ca19.
ca12.ca11. ca16.
cQ.1.
12'-3"
CART HOLDING,
CLEAN
BC107D
0 SF/ 332 SF
ORSS1
STORAGE,
CLEAN
BC107E
240 SF/ 378 SF
SRS05
TELECOM
CLOSET
BC108
0 SF/ 109 SF
OPEN SPACE
BC102
586 SF
CORRIDOR
BC105
402 SF
CLEAN
CORRIDOR
BC107F
0 SF/ 118 SF
HALL
BC107C
155 SF
CASE CART
ASSEMBLY
BC107
120 SF/ 309 SF
CSCQ1
DISPATCH AREA
BC107B
80 SF/ 99 SF
CHC01
HAC
BC107G
60 SF/ 65 SF
JANC2
WORKSTATION,
CASE CART
DISPATCH
BC107A
56 SF/ 59 SF
OFA07
ELEV
B-EL-DL01
34 SF
CORRIDOR
BD171B
477 SF
CORRIDOR
BD171C
189 SF
CASE CART
ASSEMBLY
BD185B
120 SF/ 416 SF
CSCQ1
PPE ALCOVE
BD179
0 SF/ 140 SF
CSPE1
ANTEROOM,
SOILED
TRANSITION /
DROP-OFF
BD180
120 SF/ 152 SF
DECONTAMINATION
CASE CART
AREA
BD180A
990 SF/ 147 SF
OFFICE
BC110
127 SF
OFFICE
BC112
98 SF
TELECOM
BC113
194 SF
STAFF LOUNGE
BD178
360 SF/ 349 SF
SL001
TOILET
BD177A
60 SF/ 61 SF
TNPG1
LOCKER, MALE
BD176
476 SF/ 276 SF
LR002
HALL
BD175A
91 SF
HALL
BD176B
39 SF
CORRIDOR
BD177
109 SF
LOCKER,
FEMALE
BD175
476 SF/ 315 SF
LR002
HALL
BD175B
59 SF
TLT/SHW F
BD175D
80 SF/ 78 SF
TLT/SHW F
BD175C
80 SF/ 80 SF
TLT/SHW M
BD176D
80 SF/ 94 SF
TLT/SHW M
BD176C
80 SF/ 84 SF
HALL
BD176A
80 SF/ 80 SF
WORKST. 07
BD174A
56 SF/ 57 SF
OFA07
WORKST. 06
BD174B
56 SF/ 56 SF
OFA07
TRAINING ROOM
BD174
240 SF/ 238 SF
CFR01
ADMIN SPACE
BC106
265 SF
VENDOR
DROP-OFF /
PICK-UP
BD172
120 SF/ 90 SF
SRS01
CART LOBBY
BD171A
64 SF
WORKST. 08
BD172A
56 SF/ 53 SF
OFA07
CORRIDOR
BD171
126 SF
OPEN SPACE
BD168
243 SF
OFFICE
BC111
88 SF
7' -8
/8
BA01
BA01a
BA01b
BID ALTERNATE 1
.c14..c16. .c12. .c11. .c10. .c8. .c7.
.caG.
.caH.
.caK.
.ca15..ca14..ca13.
cQ.177
.eTt.
.cT.
.cS.
.cR.
.cQ.
.c18.
.c25.
.c24.
.c26.
.eTT.
.T.9.
.G.8.
.H.8.
.ca18.
.K.6..ca19.
.ca12..ca11. .ca16.
.cQ.1.
SHELL SPACE
BC106A
768 SF
TELECOM
CLOSET
BC108
0 SF/ 109 SF
OPEN SPACE
BC102
586 SF
CORRIDOR
BC105
402 SF
CLEAN
CORRIDOR
BC107F
0 SF/ 118 SF
HALL
BC107C
149 SF
CASE CART
ASSEMBLY
BC107
120 SF/ 304 SF
CSCQ1
DISPATCH AREA
BC107B
80 SF/ 99 SF
CHC01
HAC
BC107G
60 SF/ 65 SF
JANC2
WORKSTATION,
CASE CART
DISPATCH
BC107A
56 SF/ 59 SF
OFA07
ELEV
B-EL-DL01
32 SF
CORRIDOR
BD171B
477 SF
CORRIDOR
BD171C
189 SF
CASE CART
ASSEMBLY
BD185B
120 SF/ 120 SF
CSCQ1
PPE ALCOVE
BD179
0 SF/ 140 SF
CSPE1
ANTEROOM,
SOILED
TRANSITION /
DROP-OFF
BD180
120 SF/ 152 SF
DECONTAMINATION
CASE CART
AREA
BD180A
990 SF/ 147 SF
OFFICE
BC110
127 SF
OFFICE
BC111
88 SF
OFFICE
BC112
101 SF
TELECOM
BC113
191 SF
STAFF LOUNGE
BD178
360 SF/ 349 SF
SL001
TOILET
BD177A
60 SF/ 61 SF
TNPG1
LOCKER, MALE
BD176
476 SF/ 276 SF
LR002
HALL
BD175A
91 SF
HALL
BD176B
38 SF
CORRIDOR
BD177
109 SF
LOCKER,
FEMALE
BD175
476 SF/ 316 SF
LR002
HALL
BD175B
58 SFTLT/SHW F
BD175D
80 SF/ 78 SF
TLT/SHW F
BD175C
80 SF/ 80 SF
TLT/SHW M
BD176D
80 SF/ 94 SF
TLT/SHW M
BD176C
80 SF/ 84 SF
HALL
BD176A
80 SF/ 80 SF
WORKST. 07
BD174A
56 SF/ 57 SF
OFA07
WORKST. 06
BD174B
56 SF/ 56 SF
OFA07
TRAINING ROOM
BD174
240 SF/ 238 SF
CFR01
ADMIN SPACE
BC106
260 SF
VENDOR
DROP-OFF /
PICK-UP
BD172
120 SF/ 90 SF
SRS01
CART LOBBY
BD171A
64 SF
WORKST. 08
BD172A
56 SF/ 53 SF
OFA07
CORRIDOR
BD171
126 SF
OPEN SPACE
BD168
243 SF
SHELL SPACE
BC107D
712 SF
BA02
BA02a
BA02b
BID ALTERNATE 1
BID ALTERNATE 2
B C
D
.2
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
556-402
11/29/2022
EXPAND STERILE PROCESSING
SERVICE (SPS)
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer Stevens & Schaap P.C.
1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.
3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010
IMEG Corp.
263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320
Calibre Engineering, Inc.
9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434
Force Protect Security Cons.
10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407
KEY PLAN
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/1
/2
:5
:0
P
M
GI103
BID ALTERNATE 1 & 2
133CA
3/32" = 1'-0" D1
BASEMENT - NEW CONSTRUCTION - PHASE 4 - BID ALTERNATE 1
3/32" = 1'-0"
D5
BASEMENT - NEW CONSTRUCTION - PHASE 4 - BID ALTERNATE 2
BID ALTERNATE KEYNOTES
KEY KEYNOTE
BA01 IF BID ALTERNATE 1 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES, CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, AND
INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.
BA01a IF BID ALTERNATE 1 IS ACCEPTED, DO NOT CONSTRUCT NEW OFFICES AND WORKSTATIONS.
BA01b IF BID ALTERNATE 1 IS ACCEPTED, CONSTRUCT NEW ADMIN SPACE BC106, ROOM FINISHES TO BE THE SAME AS
OFFICE, SPS CHIEF BC106.
BA02 IF BID ALTERNATE 2 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES, CEILING FINISHES, AND TEMPORARY BARRIER WALLS IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, AND INFILL
FLOORS AND WALLS TO MATCH ADJACENT SURFACES.
BA02a IF BID ALTERNATE 2 IS ACCEPTED, DO NOT CONSTRUCT NEW STORAGE CLEAN AND CASE CART STORAGE
SPACES.
BA02b IF BID ALTERNATE 2 IS ACCEPTED, CONTRACTOR TO PROVIDE & CONSTRUCT NEW WALL TYPE D1 TO SEPARATE
NEW SPACES FROM UNFINISHED SPACES.
BA03 IF BID ALTERNATE 3 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES (QUARRY TILE), CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.
BA04 IF BID ALTERNATE 4 IS ACCEPTED, REMOVE ONLY THE EXISTING FLOOR FINISHES (QUARRY TILE), CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL
PATCH, REPAIR, AND INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.
BA04a IF BID ALTERNATE 4 IS ACCEPTED, DO NOT CONSTRUCT NEW TRAING ROOM, LOCKER ROOMS, TOILET/SHOWERS, AND STAFF LOUNGE.
BA04c IF BID ALTERNATE 4 IS ACCEPTED, THE EXISTING ROOMS, FLOOR FINISHES, CEILING FINISHES, FIXTURES AND EQUIPMENT ARE TO REMAIN IN PLACE AND KEPT IN FUNCTIONING ORDER FOR VA TO KEEP IN USE.
BA04d IF BID ALTERNATE 4 IS ACCEPTED, THE EXISTING STAFF OFFICES ARE TO REMAIN IN PLACE AND KEPT IN
FUNCTIONING ORDER FOR VA TO KEEP IN USE.
0' 8' 16' 32'
SCALE: 3/32" = 1'-0"
Mark Revisions: Date:
BID ALTERNATES GENERAL NOTES & LEGEND
GENERAL BID ALTERNATE NOTES:
THE BID ALTERNATE NARRATIVE AND BID ALTERNATE FLOOR PLANS PROVIDE A
GENERAL OVERVIEW FOR PROJECT BIDS AS DESIGNED. NEITHER THE NARRATIVE NOR
THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF BID
ALTERNATES OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY
RELATE TO BID ALTERNATES. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL
SCOPE OF BID ALTERNATES AS DESCRIBED HEREIN AND WORK WITH THE PROJECT
CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION
PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS
DETAILS OF EACH BID ALTERNATE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO):
TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY
WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN BID ALTERNATES, INFECTION
CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION
CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.
REFER TO ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.
HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE
GENERAL BID ALTERNATE PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL
CLARIFYING INFORMATION. COPIES OF THE MOST CURRENT ASBESTOS REPORT AND
LEAD-BASE PAINT REPORT ARE TO BE OBTAINED FROM THE COR.
THIS BID ALTERNATE PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES
DIRECTLY ADJACENT TO WORKING SPS AREAS. SPECIAL CARE SHALL BE TAKEN BY THE
CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC. IN
SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE
HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP
ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST
THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME
ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL
ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT
DEPARTMENTS.
BID ALTERNATE 1 BID ALTERNATE 2 BID ALTERNATE 3
BID ALTERNATE 1 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 1A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, CEILINGS FINISHES, AND SPS EQUIPMENT IN THEIR ENTIREY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.
1A. OFFICE, SPS CHIEF BC106; OFFICE, SPS DEPUTY CHIEF BC106A; HALL BC106B; COPIER / WORKST. 07 BC106C;
OFFICE, AO / WORKST. 01 BC106D; WORKST. 02 BC106F; WORKST. 03 BC106G; WORKST. 04 BC106H; WORKST. 05 BC106J;
PPE BC106K.
BID ALTERNATE 2 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 2A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, & CEILING FINISHES. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW
WALL, FLOOR, & CEILING FINISHES FROM BASE BID.
2A. CASE CART STORAGE BC107D; STORAGE CLEAN BC107E.
BID ALTERNATE 3 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES., SEE NOTE 3A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, & CEILING FINISHES AND SPS EQUIPMENT IN THEIR ENTIRETY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.
3A. CORRIDOR BD171B; CORRIDOR BD171C.
BID ALTERNATE 4 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 4A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, CEILING FINISHES, AND SPS EQUIPMENT IN THEIR ENTERITY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.
4A. TRAINING ROOM BD174; WORKST. 09 BD174A; WORKST. 10 BD174B; LOCKER, FEMALE BD175; HALL BD175A; HALL BD BD175B;
TLT/SHW F BD175C; TLT/SHW F BD175D; LOCKER, MALE BD176; HALL BD176A; HALL BD 176B; TLT/SHW M BD176C;
TLT/SHW M BD176D; CORRIDOR BD177; TOILET BD177A.; STAFF LOUNGE BD178.
NOTES
A. CONSTRUCTION COSTS INCLUDES ALL LABOR AND MATERIALS THAT WOULD BE USED TO CONSTRUCT NEW ROOMS & SPACES.
B. MATERIALS INCLUDE ALL ROOM FINISHES FOR FLOORS, WALLS, & CEILINGS; AND ALL MEP ITEMS, FIXTURES, AND EQUIPMENT.
BID ALTERNATE 4
.c14...c16.. .c12.. .c11.. .c10.. .c8.. .c7..
.caG..
.caH..
.caK..
.ca15...ca14...ca13..
.eSs..
.eTt..
.cT..
.cS..
.cR..
.cQ..
.c18..
.c25..
.c24..
.c26..
.eTT..
.T.9..
.G.8..
.H.8..
.ca18..
.K.6...ca19..
.ca12..cQ.159 .ca16..
.cQ.1..
Shell Space
BC106A
768 SF
12'-3"
TELECOM
CLOSET
BC108
0 SF/ 109 SF
OPEN SPACE
BC102
586 SF
CORRIDOR
BC105
402 SF
CLEAN
CORRIDOR
BC107F
0 SF/ 118 SF
HALL
BC107C
149 SF
CASE CART
ASSEMBLY
BC107
120 SF/ 304 SF
CSCQ1
DISPATCH AREA
BC107B
80 SF/ 99 SF
CHC01
HAC
BC107G
60 SF/ 65 SF
JANC2
WORKSTATION,
CASE CART
DISPATCH
BC107A
56 SF/ 59 SF
OFA07
ELEV
B-EL-DL01
33 SF
OPEN SPACE
BD171B
594 SF
CASE CART
ASSEMBLY
BD185B
120 SF/ 416 SF
CSCQ1
CORRIDOR
BD179
0 SF/ 295 SF
CSPE1
ANTEROOM
SOILED
TRANSITION /
DROP-OFF
BD180
990 SF/ 170 SF
OFFICE
BC110
127 SF
OFFICE
BC111
88 SF
OFFICE
BC112
101 SF
TELECOM
BC113
191 SF
STAFF LOUNGE
BD178
360 SF/ 156 SF
SL001
TOILET
BD177A
60 SF/ 61 SF
TNPG1
LOCKER, MALE
BD176
476 SF/ 276 SF
LR002
HALL
BD175A
91 SF
HALL
BD176B
38 SF
CORRIDOR
BD177
173 SF
LOCKER,
FEMALE
BD175
476 SF/ 316 SF
LR002
HALL
BD175B
58 SF
TLT/SHW F
BD175D
80 SF/ 78 SF
TLT/SHW F
BD175C
80 SF/ 80 SF
TLT/SHW M
BD176D
80 SF/ 94 SF
TLT/SHW M
BD176C
80 SF/ 84 SF
HALL
BD176A
80 SF/ 80 SF
WORKST. 07
BD174A
56 SF/ 57 SF
OFA07
WORKST. 06
BD174B
56 SF/ 56 SF
OFA07
TRAINING ROOM
BD174
240 SF/ 238 SF
CFR01
ADMIN SPACE
BC157
260 SF
VENDOR
DROP-OFF /
PICK-UP
BD172
120 SF/ 90 SF
SRS01
CART LOBBY
BD171A
64 SF
WORKST. 08
BD172A
56 SF/ 53 SF
OFA07
CORRIDOR
BD171
197 SF
OPEN SPACE
BC162
243 SF
SHELL SPACE
BC107D
712 SF
PPE ALCOVE
BD180A
105 SF
BA03
BA03
BID ALTERNATE 1
BID ALTERNATE 2
BID ALTERNATE 3
BD178.3
BD180A.3 BD180.3
BD171B.3
..c14....c16.. ..c12.. ..c11.. ..c10.. ..c8.. ..C7..
..caG..
..caH..
..caK..
..ca15....ca14....ca13..
cQ.15
..eTt
..cT..
..cS..
..cR..
..cQ..
..c18..
..c25..
..c24..
..c26..
..eTT..
..T.9..
..G.8..
..H.8..
..ca18..
..K.6....ca19..
..ca12....ca11.. ..ca16..
..cQ.1..
TELECOM
CLOSET
BC108
0 SF/ 109 SF
OPEN SPACE
BC102
606 SF
TLT
BC106
41 SF
SHWR
BC106A
20 SF
HAC
BC106
58 SF
HAC
BC107G
60 SF/ 65 SF
JANC2
DISPATCH AREA
BC107B
80 SF/ 99 SF
CHC01
WORKSTATION,
CASE CART
DISPATCH
BC107A
56 SF/ 59 SF
OFA07
CLEAN
CORRIDOR
BC107F
0 SF/ 104 SF
CORRIDOR
BC105
406 SF
OFFICE
BC110
127 SF
OFFICE
BC111
88 SF
TELECOM
BC113
191 SF
OFFICE
BC112
101 SF
CART LOBBY
BD171A
63 SF
HALL
BC107C
149 SF
CASE CART
ASSEMBLY
BC107
120 SF/ 304 SF
CSCQ1
CASE CART
ASSEMBLY
BD185B
120 SF/ 118 SF
CSCQ1
CORRIDOR
BD171B
388 SF
PPE
BC102C - 272
0 SF/ 19 SF
CSPE1
M LCKR
BD172
90 SF
F LOCKER
BD172
74 SF
STAFF TLT
BD172A
55 SF
ELEV
B-EL-DL01
35 SF
ELEC
BD170
14 SF
SHELL SPACE
BD175
2174 SF
SHELL SPACE
BC106A
768 SF
SHELL SPACE
BC107D
705 SF
CORRIDOR
BD177
105 SF PPE ALCOVE
BD180A
105 SF
ANTEROOM
SOILED
TRANSITION /
DROP-OFF
BD180
150 SF
CORRIDOR
BD179
295 SF
CORRIDOR
BD171
241 SF
BA04
BA04a
BA04c
BA04c
BA04d
BID ALTERNATE 1
BID ALTERNATE 2
BID ALTERNATE 3
BID ALTERNATE 4
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
556-402
11/29/2022
EXPAND STERILE PROCESSING
SERVICE (SPS)
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer Stevens & Schaap P.C.
1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.
3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010
IMEG Corp.
263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320
Calibre Engineering, Inc.
9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434
Force Protect Security Cons.
10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407
KEY PLAN
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/1
/2
:5
:0
P
M
GI104
BID ALTERNATE 3 & 4
133CA
3/32" = 1'-0" D1
BASEMENT - NEW CONSTRUCTION - PHASE 4 - BID ALTERNATE 3
3/32" = 1'-0"
D6
BASEMENT - NEW CONSTRUCTION - PHASE 4 - BID ALTERNATE 4
BID ALTERNATE KEYNOTES
KEY KEYNOTE
BA01 IF BID ALTERNATE 1 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES, CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, AND
INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.
BA01a IF BID ALTERNATE 1 IS ACCEPTED, DO NOT CONSTRUCT NEW OFFICES AND WORKSTATIONS.
BA01b IF BID ALTERNATE 1 IS ACCEPTED, CONSTRUCT NEW ADMIN SPACE BC106, ROOM FINISHES TO BE THE SAME AS
OFFICE, SPS CHIEF BC106.
BA02 IF BID ALTERNATE 2 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES, CEILING FINISHES, AND TEMPORARY BARRIER WALLS IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, AND INFILL
FLOORS AND WALLS TO MATCH ADJACENT SURFACES.
BA02a IF BID ALTERNATE 2 IS ACCEPTED, DO NOT CONSTRUCT NEW STORAGE CLEAN AND CASE CART STORAGE
SPACES.
BA02b IF BID ALTERNATE 2 IS ACCEPTED, CONTRACTOR TO PROVIDE & CONSTRUCT NEW WALL TYPE D1 TO SEPARATE
NEW SPACES FROM UNFINISHED SPACES.
BA03 IF BID ALTERNATE 3 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES (QUARRY TILE), CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.
BA04 IF BID ALTERNATE 4 IS ACCEPTED, REMOVE ONLY THE EXISTING FLOOR FINISHES (QUARRY TILE), CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL
PATCH, REPAIR, AND INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.
BA04a IF BID ALTERNATE 4 IS ACCEPTED, DO NOT CONSTRUCT NEW TRAING ROOM, LOCKER ROOMS, TOILET/SHOWERS, AND STAFF LOUNGE.
BA04c IF BID ALTERNATE 4 IS ACCEPTED, THE EXISTING ROOMS, FLOOR FINISHES, CEILING FINISHES, FIXTURES AND EQUIPMENT ARE TO REMAIN IN PLACE AND KEPT IN FUNCTIONING ORDER FOR VA TO KEEP IN USE.
BA04d IF BID ALTERNATE 4 IS ACCEPTED, THE EXISTING STAFF OFFICES ARE TO REMAIN IN PLACE AND KEPT IN
FUNCTIONING ORDER FOR VA TO KEEP IN USE.
0' 8' 16' 32'
SCALE: 3/32" = 1'-0"
Mark Revisions: Date:
MGV
MGV
MGV
THE FOLLOWING IS A SUMMARY OF THE BASIS OF DESIGN NARRATIVE THAT IS INTENDED TO DEMONSTRATE COMPLIANCE WITH APPLICABLE CODES AND STANDARDS. MORE DETAILED CODE ANALYSIS INFORMATION IS PROVIDED ON SUBSEQUENT DRAWING SHEETS AND WITHIN THE
FIRE PROTECTION AND LIFE SAFETY SECTION OF THE DESIGN NARRATIVE.
APPLICABLE CODES:
THE FOLLOWING PRIMARY CODES AND STANDARDS ARE USED AS THE BASIS FOR THE DESIGN
• VA FIRE PROTECTION DESIGN MANUAL (VAFPDM; 8TH EDITION JUNE 1 2021)
• NATIONAL FIRE PROTECTION ASSOCIATION FIRE CODE (NFPA 1; 2021 EDITION)
• NATIONAL FIRE PROTECTION ASSOCIATION STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS (NFPA 13; 2022 EDITION)
• NATIONAL FIRE PROTECTION ASSOCIATION NATIONAL FIRE ALARM AND SIGNALING CODE (NFPA 72, 2022 EDITION)
• NATIONAL FIRE PROTECTION ASSOCIATION LIFE SAFETY CODE (NFPA 101; 2021 EDITION)
• INTERNATIONAL BUILDING CODE (IBC; 2021 EDITION) *NOTE: AS ENFORCED BY VAFPDM §1.3.
BUILDING REHABILITATION SCOPE
THE REHABILITATION SCOPE OF WORK CONSISTS OF AN ADDITION AND A MODIFICATION OF LESS THAN 50% OF THE AREA OF THE BUILDING. IN ACCORDANCE WITH NFPA 101 §43.8.1, THE ADDITION SHALL COMPLY WITH THE SECTIONS OF THE CODE APPLICABLE TO NEW CONSTRUCTION FOR THE OCCUPANCY, AND THE EXISTING PORTION OF THE BUILDING SHALL COMPLY WITH THE REQUIREMENTS FOR EXISTING BUILDINGS FOR THE OCCUPANCY. THEREFORE, THE ADDITION AREAS SHALL COMPLY WITH THE REQUIREMENTS IN NFPA 101 CHAPTER 38 FOR NEW BUSINESS OCCUPANCIES AND THE REMAINDER SHALL COMPLY WITH CHAPTER 39 FOR EXISTING BUSINESS OCCUPANCIES. ALL NEW CONSTRUCTION ELEMENTS WITHIN MODIFICATION AREAS SHALL COMPLY WITH CHAPTER 38 FOR NEW BUSINESS OCCUPANCIES IN ACCORDANCE WITH NFPA 101 §43.5.1.3.
SITE FIRE PROTECTION DESIGN
NONE OF THE ASPECTS OF THE SITE FIRE DEPARTMENT / EMERGENCY VEHICLE ACCESS ARE BEING MODIFIED AS PART OF THIS RENOVATION
SCOPE OF WORK AND ARE TO REMAIN AS IS.
OCCUPANCY CLASSIFICATION:
OCCUPANCY CLASSIFICATION IS DETERMINED IN ACCORDANCE WITH NFPA 101 AS REQUIRED BY THE VAFPDM. AS INDICATED ON THE EXISTING STATEMENT OF CONDITIONS PLANS, THE ENTIRETY OF THE BASEMENT LEVEL OF BUILDING 133CA IS CLASSIFIED AS A BUSINESS OCCUPANCY.
AS PART OF THIS SCOPE OF WORK, THE ADDITION AND MODIFICATION AREAS ARE CLASSIFIED AS NEW BUSINESS OCCUPANCIES IN ACCORDANCE WITH NFPA 101 CHAPTER 38 AND THE EXISTING OUT OF SCOPE AREAS ARE CLASSIFIED AS EXISTING BUSINESS OCCUPANCIES IN
ACCORDANCE WITH NFPA 101 CHAPTER 39.
OCCUPANCY SEPARATIONS:
THE ENTIRE BUILDING IS CLASSIFIED AS BUSINESS OCCUPANCIES AND ALL ADJACENT OCCUPANCIES ARE CLASSIFIED AS BUSINESS AS WELL;
THEREFORE NO OCCUPANCY SEPARATIONS ARE PROVIDED.
BUILDING SEPARATION:
IN ACCORDANCE WITH §2.2.A OF THE VAFPDM, THERE ARE NO REQUIREMENTS FOR SEPARATION OR OPENINGS BETWEEN VA BUILDINGS WHEN ALL BUILDINGS ARE FULLY SPRINKLER PROTECTED. BUILDING 133/CA IS FULLY SPRINKLERED AND ALL EXISTING BUILDING SEPARATIONS ARE
TO REMAIN.
BUILDING CONSTRUCTION TYPE:
AS INDICATED ON EXISTING STATEMENT OF CONDITIONS (SOC) AND RECORD CONSTRUCTION DOCUMENTS, THE EXISTING BUILDING 133/CA IS CLASSIFIED AS CONSTRUCTION TYPE I (332) CONSTRUCTION PER NFPA 220 AND TYPE I-A PER THE IBC; REVIEW OF AS-BUILT DOCUMENTATION ALIGNS WITH THIS CLASSIFICATION. THE REHABILITATION WORK INCLUDED IN THIS SCOPE OF WORK WILL BE DONE IN A MANNER WHICH MAINTAINS THE EXISTING CONSTRUCTION TYPE AND THEREFORE, NO MODIFICATIONS TO THE EXISTING CONSTRUCTION TYPE WILL BE
INCORPORATED AS PART OF THIS SCOPE OF WORK.
FIRE-RESISTANCE RATINGS:
TO ACHIEVE THE REQUIRED FIRE RESISTANCE RATING OF STRUCTURAL ELEMENTS AS SHOWN IN THE FIRE RESISTANCE TABLE FOR TYPE I(332) IMPLEMENT THE FOLLOWING FIRE-RATED ASSEMBLIES, OR OTHER EQUIVALENT SYSTEM. IN ACCORDANCE WITH THE MANUFACTURES INSTRUCTIONS TO PROTECT THE FOLLOWING COMPONENT AND METHOD AS DETERMINED IN ASTM E119 AND UL 263 FOR THE FOLLOWING.
COMPOSITE DECK WITH CONCRETE FILL HAS BEEN DESIGNED TO PROVIDE THE APPLICABLE REQUIRED FIRE RATING FOR FLOORS AND ROOFS WITHOUT THE USE OF APPLIED FIRE PROFFING, UNLESS OTHERWISE NOTED(E.G., WHERE SLAB DEPTRESSION REDUCES CONCRETE
THICKNESS PER (UL DESIGN - D825).
RATED STRUCTURAL COMPONENT: UL DESIGN SYSTEM:
PRIMARY STRUCTURAL FRAME (INTUMESCENT COATING) BXUV.X650
PRIMARY STRUCTURAL FRAME (SPRAY APPLIED FIRE-RESISTIVE MATERIAL) BXUV.D601
COLUMNS BXUV.Y739
FLOORS ASSEMBLIES SUPPORTING MORE THAN TWO FLOORS BXUV.D902
CONCRETE BEAMS BXUV.N864
STEEL TRUSSES BXUV.X701
NON-FRAME SUPPORT BEAMS - FLOORS BXUV.N782
NON-FRAME SUPPORT BEAMS - ROOFS BXUV.S735
ROOFS BXUV.D902
ALLOWABLE HEIGHT & AREA ANALYSIS (NFPA 101 §42.1.6 & IBC TABLES 504.3, 504.4 & 506.2) NFPA 101 DOES NOT INCLUDE CONSTRUCTION TYPE REQUIREMENTS FOR BUSINESS OCCUPANCIES AND THEREFORE §2.1-C OF THE VAFPDM REQUIRES THAT THE HEIGHT AND AREA LIMITATIONS BE IN ACCORDANCE WITH THE IBC. THE NUMBER OF STORIES AND BUILDING HEIGHT ARE NOT AFFECTED AS PART OF THIS SCOPE OF WORK; HOWEVER, THE BUILDING AREA OF THE BASEMENT IS BEING INCREASED BY APPROXIMATELY 6,000 FT2 AS A RESULT OF THIS SCOPE OF WORK. IN ACCORDANCE WITH IBC TABLE 506.2 THE AREA OF A TYPE I-A BUILDING CONTAINING A GROUP B OCCUPANCY IS UNLIMITED; THEREFORE THE PROPOSED SCOPE OF WORK MAINTAINS COMPLIANCE WITH ALLOWABLE
HEIGHT AND AREA REQUIREMENTS AS DICTATED BY THE VAFPDM.
HAZARDOUS AREA SEPARATION:
BUILDING 133/CA CONTAINS HEALTH CARE OCCUPANCIES, THEREFORE, NFPA 101 §18.1.3.11 REQUIRES THAT ANY AREA WITH A HAZARD OF CONTENTS CLASSIFIED HIGHER THAN THAT OF THE HEALTH CARE OCCUPANCY AND LOCATED IN THE SAME BUILDING SHALL BE PROTECTED IN ACCORDANCE WITH NFPA 101 §18.3.2. THE EXISTING SPS AREAS ARE SEPARATED FROM THE REMAINDER OF THE BASEMENT BY SMOKE
PARTITIONS, AND WILL BE MAINTAINED AS INDICATED ON THE LIFE SAFETY PLANS.
SMOKE COMPARTMENTATION
BUSINESS OCCUPANCIES ARE NOT REQUIRED TO BE PROVIDED WITH SMOKE COMPARTMENTS PER NFPA 101 OR THE VAFPDM; HOWEVER, EXISTING SMOKE COMPARTMENT BOUNDARIES ARE MAINTAINED OR MODIFIED TO MAINTAIN COMPARTMENTATION THROUGHOUT BUILDING
133/CA.
EGRESS DESIGN:
ALL EGRESS PROVISIONS ARE PROVIDED IN ACCORDANCE WITH NFPA 101 AND THE VAFPDM.
• OCCUPANT LOAD CALCULATIONS ARE BASED ON THE FACTORS IN NFPA 101 TABLE 7.3.1.2
• NUMBER OF EXITS AND CONFIGURATION IS PROVIDED IN ACCORDANCE WITH NFPA 101 SECTIONS 7.4 AND 7.5.
• EXIT ACCESS AND TRAVEL DISTANCE REQUIREMENTS (TRAVEL DISTANCE LIMITATIONS, COMMON PATH LIMITATIONS, AND DEAD-END
CORRIDORS) ARE IN ACCORDANCE WITH NFPA 101 §A.7.6.
• EXITS MEET THE REQUIREMENTS OF NFPA 101 SECTION 7.1.3.2 AND EGRESS COMPONENTS CONFORM TO THE TYPES AND REQUIREMENTS
IN NFPA 101 SECTION 7.2.
• EGRESS WIDTH AND CAPACITY IS PROVIDED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .