Attachment 7_5 C_D_Waste_Mgmt_Plan___Reporting_Template.xlsx

XLSX spreadsheet 350 KB Posted

Attached to
NARA Replace Roof on Bays F&G Federal contract opportunity
Solicitation number
47PL0124R0030
Issued by
General Services Administration Public Buildings Service Region 10

About this file

This document is an Excel template for a Waste Diversion Plan and Report for a federal construction project. The template includes sections for the contractor to estimate anticipated waste diversion and to report the actual waste diversion achieved during the project. The template tracks the diversion of various construction and demolition materials such as concrete, drywall, and metals. The contractor must report the final waste diversion metrics via the ePMXpress project tracking system at project completion. The template also includes a volume-to-weight conversion reference table and instructions for retaining waste diversion documentation.

The related federal contract opportunity is for the replacement of the roofing assembly on Bays F&G of an existing NARA facility. The contract has a period of performance of 290 calendar days, with 260 days for substantial completion and 30 days for final completion. A pre-proposal site visit is scheduled for June 28, 2024. The solicitation is being issued by the General Services Administration (GSA) Public Buildings Service, Region 10.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Waste Diversion Plan

: +christopher.clever@gsa.gov +walter.tersch@gsa.gov

(For consideration as an alternate). Anticipated sections match Actual to the right for 1:1 comparison.

-Jake Begnaud - WPIDBB Fine with either, will defer to +walter.tersch@gsa.gov Seems like it only boils down to estimating method or not.

-Christopher Clever - PCBL That's correct.

-Jake Begnaud - WPIDBBProject Waste Management PlanSubmittal Type:Waste Diversion Plan (Anticipated):FALSEWaste Diversion Report (Final) :FALSE
The general info in these gray cells replicates onto the Report tabs.
Project Name:ECC (estimated construction cost):Project Manager:ePM/ePMX Project # :
Project Short Description:PM email or phone:gBUILD Project # :
Building Number:Service Center / Field Office:Budget Activity:(list all applicable)RWA # :

Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)

Material*
(see weight conversion factors below)Diversion MethodTarget Diversion Rate for each material, by weight
(Change to actual target(s) as needed)Diverted (lbs)Landfilled (lbs)Total C&D material weight (Diverted + Landfilled) (lbs)Diversion

Rate

Reuse*Recycle or CompostDonation
AsphaltFALSEFALSEFALSE50%000n/a
Brick, Masonry, and TileFALSEFALSEFALSE50%000n/a
CardboardFALSEFALSEFALSE50%000n/a
Carpet, including PaddingFALSEFALSEFALSE50%000n/a
Ceiling tileFALSEFALSEFALSE50%000n/a
ConcreteFALSEFALSEFALSE50%000n/a
Drywall/ sheetrock (unpainted)FALSEFALSEFALSE50%000n/a
MetalsFALSEFALSEFALSE50%000n/a
Painted wood, drywall, or plywoodFALSEFALSEFALSE50%000n/a
Reusable itemsFALSEFALSEFALSE50%000n/a
RoofingFALSEFALSEFALSE50%000n/a
Soil, Rock, Land Clearing DebrisFALSEFALSEFALSE50%000n/a
Wood (unpainted)FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Total**:000n/a
Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse.
ItemReuse OnsiteReuse OffsiteOff-Site Recipient or Salvage/ Deconstruction Company
Volume-to-Weight Conversion Factor Reference Table
If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal.
Asphalt paving: 1 cubic yard = 773 lbsDirt or sand: 1 cubic yard = 929 lbs
Asphalt or composite roof shingles: 1 cubic yard = 731 lbsFiberglass insulation, loose: 1 cubic yard = 17 lbs
Brick, laid flat: 1 flat square foot = 20 lbsMixed (composite) C&D material: 1 cubic yard = 417 lbs
Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs)Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs
Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbsRock, crushed: 1 cubic yard = 2,570 lbs
Concrete: 1 cubic yard = 860 lbsWood: 1 cubic yard = 169 lbs
*Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 1

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 2

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 3

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 4

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 5

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 6

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 7

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 8

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 9

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 10

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 11

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 12

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

ESRI_MAPINFO_SHEET

DO NOT EDIT

For Esri use only

File details come from the government source that posted it. Updated .