Attachment 15 - 556-402 SPS 100CD Struct Interior Design V2 29NOV22-r14JUN24.pdf

PDF 6 MB Posted

Attached to
Y1DA--556-402 Expand Sterile Processing Service (SPS) - Construction - Lovell FHCC, North Chicago, IL
Solicitation number
36C77624B0018
Issued by

About this file

This document is a 100% Construction Document for the Expand Sterile Processing Service (SPS) project at the Captain James A. Lovell Federal Healthcare Center in North Chicago, Illinois. It contains detailed interior design plans, specifications, and finish schedules for the renovation and expansion of the SPS facilities. Key details include:

The project involves renovating and expanding the Sterile Processing Services (SPS) department at the healthcare center. Interior finishes such as ceramic/porcelain tile, resilient base, resinous flooring, solid surface countertops, interior wood doors, and wall protection are specified. The document includes detailed plan drawings, finish schedules, and product information for the various interior finishes and materials to be used. There are also bid alternates identified for potential scope reductions. This construction document supports federal contract solicitation 36C77624B0018 issued by the Department of Veterans Affairs Technology Acquisition Center in Austin.

View the file

Other files

File Type Posted
S06 - 36C77624B0018 0004.pdf PDF
Attachment 25 - Bid Abstract OF 1419 - SPS North Chicago - Signed.pdf PDF
Attachment 26 - Bid Abstract OF 1419A - SPS North Chicago.pdf PDF
Attachment 24 - 556-402 SPS 100CD Specs Div 221300 Facility Sanitary and Vent Piping.pdf PDF
S06 - 36C77624B0018 0003.pdf PDF
S06 - 36C77624B0018 0002.pdf PDF
Attachment 22 - Technical Questions and Responses - SPS North Chicago.pdf PDF
Attachment 23 - RFI97 Atch - Bldg133CA - LDP-1-F9 QMDP-1-G3.pdf PDF
S06 - 36C77624B0018 0001.pdf PDF
Attachment 21 - Site Visit Sign-in Sheet SPS North Chicago_15JUL24.pdf PDF
Attachment 13 - 556-402 SPS 100CD SpecsV2 29NOV22-r14JUN24.pdf PDF
Attachment 12 - 556-402 SPS 100CD SpecsV1 29NOV22-r14JUN24.pdf PDF
Attachment 20 - Division Cost Breakdown - BLANK.xlsx XLSX spreadsheet
Attachment 11 - 556-402 SPS 100CD Reports 29NOV22.pdf PDF
Attachment 10 - 556-402 Expand SPS - 100CD Equip Cut Sheets - Excerpt.pdf PDF
Attachment 3 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 2-8.pdf PDF
Attachment 16 - Wage Determination - Lake County.pdf PDF
Attachment 14 - 556-402 SPS 100CD Struct Interior Design V1 29NOV22-r14JUN24.pdf PDF
Attachment 7 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 6-8.pdf PDF
Attachment 17 - Limitations on Subcontracting - Construction.docx DOCX document
S02 - 36C77624B0018.pdf PDF
Attachment 4 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 3-8.pdf PDF
Attachment 19 - Contractors Statement for Exempt Organization - Illinois.docx DOCX document
Attachment 6 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 5-8.pdf PDF
Attachment 8 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 7-8.pdf PDF
Attachment 18 - Illinois Tax Language - 1.26.2023 - FINAL.docx DOCX document
Attachment 9 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 8-8.pdf PDF
Attachment 5 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 4-8.pdf PDF
Attachment 1 - 556-402 Expand SPS - GC SOW 29MAR24.docx DOCX document
Attachment 2 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 1-8.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Structural Interior Design

(SID) - Volume 2 U.S. DEPARTMENT OF VETERAN AFFAIRS

3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 60064

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

556-402 / 2021-22

100% CONSTRUCTION DOCUMENTS

11/29/2022

TOC - TABLE OF CONTENTS

TOC TABLE OF CONTENTS

Tuesday, November 29, 2022

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

Tab Title Sequence

STRUCTURAL INTERIOR DESIGN - VOLUME 1

A POINTS OF CONTACT A-1

B INTERIOR DESIGN NARRATIVE B-1

C RENDERINGS AE901

D SECTION 09 06 00 SCHEDULE FOR FINISHES D-1 / D-26

E EXTERIOR FINISHES E-1 /E-9

F INTERIOR FINISHES F-1 / F-25

Tab Title Sequence

STRUCTURAL INTERIOR DESIGN - VOLUME 2

F INTERIOR FINISHES F-26 / F-47

G INTERIORS SHEET LIST IN100.1 - IN603

TOC - 1

Alesia Architecture 556-402 / 2021-22

PART F - INTERIOR FINISHES

PART F INTERIOR FINISHES

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

PT-2 - CERAMIC/PORCELAIN TILING

Manufacturer: Crossville. Prodct: Shades 2.0. Size: 1" x 3". Finish: SPO. Application: Shower floors.

Color: Whites. Contact: Pamela Kocina-Kerzman, (402) 452-0025, pamela.kocina-kerzman@virginiatile.com

F - 26 SID PackageAlesia Architecture

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

PT-3 - CERAMIC/PORCELAIN TILING

Manufacturer: Crossville. Prodct: Moonstruck. Size: 12" x 24". Finish: UPS. Application: Tile base and walls. Color: Gemini. Contact: Pamela Kocina-Kerzman, (402) 452-0025, pamela.kocina-kerzman@virginiatile.com

F - 27

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

PT-4 - CERAMIC/PORCELAIN TILING

Manufacturer: Crossville. Prodct: Moonstruck. Size: 4" x 24". Finish: UPS. Application: Tile base in rooms without tile above on the wall. Color: Gemini. Contact: Pamela Kocina-Kerzman, (402) 452- 0025, pamela.kocina-kerzman@virginiatile.com

F - 28

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

RB-1 - RESILIENT BASE AND ACCESSORIES

Manufacturer: Tarkett. Product: Johnsonite TightLock thermoplastic rubber. Size: 6" high. Color: 32 Pebble. Contact: Andy Crabb, (641) 529-7023, andy.crabb@tarkett.com

F - 29

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

RES-5 - RESINOUS TERRAZZO FLOORING

Manufacturer: Key Resin Company. Product: Terrazzo. Style: Classic Series. Color: Spiced Cider KRT- 1814. Cove Base Height: 6". Contact: Brian Boie, (612) 805-6293, brian@icsmidwest.com

F - 30

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

RES-6A - RESINOUS URETHANE MORTAR FLOORING

Manufacturer: Stonhard. Product: Stonclad UT. Color: Stonkote GS4 #4022 w/ Texture 1. Cove Base Height: 6". Application: Urethane for climatic areas. Contact: Kyle Siedlik, (402) 238-6709, kyle.siedlik@stonhard.com

F - 31

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

RES-6B - RESINOUS EPOXY MORTAR FLOORING

Manufacturer: Stonhard. Product: Stonclad GS. Color: Stonkote GS4 #4022 w/ Texture 1. Cove Base Height: 6". Application: Epoxy for Non-climatic areas. Contact: Kyle Siedlik, (402) 238-6709, kyle.siedlik@stonhard.com

F - 32

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

RES-W-1 - RESINOUS SPECIALTY GLAZED COATING SYSTEMS

Manufacturer: Stonhard. Product: Stonglaze VSE. Color: Ash Gray. Application: Typical scrubbable wall color. Contact: Kyle Siedlik, (402) 238-6709, kyle.siedlik@stonhard.com

F - 33

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

RES-W-2 - RESINOUS SPECIALTY GLAZED COATING SYSTEMS

Manufacturer: Stonhard. Product: Stonglaze VSE. Color: White. Applicationn: Scrubbable GWB ceilings. Contact: Kyle Siedlik, (402) 238-6709, kyle.siedlik@stonhard.com

F - 34

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

RES-W-3 - RESINOUS SPECIALTY GLAZED COATING SYSTEMS

Not used.

F - 35

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

RES-W-4 - RESINOUS SPECIALTY GLAZED COATING SYSTEMS

Manufacturer: Stonhard. Product: Stonglaze VSE. Color: PPG 1144-4 Holly Glen (Custom Color).

Application: Accent scrubbable wall color. Contact: Kyle Siedlik, (402) 238-6709, kyle.siedlik@stonhard.com

F - 36

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

RSF-1 - RESILIENT SHEET FLOORING

Manufacturer: Patcraft. Product: Holistic Shades. Size: 78.74" X 65.62'. Color: 00111 Radiant with color match heat weld at seams. Contact: Luan Scott, (402) 490-4098, luan.scott@patcraft.com

F - 37

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

RSF-2 - RESILIENT TILE FLOORING

Manufacturer: Match existing (similar to Teknoflor). Product: Match existing (similar to Forestscapes HPD). Size: 6’ W x 75’ L rolls. Color: Match existing light wood flooring to match adjacent floor finish (similar to 88061 Tanned).

F - 38

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

SSM-1 - SOLID SURFACE COUNTERTOP

Manufacturer: Corian Solid Surface. Thickness: 1/2". Color: Neutral Aggregate. Application: Staff Lounge countertops w/ eased edges. Contact: Hallmark Building Supplies, Inc. - Kim Brose, 612-791- 4961, Kim@hllmark.com

F - 39

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

ST-1 - INTERIOR WOOD DOORS

Manufacturer: VT Industries. Producr: Architectural Wood Doors. Series: Heritage Collection. Finish:

White Maple to match existing. Contact: April Ruble, (712) 369-0174, Aruble@vtindustries.com

F - 40

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

SVT-SD-1 - RESILIENT TILE FLOORING

Manufacturer: American Biltrite. Product: Electrotile Static Dissipative. Size: 12" x 12". Color: SDT- 143-A1E White/Taupe.

F - 41

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

TS-1 - CERAMIC/PORCELAIN TILING ACCESSORIES

Manufacturer: Schluter Systems. Product: SCHIENE. Size: As needed. Finish: Stainless Steel 304.

Application: Floor transition, wall top, outside corners and cove base metal stop strip. Contact: Ryan Dode, (405) 657-0833, Rdode@schluter.com

F - 42

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

TS-2 - CERAMIC/PORCELAIN TILING ACCESSORIES

Manufacturer: Schluter Systems. Product: DILEX-EHK. Size: As needed. Finish: Stainless Steel 304.

Application: Wall inside corner cove. Contact: Ryan Dode, (405) 657-0833, Rdode@schluter.com

F - 43

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

TS-3 - CERAMIC/PORCELAIN TILING ACCESSORIES

Manufacturer: Schluter. Product: DILEX-HKS. Size: As needed. Finish: Stainless Steel 304 w/ Grey movment joint. Application: Floor cove. Contact: Ryan Dode, (405) 657-0833, Rdode@schluter.com

F - 44

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

TS-4 - RESINOUS MORTAR FLOORING ACCESSORIES

Manufacturer: Manhatton American. Product: L angle. Size: As needed. Finish: Mill. Application:

Zinc divider strips for resinous flooring and base (Transition, Start/Stop and Divider strips for Resinous Floors).

F - 45

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

WP-1 - WALL AND DOOR PROTECTION

Manufacturer: Construction Specialties. Product: .075 Acrovyn 4000 Wall Covering, adhesive mount, with clear silicone at all edges, no accessories. Size: 4’x10’ panels to reduce joints. Texture: Suede.

Color: to Match Existing (934 Pearl field verify). Application: Wall Protection (rigid sheet wainscot).

Contact: Janelle Shortall, (855) 427-4844 ex 6964, Jshortall@c-sgroup.com

F - 46

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 6006

100% CONSTRUCTION DOCUMENTS

WP-2 - WALL AND DOOR PROTECTION

Manufacturer: Construction Specialties. Product: .075 Acrovyn 4000 Wall Covering, adhesive mount, with clear silicone at all edges, no accessories. Size: 4’x10’ panels to reduce joints. Texture: Suede.

Color: 315 Galveston Gray. Application: Wall Protection (rigid sheet wainscot). Contact: Janelle Shortall, (855) 427-4844 ex 6964, Jshortall@c-sgroup.com

F - 47

PART G - INTERIORS SHEET LIST

Drawing Sheet List

PART G INTERIORS SHEET LIST

Tuesday, November 29, 2022

EXPAND STERILE PROCESSING SERVICES (SPS) CAPT. JAMES A. LOVELL FHCC

U.S. DEPARTMENT OF VETERAN AFFAIRS | 3001 GREEN BAY ROAD, NORTH CHICAGO, IL, 600

100% CONSTRUCTION DOCUMENTS

IN100.1 BASEMENT FLOOR - INTERIORS PLAN - PHASE 1

IN100.2 BASEMENT FLOOR - INTERIORS PLAN - PHASE 2

IN100.3 BASEMENT FLOOR - INTERIORS PLAN - PHASE 3

IN100.4 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4

IN100.41 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 1

IN100.42 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 2

IN100.43 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 3

IN100.44 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 4

IN101.2 FIRST FLOOR - INTERIORS PLAN - PHASE 2

IN501 INTERIORS DETAILS

IN601 ROOM FINISH SCHEDULE

IN602 ROOM FINISH SCHEDULE - BID ALTERNATES

IN603 SIGNAGE SCHEDULE

SID Package G - 1

Alesia Architecture

SS

S S S S S S S S S S S S S

S S

S S

S S

S S

S S

S S

S S S

DN

c 1 4c 1 6 c 1 2 c 1 1 c 1 0 c 8 c 7 c 7 c a G c a H c a K c a 1 5c a 1 4c a 1 3 e S s e T t c T c S c R c Q c 1 8 c 2 5 c 2 4 c 2 6 e T T c a 1 8 c a 1 9 c 1 .

c 2 .

c 3 .

c A c a 1 2c a 1 1c a 1 0 c a 1 6

T E M P .

C O R R ID O R 1

B C 0 0 1

3 7 7 S F

C G -2

W P -2

W P -2

W P -2

W P -2

W P -2

C G -1

C G -1

W P -2

C G -1 C G -1

C G -1

B 1

A 3 c Q .1 W P -2

FLOOR FINISH LEGEND

EXIST

7 .8

7 .8

1 0 5 S F

P T T E C H B D 1 6 1 0 - 1 3 3 C A

1 4 0 1 S F

C A S E C A R T B D 1 6 8 - 1 3 3 C A

4 7 S F

J A N B D 1 6 8 B - 1 3 3 C A

1 2 0 1 S F

S P S C L E A N B D 1 6 8 A - 1 3 3 C A

1 0 0 9 S F

S P S

D E C O N T A M IN A T IO N

B D 1 7 1 - 1 3 3 C A

S P S D E C O N B D 1 7 1 A - 1 3 3 C A

1 1 3 S F

E L E V B - E L - D L 0 1

3 6 S F

4 4 S F

E N G C L O S E T B D 1 6 9 - 1 3 3 C A

M L C K R B C 1 0 5 B - 1 3 3

4 4 S F

F L C K R B C 1 0 5 A - 1 3 3

4 8 S F

C O R R ID O R

B C 1 0 5 - 1 3 3

7 4 S F

T L T B C 1 0 6 - 1 3 3

4 4 S F S H W R B C 1 0 6 A - 1 3 3

2 1 S F

H A C B C 1 0 9 - 1 3 3

6 0 S F

M L C K R B C 1 0 7 - 1 3 3

9 4 S F

C O R R ID O R

C B 1 4 7 - 1 3 3

2 0 3 S F

E L E C B C 1 0 4 - 1 3 3

5 3 S F

C S S M A N A G E R - S T O R A G E

B C 1 0 3 - 1 3 3

5 5 S F

C S S M A N A G E R -

IN V E N T O R Y

B C 1 0 3 A - 1 3 3

6 5 S F

S P S S T A F F & C E N T R A L

S U P P L Y L IG H T

S T O R A G E

B C 1 0 2 A - 1 3 3

2 3 0 2 S F

C A R T L IF T

B -E L -C L 0 2

6 3 S F

C A R T L IF T

C B 1 4 9 - 1 3 3

1 0 6 S F

J A N C L O B C 1 0 2 E -1 3 3

7 4 S F

F L O C K E R B D 1 7 2 - 1 3 3 C A

7 4 S F

6 0 S F

M T L T B D 1 6 7 - 1 3 3 C A

C O R R ID O R

C B 1 4 8 - 1 3 3 C A

7 9 4 S F

1 4 S F

E L E C B D 1 7 0 - 1 3 3 C A

5 5 S F

S T A F F T L T B D 1 7 2 A - 1 3 3 C A

P A S S B C 1 0 2 D -1 3 3

2 3 S F C A R T W A S H B C 1 0 2 B -1 3 3

3 6 S F

S T E R IL E

P R O C E S S IN G

B C 1 0 2 C -1 3 3

1 2 5 S F

S P S C H IE F

B C 1 1 0 - 1 3 3

1 2 7 S F

S P S P R O G S U P P O R T

B C 1 1 1 - 1 3 3

8 8 S F

S P S A S S T C H IE F

B C 1 1 2 - 1 3 3

1 0 1 S F

T E L E C O M B C 1 1 3 - 1 3 3

1 9 1 S F

1 7 5 S F

R E C Y C L E B D 1 6 6 A - 1 3 3 C A

7 7 2 S F

H Y D R O T H E R A P Y B D 1 6 2 H - 1 3 3 C A

S T A IR # 3

S W -B -0 3

1 8 0 S F

9 4 S F

B R E A K R O O M B C 1 7 3 - 1 3 3 C A

C E N T R A L

S U P P L Y L IG H T

S T O R A G E B C 1 0 2 - 1 3 3

6 5 1 S F

1 . R E F E R T O A G 0 0 1 F O R G E N E R A L A R C H IT E C T U R A L N O T E S .

2 . S E E S E C T IO N 0 1 0 0 0 0 - G E N E R A L R E Q U IR E M E N T S F O R L IS T IN G A N D D E S C R IP T IO N O F B A S E B ID A N D D E D U C T A L T E R N A T E S . S E E R E S P E C T IV E P R O J E C T M A N U A L S E C T IO N S F O R A D D IT IO N A L D E D U C T

A L T E R N A T E IN F O R M A T IO N .

3 . S E E S E C T IO N 0 9 0 6 0 0 - S C H E D U L E F O R F IN IS H E S F O R A D D IT IO N A L IN F O R M A T IO N O N F IN IS H E S N O T E D O N

D R A W IN G S .

4 . S E E S H E E T IN 6 0 0 S E R IE S F O R R O O M F IN IS H S C H E D U L E IN C L U D IN G A D D IT IO N A L F L O O R A N D W A L L F IN IS H

N O T E S A N D IN S T R U C T IO N S .

5 . S E E S H E E T IN 5 0 1 , T H E V A S IG N A G E D E S IG N G U ID E C H A P T E R 9 A N D S E C T IO N 1 0 1 4 0 0 F O R S IG N A G E

D E T A IL S .

6 . S E E S H E E T IN 6 0 0 S E R IE S F O R S IG N A G E S C H E D U L E .

7 . F O R B ID A L T E R N A T E S H E E T S R E F E R T O S H E E T IN 1 0 0 .4 F O R R E Q U IR E D W A L L P R O T E C T IO N A N D A C C E N T

W A L L L O C A T IO N S .

G E N E R A L IN T E R IO R S N O T E S :

P L A N N O R T H

P ro je c t N u m b e r

B u ild in g N u m b e r

D ra w in g N u m b e r

P ro je c t T it le

L o c a t io n

Is s u e D a te C h e c k e d D ra w n

D ra w in g T it le

A p p ro v e d :

V A F O R M 0 8 - 6 2 3 1

A

F U L L Y S P R IN K L E R E D

O ffic e o f C o n s tru c t io n a n d F a c ilit ie s M a n a g e m e n t

U .S . D e p a r t m e n t o f V e t e r a n s A ffa ir s

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 1 0

P h a s e

A R C H IT E C T /E N G IN E E R O F R E C O R D S T A M P

321 4 5 6 7 8 9 1 0

5 5 6 -4 0 2

1 1 /2 9 /2 0 2 2

E X P A N D S T E R IL E P R O C E S S IN G

S E R V IC E (S P S )

1 0 0 % C O N S T R U C T IO N

D O C U M E N T S

C a p ta in J a m e s A . L o v e ll F e d e ra l H e a lth c a re C e n te r 3 0 0 1 G re e n B a y R o a d , N o r th C h ic a g o , IL 6 0 0 6 4

A le s ia A rc h ite c tu re P .C .

3 7 0 5 N o r th 2 0 0 th S tre e t E lk h o rn , N e b ra s k a 6 8 0 2 2 P h o n e : (4 0 2 ) 2 9 1 -6 9 4 1

S h a ffe r S te v e n s & S c h a a p P .C .

1 0 7 0 H o w a rd S t O m a h a , N e b ra s k a 6 8 1 0 2 P h o n e : (4 0 2 ) 4 5 5 -7 6 9 8 in c a n d e s c e n c e life s a fe ty , in c .

3 5 7 5 R in g s b y C t U n it 4 0 8 , D e n v e r , C O 8 0 2 1 6 P h o n e : (7 2 0 ) 7 2 2 -3 0 1 0

IM E G C o rp .

2 6 3 S h u m a n B lv d . S u ite 5 5 0 N a p e rv ille , IL 6 0 5 6 3 P h o n e : (6 3 0 ) 5 2 7 -2 3 2 0

C a lib re E n g in e e r in g , In c .

9 0 9 0 S R id g e lin e B lv d # 1 0 5 , H ig h la n d s R a n c h , C O 8 0 1 2 9 P h o n e : (3 0 3 ) 7 3 0 -0 4 3 4

F o rc e P ro te c t S e c u r ity C o n s .

1 0 9 0 1 F ro n t B e a c h R o a d , S u ite 1 4 1 5 P a n a m a C ity B e a c h , F L 3 2 4 0 7

K E Y P L A N

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/2 /2

:1

:3

P M

IN 1 0 0 .1

B A S E M E N T F L O O R - IN T E R IO R S P L A N -

P H A S E 1

R J O J P T

1 3 3 C A

1 /8 " = 1 '-0 " F 1

B A S E M E N T F L O O R - IN T E R IO R S P L A N - P H A S E 1 0 ' 4 ' 8 ' 1 6 ' 3 2 '

S C A L E : 1 /8 " = 1 '-0 "

INTERIORS KEYNOTES

KEY KEYNOTE

IN01 TS-1 TRANSITION, FRAME AT INSET MAT-1 AND WALL OUTSIDE CORNER(S).

IN02 TS-2 TRANSITION, WALL INSIDE CORNER COVE.

IN03 TS-3 TRANSITION, FLOOR COVE.

IN04 TS-4 TRANSITION, START/STOP STRIP FOR SEAMLESS RESINOUS FLOORING

SYSTEMS.

IN05 REMOVE EXISTING FLOORING AND INSTALL FLOOR LEVELING COMPOUND

FEATHERED OUT 36" MINIMUM. INSTALL NEW FLOORING TO MATCH EXISTING OR

USE HOSPITAL’S ATTIC STOCK OF EXISTING MATERIALS. ADJACENT FLOORING

TRANSITIONS SHALL BE FLUSH WITH EACH OTHER.

IN06 PATCH, PAINT AND/OR REPAIR TO MATCH ADJACENT FINISHES.

IN07 1/4” PER FOOT MINIMUM SLOPE TO FLOOR DRAIN(S). START SLOPE AT ROOM(S)

PERIMETER.

IN08 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE

PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH

ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS. THE

STAINLESS STEEL PANEL SIZES SHALL BE AS LARGE AS POSSIBLE WITH MINIMAL

JOINTS AND MINIMAL FLUSH EXPOSED FASTENERS. PANELS SHALL BE MOUNTED

ONTOP OF THE COVE BASE CONTINOUS TO THE FINISHED CEILING. ALL JOINTS

AND CONNECTIONS SHALL BE SEALED WITH CLEAR SILICONE AND/OR GASKETED

PER MANUFACTURER’S RECOMMENDATIONS FOR INFECTION CONTROL,

REQUIRED ROOM PRESURIZATIONS AND BALANCING REQUIREMENTS.

IN09 REMOVE EXISTING NON-STRUCTURAL TOPPING, FILL WITH GEOFOAM TOPPED

WITH 3” FIBER-REINFORCED CONCRETE MATCHING TOP OF EXISTING FINISH

FLOOR ELEVATION.

IN10 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE

PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH

ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS.

Revisions: Date:

ISSUED 11/29/2022

SET REV 06/14/2024

S S S S S S S S S S S S S

S S

S S

S S

S S

S S

S S

S S S

SS

SS

DN

S S T L

S S

T L

S S

T L

S S

T L

R E

S -W

-4

R E

S -W

-4

R E

S -W

-4

R E S -W -4

R E S -W -4

R E S -W -4

R E S -W -4

R E S -W -4 c 1 4c 1 6 c 1 2 c 1 1 c 1 0 c 8 c 7 c 7 c a G c a H c a K c a 1 5c a 1 4c a 1 3 e S s e T t c T c S c R c Q c 1 8 c 2 5 c 2 4 c 2 6 e T T

R .8

T .1

T .9

G .8

H .8

6 5

K .2 c a 1 8

K .3

K .6

K .8 c a 1 9

L .1

L .9

L .4

3 .7 2 14 3 c 1 .

c 2 .

c 3 .

c A

5 .1c a 1 2c a 1 1c a 1 0 c a 1 6

4 .8

FLOOR FINISH LEGEND

EXIST

MAT-1

RES-6A

RES-6B

RES-6B / MAT-1

SVT-SD-1

S T O R A G E S P S B D 1 8 3 A

6 0 S F / 8 9 S F S R S P 1

D E C O N T A M IN A T IO N

W O R K A R E A

B D 1 8 1

9 9 0 S F / 1 0 7 0 S F C S D E 1

S T O R A G E , W A T E R

T R E A T M E N T & D E T E R G E N T

B D 1 8 1 E

2 1 0 S F / 2 1 0 S F C S W T 1

D E C O N T A M IN A T IO N

B D 1 8 2

1 2 0 S F / 1 7 3 S F C S S D 1

S C O P E

P R O C E S S IN G

B D 1 8 2 A

2 6 5 S F / 2 7 0 S F C S S P 1

C A R T R E T U R N B D 1 8 1 C

3 0 S F / 3 4 S F C H C 0 1

U N L O A D IN G /

C O O L IN G

B D 1 8 1 D

1 3 5 S F / 1 3 8 S F C H C 0 1

S T E R IL E A R E A ,

S T E A M B D 1 8 4

3 2 0 S F / 4 6 0 S F C S S S 1

H A C B D 1 8 1 F

6 0 S F / 6 4 S F J A N C 2

S T O R A G E , S T E R IL E

D U R A B L E S B D 1 8 5

2 4 0 S F / 5 7 2 S F S R S 0 5

S T E R IL . A R E A ,

L O W T E M P

B D 1 8 4 A

1 2 0 S F / 2 4 0 S F C S L T 1

C A R T W A S H E R 2 B D 1 8 1 B

1 8 0 S F / 1 6 6 S F C W S H 2

C A R T W A S H E R 1 B D 1 8 1 A

1 8 0 S F / 1 6 2 S F C W S H 2

S C O P E S T A G IN G

B D 1 8 2 B

6 0 S F / 9 3 S F C S S T 1

T E L E C O M C L O S E T

B C 1 0 8

0 S F / 1 1 1 S F

U N L O A D IN G /C O O L IN G

B D 1 8 4 B

0 S F / 2 2 1 S F C H C 0 1

S S E Q U IP .

B D 1 8 4 C

0 S F / 2 4 6 S F C S S S 1

V E S T IB U L E

B D 1 8 6

8 7 S F L O B 0 2

V E S T IB U L E

B D 1 8 3 B

7 2 S F

H A L L B D 1 8 5 A

3 1 3 S F

T E M P .

C O R R ID O R 2

B C 0 0 2

7 2 S F

T E M P . S P A C E B C 0 0 3

5 1 8 S F

C G -1 C G -1

C G -1

C G -1C G -1 C G -1

C G -1C G -1

C G -1C G -1

C G -1C G -1

C L E A N W O R K R O O M , IN S T R U M E N T

S E T B D 1 8 3

1 1 7 5 S F / 1 1 2 9 S F

C S IA 1

V E S T IB U L E

B D 1 8 1 H

4 5 S F

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1 C G -1 C G -1

C G -1C G -1

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1C G -1

C G -1 C G -1

C G -1C G -1

C G -1

C G -1

C G -1

C G -1 C G -1

C G -1 C G -1

C G -1

C G -1

C G -1

C G -2

C G -1

W P -2

W P -2

W P -2

W P -2 W P -2

W P -2

W P -2

W P -2

W P -2

W P -2

W P -2

W P -2

W P -2

W P -2

W P -2 W P -2

A 1

B 1

B 1 B 1 A 3

A 3

A 1

A 1

A 1

A 1

A 1

A 1

A 1

A 1 A 1

A 1

A 1

A 1

A 1

C 1

C 1 c Q .1

C G -2

C G -1

C G -1

C G -1

C G -1

W P -2 C G -1

W P -2

W P -2

C G -2 C G -2

W P -2

W P -2

W P -2 W P -2 C G -2

W P -2

W P -2 W P -2

W P -2 C G -2

W P -2 W P -2

W P -2

W P -2

W P -2

W P -2

W P -2

IN 0 8

IN 0 8

IN 1 0 0 .2

D 9

C G -1

E J -2

E J -2

E J -1

E J -1

E J -1

IN 0 9

IN 0 9

7 .8

7 .8

IN 1 0

IN 1 0IN 1 0

IN 1 0

IN 1 0

1 0 5 S F

P T T E C H B D 1 6 1 0 - 1 3 3 C A

1 4 0 1 S F

C A S E C A R T B D 1 6 8 - 1 3 3 C A

4 7 S F

J A N B D 1 6 8 B - 1 3 3 C A

1 2 0 1 S F

S P S C L E A N B D 1 6 8 A - 1 3 3 C A

1 0 0 9 S F

S P S

D E C O N T A M IN A T IO N

B D 1 7 1 - 1 3 3 C A

S P S D E C O N B D 1 7 1 A - 1 3 3 C A

1 1 3 S F

E L E V B - E L - D L 0 1

3 6 S F

4 4 S F

E N G C L O S E T B D 1 6 9 - 1 3 3 C A

M L C K R B C 1 0 5 B - 1 3 3

4 4 S F

F L C K R B C 1 0 5 A - 1 3 3

4 8 S F

C O R R ID O R

B C 1 0 5 - 1 3 3

7 4 S F

T L T B C 1 0 6 - 1 3 3

4 4 S F S H W R B C 1 0 6 A - 1 3 3

2 1 S F

H A C B C 1 0 9 - 1 3 3

6 0 S F

M L C K R B C 1 0 7 - 1 3 3

9 4 S F

C O R R ID O R

C B 1 4 7 - 1 3 3

2 0 3 S F

E L E C B C 1 0 4 - 1 3 3

5 3 S F

C S S M A N A G E R - S T O R A G E

B C 1 0 3 - 1 3 3

5 5 S F

C S S M A N A G E R -

IN V E N T O R Y

B C 1 0 3 A - 1 3 3

6 5 S F

S P S S T A F F & C E N T R A L

S U P P L Y L IG H T

S T O R A G E

B C 1 0 2 A - 1 3 3

2 3 0 2 S F

C A R T L IF T

B -E L -C L 0 2

6 3 S F

C A R T L IF T

C B 1 4 9 - 1 3 3

1 0 6 S F

J A N C L O B C 1 0 2 E -1 3 3

7 4 S F

F L O C K E R B D 1 7 2 - 1 3 3 C A

7 4 S F

6 0 S F

M T L T B D 1 6 7 - 1 3 3 C A

C O R R ID O R

C B 1 4 8 - 1 3 3 C A

7 9 4 S F

1 4 S F

E L E C B D 1 7 0 - 1 3 3 C A

5 5 S F

S T A F F T L T B D 1 7 2 A - 1 3 3 C A

P A S S B C 1 0 2 D -1 3 3

2 3 S F C A R T W A S H B C 1 0 2 B -1 3 3

3 6 S F

S T E R IL E

P R O C E S S IN G

B C 1 0 2 C -1 3 3

1 2 5 S F

S P S C H IE F

B C 1 1 0 - 1 3 3

1 2 7 S F

S P S P R O G S U P P O R T

B C 1 1 1 - 1 3 3

8 8 S F

S P S A S S T C H IE F

B C 1 1 2 - 1 3 3

1 0 1 S F

T E L E C O M B C 1 1 3 - 1 3 3

1 9 1 S F

1 7 5 S F

R E C Y C L E B D 1 6 6 A - 1 3 3 C A

7 7 2 S F

H Y D R O T H E R A P Y B D 1 6 2 H - 1 3 3 C A

S T A IR # 3

S W -B -0 3

1 8 0 S F

9 4 S F

B R E A K R O O M B C 1 7 3 - 1 3 3 C A

1 . R E F E R T O A G 0 0 1 F O R G E N E R A L A R C H IT E C T U R A L N O T E S .

2 . S E E S E C T IO N 0 1 0 0 0 0 - G E N E R A L R E Q U IR E M E N T S F O R L IS T IN G A N D D E S C R IP T IO N O F B A S E B ID A N D D E D U C T A L T E R N A T E S . S E E R E S P E C T IV E P R O J E C T M A N U A L S E C T IO N S F O R A D D IT IO N A L D E D U C T

A L T E R N A T E IN F O R M A T IO N .

3 . S E E S E C T IO N 0 9 0 6 0 0 - S C H E D U L E F O R F IN IS H E S F O R A D D IT IO N A L IN F O R M A T IO N O N F IN IS H E S N O T E D O N

D R A W IN G S .

4 . S E E S H E E T IN 6 0 0 S E R IE S F O R R O O M F IN IS H S C H E D U L E IN C L U D IN G A D D IT IO N A L F L O O R A N D W A L L F IN IS H

N O T E S A N D IN S T R U C T IO N S .

5 . S E E S H E E T IN 5 0 1 , T H E V A S IG N A G E D E S IG N G U ID E C H A P T E R 9 A N D S E C T IO N 1 0 1 4 0 0 F O R S IG N A G E

D E T A IL S .

6 . S E E S H E E T IN 6 0 0 S E R IE S F O R S IG N A G E S C H E D U L E .

7 . F O R B ID A L T E R N A T E S H E E T S R E F E R T O S H E E T IN 1 0 0 .4 F O R R E Q U IR E D W A L L P R O T E C T IO N A N D A C C E N T

W A L L L O C A T IO N S .

G E N E R A L IN T E R IO R S N O T E S :

c 7 c S

R .8

V E S T IB U L E

B D 1 8 6

8 7 S F L O B 0 2

A 1 B 1W P -2 C G -1

W P -2 C G -1

W P -2

6'-0" 1'-0"

1/

4" 8'

-0

7/

8"

M A T -1

R E S -6 B

E J -6

E J -2

E J -6

E J -9

E J -2

IN 0 1

P L A N N O R T H

P ro je c t N u m b e r

B u ild in g N u m b e r

D ra w in g N u m b e r

P ro je c t T it le

L o c a t io n

Is s u e D a te C h e c k e d D ra w n

D ra w in g T it le

A p p ro v e d :

V A F O R M 0 8 - 6 2 3 1

A

F U L L Y S P R IN K L E R E D

O ffic e o f C o n s tru c t io n a n d F a c ilit ie s M a n a g e m e n t

U .S . D e p a r t m e n t o f V e t e r a n s A ffa ir s

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 1 0

P h a s e

A R C H IT E C T /E N G IN E E R O F R E C O R D S T A M P

321 4 5 6 7 8 9 1 0

5 5 6 -4 0 2

1 1 /2 9 /2 0 2 2

E X P A N D S T E R IL E P R O C E S S IN G

S E R V IC E (S P S )

1 0 0 % C O N S T R U C T IO N

D O C U M E N T S

C a p ta in J a m e s A . L o v e ll F e d e ra l H e a lth c a re C e n te r 3 0 0 1 G re e n B a y R o a d , N o r th C h ic a g o , IL 6 0 0 6 4

A le s ia A rc h ite c tu re P .C .

3 7 0 5 N o r th 2 0 0 th S tre e t E lk h o rn , N e b ra s k a 6 8 0 2 2 P h o n e : (4 0 2 ) 2 9 1 -6 9 4 1

S h a ffe r S te v e n s & S c h a a p P .C .

1 0 7 0 H o w a rd S t O m a h a , N e b ra s k a 6 8 1 0 2 P h o n e : (4 0 2 ) 4 5 5 -7 6 9 8 in c a n d e s c e n c e life s a fe ty , in c .

3 5 7 5 R in g s b y C t U n it 4 0 8 , D e n v e r , C O 8 0 2 1 6 P h o n e : (7 2 0 ) 7 2 2 -3 0 1 0

IM E G C o rp .

2 6 3 S h u m a n B lv d . S u ite 5 5 0 N a p e rv ille , IL 6 0 5 6 3 P h o n e : (6 3 0 ) 5 2 7 -2 3 2 0

C a lib re E n g in e e r in g , In c .

9 0 9 0 S R id g e lin e B lv d # 1 0 5 , H ig h la n d s R a n c h , C O 8 0 1 2 9 P h o n e : (3 0 3 ) 7 3 0 -0 4 3 4

F o rc e P ro te c t S e c u r ity C o n s .

1 0 9 0 1 F ro n t B e a c h R o a d , S u ite 1 4 1 5 P a n a m a C ity B e a c h , F L 3 2 4 0 7

K E Y P L A N

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/2 /2

:1

:3

P M

IN 1 0 0 .2

B A S E M E N T F L O O R - IN T E R IO R S P L A N -

P H A S E 2

R J O J P T

1 3 3 C A

1 /8 " = 1 '-0 " F 1

B A S E M E N T F L O O R - IN T E R IO R S P L A N - P H A S E 2 0 ' 4 ' 8 ' 1 6 ' 3 2 '

S C A L E : 1 /8 " = 1 '-0 "

INTERIORS KEYNOTES

KEY KEYNOTE

IN01 TS-1 TRANSITION, FRAME AT INSET MAT-1 AND WALL OUTSIDE CORNER(S).

IN02 TS-2 TRANSITION, WALL INSIDE CORNER COVE.

IN03 TS-3 TRANSITION, FLOOR COVE.

IN04 TS-4 TRANSITION, START/STOP STRIP FOR SEAMLESS RESINOUS FLOORING

SYSTEMS.

IN05 REMOVE EXISTING FLOORING AND INSTALL FLOOR LEVELING COMPOUND

FEATHERED OUT 36" MINIMUM. INSTALL NEW FLOORING TO MATCH EXISTING OR

USE HOSPITAL’S ATTIC STOCK OF EXISTING MATERIALS. ADJACENT FLOORING

TRANSITIONS SHALL BE FLUSH WITH EACH OTHER.

IN06 PATCH, PAINT AND/OR REPAIR TO MATCH ADJACENT FINISHES.

IN07 1/4” PER FOOT MINIMUM SLOPE TO FLOOR DRAIN(S). START SLOPE AT ROOM(S)

PERIMETER.

IN08 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE

PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH

ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS. THE

STAINLESS STEEL PANEL SIZES SHALL BE AS LARGE AS POSSIBLE WITH MINIMAL

JOINTS AND MINIMAL FLUSH EXPOSED FASTENERS. PANELS SHALL BE MOUNTED

ONTOP OF THE COVE BASE CONTINOUS TO THE FINISHED CEILING. ALL JOINTS

AND CONNECTIONS SHALL BE SEALED WITH CLEAR SILICONE AND/OR GASKETED

PER MANUFACTURER’S RECOMMENDATIONS FOR INFECTION CONTROL,

REQUIRED ROOM PRESURIZATIONS AND BALANCING REQUIREMENTS.

IN09 REMOVE EXISTING NON-STRUCTURAL TOPPING, FILL WITH GEOFOAM TOPPED

WITH 3” FIBER-REINFORCED CONCRETE MATCHING TOP OF EXISTING FINISH

FLOOR ELEVATION.

IN10 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE

PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH

ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS.

Revisions: Date:

1 /4 " = 1 '-0 " D 9

E N L A R G E D P L A N - V E S T IB U L E (B D 1 8 6 )

0 ' 2 ' 4 ' 8 ' 1 6 '

S C A L E : 1 /4 " = 1 '-0 "

S S S S S S S S S S S S S

S S

S S

S S

S S

S S

S S

S S S

S S S S S S S

SS

SS

SS

DN

c 1 4c 1 6 c 1 2 c 1 1 c 1 0 c 8 c 7 c 7 c a G c a H c a K c a 1 5c a 1 4c a 1 3 e S s e T t c T c S c R c Q c 1 8 c 2 5 c 2 4 c 2 6 e T T

R .8

T .1

T .9

G .8

H .8

6 5

K .2 c a 1 8

K .3

K .6

K .8 c a 1 9

L .1

L .9

L .4

3 .7 2 14 3 c 1 .

c 2 .

c 3 .

c A

5 .1c a 1 2c a 1 1c a 1 0 c a 1 6

4 .8

T E M P .

C O R R ID O R 3

B C 0 0 3

1 8 0 S F

T E M P .

C O R R ID O R 1

B C 0 0 1

3 9 3 S F

C G -1

C G -1

C G -2

C G -2C G -2

C G -2

W P -2

W P -2

W P -2

W P -2

W P -2

W P -2

W P -2

W P -2

IN 0 5

IN 0 6

C 1 c Q .1

T E M P .

C O R R ID O R 4

B D 0 0 1

1 0 4 S F T E M P .

C O R R ID O R 5

B D 0 0 2

2 9 9 S F

C O R R ID O R

B D 1 7 9

3 0 0 S F

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1

C G -1 W P -2

C G -1

C G -1

W P -2 C G -1

W P -2

W P -2

C G -2

W P -2

W P -2

E J -1

E J -1

E J -1

A N T E R O O M

S O IL E D

T R A N S IT IO N /

D R O P -O F F

B D 1 8 0

1 2 0 S F / 1 5 0 S F C S C R 1

P P E A L C O V E B D 1 8 0 A

1 0 5 S F

T E M P .

C O R R ID O R 6

B D 0 0 3

1 0 5 S F

FLOOR FINISH LEGEND

EXIST

RES-6A

RES 6A

RES-6B

W P -2 W P -2 W P -2 W P -2

W P -2

W P -2

W P -2

W P -2

W P -2

7 .8

7 .8

1 0 5 S F

P T T E C H B D 1 6 1 0 - 1 3 3 C A

1 4 0 1 S F

C A S E C A R T B D 1 6 8 - 1 3 3 C A

4 7 S F

J A N B D 1 6 8 B - 1 3 3 C A

1 2 0 1 S F

S P S C L E A N B D 1 6 8 A - 1 3 3 C A

1 0 0 9 S F

S P S

D E C O N T A M IN A T IO N

B D 1 7 1 - 1 3 3 C A

1 1 3 S F

S P S D E C O N B D 1 7 1 A - 1 3 3 C A

E L E V B - E L - D L 0 1

3 6 S F

4 4 S F

E N G C L O S E T B D 1 6 9 - 1 3 3 C A

M L C K R B C 1 0 5 B - 1 3 3

4 4 S F

F L C K R B C 1 0 5 A - 1 3 3

4 8 S F

C O R R ID O R

B C 1 0 5 - 1 3 3

7 4 S F

T L T B C 1 0 6 - 1 3 3

4 4 S F S H W R

B C 1 0 6 A - 1 3 3

2 1 S F

H A C B C 1 0 9 - 1 3 3

6 0 S F

M L C K R B C 1 0 7 - 1 3 3

9 4 S F

C O R R ID O R

C B 1 4 7 - 1 3 3

2 0 3 S F

E L E C B C 1 0 4 - 1 3 3

5 3 S F

C S S M A N A G E R - S T O R A G E

B C 1 0 3 - 1 3 3

5 5 S F

C S S M A N A G E R -

IN V E N T O R Y

B C 1 0 3 A - 1 3 3

6 5 S F

C E N T R A L

S U P P L Y L IG H T

S T O R A G E B C 1 0 2 - 1 3 3

6 5 1 S F

S P S S T A F F & C E N T R A L

S U P P L Y L IG H T

S T O R A G E

B C 1 0 2 A - 1 3 3

2 3 0 2 S F

C A R T L IF T

B -E L -C L 0 2

6 3 S F

C A R T L IF T

C B 1 4 9 - 1 3 3

1 0 6 S F

J A N C L O B C 1 0 2 E -1 3 3

7 4 S F

7 4 S F

F L O C K E R B D 1 7 2 - 1 3 3 C A

6 0 S F

M T L T B D 1 6 7 - 1 3 3 C A

7 9 4 S F

C O R R ID O R

C B 1 4 8 - 1 3 3 C A

1 4 S F

E L E C B D 1 7 0 - 1 3 3 C A

5 5 S F

S T A F F T L T B D 1 7 2 A - 1 3 3 C A

P A S S B C 1 0 2 D -1 3 3

2 3 S F C A R T W A S H B C 1 0 2 B -1 3 3

3 6 S F

S T E R IL E

P R O C E S S IN G

B C 1 0 2 C -1 3 3

1 2 5 S F

S P S C H IE F

B C 1 1 0 - 1 3 3

1 2 7 S F

S P S P R O G S U P P O R T

B C 1 1 1 - 1 3 3

8 8 S F

S P S A S S T C H IE F

B C 1 1 2 - 1 3 3

1 0 1 S F

T E L E C O M B C 1 1 3 - 1 3 3

1 9 1 S F

1 7 5 S F

R E C Y C L E B D 1 6 6 A - 1 3 3 C A

7 7 2 S F

H Y D R O T H E R A P Y B D 1 6 2 H - 1 3 3 C A

S T A IR # 3

S W -B -0 3

1 8 0 S F

9 4 S F

B R E A K R O O M B C 1 7 3 - 1 3 3 C A

S T O R A G E S P S B D 1 8 3 A

6 0 S F / 8 9 S F S R S P 1

D E C O N T A M IN A T IO N

W O R K A R E A

B D 1 8 1

9 9 0 S F / 1 0 7 0 S F C S D E 1

S T O R A G E , W A T E R

T R E A T M E N T & D E T E R G E N T

B D 1 8 1 E

2 1 0 S F / 2 1 0 S F C S W T 1

D E C O N T A M IN A T IO N

B D 1 8 2

1 2 0 S F / 1 7 3 S F C S S D 1

S C O P E

P R O C E S S IN G

B D 1 8 2 A

2 6 5 S F / 2 7 0 S F C S S P 1

C A R T R E T U R N B D 1 8 1 C

3 0 S F / 3 4 S F C H C 0 1

U N L O A D IN G /

C O O L IN G

B D 1 8 1 D

1 3 5 S F / 1 3 8 S F C H C 0 1

S T E R IL E A R E A ,

S T E A M B D 1 8 4

3 2 0 S F / 4 6 0 S F C S S S 1

H A C B D 1 8 1 F

6 0 S F / 6 4 S F J A N C 2

S T O R A G E , S T E R IL E

D U R A B L E S B D 1 8 5

2 4 0 S F / 5 7 2 S F S R S 0 5

S T E R IL . A R E A ,

L O W T E M P

B D 1 8 4 A

1 2 0 S F / 2 4 0 S F C S L T 1

C A R T W A S H E R 2 B D 1 8 1 B

1 8 0 S F / 1 6 6 S F C W S H 2

C A R T W A S H E R 1 B D 1 8 1 A

1 8 0 S F / 1 6 2 S F C W S H 2

S C O P E S T A G IN G

B D 1 8 2 B

6 0 S F / 9 3 S F C S S T 1

T E L E C O M C L O S E T

B C 1 0 8

0 S F / 1 1 1 S F

U N L O A D IN G /C O O L IN G

B D 1 8 4 B

0 S F / 2 2 1 S F C H C 0 1

S S E Q U IP .

B D 1 8 4 C

0 S F / 2 4 6 S F C S S S 1

V E S T IB U L E

B D 1 8 6

8 7 S F L O B 0 2

H A L L B D 1 8 5 A

3 1 3 S F

V E S T IB U L E

B D 1 8 3 B

7 2 S F

T E M P .

C O R R ID O R 2

B C 0 0 2

7 2 S FT E M P . S P A C E

B C 0 0 3

5 1 8 S F

C L E A N W O R K R O O M , IN S T R U M E N T

S E T B D 1 8 3

1 1 7 5 S F / 1 1 2 9 S F

C S IA 1

1 . R E F E R T O A G 0 0 1 F O R G E N E R A L A R C H IT E C T U R A L N O T E S .

2 . S E E S E C T IO N 0 1 0 0 0 0 - G E N E R A L R E Q U IR E M E N T S F O R L IS T IN G A N D D E S C R IP T IO N O F B A S E B ID A N D D E D U C T A L T E R N A T E S . S E E R E S P E C T IV E P R O J E C T M A N U A L S E C T IO N S F O R A D D IT IO N A L D E D U C T

A L T E R N A T E IN F O R M A T IO N .

3 . S E E S E C T IO N 0 9 0 6 0 0 - S C H E D U L E F O R F IN IS H E S F O R A D D IT IO N A L IN F O R M A T IO N O N F IN IS H E S N O T E D O N

D R A W IN G S .

4 . S E E S H E E T IN 6 0 0 S E R IE S F O R R O O M F IN IS H S C H E D U L E IN C L U D IN G A D D IT IO N A L F L O O R A N D W A L L F IN IS H

N O T E S A N D IN S T R U C T IO N S .

5 . S E E S H E E T IN 5 0 1 , T H E V A S IG N A G E D E S IG N G U ID E C H A P T E R 9 A N D S E C T IO N 1 0 1 4 0 0 F O R S IG N A G E

D E T A IL S .

6 . S E E S H E E T IN 6 0 0 S E R IE S F O R S IG N A G E S C H E D U L E .

7 . F O R B ID A L T E R N A T E S H E E T S R E F E R T O S H E E T IN 1 0 0 .4 F O R R E Q U IR E D W A L L P R O T E C T IO N A N D A C C E N T

W A L L L O C A T IO N S .

G E N E R A L IN T E R IO R S N O T E S :

P L A N N O R T H

P ro je c t N u m b e r

B u ild in g N u m b e r

D ra w in g N u m b e r

P ro je c t T it le

L o c a t io n

Is s u e D a te C h e c k e d D ra w n

D ra w in g T it le

A p p ro v e d :

V A F O R M 0 8 - 6 2 3 1

A

F U L L Y S P R IN K L E R E D

O ffic e o f C o n s tru c t io n a n d F a c ilit ie s M a n a g e m e n t

U .S . D e p a r t m e n t o f V e t e r a n s A ffa ir s

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 1 0

P h a s e

A R C H IT E C T /E N G IN E E R O F R E C O R D S T A M P

321 4 5 6 7 8 9 1 0

5 5 6 -4 0 2

1 1 /2 9 /2 0 2 2

E X P A N D S T E R IL E P R O C E S S IN G

S E R V IC E (S P S )

1 0 0 % C O N S T R U C T IO N

D O C U M E N T S

C a p ta in J a m e s A . L o v e ll F e d e ra l H e a lth c a re C e n te r 3 0 0 1 G re e n B a y R o a d , N o r th C h ic a g o , IL 6 0 0 6 4

A le s ia A rc h ite c tu re P .C .

3 7 0 5 N o r th 2 0 0 th S tre e t E lk h o rn , N e b ra s k a 6 8 0 2 2 P h o n e : (4 0 2 ) 2 9 1 -6 9 4 1

S h a ffe r S te v e n s & S c h a a p P .C .

1 0 7 0 H o w a rd S t O m a h a , N e b ra s k a 6 8 1 0 2 P h o n e : (4 0 2 ) 4 5 5 -7 6 9 8 in c a n d e s c e n c e life s a fe ty , in c .

3 5 7 5 R in g s b y C t U n it 4 0 8 , D e n v e r , C O 8 0 2 1 6 P h o n e : (7 2 0 ) 7 2 2 -3 0 1 0

IM E G C o rp .

2 6 3 S h u m a n B lv d . S u ite 5 5 0 N a p e rv ille , IL 6 0 5 6 3 P h o n e : (6 3 0 ) 5 2 7 -2 3 2 0

C a lib re E n g in e e r in g , In c .

9 0 9 0 S R id g e lin e B lv d # 1 0 5 , H ig h la n d s R a n c h , C O 8 0 1 2 9 P h o n e : (3 0 3 ) 7 3 0 -0 4 3 4

F o rc e P ro te c t S e c u r ity C o n s .

1 0 9 0 1 F ro n t B e a c h R o a d , S u ite 1 4 1 5 P a n a m a C ity B e a c h , F L 3 2 4 0 7

K E Y P L A N

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/2 /2

:1

:4

P M

IN 1 0 0 .3

B A S E M E N T F L O O R - IN T E R IO R S P L A N -

P H A S E 3

R J O J P T

1 3 3 C A

1 /8 " = 1 '-0 " F 1

B A S E M E N T F L O O R - IN T E R IO R S P L A N - P H A S E 3 0 ' 4 ' 8 ' 1 6 ' 3 2 '

S C A L E : 1 /8 " = 1 '-0 "

INTERIORS KEYNOTES

KEY KEYNOTE

IN01 TS-1 TRANSITION, FRAME AT INSET MAT-1 AND WALL OUTSIDE CORNER(S).

IN02 TS-2 TRANSITION, WALL INSIDE CORNER COVE.

IN03 TS-3 TRANSITION, FLOOR COVE.

IN04 TS-4 TRANSITION, START/STOP STRIP FOR SEAMLESS RESINOUS FLOORING

SYSTEMS.

IN05 REMOVE EXISTING FLOORING AND INSTALL FLOOR LEVELING COMPOUND

FEATHERED OUT 36" MINIMUM. INSTALL NEW FLOORING TO MATCH EXISTING OR

USE HOSPITAL’S ATTIC STOCK OF EXISTING MATERIALS. ADJACENT FLOORING

TRANSITIONS SHALL BE FLUSH WITH EACH OTHER.

IN06 PATCH, PAINT AND/OR REPAIR TO MATCH ADJACENT FINISHES.

IN07 1/4” PER FOOT MINIMUM SLOPE TO FLOOR DRAIN(S). START SLOPE AT ROOM(S)

PERIMETER.

IN08 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE

PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH

ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS. THE

STAINLESS STEEL PANEL SIZES SHALL BE AS LARGE AS POSSIBLE WITH MINIMAL

JOINTS AND MINIMAL FLUSH EXPOSED FASTENERS. PANELS SHALL BE MOUNTED

ONTOP OF THE COVE BASE CONTINOUS TO THE FINISHED CEILING. ALL JOINTS

AND CONNECTIONS SHALL BE SEALED WITH CLEAR SILICONE AND/OR GASKETED

PER MANUFACTURER’S RECOMMENDATIONS FOR INFECTION CONTROL,

REQUIRED ROOM PRESURIZATIONS AND BALANCING REQUIREMENTS.

IN09 REMOVE EXISTING NON-STRUCTURAL TOPPING, FILL WITH GEOFOAM TOPPED

WITH 3” FIBER-REINFORCED CONCRETE MATCHING TOP OF EXISTING FINISH

FLOOR ELEVATION.

IN10 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE

PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH

ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS.

Revisions: Date:

S S

S S

S S

S S

S S

S S

S S S

S S

S S S S S S S

SS

SS

SS

SS

SS

DN

P-4

RES-W-4

P -4

P -4

P -4

P-4

P -4

P -4 c14c16 c12 c11 c10 c8 c7 c7 caG caH caK ca15ca14ca13 eSs eTt cT cS cR cQ c18 c25 c24 c26 eTT

R.8

T.1

T.9

G.8

H.8

6 5

K.2 ca18

K.3

K.6

K.8 ca19

L.1

L.9

L.4

3.7 2 14 3 c1.

c2.

c3.

cA

5.1ca12ca11ca10 ca16

4.8

COPIER /

WORKST. 07

BC106C

100 SF/ 98 SF

RPR01

WORKST. 05

BC106J

56 SF/ 59 SF

OFA07

WORKST. 02

BC106F

56 SF/ 53 SF

OFA07

PPE

BC106K

0 SF/ 73 SF

CSPE1

OFFICE, AO /

WORKST. 01

BC106D

56 SF/ 55 SF

OFA09

DISPATCH AREA

BC107B

80 SF/ 105 SF

CHC01

WORKSTATION,

CASE CART

DISPATCH

BC107A

56 SF/ 58 SF

OFA07

HAC

BC107G

60 SF/ 64 SF

JANC2

CLEAN

CORRIDOR

BC107F

0 SF/ 91 SF

VENDOR

DROP-OFF /

PICK-UP

BD172

120 SF/ 95 SF

SRS01

WORKST. 07

BD174A

56 SF/ 57 SF

OFA07

LOCKER, MALE

BD176

476 SF/ 276 SF

LR002

STAFF LOUNGE

BD178

360 SF/ 349 SF

SL001

TOILET

BD177A

60 SF/ 60 SF

TNPG1

TRAINING ROOM

BD174

240 SF/ 238 SF

CFR01

WORKST. 03

BC106G

56 SF/ 56 SF

OFA07

CART LOBBY

BD171A

64 SF

PPE

BC102C - 272

0 SF/ 19 SF

CSPE1

HALL

BD175A

91 SF

HALL

BD176B

38 SF

STORAGE,

CLEAN

BC107E

240 SF/ 379 SF

SRS05

HALL

BC107C

205 SF

OPEN SPACE

BC102

585 SF

OFFICE

BC110

127 SF

OFFICE

BC111

88 SF

TELECOM

BC113

191 SF

SOILED ELEV

B-EL-DL01

36 SF

CORRIDOR

BD171

123 SF

CG-2 CG-2

CG-2

CG-2

CG-2

CG-1 CG-1 CG-1

CG-1CG-1

CG-1

CG-1

CG-1CG-1

CG-1

CG-1

CG-1

CG-2 CG-2

CG-2

CG-2 CG-2

CG-2

CG-2

CG-2

CG-2

CG-2

CG-2

CG-2

CG-2

CG-2

CG-2

CG-2 CG-2

CG-2

CG-2

CG-2

CG-2

CG-2 CG-2 CG-2

CG-2

CG-2

CG-2 CG-2

CG-2

CG-2

CG-1

CG-1

HR-1

HR-1

HR-1

HR-1

HR-1

HR-1

HR-1

HR-1HR-1

HR-1

HR-1

HR-1

WP-2

WP-2

WP-2

WP-2

WP-2

WP-2

WP-1

WP-1

WP-1

WP-2

WP-1

WP-1

IN04

IN04

IN05

IN06

IN05

IN06

IN05

IN06

IN05

IN06

IN05

IN06

IN06

IN05

IN06

WP-2

WP-2

WP-2

WP-2

A1 A1

A1 A1A1A1

A1

A1

A2 A2

A1

A1

A1

A2

A1

A1

A2

A2

A1

A1

A1

A1

A1

A1

A1

CG-2

cQ.1

CG-1

WP-2

WP-2

CG-2

CG-2 CG-2WP-1

HR-1

CG-2

WORKST. 08

BD172A

56 SF/ 56 SF

OFA07

CASE CART

ASSEMBLY

BD185B

120 SF/ 104 SF

CSCQ1

CORRIDOR

BC105

423 SF

CORRIDOR

BD177

108 SF

PPE ALCOVE

BD179

0 SF/ 140 SF

CSPE1

HALL

BD175B

58 SF

ANTEROOM,

SOILED

TRANSITION /

DROP-OFF

BD180

120 SF/ 153 SF

DECONTAMINATION

CASE CART

AREA

BD180A

990 SF/ 144 SF

CASE CART

STORAGE

BC107D

329 SF

ORSS1

CASE CART

ASSEMBLY

BC107

120 SF/ 251 SF

CSCQ1

OFFICE, SPS

CHIEF

BC106

110 SF/ 112 SF

OFA09

OFFICE, SPS

DEPUTY CHIEF

BC106A

100 SF/ 98 SF

OFA09

HALL

BC106B

151 SF

HALL

BC106L

237 SF

WORKST. 04

BC106H

56 SF/ 56 SF

OFA07

WORKST. 06

BD174B

56 SF/ 55 SF

OFA07

TLT/SHW F

BD175D

80 SF/ 76 SF

TSSU1

TLT/SHW F

BD175C

80 SF/ 78 SF

TSSU1

LOCKER,

FEMALE

BD175

476 SF/ 316 SF

LR002

HALL

BD176A

80 SF

TLT/SHW M

BD176D

80 SF/ 93 SF

TSSU1

TLT/SHW M

BD176C

80 SF/ 82 SF

TSSU1

CORRIDOR

BD171B

0 SF/ 485 SF

CORRIDOR

BD171C

0 SF/ 185 SF

OPEN SPACE

BD168

0 SF/ 243 SF

IN07

IN07

IN07

IN07

IN07

IN07

IN07

IN07

IN07

CG-2

CG-2

CG-2

CG-2

CG-2

HR-1

CG-2

WP-1

WP-1HR-1

WP-1

WP-1

WP-2

CG-1

WP-2

WP-2

WP-2 WP-2

CG-1

WP-2

CG-1

WP-2

WP-2

OFFICE

BC112

101 SF

WP-2WP-2

WP-2

WP-2

WP-2

WP-2

WP-2

WP-2

WP-2

FLOOR FINISH LEGEND

CONC / CS-1

CPT-1

EXIST

PT-1

PT-1 / PT-2

RES-5

RES-6B

RSF-1

WP-2

A3

A1

CG-2

CG-2

WP-2

WP-2

WP-2

WP-2

WP-2

CG-2

CG-2

WP-2

WP-2

WP-2

WP-2

WP-2

WP-2

EJ-1

EJ-1

EJ-1

7.8

7.8

IN09

CG-1

WP-2

WP-2

CG-1

WP-2

WP-2

WP-2

CG-1

CG-1

WP-2

WP-2

CG-1 CART LIFT

CB149 - 133

106 SF

A1

STORAGE SPS

BD183A

60 SF/ 89 SF

SRSP1

DECONTAMINATION

WORK AREA

BD181

990 SF/ 1066 SF

CSDE1

STORAGE,

WATER

TREATMENT &

DETERGENT

BD181E

210 SF/ 210 SF

CSWT1

DECONTAMINATION

BD182

120 SF/ 173 SF

CSSD1

SCOPE

PROCESSING

BD182A

265 SF/ 270 SF

CSSP1

CART RETURN

BD181C

30 SF/ 32 SF

CHC01

UNLOADING/

COOLING

BD181D

135 SF/ 138 SF

CHC01

STERILE AREA,

STEAM

BD184

320 SF/ 460 SF

CSSS1

HAC

BD181F

60 SF/ 64 SF

JANC2

STORAGE,

STERILE

DURABLES

BD185

240 SF/ 572 SF

SRS05

STERIL. AREA,

LOW TEMP

BD184A

120 SF/ 240 SF

CSLT1

CART WASHER 2

BD181B

180 SF/ 166 SF

CWSH2

CART WASHER 1

BD181A

180 SF/ 162 SF

CWSH2

SCOPE STAGING

BD182B

60 SF/ 93 SF

CSST1

TELECOM

CLOSET

BC108

0 SF/ 111 SF

UNLOADING/COOLING

BD184B

0 SF/ 221 SF

CHC01

SS EQUIP.

BD184C

0 SF/ 246 SF

CSSS1

VESTIBULE

BD186

87 SF

LOB02

HALL

BD185A

313 SF

VESTIBULE

BD183B

72 SF

TEMP.

CORRIDOR 2

BC002

72 SFTEMP. SPACE

BC003

518 SF

CLEAN

WORKROOM,

INSTRUMENT

SET

BD183

1175 SF/ 1129 SF

CSIA1

1. REFER TO AG001 FOR GENERAL ARCHITECTURAL NOTES.

2. SEE SECTION 01 00 00 - GENERAL REQUIREMENTS FOR LISTING AND DESCRIPTION OF BASE BID AND

DEDUCT ALTERNATES. SEE RESPECTIVE PROJECT MANUAL SECTIONS FOR ADDITIONAL DEDUCT

ALTERNATE INFORMATION.

3. SEE SECTION 09 06 00 - SCHEDULE FOR FINISHES FOR ADDITIONAL INFORMATION ON FINISHES NOTED ON

DRAWINGS.

4. SEE SHEET IN600 SERIES FOR ROOM FINISH SCHEDULE INCLUDING ADDITIONAL FLOOR AND WALL FINISH

NOTES AND INSTRUCTIONS.

5. SEE SHEET IN501, THE VA SIGNAGE DESIGN GUIDE CHAPTER 9 AND SECTION 10 14 00 FOR SIGNAGE

DETAILS.

6. SEE SHEET IN600 SERIES FOR SIGNAGE SCHEDULE.

7. FOR BID ALTERNATE SHEETS REFER TO SHEET IN100.4 FOR REQUIRED WALL PROTECTION AND ACCENT

WALL LOCATIONS.

GENERAL INTERIORS NOTES:

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/1

/2

:5

:1

P

M

IN100.4

BASEMENT FLOOR - INTERIORS PLAN -

PHASE 4

RJO JPT

133CA

1/8" = 1'-0" F1

BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 0' 4' 8' 16' 32'

SCALE: 1/8" = 1'-0"

INTERIORS KEYNOTES

KEY KEYNOTE

IN01 TS-1 TRANSITION, FRAME AT INSET MAT-1 AND WALL OUTSIDE CORNER(S).

IN02 TS-2 TRANSITION, WALL INSIDE CORNER COVE.

IN03 TS-3 TRANSITION, FLOOR COVE.

IN04 TS-4 TRANSITION, START/STOP STRIP FOR SEAMLESS RESINOUS FLOORING

SYSTEMS.

IN05 REMOVE EXISTING FLOORING AND INSTALL FLOOR LEVELING COMPOUND

FEATHERED OUT 36" MINIMUM. INSTALL NEW FLOORING TO MATCH EXISTING OR

USE HOSPITAL’S ATTIC STOCK OF EXISTING MATERIALS. ADJACENT FLOORING

TRANSITIONS SHALL BE FLUSH WITH EACH OTHER.

IN06 PATCH, PAINT AND/OR REPAIR TO MATCH ADJACENT FINISHES.

IN07 1/4” PER FOOT MINIMUM SLOPE TO FLOOR DRAIN(S). START SLOPE AT ROOM(S)

PERIMETER.

IN08 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE

PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH

ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS. THE

STAINLESS STEEL PANEL SIZES SHALL BE AS LARGE AS POSSIBLE WITH MINIMAL

JOINTS AND MINIMAL FLUSH EXPOSED FASTENERS. PANELS SHALL BE MOUNTED

ONTOP OF THE COVE BASE CONTINOUS TO THE FINISHED CEILING. ALL JOINTS

AND CONNECTIONS SHALL BE SEALED WITH CLEAR SILICONE AND/OR GASKETED

PER MANUFACTURER’S RECOMMENDATIONS FOR INFECTION CONTROL,

REQUIRED ROOM PRESURIZATIONS AND BALANCING REQUIREMENTS.

IN09 REMOVE EXISTING NON-STRUCTURAL TOPPING, FILL WITH GEOFOAM TOPPED

WITH 3” FIBER-REINFORCED CONCRETE MATCHING TOP OF EXISTING FINISH

FLOOR ELEVATION.

IN10 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE

PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH

ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS.

Mark Revisions: Date:

A VA Revisions 07/05/2023

07/05/2023 REVISIONS

P-4

P -4

P -4

P -4

P-4

P -4

P -4

RES-W-4

1. REFER TO AG001 FOR GENERAL ARCHITECTURAL NOTES.

2. SEE SECTION 01 00 00 - GENERAL REQUIREMENTS FOR LISTING AND DESCRIPTION OF BASE BID AND

DEDUCT ALTERNATES. SEE RESPECTIVE PROJECT MANUAL SECTIONS FOR ADDITIONAL DEDUCT

ALTERNATE INFORMATION.

3. SEE SECTION 09 06 00 - SCHEDULE FOR FINISHES FOR ADDITIONAL INFORMATION ON FINISHES NOTED ON

DRAWINGS.

4. SEE SHEET IN600 SERIES FOR ROOM FINISH SCHEDULE INCLUDING ADDITIONAL FLOOR AND WALL FINISH

NOTES AND INSTRUCTIONS.

5. SEE SHEET IN501, THE VA SIGNAGE DESIGN GUIDE CHAPTER 9 AND SECTION 10 14 00 FOR SIGNAGE

DETAILS.

6. SEE SHEET IN600 SERIES FOR SIGNAGE SCHEDULE.

7. FOR BID ALTERNATE SHEETS REFER TO SHEET IN100.4 FOR REQUIRED WALL PROTECTION AND ACCENT

WALL LOCATIONS.

GENERAL INTERIORS NOTES:

c14.c16. c12. c11. c10. c8. c7.

caG.

caH.

caK.

ca15.ca14.ca13.

eSs.

cTt.

cT.

cS.

cR.

cQ.

c18.

c25.

ca24.

c26.

CTT.

T.9.

G.8.

H.8.

ca18.

K.6.

ca19.

ca12.

ca11.

ca16.

cQ.1.

SHELL SPACE

BC106A

768 SF

CART HOLDING,

CLEAN

BC107D

0 SF/ 332 SF

ORSS1

STORAGE,

CLEAN

BC107E

240 SF/ 378 SF

SRS05

TELECOM

CLOSET

BC108

0 SF/ 109 SF

OPEN SPACE

BC102

586 SF

CORRIDOR

BC105

402 SF

CLEAN

CORRIDOR

BC107F

0 SF/ 118 SF

HALL

BC107C

155 SF CASE CART

ASSEMBLY

BC107

120 SF/ 309 SF

CSCQ1

DISPATCH AREA

BC107B

80 SF/ 99 SF

CHC01

HAC

BC107G

60 SF/ 65 SF

JANC2

WORKSTATION,

CASE CART

DISPATCH

BC107A

56 SF/ 59 SF

OFA07

ELEV

B-EL-DL01

34 SF

ELEC

BD221

14 SF

CORRIDOR

BD171B

477 SF

CORRIDOR

BD171C

189 SF

CASE CART

ASSEMBLY

BD185B

120 SF/ 416 SF

CSCQ1

PPE ALCOVE

BD179

0 SF/ 140 SF

CSPE1

ANTEROOM,

SOILED

TRANSITION /

DROP-OFF

BD180

120 SF/ 152 SF

DECONTAMINATION

CASE CART

AREA

BD180A

990 SF/ 147 SF

OFFICE

BC110

127 SF

OFFICE

BC112

98 SF

TELECOM

BC113

194 SF

PPE

BC102C - 272

0 SF/ 14 SF

CSPE1

LOCKER, MALE

BD176

476 SF/ 276 SF

LR002

STAFF LOUNGE

BD178

360 SF/ 349 SF

SL001

TOILET

BD177A

60 SF/ 61 SF

TNPG1

HALL

BD175A

91 SF

HALL

BD176B

39 SF

CORRIDOR

BD177

109 SF

LOCKER,

FEMALE

BD175

476 SF/ 315 SF

LR002

HALL

BD175B

59 SF

TLT/SHW F

BD175D

80 SF/ 78 SF

TLT/SHW F

BD175C

80 SF/ 80 SF

TLT/SHW M

BD176D

80 SF/ 94 SF

TLT/SHW M

BD176C

80 SF/ 84 SF

HALL

BD176A

80 SF/ 80 SF

WORKST. 07

BD174A

56 SF/ 57 SF

OFA07

WORKST. 06

BD174B

56 SF/ 56 SF

OFA07

TRAINING ROOM

BD174

240 SF/ 238 SF

CFR01

ADMIN SPACE

BC106

265 SF

WORKST. 08

BD172A

56 SF/ 53 SF

OFA07

VENDOR

DROP-OFF /

PICK-UP

BD172

120 SF/ 90 SF

SRS01

CART LOBBY

BD171A

64 SF

CORRIDOR

BD171

126 SF

OPEN SPACE

BD168

243 SF

OFFICE

BC111

88 SF BA01

BA01b BA01a

CG-2 CG-2 A1

A1

CG-2

CG-2

CG-2

CG-2

CG-2

A1

CG-2

CG-2

CG-2

CG-2 CG-2

A1

CG-2

CG-2

CG-1CG-1

CG-1

WP-2

WP-2

WP-2

WP-2

WP-2

WP-2 CG-2

WP-2 WP-2

WP-2

WP-2CG-2

WP-2

WP-2

WP-2

CG-2

IN09

FLOOR FINISH LEGEND

CONC / CS-1

CPT-1

EXIST

PT-1

PT-1 / PT-2

RES-5

RES-6B

RSF-1

SVT-SD-1

CART LIFT

CB149 - 133

106 SF

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/1

/2

:5

:1

P

M

IN100.41

BASEMENT FLOOR - INTERIORS PLAN -

PHASE 4 - BID ALTERNATE 1 133CA

0' 4' 8' 16' 32'

SCALE: 1/8" = 1'-0"

INTERIORS KEYNOTES

KEY KEYNOTE

IN01 TS-1 TRANSITION, FRAME AT INSET MAT-1 AND WALL OUTSIDE CORNER(S).

IN02 TS-2 TRANSITION, WALL INSIDE CORNER COVE.

IN03 TS-3 TRANSITION, FLOOR COVE.

IN04 TS-4 TRANSITION, START/STOP STRIP FOR SEAMLESS RESINOUS FLOORING

SYSTEMS.

IN05 REMOVE EXISTING FLOORING AND INSTALL FLOOR LEVELING COMPOUND

FEATHERED OUT 36" MINIMUM. INSTALL NEW FLOORING TO MATCH EXISTING OR

USE HOSPITAL’S ATTIC STOCK OF EXISTING MATERIALS. ADJACENT FLOORING

TRANSITIONS SHALL BE FLUSH WITH EACH OTHER.

IN06 PATCH, PAINT AND/OR REPAIR TO MATCH ADJACENT FINISHES.

IN07 1/4” PER FOOT MINIMUM SLOPE TO FLOOR DRAIN(S). START SLOPE AT ROOM(S)

PERIMETER.

IN08 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE

PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH

ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS. THE

STAINLESS STEEL PANEL SIZES SHALL BE AS LARGE AS POSSIBLE WITH MINIMAL

JOINTS AND MINIMAL FLUSH EXPOSED FASTENERS. PANELS SHALL BE MOUNTED

ONTOP OF THE COVE BASE CONTINOUS TO THE FINISHED CEILING. ALL JOINTS

AND CONNECTIONS SHALL BE SEALED WITH CLEAR SILICONE AND/OR GASKETED

PER MANUFACTURER’S RECOMMENDATIONS FOR INFECTION CONTROL,

REQUIRED ROOM PRESURIZATIONS AND BALANCING REQUIREMENTS.

IN09 REMOVE EXISTING NON-STRUCTURAL TOPPING, FILL WITH GEOFOAM TOPPED

WITH 3” FIBER-REINFORCED CONCRETE MATCHING TOP OF EXISTING FINISH

FLOOR ELEVATION.

IN10 GENERAL CONTRACTOR AND EQUIPMENT MANUFACTURER SHALL COORDINATE

PURCHASE / INSTALLATION OF STAINLESS STEEL WALL PANELS WITH

ARCHITECTURAL WALL(S), OPENING SIZE(S) AND BACKING REQUIREMENTS.

BID ALTERNATE KEYNOTES

KEY KEYNOTE

BA01 IF BID ALTERNATE 1 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES, CEILING FINISHES, PLUMBING FIXTURES, AND SPS EQUIPMENT IN THEIR ENTIRETY, U.N.O., THE CONTRACTOR SHALL PATCH, REPAIR, AND

INFILL FLOORS AND WALLS TO MATCH ADJACENT SURFACES.

BA01a IF BID ALTERNATE 1 IS ACCEPTED, DO NOT CONSTRUCT NEW OFFICES AND WORKSTATIONS.

BA01b IF BID ALTERNATE 1 IS ACCEPTED, CONSTRUCT NEW ADMIN SPACE BC106, ROOM FINISHES TO BE THE SAME AS

OFFICE, SPS CHIEF BC106.

BA02 IF BID ALTERNATE 2 IS ACCEPTED, REMOVE THE EXISTING FLOOR FINISHES,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .