Attachment 2 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 1-8.pdf

PDF 16 MB Posted

Attached to
Y1DA--556-402 Expand Sterile Processing Service (SPS) - Construction - Lovell FHCC, North Chicago, IL
Solicitation number
36C77624B0018
Issued by

About this file

This document appears to be attachment 2, which contains drawings related to the expansion of the Sterile Processing Service (SPS) at the Lovell Federal Health Care Center in North Chicago, Illinois. The drawings are part of the solicitation for the construction project under Solicitation Number 36C77624B0018, issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The project involves the expansion of the SPS facility, with drawings covering various aspects of the construction work. The drawings are dated from November 29, 2022, to June 24, 2024.

View the file

Other files

File Type Posted
S06 - 36C77624B0018 0004.pdf PDF
Attachment 25 - Bid Abstract OF 1419 - SPS North Chicago - Signed.pdf PDF
Attachment 26 - Bid Abstract OF 1419A - SPS North Chicago.pdf PDF
Attachment 24 - 556-402 SPS 100CD Specs Div 221300 Facility Sanitary and Vent Piping.pdf PDF
S06 - 36C77624B0018 0003.pdf PDF
S06 - 36C77624B0018 0002.pdf PDF
Attachment 22 - Technical Questions and Responses - SPS North Chicago.pdf PDF
Attachment 23 - RFI97 Atch - Bldg133CA - LDP-1-F9 QMDP-1-G3.pdf PDF
S06 - 36C77624B0018 0001.pdf PDF
Attachment 21 - Site Visit Sign-in Sheet SPS North Chicago_15JUL24.pdf PDF
Attachment 13 - 556-402 SPS 100CD SpecsV2 29NOV22-r14JUN24.pdf PDF
Attachment 12 - 556-402 SPS 100CD SpecsV1 29NOV22-r14JUN24.pdf PDF
Attachment 20 - Division Cost Breakdown - BLANK.xlsx XLSX spreadsheet
Attachment 11 - 556-402 SPS 100CD Reports 29NOV22.pdf PDF
Attachment 10 - 556-402 Expand SPS - 100CD Equip Cut Sheets - Excerpt.pdf PDF
Attachment 3 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 2-8.pdf PDF
Attachment 16 - Wage Determination - Lake County.pdf PDF
Attachment 14 - 556-402 SPS 100CD Struct Interior Design V1 29NOV22-r14JUN24.pdf PDF
Attachment 7 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 6-8.pdf PDF
Attachment 17 - Limitations on Subcontracting - Construction.docx DOCX document
S02 - 36C77624B0018.pdf PDF
Attachment 15 - 556-402 SPS 100CD Struct Interior Design V2 29NOV22-r14JUN24.pdf PDF
Attachment 4 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 3-8.pdf PDF
Attachment 19 - Contractors Statement for Exempt Organization - Illinois.docx DOCX document
Attachment 6 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 5-8.pdf PDF
Attachment 8 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 7-8.pdf PDF
Attachment 18 - Illinois Tax Language - 1.26.2023 - FINAL.docx DOCX document
Attachment 9 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 8-8.pdf PDF
Attachment 5 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 4-8.pdf PDF
Attachment 1 - 556-402 Expand SPS - GC SOW 29MAR24.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/5

/2

:0

:1

P M

GI001

COVER

MP

133CA

C A P T. J A M E S A. L O V E L L F E D E R A L H E A L T H C A R E C E N T E R

EXPAND STERILE PROCESSING SERVICE (SPS)

NORTH CHICAGO, ILLINOIS, 60064

SITE LOCATION

VA Contract Number: 36C77622C0002

VA Point of Contact:

Daniel J. Lid, D: (224) 610-3567, Contracting Officer's Representative (COR)

Mark Revisions: Date: 07/05/2023 REVISIONS

11/29/2022

REV 6/14/2024

Volume 1 of 8

ISSUED 11/29/2022

SET REV 06/14/2024

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/2

/2

:1

:3

P

M

GI002

INDEX OF DRAWINGS

MP

133CA

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

GENERAL

GI001 COVER

GI002 INDEX OF DRAWINGS

GI101 PHASING PLANS

GI102 FLOW DIAGRAMS

GI103 BID ALTERNATE 1 & 2

GI104 BID ALTERNATE 3 & 4

LIFE SAFETY

LS000 CODE COMPLIANCE SUMMARY PLAN

LS100 PIPE BASEMENT - LIFE SAFETY PLAN

LS101 BASEMENT FLOOR - LIFE SAFETY PLAN

LS102 FIRST FLOOR - LIFE SAFETY PLAN

LS103 EGRESS PHASING COMPLIANCE PLAN - BASEMENT

HAZARDOUS MATERIALS

HA101 BASEMENT FLOOR PLAN – ASBESTOS ABATEMENT

CIVIL

CD100 DEMOLITION PLAN PHASE 1

SP100 SITE PLAN PHASE 1

CS500 SITE DETAILS PHASE 1

CS501 SITE DETAILS PHASE 1

CG100 GRADING PLAN PHASE 1

CU100 OVERALL UTILITY PLAN PHASE 1

CU101 SANITARY SEWER PLAN & PROFILE PHASE 1

CU104 STORM SEWER PLAN AND PROFILE PHASE 1

CU500 STORM SEWER DETAILS PHASE 1

CU501 STORM SEWER DETAILS PHASE 1

STRUCTURAL

SG001 STRUCTURAL GENERAL NOTES

SD1PB.1 PIPE BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 1

SD100.1 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEVATION - PHASE 1

SD100.2 BASEMENT FLOOR - DEMO PLAN & ELEVATION - PHASE 2

SD100.3 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 3

SD100.4 BASEMENT FLOOR - PARTIAL DEMO PLAN - PHASE 4

SB1PB.1 PIPE BASEMENT FLOOR - FNDN. & MUD SLAB PLAN - PHASE 1

SB1PB.2 PIPE BASEMENT FLOOR - FOUNDATION & MUD SLAB - PHASE 2

SB301 STRUCTURAL SECTIONS

SB501 FOUNDATION DETAILS & SCHEDULES

SB502 FOUNDATION DETAILS

SF100.1 BASEMENT FLOOR FRAMING PLAN - PHASE 1

SF100.2 BASEMENT FLOOR FRAMING PLAN - PHASE 2

SF100.3 BASEMENT FLOOR - FRAMING PLAN - PHASE 3

SF101.2 FIRST FLOOR - MECHANICAL PENTHOUSE FRAMING PLAN - PHASE 2

SF102.2 SECOND FLOOR - ROOF FRAMING PLAN - PHASE 2

SF401 ELEVATIONS & DETAILS

SF402 STRUCTURAL RETROFIT ELEVATIONS IN BUILDING 133-C

SF501 FRAMING DETAILS

SF502 FRAMING DETAILS

SF503 FRAMING DETAILS

SF504 FRAMING DETAILS

SF510 LIGHT GAGE FRAMING STRUCTURAL DETAILS

SF511 WALL SECTIONS -LIGHT GAGE INFORMATION

SF600 LIVE LOAD DIAGRAM - BASEMENT FLOOR

SF601 LIVE LOAD DIAGRAM - FIRST FLOOR

ARCHITECTURAL

AG001 ARCHITECTURAL ABBREVIATIONS, LEGENDS AND NOTES

AD1PB.2 PIPE BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2

AD100.1 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 1

AD100.2 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2

AD100.3 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 3

AD100.4 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 4

AD101.2 FIRST FLOOR - DEMOLITION PLAN - PHASE 2

AD102.2 SECOND FLOOR - DEMOLITION PLAN - PHASE 2

AE1PB.2 PIPE BASEMENT FLOOR - FLOOR PLAN - PHASE 2

AE100.1 BASEMENT FLOOR - FLOOR PLAN - PHASE 1

AE100.2 BASEMENT FLOOR - FLOOR PLAN - PHASE 2

AE100.3 BASEMENT FLOOR - FLOOR PLAN - PHASE 3

AE100.4 BASEMENT FLOOR - FLOOR PLAN - PHASE 4

AE101.2 FIRST FLOOR - MECHANICAL PENTHOUSE PLAN - PHASE 2

AE102.2 SECOND FLOOR - ROOF PLAN - PHASE 2

AE110.1 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 1

AE110.2 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 2

AE110.3 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 3

AE110.4 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 4

AE201 EXTERIOR ELEVATIONS

AE301 BUILDING SECTIONS

AE302 WALL SECTIONS

AE303 WALL SECTIONS

AE304 WALL SECTIONS

AE401 ENLARGED PLANS AND ELEVATIONS

AE402 ENLARGED PLANS AND ELEVATIONS

AE501 EXTERIOR DETAILS

AE502 WALL SECTIONS & DETAILS

AE503 EXPANSION JOINT DETAILS

AE504 PLAN DETAILS

AE505 PLAN DETAILS

AE531 CEILING DETAILS

AE601 ROOM PROGRAM SCHEDULE

AE602 DOOR SCHEDULES AND DETAILS

AE801 WALL TYPES

AE901 EXTERIOR RENDERINGS AND INTERIOR 3D VIEWS

AE902 BASEMENT FLOOR - FUNCTIONAL AREA PLAN

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

INTERIORS

IN100.1 BASEMENT FLOOR - INTERIORS PLAN - PHASE 1

IN100.2 BASEMENT FLOOR - INTERIORS PLAN - PHASE 2

IN100.3 BASEMENT FLOOR - INTERIORS PLAN - PHASE 3

IN100.4 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4

IN100.41 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 1

IN100.42 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 2

IN100.43 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 3

IN100.44 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 4

IN101.2 FIRST FLOOR - INTERIORS PLAN - PHASE 2

IN501 INTERIORS DETAILS

IN601 ROOM FINISH SCHEDULE

IN602 ROOM FINISH SCHEDULE - BID ALTERNATES

IN603 SIGNAGE SCHEDULE

EQUIPMENT

QH100.2C BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA C

QH100.2D BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D

QH100.4A BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA A

QH100.4B BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA B

QH101.2D FIRST FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D

QH601 EQUIPMENT JSN SCHEDULES

FIRE PROTECTION

FA000 FIRE ALARM NOTES AND DETAILS

FA101 BASEMENT - FIRE ALARM PLAN

FA102 FIRST FLOOR - FIRE ALARM PLAN

FX000 FIRE SUPPRESSION NOTES AND DETAILS

FX101 BASEMENT - FIRE SUPPRESSION PLAN

FX102 FIRST FLOOR - FIRE SUPPRESSION PLAN

PLUMBING

P000 PLUMBING COVERSHEET

PD1PB.2 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 2

PD1PB.4 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 4

PD100.4 BASEMENT DEMOLITION - PLUMBING - PHASE 4

P1PB.0 PIPE BASEMENT - PLUMBING - ALL PHASES

P1PB.2 PIPE BASEMENT - PLUMBING - PHASE 2

P1PB.3 PIPE BASEMENT - PLUMBING - PHASE 3

P1PB.4 PIPE BASEMENT - PLUMBING - PHASE 4

P1PB.44 PIPE BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4

P100.0 BASEMENT - PLUMBING - ALL PHASES

P100.2 BASEMENT - PLUMBING - PHASE 2

P100.3 BASEMENT - PLUMBING - PHASE 3

P100.4 BASEMENT - PLUMBING - PHASE 4

P100.44 BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4

P101.0 FIRST FLOOR - PLUMBING - ALL PHASES

P101.2 FIRST FLOOR - PLUMBING - PHASE 2

P102.0 SECOND FLOOR - PLUMBING - ALL PHASES

P102.2 SECOND FLOOR - PLUMBING - PHASE 2

P200 PLUMBING ENLARGED PLAN

P300 D.I. WATER FLOW DIAGRAM

P301 PLUMBING SANITARY-VENT RISER DIAGRAM - PHASE 2

P302 PLUMBING DOMESTIC WATER RISER DIAGRAM - PHASE 2

P303 PLUMBING RISER DIAGRAM - PHASE 4

P304 DI WATER RISER DIAGRAM - PHASE 2

P400 PLUMBING DETAILS

P401 PLUMBING DETAILS

P500 PLUMBING SCHEDULES

MECHANICAL

M000 MECHANICAL COVERSHEET

MD2PB.2 PIPE BASEMENT DEMOLITION - PIPING - PHASE 2

MD100.1 BASEMENT DEMOLITION - VENTILATION - PHASE 1

MD100.2 BASEMENT DEMOLITION - VENTILATION - PHASE 2

MD100.3 BASEMENT DEMOLITION - VENTILATION - PHASE 3

MD100.4 BASEMENT DEMOLITION - VENTILATION - PHASE 4

MD101.2 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 2

MD101.4 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 4

MD102.4 SECOND FLOOR DEMOLITION – VENTILATION – PHASE 4

MD103.4 THIRD FLOOR DEMOLITION – VENTILATION – PHASE 4

MD104.4 FOURTH FLOOR DEMOLITION – VENTILATION – PHASE 4

MD200.4 BASEMENT DEMOLITION - PIPING - PHASE 4

M1PB.2 PIPE BASEMENT - VENTILATION - PHASE 2

M2PB.2 PIPE BASEMENT - PIPING - PHASE 2

M100.0 BASEMENT - VENTILATION - ALL PHASES

M100.1 BASEMENT - VENTILATION - PHASE 1

M100.2 BASEMENT - VENTILATION - PHASE 2

M100.3 BASEMENT - VENTILATION - PHASE 3

M100.4 BASEMENT - VENTILATION - PHASE 4

M100.41 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 1

M100.42 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 2

M100.43 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 3

M100.44 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 4

M101.0 FIRST FLOOR - VENTILATION - ALL PHASES

M101.2 FIRST FLOOR - VENTILATION - PHASE 2

M101.4 FIRST FLOOR - VENTILATION - PHASE 4

M102.0 SECOND FLOOR - VENTILATION - ALL PHASES

M102.2 SECOND FLOOR - VENTILATION - PHASE 2

M200.0 BASEMENT - PIPING - ALL PHASES

M200.2 BASEMENT - PIPING - PHASE 2

M200.4 BASEMENT - PIPING - PHASE 4

M200.44 BASEMENT – PIPING – PHASE 4 – BID ALTERNATE 4

M201.0 FIRST FLOOR - PIPING - ALL PHASES

M201.2 FIRST FLOOR - PIPING - PHASE 2

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

M300 MECHANICAL DETAILS

M301 MECHANICAL DETAILS

M302 MECHANICAL DETAILS

M303 MECHANICAL DETAILS

M304 AHU COMPONENT PLAN

M305 AIRFLOW MAP

M306 AIRFLOW MAP

M307 STEAM FLOW DIAGRAM

M400 MECHANICAL DIAGRAMS

M401 MECHANICAL DIAGRAMS

M402 MECHANICAL DIAGRAMS

M403 MECHANICAL DIAGRAMS

M600 MECHANICAL SCHEDULES

M601 MECHANICAL SCHEDULES

ELECTRICAL

E000 ELECTRICAL COVERSHEET

ED100.1 BASEMENT DEMOLITION - ELECTRICAL- PHASE 1

ED100.2 BASEMENT DEMOLITION - ELECTRICAL - PHASE 2

ED100.3 BASEMENT DEMOLITION - ELECTRICAL - PHASE 3

ED100.4 BASEMENT DEMOLITION - ELECTRICAL - PHASE 4

E1PB.2 SUB BASEMENT - ELECTRICAL - PHASE 2

E100.0 BASEMENT - POWER - ALL PHASES

E100.1 BASEMENT - POWER - PHASE 1

E100.2 BASEMENT - POWER - PHASE 2

E100.3 BASEMENT - POWER - PHASE 3

E100.4 BASEMENT - POWER - PHASE 4

E100.41 BASEMENT - POWER - PHASE 4 - ALTERNATE 1

E100.42 BASEMENT - POWER - PHASE 4 - ALTERNATE 2

E100.43 BASEMENT - POWER - PHASE 4 - ALTERNATE 3

E100.44 BASEMENT - POWER - PHASE 4 - ALTERNATE 4

E101.0 BASEMENT - LIGHTING - ALL PHASES

E101.1 BASEMENT - LIGHTING - PHASE 1

E101.2 BASEMENT - LIGHTING - PHASE 2

E101.3 BASEMENT - LIGHTING - PHASE 3

E101.4 BASEMENT - LIGHTING - PHASE 4

E101.41 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 1

E101.42 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 2

E101.43 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 3

E101.44 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 4

E200 FIRST FLOOR - POWER - PHASE 2

E201 FIRST FLOOR - LIGHTING - PHASE 2

E301 FIRST FLOOR OVERALL AND ENLARGED ELECTRICAL PLANS

E400 ELECTRICAL DIAGRAMS

E601 ELECTRICAL DETAILS

E602 ELECTRICAL DETAILS

E603 ELECTRICAL DETAILS

E701 ELECTRICAL PANEL SCHEDULES

TECHNOLOGY

T001 TECHNOLOGY COVERSHEET

TD100.1 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 1

TD100.2 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 2

TD100.3 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 3

TD100.4 BASEMENT DEMOLITION - TECHNOLOGY - PHASE 4

T002 OVERALL PLANS - TECHNOLOGY

T003 OVERALL PLANS - TECHNOLOGY

T100.1 BASEMENT - TECHNOLOGY - PHASE 1

T100.2 BASEMENT - TECHNOLOGY - PHASE 2

T100.3 BASEMENT - TECHNOLOGY - PHASE 3

T100.4 BASEMENT - TECHNOLOGY - PHASE 4

T100.41 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 1

T100.42 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 2

T100.43 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 3

T100.44 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 4

T200 TECHNOLOGY ROOM ENLARGEMENTS

T300 TECHNOLOGY DETAILS

T301 TECHNOLOGY DETAILS

T600 TECHNOLOGY SCHEDULES

Mark Revisions: Date:

VOL. 1

VOL. 2

VOL. 3

VOL. 4

VOL. 4

VOL. 5

VOL. 6

VOL. 6

VOL. 7

VOL. 8

UP

DN

UP

UP

DN

UP

UP

DN

UP

UP

DN

PHASING NOTES & LEGEND

GENERAL PHASING NOTES:

THE PHASING NARRATIVE AND PHASING FLOOR PLANS PROVIDE A GENERAL OVERVIEW FOR

PROJECT PHASING AS DESIGNED. NEITHER THE NARRATIVE NOR THE DRAWINGS ARE

INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF PHASING OR THE ENTIRE SEQUENCE

OF CONSTRUCTION ACTIVITIES AS THEY RELATE TO PHASING. THE CONTRACTOR SHALL

UNDERSTAND THE GENERAL SCOPE OF PHASING AS DESCRIBED HEREIN AND WORK WITH

THE PROJECT CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE

CONSTRUCTION PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE

VARIOUS DETAILS OF EACH PHASE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO):

TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY WALLS AND

EGRESS DOORS, TRANSITIONS BETWEEN PHASES, INFECTION CONTROL MEASURES,

HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION CIRCULATION PATHWAYS, AND

EMERGENCY PREPAREDNESS.

REFER TO ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.

HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE GENERAL

PHASING PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL CLARIFYING

INFORMATION. COPIES OF THE MOST CURRENT ASBESTOS REPORT AND LEAD-BASE PAINT

REPORT ARE TO BE OBTAINED FROM THE COR.

THIS PHASING PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES DIRECTLY

ADJACENT TO WORKING SPS AREAS. SPECIAL CARE SHALL BE TAKEN BY THE CONTRACTOR

TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC. IN SUCH A WAY AS TO

MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE HEALTHCARE SERVICES. THE

PROJECT COR SHALL HAVE THE AUTHORITY TO STOP ANY ACTIVITY DEEMED TOO

DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST THE CONTRACTOR IN

SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME ACTIVITY. THE CONTRACTOR

SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL ACTIVITIES THAT COULD HAVE THE

POTENTIAL TO DISRUPT THE ADJACENT DEPARTMENTS.

PHASE 1 PHASE 2 PHASE 3

PHASE 1 - PARTIAL DEMOLITION & RENOVATION OF EXISTING SITE UTILITIES

A. CONTRACTOR TO LOCATE AND VERIFY ALL UTILITY LINES, PIPES, CONNECTIONS ON THE

PROJECT SITE AND/OR RUNNING THROUGH THE PROJECT AREA .

B. CONTRACTOR SHALL PROVIDE A FENCE AROUND CONSTRUCTION AREA FOR PEDESTRIAN

CONTROL AND CONSTRUCTION DEBRIS.

C. CONTRACTOR TO DEMO, REPLACE, AND RELOCATE EXISTING UTILITY LINES AS

INDICATED IN DRAWINGS AND SPECIFICATIONS WITHOUT DISRUPTING THE EXISTING SPS

OPERATIONS, UNLESS APPROVED BY COR AND VA FHCC.

D. CONTRACTOR TO CONSTRUCT TEMPORARY CORRIDOR(S) AND DOORS AS SHOWN ON

PLAN.

E. CONTRACTOR SHALL NOTIFY VA OF THE PLANNED COMPLETION DATE OF PHASE 1 SO VA

CAN PLAN THE TRANSITION OF OPERATIONS BACK INTO PHASE 1 AREA ACCORDINGLY.

PHASE 2 - CONSTRUCT NEW SPS ADDITION & TEMPORARY INTERIOR CONSTRUCTION BARRIER

WALLS.

A. NEW SPS ADDITION IS CONSTRUCTED IN ACCORDANCE WITH CONSTRUCTION

DOCUMENTS, THE EXISTING SPS OPERATIONS WILL REMAIN IN USE.

B. CONTRACTOR WILL PLAN AND COORDINATE THE CONSTRUCTION OF THE MECHANICAL

PENTHOUSE AND THE CONNECTION TO THE EXISTING FIRST FLOOR MECHANICAL ROOM

WITH THE COR AND VA FHCC, SO AS NOT TO DISRUPT THE SPS AND FHCC OPERATIONS.

C. CONTRACTOR WILL PLAN AND COORDINATE THE CONSTRUCTION OF THE TEMPORARY

INTERIOR CONSTRUCTION BARRIER WALLS WITH THE COR AND VA FHCC SO AS NOT TO

DISRUPT THE EXISTING SPS OPERATIONS.

D. CONTRACTOR WILL NEED TO NOTIFY VA OF THE PLANNED COMPLETION DATE OF

PHASE 2, SO VA CAN PLAN THE TRANSITION OF OPERATIONS BACK INTO PHASE 2 AREA

ACCORDINGLY.

PHASE 3 - TRANSITION SPS OPERATIONS FROM THE EXISTING SPS TO THE NEW SPS ADDITION, AND CONSTRUCT TEMPORARY CORRIDORS FROM THE NEW SPS ADDITION THROUGH

THE EXISTING SPS SPACES.

A. CONTRACTOR WILL PLAN AND COORDINATE THE CONSTRUCTION OF THE TEMPORARY

CLEAN CORRIDOR WALLS WITH THE COR AND VA FHCC SO AS NOT TO DISRUPT THE

EXISTING SPS OPERATIONS.

B. CONTRACTOR WILL PLAN AND COORDINATE THE CONSTRUCTION OF THE TEMPORARY

SOILED / DIRTY CORRIDOR WALLS WITH THE COR AND VA FHCC SO AS NOT TO DISRUPT

THE EXISTING SPS OPERATIONS.

C. CONTRACTOR WILL NEED TO NOTIFY VA OF THE PLANNED COMPLETION DATE OF

PHASE 3, SO VA CAN PLAN THE TRANSITION OF OPERATIONS BACK INTO PHASE 3 AREA

ACCORDINGLY.

PHASE 4 - CONSTRUCT STAFF, ADMINISTRATION, AND LOCKER ROOM SPACES.

A. REMOVE, SALVAGE, AND RETURN EXISTING SPS EQUIPMENT AND FIXTURES TO VA FHCC,

UNLESS NOTED OTHERWISE.

B. PATCH, INFILL, & REPAIR EXISTING CONCRETE FLOOR SLABS AND WALLS AS REQUIRED

FOR NEW FLOOR AND WALL FINISHES.

PHASE 4.1 - REMOVE TEMPORARY CORRIDORS AND FINISH CONSTRUCTION IN ALL SPACES.

A. PATCH, INFILL, & REPAIR EXISTING CONCRETE FLOOR SLABS AND WALLS AS REQUIRED

FOR NEW FLOOR AND WALL FINISHES.

PHASE 4 PHASE 4.1

c14c16 c12 c11 c10 c8 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c18 c25 c24 c26 eTT ca18 ca19 ca12ca11 ca16 cQ.1

7.8 c14c16 c12 c11 c10 c8 c7 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c18 c25 c24 c26 eTT

R.8

T.1

T.9

G.8

H.8

6 5

K.2 ca18

K.3

K.6

K.8 ca19

L.1

L.9

L.4

3.7 2 14 3 c1.

5.1ca12ca11 ca16

4.8 cQ.1

7.8 c14c16 c12 c11 c10 c8 c7 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c25 c24 c26 eTT

R.8

T.1

T.9

G.8

H.8

6 5

K.2 ca18

K.3

K.6

K.8 ca19

L.1

L.9

L.4

3.7 2 14 3

5.1ca12ca11 ca16

4.8 cQ.1

7.8c14c16 c12 c11 c10 c8 c7 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c18 c25 c24 c26 eTT ca18

K.3

K.6

K.8 ca19

L.1

L.9

L.4

3.7 2 14 3 c1.

5.1ca12ca11 ca16

4.8

4D 4E

4B

4A

4C cQ.1

7.8

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/1

/2

:5

:2

P

M

GI101

PHASING PLANS

AJC

133CA

1/16" = 1'-0"

BASEMENT - PHASING PLAN PHASE 1

1/16" = 1'-0"

BASEMENT - PHASING PLAN PHASE 2 & 3

1/16" = 1'-0"

FIRST FLOOR - PHASING PLAN PHASE 2

1/16" = 1'-0"

BASEMENT - PHASING PLAN PHASE 4

0' 8' 16' 32' 64'

SCALE: 1/16" = 1'-0"

Mark Revisions: Date:

A VA Revisions 07/05/2023

07/05/2023 REVISIONS

DNUP

UP

DN

Pass-through Window

Floor Access Hatch

Clean ELV

STORAGE SPS

BD183A

DECONTAMINATION

WORK AREA

BD181

STORAGE,

WATER

TREATMENT &

DETERGENT

BD181E

DECONTAMINATION

BD182

SCOPE

PROCESSING

BD182A

CLEAN

WORKROOM,

INSTRUMENT

SET

BD183

CART RETURN

BD181C

UNLOADING/

COOLING

BD181D

STERIL. AREA,

STEAM

BD184

HAC

BD181F

STORAGE,

STERILE

DURABLES

BD185

STERIL. AREA,

LOW TEMP

BD184A

CART WASHER

BD181B

CART WASHER

BD181A

SCOPE

STAGING

BD182B

TELECOM

BC108

UNLOADING/COOLING

BD184B

SS EQUIP.

BD184C

VESTIBULE

BD186

VESTIBULE

BD183B

WORKST. 05

BC106J

WORKST. 02

BC106F

PPE

BC106K

DISPATCH AREA

BC107B

WORKSTATION,

CASE CART

DISPATCH

BC107A

HAC

BC107G

STORAGE,

CLEAN

BC107E

PPE

BC107H

CLEAN

CORRIDOR

BC107F

VENDOR

DROP-OFF /

PICK-UP

BD172

WORKST. 09

BD174A

LOCKER, MALE

BD176

STAFF LOUNGE

BD178

TOILET

BD177A

TRAINING

ROOM

BD174

WORKST. 03

BC106G

CORRIDOR

BC105

HALL

BD175A

HALL

BD176B

CORRIDOR

BD177

OPEN SPACE

BC102

CART LOBBY

BD171A

SOILED ELEV

B-EL-DL01

CORRIDOR

BD171

HALL

BC107C

CASE CART

STORAGE

BC107D

TLT/SHW M

BD176D

TLT/SHW M

BD176C

PPE ALCOVE

BD179

ANTEROOM,

SOILED

TRANSITION /

DROP-OFF

BD180

CORRIDOR

BD171C

CORRIDOR

BD171B

DECONTAMINATION

CASE CART

AREA

BD180A

HALL

BD176A

HALL

BD185A

CASE CART

ASSEMBLY

BD185B

CASE CART

ASSEMBLY

BC107

WORKST. 08

BD172A

WORKST. 06

BD174B

COPIER /

WORKST. 07

BC106C

HALL

BC106L

OFFICE, AO /

WORKST. 01

BC106D

OFFICE, SPS

DEPUTY CHIEF

BC106A

OFFICE, SPS

CHIEF

BC106

HALL

BC106B

WORKST. 04

BC106H

OPEN SPACE

BD168

LOCKER,

FEMALE

BD175

HALL

BD175BTLT/SHW F

BD175D

TLT/SHW F

BD175C

CART LIFT

CB149 - 133

Department Legend

1 - DECONTAMINATION AREA

2 - SCOPE PROCESSING AREA

3 - PREPARATION AND

ASSEMBLY AREA

4 - STERILIZATION AREA

5 - RECEIVING, STORAGE AND

DISPATCH AREA

6 - STAFF AND

ADMINISTRATIVE AREA

7 - SUPPORT

Pass-through Window

Floor Access Hatch

Clean ELV

STORAGE SPS

BD183A

DECONTAMINATION

WORK AREA

BD181

STORAGE,

WATER

TREATMENT &

DETERGENT

BD181E

DECONTAMINATION

BD182

SCOPE

PROCESSING

BD182A

CLEAN

WORKROOM,

INSTRUMENT

SET

BD183

CART RETURN

BD181C

UNLOADING/

COOLING

BD181D

STERIL. AREA,

STEAM

BD184

HAC

BD181F

STORAGE,

STERILE

DURABLES

BD185

STERIL. AREA,

LOW TEMP

BD184A

CART WASHER

BD181B

CART WASHER

BD181A

SCOPE

STAGING

BD182B

TELECOM

BC108

UNLOADING/COOLING

BD184B

SS EQUIP.

BD184C

VESTIBULE

BD186

VESTIBULE

BD183B

WORKST. 05

BC106J

WORKST. 02

BC106F

PPE

BC106K

DISPATCH AREA

BC107B

WORKSTATION,

CASE CART

DISPATCH

BC107A

HAC

BC107G

STORAGE,

CLEAN

BC107E

PPE

BC107H

CLEAN

CORRIDOR

BC107F

VENDOR

DROP-OFF /

PICK-UP

BD172

WORKST. 09

BD174A

LOCKER, MALE

BD176

STAFF LOUNGE

BD178

TOILET

BD177A

TRAINING

ROOM

BD174

WORKST. 03

BC106G

CORRIDOR

BC105

HALL

BD175A

HALL

BD176B

CORRIDOR

BD177

OPEN SPACE

BC102

CART LOBBY

BD171A

SOILED ELEV

B-EL-DL01

HALL

BC107C

CASE CART

STORAGE

BC107D

COPIER /

WORKST. 07

BC106C

WORKST. 04

BC106H

OFFICE, SPS

DEPUTY CHIEF

BC106A

OFFICE, SPS

CHIEF

BC106

HALL

BC106B

WORKST. 08

BD172A

LOCKER,

FEMALE

BD175

OFFICE, AO /

WORKST. 01

BC106D

HALL

BC106L

WORKST. 06

BD174B TLT/SHW F

BD175D

TLT/SHW F

BD175C

HALL

BD175B

HALL

BD176A

TLT/SHW M

BD176C

TLT/SHW M

BD176D

PPE ALCOVE

BD179

ANTEROOM,

SOILED

TRANSITION /

DROP-OFF

BD180

DECONTAMINATION

CASE CART

AREA

BD180A

CORRIDOR

BD171B

CORRIDOR

BD171CCORRIDOR

BD171

CASE CART

ASSEMBLY

BD185B

HALL

BD185A

CASE CART

ASSEMBLY

BC107

OPEN SPACE

BD168

CART LIFT

CB149 - 133

FLOW DIAGRAM LEGEND

SOILED CASE CART & RME

CLEAN CASE CART & RME

STERILE CASE CART & RME

CASE CART & RME

DECONTAMINATION, SCOPE PROCESSING STAFF

ADMINISTRATIVE AND SPS STAFF

CLEAN, STERILE, ASSEMBLY, DISPATCH STAFF

SPS STAFF

FLOW DIRECTION

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/1

/2

:5

:5

P

M

GI102

FLOW DIAGRAMS

AJC

133CA

0' 8' 16' 32'

SCALE: 3/32" = 1'-0"

3/32" = 1'-0"

BASEMENT - CART & RME FLOW DIAGRAM

3/32" = 1'-0"

BASEMENT - STAFF - FLOW DIAGRAM

Mark Revisions: Date:

A VA Revisions 07/05/2023

07/05/2023 REVISIONS

BID ALTERNATES GENERAL NOTES & LEGEND

GENERAL BID ALTERNATE NOTES:

THE BID ALTERNATE NARRATIVE AND BID ALTERNATE FLOOR PLANS PROVIDE A

GENERAL OVERVIEW FOR PROJECT BIDS AS DESIGNED. NEITHER THE NARRATIVE NOR

THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF BID

ALTERNATES OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY

RELATE TO BID ALTERNATES. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL

SCOPE OF BID ALTERNATES AS DESCRIBED HEREIN AND WORK WITH THE PROJECT

CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION

PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS

DETAILS OF EACH BID ALTERNATE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO):

TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY

WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN BID ALTERNATES, INFECTION

CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION

CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.

REFER TO ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.

HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE

GENERAL BID ALTERNATE PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL

CLARIFYING INFORMATION. COPIES OF THE MOST CURRENT ASBESTOS REPORT AND

LEAD-BASE PAINT REPORT ARE TO BE OBTAINED FROM THE COR.

THIS BID ALTERNATE PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES

DIRECTLY ADJACENT TO WORKING SPS AREAS. SPECIAL CARE SHALL BE TAKEN BY THE

CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC. IN

SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE

HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP

ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST

THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME

ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL

ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT

DEPARTMENTS.

BID ALTERNATE 1 BID ALTERNATE 2 BID ALTERNATE 3

BID ALTERNATE 1 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 1A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, CEILINGS FINISHES, AND SPS EQUIPMENT IN THEIR ENTIREY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.

1A. OFFICE, SPS CHIEF BC106; OFFICE, SPS DEPUTY CHIEF BC106A; HALL BC106B; COPIER / WORKST. 07 BC106C;

OFFICE, AO / WORKST. 01 BC106D; WORKST. 02 BC106F; WORKST. 03 BC106G; WORKST. 04 BC106H; WORKST. 05 BC106J;

PPE BC106K.

BID ALTERNATE 2 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 2A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, & CEILING FINISHES. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW

WALL, FLOOR, & CEILING FINISHES FROM BASE BID.

2A. CASE CART STORAGE BC107D; STORAGE CLEAN BC107E.

BID ALTERNATE 3 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES., SEE NOTE 3A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, & CEILING FINISHES AND SPS EQUIPMENT IN THEIR ENTIRETY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.

3A. CORRIDOR BD171B; CORRIDOR BD171C.

BID ALTERNATE 4 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 4A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, CEILING FINISHES, AND SPS EQUIPMENT IN THEIR ENTERITY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.

4A. TRAINING ROOM BD174; WORKST. 09 BD174A; WORKST. 10 BD174B; LOCKER, FEMALE BD175; HALL BD175A; HALL BD BD175B;

TLT/SHW F BD175C; TLT/SHW F BD175D; LOCKER, MALE BD176; HALL BD176A; HALL BD 176B; TLT/SHW M BD176C;

TLT/SHW M BD176D; CORRIDOR BD177; TOILET BD177A.; STAFF LOUNGE BD178.

NOTES

A. CONSTRUCTION COSTS INCLUDES ALL LABOR AND MATERIALS THAT WOULD BE USED TO CONSTRUCT NEW ROOMS & SPACES.

B. MATERIALS INCLUDE ALL ROOM FINISHES FOR FLOORS, WALLS, & CEILINGS; AND ALL MEP ITEMS, FIXTURES, AND EQUIPMENT.

BID ALTERNATE 4

SHELL SPACE

BC106A

768 SF

c14.c16. c12. c11. c10. c8. c7.

caG.

caH.

caK.

ca15.ca14.ca13.

eSs.

cTt.

cT.

cS.

cR.

cQ.

c18.

c25.

ca24.

c26.

CTT.

T.9.

G.8.

H.8.

ca18.

K.6.ca19.

ca12.ca11. ca16.

cQ.1.

12'-3"

CART HOLDING,

CLEAN

BC107D

0 SF/ 332 SF

ORSS1

STORAGE,

CLEAN

BC107E

240 SF/ 378 SF

SRS05

TELECOM

CLOSET

BC108

0 SF/ 109 SF

OPEN SPACE

BC102

586 SF

CORRIDOR

BC105

402 SF

CLEAN

CORRIDOR

BC107F

0 SF/ 118 SF

HALL

BC107C

155 SF

CASE CART

ASSEMBLY

BC107

120 SF/ 309 SF

CSCQ1

DISPATCH AREA

BC107B

80 SF/ 99 SF

CHC01

HAC

BC107G

60 SF/ 65 SF

JANC2

WORKSTATION,

CASE CART

DISPATCH

BC107A

56 SF/ 59 SF

OFA07

ELEV

B-EL-DL01

34 SF

CORRIDOR

BD171B

477 SF

CORRIDOR

BD171C

189 SF

CASE CART

ASSEMBLY

BD185B

120 SF/ 416 SF

CSCQ1

PPE ALCOVE

BD179

0 SF/ 140 SF

CSPE1

ANTEROOM,

SOILED

TRANSITION /

DROP-OFF

BD180

120 SF/ 152 SF

DECONTAMINATION

CASE CART

AREA

BD180A

990 SF/ 147 SF

OFFICE

BC110

127 SF

OFFICE

BC112

98 SF

TELECOM

BC113

194 SF

STAFF LOUNGE

BD178

360 SF/ 349 SF

SL001

TOILET

BD177A

60 SF/ 61 SF

TNPG1

LOCKER, MALE

BD176

476 SF/ 276 SF

LR002

HALL

BD175A

91 SF

HALL

BD176B

39 SF

CORRIDOR

BD177

109 SF

LOCKER,

FEMALE

BD175

476 SF/ 315 SF

LR002

HALL

BD175B

59 SF

TLT/SHW F

BD175D

80 SF/ 78 SF

TLT/SHW F

BD175C

80 SF/ 80 SF

TLT/SHW M

BD176D

80 SF/ 94 SF

TLT/SHW M

BD176C

80 SF/ 84 SF

HALL

BD176A

80 SF/ 80 SF

WORKST. 07

BD174A

56 SF/ 57 SF

OFA07

WORKST. 06

BD174B

56 SF/ 56 SF

OFA07

TRAINING ROOM

BD174

240 SF/ 238 SF

CFR01

ADMIN SPACE

BC106

265 SF

VENDOR

DROP-OFF /

PICK-UP

BD172

120 SF/ 90 SF

SRS01

CART LOBBY

BD171A

64 SF

WORKST. 08

BD172A

56 SF/ 53 SF

OFA07

CORRIDOR

BD171

126 SF

OPEN SPACE

BD168

243 SF

OFFICE

BC111

88 SF

7' -8

/8

BA01

BA01a

BA01b

BID ALTERNATE 1

.c14..c16. .c12. .c11. .c10. .c8. .c7.

.caG.

.caH.

.caK.

.ca15..ca14..ca13.

cQ.177

.eTt.

.cT.

.cS.

.cR.

.cQ.

.c18.

.c25.

.c24.

.c26.

.eTT.

.T.9.

.G.8.

.H.8.

.ca18.

.K.6..ca19.

.ca12..ca11. .ca16.

.cQ.1.

SHELL SPACE

BC106A

768 SF

TELECOM

CLOSET

BC108

0 SF/ 109 SF

OPEN SPACE

BC102

586 SF

CORRIDOR

BC105

402 SF

CLEAN

CORRIDOR

BC107F

0 SF/ 118 SF

HALL

BC107C

149 SF

CASE CART

ASSEMBLY

BC107

120 SF/ 304 SF

CSCQ1

DISPATCH AREA

BC107B

80 SF/ 99 SF

CHC01

HAC

BC107G

60 SF/ 65 SF

JANC2

WORKSTATION,

CASE CART

DISPATCH

BC107A

56 SF/ 59 SF

OFA07

ELEV

B-EL-DL01

32 SF

CORRIDOR

BD171B

477 SF

CORRIDOR

BD171C

189 SF

CASE CART

ASSEMBLY

BD185B

120 SF/ 120 SF

CSCQ1

PPE ALCOVE

BD179

0 SF/ 140 SF

CSPE1

ANTEROOM,

SOILED

TRANSITION /

DROP-OFF

BD180

120 SF/ 152 SF

DECONTAMINATION

CASE CART

AREA

BD180A

990 SF/ 147 SF

OFFICE

BC110

127 SF

OFFICE

BC111

88 SF

OFFICE

BC112

101 SF

TELECOM

BC113

191 SF

STAFF LOUNGE

BD178

360 SF/ 349 SF

SL001

TOILET

BD177A

60 SF/ 61 SF

TNPG1

LOCKER, MALE

BD176

476 SF/ 276 SF

LR002

HALL

BD175A

91 SF

HALL

BD176B

38 SF

CORRIDOR

BD177

109 SF

LOCKER,

FEMALE

BD175

476 SF/ 316 SF

LR002

HALL

BD175B

58 SFTLT/SHW F

BD175D

80 SF/ 78 SF

TLT/SHW F

BD175C

80 SF/ 80 SF

TLT/SHW M

BD176D

80 SF/ 94 SF

TLT/SHW M

BD176C

80 SF/ 84 SF

HALL

BD176A

80 SF/ 80 SF

WORKST. 07

BD174A

56 SF/ 57 SF

OFA07

WORKST. 06

BD174B

56 SF/ 56 SF

OFA07

TRAINING ROOM

BD174

240 SF/ 238 SF

CFR01

ADMIN SPACE

BC106

260 SF

VENDOR

DROP-OFF /

PICK-UP

BD172

120 SF/ 90 SF

SRS01

CART LOBBY

BD171A

64 SF

WORKST. 08

BD172A

56 SF/ 53 SF

OFA07

CORRIDOR

BD171

126 SF

OPEN SPACE

BD168

243 SF

SHELL SPACE

BC107D

712 SF

BA02

BA02a

BA02b

BID ALTERNATE 1

BID ALTERNATE 2

B C

D

.2

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/1

/2

:5

:0

P

M

GI103

BID ALTERNATE 1 & 2

133CA

3/32" = 1'-0" D1

BASEMENT - NEW CONSTRUCTION - PHASE 4 - BID ALTERNATE 1

3/32" = 1'-0"

D5

BASEMENT - NEW CONSTRUCTION - PHASE 4 - BID ALTERNATE 2

BID ALTERNATE KEYNOTES

KEY KEYNOTE

BA01 IF BID ALTERNATE 1 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES, CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, AND

INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.

BA01a IF BID ALTERNATE 1 IS ACCEPTED, DO NOT CONSTRUCT NEW OFFICES AND WORKSTATIONS.

BA01b IF BID ALTERNATE 1 IS ACCEPTED, CONSTRUCT NEW ADMIN SPACE BC106, ROOM FINISHES TO BE THE SAME AS

OFFICE, SPS CHIEF BC106.

BA02 IF BID ALTERNATE 2 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES, CEILING FINISHES, AND TEMPORARY BARRIER WALLS IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, AND INFILL

FLOORS AND WALLS TO MATCH ADJACENT SURFACES.

BA02a IF BID ALTERNATE 2 IS ACCEPTED, DO NOT CONSTRUCT NEW STORAGE CLEAN AND CASE CART STORAGE

SPACES.

BA02b IF BID ALTERNATE 2 IS ACCEPTED, CONTRACTOR TO PROVIDE & CONSTRUCT NEW WALL TYPE D1 TO SEPARATE

NEW SPACES FROM UNFINISHED SPACES.

BA03 IF BID ALTERNATE 3 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES (QUARRY TILE), CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.

BA04 IF BID ALTERNATE 4 IS ACCEPTED, REMOVE ONLY THE EXISTING FLOOR FINISHES (QUARRY TILE), CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL

PATCH, REPAIR, AND INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.

BA04a IF BID ALTERNATE 4 IS ACCEPTED, DO NOT CONSTRUCT NEW TRAING ROOM, LOCKER ROOMS, TOILET/SHOWERS, AND STAFF LOUNGE.

BA04c IF BID ALTERNATE 4 IS ACCEPTED, THE EXISTING ROOMS, FLOOR FINISHES, CEILING FINISHES, FIXTURES AND EQUIPMENT ARE TO REMAIN IN PLACE AND KEPT IN FUNCTIONING ORDER FOR VA TO KEEP IN USE.

BA04d IF BID ALTERNATE 4 IS ACCEPTED, THE EXISTING STAFF OFFICES ARE TO REMAIN IN PLACE AND KEPT IN

FUNCTIONING ORDER FOR VA TO KEEP IN USE.

0' 8' 16' 32'

SCALE: 3/32" = 1'-0"

Mark Revisions: Date:

BID ALTERNATES GENERAL NOTES & LEGEND

GENERAL BID ALTERNATE NOTES:

THE BID ALTERNATE NARRATIVE AND BID ALTERNATE FLOOR PLANS PROVIDE A

GENERAL OVERVIEW FOR PROJECT BIDS AS DESIGNED. NEITHER THE NARRATIVE NOR

THE DRAWINGS ARE INTENDED TO FULLY COMMUNICATE EVERY ASPECT OF BID

ALTERNATES OR THE ENTIRE SEQUENCE OF CONSTRUCTION ACTIVITIES AS THEY

RELATE TO BID ALTERNATES. THE CONTRACTOR SHALL UNDERSTAND THE GENERAL

SCOPE OF BID ALTERNATES AS DESCRIBED HEREIN AND WORK WITH THE PROJECT

CONTRACTING OFFICER'S REPRESENTATIVE (COR) THROUGHOUT THE CONSTRUCTION

PROCESS TO DEVELOP APPROPRIATE PLANS FOR APPROACHING THE VARIOUS

DETAILS OF EACH BID ALTERNATE OF THE PROJECT, INCLUDING (BUT NOT LIMITED TO):

TIMING OF CHANGES TO BUILDING SYSTEMS, EXACT LOCATIONS OF TEMPORARY

WALLS AND EGRESS DOORS, TRANSITIONS BETWEEN BID ALTERNATES, INFECTION

CONTROL MEASURES, HAZARDOUS MATERIALS ABATEMENT, CONSTRUCTION

CIRCULATION PATHWAYS, AND EMERGENCY PREPAREDNESS.

REFER TO ABATEMENT SPECIFICATION SECTIONS IN THE SPECIFICATIONS MANUAL.

HAZARDOUS MATERIALS SHALL BE ABATED IN A MANNER CONGRUENT WITH THE

GENERAL BID ALTERNATE PLAN. REFER ALSO TO DEMOLITION PLANS FOR ADDITIONAL

CLARIFYING INFORMATION. COPIES OF THE MOST CURRENT ASBESTOS REPORT AND

LEAD-BASE PAINT REPORT ARE TO BE OBTAINED FROM THE COR.

THIS BID ALTERNATE PLAN INCLUDES LOCATING ACTIVE CONSTRUCTION ZONES

DIRECTLY ADJACENT TO WORKING SPS AREAS. SPECIAL CARE SHALL BE TAKEN BY THE

CONTRACTOR TO COORDINATE DISRUPTIVE ACTIVITIES (NOISE, VIBRATION, ETC. IN

SUCH A WAY AS TO MINIMIZE THEIR IMPACT ON THE VA'S ABILITY TO PROVIDE

HEALTHCARE SERVICES. THE PROJECT COR SHALL HAVE THE AUTHORITY TO STOP

ANY ACTIVITY DEEMED TOO DISRUPTIVE FOR HOSPITAL OPERATIONS AND WILL ASSIST

THE CONTRACTOR IN SCHEDULING AN APPROPRIATE TIME OR PLACE FOR THE SAME

ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE COR IN ADVANCE OF ANY AND ALL

ACTIVITIES THAT COULD HAVE THE POTENTIAL TO DISRUPT THE ADJACENT

DEPARTMENTS.

BID ALTERNATE 1 BID ALTERNATE 2 BID ALTERNATE 3

BID ALTERNATE 1 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 1A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, CEILINGS FINISHES, AND SPS EQUIPMENT IN THEIR ENTIREY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.

1A. OFFICE, SPS CHIEF BC106; OFFICE, SPS DEPUTY CHIEF BC106A; HALL BC106B; COPIER / WORKST. 07 BC106C;

OFFICE, AO / WORKST. 01 BC106D; WORKST. 02 BC106F; WORKST. 03 BC106G; WORKST. 04 BC106H; WORKST. 05 BC106J;

PPE BC106K.

BID ALTERNATE 2 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 2A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, & CEILING FINISHES. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW

WALL, FLOOR, & CEILING FINISHES FROM BASE BID.

2A. CASE CART STORAGE BC107D; STORAGE CLEAN BC107E.

BID ALTERNATE 3 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES., SEE NOTE 3A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, & CEILING FINISHES AND SPS EQUIPMENT IN THEIR ENTIRETY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.

3A. CORRIDOR BD171B; CORRIDOR BD171C.

BID ALTERNATE 4 - DO NOT CONSTRUCT THE FOLLOWING NEW ROOMS & SPACES, SEE NOTE 4A. CONTRACTOR TO REMOVE ALL EXISTING WALL, FLOOR, CEILING FINISHES, AND SPS EQUIPMENT IN THEIR ENTERITY. CONTRACTOR TO DEDUCT ALL COSTS ASSOCIATED WITH NEW WALL, FLOOR, & CEILING FINISHES FROM BASE BID.

4A. TRAINING ROOM BD174; WORKST. 09 BD174A; WORKST. 10 BD174B; LOCKER, FEMALE BD175; HALL BD175A; HALL BD BD175B;

TLT/SHW F BD175C; TLT/SHW F BD175D; LOCKER, MALE BD176; HALL BD176A; HALL BD 176B; TLT/SHW M BD176C;

TLT/SHW M BD176D; CORRIDOR BD177; TOILET BD177A.; STAFF LOUNGE BD178.

NOTES

A. CONSTRUCTION COSTS INCLUDES ALL LABOR AND MATERIALS THAT WOULD BE USED TO CONSTRUCT NEW ROOMS & SPACES.

B. MATERIALS INCLUDE ALL ROOM FINISHES FOR FLOORS, WALLS, & CEILINGS; AND ALL MEP ITEMS, FIXTURES, AND EQUIPMENT.

BID ALTERNATE 4

.c14...c16.. .c12.. .c11.. .c10.. .c8.. .c7..

.caG..

.caH..

.caK..

.ca15...ca14...ca13..

.eSs..

.eTt..

.cT..

.cS..

.cR..

.cQ..

.c18..

.c25..

.c24..

.c26..

.eTT..

.T.9..

.G.8..

.H.8..

.ca18..

.K.6...ca19..

.ca12..cQ.159 .ca16..

.cQ.1..

Shell Space

BC106A

768 SF

12'-3"

TELECOM

CLOSET

BC108

0 SF/ 109 SF

OPEN SPACE

BC102

586 SF

CORRIDOR

BC105

402 SF

CLEAN

CORRIDOR

BC107F

0 SF/ 118 SF

HALL

BC107C

149 SF

CASE CART

ASSEMBLY

BC107

120 SF/ 304 SF

CSCQ1

DISPATCH AREA

BC107B

80 SF/ 99 SF

CHC01

HAC

BC107G

60 SF/ 65 SF

JANC2

WORKSTATION,

CASE CART

DISPATCH

BC107A

56 SF/ 59 SF

OFA07

ELEV

B-EL-DL01

33 SF

OPEN SPACE

BD171B

594 SF

CASE CART

ASSEMBLY

BD185B

120 SF/ 416 SF

CSCQ1

CORRIDOR

BD179

0 SF/ 295 SF

CSPE1

ANTEROOM

SOILED

TRANSITION /

DROP-OFF

BD180

990 SF/ 170 SF

OFFICE

BC110

127 SF

OFFICE

BC111

88 SF

OFFICE

BC112

101 SF

TELECOM

BC113

191 SF

STAFF LOUNGE

BD178

360 SF/ 156 SF

SL001

TOILET

BD177A

60 SF/ 61 SF

TNPG1

LOCKER, MALE

BD176

476 SF/ 276 SF

LR002

HALL

BD175A

91 SF

HALL

BD176B

38 SF

CORRIDOR

BD177

173 SF

LOCKER,

FEMALE

BD175

476 SF/ 316 SF

LR002

HALL

BD175B

58 SF

TLT/SHW F

BD175D

80 SF/ 78 SF

TLT/SHW F

BD175C

80 SF/ 80 SF

TLT/SHW M

BD176D

80 SF/ 94 SF

TLT/SHW M

BD176C

80 SF/ 84 SF

HALL

BD176A

80 SF/ 80 SF

WORKST. 07

BD174A

56 SF/ 57 SF

OFA07

WORKST. 06

BD174B

56 SF/ 56 SF

OFA07

TRAINING ROOM

BD174

240 SF/ 238 SF

CFR01

ADMIN SPACE

BC157

260 SF

VENDOR

DROP-OFF /

PICK-UP

BD172

120 SF/ 90 SF

SRS01

CART LOBBY

BD171A

64 SF

WORKST. 08

BD172A

56 SF/ 53 SF

OFA07

CORRIDOR

BD171

197 SF

OPEN SPACE

BC162

243 SF

SHELL SPACE

BC107D

712 SF

PPE ALCOVE

BD180A

105 SF

BA03

BA03

BID ALTERNATE 1

BID ALTERNATE 2

BID ALTERNATE 3

BD178.3

BD180A.3 BD180.3

BD171B.3

..c14....c16.. ..c12.. ..c11.. ..c10.. ..c8.. ..C7..

..caG..

..caH..

..caK..

..ca15....ca14....ca13..

cQ.15

..eTt

..cT..

..cS..

..cR..

..cQ..

..c18..

..c25..

..c24..

..c26..

..eTT..

..T.9..

..G.8..

..H.8..

..ca18..

..K.6....ca19..

..ca12....ca11.. ..ca16..

..cQ.1..

TELECOM

CLOSET

BC108

0 SF/ 109 SF

OPEN SPACE

BC102

606 SF

TLT

BC106

41 SF

SHWR

BC106A

20 SF

HAC

BC106

58 SF

HAC

BC107G

60 SF/ 65 SF

JANC2

DISPATCH AREA

BC107B

80 SF/ 99 SF

CHC01

WORKSTATION,

CASE CART

DISPATCH

BC107A

56 SF/ 59 SF

OFA07

CLEAN

CORRIDOR

BC107F

0 SF/ 104 SF

CORRIDOR

BC105

406 SF

OFFICE

BC110

127 SF

OFFICE

BC111

88 SF

TELECOM

BC113

191 SF

OFFICE

BC112

101 SF

CART LOBBY

BD171A

63 SF

HALL

BC107C

149 SF

CASE CART

ASSEMBLY

BC107

120 SF/ 304 SF

CSCQ1

CASE CART

ASSEMBLY

BD185B

120 SF/ 118 SF

CSCQ1

CORRIDOR

BD171B

388 SF

PPE

BC102C - 272

0 SF/ 19 SF

CSPE1

M LCKR

BD172

90 SF

F LOCKER

BD172

74 SF

STAFF TLT

BD172A

55 SF

ELEV

B-EL-DL01

35 SF

ELEC

BD170

14 SF

SHELL SPACE

BD175

2174 SF

SHELL SPACE

BC106A

768 SF

SHELL SPACE

BC107D

705 SF

CORRIDOR

BD177

105 SF PPE ALCOVE

BD180A

105 SF

ANTEROOM

SOILED

TRANSITION /

DROP-OFF

BD180

150 SF

CORRIDOR

BD179

295 SF

CORRIDOR

BD171

241 SF

BA04

BA04a

BA04c

BA04c

BA04d

BID ALTERNATE 1

BID ALTERNATE 2

BID ALTERNATE 3

BID ALTERNATE 4

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/1

/2

:5

:0

P

M

GI104

BID ALTERNATE 3 & 4

133CA

3/32" = 1'-0" D1

BASEMENT - NEW CONSTRUCTION - PHASE 4 - BID ALTERNATE 3

3/32" = 1'-0"

D6

BASEMENT - NEW CONSTRUCTION - PHASE 4 - BID ALTERNATE 4

BID ALTERNATE KEYNOTES

KEY KEYNOTE

BA01 IF BID ALTERNATE 1 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES, CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, AND

INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.

BA01a IF BID ALTERNATE 1 IS ACCEPTED, DO NOT CONSTRUCT NEW OFFICES AND WORKSTATIONS.

BA01b IF BID ALTERNATE 1 IS ACCEPTED, CONSTRUCT NEW ADMIN SPACE BC106, ROOM FINISHES TO BE THE SAME AS

OFFICE, SPS CHIEF BC106.

BA02 IF BID ALTERNATE 2 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES, CEILING FINISHES, AND TEMPORARY BARRIER WALLS IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, AND INFILL

FLOORS AND WALLS TO MATCH ADJACENT SURFACES.

BA02a IF BID ALTERNATE 2 IS ACCEPTED, DO NOT CONSTRUCT NEW STORAGE CLEAN AND CASE CART STORAGE

SPACES.

BA02b IF BID ALTERNATE 2 IS ACCEPTED, CONTRACTOR TO PROVIDE & CONSTRUCT NEW WALL TYPE D1 TO SEPARATE

NEW SPACES FROM UNFINISHED SPACES.

BA03 IF BID ALTERNATE 3 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES (QUARRY TILE), CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.

BA04 IF BID ALTERNATE 4 IS ACCEPTED, REMOVE ONLY THE EXISTING FLOOR FINISHES (QUARRY TILE), CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL

PATCH, REPAIR, AND INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.

BA04a IF BID ALTERNATE 4 IS ACCEPTED, DO NOT CONSTRUCT NEW TRAING ROOM, LOCKER ROOMS, TOILET/SHOWERS, AND STAFF LOUNGE.

BA04c IF BID ALTERNATE 4 IS ACCEPTED, THE EXISTING ROOMS, FLOOR FINISHES, CEILING FINISHES, FIXTURES AND EQUIPMENT ARE TO REMAIN IN PLACE AND KEPT IN FUNCTIONING ORDER FOR VA TO KEEP IN USE.

BA04d IF BID ALTERNATE 4 IS ACCEPTED, THE EXISTING STAFF OFFICES ARE TO REMAIN IN PLACE AND KEPT IN

FUNCTIONING ORDER FOR VA TO KEEP IN USE.

0' 8' 16' 32'

SCALE: 3/32" = 1'-0"

Mark Revisions: Date:

MGV

MGV

MGV

THE FOLLOWING IS A SUMMARY OF THE BASIS OF DESIGN NARRATIVE THAT IS INTENDED TO DEMONSTRATE COMPLIANCE WITH APPLICABLE CODES AND STANDARDS. MORE DETAILED CODE ANALYSIS INFORMATION IS PROVIDED ON SUBSEQUENT DRAWING SHEETS AND WITHIN THE

FIRE PROTECTION AND LIFE SAFETY SECTION OF THE DESIGN NARRATIVE.

APPLICABLE CODES:

THE FOLLOWING PRIMARY CODES AND STANDARDS ARE USED AS THE BASIS FOR THE DESIGN

• VA FIRE PROTECTION DESIGN MANUAL (VAFPDM; 8TH EDITION JUNE 1 2021)

• NATIONAL FIRE PROTECTION ASSOCIATION FIRE CODE (NFPA 1; 2021 EDITION)

• NATIONAL FIRE PROTECTION ASSOCIATION STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS (NFPA 13; 2022 EDITION)

• NATIONAL FIRE PROTECTION ASSOCIATION NATIONAL FIRE ALARM AND SIGNALING CODE (NFPA 72, 2022 EDITION)

• NATIONAL FIRE PROTECTION ASSOCIATION LIFE SAFETY CODE (NFPA 101; 2021 EDITION)

• INTERNATIONAL BUILDING CODE (IBC; 2021 EDITION) *NOTE: AS ENFORCED BY VAFPDM §1.3.

BUILDING REHABILITATION SCOPE

THE REHABILITATION SCOPE OF WORK CONSISTS OF AN ADDITION AND A MODIFICATION OF LESS THAN 50% OF THE AREA OF THE BUILDING. IN ACCORDANCE WITH NFPA 101 §43.8.1, THE ADDITION SHALL COMPLY WITH THE SECTIONS OF THE CODE APPLICABLE TO NEW CONSTRUCTION FOR THE OCCUPANCY, AND THE EXISTING PORTION OF THE BUILDING SHALL COMPLY WITH THE REQUIREMENTS FOR EXISTING BUILDINGS FOR THE OCCUPANCY. THEREFORE, THE ADDITION AREAS SHALL COMPLY WITH THE REQUIREMENTS IN NFPA 101 CHAPTER 38 FOR NEW BUSINESS OCCUPANCIES AND THE REMAINDER SHALL COMPLY WITH CHAPTER 39 FOR EXISTING BUSINESS OCCUPANCIES. ALL NEW CONSTRUCTION ELEMENTS WITHIN MODIFICATION AREAS SHALL COMPLY WITH CHAPTER 38 FOR NEW BUSINESS OCCUPANCIES IN ACCORDANCE WITH NFPA 101 §43.5.1.3.

SITE FIRE PROTECTION DESIGN

NONE OF THE ASPECTS OF THE SITE FIRE DEPARTMENT / EMERGENCY VEHICLE ACCESS ARE BEING MODIFIED AS PART OF THIS RENOVATION

SCOPE OF WORK AND ARE TO REMAIN AS IS.

OCCUPANCY CLASSIFICATION:

OCCUPANCY CLASSIFICATION IS DETERMINED IN ACCORDANCE WITH NFPA 101 AS REQUIRED BY THE VAFPDM. AS INDICATED ON THE EXISTING STATEMENT OF CONDITIONS PLANS, THE ENTIRETY OF THE BASEMENT LEVEL OF BUILDING 133CA IS CLASSIFIED AS A BUSINESS OCCUPANCY.

AS PART OF THIS SCOPE OF WORK, THE ADDITION AND MODIFICATION AREAS ARE CLASSIFIED AS NEW BUSINESS OCCUPANCIES IN ACCORDANCE WITH NFPA 101 CHAPTER 38 AND THE EXISTING OUT OF SCOPE AREAS ARE CLASSIFIED AS EXISTING BUSINESS OCCUPANCIES IN

ACCORDANCE WITH NFPA 101 CHAPTER 39.

OCCUPANCY SEPARATIONS:

THE ENTIRE BUILDING IS CLASSIFIED AS BUSINESS OCCUPANCIES AND ALL ADJACENT OCCUPANCIES ARE CLASSIFIED AS BUSINESS AS WELL;

THEREFORE NO OCCUPANCY SEPARATIONS ARE PROVIDED.

BUILDING SEPARATION:

IN ACCORDANCE WITH §2.2.A OF THE VAFPDM, THERE ARE NO REQUIREMENTS FOR SEPARATION OR OPENINGS BETWEEN VA BUILDINGS WHEN ALL BUILDINGS ARE FULLY SPRINKLER PROTECTED. BUILDING 133/CA IS FULLY SPRINKLERED AND ALL EXISTING BUILDING SEPARATIONS ARE

TO REMAIN.

BUILDING CONSTRUCTION TYPE:

AS INDICATED ON EXISTING STATEMENT OF CONDITIONS (SOC) AND RECORD CONSTRUCTION DOCUMENTS, THE EXISTING BUILDING 133/CA IS CLASSIFIED AS CONSTRUCTION TYPE I (332) CONSTRUCTION PER NFPA 220 AND TYPE I-A PER THE IBC; REVIEW OF AS-BUILT DOCUMENTATION ALIGNS WITH THIS CLASSIFICATION. THE REHABILITATION WORK INCLUDED IN THIS SCOPE OF WORK WILL BE DONE IN A MANNER WHICH MAINTAINS THE EXISTING CONSTRUCTION TYPE AND THEREFORE, NO MODIFICATIONS TO THE EXISTING CONSTRUCTION TYPE WILL BE

INCORPORATED AS PART OF THIS SCOPE OF WORK.

FIRE-RESISTANCE RATINGS:

TO ACHIEVE THE REQUIRED FIRE RESISTANCE RATING OF STRUCTURAL ELEMENTS AS SHOWN IN THE FIRE RESISTANCE TABLE FOR TYPE I(332) IMPLEMENT THE FOLLOWING FIRE-RATED ASSEMBLIES, OR OTHER EQUIVALENT SYSTEM. IN ACCORDANCE WITH THE MANUFACTURES INSTRUCTIONS TO PROTECT THE FOLLOWING COMPONENT AND METHOD AS DETERMINED IN ASTM E119 AND UL 263 FOR THE FOLLOWING.

COMPOSITE DECK WITH CONCRETE FILL HAS BEEN DESIGNED TO PROVIDE THE APPLICABLE REQUIRED FIRE RATING FOR FLOORS AND ROOFS WITHOUT THE USE OF APPLIED FIRE PROFFING, UNLESS OTHERWISE NOTED(E.G., WHERE SLAB DEPTRESSION REDUCES CONCRETE

THICKNESS PER (UL DESIGN - D825).

RATED STRUCTURAL COMPONENT: UL DESIGN SYSTEM:

PRIMARY STRUCTURAL FRAME (INTUMESCENT COATING) BXUV.X650

PRIMARY STRUCTURAL FRAME (SPRAY APPLIED FIRE-RESISTIVE MATERIAL) BXUV.D601

COLUMNS BXUV.Y739

FLOORS ASSEMBLIES SUPPORTING MORE THAN TWO FLOORS BXUV.D902

CONCRETE BEAMS BXUV.N864

STEEL TRUSSES BXUV.X701

NON-FRAME SUPPORT BEAMS - FLOORS BXUV.N782

NON-FRAME SUPPORT BEAMS - ROOFS BXUV.S735

ROOFS BXUV.D902

ALLOWABLE HEIGHT & AREA ANALYSIS (NFPA 101 §42.1.6 & IBC TABLES 504.3, 504.4 & 506.2) NFPA 101 DOES NOT INCLUDE CONSTRUCTION TYPE REQUIREMENTS FOR BUSINESS OCCUPANCIES AND THEREFORE §2.1-C OF THE VAFPDM REQUIRES THAT THE HEIGHT AND AREA LIMITATIONS BE IN ACCORDANCE WITH THE IBC. THE NUMBER OF STORIES AND BUILDING HEIGHT ARE NOT AFFECTED AS PART OF THIS SCOPE OF WORK; HOWEVER, THE BUILDING AREA OF THE BASEMENT IS BEING INCREASED BY APPROXIMATELY 6,000 FT2 AS A RESULT OF THIS SCOPE OF WORK. IN ACCORDANCE WITH IBC TABLE 506.2 THE AREA OF A TYPE I-A BUILDING CONTAINING A GROUP B OCCUPANCY IS UNLIMITED; THEREFORE THE PROPOSED SCOPE OF WORK MAINTAINS COMPLIANCE WITH ALLOWABLE

HEIGHT AND AREA REQUIREMENTS AS DICTATED BY THE VAFPDM.

HAZARDOUS AREA SEPARATION:

BUILDING 133/CA CONTAINS HEALTH CARE OCCUPANCIES, THEREFORE, NFPA 101 §18.1.3.11 REQUIRES THAT ANY AREA WITH A HAZARD OF CONTENTS CLASSIFIED HIGHER THAN THAT OF THE HEALTH CARE OCCUPANCY AND LOCATED IN THE SAME BUILDING SHALL BE PROTECTED IN ACCORDANCE WITH NFPA 101 §18.3.2. THE EXISTING SPS AREAS ARE SEPARATED FROM THE REMAINDER OF THE BASEMENT BY SMOKE

PARTITIONS, AND WILL BE MAINTAINED AS INDICATED ON THE LIFE SAFETY PLANS.

SMOKE COMPARTMENTATION

BUSINESS OCCUPANCIES ARE NOT REQUIRED TO BE PROVIDED WITH SMOKE COMPARTMENTS PER NFPA 101 OR THE VAFPDM; HOWEVER, EXISTING SMOKE COMPARTMENT BOUNDARIES ARE MAINTAINED OR MODIFIED TO MAINTAIN COMPARTMENTATION THROUGHOUT BUILDING

133/CA.

EGRESS DESIGN:

ALL EGRESS PROVISIONS ARE PROVIDED IN ACCORDANCE WITH NFPA 101 AND THE VAFPDM.

• OCCUPANT LOAD CALCULATIONS ARE BASED ON THE FACTORS IN NFPA 101 TABLE 7.3.1.2

• NUMBER OF EXITS AND CONFIGURATION IS PROVIDED IN ACCORDANCE WITH NFPA 101 SECTIONS 7.4 AND 7.5.

• EXIT ACCESS AND TRAVEL DISTANCE REQUIREMENTS (TRAVEL DISTANCE LIMITATIONS, COMMON PATH LIMITATIONS, AND DEAD-END

CORRIDORS) ARE IN ACCORDANCE WITH NFPA 101 §A.7.6.

• EXITS MEET THE REQUIREMENTS OF NFPA 101 SECTION 7.1.3.2 AND EGRESS COMPONENTS CONFORM TO THE TYPES AND REQUIREMENTS

IN NFPA 101 SECTION 7.2.

• EGRESS WIDTH AND CAPACITY IS PROVIDED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .