Attachment 5 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 4-8.pdf
PDF 21 MB Posted
- Attached to
- Y1DA--556-402 Expand Sterile Processing Service (SPS) - Construction - Lovell FHCC, North Chicago, IL
- Solicitation number
- 36C77624B0018
About this file
This document appears to be a set of drawings related to the expansion of the Sterile Processing Service (SPS) at the Lovell Federal Health Care Center in North Chicago, Illinois. The drawings are part of the solicitation for Solicitation Number 36C77624B0018, which is for a minor construction project to expand the SPS facility. The solicitation is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The drawings provide details on the construction specifications and layouts for the expanded SPS facility.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
556-402
11/29/2022
EXPAND STERILE PROCESSING
SERVICE (SPS)
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer Stevens & Schaap P.C.
1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.
3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010
IMEG Corp.
263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320
Calibre Engineering, Inc.
9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434
Force Protect Security Cons.
10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/5
/2
:0
:1
P M
GI001
COVER
MP
133CA
C A P T. J A M E S A. L O V E L L F E D E R A L H E A L T H C A R E C E N T E R
EXPAND STERILE PROCESSING SERVICE (SPS)
NORTH CHICAGO, ILLINOIS, 60064
SITE LOCATION
VA Contract Number: 36C77622C0002
VA Point of Contact:
Daniel J. Lid, D: (224) 610-3567, Contracting Officer's Representative (COR)
Mark Revisions: Date: 07/05/2023 REVISIONS
11/29/2022
REV 6/14/2024
Volume 4 of 8
ISSUED 11/29/2022
SET REV 06/14/2024
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
556-402
11/29/2022
EXPAND STERILE PROCESSING
SERVICE (SPS)
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer Stevens & Schaap P.C.
1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.
3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010
IMEG Corp.
263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320
Calibre Engineering, Inc.
9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434
Force Protect Security Cons.
10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/2
/2
:1
:3
P
M
GI002
INDEX OF DRAWINGS
MP
133CA
INDEX OF DRAWINGS
SHEET
NO. SHEET NAME
GENERAL
GI001 COVER
GI002 INDEX OF DRAWINGS
GI101 PHASING PLANS
GI102 FLOW DIAGRAMS
GI103 BID ALTERNATE 1 & 2
GI104 BID ALTERNATE 3 & 4
LIFE SAFETY
LS000 CODE COMPLIANCE SUMMARY PLAN
LS100 PIPE BASEMENT - LIFE SAFETY PLAN
LS101 BASEMENT FLOOR - LIFE SAFETY PLAN
LS102 FIRST FLOOR - LIFE SAFETY PLAN
LS103 EGRESS PHASING COMPLIANCE PLAN - BASEMENT
HAZARDOUS MATERIALS
HA101 BASEMENT FLOOR PLAN – ASBESTOS ABATEMENT
CIVIL
CD100 DEMOLITION PLAN PHASE 1
SP100 SITE PLAN PHASE 1
CS500 SITE DETAILS PHASE 1
CS501 SITE DETAILS PHASE 1
CG100 GRADING PLAN PHASE 1
CU100 OVERALL UTILITY PLAN PHASE 1
CU101 SANITARY SEWER PLAN & PROFILE PHASE 1
CU104 STORM SEWER PLAN AND PROFILE PHASE 1
CU500 STORM SEWER DETAILS PHASE 1
CU501 STORM SEWER DETAILS PHASE 1
STRUCTURAL
SG001 STRUCTURAL GENERAL NOTES
SD1PB.1 PIPE BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 1
SD100.1 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEVATION - PHASE 1
SD100.2 BASEMENT FLOOR - DEMO PLAN & ELEVATION - PHASE 2
SD100.3 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 3
SD100.4 BASEMENT FLOOR - PARTIAL DEMO PLAN - PHASE 4
SB1PB.1 PIPE BASEMENT FLOOR - FNDN. & MUD SLAB PLAN - PHASE 1
SB1PB.2 PIPE BASEMENT FLOOR - FOUNDATION & MUD SLAB - PHASE 2
SB301 STRUCTURAL SECTIONS
SB501 FOUNDATION DETAILS & SCHEDULES
SB502 FOUNDATION DETAILS
SF100.1 BASEMENT FLOOR FRAMING PLAN - PHASE 1
SF100.2 BASEMENT FLOOR FRAMING PLAN - PHASE 2
SF100.3 BASEMENT FLOOR - FRAMING PLAN - PHASE 3
SF101.2 FIRST FLOOR - MECHANICAL PENTHOUSE FRAMING PLAN - PHASE 2
SF102.2 SECOND FLOOR - ROOF FRAMING PLAN - PHASE 2
SF401 ELEVATIONS & DETAILS
SF402 STRUCTURAL RETROFIT ELEVATIONS IN BUILDING 133-C
SF501 FRAMING DETAILS
SF502 FRAMING DETAILS
SF503 FRAMING DETAILS
SF504 FRAMING DETAILS
SF510 LIGHT GAGE FRAMING STRUCTURAL DETAILS
SF511 WALL SECTIONS -LIGHT GAGE INFORMATION
SF600 LIVE LOAD DIAGRAM - BASEMENT FLOOR
SF601 LIVE LOAD DIAGRAM - FIRST FLOOR
ARCHITECTURAL
AG001 ARCHITECTURAL ABBREVIATIONS, LEGENDS AND NOTES
AD1PB.2 PIPE BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2
AD100.1 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 1
AD100.2 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2
AD100.3 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 3
AD100.4 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 4
AD101.2 FIRST FLOOR - DEMOLITION PLAN - PHASE 2
AD102.2 SECOND FLOOR - DEMOLITION PLAN - PHASE 2
AE1PB.2 PIPE BASEMENT FLOOR - FLOOR PLAN - PHASE 2
AE100.1 BASEMENT FLOOR - FLOOR PLAN - PHASE 1
AE100.2 BASEMENT FLOOR - FLOOR PLAN - PHASE 2
AE100.3 BASEMENT FLOOR - FLOOR PLAN - PHASE 3
AE100.4 BASEMENT FLOOR - FLOOR PLAN - PHASE 4
AE101.2 FIRST FLOOR - MECHANICAL PENTHOUSE PLAN - PHASE 2
AE102.2 SECOND FLOOR - ROOF PLAN - PHASE 2
AE110.1 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 1
AE110.2 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 2
AE110.3 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 3
AE110.4 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 4
AE201 EXTERIOR ELEVATIONS
AE301 BUILDING SECTIONS
AE302 WALL SECTIONS
AE303 WALL SECTIONS
AE304 WALL SECTIONS
AE401 ENLARGED PLANS AND ELEVATIONS
AE402 ENLARGED PLANS AND ELEVATIONS
AE501 EXTERIOR DETAILS
AE502 WALL SECTIONS & DETAILS
AE503 EXPANSION JOINT DETAILS
AE504 PLAN DETAILS
AE505 PLAN DETAILS
AE531 CEILING DETAILS
AE601 ROOM PROGRAM SCHEDULE
AE602 DOOR SCHEDULES AND DETAILS
AE801 WALL TYPES
AE901 EXTERIOR RENDERINGS AND INTERIOR 3D VIEWS
AE902 BASEMENT FLOOR - FUNCTIONAL AREA PLAN
INDEX OF DRAWINGS
SHEET
NO. SHEET NAME
INTERIORS
IN100.1 BASEMENT FLOOR - INTERIORS PLAN - PHASE 1
IN100.2 BASEMENT FLOOR - INTERIORS PLAN - PHASE 2
IN100.3 BASEMENT FLOOR - INTERIORS PLAN - PHASE 3
IN100.4 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4
IN100.41 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 1
IN100.42 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 2
IN100.43 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 3
IN100.44 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 4
IN101.2 FIRST FLOOR - INTERIORS PLAN - PHASE 2
IN501 INTERIORS DETAILS
IN601 ROOM FINISH SCHEDULE
IN602 ROOM FINISH SCHEDULE - BID ALTERNATES
IN603 SIGNAGE SCHEDULE
EQUIPMENT
QH100.2C BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA C
QH100.2D BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D
QH100.4A BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA A
QH100.4B BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA B
QH101.2D FIRST FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D
QH601 EQUIPMENT JSN SCHEDULES
FIRE PROTECTION
FA000 FIRE ALARM NOTES AND DETAILS
FA101 BASEMENT - FIRE ALARM PLAN
FA102 FIRST FLOOR - FIRE ALARM PLAN
FX000 FIRE SUPPRESSION NOTES AND DETAILS
FX101 BASEMENT - FIRE SUPPRESSION PLAN
FX102 FIRST FLOOR - FIRE SUPPRESSION PLAN
PLUMBING
P000 PLUMBING COVERSHEET
PD1PB.2 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 2
PD1PB.4 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 4
PD100.4 BASEMENT DEMOLITION - PLUMBING - PHASE 4
P1PB.0 PIPE BASEMENT - PLUMBING - ALL PHASES
P1PB.2 PIPE BASEMENT - PLUMBING - PHASE 2
P1PB.3 PIPE BASEMENT - PLUMBING - PHASE 3
P1PB.4 PIPE BASEMENT - PLUMBING - PHASE 4
P1PB.44 PIPE BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4
P100.0 BASEMENT - PLUMBING - ALL PHASES
P100.2 BASEMENT - PLUMBING - PHASE 2
P100.3 BASEMENT - PLUMBING - PHASE 3
P100.4 BASEMENT - PLUMBING - PHASE 4
P100.44 BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4
P101.0 FIRST FLOOR - PLUMBING - ALL PHASES
P101.2 FIRST FLOOR - PLUMBING - PHASE 2
P102.0 SECOND FLOOR - PLUMBING - ALL PHASES
P102.2 SECOND FLOOR - PLUMBING - PHASE 2
P200 PLUMBING ENLARGED PLAN
P300 D.I. WATER FLOW DIAGRAM
P301 PLUMBING SANITARY-VENT RISER DIAGRAM - PHASE 2
P302 PLUMBING DOMESTIC WATER RISER DIAGRAM - PHASE 2
P303 PLUMBING RISER DIAGRAM - PHASE 4
P304 DI WATER RISER DIAGRAM - PHASE 2
P400 PLUMBING DETAILS
P401 PLUMBING DETAILS
P500 PLUMBING SCHEDULES
MECHANICAL
M000 MECHANICAL COVERSHEET
MD2PB.2 PIPE BASEMENT DEMOLITION - PIPING - PHASE 2
MD100.1 BASEMENT DEMOLITION - VENTILATION - PHASE 1
MD100.2 BASEMENT DEMOLITION - VENTILATION - PHASE 2
MD100.3 BASEMENT DEMOLITION - VENTILATION - PHASE 3
MD100.4 BASEMENT DEMOLITION - VENTILATION - PHASE 4
MD101.2 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 2
MD101.4 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 4
MD102.4 SECOND FLOOR DEMOLITION – VENTILATION – PHASE 4
MD103.4 THIRD FLOOR DEMOLITION – VENTILATION – PHASE 4
MD104.4 FOURTH FLOOR DEMOLITION – VENTILATION – PHASE 4
MD200.4 BASEMENT DEMOLITION - PIPING - PHASE 4
M1PB.2 PIPE BASEMENT - VENTILATION - PHASE 2
M2PB.2 PIPE BASEMENT - PIPING - PHASE 2
M100.0 BASEMENT - VENTILATION - ALL PHASES
M100.1 BASEMENT - VENTILATION - PHASE 1
M100.2 BASEMENT - VENTILATION - PHASE 2
M100.3 BASEMENT - VENTILATION - PHASE 3
M100.4 BASEMENT - VENTILATION - PHASE 4
M100.41 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 1
M100.42 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 2
M100.43 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 3
M100.44 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 4
M101.0 FIRST FLOOR - VENTILATION - ALL PHASES
M101.2 FIRST FLOOR - VENTILATION - PHASE 2
M101.4 FIRST FLOOR - VENTILATION - PHASE 4
M102.0 SECOND FLOOR - VENTILATION - ALL PHASES
M102.2 SECOND FLOOR - VENTILATION - PHASE 2
M200.0 BASEMENT - PIPING - ALL PHASES
M200.2 BASEMENT - PIPING - PHASE 2
M200.4 BASEMENT - PIPING - PHASE 4
M200.44 BASEMENT – PIPING – PHASE 4 – BID ALTERNATE 4
M201.0 FIRST FLOOR - PIPING - ALL PHASES
M201.2 FIRST FLOOR - PIPING - PHASE 2
INDEX OF DRAWINGS
SHEET
NO. SHEET NAME
M300 MECHANICAL DETAILS
M301 MECHANICAL DETAILS
M302 MECHANICAL DETAILS
M303 MECHANICAL DETAILS
M304 AHU COMPONENT PLAN
M305 AIRFLOW MAP
M306 AIRFLOW MAP
M307 STEAM FLOW DIAGRAM
M400 MECHANICAL DIAGRAMS
M401 MECHANICAL DIAGRAMS
M402 MECHANICAL DIAGRAMS
M403 MECHANICAL DIAGRAMS
M600 MECHANICAL SCHEDULES
M601 MECHANICAL SCHEDULES
ELECTRICAL
E000 ELECTRICAL COVERSHEET
ED100.1 BASEMENT DEMOLITION - ELECTRICAL- PHASE 1
ED100.2 BASEMENT DEMOLITION - ELECTRICAL - PHASE 2
ED100.3 BASEMENT DEMOLITION - ELECTRICAL - PHASE 3
ED100.4 BASEMENT DEMOLITION - ELECTRICAL - PHASE 4
E1PB.2 SUB BASEMENT - ELECTRICAL - PHASE 2
E100.0 BASEMENT - POWER - ALL PHASES
E100.1 BASEMENT - POWER - PHASE 1
E100.2 BASEMENT - POWER - PHASE 2
E100.3 BASEMENT - POWER - PHASE 3
E100.4 BASEMENT - POWER - PHASE 4
E100.41 BASEMENT - POWER - PHASE 4 - ALTERNATE 1
E100.42 BASEMENT - POWER - PHASE 4 - ALTERNATE 2
E100.43 BASEMENT - POWER - PHASE 4 - ALTERNATE 3
E100.44 BASEMENT - POWER - PHASE 4 - ALTERNATE 4
E101.0 BASEMENT - LIGHTING - ALL PHASES
E101.1 BASEMENT - LIGHTING - PHASE 1
E101.2 BASEMENT - LIGHTING - PHASE 2
E101.3 BASEMENT - LIGHTING - PHASE 3
E101.4 BASEMENT - LIGHTING - PHASE 4
E101.41 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 1
E101.42 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 2
E101.43 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 3
E101.44 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 4
E200 FIRST FLOOR - POWER - PHASE 2
E201 FIRST FLOOR - LIGHTING - PHASE 2
E301 FIRST FLOOR OVERALL AND ENLARGED ELECTRICAL PLANS
E400 ELECTRICAL DIAGRAMS
E601 ELECTRICAL DETAILS
E602 ELECTRICAL DETAILS
E603 ELECTRICAL DETAILS
E701 ELECTRICAL PANEL SCHEDULES
TECHNOLOGY
T001 TECHNOLOGY COVERSHEET
TD100.1 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 1
TD100.2 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 2
TD100.3 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 3
TD100.4 BASEMENT DEMOLITION - TECHNOLOGY - PHASE 4
T002 OVERALL PLANS - TECHNOLOGY
T003 OVERALL PLANS - TECHNOLOGY
T100.1 BASEMENT - TECHNOLOGY - PHASE 1
T100.2 BASEMENT - TECHNOLOGY - PHASE 2
T100.3 BASEMENT - TECHNOLOGY - PHASE 3
T100.4 BASEMENT - TECHNOLOGY - PHASE 4
T100.41 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 1
T100.42 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 2
T100.43 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 3
T100.44 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 4
T200 TECHNOLOGY ROOM ENLARGEMENTS
T300 TECHNOLOGY DETAILS
T301 TECHNOLOGY DETAILS
T600 TECHNOLOGY SCHEDULES
Mark Revisions: Date:
VOL. 1
VOL. 2
VOL. 3
VOL. 4
VOL. 4
VOL. 5
VOL. 6
VOL. 6
VOL. 7
VOL. 8
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
556-402
11/29/2022
EXPAND STERILE PROCESSING
SERVICE (SPS)
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer Stevens & Schaap P.C.
1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.
3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010
IMEG Corp.
263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320
Calibre Engineering, Inc.
9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434
Force Protect Security Cons.
10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/2 /2
:1
:0
P M
AE901
EXTERIOR RENDERINGS AND
INTERIOR 3D VIEWS
MP
133CA
C1
3D VIEW - DECONTAMINATION WORK AREA
TO CART WASHERS
F1
3D VIEW - STERILE AREA, STEAM
1" = 30'-0" C7
BUILDING RENDERING
Revisions: Date:
Department Legend
1 - DECONTAMINATION
AREA
2 - SCOPE PROCESSING
AREA
3 - PREPARATION AND
ASSEMBLY AREA
4 - STERILIZATION AREA
5 - RECEIVING, STORAGE
AND DISPATCH AREA
6 - STAFF AND
ADMINISTRATIVE AREA
7 - SUPPORT
SS1
SS2
SS3
SS
small
HP1
HP2
HP3
HP4
Floor Access Hatch
Soiled
ELV
Clean ELV
SS4
STORAGE SPS
BD183A
60 SF/ 89 SF
SRSP1
DECONTAMINATION
WORK AREA
BD181
990 SF/ 1066 SF
CSDE1
STORAGE,
WATER
TREATMENT &
DETERGENT
BD181E
210 SF/ 210 SF
CSWT1
DECONTAMINATION
BD182
120 SF/ 173 SF
CSSD1
SCOPE
PROCESSING
BD182A
265 SF/ 270 SF
CSSP1
CLEAN
WORKROOM,
INSTRUMENT
SET
BD183
1175 SF/ 1129 SF
CSIA1
CART RETURN
BD181C
30 SF/ 32 SF
CHC01
UNLOADING/
COOLING
BD181D
135 SF/ 138 SF
CHC01
STERIL. AREA,
STEAM
BD184
320 SF/ 460 SF
CSSS1
HAC
BD181F
60 SF/ 64 SF
JANC2
STORAGE,
STERILE
DURABLES
BD185
240 SF/ 572 SF
SRS05
STERIL. AREA,
LOW TEMP
BD184A
120 SF/ 240 SF
CSLT1
CART WASHER 2
BD181B
180 SF/ 166 SF
CWSH2
CART WASHER 1
BD181A
180 SF/ 162 SF
CWSH2
SCOPE STAGING
BD182B
60 SF/ 93 SF
CSST1
TELECOM
BC108
0 SF/ 111 SF
UNLOADING/COOLING
BD184B
0 SF/ 221 SF
CHC01
SS EQUIP.
BD184C
0 SF/ 246 SF
CSSS1
VESTIBULE
BD186
0 SF/ 87 SF
LOB02
VESTIBULE
BD183B
0 SF/ 72 SF
LOB02
WORKST. 05
BC106J
56 SF/ 59 SF
OFA07
WORKST. 02
BC106F
56 SF/ 53 SF
OFA07
PPE
BC106K
0 SF/ 73 SF
CSPE1
DISPATCH AREA
BC107B
80 SF/ 105 SF
CHC01
WORKSTATION,
CASE CART
DISPATCH
BC107A
56 SF/ 58 SF
OFA07
HAC
BC107G
60 SF/ 64 SF
JANC2
PPE
BC107H
0 SF/ 19 SF
CSPE1
CLEAN
CORRIDOR
BC107F
0 SF/ 91 SF
CASE CART
ASSEMBLY
BD185B
120 SF/ 104 SF
CSCQ1
VENDOR
DROP-OFF /
PICK-UP
BD172
120 SF/ 95 SF
SRS01
WORKST. 09
BD174A
56 SF/ 57 SF
OFA07
LOCKER, MALE
BD176
476 SF/ 276 SF
LR002
STAFF LOUNGE
BD178
360 SF/ 349 SF
SL001
TOILET
BD177A
60 SF/ 60 SF
TNPG1
TRAINING ROOM
BD174
240 SF/ 238 SF
CFR01
WORKST. 03
BC106G
56 SF/ 56 SF
OFA07
CORRIDOR
BC105
0 SF/ 423 SF
HALL
BD175A
0 SF/ 91 SF
HALL
BD176B
0 SF/ 38 SF
CORRIDOR
BD177
0 SF/ 108 SF
OPEN SPACE
BC102
0 SF/ 585 SF
CART LOBBY
BD171A
0 SF/ 64 SF
SOILED ELEV
B-EL-DL01
0 SF/ 32 SF
CORRIDOR
BD171
0 SF/ 123 SF
HALL
BC107C
0 SF/ 205 SF
VESTIBULE
BD181H
0 SF/ 45 SF
LOB02
WORKST. 08
BD172A
56 SF/ 56 SF
OFA07
STORAGE,
CLEAN
BC107E
240 SF/ 379 SF
SRS05
CASE CART
STORAGE
BC107D
0 SF/ 329 SF
ORSS1
CASE CART
ASSEMBLY
BC107
120 SF/ 251 SF
CSCQ1
HALL
BD185A
0 SF/ 312 SF
CORRIDOR
BD171B
0 SF/ 485 SF
CORRIDOR
BD171C
0 SF/ 185 SF
PPE ALCOVE
BD179
0 SF/ 140 SF
CSPE1
LOCKER,
FEMALE
BD175
476 SF/ 316 SF
LR002
HALL
BD175B
0 SF/ 58 SF
TLT/SHW F
BD175D
80 SF/ 76 SF
TSSU1
TLT/SHW F
BD175C
80 SF/ 78 SF
TSSU1
OFFICE, SPS
CHIEF
BC106
110 SF/ 112 SF
OFA09
OFFICE, SPS
DEPUTY CHIEF
BC106A
100 SF/ 98 SF
OFA09
HALL
BC106B
0 SF/ 151 SF
OFFICE, AO /
WORKST. 01
BC106D
56 SF/ 55 SF
OFA09
HALL
BC106L
0 SF/ 237 SF
HALL
BC106L
0 SF/ 237 SF
ANTEROOM,
SOILED
TRANSITION /
DROP-OFF
BD180
120 SF/ 153 SF
DECONTAMINATION
CASE CART
AREA
BD180A
990 SF/ 144 SF
CSDE1
TLT/SHW M
BD176D
80 SF/ 93 SF
TSSU1
TLT/SHW M
BD176C
80 SF/ 82 SF
TSSU1
HALL
BD176A
0 SF/ 80 SF
WORKST. 06
BD174B
56 SF/ 55 SF
OFA07
WORKST. 04
BC106H
56 SF/ 56 SF
OFA07
COPIER /
WORKST. 07
BC106C
100 SF/ 98 SF
RPR01
OPEN SPACE
BD168
0 SF/ 243 SF
7.8
7.8
106 SF
CART LIFT
CB149 - 133
OFFICE
BC110
127 SF
OFFICE
BC111
88 SF
TELECOM
BC113
191 SF
OFFICE
BC112
101 SF
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
556-402
11/29/2022
EXPAND STERILE PROCESSING
SERVICE (SPS)
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer Stevens & Schaap P.C.
1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.
3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010
IMEG Corp.
263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320
Calibre Engineering, Inc.
9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434
Force Protect Security Cons.
10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407
KEY PLAN
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/2
/2
:4
:5
P
M
AE902
BASEMENT FLOOR - FUNCTIONAL
AREA PLAN
MP
133CA
1/8" = 1'-0" F1
BASEMENT - FUNCTIONAL AREA - DEPARTMENT PLAN
Mark Revisions: Date:
A VA Revisions 07/05/2023
07/05/2023 REVISIONS
SS
S S S S S S S S S S S S S
S S
S S
S S
S S
S S
S S
S S S
DN
c 1 4c 1 6 c 1 2 c 1 1 c 1 0 c 8 c 7 c 7 c a G c a H c a K c a 1 5c a 1 4c a 1 3 e S s e T t c T c S c R c Q c 1 8 c 2 5 c 2 4 c 2 6 e T T c a 1 8 c a 1 9 c 1 .
c 2 .
c 3 .
c A c a 1 2c a 1 1c a 1 0 c a 1 6
T E M P .
C O R R ID O R 1
B C 0 0 1
3 7 7 S F
C G -2
W P -2
W P -2
W P -2
W P -2
W P -2
C G -1
C G -1
W P -2
C G -1 C G -1
C G -1
B 1
A 3 c Q .1 W P -2
FLOOR FINISH LEGEND
EXIST
7 .8
7 .8
1 0 5 S F
P T T E C H B D 1 6 1 0 - 1 3 3 C A
1 4 0 1 S F
C A S E C A R T B D 1 6 8 - 1 3 3 C A
4 7 S F
J A N B D 1 6 8 B - 1 3 3 C A
1 2 0 1 S F
S P S C L E A N B D 1 6 8 A - 1 3 3 C A
1 0 0 9 S F
S P S
D E C O N T A M IN A T IO N
B D 1 7 1 - 1 3 3 C A
S P S D E C O N B D 1 7 1 A - 1 3 3 C A
1 1 3 S F
E L E V B - E L - D L 0 1
3 6 S F
4 4 S F
E N G C L O S E T B D 1 6 9 - 1 3 3 C A
M L C K R B C 1 0 5 B - 1 3 3
4 4 S F
F L C K R B C 1 0 5 A - 1 3 3
4 8 S F
C O R R ID O R
B C 1 0 5 - 1 3 3
7 4 S F
T L T B C 1 0 6 - 1 3 3
4 4 S F S H W R B C 1 0 6 A - 1 3 3
2 1 S F
H A C B C 1 0 9 - 1 3 3
6 0 S F
M L C K R B C 1 0 7 - 1 3 3
9 4 S F
C O R R ID O R
C B 1 4 7 - 1 3 3
2 0 3 S F
E L E C B C 1 0 4 - 1 3 3
5 3 S F
C S S M A N A G E R - S T O R A G E
B C 1 0 3 - 1 3 3
5 5 S F
C S S M A N A G E R -
IN V E N T O R Y
B C 1 0 3 A - 1 3 3
6 5 S F
S P S S T A F F & C E N T R A L
S U P P L Y L IG H T
S T O R A G E
B C 1 0 2 A - 1 3 3
2 3 0 2 S F
C A R T L IF T
B -E L -C L 0 2
6 3 S F
C A R T L IF T
C B 1 4 9 - 1 3 3
1 0 6 S F
J A N C L O B C 1 0 2 E -1 3 3
7 4 S F
F L O C K E R B D 1 7 2 - 1 3 3 C A
7 4 S F
6 0 S F
M T L T B D 1 6 7 - 1 3 3 C A
C O R R ID O R
C B 1 4 8 - 1 3 3 C A
7 9 4 S F
1 4 S F
E L E C B D 1 7 0 - 1 3 3 C A
5 5 S F
S T A F F T L T B D 1 7 2 A - 1 3 3 C A
P A S S B C 1 0 2 D -1 3 3
2 3 S F C A R T W A S H B C 1 0 2 B -1 3 3
3 6 S F
S T E R IL E
P R O C E S S IN G
B C 1 0 2 C -1 3 3
1 2 5 S F
S P S C H IE F
B C 1 1 0 - 1 3 3
1 2 7 S F
S P S P R O G S U P P O R T
B C 1 1 1 - 1 3 3
8 8 S F
S P S A S S T C H IE F
B C 1 1 2 - 1 3 3
1 0 1 S F
T E L E C O M B C 1 1 3 - 1 3 3
1 9 1 S F
1 7 5 S F
R E C Y C L E B D 1 6 6 A - 1 3 3 C A
7 7 2 S F
H Y D R O T H E R A P Y B D 1 6 2 H - 1 3 3 C A
S T A IR # 3
S W -B -0 3
1 8 0 S F
9 4 S F
B R E A K R O O M B C 1 7 3 - 1 3 3 C A
C E N T R A L
S U P P L Y L IG H T
S T O R A G E B C 1 0 2 - 1 3 3
6 5 1 S F
1 . R E F E R T O A G 0 0 1 F O R G E N E R A L A R C H IT E C T U R A L N O T E S .
2 . S E E S E C T IO N 0 1 0 0 0 0 - G E N E R A L R E Q U IR E M E N T S F O R L IS T IN G A N D D E S C R IP T IO N O F B A S E B ID A N D D E D U C T A L T E R N A T E S . S E E R E S P E C T IV E P R O J E C T M A N U A L S E C T IO N S F O R A D D IT IO N A L D E D U C T
A L T E R N A T E IN F O R M A T IO N .
3 . S E E S E C T IO N 0 9 0 6 0 0 - S C H E D U L E F O R F IN IS H E S F O R A D D IT IO N A L IN F O R M A T IO N O N F IN IS H E S N O T E D O N
D R A W IN G S .
4 . S E E S H E E T IN 6 0 0 S E R IE S F O R R O O M F IN IS H S C H E D U L E IN C L U D IN G A D D IT IO N A L F L O O R A N D W A L L F IN IS H
N O T E S A N D IN S T R U C T IO N S .
5 . S E E S H E E T IN 5 0 1 , T H E V A S IG N A G E D E S IG N G U ID E C H A P T E R 9 A N D S E C T IO N 1 0 1 4 0 0 F O R S IG N A G E
D E T A IL S .
6 . S E E S H E E T IN 6 0 0 S E R IE S F O R S IG N A G E S C H E D U L E .
7 . F O R B ID A L T E R N A T E S H E E T S R E F E R T O S H E E T IN 1 0 0 .4 F O R R E Q U IR E D W A L L P R O T E C T IO N A N D A C C E N T
W A L L L O C A T IO N S .
G E N E R A L IN T E R IO R S N O T E S :
P L A N N O R T H
P ro je c t N u m b e r
B u ild in g N u m b e r
D ra w in g N u m b e r
P ro je c t T it le
L o c a t io n
Is s u e D a te C h e c k e d D ra w n
D ra w in g T it le
A p p ro v e d :
V A F O R M 0 8 - 6 2 3 1
A
F U L L Y S P R IN K L E R E D
O ffic e o f C o n s tru c t io n a n d F a c ilit ie s M a n a g e m e n t
U .S . D e p a r t m e n t o f V e t e r a n s A ffa ir s
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 1 0
P h a s e
A R C H IT E C T /E N G IN E E R O F R E C O R D S T A M P
321 4 5 6 7 8 9 1 0
5 5 6 -4 0 2
1 1 /2 9 /2 0 2 2
E X P A N D S T E R IL E P R O C E S S IN G
S E R V IC E (S P S )
1 0 0 % C O N S T R U C T IO N
D O C U M E N T S
C a p ta in J a m e s A . L o v e ll F e d e ra l H e a lth c a re C e n te r 3 0 0 1 G re e n B a y R o a d , N o r th C h ic a g o , IL 6 0 0 6 4
A le s ia A rc h ite c tu re P .C .
3 7 0 5 N o r th 2 0 0 th S tre e t E lk h o rn , N e b ra s k a 6 8 0 2 2 P h o n e : (4 0 2 ) 2 9 1 -6 9 4 1
S h a ffe r S te v e n s & S c h a a p P .C .
1 0 7 0 H o w a rd S t O m a h a , N e b ra s k a 6 8 1 0 2 P h o n e : (4 0 2 ) 4 5 5 -7 6 9 8 in c a n d e s c e n c e life s a fe ty , in c .
3 5 7 5 R in g s b y C t U n it 4 0 8 , D e n v e r , C O 8 0 2 1 6 P h o n e : (7 2 0 ) 7 2 2 -3 0 1 0
IM E G C o rp .
2 6 3 S h u m a n B lv d . S u ite 5 5 0 N a p e rv ille , IL 6 0 5 6 3 P h o n e : (6 3 0 ) 5 2 7 -2 3 2 0
C a lib re E n g in e e r in g , In c .
9 0 9 0 S R id g e lin e B lv d # 1 0 5 , H ig h la n d s R a n c h , C O 8 0 1 2 9 P h o n e : (3 0 3 ) 7 3 0 -0 4 3 4
F o rc e P ro te c t S e c u r ity C o n s .
1 0 9 0 1 F ro n t B e a c h R o a d , S u ite 1 4 1 5 P a n a m a C ity B e a c h , F L 3 2 4 0 7
K E Y P L A N
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/2 /2
:1
:3
P M
IN 1 0 0 .1
B A S E M E N T F L O O R - IN T E R IO R S P L A N -
P H A S E 1
R J O J P T
1 3 3 C A
1 /8 " = 1 '-0 " F 1
B A S E M E N T F L O O R - IN T E R IO R S P L A N - P H A S E 1 0 ' 4 ' 8 ' 1 6 ' 3 2 '
S C A L E : 1 /8 " = 1 '-0 "
INTERIORS KEYNOTES
KEY KEYNOTE
IN01 TS-1 TRANSITION, FRAME AT INSET MAT-1 AND WALL OUTSIDE CORNER(S).
IN02 TS-2 TRANSITION, WALL INSIDE CORNER COVE.
IN03 TS-3 TRANSITION, FLOOR COVE.
IN04 TS-4 TRANSITION, START/STOP STRIP FOR SEAMLESS RESINOUS FLOORING
SYSTEMS.
IN05 REMOVE EXISTING FLOORING AND INSTALL FLOOR LEVELING COMPOUND
FEATHERED OUT 36" MINIMUM. INSTALL NEW FLOORING TO MATCH EXISTING OR
USE HOSPITAL’S ATTIC STOCK OF EXISTING MATERIALS. ADJACENT FLOORING
TRANSITIONS SHALL BE FLUSH WITH EACH OTHER.
IN06 PATCH, PAINT AND/OR REPAIR TO MATCH ADJACENT FINISHES.
IN07 1/4” PER FOOT MINIMUM SLOPE TO FLOOR DRAIN(S). START SLOPE AT ROOM(S)
PERIMETER.
IN08 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE
PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH
ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS. THE
STAINLESS STEEL PANEL SIZES SHALL BE AS LARGE AS POSSIBLE WITH MINIMAL
JOINTS AND MINIMAL FLUSH EXPOSED FASTENERS. PANELS SHALL BE MOUNTED
ONTOP OF THE COVE BASE CONTINOUS TO THE FINISHED CEILING. ALL JOINTS
AND CONNECTIONS SHALL BE SEALED WITH CLEAR SILICONE AND/OR GASKETED
PER MANUFACTURER’S RECOMMENDATIONS FOR INFECTION CONTROL,
REQUIRED ROOM PRESURIZATIONS AND BALANCING REQUIREMENTS.
IN09 REMOVE EXISTING NON-STRUCTURAL TOPPING, FILL WITH GEOFOAM TOPPED
WITH 3” FIBER-REINFORCED CONCRETE MATCHING TOP OF EXISTING FINISH
FLOOR ELEVATION.
IN10 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE
PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH
ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS.
Revisions: Date:
S S S S S S S S S S S S S
S S
S S
S S
S S
S S
S S
S S S
SS
SS
DN
S S T L
S S
T L
S S
T L
S S
T L
R E
S -W
-4
R E
S -W
-4
R E
S -W
-4
R E S -W -4
R E S -W -4
R E S -W -4
R E S -W -4
R E S -W -4 c 1 4c 1 6 c 1 2 c 1 1 c 1 0 c 8 c 7 c 7 c a G c a H c a K c a 1 5c a 1 4c a 1 3 e S s e T t c T c S c R c Q c 1 8 c 2 5 c 2 4 c 2 6 e T T
R .8
T .1
T .9
G .8
H .8
6 5
K .2 c a 1 8
K .3
K .6
K .8 c a 1 9
L .1
L .9
L .4
3 .7 2 14 3 c 1 .
c 2 .
c 3 .
c A
5 .1c a 1 2c a 1 1c a 1 0 c a 1 6
4 .8
FLOOR FINISH LEGEND
EXIST
MAT-1
RES-6A
RES-6B
RES-6B / MAT-1
SVT-SD-1
S T O R A G E S P S B D 1 8 3 A
6 0 S F / 8 9 S F S R S P 1
D E C O N T A M IN A T IO N
W O R K A R E A
B D 1 8 1
9 9 0 S F / 1 0 7 0 S F C S D E 1
S T O R A G E , W A T E R
T R E A T M E N T & D E T E R G E N T
B D 1 8 1 E
2 1 0 S F / 2 1 0 S F C S W T 1
D E C O N T A M IN A T IO N
B D 1 8 2
1 2 0 S F / 1 7 3 S F C S S D 1
S C O P E
P R O C E S S IN G
B D 1 8 2 A
2 6 5 S F / 2 7 0 S F C S S P 1
C A R T R E T U R N B D 1 8 1 C
3 0 S F / 3 4 S F C H C 0 1
U N L O A D IN G /
C O O L IN G
B D 1 8 1 D
1 3 5 S F / 1 3 8 S F C H C 0 1
S T E R IL E A R E A ,
S T E A M B D 1 8 4
3 2 0 S F / 4 6 0 S F C S S S 1
H A C B D 1 8 1 F
6 0 S F / 6 4 S F J A N C 2
S T O R A G E , S T E R IL E
D U R A B L E S B D 1 8 5
2 4 0 S F / 5 7 2 S F S R S 0 5
S T E R IL . A R E A ,
L O W T E M P
B D 1 8 4 A
1 2 0 S F / 2 4 0 S F C S L T 1
C A R T W A S H E R 2 B D 1 8 1 B
1 8 0 S F / 1 6 6 S F C W S H 2
C A R T W A S H E R 1 B D 1 8 1 A
1 8 0 S F / 1 6 2 S F C W S H 2
S C O P E S T A G IN G
B D 1 8 2 B
6 0 S F / 9 3 S F C S S T 1
T E L E C O M C L O S E T
B C 1 0 8
0 S F / 1 1 1 S F
U N L O A D IN G /C O O L IN G
B D 1 8 4 B
0 S F / 2 2 1 S F C H C 0 1
S S E Q U IP .
B D 1 8 4 C
0 S F / 2 4 6 S F C S S S 1
V E S T IB U L E
B D 1 8 6
8 7 S F L O B 0 2
V E S T IB U L E
B D 1 8 3 B
7 2 S F
H A L L B D 1 8 5 A
3 1 3 S F
T E M P .
C O R R ID O R 2
B C 0 0 2
7 2 S F
T E M P . S P A C E B C 0 0 3
5 1 8 S F
C G -1 C G -1
C G -1
C G -1C G -1 C G -1
C G -1C G -1
C G -1C G -1
C G -1C G -1
C L E A N W O R K R O O M , IN S T R U M E N T
S E T B D 1 8 3
1 1 7 5 S F / 1 1 2 9 S F
C S IA 1
V E S T IB U L E
B D 1 8 1 H
4 5 S F
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1 C G -1 C G -1
C G -1C G -1
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1C G -1
C G -1 C G -1
C G -1C G -1
C G -1
C G -1
C G -1
C G -1 C G -1
C G -1 C G -1
C G -1
C G -1
C G -1
C G -2
C G -1
W P -2
W P -2
W P -2
W P -2 W P -2
W P -2
W P -2
W P -2
W P -2
W P -2
W P -2
W P -2
W P -2
W P -2
W P -2 W P -2
A 1
B 1
B 1 B 1 A 3
A 3
A 1
A 1
A 1
A 1
A 1
A 1
A 1
A 1 A 1
A 1
A 1
A 1
A 1
C 1
C 1 c Q .1
C G -2
C G -1
C G -1
C G -1
C G -1
W P -2 C G -1
W P -2
W P -2
C G -2 C G -2
W P -2
W P -2
W P -2 W P -2 C G -2
W P -2
W P -2 W P -2
W P -2 C G -2
W P -2 W P -2
W P -2
W P -2
W P -2
W P -2
W P -2
IN 0 8
IN 0 8
IN 1 0 0 .2
D 9
C G -1
E J -2
E J -2
E J -1
E J -1
E J -1
IN 0 9
IN 0 9
7 .8
7 .8
IN 1 0
IN 1 0IN 1 0
IN 1 0
IN 1 0
1 0 5 S F
P T T E C H B D 1 6 1 0 - 1 3 3 C A
1 4 0 1 S F
C A S E C A R T B D 1 6 8 - 1 3 3 C A
4 7 S F
J A N B D 1 6 8 B - 1 3 3 C A
1 2 0 1 S F
S P S C L E A N B D 1 6 8 A - 1 3 3 C A
1 0 0 9 S F
S P S
D E C O N T A M IN A T IO N
B D 1 7 1 - 1 3 3 C A
S P S D E C O N B D 1 7 1 A - 1 3 3 C A
1 1 3 S F
E L E V B - E L - D L 0 1
3 6 S F
4 4 S F
E N G C L O S E T B D 1 6 9 - 1 3 3 C A
M L C K R B C 1 0 5 B - 1 3 3
4 4 S F
F L C K R B C 1 0 5 A - 1 3 3
4 8 S F
C O R R ID O R
B C 1 0 5 - 1 3 3
7 4 S F
T L T B C 1 0 6 - 1 3 3
4 4 S F S H W R B C 1 0 6 A - 1 3 3
2 1 S F
H A C B C 1 0 9 - 1 3 3
6 0 S F
M L C K R B C 1 0 7 - 1 3 3
9 4 S F
C O R R ID O R
C B 1 4 7 - 1 3 3
2 0 3 S F
E L E C B C 1 0 4 - 1 3 3
5 3 S F
C S S M A N A G E R - S T O R A G E
B C 1 0 3 - 1 3 3
5 5 S F
C S S M A N A G E R -
IN V E N T O R Y
B C 1 0 3 A - 1 3 3
6 5 S F
S P S S T A F F & C E N T R A L
S U P P L Y L IG H T
S T O R A G E
B C 1 0 2 A - 1 3 3
2 3 0 2 S F
C A R T L IF T
B -E L -C L 0 2
6 3 S F
C A R T L IF T
C B 1 4 9 - 1 3 3
1 0 6 S F
J A N C L O B C 1 0 2 E -1 3 3
7 4 S F
F L O C K E R B D 1 7 2 - 1 3 3 C A
7 4 S F
6 0 S F
M T L T B D 1 6 7 - 1 3 3 C A
C O R R ID O R
C B 1 4 8 - 1 3 3 C A
7 9 4 S F
1 4 S F
E L E C B D 1 7 0 - 1 3 3 C A
5 5 S F
S T A F F T L T B D 1 7 2 A - 1 3 3 C A
P A S S B C 1 0 2 D -1 3 3
2 3 S F C A R T W A S H B C 1 0 2 B -1 3 3
3 6 S F
S T E R IL E
P R O C E S S IN G
B C 1 0 2 C -1 3 3
1 2 5 S F
S P S C H IE F
B C 1 1 0 - 1 3 3
1 2 7 S F
S P S P R O G S U P P O R T
B C 1 1 1 - 1 3 3
8 8 S F
S P S A S S T C H IE F
B C 1 1 2 - 1 3 3
1 0 1 S F
T E L E C O M B C 1 1 3 - 1 3 3
1 9 1 S F
1 7 5 S F
R E C Y C L E B D 1 6 6 A - 1 3 3 C A
7 7 2 S F
H Y D R O T H E R A P Y B D 1 6 2 H - 1 3 3 C A
S T A IR # 3
S W -B -0 3
1 8 0 S F
9 4 S F
B R E A K R O O M B C 1 7 3 - 1 3 3 C A
1 . R E F E R T O A G 0 0 1 F O R G E N E R A L A R C H IT E C T U R A L N O T E S .
2 . S E E S E C T IO N 0 1 0 0 0 0 - G E N E R A L R E Q U IR E M E N T S F O R L IS T IN G A N D D E S C R IP T IO N O F B A S E B ID A N D D E D U C T A L T E R N A T E S . S E E R E S P E C T IV E P R O J E C T M A N U A L S E C T IO N S F O R A D D IT IO N A L D E D U C T
A L T E R N A T E IN F O R M A T IO N .
3 . S E E S E C T IO N 0 9 0 6 0 0 - S C H E D U L E F O R F IN IS H E S F O R A D D IT IO N A L IN F O R M A T IO N O N F IN IS H E S N O T E D O N
D R A W IN G S .
4 . S E E S H E E T IN 6 0 0 S E R IE S F O R R O O M F IN IS H S C H E D U L E IN C L U D IN G A D D IT IO N A L F L O O R A N D W A L L F IN IS H
N O T E S A N D IN S T R U C T IO N S .
5 . S E E S H E E T IN 5 0 1 , T H E V A S IG N A G E D E S IG N G U ID E C H A P T E R 9 A N D S E C T IO N 1 0 1 4 0 0 F O R S IG N A G E
D E T A IL S .
6 . S E E S H E E T IN 6 0 0 S E R IE S F O R S IG N A G E S C H E D U L E .
7 . F O R B ID A L T E R N A T E S H E E T S R E F E R T O S H E E T IN 1 0 0 .4 F O R R E Q U IR E D W A L L P R O T E C T IO N A N D A C C E N T
W A L L L O C A T IO N S .
G E N E R A L IN T E R IO R S N O T E S :
c 7 c S
R .8
V E S T IB U L E
B D 1 8 6
8 7 S F L O B 0 2
A 1 B 1W P -2 C G -1
W P -2 C G -1
W P -2
6'-0" 1'-0"
1/
4" 8'
-0
7/
8"
M A T -1
R E S -6 B
E J -6
E J -2
E J -6
E J -9
E J -2
IN 0 1
P L A N N O R T H
P ro je c t N u m b e r
B u ild in g N u m b e r
D ra w in g N u m b e r
P ro je c t T it le
L o c a t io n
Is s u e D a te C h e c k e d D ra w n
D ra w in g T it le
A p p ro v e d :
V A F O R M 0 8 - 6 2 3 1
A
F U L L Y S P R IN K L E R E D
O ffic e o f C o n s tru c t io n a n d F a c ilit ie s M a n a g e m e n t
U .S . D e p a r t m e n t o f V e t e r a n s A ffa ir s
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 1 0
P h a s e
A R C H IT E C T /E N G IN E E R O F R E C O R D S T A M P
321 4 5 6 7 8 9 1 0
5 5 6 -4 0 2
1 1 /2 9 /2 0 2 2
E X P A N D S T E R IL E P R O C E S S IN G
S E R V IC E (S P S )
1 0 0 % C O N S T R U C T IO N
D O C U M E N T S
C a p ta in J a m e s A . L o v e ll F e d e ra l H e a lth c a re C e n te r 3 0 0 1 G re e n B a y R o a d , N o r th C h ic a g o , IL 6 0 0 6 4
A le s ia A rc h ite c tu re P .C .
3 7 0 5 N o r th 2 0 0 th S tre e t E lk h o rn , N e b ra s k a 6 8 0 2 2 P h o n e : (4 0 2 ) 2 9 1 -6 9 4 1
S h a ffe r S te v e n s & S c h a a p P .C .
1 0 7 0 H o w a rd S t O m a h a , N e b ra s k a 6 8 1 0 2 P h o n e : (4 0 2 ) 4 5 5 -7 6 9 8 in c a n d e s c e n c e life s a fe ty , in c .
3 5 7 5 R in g s b y C t U n it 4 0 8 , D e n v e r , C O 8 0 2 1 6 P h o n e : (7 2 0 ) 7 2 2 -3 0 1 0
IM E G C o rp .
2 6 3 S h u m a n B lv d . S u ite 5 5 0 N a p e rv ille , IL 6 0 5 6 3 P h o n e : (6 3 0 ) 5 2 7 -2 3 2 0
C a lib re E n g in e e r in g , In c .
9 0 9 0 S R id g e lin e B lv d # 1 0 5 , H ig h la n d s R a n c h , C O 8 0 1 2 9 P h o n e : (3 0 3 ) 7 3 0 -0 4 3 4
F o rc e P ro te c t S e c u r ity C o n s .
1 0 9 0 1 F ro n t B e a c h R o a d , S u ite 1 4 1 5 P a n a m a C ity B e a c h , F L 3 2 4 0 7
K E Y P L A N
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/2 /2
:1
:3
P M
IN 1 0 0 .2
B A S E M E N T F L O O R - IN T E R IO R S P L A N -
P H A S E 2
R J O J P T
1 3 3 C A
1 /8 " = 1 '-0 " F 1
B A S E M E N T F L O O R - IN T E R IO R S P L A N - P H A S E 2 0 ' 4 ' 8 ' 1 6 ' 3 2 '
S C A L E : 1 /8 " = 1 '-0 "
INTERIORS KEYNOTES
KEY KEYNOTE
IN01 TS-1 TRANSITION, FRAME AT INSET MAT-1 AND WALL OUTSIDE CORNER(S).
IN02 TS-2 TRANSITION, WALL INSIDE CORNER COVE.
IN03 TS-3 TRANSITION, FLOOR COVE.
IN04 TS-4 TRANSITION, START/STOP STRIP FOR SEAMLESS RESINOUS FLOORING
SYSTEMS.
IN05 REMOVE EXISTING FLOORING AND INSTALL FLOOR LEVELING COMPOUND
FEATHERED OUT 36" MINIMUM. INSTALL NEW FLOORING TO MATCH EXISTING OR
USE HOSPITAL’S ATTIC STOCK OF EXISTING MATERIALS. ADJACENT FLOORING
TRANSITIONS SHALL BE FLUSH WITH EACH OTHER.
IN06 PATCH, PAINT AND/OR REPAIR TO MATCH ADJACENT FINISHES.
IN07 1/4” PER FOOT MINIMUM SLOPE TO FLOOR DRAIN(S). START SLOPE AT ROOM(S)
PERIMETER.
IN08 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE
PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH
ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS. THE
STAINLESS STEEL PANEL SIZES SHALL BE AS LARGE AS POSSIBLE WITH MINIMAL
JOINTS AND MINIMAL FLUSH EXPOSED FASTENERS. PANELS SHALL BE MOUNTED
ONTOP OF THE COVE BASE CONTINOUS TO THE FINISHED CEILING. ALL JOINTS
AND CONNECTIONS SHALL BE SEALED WITH CLEAR SILICONE AND/OR GASKETED
PER MANUFACTURER’S RECOMMENDATIONS FOR INFECTION CONTROL,
REQUIRED ROOM PRESURIZATIONS AND BALANCING REQUIREMENTS.
IN09 REMOVE EXISTING NON-STRUCTURAL TOPPING, FILL WITH GEOFOAM TOPPED
WITH 3” FIBER-REINFORCED CONCRETE MATCHING TOP OF EXISTING FINISH
FLOOR ELEVATION.
IN10 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE
PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH
ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS.
Revisions: Date:
1 /4 " = 1 '-0 " D 9
E N L A R G E D P L A N - V E S T IB U L E (B D 1 8 6 )
0 ' 2 ' 4 ' 8 ' 1 6 '
S C A L E : 1 /4 " = 1 '-0 "
S S S S S S S S S S S S S
S S
S S
S S
S S
S S
S S
S S S
S S S S S S S
SS
SS
SS
DN
c 1 4c 1 6 c 1 2 c 1 1 c 1 0 c 8 c 7 c 7 c a G c a H c a K c a 1 5c a 1 4c a 1 3 e S s e T t c T c S c R c Q c 1 8 c 2 5 c 2 4 c 2 6 e T T
R .8
T .1
T .9
G .8
H .8
6 5
K .2 c a 1 8
K .3
K .6
K .8 c a 1 9
L .1
L .9
L .4
3 .7 2 14 3 c 1 .
c 2 .
c 3 .
c A
5 .1c a 1 2c a 1 1c a 1 0 c a 1 6
4 .8
T E M P .
C O R R ID O R 3
B C 0 0 3
1 8 0 S F
T E M P .
C O R R ID O R 1
B C 0 0 1
3 9 3 S F
C G -1
C G -1
C G -2
C G -2C G -2
C G -2
W P -2
W P -2
W P -2
W P -2
W P -2
W P -2
W P -2
W P -2
IN 0 5
IN 0 6
C 1 c Q .1
T E M P .
C O R R ID O R 4
B D 0 0 1
1 0 4 S F T E M P .
C O R R ID O R 5
B D 0 0 2
2 9 9 S F
C O R R ID O R
B D 1 7 9
3 0 0 S F
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1
C G -1 W P -2
C G -1
C G -1
W P -2 C G -1
W P -2
W P -2
C G -2
W P -2
W P -2
E J -1
E J -1
E J -1
A N T E R O O M
S O IL E D
T R A N S IT IO N /
D R O P -O F F
B D 1 8 0
1 2 0 S F / 1 5 0 S F C S C R 1
P P E A L C O V E B D 1 8 0 A
1 0 5 S F
T E M P .
C O R R ID O R 6
B D 0 0 3
1 0 5 S F
FLOOR FINISH LEGEND
EXIST
RES-6A
RES 6A
RES-6B
W P -2 W P -2 W P -2 W P -2
W P -2
W P -2
W P -2
W P -2
W P -2
7 .8
7 .8
1 0 5 S F
P T T E C H B D 1 6 1 0 - 1 3 3 C A
1 4 0 1 S F
C A S E C A R T B D 1 6 8 - 1 3 3 C A
4 7 S F
J A N B D 1 6 8 B - 1 3 3 C A
1 2 0 1 S F
S P S C L E A N B D 1 6 8 A - 1 3 3 C A
1 0 0 9 S F
S P S
D E C O N T A M IN A T IO N
B D 1 7 1 - 1 3 3 C A
1 1 3 S F
S P S D E C O N B D 1 7 1 A - 1 3 3 C A
E L E V B - E L - D L 0 1
3 6 S F
4 4 S F
E N G C L O S E T B D 1 6 9 - 1 3 3 C A
M L C K R B C 1 0 5 B - 1 3 3
4 4 S F
F L C K R B C 1 0 5 A - 1 3 3
4 8 S F
C O R R ID O R
B C 1 0 5 - 1 3 3
7 4 S F
T L T B C 1 0 6 - 1 3 3
4 4 S F S H W R
B C 1 0 6 A - 1 3 3
2 1 S F
H A C B C 1 0 9 - 1 3 3
6 0 S F
M L C K R B C 1 0 7 - 1 3 3
9 4 S F
C O R R ID O R
C B 1 4 7 - 1 3 3
2 0 3 S F
E L E C B C 1 0 4 - 1 3 3
5 3 S F
C S S M A N A G E R - S T O R A G E
B C 1 0 3 - 1 3 3
5 5 S F
C S S M A N A G E R -
IN V E N T O R Y
B C 1 0 3 A - 1 3 3
6 5 S F
C E N T R A L
S U P P L Y L IG H T
S T O R A G E B C 1 0 2 - 1 3 3
6 5 1 S F
S P S S T A F F & C E N T R A L
S U P P L Y L IG H T
S T O R A G E
B C 1 0 2 A - 1 3 3
2 3 0 2 S F
C A R T L IF T
B -E L -C L 0 2
6 3 S F
C A R T L IF T
C B 1 4 9 - 1 3 3
1 0 6 S F
J A N C L O B C 1 0 2 E -1 3 3
7 4 S F
7 4 S F
F L O C K E R B D 1 7 2 - 1 3 3 C A
6 0 S F
M T L T B D 1 6 7 - 1 3 3 C A
7 9 4 S F
C O R R ID O R
C B 1 4 8 - 1 3 3 C A
1 4 S F
E L E C B D 1 7 0 - 1 3 3 C A
5 5 S F
S T A F F T L T B D 1 7 2 A - 1 3 3 C A
P A S S B C 1 0 2 D -1 3 3
2 3 S F C A R T W A S H B C 1 0 2 B -1 3 3
3 6 S F
S T E R IL E
P R O C E S S IN G
B C 1 0 2 C -1 3 3
1 2 5 S F
S P S C H IE F
B C 1 1 0 - 1 3 3
1 2 7 S F
S P S P R O G S U P P O R T
B C 1 1 1 - 1 3 3
8 8 S F
S P S A S S T C H IE F
B C 1 1 2 - 1 3 3
1 0 1 S F
T E L E C O M B C 1 1 3 - 1 3 3
1 9 1 S F
1 7 5 S F
R E C Y C L E B D 1 6 6 A - 1 3 3 C A
7 7 2 S F
H Y D R O T H E R A P Y B D 1 6 2 H - 1 3 3 C A
S T A IR # 3
S W -B -0 3
1 8 0 S F
9 4 S F
B R E A K R O O M B C 1 7 3 - 1 3 3 C A
S T O R A G E S P S B D 1 8 3 A
6 0 S F / 8 9 S F S R S P 1
D E C O N T A M IN A T IO N
W O R K A R E A
B D 1 8 1
9 9 0 S F / 1 0 7 0 S F C S D E 1
S T O R A G E , W A T E R
T R E A T M E N T & D E T E R G E N T
B D 1 8 1 E
2 1 0 S F / 2 1 0 S F C S W T 1
D E C O N T A M IN A T IO N
B D 1 8 2
1 2 0 S F / 1 7 3 S F C S S D 1
S C O P E
P R O C E S S IN G
B D 1 8 2 A
2 6 5 S F / 2 7 0 S F C S S P 1
C A R T R E T U R N B D 1 8 1 C
3 0 S F / 3 4 S F C H C 0 1
U N L O A D IN G /
C O O L IN G
B D 1 8 1 D
1 3 5 S F / 1 3 8 S F C H C 0 1
S T E R IL E A R E A ,
S T E A M B D 1 8 4
3 2 0 S F / 4 6 0 S F C S S S 1
H A C B D 1 8 1 F
6 0 S F / 6 4 S F J A N C 2
S T O R A G E , S T E R IL E
D U R A B L E S B D 1 8 5
2 4 0 S F / 5 7 2 S F S R S 0 5
S T E R IL . A R E A ,
L O W T E M P
B D 1 8 4 A
1 2 0 S F / 2 4 0 S F C S L T 1
C A R T W A S H E R 2 B D 1 8 1 B
1 8 0 S F / 1 6 6 S F C W S H 2
C A R T W A S H E R 1 B D 1 8 1 A
1 8 0 S F / 1 6 2 S F C W S H 2
S C O P E S T A G IN G
B D 1 8 2 B
6 0 S F / 9 3 S F C S S T 1
T E L E C O M C L O S E T
B C 1 0 8
0 S F / 1 1 1 S F
U N L O A D IN G /C O O L IN G
B D 1 8 4 B
0 S F / 2 2 1 S F C H C 0 1
S S E Q U IP .
B D 1 8 4 C
0 S F / 2 4 6 S F C S S S 1
V E S T IB U L E
B D 1 8 6
8 7 S F L O B 0 2
H A L L B D 1 8 5 A
3 1 3 S F
V E S T IB U L E
B D 1 8 3 B
7 2 S F
T E M P .
C O R R ID O R 2
B C 0 0 2
7 2 S FT E M P . S P A C E
B C 0 0 3
5 1 8 S F
C L E A N W O R K R O O M , IN S T R U M E N T
S E T B D 1 8 3
1 1 7 5 S F / 1 1 2 9 S F
C S IA 1
1 . R E F E R T O A G 0 0 1 F O R G E N E R A L A R C H IT E C T U R A L N O T E S .
2 . S E E S E C T IO N 0 1 0 0 0 0 - G E N E R A L R E Q U IR E M E N T S F O R L IS T IN G A N D D E S C R IP T IO N O F B A S E B ID A N D D E D U C T A L T E R N A T E S . S E E R E S P E C T IV E P R O J E C T M A N U A L S E C T IO N S F O R A D D IT IO N A L D E D U C T
A L T E R N A T E IN F O R M A T IO N .
3 . S E E S E C T IO N 0 9 0 6 0 0 - S C H E D U L E F O R F IN IS H E S F O R A D D IT IO N A L IN F O R M A T IO N O N F IN IS H E S N O T E D O N
D R A W IN G S .
4 . S E E S H E E T IN 6 0 0 S E R IE S F O R R O O M F IN IS H S C H E D U L E IN C L U D IN G A D D IT IO N A L F L O O R A N D W A L L F IN IS H
N O T E S A N D IN S T R U C T IO N S .
5 . S E E S H E E T IN 5 0 1 , T H E V A S IG N A G E D E S IG N G U ID E C H A P T E R 9 A N D S E C T IO N 1 0 1 4 0 0 F O R S IG N A G E
D E T A IL S .
6 . S E E S H E E T IN 6 0 0 S E R IE S F O R S IG N A G E S C H E D U L E .
7 . F O R B ID A L T E R N A T E S H E E T S R E F E R T O S H E E T IN 1 0 0 .4 F O R R E Q U IR E D W A L L P R O T E C T IO N A N D A C C E N T
W A L L L O C A T IO N S .
G E N E R A L IN T E R IO R S N O T E S :
P L A N N O R T H
P ro je c t N u m b e r
B u ild in g N u m b e r
D ra w in g N u m b e r
P ro je c t T it le
L o c a t io n
Is s u e D a te C h e c k e d D ra w n
D ra w in g T it le
A p p ro v e d :
V A F O R M 0 8 - 6 2 3 1
A
F U L L Y S P R IN K L E R E D
O ffic e o f C o n s tru c t io n a n d F a c ilit ie s M a n a g e m e n t
U .S . D e p a r t m e n t o f V e t e r a n s A ffa ir s
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 1 0
P h a s e
A R C H IT E C T /E N G IN E E R O F R E C O R D S T A M P
321 4 5 6 7 8 9 1 0
5 5 6 -4 0 2
1 1 /2 9 /2 0 2 2
E X P A N D S T E R IL E P R O C E S S IN G
S E R V IC E (S P S )
1 0 0 % C O N S T R U C T IO N
D O C U M E N T S
C a p ta in J a m e s A . L o v e ll F e d e ra l H e a lth c a re C e n te r 3 0 0 1 G re e n B a y R o a d , N o r th C h ic a g o , IL 6 0 0 6 4
A le s ia A rc h ite c tu re P .C .
3 7 0 5 N o r th 2 0 0 th S tre e t E lk h o rn , N e b ra s k a 6 8 0 2 2 P h o n e : (4 0 2 ) 2 9 1 -6 9 4 1
S h a ffe r S te v e n s & S c h a a p P .C .
1 0 7 0 H o w a rd S t O m a h a , N e b ra s k a 6 8 1 0 2 P h o n e : (4 0 2 ) 4 5 5 -7 6 9 8 in c a n d e s c e n c e life s a fe ty , in c .
3 5 7 5 R in g s b y C t U n it 4 0 8 , D e n v e r , C O 8 0 2 1 6 P h o n e : (7 2 0 ) 7 2 2 -3 0 1 0
IM E G C o rp .
2 6 3 S h u m a n B lv d . S u ite 5 5 0 N a p e rv ille , IL 6 0 5 6 3 P h o n e : (6 3 0 ) 5 2 7 -2 3 2 0
C a lib re E n g in e e r in g , In c .
9 0 9 0 S R id g e lin e B lv d # 1 0 5 , H ig h la n d s R a n c h , C O 8 0 1 2 9 P h o n e : (3 0 3 ) 7 3 0 -0 4 3 4
F o rc e P ro te c t S e c u r ity C o n s .
1 0 9 0 1 F ro n t B e a c h R o a d , S u ite 1 4 1 5 P a n a m a C ity B e a c h , F L 3 2 4 0 7
K E Y P L A N
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/2 /2
:1
:4
P M
IN 1 0 0 .3
B A S E M E N T F L O O R - IN T E R IO R S P L A N -
P H A S E 3
R J O J P T
1 3 3 C A
1 /8 " = 1 '-0 " F 1
B A S E M E N T F L O O R - IN T E R IO R S P L A N - P H A S E 3 0 ' 4 ' 8 ' 1 6 ' 3 2 '
S C A L E : 1 /8 " = 1 '-0 "
INTERIORS KEYNOTES
KEY KEYNOTE
IN01 TS-1 TRANSITION, FRAME AT INSET MAT-1 AND WALL OUTSIDE CORNER(S).
IN02 TS-2 TRANSITION, WALL INSIDE CORNER COVE.
IN03 TS-3 TRANSITION, FLOOR COVE.
IN04 TS-4 TRANSITION, START/STOP STRIP FOR SEAMLESS RESINOUS FLOORING
SYSTEMS.
IN05 REMOVE EXISTING FLOORING AND INSTALL FLOOR LEVELING COMPOUND
FEATHERED OUT 36" MINIMUM. INSTALL NEW FLOORING TO MATCH EXISTING OR
USE HOSPITAL’S ATTIC STOCK OF EXISTING MATERIALS. ADJACENT FLOORING
TRANSITIONS SHALL BE FLUSH WITH EACH OTHER.
IN06 PATCH, PAINT AND/OR REPAIR TO MATCH ADJACENT FINISHES.
IN07 1/4” PER FOOT MINIMUM SLOPE TO FLOOR DRAIN(S). START SLOPE AT ROOM(S)
PERIMETER.
IN08 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE
PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH
ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS. THE
STAINLESS STEEL PANEL SIZES SHALL BE AS LARGE AS POSSIBLE WITH MINIMAL
JOINTS AND MINIMAL FLUSH EXPOSED FASTENERS. PANELS SHALL BE MOUNTED
ONTOP OF THE COVE BASE CONTINOUS TO THE FINISHED CEILING. ALL JOINTS
AND CONNECTIONS SHALL BE SEALED WITH CLEAR SILICONE AND/OR GASKETED
PER MANUFACTURER’S RECOMMENDATIONS FOR INFECTION CONTROL,
REQUIRED ROOM PRESURIZATIONS AND BALANCING REQUIREMENTS.
IN09 REMOVE EXISTING NON-STRUCTURAL TOPPING, FILL WITH GEOFOAM TOPPED
WITH 3” FIBER-REINFORCED CONCRETE MATCHING TOP OF EXISTING FINISH
FLOOR ELEVATION.
IN10 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE
PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH
ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS.
Revisions: Date:
S S
S S
S S
S S
S S
S S
S S S
S S
S S S S S S S
SS
SS
SS
SS
SS
DN
P-4
RES-W-4
P -4
P -4
P -4
P-4
P -4
P -4 c14c16 c12 c11 c10 c8 c7 c7 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c18 c25 c24 c26 eTT
R.8
T.1
T.9
G.8
H.8
6 5
K.2 ca18
K.3
K.6
K.8 ca19
L.1
L.9
L.4
3.7 2 14 3 c1.
c2.
c3.
cA
5.1ca12ca11ca10 ca16
4.8
COPIER /
WORKST. 07
BC106C
100 SF/ 98 SF
RPR01
WORKST. 05
BC106J
56 SF/ 59 SF
OFA07
WORKST. 02
BC106F
56 SF/ 53 SF
OFA07
PPE
BC106K
0 SF/ 73 SF
CSPE1
OFFICE, AO /
WORKST. 01
BC106D
56 SF/ 55 SF
OFA09
DISPATCH AREA
BC107B
80 SF/ 105 SF
CHC01
WORKSTATION,
CASE CART
DISPATCH
BC107A
56 SF/ 58 SF
OFA07
HAC
BC107G
60 SF/ 64 SF
JANC2
CLEAN
CORRIDOR
BC107F
0 SF/ 91 SF
VENDOR
DROP-OFF /
PICK-UP
BD172
120 SF/ 95 SF
SRS01
WORKST. 07
BD174A
56 SF/ 57 SF
OFA07
LOCKER, MALE
BD176
476 SF/ 276 SF
LR002
STAFF LOUNGE
BD178
360 SF/ 349 SF
SL001
TOILET
BD177A
60 SF/ 60 SF
TNPG1
TRAINING ROOM
BD174
240 SF/ 238 SF
CFR01
WORKST. 03
BC106G
56 SF/ 56 SF
OFA07
CART LOBBY
BD171A
64 SF
PPE
BC102C - 272
0 SF/ 19 SF
CSPE1
HALL
BD175A
91 SF
HALL
BD176B
38 SF
STORAGE,
CLEAN
BC107E
240 SF/ 379 SF
SRS05
HALL
BC107C
205 SF
OPEN SPACE
BC102
585 SF
OFFICE
BC110
127 SF
OFFICE
BC111
88 SF
TELECOM
BC113
191 SF
SOILED ELEV
B-EL-DL01
36 SF
CORRIDOR
BD171
123 SF
CG-2 CG-2
CG-2
CG-2
CG-2
CG-1 CG-1 CG-1
CG-1CG-1
CG-1
CG-1
CG-1CG-1
CG-1
CG-1
CG-1
CG-2 CG-2
CG-2
CG-2 CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2 CG-2
CG-2
CG-2
CG-2
CG-2
CG-2 CG-2 CG-2
CG-2
CG-2
CG-2 CG-2
CG-2
CG-2
CG-1
CG-1
HR-1
HR-1
HR-1
HR-1
HR-1
HR-1
HR-1
HR-1HR-1
HR-1
HR-1
HR-1
WP-2
WP-2
WP-2
WP-2
WP-2
WP-2
WP-1
WP-1
WP-1
WP-2
WP-1
WP-1
IN04
IN04
IN05
IN06
IN05
IN06
IN05
IN06
IN05
IN06
IN05
IN06
IN06
IN05
IN06
WP-2
WP-2
WP-2
WP-2
A1 A1
A1 A1A1A1
A1
A1
A2 A2
A1
A1
A1
A2
A1
A1
A2
A2
A1
A1
A1
A1
A1
A1
A1
CG-2
cQ.1
CG-1
WP-2
WP-2
CG-2
CG-2 CG-2WP-1
HR-1
CG-2
WORKST. 08
BD172A
56 SF/ 56 SF
OFA07
CASE CART
ASSEMBLY
BD185B
120 SF/ 104 SF
CSCQ1
CORRIDOR
BC105
423 SF
CORRIDOR
BD177
108 SF
PPE ALCOVE
BD179
0 SF/ 140 SF
CSPE1
HALL
BD175B
58 SF
ANTEROOM,
SOILED
TRANSITION /
DROP-OFF
BD180
120 SF/ 153 SF
DECONTAMINATION
CASE CART
AREA
BD180A
990 SF/ 144 SF
CASE CART
STORAGE
BC107D
329 SF
ORSS1
CASE CART
ASSEMBLY
BC107
120 SF/ 251 SF
CSCQ1
OFFICE, SPS
CHIEF
BC106
110 SF/ 112 SF
OFA09
OFFICE, SPS
DEPUTY CHIEF
BC106A
100 SF/ 98 SF
OFA09
HALL
BC106B
151 SF
HALL
BC106L
237 SF
WORKST. 04
BC106H
56 SF/ 56 SF
OFA07
WORKST. 06
BD174B
56 SF/ 55 SF
OFA07
TLT/SHW F
BD175D
80 SF/ 76 SF
TSSU1
TLT/SHW F
BD175C
80 SF/ 78 SF
TSSU1
LOCKER,
FEMALE
BD175
476 SF/ 316 SF
LR002
HALL
BD176A
80 SF
TLT/SHW M
BD176D
80 SF/ 93 SF
TSSU1
TLT/SHW M
BD176C
80 SF/ 82 SF
TSSU1
CORRIDOR
BD171B
0 SF/ 485 SF
CORRIDOR
BD171C
0 SF/ 185 SF
OPEN SPACE
BD168
0 SF/ 243 SF
IN07
IN07
IN07
IN07
IN07
IN07
IN07
IN07
IN07
CG-2
CG-2
CG-2
CG-2
CG-2
HR-1
CG-2
WP-1
WP-1HR-1
WP-1
WP-1
WP-2
CG-1
WP-2
WP-2
WP-2 WP-2
CG-1
WP-2
CG-1
WP-2
WP-2
OFFICE
BC112
101 SF
WP-2WP-2
WP-2
WP-2
WP-2
WP-2
WP-2
WP-2
WP-2
FLOOR FINISH LEGEND
CONC / CS-1
CPT-1
EXIST
PT-1
PT-1 / PT-2
RES-5
RES-6B
RSF-1
WP-2
A3
A1
CG-2
CG-2
WP-2
WP-2
WP-2
WP-2
WP-2
CG-2
CG-2
WP-2
WP-2
WP-2
WP-2
WP-2
WP-2
EJ-1
EJ-1
EJ-1
7.8
7.8
IN09
CG-1
WP-2
WP-2
CG-1
WP-2
WP-2
WP-2
CG-1
CG-1
WP-2
WP-2
CG-1 CART LIFT
CB149 - 133
106 SF
A1
STORAGE SPS
BD183A
60 SF/ 89 SF
SRSP1
DECONTAMINATION
WORK AREA
BD181
990 SF/ 1066 SF
CSDE1
STORAGE,
WATER
TREATMENT &
DETERGENT
BD181E
210 SF/ 210 SF
CSWT1
DECONTAMINATION
BD182
120 SF/ 173 SF
CSSD1
SCOPE
PROCESSING
BD182A
265 SF/ 270 SF
CSSP1
CART RETURN
BD181C
30 SF/ 32 SF
CHC01
UNLOADING/
COOLING
BD181D
135 SF/ 138 SF
CHC01
STERILE AREA,
STEAM
BD184
320 SF/ 460 SF
CSSS1
HAC
BD181F
60 SF/ 64 SF
JANC2
STORAGE,
STERILE
DURABLES
BD185
240 SF/ 572 SF
SRS05
STERIL. AREA,
LOW TEMP
BD184A
120 SF/ 240 SF
CSLT1
CART WASHER 2
BD181B
180 SF/ 166 SF
CWSH2
CART WASHER 1
BD181A
180 SF/ 162 SF
CWSH2
SCOPE STAGING
BD182B
60 SF/ 93 SF
CSST1
TELECOM
CLOSET
BC108
0 SF/ 111 SF
UNLOADING/COOLING
BD184B
0 SF/ 221 SF
CHC01
SS EQUIP.
BD184C
0 SF/ 246 SF
CSSS1
VESTIBULE
BD186
87 SF
LOB02
HALL
BD185A
313 SF
VESTIBULE
BD183B
72 SF
TEMP.
CORRIDOR 2
BC002
72 SFTEMP. SPACE
BC003
518 SF
CLEAN
WORKROOM,
INSTRUMENT
SET
BD183
1175 SF/ 1129 SF
CSIA1
1. REFER TO AG001 FOR GENERAL ARCHITECTURAL NOTES.
2. SEE SECTION 01 00 00 - GENERAL REQUIREMENTS FOR LISTING AND DESCRIPTION OF BASE BID AND
DEDUCT ALTERNATES. SEE RESPECTIVE PROJECT MANUAL SECTIONS FOR ADDITIONAL DEDUCT
ALTERNATE INFORMATION.
3. SEE SECTION 09 06 00 - SCHEDULE FOR FINISHES FOR ADDITIONAL INFORMATION ON FINISHES NOTED ON
DRAWINGS.
4. SEE SHEET IN600 SERIES FOR ROOM FINISH SCHEDULE INCLUDING ADDITIONAL FLOOR AND WALL FINISH
NOTES AND INSTRUCTIONS.
5. SEE SHEET IN501, THE VA SIGNAGE DESIGN GUIDE CHAPTER 9 AND SECTION 10 14 00 FOR SIGNAGE
DETAILS.
6. SEE SHEET IN600 SERIES FOR SIGNAGE SCHEDULE.
7. FOR BID ALTERNATE SHEETS REFER TO SHEET IN100.4 FOR REQUIRED WALL PROTECTION AND ACCENT
WALL LOCATIONS.
GENERAL INTERIORS NOTES:
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
556-402
11/29/2022
EXPAND STERILE PROCESSING
SERVICE (SPS)
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
Shaffer Stevens & Schaap P.C.
1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.
3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010
IMEG Corp.
263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320
Calibre Engineering, Inc.
9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434
Force Protect Security Cons.
10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407
KEY PLAN
A u to d e s k D o c s /2
-2
-4
V
A E x p a n d S te ri le P ro c e s s in g S e rv ic e s
S P
S
D e s ig n /R
-2
V
A
-4
.r v t
/1
/2
:5
:1
P
M
IN100.4
BASEMENT FLOOR - INTERIORS PLAN -
PHASE 4
RJO JPT
133CA
1/8" = 1'-0" F1
BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 0' 4' 8' 16' 32'
SCALE: 1/8" = 1'-0"
INTERIORS KEYNOTES
KEY KEYNOTE
IN01 TS-1 TRANSITION, FRAME AT INSET MAT-1 AND WALL OUTSIDE CORNER(S).
IN02 TS-2 TRANSITION, WALL INSIDE CORNER COVE.
IN03 TS-3 TRANSITION, FLOOR COVE.
IN04 TS-4 TRANSITION, START/STOP STRIP FOR SEAMLESS RESINOUS FLOORING
SYSTEMS.
IN05 REMOVE EXISTING FLOORING AND INSTALL FLOOR LEVELING COMPOUND
FEATHERED OUT 36" MINIMUM. INSTALL NEW FLOORING TO MATCH EXISTING OR
USE HOSPITAL’S ATTIC STOCK OF EXISTING MATERIALS. ADJACENT FLOORING
TRANSITIONS SHALL BE FLUSH WITH EACH OTHER.
IN06 PATCH, PAINT AND/OR REPAIR TO MATCH ADJACENT FINISHES.
IN07 1/4” PER FOOT MINIMUM SLOPE TO FLOOR DRAIN(S). START SLOPE AT ROOM(S)
PERIMETER.
IN08 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE
PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH
ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS. THE
STAINLESS STEEL PANEL SIZES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .