Attachment 6 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 5-8.pdf

PDF 12 MB Posted

Attached to
Y1DA--556-402 Expand Sterile Processing Service (SPS) - Construction - Lovell FHCC, North Chicago, IL
Solicitation number
36C77624B0018
Issued by

About this file

This document appears to be Attachment 6 to a federal solicitation, containing 556-402 SPS 100CD drawings for the "Expand Sterile Processing Service (SPS) - Construction" project at the Lovell Federal Health Care Center in North Chicago, IL. The related federal contract opportunity, Solicitation Number 36C77624B0018, is for a minor construction project to expand the sterile processing service at the North Chicago facility. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The drawings provided in this attachment likely contain detailed technical specifications and design information related to the construction work required under this contract opportunity.

View the file

Other files

File Type Posted
S06 - 36C77624B0018 0004.pdf PDF
Attachment 25 - Bid Abstract OF 1419 - SPS North Chicago - Signed.pdf PDF
Attachment 26 - Bid Abstract OF 1419A - SPS North Chicago.pdf PDF
Attachment 24 - 556-402 SPS 100CD Specs Div 221300 Facility Sanitary and Vent Piping.pdf PDF
S06 - 36C77624B0018 0003.pdf PDF
S06 - 36C77624B0018 0002.pdf PDF
Attachment 22 - Technical Questions and Responses - SPS North Chicago.pdf PDF
Attachment 23 - RFI97 Atch - Bldg133CA - LDP-1-F9 QMDP-1-G3.pdf PDF
S06 - 36C77624B0018 0001.pdf PDF
Attachment 21 - Site Visit Sign-in Sheet SPS North Chicago_15JUL24.pdf PDF
Attachment 13 - 556-402 SPS 100CD SpecsV2 29NOV22-r14JUN24.pdf PDF
Attachment 12 - 556-402 SPS 100CD SpecsV1 29NOV22-r14JUN24.pdf PDF
Attachment 20 - Division Cost Breakdown - BLANK.xlsx XLSX spreadsheet
Attachment 11 - 556-402 SPS 100CD Reports 29NOV22.pdf PDF
Attachment 10 - 556-402 Expand SPS - 100CD Equip Cut Sheets - Excerpt.pdf PDF
Attachment 3 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 2-8.pdf PDF
Attachment 16 - Wage Determination - Lake County.pdf PDF
Attachment 14 - 556-402 SPS 100CD Struct Interior Design V1 29NOV22-r14JUN24.pdf PDF
Attachment 7 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 6-8.pdf PDF
Attachment 17 - Limitations on Subcontracting - Construction.docx DOCX document
S02 - 36C77624B0018.pdf PDF
Attachment 15 - 556-402 SPS 100CD Struct Interior Design V2 29NOV22-r14JUN24.pdf PDF
Attachment 4 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 3-8.pdf PDF
Attachment 19 - Contractors Statement for Exempt Organization - Illinois.docx DOCX document
Attachment 8 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 7-8.pdf PDF
Attachment 18 - Illinois Tax Language - 1.26.2023 - FINAL.docx DOCX document
Attachment 9 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 8-8.pdf PDF
Attachment 5 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 4-8.pdf PDF
Attachment 1 - 556-402 Expand SPS - GC SOW 29MAR24.docx DOCX document
Attachment 2 - 556-402 SPS 100CD Drawings 29NOV22-r14JUN24 1-8.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/5

/2

:0

:1

P M

GI001

COVER

MP

133CA

C A P T. J A M E S A. L O V E L L F E D E R A L H E A L T H C A R E C E N T E R

EXPAND STERILE PROCESSING SERVICE (SPS)

NORTH CHICAGO, ILLINOIS, 60064

SITE LOCATION

VA Contract Number: 36C77622C0002

VA Point of Contact:

Daniel J. Lid, D: (224) 610-3567, Contracting Officer's Representative (COR)

Mark Revisions: Date: 07/05/2023 REVISIONS

11/29/2022

REV 6/14/2024

Volume 5 of 8

ISSUED 11/29/2022

SET REV 06/14/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Blvd. Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /R

-2

V

A

-4

.r v t

/2

/2

:1

:3

P

M

GI002

INDEX OF DRAWINGS

MP

133CA

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

GENERAL

GI001 COVER

GI002 INDEX OF DRAWINGS

GI101 PHASING PLANS

GI102 FLOW DIAGRAMS

GI103 BID ALTERNATE 1 & 2

GI104 BID ALTERNATE 3 & 4

LIFE SAFETY

LS000 CODE COMPLIANCE SUMMARY PLAN

LS100 PIPE BASEMENT - LIFE SAFETY PLAN

LS101 BASEMENT FLOOR - LIFE SAFETY PLAN

LS102 FIRST FLOOR - LIFE SAFETY PLAN

LS103 EGRESS PHASING COMPLIANCE PLAN - BASEMENT

HAZARDOUS MATERIALS

HA101 BASEMENT FLOOR PLAN – ASBESTOS ABATEMENT

CIVIL

CD100 DEMOLITION PLAN PHASE 1

SP100 SITE PLAN PHASE 1

CS500 SITE DETAILS PHASE 1

CS501 SITE DETAILS PHASE 1

CG100 GRADING PLAN PHASE 1

CU100 OVERALL UTILITY PLAN PHASE 1

CU101 SANITARY SEWER PLAN & PROFILE PHASE 1

CU104 STORM SEWER PLAN AND PROFILE PHASE 1

CU500 STORM SEWER DETAILS PHASE 1

CU501 STORM SEWER DETAILS PHASE 1

STRUCTURAL

SG001 STRUCTURAL GENERAL NOTES

SD1PB.1 PIPE BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 1

SD100.1 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEVATION - PHASE 1

SD100.2 BASEMENT FLOOR - DEMO PLAN & ELEVATION - PHASE 2

SD100.3 BASEMENT FLOOR - PARTIAL DEMO PLAN & ELEV - PHASE 3

SD100.4 BASEMENT FLOOR - PARTIAL DEMO PLAN - PHASE 4

SB1PB.1 PIPE BASEMENT FLOOR - FNDN. & MUD SLAB PLAN - PHASE 1

SB1PB.2 PIPE BASEMENT FLOOR - FOUNDATION & MUD SLAB - PHASE 2

SB301 STRUCTURAL SECTIONS

SB501 FOUNDATION DETAILS & SCHEDULES

SB502 FOUNDATION DETAILS

SF100.1 BASEMENT FLOOR FRAMING PLAN - PHASE 1

SF100.2 BASEMENT FLOOR FRAMING PLAN - PHASE 2

SF100.3 BASEMENT FLOOR - FRAMING PLAN - PHASE 3

SF101.2 FIRST FLOOR - MECHANICAL PENTHOUSE FRAMING PLAN - PHASE 2

SF102.2 SECOND FLOOR - ROOF FRAMING PLAN - PHASE 2

SF401 ELEVATIONS & DETAILS

SF402 STRUCTURAL RETROFIT ELEVATIONS IN BUILDING 133-C

SF501 FRAMING DETAILS

SF502 FRAMING DETAILS

SF503 FRAMING DETAILS

SF504 FRAMING DETAILS

SF510 LIGHT GAGE FRAMING STRUCTURAL DETAILS

SF511 WALL SECTIONS -LIGHT GAGE INFORMATION

SF600 LIVE LOAD DIAGRAM - BASEMENT FLOOR

SF601 LIVE LOAD DIAGRAM - FIRST FLOOR

ARCHITECTURAL

AG001 ARCHITECTURAL ABBREVIATIONS, LEGENDS AND NOTES

AD1PB.2 PIPE BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2

AD100.1 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 1

AD100.2 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 2

AD100.3 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 3

AD100.4 BASEMENT FLOOR - DEMOLITION PLAN - PHASE 4

AD101.2 FIRST FLOOR - DEMOLITION PLAN - PHASE 2

AD102.2 SECOND FLOOR - DEMOLITION PLAN - PHASE 2

AE1PB.2 PIPE BASEMENT FLOOR - FLOOR PLAN - PHASE 2

AE100.1 BASEMENT FLOOR - FLOOR PLAN - PHASE 1

AE100.2 BASEMENT FLOOR - FLOOR PLAN - PHASE 2

AE100.3 BASEMENT FLOOR - FLOOR PLAN - PHASE 3

AE100.4 BASEMENT FLOOR - FLOOR PLAN - PHASE 4

AE101.2 FIRST FLOOR - MECHANICAL PENTHOUSE PLAN - PHASE 2

AE102.2 SECOND FLOOR - ROOF PLAN - PHASE 2

AE110.1 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 1

AE110.2 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 2

AE110.3 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 3

AE110.4 BASEMENT FLOOR - REFLECTED CEILING PLAN - PHASE 4

AE201 EXTERIOR ELEVATIONS

AE301 BUILDING SECTIONS

AE302 WALL SECTIONS

AE303 WALL SECTIONS

AE304 WALL SECTIONS

AE401 ENLARGED PLANS AND ELEVATIONS

AE402 ENLARGED PLANS AND ELEVATIONS

AE501 EXTERIOR DETAILS

AE502 WALL SECTIONS & DETAILS

AE503 EXPANSION JOINT DETAILS

AE504 PLAN DETAILS

AE505 PLAN DETAILS

AE531 CEILING DETAILS

AE601 ROOM PROGRAM SCHEDULE

AE602 DOOR SCHEDULES AND DETAILS

AE801 WALL TYPES

AE901 EXTERIOR RENDERINGS AND INTERIOR 3D VIEWS

AE902 BASEMENT FLOOR - FUNCTIONAL AREA PLAN

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

INTERIORS

IN100.1 BASEMENT FLOOR - INTERIORS PLAN - PHASE 1

IN100.2 BASEMENT FLOOR - INTERIORS PLAN - PHASE 2

IN100.3 BASEMENT FLOOR - INTERIORS PLAN - PHASE 3

IN100.4 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4

IN100.41 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 1

IN100.42 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 2

IN100.43 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 3

IN100.44 BASEMENT FLOOR - INTERIORS PLAN - PHASE 4 - BID ALTERNATE 4

IN101.2 FIRST FLOOR - INTERIORS PLAN - PHASE 2

IN501 INTERIORS DETAILS

IN601 ROOM FINISH SCHEDULE

IN602 ROOM FINISH SCHEDULE - BID ALTERNATES

IN603 SIGNAGE SCHEDULE

EQUIPMENT

QH100.2C BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA C

QH100.2D BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D

QH100.4A BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA A

QH100.4B BASEMENT FLOOR - EQUIPMENT PLAN - PHASE 4 AREA B

QH101.2D FIRST FLOOR - EQUIPMENT PLAN - PHASE 2 AREA D

QH601 EQUIPMENT JSN SCHEDULES

FIRE PROTECTION

FA000 FIRE ALARM NOTES AND DETAILS

FA101 BASEMENT - FIRE ALARM PLAN

FA102 FIRST FLOOR - FIRE ALARM PLAN

FX000 FIRE SUPPRESSION NOTES AND DETAILS

FX101 BASEMENT - FIRE SUPPRESSION PLAN

FX102 FIRST FLOOR - FIRE SUPPRESSION PLAN

PLUMBING

P000 PLUMBING COVERSHEET

PD1PB.2 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 2

PD1PB.4 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 4

PD100.4 BASEMENT DEMOLITION - PLUMBING - PHASE 4

P1PB.0 PIPE BASEMENT - PLUMBING - ALL PHASES

P1PB.2 PIPE BASEMENT - PLUMBING - PHASE 2

P1PB.3 PIPE BASEMENT - PLUMBING - PHASE 3

P1PB.4 PIPE BASEMENT - PLUMBING - PHASE 4

P1PB.44 PIPE BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4

P100.0 BASEMENT - PLUMBING - ALL PHASES

P100.2 BASEMENT - PLUMBING - PHASE 2

P100.3 BASEMENT - PLUMBING - PHASE 3

P100.4 BASEMENT - PLUMBING - PHASE 4

P100.44 BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4

P101.0 FIRST FLOOR - PLUMBING - ALL PHASES

P101.2 FIRST FLOOR - PLUMBING - PHASE 2

P102.0 SECOND FLOOR - PLUMBING - ALL PHASES

P102.2 SECOND FLOOR - PLUMBING - PHASE 2

P200 PLUMBING ENLARGED PLAN

P300 D.I. WATER FLOW DIAGRAM

P301 PLUMBING SANITARY-VENT RISER DIAGRAM - PHASE 2

P302 PLUMBING DOMESTIC WATER RISER DIAGRAM - PHASE 2

P303 PLUMBING RISER DIAGRAM - PHASE 4

P304 DI WATER RISER DIAGRAM - PHASE 2

P400 PLUMBING DETAILS

P401 PLUMBING DETAILS

P500 PLUMBING SCHEDULES

MECHANICAL

M000 MECHANICAL COVERSHEET

MD2PB.2 PIPE BASEMENT DEMOLITION - PIPING - PHASE 2

MD100.1 BASEMENT DEMOLITION - VENTILATION - PHASE 1

MD100.2 BASEMENT DEMOLITION - VENTILATION - PHASE 2

MD100.3 BASEMENT DEMOLITION - VENTILATION - PHASE 3

MD100.4 BASEMENT DEMOLITION - VENTILATION - PHASE 4

MD101.2 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 2

MD101.4 FIRST FLOOR DEMOLITION - VENTILATION - PHASE 4

MD102.4 SECOND FLOOR DEMOLITION – VENTILATION – PHASE 4

MD103.4 THIRD FLOOR DEMOLITION – VENTILATION – PHASE 4

MD104.4 FOURTH FLOOR DEMOLITION – VENTILATION – PHASE 4

MD200.4 BASEMENT DEMOLITION - PIPING - PHASE 4

M1PB.2 PIPE BASEMENT - VENTILATION - PHASE 2

M2PB.2 PIPE BASEMENT - PIPING - PHASE 2

M100.0 BASEMENT - VENTILATION - ALL PHASES

M100.1 BASEMENT - VENTILATION - PHASE 1

M100.2 BASEMENT - VENTILATION - PHASE 2

M100.3 BASEMENT - VENTILATION - PHASE 3

M100.4 BASEMENT - VENTILATION - PHASE 4

M100.41 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 1

M100.42 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 2

M100.43 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 3

M100.44 BASEMENT – VENTILATION – PHASE 4 - BID ALTERNATE 4

M101.0 FIRST FLOOR - VENTILATION - ALL PHASES

M101.2 FIRST FLOOR - VENTILATION - PHASE 2

M101.4 FIRST FLOOR - VENTILATION - PHASE 4

M102.0 SECOND FLOOR - VENTILATION - ALL PHASES

M102.2 SECOND FLOOR - VENTILATION - PHASE 2

M200.0 BASEMENT - PIPING - ALL PHASES

M200.2 BASEMENT - PIPING - PHASE 2

M200.4 BASEMENT - PIPING - PHASE 4

M200.44 BASEMENT – PIPING – PHASE 4 – BID ALTERNATE 4

M201.0 FIRST FLOOR - PIPING - ALL PHASES

M201.2 FIRST FLOOR - PIPING - PHASE 2

INDEX OF DRAWINGS

SHEET

NO. SHEET NAME

M300 MECHANICAL DETAILS

M301 MECHANICAL DETAILS

M302 MECHANICAL DETAILS

M303 MECHANICAL DETAILS

M304 AHU COMPONENT PLAN

M305 AIRFLOW MAP

M306 AIRFLOW MAP

M307 STEAM FLOW DIAGRAM

M400 MECHANICAL DIAGRAMS

M401 MECHANICAL DIAGRAMS

M402 MECHANICAL DIAGRAMS

M403 MECHANICAL DIAGRAMS

M600 MECHANICAL SCHEDULES

M601 MECHANICAL SCHEDULES

ELECTRICAL

E000 ELECTRICAL COVERSHEET

ED100.1 BASEMENT DEMOLITION - ELECTRICAL- PHASE 1

ED100.2 BASEMENT DEMOLITION - ELECTRICAL - PHASE 2

ED100.3 BASEMENT DEMOLITION - ELECTRICAL - PHASE 3

ED100.4 BASEMENT DEMOLITION - ELECTRICAL - PHASE 4

E1PB.2 SUB BASEMENT - ELECTRICAL - PHASE 2

E100.0 BASEMENT - POWER - ALL PHASES

E100.1 BASEMENT - POWER - PHASE 1

E100.2 BASEMENT - POWER - PHASE 2

E100.3 BASEMENT - POWER - PHASE 3

E100.4 BASEMENT - POWER - PHASE 4

E100.41 BASEMENT - POWER - PHASE 4 - ALTERNATE 1

E100.42 BASEMENT - POWER - PHASE 4 - ALTERNATE 2

E100.43 BASEMENT - POWER - PHASE 4 - ALTERNATE 3

E100.44 BASEMENT - POWER - PHASE 4 - ALTERNATE 4

E101.0 BASEMENT - LIGHTING - ALL PHASES

E101.1 BASEMENT - LIGHTING - PHASE 1

E101.2 BASEMENT - LIGHTING - PHASE 2

E101.3 BASEMENT - LIGHTING - PHASE 3

E101.4 BASEMENT - LIGHTING - PHASE 4

E101.41 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 1

E101.42 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 2

E101.43 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 3

E101.44 BASEMENT - LIGHTING - PHASE 4 - ALTERNATE 4

E200 FIRST FLOOR - POWER - PHASE 2

E201 FIRST FLOOR - LIGHTING - PHASE 2

E301 FIRST FLOOR OVERALL AND ENLARGED ELECTRICAL PLANS

E400 ELECTRICAL DIAGRAMS

E601 ELECTRICAL DETAILS

E602 ELECTRICAL DETAILS

E603 ELECTRICAL DETAILS

E701 ELECTRICAL PANEL SCHEDULES

TECHNOLOGY

T001 TECHNOLOGY COVERSHEET

TD100.1 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 1

TD100.2 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 2

TD100.3 BASEMENT DEMOLITION - TECHNOLOGY- PHASE 3

TD100.4 BASEMENT DEMOLITION - TECHNOLOGY - PHASE 4

T002 OVERALL PLANS - TECHNOLOGY

T003 OVERALL PLANS - TECHNOLOGY

T100.1 BASEMENT - TECHNOLOGY - PHASE 1

T100.2 BASEMENT - TECHNOLOGY - PHASE 2

T100.3 BASEMENT - TECHNOLOGY - PHASE 3

T100.4 BASEMENT - TECHNOLOGY - PHASE 4

T100.41 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 1

T100.42 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 2

T100.43 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 3

T100.44 BASEMENT - TECHNOLOGY - PHASE 4 - ALTERNATE 4

T200 TECHNOLOGY ROOM ENLARGEMENTS

T300 TECHNOLOGY DETAILS

T301 TECHNOLOGY DETAILS

T600 TECHNOLOGY SCHEDULES

Mark Revisions: Date:

VOL. 1

VOL. 2

VOL. 3

VOL. 4

VOL. 4

VOL. 5

VOL. 6

VOL. 6

VOL. 7

VOL. 8

PLUMBING ABBREVIATION KEY

CO CLEANOUT

CLINICAL SINKCS

EMERGENCY EYEWASHEE

FLOOR CLEANOUTFCO

FLOOR DRAINFD

FLOOR SINKFS

HOSE BIBBHB

I.E. INVERT ELEVATION (FOR REFERENCE ONLY)

LAVATORYLAV

MOP BASINMB

MH MANHOLE

MIXING VALVEMV

NEUTRALIZATION TANKNT

ROOF DRAINRD

SINKSK

SERVICE SINKSS

TRAP PRIMERTP

URINALUR

WATER CLOSETWC

WALL CLEANOUTWCO

WATER HEATERWH

YARD CLEANOUTYCO

EMERGENCY SHOWERES

EMERGENCY SHOWER/EYEWASHESE

ELECTRIC WATER COOLEREWC

VENT THROUGH ROOFVTR

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

BFP BACKFLOW PREVENTER

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS OTHERWISE NOTESUON

EXISTINGE

FLOW METERFM

WATER METERWM

CAST IRONCI

DUCTILE IRONDI

NOT IN CONTRACTNIC

NORMALLY CLOSEDN.C.

NORMALLY OPENN.O.

UTILITY BOXUB

SHORT CIRCUIT CURRENT RATINGSCCR

PLUMBING SYMBOL LIST

SYMBOL: DESCRIPTION:

PIPE SERVING FIXTURE ON FLOOR ABOVE

(EXAMPLE: FD = FLOOR DRAIN)FD

PITCH PIPE IN DIRECTION

RD-1

6"(1000)

ROOF DRAIN PROPERTIES SYMBOL

SIZE (ROOF SQ. FT.)

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

GPM

CHECK VALVE

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

METERM

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

ACID VENTAV

ACID WASTEAW

COLD WATER - POTABLECW

DT DRAIN TILE

HOT WATER - POTABLEHW

HOT WATER CIRCULATING - POTABLEHWC

PUMPED DISCHARGEPD

SANITARY DRAINAGESAN

STORM DRAINAGE (ROOF SQUARE FOOTAGE)ST(1,000)

STS STORM DRAINAGE (SECONDARY)

VENTV

COMPRESSED AIRCA

DEIONIZED WATERDI

REVERSE OSMOSIS WATERRO

TW TEMPERED WATER

DRAIND

NOT ALL SYMBOLS MAY APPLY.

PRESSURE REDUCING VALVE (LIQUID/GAS)

SOLENOID VALVE

SAFETY/RELIEF VALVE

VACUUM BREAKER

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

PUMP

OXYGENO

PIPE CONTINUATION

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

ROUTE TO DRAIN

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE

AND HOSE CONNECTION WITH CAP

FLEXIBLE CONNECTION

MANUAL AIR VENT

DRAIN VALVE WITH HOSE CONNECTION AND CAP

DRAIN - MEDICAL GASDMG

BACKFLOW PREVENTER

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO

THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN

THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE

BASIS OF DESIGN.

3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL

APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.

4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874

5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY

ALL ELEVATIONS BEFORE BEGINNING WORK.

6. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO

BEGINNING ANY WORK.

7. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO

PLUMBING FIXTURES.

8. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN

DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT

BE CONSIDERED SHUTOFF VALVES.

9. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL

SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR

ADDITIONAL DEMOLITION INFORMATION.

10. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK

UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL

INFORMATION.

11. COORDINATE SHUTDOWNS OF EXISTING COLD WATER MAINS WITH OWNER FOR NEW

CONNECTION SERVING SPS EXPANSION.

PLUMBING GENERAL NOTES:

1. THE SYMBOLS ARE FOR THE CONVENIENCE OF THE CONTRACTOR. CONTRACTOR SHALL

VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR FULLY OPERATIONAL

SYSTEMS, WHETHER SPECIFIED OR NOT.

2. COORDINATE SHUTDOWNS OF EXISTING OXYGEN MAINS WITH OWNER FOR REVISED SCOPE

OF WORK SHOWN ON DRAWINGS.

MEDICAL GAS GENERAL NOTES:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL

EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT

LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,

TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.

16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH

OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE

EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO

THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED

ELECTRICAL SPACE INCLUDING; DUCTWORK, PIPING, ETC.

17. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

18. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND

SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING] [EACH

CONTRACTOR SHALL CUT AND PATCH ROOFS, WALLS, AND FLOORS ASSOCIATED WITH

THEIR WORK.

6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

MECHANICAL PHASING NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO

GENERAL CONTRACTOR'S/ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND PHASING

SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY

DRAWINGS DEPICT THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND

TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE

REQUIREMENTS OF THE PHASING CRITERIA.

2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.

WITH AFFECTED ADJACENT AREAS.

3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE

ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF

PROJECT.

4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP

ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT

5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

SECURITY CONTRACTORS.C.

HEATING CONTRACTORH.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONSTRUCTION MANAGERC.M.

PLUMBING SLOPE REQUIREMENTS:

INTERIOR:

SANITARY WASTE: ≤2-1/2”ø=1/4” PER FOOT ≥3”ø = 1/8” PER FOOT ≥8”ø = 1/16” PER FOOT

STORM (GRAVITY): 1/8” PER FOOT

CONDENSATE AND INDIRECT DRAINAGE: 1/8” PER FOOT

SANITARY AND GREASE VENT: NO SPECIFIC PITCH, PITCH TO FIXTURES

DOMESTIC WATER: NO SPECIFIC PITCH, PITCH TO FIXTURES

BASED ON PLUMBING CODE: IPC-2018

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le

P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /M

E P

T

.0

J L V

A -N o rt h C h ic a g o

IL

-S

P S

E x p a n s io n C

.r v t

/2

/2

:0

:0

A

M

P000

PLUMBING COVERSHEET

SWM NVP

133CA

PLUMBING SHEET INDEX

P000 PLUMBING COVERSHEET

PD1PB.2 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 2

PD1PB.4 PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 4

PD100.4 BASEMENT DEMOLITION - PLUMBING - PHASE 4

P1PB.0 PIPE BASEMENT - PLUMBING - ALL PHASES

P1PB.2 PIPE BASEMENT - PLUMBING - PHASE 2

P1PB.3 PIPE BASEMENT - PLUMBING - PHASE 3

P1PB.4 PIPE BASEMENT - PLUMBING - PHASE 4

P1PB.44 PIPE BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4

P100.0 BASEMENT - PLUMBING - ALL PHASES

P100.2 BASEMENT - PLUMBING - PHASE 2

P100.3 BASEMENT - PLUMBING - PHASE 3

P100.4 BASEMENT - PLUMBING - PHASE 4

P100.44 BASEMENT – PLUMBING – PHASE 4 – BID ALTERNATE 4

P101.0 FIRST FLOOR - PLUMBING - ALL PHASES

P101.2 FIRST FLOOR - PLUMBING - PHASE 2

P102.0 SECOND FLOOR - PLUMBING - ALL PHASES

P102.2 SECOND FLOOR - PLUMBING - PHASE 2

P200 PLUMBING ENLARGED PLAN

P300 D.I. WATER FLOW DIAGRAM

P301 PLUMBING SANITARY-VENT RISER DIAGRAM - PHASE 2

P302 PLUMBING DOMESTIC WATER RISER DIAGRAM - PHASE 2

P303 PLUMBING RISER DIAGRAM - PHASE 4

P304 DI WATER RISER DIAGRAM - PHASE 2

P400 PLUMBING DETAILS

P401 PLUMBING DETAILS

P500 PLUMBING SCHEDULES

GRAND TOTAL: 27

NOTES:

1. SANITARY RISER UP IN WALL TO FIXTURE SHALL BE A MINUMUM OF 2".

2. 1/2" CW AND HW APPLIES ONLY TO THE FINAL VERTICAL RISE-DROP TO EACH FIXTURE, BRANCH PIPING TO VERTICAL RISE-DROP SHALL BE A MINIMUM OF 3/4" UNLESS NOTED OTHERWISE.SIZES

SHOWN ARE MINIMUMS.

3. SIZES SHOWN ON THE DRAWING THAT ARE LARGER THAN THE SIZES LISTED IN THE SCHEDULE

SHALL DICTATE THE ROUGH-IN SIZE.

PLUMBING FIXTURE ROUGH-IN SCHEDULE

FIXTURE DESCRIPTION

DOMESTIC

C.W. (NOTE 3)

DOMESTIC

H.W. (NOTE 3)

SANITARY

(NOTE 3)

VENT

(NOTE 3)

REMARKS

EMERGENCY EYE/FACE

WASH

3/4" 3/4" 1 1/4" 1 1/4"

FLOOR DRAIN/FLOOR SINK - - 2" 1 1/2" -

FLOOR DRAIN/FLOOR SINK - - 3" 1 1/2" -

FLOOR DRAIN/FLOOR SINK - - 4" 2" -

HOSE BIB 3/4" - - - -

LAVATORY 1/2" 1/2" 1 1/2" 1 1/2" NOTE 1 & 2

MOP BASIN 3/4" 3/4" 2" 1 1/2"

SHOWER 1/2" 1/2" 3" 1 1/2" NOTE 2

SINK 1/2" 1/2" 1 1/2" 1 1/2" NOTE 1 & 2

WATER CLOSET 1" - 4" 2"

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

K

H

G

T

7.1

Q.1

Q.6

R

S

TT

Tt

S.

6 5

R.8

T.1

G.8

K.1

K.3

K.6

4 3 2 1

J

L L.1

7.8

.18 11.12.14.16.

.25

.T

PIPE BASEMENT

PC100

Not Enclosed

PIPE BASEMENT

PD100

6216 SF

1"O UP

CO

"O

1"O

1"O

1"O UP

5"SAN 5"SAN

1 1/2" SAN

5"SAN4"SAN4"SAN

4"SAN

3"ST UP 4"SAN

4"SAN UP

4"SAN

4"SAN UP

4"SAN8"ST

3"SAN UP 3"SAN UP

2"V UP

CO

3"SAN

MB

SH

4"SAN UP

2"V UP

8"ST

2"V UP

4"SAN UP

4"SAN

CO

4"SAN UP

1 1/2"SAN UP

3"SAN UP

FCO

FCO

FD

FCO

SK

SK

WC

MB

2"V UP

2"V UP

(TYP.3)

FD FCO

1"O UP

2"V UP

FD

FD

FCO

FCO

4"SAN

FD

FD

FD

FD

S A

N

FD

MB

3"SAN UP

3"SAN

2"V UP

(TYP.3)

4" SAN

FCO

4"SAN UP

2"V UP

2"SAN UP

FD FD

FD

FD

FD

2"SAN UP

FD

FD

FCO

FCO

2"V UP

4"SAN

4"SAN

4"SAN

2"SAN UP

4"SAN

4" S A N

4"SAN

4"SAN

FD

CO

4"SAN

4"SAN

4" S A N

4" SAN

2"SAN UP4"SAN

4" SAN

4"

S A N

LAV

4"SAN

4"SAN

CO

4"ST UP

4" V

4" S T

6" S T2"

V

4"SAN UP

4"V UP

4"ST UP

4"V DN

4" S A N

2"V UP

2"V UP

4"SAN

4" 4"

4"SAN

FD FD

FD

2"V UP

"S

A N

DISCONNECT EXISTING SAN CONNECTING TO

CIVIL MAINS AND CAP AT CIVIL MAINS.

PREPARE EXISTING PIPE FOR NEW

CONNECTION. COORDINATE SHUTDOWNS OF

EXISTING UTILITY WITH OWNER TO MINIMIZE

DISRUPTIONS. CONTRACTOR TO FIELD

VERIFY LOCATION OF EXISTING SAN PIPE.

5" SAN

REVISED MANHOLE. REFER TO

CIVIL DRAWINGS FOR DETAILS.

8" S A N

3"CW UP

1 1/2"HW UP

3/4"HWC UP

3"CW

3/4"HWC

1 1/2"HW

3/4"HWC

1 1/2"HW

3"CW

6"SAN DN

TO SITE BULK

OXYGEN TANK.

EMERGENCY

OXYGEN

CONNECTION

EXISTING

FLOWMETER

EXISTING PRV

1"O

6"CW

CUT EXISTING CW MAIN IN MECHANICAL

ROOM AND PREPARE FOR NEW

CONNECTION. COORDINATE SHUTDOWNS

OF EXISTING SYSTEM WITH OWNER TO

MINIMIZE DISRUPTIONS.

EXISTING DOMESTIC

WATER BOOSTER PUMPS

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le

P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /M

E P

T

.0

J L V

A -N o rt h C h ic a g o

IL

-S

P S

E x p a n s io n C

.r v t

/2

/2

:0

:3

A

M

PD1PB.2

PIPE BASEMENT DEMOLITION -

PLUMBING - PHASE 2

SWM NVP

133CA

N O R

HT

1/8" = 1'-0"

PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 2

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

G

T

7.1

Q.1

Q.6

R

S

TT

Tt

S.

6 5

R.8

T.1

G.8

K.1

K.3

K.6

4 3 2 1

J

L L.1

7.8

.18 11.12.14.16.

.25

.T

PIPE BASEMENT

PC100

Not Enclosed

PIPE BASEMENT

PD100

6216 SF

1"O UP

CO

"O

1"O

1"O

1"O UP

5"SAN 5"SAN

1 1/2" SAN

5"SAN4"SAN4"SAN

4"SAN

4"3"ST UP 4"SAN

4"SAN UP

4"SAN

4"SAN UP

4"SAN8"ST

3"SAN UP 3"SAN UP

2"V UP

CO

3"SAN

MB

SH

4"SAN UP

2"V UP

8"ST

2"V UP

4"SAN UP

4"SAN

CO

4"SAN UP

1 1/2"SAN

UP

3"SAN UP

FCO

FCO

FD

FCO

SK

SK

4"SAN UP

MB

2"V UP

2"V UP

(TYP.3)

FD FCO

1"O UP

2"V UP

FD

FD

FCO

FCO

4"SAN

FD

FD

FD

FD

S A

N

FD

MB

3"SAN UP

2"V UP

(TYP.2)

4" SAN

FCO

4"SAN UP

2"V UP

2"SAN UP

FD FD

FD

FD

FD

2"SAN UP

FD

FD

FCO

FCO

2"V UP

4"SAN

4"SAN

4"SAN

2"SAN UP

4"SAN

4" S A N

4"SAN

4"SAN

FD

CO

4"SAN

4"SAN

4" S A N

4" SAN

2"SAN UP4"SAN

4" SAN

4"

S A N

LAV

4"SAN

4"SAN

CO

4"ST UP

4" V

4" S T

6" S T2"

V

4"SAN UP

4"V UP

4"ST UP

4"V DN

4" S A N

2"V UP

2"V UP

4"SAN

4" SAN 4" SAN

4"SAN

FD FD

FD

2"V UP

"S

A N

2"V UP

4"SAN

FD

2"V UP

1"O UP

8" S A N

6"ST UP

4"ST UP

6"ST UP

4"ST UP

FCO

FCO

FCO

YCO

FCO

FCO

FCO

FS

FD

FS

FS

FS

SK

MB

SK

EE

FS

FS

FS

FS

FS

FS

FS

SK

EE

FS

FS

FS

FS

FS

SK

EE

FS

FS

FS

FS

FS

FS

FS

FS

MANHOLE

YCO

SK FS

FS

FS

FCO

FCO

1 1/2"V UP 2"V UP

(TYP.4) FS

2"V UP

FCO

FCO

2"V UP

2"V UP

FD

SKFCO

2"V UP

2"V UP

2"V UP

2"V UP

2"V UP

2"V UP

2"V UP

FCO

2"V UP

(TYP.4)

FCO

FCO

2"V UP

(TYP.5)

2"V UP

4"SAN

4"DT

"D

T

4"SAN

4" D

T

3"SAN

4"SAN

4"SAN

4"SAN

"P

D

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

8"SAN

4"SAN

4"SAN

4"SAN

4"SAN

"S

A N

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"ST (750)

6"ST (3,450)

8"ST (6,540)

"S

T

,3

4"ST (560)

6"ST (3,450)

YCO

3"CW UP

1 1/2"HW UP

3/4"HWC UP

3"CW

3/4"HWC

1 1/2"HW

3/4"HWC

1 1/2"HW

3"CW

6"SAN

3"SAN

TP-1

CO

CO

SK EE

FCO

TO SITE BULK

OXYGEN TANK.

EMERGENCY

OXYGEN

CONNECTION

EXISTING

FLOWMETER

EXISTING PRV

1"O

FCO

6"CW

"C

W

3"CW

3"CW

3"CW UP

EXISTING DOMESTIC

WATER BOOSTER PUMPS

FS

2"V UP

CUT PIPES AS SHOWN

AND PREPARE FOR

NEW CONNECTIONS.

SP-1

FCO

FCO

6"SAN

"S

A N

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le

P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /M

E P

T

.0

J L V

A -N o rt h C h ic a g o

IL

-S

P S

E x p a n s io n C

.r v t

/2

/2

:0

:4

A

M

PD1PB.4

PIPE BASEMENT DEMOLITION -

PLUMBING - PHASE 4

SWM NVP

133CA

N O R

HT

1/8" = 1'-0"

PIPE BASEMENT DEMOLITION - PLUMBING - PHASE 4

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

SHEET NOTES:

1. CUT EXISTING SLAB AS REQUIRED TO REMOVE

PLUMBING PIPING. PATCH SLAB TO MATCH

EXISTING. REFER TO ARCHITECT AND

STRUCTURE DRAWINGS FOR DETAILS.

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

G

T

7.1

Q.1

Q.6

R

S

TT

Tt

S.

6 5

R.8

T.1

G.8

K.1

K.3

K.6

4 3 1

J

L L.1

7.8

.18 11.12.14.16.

.25

.T

FCO-E

4"SAN DN

1"O DN

MB

1 1/2"V

UP

1 1/2"V

FD-E

FD-E

FD-E

1 1/2"SAN CO

CO

CO

/2

"M A

/2 "M

V

/4

"H W

/4

"H W

C

/4

"C W

"O

"N

4"SAN UP

2 1/2"CW UP

1"HW UP

1"HW UP

4"SAN

EXISTING WATER

HEATER

2"V DN

4"V UP

EXISTING

MEDICAL VACUUM

PUMP

EXISTING FIRE

PUMP

EXISTING BFP

1 1/2"SAN UP

1 1/2"SAN

1"N UP

1 1/2"MV UP

1/2"MA UP

1/2"O UP

1"O

3/4"HW

3/4"CW

/4

"C W

/4

"H W

1"O DN

"O

FD

2"AV UP

2"AV UP

FD

CO

3/4"CW UP

3/4"HW UP

4"AW

3"SAN

3/4"CW,

3/4"HW &

1 1/2"AW UP

/4

"H W

C

3/4" HWC

3/4"CW UP

3/4"HW UP

2"V UP

3/4" HW

3/4" CW

1"O DN

1"O UP

2"V DN

1 1/2"MV

1/2"MA

3/4"HWC

3/4"HW

3/4"CW

1"O

CO

FD

3/4"CW UP

3/4"HW UP

2AV UP

3/4"CW UP

3/4"HW UP

1 1/2"SAN UP

3/4" CW

3/4" HW

3/4"HW

3/4"CW

SH

WC

LAV

MB 2" V

4"AW

MB

2"V DN

3/4" CW

3/4" HW

3/4"HW

3/4"CW

3"SAN UP

& DN

4"AW DN

2"V

"V

"V

3"ST UP & DN

2"AV UP

4"SAN UP

CW & HW

UP

CW

HW

C W

H W

3/4"HW

3/4"CW

FD

FD

"S

A N

3/4"HW

C

1 1/2"HW

2 1/2"CW

2"V DN

2"V UP

2"V DN

FCO-E

4"V UP

FCO-E

FCO-E

FCO-E

3"SAN

FD

3/4"CW UP

2"V UP

FCO-E

2 1/2"V

4"SAN

4"SAN

1 1/2"HW

2 1/2"CW

4"SAN DN

2"V DN

3/4"HW

1 1/2"CW

CO

3"SAN 1 1/2"CW UP

3/4"HW UP

3"SAN UP

CO

1 1/2"HW

2 1/2"CW

1 1/4"HW

2"CW

2 1/2"CW

1 1/2"HW

LAV

WC

2"V DN

1 1/2"CW CW

4"SAN DN

4"SAN

C W

V

BFP

BFP

BFP

2" V

BFP

3"DI DN

1 1/2"CW

3/4" HWC

1"HW

2 1/2"CW

1"HWC

4"ST UP

& DN

4" S A N

4"ST UP

4"ST DN

4"SAN UP

4"V UP

4" V

4" S A N 4" S T

L-E

WC-E

3/4"HW DN

1 1/2"CW DN

4"SAN DN

4"V DN

3"V

FD-E

2"V DN

FD-E

FD-E

1"HW

2"V DN

1"HWC

2 1/2"CW

1 1/2"HW

3"V

1 1/2"HW

FD-E

FCO-E

FD-E

2" V

2 1/2"CW

1 1/4"HW

3/ 4"

C W

FCO-E

2" V

2" V 2" V

V

2" V

2" V

3/4" CW

3/4" HW

1 1/2" CW

1"CW UP

1 1/2" CW

3/4" HW

3/4" CW

3"SAN DN

3/4"HW

3/4"CW

3/4" CW

1"DI UP

1/2"MA DN

1/2"IA DN

1/2" DI DN

3/4"HW DN

3/4"CW DN

1/2"MA

1/2"IA

3"DI

1 1/2"DI

3/4"HW UP

3"SAN UP

3/4"CW UP

2"SAN UP

4"SAN

4" S A N

1/2"MA

3"DI

3"HW

1"HWC

4"CW

1 1/2"DI

1/2"IA

4"CW

3"HW

FCO-E

FD-E

FD-E

FD-E

3/4"HWC

4"CW

3"HW

2" V

3/4" HW

3/4"CW CW

2" V

2"CW CW

1" HW

2 1/2"CW

1 1/2"HW

2"CW

1"HW

2"AV DN

2"V DN

SK

1 1/2" CW

3/4" HW FCO-E

FD

2"V UP

2"V UP

"S

A N

CO

SK

"V

"V

MB

2"V DN

4"SAN

"S

T S

(5

"S

T S

CO

4"STS (695)

4"ST (695)

CO

CO

4"ST (950)

6"STS UP

RD RD

4"ST DN

4"ST (750)

CO

6"STS (4,200)

6"STS (3,450)

SK-2

MB-1

RDO-1

RDO-1

RDO-1

HB-1

FS-1

FS-1

FS-1

FS-1

FD

FD

FD

FD

FD

FD

FD

FD

3"CW UP

3"MA INTAKE

UP

4"MV EXHAUST

VENT UP

FD

SK

2"V DN

3"CW UP & DN

1 1/2"HW UP & DN

3/4"HWC UP & DN

FCO-1

FCO-1

FS-1

FS-1

FS-1

FS-1

FCO-1

FCO-1

FCO-1

FCO-1

FCO-1

EE-1

EE-1

FCO-1

FCO-1

FS-1

FS-1

FS-1

FCO-1

FCO-1

FS-1

FS-1

FCO-1

YCO-1

YCO-1

YCO-1

FCO-1

FD-2

FS-1

FS-1

FS-1

SK-2

RD

RD

RD

RD

6"ST UP & DN

4"STS (1,510)

RD

RD

RD

SK-2

FS-1

(TYP.5)

FS-1

(TYP.4)

SK-2

FS-1

(TYP.4)

EE-1

SK-2

FS

4"SAN DN

EE-2

4"ST DN

2"V DN

(TYP.4)

2"V DN

2"V DN

2"V DN

2"V DN

2"V DN

2"V DN

2"V DN

2"V DN

2"V DN

2"V DN

2" V DN

2" V DN

(TYP.4)

4" V UP

2" V DN

4" VTR

2" V DN

2" V DN

2" V DN

2"V DN

2"V UP

4"SAN

DN

2"V UP

3/4"CW DN

2"V DN

SK-2

EE-1FCO-1

FS

3"CW UP

FCO-1

3"CW DN

REMOVE CAPS AND

PREPARE FOR NEW

CONNECTIONS.

FCO-1

FCO-1

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le

P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /M

E P

T

.0

J L V

A -N o rt h C h ic a g o

IL

-S

P S

E x p a n s io n C

.r v t

/2

/2

:0

:0

A

M

PD100.4

BASEMENT DEMOLITION - PLUMBING -

PHASE 4

SWM NVP

133CA

N O R

HT

1/8" = 1'-0"

BASEMENT DEMOLITION - PLUMBING - PHASE 4

KEYNOTES:

1. REMOVE EXISTING OXYGEN SHUTOFF VALVE

AND PANEL. RECONNECT EXISTING OXYGEN

PIPING AS REQUIRED. COORDINATE WITH

OWNER TO RECERTIFY OXYGEN SERVICE.

COORDINATE SHUTDOWNS OF EXISTING

SYSTEMS WITH OWNER TO MINIMIZE

DISRUPTIONS.

2. REMOVE EXISTING INSTRUMENT AIR AND

VACUUM OUTLETS. REMOVE ASSOCIATED

PIPING BACK TO ACTIVE MAIN AND CAP.

3. REMOVE EXISTING DI WATER PIPING SERVING

EQUIPMENT BEING REMOVED BACK TO ACTIVE

MAIN AND REWORK DI WATER MAINS.

MAINTAIN RECIRCULATING DI WATER LOOP

AND DO NOT LEAVE ANY DEADLEGS.

4. REMOVE EXISTING NEUTRALIZATION TANK AND

ASSOCIATED PIPING. CONNECT EXISTING ACID

WASTE PIPING TO NEAREST SANITARY MAINS

IN PIPE BASEMENT.

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

G

T

7.1

Q.1

Q.6

R

S

TT

Tt

S.

6 5

R.8

T.1

G.8

K.1

K.3

K.6

4 3 2 1

J

L L.1

7.8

.18 11.12.14.16.

.25

.T

PIPE BASEMENT

PC100

Not Enclosed

PIPE BASEMENT

PD100

6216 SF

6"ST UP

4"ST UP

6"ST UP

4"ST UP

FCO

FCO

FCO

YCO

FCO

FCO

FCO

FS

FD

FS

FS

FCO

YCO

FS

MB

SK

EE

FS

FS

FS

FS

FS

FS

FS

SK

EE

FS

FS

FS

FS

FS

SK

EE

FS

FS

FS

FS

FS

FS

FS

FS

YCO

FS

FS

FS

FCO

FCO

FS

FCO

FCO

FD

SKFCO

FCO

FCO

FCO

2"V UP

(TYP.5)

1 1/2"V UP 2"V UP

(TYP.4)

2"V UP

2"V UP

2"V UP

2"V UP

2"V UP

2"V UP

2"V UP

2"V UP

2"V UP

2"V UP

2"V UP

(TYP.4)

2"V UP

4"SAN

4"DT

"D

T

4"DT

4"SAN

4" D

T

3"SAN

4"SAN

4"SAN

4"SAN

"P

D

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

"S

A N

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"ST (750)

6"ST (3,450) 8"ST (7,100)

8"ST (6,540)

"S

T

,3

4"ST (560)

6"ST (3,450)

FCO

EE

"O

5"SAN5"SAN4"SAN4"SAN

4"SAN

3"ST UP 4"SAN

4"SAN UP

4"SAN

4"SAN8"ST

3"SAN UP

CO

3"SAN

8"ST

4"SAN

CO

FCO

FCO

FCO

FD

1"O UP

FD

FD

FCO

FCO

4"SAN

3"SAN UP

FCO

4"SAN UP

2"V UP

4"SAN UP

FD FD

FD

FD

FD

2"SAN UP

FD

FD

FCO

FCO

2"V UP

4"SAN

4"SAN

4"SAN

2"SAN UP

4"SAN

4" S A N

4"SAN

4"SAN

FD

CO

4"SAN

4"SAN

4" S A N

4"SAN

4" S A N

4"SAN

4"SAN

CO

4"ST UP

4" V

4" S T

6" S T2"

V

4"SAN UP

4"V UP

4"ST UP

4"V DN

4" S A N

2"V UP

2"V UP

4"SAN

4"SAN

4"SAN UP

FD FD

FD

2"V UP

"S

A N

CO

CO

4"SAN UP

4"SAN

LAV WC

FD

SH

WC

SH

FD LAV

1 1/2"V UP

WCLAV

WC

LAV

FD

SH

SH

WC

LAV

FD

SK

SK

1 1/2"V UP

1 1/2"V UP

4"SAN

FD

FCO

1 1/2"V UP

4"SAN

4"SAN

1 1/2"V UP

1 1/2"V UP

1 1/2"V UP

EE

MB

FCO

SK FCO

4"SAN

1 1/2"V UP

FCO

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

1"O

1"O

1"O UP

5"SAN

FCO

YCO

4"DT

FS

CO

6"SAN

CO

"S

A N

6"SAN

5"SAN

2"V UP

3"CW UP

1 1/2"HW UP

3/4"HWC UP

3"CW

3/4"HWC

1 1/2"HW

3/4"HWC

1 1/2"HW

3"CW

FCO

FCO

TP-1

1"O

TO SITE BULK

OXYGEN TANK.

EMERGENCY

OXYGEN

CONNECTION

EXISTING

FLOWMETER

EXISTING PRV

FS

2"V UP

SP-1

6"CW

CONNECT 3"CW TO EXISTING

CW MAINS IN MECHANICAL

ROOM.

EXISTING DOMESTIC

WATER BOOSTER PUMPS

"C

W

FCO

FCO

BY P.C. BY C.C

BY P.C. BY C.C.

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le

P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /M

E P

T

.0

J L V

A -N o rt h C h ic a g o

IL

-S

P S

E x p a n s io n C

.r v t

/2

/2

:0

:1

A

M

P1PB.0

PIPE BASEMENT - PLUMBING - ALL

PHASES

SWM NVP

133CA

N O R

HT

1/8" = 1'-0"

PIPE BASEMENT - PLUMBING - ALL PHASES

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

SHEET NOTES:

1. THIS DRAWING REPRESENTS OVERALL AREA

OF WORK. REFER TO INDIVIDUAL PHASE

SHEETS FOR DETAILED INFORMATION OF

SCOPE OF WORK.

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

G

T

7.1

Q.1

Q.6

R

S

TT

Tt

S.

6 5

R.8

T.1

G.8

K.1

K.3

K.6

4 3 2 1

J

L L.1

7.8

.18 11.12.14.16.

.25

.T

PIPE BASEMENT

PC100

Not Enclosed

PIPE BASEMENT

PD100

6216 SF

1"O UP

CO

"O

1"O

1"O

1"O

1"O UP

5"SAN 5"SAN

1 1/2" SAN

5"SAN4"SAN4"SAN

4"SAN

4"3"ST UP

4"SAN

4"SAN UP

4"SAN

4"SAN8"ST

3"SAN UP 3"SAN UP

2"V UP

CO

3"SAN

MB

SH

4"SAN UP

2"V UP

8"ST

2"V UP

4"SAN UP

4"SAN

CO

4"SAN UP

1 1/2"SAN UP

3"SAN UP

FCO

FCO

FD

FCO

SK

SK

WC

MB

2"V UP

2"V UP

(TYP.3)

FD

1"O UP

2"V UP

FD

FD

FCO

FCO

4"SAN

FD

FD

FD

FD

S A

N

3"SAN UP

3"SAN

2"V UP

(TYP.3)

4" SAN

FCO

4"SAN UP

2"V UP

2"SAN UP

FD FD

FD

FD

FD

2"SAN UP

FD

FD

FCO

FCO

2"V UP

4"SAN

4"SAN

4"SAN

2"SAN UP

4"SAN

4" S A N

4"SAN

4"SAN

FD

CO

4"SAN

4"SAN

4" S A N

4" SAN

4"SAN

4" SAN

4"

S A N

LAV

4"SAN

4"SAN

CO

4"ST UP

4" V

4" S T

6" S T2"

V

4"SAN UP

4"V UP

4"ST UP

4"V DN

4" S A N

2"V UP

2"V UP

4"SAN

4" SAN 4" SAN

4"SAN

4"SAN UP

FD FD

FD

2"V UP

"S

A N

6"ST UP

4"ST UP

4"ST (750)

6"ST UP

4"ST UP

6"ST (3,450)

8"ST (6,540)

"S

T

,3

BY P.C. BY C.C

4"ST (560)

6"ST (3,450)

BY P.C. BY C.C.

FCO

4"SAN

FCO

FCO

SP-1

YCO

4"DT

"D

T

4"DT

FCO

FCO

FCO

4"SAN

FS

FD

FS

FS

YCO

FS

MB

SK

EE

FS

FS

FS

FS

FS

FS

FS

SK

EE

FS

FS

FS

FS

FS

SK

EE

REFER TO 5/P400 FOR DRAIN

TILE DETAIL (TYP.)

REFER TO STRUCTURAL

DRAWINGS FOR COORDINATION

WITH FOUNDATION.

FS

FS

FS

FS

FS

FS

FS

FS

8" S A N

REVISED MANHOLE. REFER

TO CIVIL DRAWINGS FOR

DETAILS.

4" D

T

YCO

SK

FS

FS

FCO

FCO

3"SAN

1 1/2"V UP 2"V UP

(TYP.4)

4"SAN

4"SAN

FS

2"V UP

FCO

FCO

2"V UP

2"V UP

FD

SK

FCO

2"V UP

4"SAN

2"V UP

2"V UP

2"V UP

2"V UP

"P

D

2"V UP

REFER TO 5/P401 FOR

SUMP PUMP DETAILS.

4"SAN

2"V UP

FCO

4"SAN 2"V UP

(TYP.4)

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

8"SAN

FCO

FCO

2"V UP

(TYP.5)

4"SAN

4"SAN

4"SAN

2"V UP

4"

4"SAN

"S

A N

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN

4"SAN UP

4"SAN UP

3/4"CW UP

TP-1

2"V UP

FCO

FD

2"SAN UP

MB

FS

2"V UP

4"SAN

8"SAN

CO

6"SAN

CO

"S

A N

6"SAN

5"SAN

6"SAN

3"CW UP

1 1/2"HW UP

3/4"HWC UP

3"CW

3/4"HWC

1 1/2"HW

3/4"HWC

1 1/2"HW

3"CW

3"SAN

FCO

I.E.= 705.52'

I.E.= 705.83'

I.E.= 705.52'

I.E.= 704.97'

I.E.= 705.36'

I.E.= 705.83'

I.E.= 705.59'

I.E.= 705.83'

I.E.= 701.33'

I.E.= 705.39'

I.E.= 705.72'

I.E.= 705.71'

I.E.= 705.21'

I.E.= 701.71'

I.E.= 702.64'

I.E.= 702.31'

I.E.= 702.10'

I.E.= 701.87'

FINISH FLOORFINISH FLOOR

700.83'

TO SITE BULK

OXYGEN TANK.

EMERGENCY

OXYGEN

CONNECTION

"O

EXISTING

FLOWMETER

EXISTING PRV

6"CW

CONNECT 3"CW TO

EXISTING CW MAINS IN

MECHANICAL ROOM.

"C

W

3"CW

3"CW

3"CW UP

EXISTING DOMESTIC

WATER BOOSTER PUMPS

FS

2"V UP

FCO

FCO

6"ST (4,200)

8"ST (7,100)

PLAN

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

556-402

ISSUED 11/29/2022

EXPAND STERILE PROCESSING

SERVICE (SPS)

100% CONSTRUCTION

DOCUMENTSAlesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer Stevens & Schaap P.C.

1070 Howard St Omaha, Nebraska 68102 Phone: (402) 455-7698 incandescence life safety, inc.

3575 Ringsby Ct Unit 408, Denver, CO 80216 Phone: (720) 722-3010

IMEG Corp.

263 Shuman Boulevard, Suite 550 Naperville, IL 60563 Phone: (630) 527-2320

Calibre Engineering, Inc.

9090 S Ridgeline Blvd #105, Highlands Ranch, CO 80129 Phone: (303) 730-0434

Force Protect Security Cons.

10901 Front Beach Road, Suite 1415 Panama City Beach, FL 32407

KEY PLAN

Captain James A. Lovell Federal Healthcare Center 3001 Green Bay Road, North Chicago, IL 60064

REV 6/14/2024

A u to d e s k D o c s /2

-2

-4

V

A E x p a n d S te ri le

P ro c e s s in g S e rv ic e s

S P

S

D e s ig n /M

E P

T

.0

J L V

A -N o rt h C h ic a g o

IL

-S

P S

E x p a n s io n C

.r v t

/2

/2

:0

:2

A

M

P1PB.2

PIPE BASEMENT - PLUMBING - PHASE

SWM NVP

133CA

N O R

HT

1/8" = 1'-0"

PIPE BASEMENT - PLUMBING - PHASE 2

KEYNOTES:

1. ROUTE FLEXIBLE COPPER PIPES TO EACH

FLOOR DRAIN/ FLOOR SINK P-TRAP SERVING

FLOOR ABOVE.

263 SHUMAN BOULEVARD

SUITE 550

NAPERVILLE, IL 60563

P: 630.527.2320 www.imegcorp.com

Illinois Design Firm Registration #184.007637-0014

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS,

TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING

AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND

SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT

WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF

IMEG CORP. ©2022 IMEG CORP.

REF. SCALE IN INCHES

0 1 2 3

PROJECT #21006895.00

SHEET NOTES:

1. CONTRACTORS FINAL PIPE ROUTING SHALL

ALLOW FULL ACCESS IN THE PIPE BASEMENT.

PRIORITIZE ACCESS TO EQUIPMENT

REQUIRING MAINTENANCE. PIPING SHALL NOT

BLOCK PATHWAYS.

Mark Revisions: Date:

MATTHEW R.

MEARS

062.058761

EXP.

11/30/202506/14/2024

G

T

7.1

Q.1

Q.6

R

S

TT

Tt

S.

6 5

R.8

T.1

G.8

K.1

K.3

K.6

4 3 2 1

J

L L.1

7.8

.18 11.12.14.16.

.25

.T

PIPE BASEMENT

PC100

Not Enclosed

PIPE BASEMENT

PD100

6216 SF

1"O UP

CO

"O

1"O

1"O

1"O UP

5"SAN 5"SAN

1 1/2"

5"SAN4"SAN4"SAN

4"SAN

4"3"ST UP

4"SAN

4"SAN UP

4"SAN

4"SAN

8"S…